JPS6142054B2 - - Google Patents
Info
- Publication number
- JPS6142054B2 JPS6142054B2 JP12344983A JP12344983A JPS6142054B2 JP S6142054 B2 JPS6142054 B2 JP S6142054B2 JP 12344983 A JP12344983 A JP 12344983A JP 12344983 A JP12344983 A JP 12344983A JP S6142054 B2 JPS6142054 B2 JP S6142054B2
- Authority
- JP
- Japan
- Prior art keywords
- rubble
- hopper
- rudder
- ladder
- work boat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/10—Placing gravel or light material under water inasmuch as not provided for elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
- Revetment (AREA)
Description
【発明の詳細な説明】
本発明は海底や水底(以下単に水底という)に
捨石層すなわち砕石基礎を構築するためのスクリ
ード方法および装置に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a screeding method and apparatus for constructing a rubble layer, that is, a crushed stone foundation, on the seabed or the bottom of the water (hereinafter simply referred to as the bottom of the water).
例えば第1図に示すように水底に基礎構造物D
を構築する場合に、まず水底の堆積層を浚渫し、
その浚渫底面B上に砂利、砕石等の捨石層C1,
C2,C3を所定の厚みに順次形成し、その上に構
造物D′を構築し、さらに捨石の層Eを形成して
いる。 For example, as shown in Figure 1, there is a basic structure D on the bottom of the water.
When constructing a
On the dredged bottom surface B is a rubble layer C 1 of gravel, crushed stone, etc.
C 2 and C 3 are sequentially formed to a predetermined thickness, a structure D' is constructed thereon, and a layer E of rubble is further formed.
このように捨石層はその上面を敷き均して実質
的に平面としなければならない。そのために、捨
石の投入工程および敷き均しのためのスクリード
工程とを必要とする。 In this way, the top surface of the rubble layer must be leveled to make it substantially flat. For this purpose, a step of adding rubble and a step of screeding for leveling are required.
従来このように捨石を投入しそして敷き均しす
るには潜水夫を用いたりしなければならず、かな
り面倒な作業であつた。 In the past, it was necessary to use a diver to introduce and spread the rubble in this way, which was quite a tedious task.
したがつて本発明の目的は船舶を用いて自動的
に捨石を投入し、かつ敷き均しすることのできる
水底スクリード法およびその方法を直接に実施す
る装置を提供するにある。 SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide an underwater screeding method that allows rubble to be automatically introduced and leveled using a ship, and an apparatus for directly carrying out the method.
本発明によれば、作業船を所定位置に繋留し、
作業船から捨石を伸縮および俯仰自在のラダーを
介して捨込みホツパに送り、捨込みホツパを所定
の高さで垂直な位置に保持してラダーを伸縮およ
び俯仰させて移動して捨石層を形成し、所定距離
移動した後に、捨込みホツパを停止した状態でラ
ダーを伸縮および俯仰させて作業船を移動し、所
定長さの捨石層が形成された後に、作業船を巾方
向に動かし、以下上記の作業を繰り返すことを特
徴とする水底スクリード方法が提案されている。 According to the present invention, a work boat is moored at a predetermined position,
The rubble is sent from the work boat to the dumping hopper via a telescoping and elevating ladder, the dumping hopper is held in a vertical position at a predetermined height, and the rudder is moved by telescoping and elevating to form a rubble layer. After moving a predetermined distance, the work boat is moved by extending/contracting and raising the rudder with the dumping hopper stopped, and after a predetermined length of rubble layer has been formed, the work boat is moved in the width direction and the following steps are taken: An underwater screed method has been proposed which is characterized by repeating the above operations.
