Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6143676B2 - - Google Patents
[go: Go Back, main page]

JPS6143676B2 - - Google Patents

Info

Publication number
JPS6143676B2
JPS6143676B2 JP55060563A JP6056380A JPS6143676B2 JP S6143676 B2 JPS6143676 B2 JP S6143676B2 JP 55060563 A JP55060563 A JP 55060563A JP 6056380 A JP6056380 A JP 6056380A JP S6143676 B2 JPS6143676 B2 JP S6143676B2
Authority
JP
Japan
Prior art keywords
core
core monitor
monitor
reactor
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP55060563A
Other languages
Japanese (ja)
Other versions
JPS56157898A (en
Inventor
Juji Hashimoto
Kazuo Yamada
Shigeo Hirano
Toshihiko Kobayashi
Yoshimi Ishii
Tomiji Yoshida
Takashi Saito
Isao Koga
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tohoku Electric Power Co Inc
Chubu Electric Power Co Inc
Hitachi Ltd
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tohoku Electric Power Co Inc
Tokyo Electric Power Co Inc
Chubu Electric Power Co Inc
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tohoku Electric Power Co Inc, Tokyo Electric Power Co Inc, Chubu Electric Power Co Inc, Hitachi Ltd filed Critical Tohoku Electric Power Co Inc
Priority to JP6056380A priority Critical patent/JPS56157898A/en
Publication of JPS56157898A publication Critical patent/JPS56157898A/en
Publication of JPS6143676B2 publication Critical patent/JPS6143676B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)

Description

【発明の詳細な説明】 本発明は、インコアモニタ交換装置に係り、特
に、インコアモニタ(原子炉内中性子束計測器)
の炉心部からの取外しおよび炉心部への装着を行
なうのに好適なインコアモニタ交換装置に関する
ものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an in-core monitor exchange device, particularly an in-core monitor (in-reactor neutron flux measuring device).
This invention relates to an in-core monitor replacement device suitable for removing and installing an in-core monitor from a reactor core.

インコアモニタには、その用途により、起動時
あるいは中間時のモニタと、出力運転時のモニタ
があり、前者は走行型、後者は定置型である。本
発明は後者の出力運転時の原子炉中性子束計測器
(パワーレンジモニタ)に関するものである。
In-core monitors can be divided into two types, depending on their use: monitors during startup or intermediate times, and monitors during output operation; the former is a traveling type, and the latter is a stationary type. The present invention relates to the latter type of reactor neutron flux measuring device (power range monitor) during power operation.

原子炉の炉心部は、炉心サポートとトツプガイ
ドとの間に多数の燃料集合体が配列されて構成さ
れる。トツプガイドの1つの格子内には通常4体
の燃料集合体が配置され、その4体の中心に十字
形の制御棒が配置される。この制御棒を挿入また
は引抜駆動して、原子炉の核反応が制御されてい
る。このように原子炉の炉心部は性能上無駄なス
ペースが全く無いように設計されており、インコ
アモニタはその細隙を縫つて配置されている。そ
の細隙が、格子状のトツプガイドの格子板下方の
スペースである。インコアモニタの故障あるいは
性能が低下した場合には、原子炉定期検査時等に
原子炉圧力容器上蓋を外した後に、これらのイン
コアモニタを交換しなければならない。この交換
作業は、現状では非常に難しい状態にある。
The core of a nuclear reactor is comprised of a large number of fuel assemblies arranged between a core support and a top guide. Usually, four fuel assemblies are arranged in one grid of the top guide, and a cross-shaped control rod is arranged in the center of the four fuel assemblies. Nuclear reactions in the nuclear reactor are controlled by inserting or withdrawing these control rods. In this way, the core of a nuclear reactor is designed so that there is no wasted space in terms of performance, and the in-core monitors are placed across the narrow spaces. This gap is the space below the lattice plate of the lattice-shaped top guide. If the in-core monitors fail or their performance deteriorates, these in-core monitors must be replaced after removing the reactor pressure vessel top cover during periodic reactor inspections. This replacement work is currently extremely difficult.

