JPH0313372B2 - - Google Patents
[go: Go Back, main page]

JPH0313372B2 - - Google Patents

Info

Publication number
JPH0313372B2
JPH0313372B2 JP58153071A JP15307183A JPH0313372B2 JP H0313372 B2 JPH0313372 B2 JP H0313372B2 JP 58153071 A JP58153071 A JP 58153071A JP 15307183 A JP15307183 A JP 15307183A JP H0313372 B2 JPH0313372 B2 JP H0313372B2
Authority
JP
Japan
Prior art keywords
rubble
ladder
hopper
belt conveyor
tripper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP58153071A
Other languages
Japanese (ja)
Other versions
JPS6047120A (en
Inventor
Masahiro Shimatani
Kenji Kikuchi
Hisamitsu Ijuin
Mitsuo Nakamura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP15307183A priority Critical patent/JPS6047120A/en
Publication of JPS6047120A publication Critical patent/JPS6047120A/en
Publication of JPH0313372B2 publication Critical patent/JPH0313372B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Foundations (AREA)

Description

【発明の詳細な説明】 本発明は海底や水底(以下単に水底という)に
捨石層すなわち砕石基礎を構築するためのスクリ
ード装置に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a screed device for constructing a rubble layer, that is, a crushed stone foundation, on the seabed or the water bottom (hereinafter simply referred to as the water bottom).

例えば第1図に示すように水底に基礎構築物D
を構築する場合に、まず水底の堆積層を浚渫し、
その浚渫底面B上に砂利、砕石等の捨石層C1
C2,C3を所定の厚みに順次形成し、その上に構
造物Dを構築し、さらに捨石の層Eを形成してい
る。
For example, as shown in Figure 1, there is a basic structure D on the bottom of the water.
When constructing a
On the dredged bottom surface B is a rubble layer C 1 of gravel, crushed stone, etc.
C 2 and C 3 are sequentially formed to a predetermined thickness, a structure D is constructed thereon, and a layer E of rubble is further formed.

このように捨石層はその上面を敷き均して実質
的に平面としなければならない。そのために、捨
石の投入工程および敷き均しのためのスクリード
工程とを必要とする。
In this way, the top surface of the rubble layer must be leveled to make it substantially flat. For this purpose, a step of adding rubble and a step of screeding for leveling are required.

従来このように捨石を投入しそして敷き均しす
るには潜水夫を用いたりしなければならず、かな
り面倒な作業であつた。
In the past, it was necessary to use a diver to introduce and spread the rubble in this way, which was quite a tedious task.

一般に水中構造物を構築するために作業船から
下方に延びるラダーを介して捨石を投入し、その
ラダーの先端で捨石を敷き均す技術は特開昭57−
81531号公報および特開昭51−72118号公報で知ら
れている。しかしながら、水中に長く延びるラダ
ーは潮流等により揺動してしまうので、敷き均し
作業において、捨石層の厚みが均一とならない。
そのために例えば前記特開昭57−81531号公報記
載の技術ではスクレーパを移動自在に設けた充填
枠を設けてあり、構成が複雑である。
Generally, in order to construct underwater structures, rubble is introduced from a work boat through a ladder extending downward, and the rubble is leveled at the tip of the ladder.
It is known from Japanese Patent Application Laid-open No. 81531 and Japanese Patent Application Laid-Open No. 72118/1983. However, since the long ladder in the water is swayed by tidal currents, etc., the thickness of the rubble layer is not uniform during leveling work.
For this purpose, for example, the technique described in the above-mentioned Japanese Patent Application Laid-Open No. 57-81531 is provided with a filling frame in which a scraper is movably provided, resulting in a complicated structure.

また前記特開昭51−72118号公報記載の技術で
は、ワイヤで作業船の進行方向に対して引張力を
与えているが、波や潮流の影響を受けやすい。
Further, in the technique described in the above-mentioned Japanese Patent Application Laid-open No. 51-72118, a tensile force is applied in the traveling direction of the work boat using a wire, but it is susceptible to the effects of waves and tidal currents.