さらに本発明によれば、アンカーで所定位置に
繋留できる作業船と、その作業船に設けた捨石ホ
ツパと、その捨石ホツパからの捨石を送るベルト
コンベヤと、そのベルトコンベヤの終端から水底
方向に延びる俯仰および伸縮自在のラダーと、そ
のラダーを俯仰させる装置と、そのラダーを伸縮
させる油圧シリンダ装置と、そのラダーの先端に
枢着された捨込みホツパと、ラダーに対して捨込
みホツパを枢動させる油圧シリンダ装置とを備え
ることを特徴とする水中スクリード装置が提供さ
れている。 Further, according to the present invention, there is provided a work boat that can be moored at a predetermined position with an anchor, a rubble hopper provided on the work boat, a belt conveyor for sending rubble from the rubble hopper, and a belt conveyor extending toward the bottom of the water from the end of the belt conveyor. A ladder that can be raised and retracted, a device for raising and retracting the ladder, a hydraulic cylinder device that extends and retracts the ladder, a drop-off hopper pivotally attached to the tip of the ladder, and a drop-off hopper that pivots with respect to the rudder. An underwater screed device is provided, which is characterized by being equipped with a hydraulic cylinder device.
したがつて、捨込みホツパを水底から所定の高
さで垂直位置に保持した状態で捨石を供給しなが
ら、ラダーを伸縮俯仰させて捨込みホツパを動か
せば、水底から所定の高さの捨石層を形成でき
る。その際、捨込みホツパの下端は敷き均し作業
も同時に行うので、捨石の投入作業と敷き均し作
業とを一工程で行うことができる。ラダーの俯
仰、伸縮による捨込みホツパの移動距離は限られ
ているので、一定長さラダーによつて捨込みホツ
パを移動させた後に、作業船を移動させ、再びラ
ダーの俯仰、伸縮によつて捨石ホツパを移動させ
る。捨込みホツパの巾には制限があるので、長手
方向の捨石の敷き均し作業が完了してから、作業
船を繋留ワイヤを引張つて巾方向に移動させ、同
様にして作業を繰り返せばよい。 Therefore, by holding the dumping hopper in a vertical position at a predetermined height from the water bottom and supplying rubble, and moving the dumping hopper by extending and raising the ladder, the rubble layer can be placed at a predetermined height from the water bottom. can be formed. At this time, leveling work is also performed on the lower end of the dumping hopper at the same time, so the work of putting in rubble and leveling work can be performed in one step. Since the distance that the dumping hopper can be moved due to the elevation, expansion and contraction of the rudder is limited, after moving the dumping hopper by a certain length using the rudder, the work boat is moved and then again by the elevation, expansion and contraction of the rudder. Move the rubble stone hoppa. Since the width of the dumping hopper is limited, after the lengthwise leveling of the rubble is completed, the work boat can be moved in the width direction by pulling the mooring wire, and the work can be repeated in the same manner.
本発明の実施に際して、最上の捨石層の上面の
ように、特に水平度を要求される場合は、水平に
設置した水平桁に案内されて捨込みホツパを動か
すのが好ましい。そのようにすることによつて捨
込みホツパの下端が敷設した捨石層の上面をスク
リードし、以て実質的に水平な面を得ることがで
きる。 When carrying out the present invention, when particularly levelness is required, such as on the upper surface of the uppermost riprap layer, it is preferable to move the dumping hopper guided by a horizontal girder installed horizontally. By doing so, the lower end of the dumping hopper can screed the upper surface of the laid rubble layer, thereby making it possible to obtain a substantially horizontal surface.
本発明の実施に際して、ラダーを俯傾させ装置
としては、デリツクワイヤを用いてるのが好まし
い。 In carrying out the present invention, it is preferable to use a pull wire as the device for tilting the rudder.
以下第2図ないし第5図を参照して本発明を実
施する装置について説明する。 An apparatus for carrying out the present invention will be described below with reference to FIGS. 2 to 5.
