JPS6140814B2 - - Google Patents
Info
- Publication number
- JPS6140814B2 JPS6140814B2 JP56133760A JP13376081A JPS6140814B2 JP S6140814 B2 JPS6140814 B2 JP S6140814B2 JP 56133760 A JP56133760 A JP 56133760A JP 13376081 A JP13376081 A JP 13376081A JP S6140814 B2 JPS6140814 B2 JP S6140814B2
- Authority
- JP
- Japan
- Prior art keywords
- soil
- excavation
- mixed
- mixed soil
- excavation shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Description
【発明の詳細な説明】
本発明は、地盤への杭の築造方法に関し、掘削
軸1の下端からセメントミルクのような土砂固結
剤2を噴出しながら地盤3を掘削すると共に掘削
土砂と土砂固結剤2とを混合して第1次混合杭4
を土中に形成しつつ掘進し、所定の位置に掘削軸
1の下端を到達させる第1工程と、掘削軸1の掘
進によつて地上に揚土された第1次混合土5をふ
るいにかけて過大粒の礫土6を除去し、次いで過
大粒の礫土6を除去した第1次混合土5にセメン
ト、フライアツシユ等の土砂固結剤を必要強度が
生じるように加えてこれを再混練して第2次混合
土7を製作する第2工程と、第1次混合杭4の造
成において掘削軸1の下端が所定位置に到達した
後に掘削軸1の下端から第1工程における土砂固
結剤2にかえて第2工程で製作する第2次混合土
7を圧出して掘削孔8中に充填しつつ掘削軸1を
引き上げ、掘削孔8中に第2次混合土7が充填さ
れた杭9を形成する第3工程よりなることを特徴
とする地盤への杭の築造方法に係るものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing piles in the ground, in which the ground 3 is excavated while spouting an earth and sand solidifying agent 2 such as cement milk from the lower end of an excavation shaft 1, and the excavated earth and sand are separated from each other. The first mixed pile 4 is prepared by mixing with the solidifying agent 2.
A first step in which the lower end of the excavation shaft 1 is reached at a predetermined position by digging while forming the soil in the soil, and a first step in which the primary mixed soil 5 lifted to the ground by the excavation of the excavation shaft 1 is sieved. The oversized gravel 6 is removed, and then a soil consolidation agent such as cement or fly ash is added to the primary mixed soil 5 from which the oversized gravel 6 has been removed, and the mixture is re-kneaded to obtain the required strength. In the second step of producing the secondary mixed soil 7 and in the creation of the first mixed pile 4, after the lower end of the excavation shaft 1 reaches a predetermined position, the earth and sand consolidation agent 2 in the first step is transferred from the lower end of the excavation shaft 1 to the soil consolidation agent 2 in the first step. On the contrary, the excavation shaft 1 is pulled up while pressing out the secondary mixed soil 7 produced in the second step and filling it into the excavation hole 8, and the pile 9 filled with the secondary mixed soil 7 is pushed out into the excavation hole 8. The present invention relates to a method for constructing piles in the ground, characterized by comprising a third step of forming piles.
従来地盤に杭を築造する工法として例えば特公
昭55―50543号公報に示された工法が知られてい
る。この従来例にあつては、単に地盤を掘削しな
がらセメントミルクを噴出し、これを掘削と同時
に混合して杭を形成していただけであつた。この
ため、いかに地中で混合するといえども上下方向
において均一な強度の杭を形成するのは不可能で
あつた。またこの従来例にあつては掘削孔内で掘
削土砂と混合する関係上、セメントミルクの濃度
が濃いと流動性が低く、掘削孔内における掘削土
砂との混合に支障が生じるものであり、この結果
使用されるセメントの量が少く、形成される杭の
強度が弱いという欠点があつた。更に他の従来例
として掘削土砂を全部地上に排土して掘削孔にモ
ルタル等を充填するものがあるが、この場合地上
に揚土された土砂の処分をしなければならず、ま
た別途充填用の砂を用意しなければならずコスト
アツプになるという欠点があつた。 As a conventional method of constructing piles in the ground, for example, the method disclosed in Japanese Patent Publication No. 50543/1983 is known. In this conventional example, cement milk was simply squirted out while excavating the ground, and the cement milk was mixed at the same time as the excavation to form the pile. For this reason, no matter how much the mixture is mixed underground, it is impossible to form a pile with uniform strength in the vertical direction. In addition, in this conventional example, since the cement milk is mixed with the excavated soil in the borehole, if the concentration of cement milk is high, the fluidity is low, which causes problems in mixing with the excavated soil in the borehole. As a result, the amount of cement used was small and the strength of the piles formed was weak. Furthermore, another conventional example involves discharging all excavated soil to the ground and filling the excavated hole with mortar, etc., but in this case, the soil lifted to the ground must be disposed of, and filling is required separately. The disadvantage was that sand had to be prepared for use, which increased costs.