さらに特開昭56−6827号公報には海上作業船を
設置し、ガツト船から石材をコンベヤで作業台上
を前後左右に移動できる台車に設けた投入ホツパ
に投入し、その投入ホツパから石材をコンベヤを
介してシユートに送り、海底マウンドを構築する
技術が開示されている。
Furthermore, in JP-A No. 56-6827, a marine work boat is installed, and stones are fed from the Gatsuto boat into a charging hopper provided on a cart that can be moved back and forth and from side to side on a workbench using a conveyor, and stones are loaded from the loading hopper. A technique for constructing an underwater mound by sending it via a conveyor to a chute is disclosed.

しかしながら、公知技術は、海上作業台とガツ
ト船との2つの設備を必要とし、特に構築しよう
とするマウンドが作業台上の台車の移動範囲より
も広い場合に、海上作業台を移動しなければなら
ず、海上作業台は海底に設置されているので、そ
の移動が非常に面倒であり、かつ工期が長くな
る。
However, the known technology requires two pieces of equipment, an offshore work platform and a Gatsuto ship, and especially when the mound to be constructed is wider than the movement range of the cart on the work platform, the offshore work platform must be moved. However, since the offshore work platform is installed on the seabed, it is very troublesome to move it and the construction period is long.

さらに特開昭56−119035号公報には、軟弱土上
に覆工用の砂を撤布する装置が開示されている
が、かかる公知技術では敷き均しすることができ
ない。
Furthermore, Japanese Patent Laid-Open No. 119035/1983 discloses an apparatus for removing sand for lining from soft soil, but such known technology cannot spread the sand evenly.

したがつて本発明の目的は、捨石の投入作業が
円滑に行われると共に、敷き均し作業において所
定の水平面に維持できる簡単な水底スクリード装
置を提供するにある。
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a simple underwater screed device that allows the work of putting in rubble stones to be carried out smoothly and maintains a predetermined horizontal surface during the leveling work.

本発明による水底スクリード装置によれば、ア
ンカーで所定位置に繋留できる作業船と、その作
業船に設けた捨石ホツパと、その捨石ホツパから
の捨石を送るベルトコンベヤと、そのベルトコン
ベヤの終端付近でその上を移動可能に設けられた
トリツパーと、そのトリツパーの下部に位置しベ
ルトコンベヤと平行な一対のレール上を走行可能
な台車とを備え、その一対のレールは作業船上に
敷設されており、さらにその台車から水底方向に
延びる伸縮自在のラダーと、そのラダーを所定位
置に支持するための支持ワイヤと、そのラダーを
伸縮させる巻掛け装置と、そのラダーの先端に枢
着された捨込みホツパと、そのラダーに対して捨
込みホツパを枢動させる油圧シリンダ装置とを備
えている。
According to the underwater screeding device according to the present invention, there is provided a work boat that can be moored at a predetermined position with an anchor, a rubble hopper provided on the work boat, a belt conveyor for sending rubble from the rubble hopper, and a belt conveyor near the end of the belt conveyor. It is equipped with a tripper that is movable on the tripper, and a trolley that is located below the tripper and can run on a pair of rails parallel to the belt conveyor, and the pair of rails are laid on a work boat. Furthermore, there is a telescopic ladder extending from the trolley toward the bottom of the water, a support wire for supporting the ladder in a predetermined position, a wrapping device for expanding and contracting the ladder, and a drop-off hopper pivotally attached to the tip of the ladder. and a hydraulic cylinder device for pivoting the dumping hopper with respect to the ladder.