第2図および第3図において、作業船1はアン
カー2で所定位置に繋留されており、そして作業
船1のデツキ上には運転および制御室3と、複数
の捨石ホツパ4と、その捨石ホツパ4からの捨石
を船尾方向に送るベルトコンベヤ5と、そのベル
トコンベヤ5の終端から捨石を受けて水底Bの方
に移るラダー6と、そのラダー6を所定の傾斜位
置で支持するための支持ワイヤ7aを張設するデ
リツク8とを備えている。ラダー6には別の支持
ワイヤ7bが止着されており、したがつてラダー
6は俯仰自在に支持されている。各捨石ホツパ4
は図示の実施例では振動フイーダ10を備え、各
振動フイーダ10からの捨石を受けてベルトコン
ベヤ5に送るための連結コンベヤ11が設けられ
ている。 In FIGS. 2 and 3, a work boat 1 is moored at a predetermined position with an anchor 2, and on the deck of the work boat 1 there is an operation and control room 3, a plurality of rubble hoppers 4, and the rubble hoppers. A belt conveyor 5 that sends the rubble from the belt conveyor 5 toward the stern, a rudder 6 that receives the rubble from the end of the belt conveyor 5 and moves it toward the water bottom B, and a support wire for supporting the rudder 6 at a predetermined inclined position. 7a is provided. Another support wire 7b is fixed to the ladder 6, so that the ladder 6 is supported so as to be able to move up and down. Each rubble stone hopper 4
In the illustrated embodiment, a vibrating feeder 10 is provided, and a connecting conveyor 11 is provided for receiving the rubble from each vibrating feeder 10 and sending it to the belt conveyor 5.
ラダー6は、一端が船尾付近に回動自在に枢着
され、ベルトコンベヤ5から送られる捨石を受け
る第1のラダー部分6aと、その第1のラダー部
分6aに摺動嵌合する第2ラダー部分6bとより
なり、それらの第1のラダー部分6aと第2のラ
ダー部分6bとは油圧シリンダ装置12によつて
伸縮可能に連結されている。第2のラダー部分6
bの先端には捨込みホツパ13が枢着されてお
り、ラダー6の傾斜角度が変化しても捨込みホツ
パ13は正しい垂直位置に保持できるようになつ
ている。ワイヤ7aはウインチ15によつて巻取
られ、ワイヤ7bはウインチ16によつて巻取ら
れるようになつている。またウインチ17はデリ
ツク8の俯仰角を制御するものである。 The rudder 6 has a first rudder part 6a which is rotatably pivoted at one end near the stern, and which receives rubble sent from the belt conveyor 5, and a second rudder part which is slidably fitted into the first rudder part 6a. The first ladder section 6a and the second ladder section 6b are extendably connected by a hydraulic cylinder device 12. Second ladder part 6
A dumping hopper 13 is pivotally attached to the tip of b, so that even if the inclination angle of the ladder 6 changes, the dumping hopper 13 can be held at the correct vertical position. The wire 7a is wound up by a winch 15, and the wire 7b is wound up by a winch 16. The winch 17 also controls the elevation angle of the derrick 8.
作動に際して捨石ホツパ4からの捨石は振動フ
イーダ10からコンベヤ11を介してベルトコン
ベヤ5に送られ、そしてラダー6を介して捨込み
ホツパ13に貯蔵される。捨込みホツパ13はそ
の下端が形成すべき捨石層C1の高さHと同じ高
さに保持されており、したがつてその位置におい
て捨込みホツパ13からの捨石は高さHの山とな
り、所定の安息角を保つた状態となる。この捨込
みホツパ13は所定の巾、例えば5m程度の巾を
有している。 In operation, the rubble from the rubble hopper 4 is conveyed from the vibratory feeder 10 via the conveyor 11 to the belt conveyor 5, and is stored via the ladder 6 in the dumping hopper 13. The lower end of the dumping hopper 13 is held at the same height as the height H of the rubble layer C1 to be formed, and therefore, at that position, the rubble from the dumping hopper 13 forms a pile of height H. A predetermined angle of repose is maintained. The disposal hopper 13 has a predetermined width, for example, about 5 m.
この状態で、捨込みホツパ13の下端を高さH
に保持してワイヤ7bを引張り、ワイヤ7aをゆ
るめ、捨込みホツパ13は垂直位置を保つて、第
2図において破線Xで示す位置まで動かす。この
とき油圧シリンダ装置12は収縮させ、油圧シリ
ンダ装置14は伸張させる。すると捨石層C1は
所定巾で、その移動距離L(例えば15m)分だけ
形成される。その際、敷き均し作業も同時に行わ
れる。次いで捨込みホツパ13を位置Xに保持し
た状態で船1の繋留ウインチ18を作動させ、船
1を第2図で左方に前記移動距離Lと実質的に同
じ距離動かす。その際ワイヤ7a,7b、油圧シ
リンダ装置12,14を作動することは勿論であ
る。このような作業を繰り返して所定巾の捨石層
を敷き均しながら形成する。 In this state, raise the lower end of the dumping hopper 13 to a height H.