本発明は上述の従来の欠点に鑑みて発明したも
のであつて、その目的とするところは、上下方向
に均一で且つ必要設計強度の杭を築造でき、また
地上に揚土されたものの処分の必要が少なく、再
使用ができてコストを下げることができ、更に第
2次混合土を掘削軸の先端から圧出するに当つて
掘削軸内がつまつたり、圧出できなかつたりする
ことがなく、スムーズに圧出できる地盤への杭の
築造方法を提供するにある。 The present invention was invented in view of the above-mentioned conventional drawbacks, and its purpose is to be able to construct piles that are uniform in the vertical direction and have the required design strength, and to facilitate the disposal of soil that has been lifted above the ground. It is less necessary, can be reused, reduces costs, and also prevents the inside of the excavation shaft from clogging or being unable to extrude the secondary mixed soil when extruding it from the tip of the excavation shaft. To provide a method for constructing piles in the ground that can be smoothly pushed out without any problems.
以下本発明を実施例により詳述する。図中1は
中空パイプ状の掘削軸であつて、外周に揚土兼撹
拌用のスクリユー部10、又は撹拌翼11又はス
クリユー部10と撹拌翼11の両方が設けてあ
る。掘削軸1は中空パイプ状で下端にビツト12
が設けてあり、また掘削軸1の下端には噴出口1
3が設けてある。この場合噴出口13を図の実施
例のようにビツト12部分に設けてもよい。掘削
軸1は1本でも、複数本並べたものでもよい。複
数本並べたものの場合掘削軸1は複数本横方向に
一直線状に並べてもよく、あるいは弓状となるよ
うに並べてもよく、あるいは三角形、四角形等の
多角形状に並べてもよい。掘削軸1を複数本並べ
た場合各掘削軸1の上端部は多軸装置14に連結
され、駆動装置15の回転を多軸装置14を介し
て各掘削軸1に伝えるようになつている。図中1
6は掘削軸1に連通接続したホースである。しか
しホース16をセメントミルクのような土砂固結
剤2を供給するための土砂固結供給装置20に接
続し、掘削軸1の下端からセメントミルクのよう
な土砂固結剤2を噴出しながら地盤3を掘削しつ
つ掘削土砂と土砂固結剤2とを混合して第1次混
合杭4を土中に形成しながら掘進していき、所定
の位置に掘削軸1の下端を到達させる。上記工程
を第1工程とする。一方掘削軸1の掘進によつて
地上に揚土された第1次混合土5をふるい17に
かけて過大粒の礫土6を除去し、次いで過大粒の
礫土6を除去して第1次混合土5にセメント、フ
ライアツシユ等の土砂固結剤を必要設計強度が生
じるように追加してこれをミキサー18で再混練
して第2次混合土7を製作する。これを第2工程
とする。ここで図中19は第2次混合土製作供給
装置であり、ペースト状の第1次混合土5を吸引
する。第2次混合土製作供給装置19には吸込部
22、ふるい17、ミキサー18、ポンプ(図示
せず)等を有している。次に第1次混合杭4の造
成において掘削軸1の下端から第1工程における
土砂固結剤2にかえて第2工程で製作する第2次
混合土7を圧出して掘削孔8中に充填しながら掘
削軸1を引き上げ、掘削孔8中に下方より順に上
方に向けて第2次混合土7を充填することで掘削
孔8中に第2次混合土7が充填された杭9を形成
する。これを第3工程とする。第3工程において
はホース16を第2次混合土製作供給装置19に
接続するものである。また第3工程中掘削孔8中
に第2次混合土7を圧出すると、それにつれて第
1次混合杭4を構成する第1次混合土5が次々と
地上に揚土されるが、この第1次混合土5を第2
次混合土製作供給装置19によつて第2次混合土
7とし、再び掘削軸1の下端より掘削孔8中に圧
充填するのである。この時掘削軸1は回転しなが
ら引き上げてもよく、回転しないで引き上げても
よい。また第2次混合土7を掘削孔8の下方より
圧充填することで掘削軸1及び第1次混合土5が
上方に押し上げられるものである。上記の第1工
程、第2工程、第3工程によつて地盤中に必要設
計強度の杭9を形成するのである。なお必要に応
じて第3工程の後で杭9に必要な曲げ強度、その
他の強度を担当する鋼管その他の構造材21を建
込む第4工程をつけ加えてもよい。上記のように
して単独の杭9を築造してもよいが、杭9の端部
が互いに重複するようにして連続して形成すると
山留壁を形成できるものである。なお第3図中各
掘削軸1が夫々回転すると共に多軸装置14も回
転することで複数本の掘削軸1が全体として回転
するようになつている。 The present invention will be explained in detail below with reference to Examples. In the figure, reference numeral 1 denotes a hollow pipe-shaped excavation shaft, on the outer periphery of which a screw part 10 for soil lifting and stirring, or a stirring blade 11, or both the screw part 10 and the stirring blade 11 are provided. The excavation shaft 1 has a hollow pipe shape and has a bit 12 at the lower end.
A spout 1 is provided at the lower end of the excavation shaft 1.
3 is provided. In this case, the spout 13 may be provided in the bit 12 portion as in the embodiment shown. The excavation shaft 1 may be one or a plurality of shafts arranged side by side. In the case of a plurality of excavation shafts 1, the plurality of excavation shafts 1 may be arranged laterally in a straight line, in an arcuate manner, or in a polygonal shape such as a triangle or a quadrangle. When a plurality of excavation shafts 1 are arranged, the upper end of each excavation shaft 1 is connected to a multi-axis device 14, and the rotation of the drive device 15 is transmitted to each excavation shaft 1 via the multi-axis device 14. 1 in the diagram