したがつて、捨込みホツパを水底から所定の高
さで垂直位置に保持した状態で捨石を供給しなが
ら、トリツパー及び台車を移動し、ラダーと共に
捨込みホツパを動かせば、水底から所定の高さの
捨石層を形成できる。その際、捨込みホツパの下
端は敷き均し作業も同時に行うので、捨石の投入
作業と敷き均し作業とを一工程で行うことができ
る。
Therefore, by holding the dumping hopper in a vertical position at a predetermined height from the water bottom and supplying rubble, moving the tripper and cart, and moving the dumping hopper together with the rudder, it will be possible to reach the predetermined height from the water bottom. A rubble layer can be formed. At this time, leveling work is also performed on the lower end of the dumping hopper at the same time, so the work of putting in rubble and leveling work can be performed in one step.

トリツパー台車の移動による捨込みホツパの移
動距離は限られているので、一定長さラダーを動
かして、捨込みホツパを移動させた後には、作業
船を移動させ、再びトリツパー、台車の移動によ
つて捨石ホツパを移動させる。捨石ホツパの巾に
は制限があるので、長手方向の捨石の敷き均し作
業が完了してから、作業船を繋留ワイヤを引張つ
て巾方向に移動させ、同様にして作業を繰り返せ
ば良い。そして水平移動を行つている途中でラダ
ーが傾斜しても、支持ワイヤおよび油圧シリンダ
装置を伸縮させて、捨込みホツパを正しい垂直位
置に保持することができるので、捨込みホツパの
下端が敷設した捨石層の上面をスクリードし、以
て実質的に水平な面を得ることができる。
The distance that the dumping hopper can be moved by moving the tripper cart is limited, so after moving the ladder a certain length and moving the dumping hopper, move the work boat and move the tripper and cart again. Move the rubble stone hoppa. Since the width of the rubble hopper is limited, after completing the leveling of the rubble in the longitudinal direction, the work boat can be moved in the width direction by pulling the mooring wire, and the work can be repeated in the same manner. Even if the ladder is tilted during horizontal movement, the support wire and hydraulic cylinder device can be expanded and contracted to hold the dumping hopper in the correct vertical position. The top surface of the rubble layer can be screeded to provide a substantially horizontal surface.

以下第2図ないし第4図を参照して本発明を実
施する装置について説明する。
An apparatus for implementing the present invention will be described below with reference to FIGS. 2 to 4.

第2図ないし第4図において、作業船1はアン
カー2で所定位置に繋留されており、そして作業
船1のデツキ上には運転および制御室3と、複数
の捨石ホツパ4と、その捨石ホツパ4からの捨石
を般尾方向に送るベルトコンベヤ5と、そのベル
トコンベヤ5の終端付近でその上を移動可能に設
けられたトリツパー6と、そのトリツパー6の下
方に位置し、ベルトコンベヤ5と平行に設けられ
たレール7上を走行する台車8と、トリツパー
6、台車8を経てベルトコンベヤ5から捨石を受
けて水底Bの方に送るパイプ即ちラダー9とを備
えている。この台車8は、ベルトコンベヤ5、ト
リツパー6からの捨石をラダー9に供給する砕石
台車部分8aと、レール7上を走行する走行台車
部分8bとより構成されている。各捨石ホツパ4
は図示の実施例では振動フイーダ10を備え、各
振動フイーダ10からの捨石を受けてベルトコン
ベヤ5に送るための連結コンベヤ11が設けられ
ている。
In FIGS. 2 to 4, a work boat 1 is moored at a predetermined position with an anchor 2, and on the deck of the work boat 1 there is an operation and control room 3, a plurality of rubble hoppers 4, and the rubble hoppers. A belt conveyor 5 that sends the rubble from 4 in the general direction, a tripper 6 that is movably provided near the end of the belt conveyor 5, and a tripper 6 located below the tripper 6 and parallel to the belt conveyor 5. It is equipped with a truck 8 that travels on a rail 7 provided at the bottom, and a pipe or ladder 9 that receives rubble from the belt conveyor 5 via the tripper 6 and the truck 8 and sends it to the bottom B. This truck 8 is composed of a stone crushing truck section 8a that supplies rubble from the belt conveyor 5 and the torturer 6 to the ladder 9, and a traveling truck section 8b that runs on the rails 7. Each rubble stone hopper 4
In the illustrated embodiment, a vibrating feeder 10 is provided, and a connecting conveyor 11 is provided for receiving the rubble from each vibrating feeder 10 and sending it to the belt conveyor 5.