従来のインコアモニタの交換作業を第1図、第
2図により説明する。第1図において、原子炉圧
力容器3内のインコアモニタ4は、トツプガイド
5、インコアフランジ6により保持されている。
原子炉炉心のシールは、インコアフランジ6とイ
ンコアモニタ4のテーパ部のシート面9でなされ
ている。7はコアサポート、8はインコアモニタ
ハウジングである。約13mのインコアモニタ4の
取扱いは、従来、燃料交換台車10、天井クレー
ン11を操作して行われる。使用済みのインコア
モニタ4を原子炉の炉心部から取外す場合には、
所定の長さに切断するか、曲げた状態で、使用済
燃料貯蔵プール(図示せず)へ貯蔵する。1は原
子炉下部室、2は原子炉建屋5階床(以下5階床
という)、16は作業台、17はホイスト、18
はインコアモニタ取扱具である。19はスプリン
グリールで原子炉下部室1内の操作台車21上に
取付けられ、ケーブル20を巻装している。22
はペデスタルである。
The replacement work of a conventional in-core monitor will be explained with reference to FIGS. 1 and 2. In FIG. 1, an in-core monitor 4 inside a reactor pressure vessel 3 is held by a top guide 5 and an in-core flange 6.
The reactor core is sealed by the in-core flange 6 and the seat surface 9 of the tapered part of the in-core monitor 4. 7 is a core support, and 8 is an in-core monitor housing. Conventionally, the approximately 13 m long in-core monitor 4 is handled by operating a fuel exchange trolley 10 and an overhead crane 11. When removing the used in-core monitor 4 from the reactor core,
It is cut to a predetermined length or bent and stored in a spent fuel storage pool (not shown). 1 is the lower reactor room, 2 is the 5th floor of the reactor building (hereinafter referred to as the 5th floor), 16 is the workbench, 17 is the hoist, 18
is an incore monitor handling tool. Reference numeral 19 is a spring reel, which is attached to the operating trolley 21 in the lower reactor chamber 1, and around which the cable 20 is wound. 22
is a pedestal.

第2図において、12はストロングバツクで、
新しいインコアモニタ4を原子炉炉心に挿入する
場合に使用する。そして、インコアモニタ4をス
トロングバツク12に取付け、インコアモニタ4
取扱い時、曲げあるいは歪が生じないようにして
いる。この場合、先ず天井クレーン11でストロ
ングバツク12の中間部のフツク13で水平に吊
り上げ、次いで、天井クレーン11の補助フツク
14でストロングバツク12の先端の吊金具15
を吊り、この天井クレーン11の2個のフツクの
操作でストロングバツク12を垂直に保持する。
しかる後、燃料交換台車10の作業台16上から
ホイスト17を操作して、インコアモニタ4をス
トロングバツク12からインコアモニタ取扱具1
8に掴み替えをして炉心部に挿入する複雑な操作
手順で行つている。
In Figure 2, 12 is a strong back;
It is used when inserting a new in-core monitor 4 into the reactor core. Then, attach the in-core monitor 4 to the strong back 12, and
Avoid bending or distortion during handling. In this case, first, the overhead crane 11 lifts the strong bag 12 horizontally using the hook 13 at the middle part, and then the auxiliary hook 14 of the overhead crane 11 lifts the strong bag 12 from the lifting fitting 15 at the tip.
The strong bag 12 is held vertically by operating two hooks of the overhead crane 11.
After that, the hoist 17 is operated from the workbench 16 of the fuel exchange cart 10 to move the Incore monitor 4 from the strong back 12 to the Incore monitor handling tool 1.
The process involves a complicated procedure of re-gripping the tube and inserting it into the reactor core.

インコアモニタ取扱具18としては、特開昭52
−46296号公報の第6図に示される操作機が提案
されている。このようなインコアモニタ取扱具1
8では、インコアモニタ4の炉心部の取外しおよ
び炉心部への装着の両方の操作を行なうことは極
めて困難である。
As the in-core monitor handling tool 18, JP-A-52
An operating device shown in FIG. 6 of Publication No. 46296 has been proposed. Incore monitor handling tool 1 like this
8, it is extremely difficult to perform both the operations of removing the in-core monitor 4 from the reactor core and attaching it to the reactor core.