The wire 7b is pulled while the wire 7a is loosened, and the disposal hopper 13 is moved to the position indicated by the broken line X in FIG. 2 while maintaining the vertical position. At this time, the hydraulic cylinder device 12 is contracted and the hydraulic cylinder device 14 is expanded. Then, the rubble layer C1 is formed with a predetermined width corresponding to the moving distance L (for example, 15 m). At this time, leveling work is also done at the same time. Then, with the dumping hopper 13 held at position X, the mooring winch 18 of the ship 1 is operated, and the ship 1 is moved to the left in FIG. 2 by a distance substantially equal to the moving distance L. At that time, it goes without saying that the wires 7a, 7b and the hydraulic cylinder devices 12, 14 are operated. Such operations are repeated to form a layer of rubble of a predetermined width while leveling it out.
次に船1を巾方向(第3図で上下方向)に所定
巾だけ動かし、前記と同様な作業を繰り返す。こ
のようにすることによつて所定の面積に捨石層
C1を形成する。以下同様にして捨石層C2および
C3を順次形成する。 Next, the ship 1 is moved by a predetermined width in the width direction (vertical direction in FIG. 3), and the same operations as described above are repeated. By doing this, a layer of rubble is formed in a predetermined area.
Form C 1 . Similarly, rubble layer C 2 and
Form C 3 sequentially.
なお一回の作業で形成する各捨石層C1,C2,
C3の高さHは3〜3.5m程度が好ましく、したが
つて捨石層の数すなわち敷き均し回数は、形成す
べく捨石層の高さに応じて適宜選択すればよい。
さて最上の捨石層C3の上面は、特に構造物を設
置するために、基面均しとして比較的正確に(例
えば5cm以内)敷き均さねばならない。 In addition, each rubble layer C 1 , C 2 , formed in one operation
The height H of C 3 is preferably about 3 to 3.5 m, and therefore the number of rubble layers, that is, the number of times of leveling, may be appropriately selected depending on the height of the rubble layer to be formed.
Now, the upper surface of the uppermost rubble layer C3 must be leveled relatively precisely (for example, within 5 cm) as a base level, especially in order to install a structure.
このために本発明によれば水中桁を設置し、そ
の水中桁によつて捨込みホツパを案内し、もつて
均一な敷き均し作業を行うようになつている。そ
の実施例が第4図および第5図に示されている。
第4図および第5図において、第2図および第3
図に対応する部分は同じ符号を付して重複説明を
省略する。 For this purpose, according to the present invention, an underwater girder is installed and the dumping hopper is guided by the underwater girder, thereby achieving uniform leveling work. An example thereof is shown in FIGS. 4 and 5.
In Figures 4 and 5, Figures 2 and 3
Portions corresponding to the figures are designated by the same reference numerals and redundant explanation will be omitted.
最上の捨石層C3を形成した後に、全体を20で
示す水中桁を捨石層C3上に水平に設置する。こ
の水中桁20は2本の平行に延びる捨込みホツパ
案内桁21,22と、その案内桁21,22の両
端に設けた支持桁23,24とで井型に構成され
ており、支持桁23,24の両端にはオイルジヤ
ツキ25が設けられている。案内桁21,22に
は複数のローラ26で案内桁21,22を挟んだ
案内桁21,22に沿つて移動できる案内部材2
7,28を設け、この案内部材27,28がそれ
ぞれ捨込みホツパ13の巾方向両側に取付けられ
ている。したがつて水中桁20を最上の捨石層
C3上に設置し、オイルジヤツキ25を遠隔操作
して水中桁20のレベルを出す。次いで捨石を捨
石ホツパ4から適時供給して、第2図および第3
図に関して説明したように、水中桁20で捨込み
ホツパ13を案内しながら、捨込みホツパ13を
移動させる。この捨込みホツパ13の移動に伴な
い、その下端は水中桁20で規定された高さに最
上の捨石層C3の上面の敷き均し作業を行うので
ある。 After forming the uppermost rubble layer C3 , an underwater girder indicated by 20 is installed horizontally on the rubble layer C3 . This underwater girder 20 is configured in a square shape with two dumping hopper guide girders 21 and 22 extending in parallel and support girders 23 and 24 provided at both ends of the guide girders 21 and 22. , 24 are provided with oil jacks 25 at both ends. The guide beams 21 and 22 are provided with a guide member 2 that can move along the guide beams 21 and 22 with the guide beams 21 and 22 sandwiched between a plurality of rollers 26.