トリツパー6はベルトコンベヤ上を移動可能と
なつており、また走行台車9もレール上を自由に
走行するようになつている。トリツパー6と走行
台車9の移動装置は巻取りリール、モータ車等任
意の機械的、電気的手段を採用し得る。
The tripper 6 is movable on a belt conveyor, and the traveling cart 9 is also designed to freely travel on rails. As a moving device for the tripper 6 and the traveling carriage 9, any mechanical or electrical means such as a take-up reel or a motor vehicle can be used.

第2図中12はラダーを所定位置にて支持する
ための支持ワイヤーである。また第4図中13は
ジヤケツト受台を示しいている。
Reference numeral 12 in FIG. 2 is a support wire for supporting the ladder at a predetermined position. Further, numeral 13 in FIG. 4 indicates a jacket holder.

ラダー9は一端が砕石台車部分8aに連結さ
れ、ベルトコンベヤ5、トリツパー6から送られ
る捨石を受ける第1のラダー部分9aと、その第
1のラダー部分9aに摺動嵌合する第2のラダー
部分9bとよりなり、それらの第1のラダー部分
9aと第2のラダー部分9bとは滑車等の巻掛け
装置14によつて伸縮可能に連結されている。
The ladder 9 has a first ladder part 9a which is connected at one end to the stone crushing cart part 8a, and which receives rubble sent from the belt conveyor 5 and the tripper 6, and a second ladder part which is slidably fitted into the first ladder part 9a. The first ladder portion 9a and the second ladder portion 9b are extendably connected by a winding device 14 such as a pulley.

第2のラダー部分9bの先端には捨込みホツパ
15が枢着されており、ラダー9の傾斜角度が変
化しても捨込みホツパ15は油圧シリンダ16を
伸縮し、捨込みホツパ15を枢動させることによ
り、正しい垂直位置に保持できるようになつてい
る。作動に際して捨石ホツパ4からの捨石は振動
フイーダ10からコンベヤ11を介してベルトコ
ンベヤ5に送られ、トリツパー6、砕石台車部分
8aおよびラダー9を介して捨込みホツパ15に
貯蔵される。捨込みホツパ15はその下端が形成
すべき捨石層C3の高さHと同じ高さに保持され
ており、したがつてその位置において捨込みホツ
パ15からの捨石は高さHの山となり、所定の安
息角を保つた状態となる。この捨込みホツパ15
は所定の巾例えば5m程度の巾を有している。
A dumping hopper 15 is pivotally attached to the tip of the second ladder portion 9b, and even if the inclination angle of the ladder 9 changes, the dumping hopper 15 expands and contracts the hydraulic cylinder 16 to pivot the dumping hopper 15. This allows it to be held in the correct vertical position. In operation, rubble from the rubble hopper 4 is sent from the vibrating feeder 10 via the conveyor 11 to the belt conveyor 5, and is stored in the dumping hopper 15 via the tripper 6, the crushed stone truck section 8a and the ladder 9. The lower end of the dumping hopper 15 is held at the same height as the height H of the rubble layer C3 to be formed, and therefore, at that position, the rubble from the dumping hopper 15 forms a pile of height H. A predetermined angle of repose is maintained. This disposal hopper 15
has a predetermined width, for example, about 5 m.