本発明の目的は、インコアモニタの炉心部への
装着および炉心部からの取外しを短時間で行なう
ことのできるインコアモニタ交換装置を提供する
ことにある。
SUMMARY OF THE INVENTION An object of the present invention is to provide an in-core monitor replacement device that allows an in-core monitor to be attached to and removed from the reactor core in a short time.

本発明の特徴は、ガイド部材に沿つてガイド部
材の軸方向に移動する固定爪と共にインコアモニ
タのつば部を挾持する可動爪を、実質的に水平方
向に移動させる第1操作手段を設け、固定爪と第
1操作手段をガイド部材の軸方向に移動させる第
2操作手段を設けることにある。
A feature of the present invention is to provide a first operating means for moving substantially horizontally a fixed claw that moves along the guide member in the axial direction of the guide member and a movable claw that clamps the collar of the in-core monitor. The object of the present invention is to provide a second operating means for moving the pawl and the first operating means in the axial direction of the guide member.

本発明は、インコアモニタの装着および取外し
動作を詳細に検討することによつてなされたもの
である。以下にその検討結果を説明する。
The present invention was developed through a detailed study of the operation of attaching and detaching an in-core monitor. The results of the study are explained below.

第3図は、インコアモニタ4の頭部詳細図であ
る。インコアモニタ4の頭部には、プランジヤ2
3が挿入される。プラグ24およびつば部25A
および25Bが、プランジヤ23に設けられる。
プランジヤ23の下端は、インコアモニタ4の頭
部内に配置されているコイルバネ26に接触して
いる。第3図は、プラグ24がトツプガイド5の
格子部材の交点の下側に設けられている凹部27
に挿入され、インコアモニタ4が炉心部に装着さ
れている状態を示している。インコアモニタ4を
取外す場合は、インコアモニタ取扱具18(特開
昭52−46296号公報の操作機)の可動爪28をA
点にあるつば部25Aに係合させ、つば部25A
をA点からB点まで距離lだけ下降させ、プラグ
24を凹部27より引出すことによつて行なわれ
る。インコアモニタ4を炉心部に装着する場合
は、可動爪28を係合したつば部25AをB点ま
で下降させた状態でプラグ24を凹部27の真下
に移動させる必要がある。したがつて、インコア
モニタ4を装着する場合と取外す場合とでは、つ
ば部25Aと係合している可動爪28の位置が、
A点とB点との間の距離lだけ異なつている。イ
ンコアモニタ4の装着時には、インコアモニタ取
扱具18の上端部が据付ガイドの上端と接触する
ので可動爪28のB点への位置決めが正確に行な
え、プラグ24の上端がトツプガイド5の下端よ
り上方に位置してプラグ24の凹部27内への挿
入が容易に行なえる。しかし、インコアモニタ4
の取外し時には、可動爪28がA点の高さになる
ようにインコアモニタ取扱具18を少し吊上げな
ければならない。この時、インコアモニタ取扱具
18は宙吊りの状態となり、可動爪28の位置決
めが精度良く行なえなくなるので、A点に存在す
るつば部25Aへの可動爪28の係合が困難とな
る。本発明は、このような問題点を解消したもの
である。
FIG. 3 is a detailed view of the head of the in-core monitor 4. FIG. A plunger 2 is attached to the head of the incore monitor 4.
3 is inserted. Plug 24 and collar 25A
and 25B are provided on the plunger 23.
The lower end of the plunger 23 is in contact with a coil spring 26 disposed within the head of the in-core monitor 4. FIG. 3 shows a recess 27 in which the plug 24 is provided below the intersection of the grid members of the top guide 5.
The in-core monitor 4 is inserted into the reactor core, and the in-core monitor 4 is shown attached to the reactor core. When removing the in-core monitor 4, move the movable claw 28 of the in-core monitor handling tool 18 (operating device of JP-A-52-46296) to A.
The collar 25A is engaged with the collar 25A at the point.
This is done by lowering the plug a distance l from point A to point B and pulling out the plug 24 from the recess 27. When installing the in-core monitor 4 in the reactor core, it is necessary to move the plug 24 directly below the recess 27 while lowering the collar 25A, which engages the movable claw 28, to point B. Therefore, the position of the movable claw 28 that engages with the collar portion 25A changes depending on whether the in-core monitor 4 is attached or removed.
The distance l between points A and B differs. When the In-core monitor 4 is installed, the upper end of the In-core monitor handling tool 18 comes into contact with the upper end of the installation guide, so the movable claw 28 can be accurately positioned at point B, and the upper end of the plug 24 is placed above the lower end of the top guide 5. With this position, the plug 24 can be easily inserted into the recess 27. However, Incore Monitor 4
When removing the in-core monitor, the in-core monitor handling tool 18 must be lifted up a little so that the movable claw 28 is at the height of point A. At this time, the in-core monitor handling tool 18 is in a suspended state, and the positioning of the movable claw 28 cannot be carried out with high precision, making it difficult to engage the movable claw 28 with the collar portion 25A located at point A. The present invention solves these problems.