6 is a hose connected to the excavation shaft 1 in communication. However, when the hose 16 is connected to the earth and sand consolidation supply device 20 for supplying the earth and sand consolidation agent 2 such as cement milk, the earth and sand consolidation agent 2 such as cement milk is spouted from the lower end of the excavation shaft 1 and the ground is 3, excavated earth and sand are mixed with earth and sand consolidation agent 2 to form a primary mixed pile 4 in the soil, and the lower end of the excavation shaft 1 is brought to a predetermined position. The above step is referred to as the first step. On the other hand, the primary mixed soil 5 lifted to the ground by the excavation shaft 1 is passed through a sieve 17 to remove oversized gravel 6, and then the oversized gravel 6 is removed and the primary mixed soil 5 is removed. A soil solidifying agent such as cement or fly ash is added to the soil so as to obtain the required design strength, and this is remixed by the mixer 18 to produce the second mixed soil 7. This is the second step. Here, 19 in the figure is a secondary mixed soil manufacturing and supplying device, which sucks the paste-like primary mixed soil 5. The secondary mixed soil production and supply device 19 includes a suction section 22, a sieve 17, a mixer 18, a pump (not shown), and the like. Next, in creating the first mixed pile 4, the second mixed soil 7 produced in the second step is extruded from the lower end of the excavation shaft 1 into the excavation hole 8 instead of the earth and sand consolidation agent 2 in the first step. While filling, the excavation shaft 1 is pulled up and the secondary mixed soil 7 is filled into the excavated hole 8 from the bottom upwards, thereby creating a pile 9 filled with the second mixed soil 7 in the excavated hole 8. Form. This is the third step. In the third step, the hose 16 is connected to the second mixed soil production and supply device 19. In addition, when the secondary mixed soil 7 is squeezed out into the excavation hole 8 during the third step, the primary mixed soil 5 constituting the primary mixed pile 4 is lifted up to the ground one after another. 1st mixed soil 5 to 2nd
A second mixed soil 7 is prepared by the next mixed soil preparation and supply device 19, and is again pressure-filled into the excavation hole 8 from the lower end of the excavation shaft 1. At this time, the excavation shaft 1 may be pulled up while rotating, or may be pulled up without rotating. Further, by pressure filling the excavation hole 8 with the secondary mixed soil 7 from below, the excavation shaft 1 and the primary mixed soil 5 are pushed upward. Piles 9 having the required design strength are formed in the ground through the first, second, and third steps described above. If necessary, a fourth step may be added after the third step in which steel pipes or other structural members 21 are erected to provide the bending strength and other strength required for the pile 9. Although a single pile 9 may be constructed as described above, a retaining wall can be formed by forming the piles 9 in succession so that their ends overlap each other. In FIG. 3, when each excavation shaft 1 rotates, the multi-axis device 14 also rotates, so that the plurality of excavation shafts 1 rotate as a whole.