この状態でトリツパー6と走行台車部分8bを
移動(第2図中左方向)すれば、捨込みホツパ1
5は高さHを保持しつつ距離Lだけ水平移動す
る。すると捨石層C3は、所定巾で、その移動距
離L(例えば15m)分だけ形成される。その際、
敷き均し作業も同時に行われる。この場合支持ワ
イヤ12を適宜巻取り、引き出すことは勿論であ
る。水平移動を行つている途中でラダー9が傾斜
した場合においても、油圧シリンダ16を伸縮さ
せ、捨込みホツパ15を枢動させることにより、
捨込みホツパ15を正しい垂直位置に保持するこ
とが可能である。なお走行台車部分8bは、常に
トリツパー6の下部に位置するようになつている
ので、ベルトコンベヤ5で運ばれる砕石は砕石台
車部分8aを経て総て無駄なくラダー9に供給さ
れる。
In this state, if you move the tripper 6 and the traveling carriage part 8b (to the left in FIG. 2), the dumping hopper 1
5 moves horizontally by a distance L while maintaining the height H. Then, the rubble layer C3 is formed with a predetermined width corresponding to the moving distance L (for example, 15 m). that time,
Leveling work is also done at the same time. In this case, it goes without saying that the support wire 12 can be appropriately wound and pulled out. Even if the ladder 9 is tilted during horizontal movement, the hydraulic cylinder 16 can be expanded and contracted to pivot the dumping hopper 15.
It is possible to hold the dumping hopper 15 in the correct vertical position. In addition, since the traveling cart portion 8b is always positioned below the tripper 6, all of the crushed stone carried by the belt conveyor 5 is supplied to the ladder 9 without waste via the crushed stone cart portion 8a.

次いで捨込みホツパ15の水平位置を保持した
状態で般1の繋留ウインチ18を作動させ、船1
を第2図で左方に前記移動距離Lと実質的に同じ
距離動かす。このような作業を繰り返して所定巾
の捨石層を敷き均しながら形成する。
Next, while maintaining the horizontal position of the dumping hopper 15, the general 1 mooring winch 18 is operated, and the ship 1
is moved to the left in FIG. 2 by a distance substantially equal to the moving distance L. Such operations are repeated to form a layer of rubble of a predetermined width while leveling it out.

次に船1を巾方向(第3図で上下方向)に所定
巾だけ動かし、前記と同様な作業を繰り返す。こ
のようにすることによつて所定の面積に捨石層
C3を形成する。捨石層C1及びC2は同様の手順に
より順次形成されたものである。捨石層を順次形
成するにあたつて、捨込みホツパ15をその都度
形成しようとする捨石層の高さまで上昇する必要
がある。
Next, the ship 1 is moved by a predetermined width in the width direction (vertical direction in FIG. 3), and the same operations as described above are repeated. By doing this, a layer of rubble is formed in a predetermined area.
Form C 3 . The rubble layers C 1 and C 2 were formed sequentially by the same procedure. When forming the rubble layer one after another, it is necessary to raise the dumping hopper 15 to the height of the rubble layer to be formed each time.

本発明にあつては、第1のラダー部9aと、そ
れに摺動嵌合する第2のラダー部9bとを滑車装
置14により伸縮させることによつて高さ調整を
行う。即ち、巻掛け装置例えば滑車装置14にお
いて第1のラダー部9aに固設された上部滑車1
4aと第2のラダー部9bに固設された下部滑車
14bとに巻回された媒介節(ロープ、チエーン
等)を巻取り、あるいは引出すことにより上部滑
車14aと、下部滑車14bとの距離を調節し、
もつて第1のラダー部9aと、第2のラダー部9
bとの摺動伸縮を制御するのである。ここで巻掛
け装置14は滑車のみならずチエーンとスプロケ
ツト等任意の巻掛け伝動機構を採用し得る。
In the present invention, the height is adjusted by extending and contracting the first ladder section 9a and the second ladder section 9b that is slidably fitted thereto using the pulley device 14. That is, in a winding device, for example, a pulley device 14, the upper pulley 1 is fixed to the first ladder portion 9a.
The distance between the upper pulley 14a and the lower pulley 14b can be reduced by winding or pulling out the intermediary node (rope, chain, etc.) wound around the lower pulley 14b fixed to the second ladder section 9b. adjust,
First ladder part 9a and second ladder part 9
This controls the sliding expansion and contraction with b. Here, the winding device 14 may employ any winding transmission mechanism such as not only a pulley but also a chain and a sprocket.