7 and 28 are provided, and these guide members 27 and 28 are attached to both sides of the disposal hopper 13 in the width direction, respectively. Therefore, the underwater girder 20 is the topmost rubble layer.
Install it on C 3 and remotely control the oil jack 25 to bring out the level of the underwater girder 20. Next, rubble is supplied from the rubble hopper 4 in a timely manner, and as shown in Figs.
As explained with reference to the figures, the disposal hopper 13 is moved while being guided by the underwater girder 20. As the dumping hopper 13 moves, its lower end performs leveling work on the upper surface of the uppermost rubble layer C3 at a height specified by the underwater girder 20.
またこのようにして長さ方向の作業が終了した
ならば、例えばクレーン船を用いて巾方向に水平
桁20を動かし、同様な作業を繰り返す。このよ
うにして最上の捨石層C3の上面の基面均し作業
が完了する。 When the work in the length direction is completed in this manner, the horizontal girder 20 is moved in the width direction using, for example, a crane ship, and the same work is repeated. In this way, the work of leveling the upper surface of the uppermost rubble layer C3 is completed.
以上の如く、本発明によれば、捨込みホツパか
ら捨石を水底に供給すると同時に、捨込みホツパ
を移動させることにより、捨石の投入と敷き均し
作業を同時に一工程で行うことができる。したが
つて作業能率が著しく向上する。またラダーが俯
仰および伸縮自在であるから、水位の高低に応じ
て常に適正位置に捨込みホツパを位置させること
ができる。 As described above, according to the present invention, by simultaneously supplying rubble from the dumping hopper to the bottom of the water and moving the dumping hopper, it is possible to perform the charging and leveling work of the rubble at the same time in one step. Therefore, work efficiency is significantly improved. Furthermore, since the rudder can be raised and retracted, the dumping hopper can always be positioned at an appropriate position depending on the height of the water level.
第1図は水中構造物を構築するための基礎構造
を示す断面図、第2図は本発明を実施した水底ス
クリード装置の側面図、第3図は第2図の水底ス
クリード装置の平面図、第4図は比較的に平面度
を高く敷き均す場合に実施される水底スクリード
装置の側面図、第5図は第4図に示す水底スクリ
ード装置の平面図である。
1…作業船、2…アンカー、4…捨石ホツパ、
5…ベルトコンベヤ、6…ラダー、7a,7b…
ワイヤ、8…デリツク、12…油圧シリンダ装
置、13…捨込みホツパ、14…油圧シリンダ装
置、B…水底、C1,C2,C3…捨石層。
FIG. 1 is a sectional view showing a basic structure for constructing an underwater structure, FIG. 2 is a side view of an underwater screed device implementing the present invention, and FIG. 3 is a plan view of the underwater screed device shown in FIG. 2. FIG. 4 is a side view of an underwater screeding device used for leveling with relatively high flatness, and FIG. 5 is a plan view of the underwater screeding device shown in FIG. 4. 1... work boat, 2... anchor, 4... rubble hopper,
5... Belt conveyor, 6... Ladder, 7a, 7b...
Wire, 8... Derrick, 12... Hydraulic cylinder device, 13... Dumping hopper, 14... Hydraulic cylinder device, B... Water bottom, C 1 , C 2 , C 3 ... Rubble layer.