本発明にあつては、叙述のように掘削軸の下端
からセメントミルクのような土砂固結剤を噴出し
ながら地盤を掘削すると共に掘削土砂と土砂固結
剤とを混合して第1次混合杭を土中に形成しつつ
掘進し、所定の位置に掘削軸の下端を到達させる
第1工程と、掘削軸の掘進によつて地上に揚土さ
れた第1次混合土にセメント、フライアツシユ等
の土砂固結剤を必要強度が生じるように加えてこ
れを再混練して第2次混合土を製作する第2工程
と、第1次混合杭の造成において掘削軸の下端が
所定位置に到達した後に掘削軸の下端から第1工
程における土砂固結剤にかえて第2工程で製作す
る第2次混合土を圧出して掘削孔中に充填しつつ
掘削軸を引き上げ、掘削孔中に第2次混合土が充
填された杭を形成する第3工程とよりなるので、
最終的に掘削孔内には上下方向の全長にわたつて
所定の強度に調整された第2次混合土が充填され
て杭が築造されることとなり、所定の強度の杭を
簡単に形成できるという利点があり、しかも第2
次混合土は掘削孔中で撹拌する必要がないのでセ
メントの量が多くて濃度の濃いものであつても何
らの問題がなく、高強度の杭を形成できるもので
ある。更に第2工程において掘削軸の掘進によつ
て地上に揚土された第1次混合土をふるいにかけ
てて過大粒の礫土を除去するので、第2次混合土
中に過大粒の礫土が存在せず、したがつてホース
や掘削軸内や掘削軸の噴出口がつまつたりしない
ものであり、この結果地上に揚土された第1次混
合土を再使用するといえども掘削軸の噴出口から
の噴出に当つて何ら支障がないものであり、確実
に第2次混合土を掘削孔中に充填できるものであ
る。また杭を形成するに当つて地上に排土した混
合土を再使用するので、地上に排土した土砂の処
分の必要が少なく、また第2次混合土の材料とな
る砂等の別途準備する必要がないので、大巾にコ
ストダウンがはかれる。また掘削土砂と土砂固結
剤とを混合した第1次混合杭が形成されるため、
掘削時及び第2次混合土の充填の途中において第
1次混合土よりなる第1次混合杭により孔の崩壊
を防止し、しかも第2次混合土の充填時に第2次
混合土と第1次混合土とが完全に置換されずに第
1次混合土の一部が残つても、第1次混合土は掘
削土砂と土砂固結剤との混合物であるため、最終
的に形成される杭は第2次混合土を主体とし且つ
全体が掘削土砂と土砂固結剤との混合物の杭とな
るものである。 In the present invention, as described above, the ground is excavated while spouting an earth and sand solidifying agent such as cement milk from the lower end of the excavation shaft, and the excavated earth and sand are mixed with the earth and sand solidifying agent to perform the first mixing. The first step is to excavate while forming piles in the soil and reach the lower end of the excavation shaft at a predetermined position.The first step is to add cement, fly ash, etc. to the first mixed soil lifted to the ground by the excavation shaft. The second step is to add soil consolidation agent to the required strength and re-knead it to produce the second mixed soil, and the lower end of the excavation shaft reaches the specified position during the creation of the first mixed pile. After that, from the lower end of the excavation shaft, the second mixed soil produced in the second process is squeezed out from the bottom end of the excavation shaft, filling it into the excavation hole, and the excavation shaft is pulled up. The third step consists of forming piles filled with secondary mixed soil.