なお一回の作業で形成する各捨石層C1,C2
C3の高さHは3〜3.5m程度が好ましく、したが
つて捨石層の数すなわち敷き均し回数は、形成す
べく捨石層の高さに応じて適宜選択すればよい。
そして最上の捨石層C3の上面は、特に構造物を
設置するために、基面均しとして比較的正確に
(例えば5cm以内)敷き均すのが好ましい。また
捨石すなわち砕石の大きさは1個5〜200Kgが好
適である。
In addition, each rubble layer C 1 , C 2 , formed in one operation
The height H of C 3 is preferably about 3 to 3.5 m, and therefore the number of rubble layers, that is, the number of times of leveling, may be appropriately selected depending on the height of the rubble layer to be formed.
The upper surface of the uppermost rubble layer C3 is preferably leveled relatively accurately (within 5 cm, for example) as a base level, especially in order to install a structure. Moreover, the size of the rubble, that is, crushed stone, is preferably 5 to 200 kg each.

以上の如く、本発明によれば、捨込みホツパか
ら捨石を水底に供給すると同時に、捨込みホツパ
を移動させることにより、捨石の投入と敷き均し
作業を同時に一工程で行うことができる。したが
つて作業能率が著しく向上する。またラダーが水
平方向及び垂直方向に移動自在であるから、水位
の高低に応じて常に適正位置に捨込みホツパを位
置させることができる。
As described above, according to the present invention, by simultaneously supplying rubble from the dumping hopper to the bottom of the water and moving the dumping hopper, it is possible to perform the charging and leveling work of the rubble at the same time in one step. Therefore, work efficiency is significantly improved. Further, since the ladder is movable in the horizontal and vertical directions, the dumping hopper can always be positioned at an appropriate position depending on the height of the water level.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は水中構造物を構築するための基礎構造
を示す断面図、第2図は本発明を実施した水底ス
クリード装置の正面図、第3図は第2図の水底ス
クリード装置の平面図、第4図は第2図の側面図
である。 1……作業船、2……アンカー、4……捨石ホ
ツパ、5……ベルトコンベヤ、6……トリツパ
ー、7……レール、8……台車、9……ラダー、
14……巻掛け装置、15……捨込みホツパ、1
6……油圧シリンダ装置、B……水底、C1,C2
C3……捨石層。
FIG. 1 is a sectional view showing a basic structure for constructing an underwater structure, FIG. 2 is a front view of an underwater screed device implementing the present invention, and FIG. 3 is a plan view of the underwater screed device shown in FIG. 2. FIG. 4 is a side view of FIG. 2. 1... work boat, 2... anchor, 4... rubble hopper, 5... belt conveyor, 6... tripper, 7... rail, 8... bogie, 9... ladder,
14... Winding device, 15... Throwing hopper, 1
6... Hydraulic cylinder device, B... Water bottom, C 1 , C 2 ,
C 3 ...Rubble layer.