Claims (1)
を伸縮および俯仰自在のラダーを介して捨込みホ
ツパに送り、捨込みホツパを所定の高さで垂直な
位置に保持してラダーを伸縮および俯仰させて移
動して捨石層を形成し、所定距離移動した後に、
捨込みホツパを停止した状態でラダーを伸縮およ
び俯仰させて作業船を移動し、所定長さの捨石層
が形成された後に、作業船を巾方向に動かし、以
下上記の作業を繰り返すことを特徴とする水底ス
クリード方法。 2 アンカーで所定位置に繋留できる作業船と、
その作業船に設けた捨石ホツパと、その捨石ホツ
パからの捨石を送るベルトコンベヤと、そのベル
トコンベヤの終端から水底方向に延びる俯仰およ
び伸縮自在のラダーと、そのラダーを俯仰させる
装置と、そのラダーを伸縮させる油圧シリンダ装
置と、そのラダーの先端に枢着された捨込みホツ
パと、ラダーに対して捨込みホツパを枢動させる
油圧シリンダ装置とを備えることを特徴とする水
中スクリード装置。[Claims] 1. A work boat is moored at a predetermined position, rubble is sent from the work boat to a dumping hopper via a telescoping and elevating ladder, and the dumping hopper is held in a vertical position at a predetermined height. The rudder is moved by extending, contracting and lifting up to form a rubble layer, and after moving a predetermined distance,
The work boat is moved by extending/contracting and elevating the rudder with the dumping hopper stopped, and after a rubble layer of a predetermined length is formed, the work boat is moved in the width direction, and the above operations are repeated. Underwater screed method. 2 A work boat that can be moored in place with an anchor,
A rubble hopper installed on the work boat, a belt conveyor that sends rubble from the rubble hopper, an elevating and telescopic ladder extending toward the bottom from the end of the belt conveyor, a device for elevating the rudder, and the rudder. What is claimed is: 1. An underwater screed device comprising: a hydraulic cylinder device that expands and contracts the screed, a dumping hopper pivotally attached to the tip of the ladder, and a hydraulic cylinder device that pivots the dumping hopper with respect to the ladder.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12344983A JPS6016615A (en) | 1983-07-08 | 1983-07-08 | Method and apparatus for screeding bottom under water |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12344983A JPS6016615A (en) | 1983-07-08 | 1983-07-08 | Method and apparatus for screeding bottom under water |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6016615A JPS6016615A (en) | 1985-01-28 |
| JPS6142054B2 true JPS6142054B2 (en) | 1986-09-18 |
Family
ID=14860879
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP12344983A Granted JPS6016615A (en) | 1983-07-08 | 1983-07-08 | Method and apparatus for screeding bottom under water |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6016615A (en) |
-
1983
- 1983-07-08 JP JP12344983A patent/JPS6016615A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6016615A (en) | 1985-01-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110952561A (en) | Working method of riprap leveling ship | |
| US3027633A (en) | Method and apparatus for bridge construction | |
| CN106522112B (en) | Side span beam section erection system of cable-stayed bridge and method thereof | |
| US6550411B1 (en) | Method for removing a jacket of a drilling or production rig and vessel provided with a device therefor | |
| US3230721A (en) | Walking work barge | |
| CN114277827B (en) | double-GPS positioning round caisson transportation, installation and construction method | |
| JP2010024776A (en) | Device for erecting building material and method for erecting building material | |
| JPS6142054B2 (en) | ||
| JP4960145B2 (en) | Leveling device | |
| JP3263049B2 (en) | Caisson manufacturing and transporting apparatus and method | |
| CN213323580U (en) | Posture adjusting device of leveling frame device of riprap leveling ship | |
| CN211494398U (en) | Stone sliding pipe device of riprap leveling ship | |
| JP2020179973A (en) | Conveyor device, construction system of underground skeleton including the same, and construction method of underground skeleton | |
| CN212711257U (en) | Riprap leveling ship | |
| CN213324785U (en) | Hopper device of riprap leveling ship | |
| JPH0313372B2 (en) | ||
| JPH0229812B2 (en) | ||
| JPH042130B2 (en) | ||
| AU2004100459A4 (en) | Structure upending sub | |
| CN120537259A (en) | Construction method of foundation pit support under thick silt geological conditions | |
| JP7050143B2 (en) | Sliding device and sliding support | |
| JPH025210B2 (en) | ||
| SU896182A1 (en) | Installation for driving in construction elements | |
| JP2001090053A (en) | Pile material transfer system | |
| JPH1082062A (en) | Immersion device of immersed tube |