Ultimately, the entire length of the excavation hole in the vertical direction is filled with secondary mixed soil that has been adjusted to a predetermined strength, and the piles are constructed, making it possible to easily form piles with a predetermined strength. There are advantages and second
The mixed soil does not need to be stirred in the excavation hole, so even if it contains a large amount of cement and is highly concentrated, there are no problems, and high-strength piles can be formed. Furthermore, in the second step, the primary mixed soil lifted to the ground by the excavation axis is sieved to remove oversized gravel, so that there is no oversized gravel in the secondary mixed soil. Therefore, the hose, the inside of the excavation shaft, and the spout of the excavation shaft will not get clogged, and as a result, even if the primary mixed soil lifted to the ground is reused, it will not clog from the spout of the excavation shaft. There is no problem in ejecting the mixed soil, and the secondary mixed soil can be reliably filled into the excavated hole. In addition, since the mixed soil removed above the ground is reused when forming the piles, there is less need to dispose of the removed earth and sand, and sand, etc., which will be used as the material for the secondary mixed soil, can be prepared separately. Since it is not necessary, the cost can be significantly reduced. In addition, since the first mixed pile is formed by mixing excavated soil and soil consolidation agent,
During excavation and during filling with the second mixed soil, the first mixed pile made of the first mixed soil prevents collapse of the hole, and when filling the second mixed soil, the second mixed soil and the first mixed soil Even if some of the primary mixed soil remains without being completely replaced with the secondary mixed soil, the primary mixed soil is a mixture of excavated soil and soil consolidation agent, so it will eventually be formed. The pile is mainly made of secondary mixed soil, and is entirely made of a mixture of excavated earth and sand and an earth and sand consolidation agent.
第1図a,b,c,dは本発明の施工順序を示
す概略図、第2図a,b,cは同上に用いる掘削
機の1例を示す概略図、第1次混合杭の形成時の
横断面図及び杭の形成時の横断面図、第3図a,
bは同上の掘削機の他例を示す概略図及び第1次
混合杭の形成時の横断面図であつて、1は掘削
軸、2は土砂固結剤、3は地盤、4は第1次混合
杭、5は第1次混合土、7は第2次混合土、8は
掘削孔、9は杭である。
Figure 1 a, b, c, d is a schematic diagram showing the construction sequence of the present invention, Figure 2 a, b, c is a schematic diagram showing an example of an excavator used in the above, formation of the first mixed pile Cross-sectional view at the time and cross-sectional view at the time of pile formation, Figure 3a,
b is a schematic diagram showing another example of the same excavator as above and a cross-sectional view at the time of forming the first mixed pile, in which 1 is the excavation shaft, 2 is the earth and sand consolidation agent, 3 is the ground, and 4 is the first 5 is the first mixed soil, 7 is the second mixed soil, 8 is the excavated hole, and 9 is the pile.