Claims (1)

【特許請求の範囲】[Claims] 1 アンカーで所定位置に繋留できる作業船と、
その作業船に設けた捨石ホツパと、その捨石ホツ
パからの捨石を送るベルトコンベヤと、そのベル
トコンベヤの終端付近でその上を移動可能に設け
られたトリツパーと、そのトリツパーの下部に位
置しベルトコンベヤと平行な一対のレール上を走
行可能な台車とを備え、その一対のレールは作業
船上に敷設されており、さらにその台車から水底
方向に延びる伸縮自在のラダーと、そのラダーを
所定位置に支持するための支持ワイヤと、そのラ
ダーを伸縮させる巻掛け装置と、そのラダーの先
端に枢着された捨込みホツパと、そのラダーに対
して捨込みホツパを枢動させる油圧シリンダ装置
とを備えていることを特徴とする水底スクリード
装置。
1. A work boat that can be moored in place with an anchor,
A rubble hopper installed on the work boat, a belt conveyor for sending rubble from the rubble hopper, a tripper installed near the end of the belt conveyor so that it can be moved over it, and a belt conveyor located at the bottom of the tripper. and a dolly that can run on a pair of rails parallel to the work boat, and the pair of rails are laid on the work boat, and a telescoping rudder that extends from the dolly toward the bottom of the water, and supports the rudder in a predetermined position. the ladder, a winding device for expanding and contracting the ladder, a dumping hopper pivotally attached to the tip of the ladder, and a hydraulic cylinder device for pivoting the dumping hopper with respect to the ladder. An underwater screed device characterized by:
JP15307183A 1983-08-24 1983-08-24 Underwater screed device Granted JPS6047120A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15307183A JPS6047120A (en) 1983-08-24 1983-08-24 Underwater screed device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15307183A JPS6047120A (en) 1983-08-24 1983-08-24 Underwater screed device

Publications (2)

Publication Number Publication Date
JPS6047120A JPS6047120A (en) 1985-03-14
JPH0313372B2 true JPH0313372B2 (en) 1991-02-22

Family

ID=15554345

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15307183A Granted JPS6047120A (en) 1983-08-24 1983-08-24 Underwater screed device

Country Status (1)

Country Link
JP (1) JPS6047120A (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5172118A (en) * 1974-09-30 1976-06-22 Nippon Dev Consult Suichuniokeru doshano suteokikoho oyobisono sochi
JPS6018772B2 (en) * 1979-06-27 1985-05-13 三菱重工業株式会社 How to create mounds etc.
JPS6019371B2 (en) * 1980-02-27 1985-05-16 五洋建設株式会社 Sand removal device for covering the underwater bottom
JPS6019372B2 (en) * 1980-11-11 1985-05-16 和茂 奥迫 Method and device for constructing foundations for underwater structures such as caissons

Also Published As

Publication number Publication date
JPS6047120A (en) 1985-03-14

Similar Documents

Publication Publication Date Title
CN110952561A (en) Working method of riprap leveling ship
CN112573113A (en) Riprap leveling ship
CN110847185B (en) Stone throwing and tamping integrated ship
CN213323580U (en) Posture adjusting device of leveling frame device of riprap leveling ship
CN212711257U (en) Riprap leveling ship
CN112344096B (en) Construction method of submarine pipeline leveling, laying, locking and burying equipment
CN211494398U (en) Stone sliding pipe device of riprap leveling ship
JPH0313372B2 (en)
CN213324785U (en) Hopper device of riprap leveling ship
JPH027954Y2 (en)
CN111997060A (en) A screed screed device
JPS58173223A (en) Seabed leveller
CN212714952U (en) Leveling frame device of riprap leveling ship
JP2515955B2 (en) Method for unloading space and device for implementing this method
JPH025210B2 (en)
CN210238519U (en) An underwater riprap tamping device
CN112377676A (en) Method for laying submarine pipeline
CN112413230A (en) A submarine pipeline leveling, laying, locking and burying equipment
JPS6142054B2 (en)
JPH0229812B2 (en)
CN215110926U (en) A kind of submarine pipeline laying equipment
JPH04238915A (en) Spreader for seabed sand
JPH1082062A (en) Immersion device of immersed tube
CN112009969A (en) Broken stone transportation device of riprap leveling ship
JPS6040662Y2 (en) Earth and sand input equipment to barge