Claims (1)
砂固結剤を噴出しながら地盤を掘削すると共に掘
削土砂と土砂固結剤とを混合して第1混合杭を土
中に形成しつつ掘進し、所定の位置に掘削軸の下
端を到達させる第1工程と、掘削軸の掘進によつ
て地上に揚土された第1混合土をふるいにかけて
過大粒の礫土を除去、次いで過大粒の礫土を除去
した第1混合土にセメント、フライアツシユ等の
土砂固結剤を必要強度が生じるように加えてこれ
を再混練して第2混合土を製作する第2工程と、
第1混合杭の造成において掘削軸の下端が所定位
置に到達した後に掘削軸の下端から第1工程にお
ける土砂固結剤にかえて第2工程で製作する第2
混合土を圧出して掘削孔中に充填しつつ掘削軸を
引き上げ、掘削孔中に第2次混合土が充填された
杭を形成する第3工程よりなることを特徴とする
地盤への杭の築造方法。1. Excavating the ground while spouting an earth and sand consolidation agent such as cement milk from the lower end of the excavation shaft, and excavating while mixing the excavated earth and sand and the earth and sand consolidation agent to form a first mixed pile in the soil, The first step is to reach the lower end of the excavation shaft at a predetermined position, and the first mixed soil lifted to the ground by the excavation of the excavation shaft is sieved to remove gravel with large grains, and then the gravel with large grains is removed. A second step of adding a soil consolidation agent such as cement or fly ash to the first mixed soil to obtain the required strength and kneading it again to produce a second mixed soil;
After the lower end of the excavation shaft reaches a predetermined position in the creation of the first mixed pile, the second mixed pile, which is manufactured in the second step in place of the earth and sand consolidation agent in the first step, is applied from the lower end of the excavation shaft to the predetermined position.
The third step is to press out the mixed soil and fill it into the excavation hole while pulling up the excavation shaft to form a pile in which the excavation hole is filled with the second mixed soil. Construction method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13376081A JPS5837225A (en) | 1981-08-26 | 1981-08-26 | Method of constructing pile into ground |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13376081A JPS5837225A (en) | 1981-08-26 | 1981-08-26 | Method of constructing pile into ground |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5837225A JPS5837225A (en) | 1983-03-04 |
| JPS6140814B2 true JPS6140814B2 (en) | 1986-09-11 |
Family
ID=15112301
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13376081A Granted JPS5837225A (en) | 1981-08-26 | 1981-08-26 | Method of constructing pile into ground |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5837225A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03113383U (en) * | 1990-03-05 | 1991-11-19 | ||
| JPH0734453A (en) * | 1993-07-19 | 1995-02-03 | Seiko Kogyo Kk | Recycle of mixture between soil/sand and soliidifying liquid substance |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5336910A (en) * | 1976-09-16 | 1978-04-05 | Takenaka Komuten Co | Method of forming soil pile |
| JPS5631928A (en) * | 1979-08-20 | 1981-03-31 | Ryoji Morita | Constructing method for soil pile |
-
1981
- 1981-08-26 JP JP13376081A patent/JPS5837225A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5837225A (en) | 1983-03-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2731806B2 (en) | Construction method of soil cement composite pile | |
| JP2000073354A (en) | Preparating method of ground improving body and preparating method of continuous walls | |
| JP4154487B2 (en) | Foundation pile construction method, foundation pile | |
| JPS6140814B2 (en) | ||
| JPS6140815B2 (en) | ||
| JPS6140813B2 (en) | ||
| JP4105016B2 (en) | Construction method of columnar ground improvement body using steel pipe pile | |
| JPH1150443A (en) | Underground consolidated body construction equipment and underground consolidated body construction method | |
| JP2587777Y2 (en) | Drilling rod for soil cement composite pile construction | |
| JPH0280710A (en) | Preparing cast-in-place concrete pile | |
| JP4006838B2 (en) | Drilling and stirring method and equipment | |
| JPS60126423A (en) | Pile driving method | |
| JPH0637767B2 (en) | Ground improvement method combining agitation blades and high-pressure injection | |
| JPS5924026A (en) | Pile formation work | |
| JP2519851B2 (en) | Foundation pile construction method | |
| JPH0629509B2 (en) | Construction method of field construction pile | |
| JP5023320B2 (en) | Column replacement construction method | |
| JPS6321796B2 (en) | ||
| KR102260596B1 (en) | Site Construction Method Of Base Top Pile For Ground Reinforcement | |
| JPH018587Y2 (en) | ||
| JPH02217516A (en) | Pile driving method and excavating casing | |
| JPH0154489B2 (en) | ||
| JPH0442493B2 (en) | ||
| JPH0234312Y2 (en) | ||
| JP3679377B2 (en) | Construction method of underground pile |