本発明の好適な一実施例であるインコアモニタ
交換装置を、第4図、第5図および第6図に基づ
いて説明する。インコアモニタ交換装置30は、
上部支持板31、ガイドロツド34、上下操作用
シリンダ37、前後操作用シリンダ42、固定爪
46および可動爪49からなつている。上部支持
板31は、ガイド杆32、吊上げ部33および各
シリンダに操作用の加圧空気を供給および排気を
行なう接続口57,59,61および62を有し
ている。4本の支柱35の上端が、上部支持板3
1に固定される。4本の支柱35の下端部は、第
4図および第5図に示すように内側に曲げられ、
各支柱35の下端は一体に接合される。中央支持
板36および下部支持板55が、支柱35に溶接
にて取付けられる。上端が上部支持板31に取付
けられる4本のガイドロツド34の下端は、中央
支持板36を貫通して下部支持板55に固定され
る。中央支持板36は、ガイドロツド34に固定
してもよい。上下操作用シリンダ37が、中央支
持板36に設置される。操作用加圧空気の給排気
を行なう管路38および39が、上下操作用シリ
ンダ37に接続され、これらの管路の上端は接続
口61および62に接続される。上下操作用シリ
ンダ37内のピストン(図示せず)に取付けられ
るピストンロツド40は、プラケツト41に取付
けられる。
An in-core monitor exchange device, which is a preferred embodiment of the present invention, will be explained based on FIGS. 4, 5, and 6. The in-core monitor exchange device 30 is
It consists of an upper support plate 31, a guide rod 34, a cylinder 37 for vertical operation, a cylinder 42 for longitudinal operation, a fixed claw 46, and a movable claw 49. The upper support plate 31 has connection ports 57, 59, 61, and 62 for supplying and exhausting pressurized air for operation to the guide rod 32, the lifting portion 33, and each cylinder. The upper ends of the four pillars 35 are connected to the upper support plate 3
Fixed to 1. The lower ends of the four pillars 35 are bent inward as shown in FIGS. 4 and 5.
The lower end of each support column 35 is joined together. A central support plate 36 and a lower support plate 55 are attached to the column 35 by welding. The lower ends of the four guide rods 34, whose upper ends are attached to the upper support plate 31, pass through the central support plate 36 and are fixed to the lower support plate 55. The central support plate 36 may be fixed to the guide rod 34. A vertical operation cylinder 37 is installed on the central support plate 36. Pipes 38 and 39 for supplying and discharging pressurized air for operation are connected to the vertical operation cylinder 37, and the upper ends of these pipes are connected to connection ports 61 and 62. A piston rod 40, which is attached to a piston (not shown) within the vertical operation cylinder 37, is attached to a bracket 41.

インコアモニタ交換装置30の下部の詳細構造
を第7図および第8図に基づいて説明する。固定
爪46は、ガイドロツド34に摺動可能に取付け
られ、さらに、ブラケツト41の下端に固定され
る。前後操作用シリンダ42および1対のガイド
54が、固定爪46上に設置される。操作用加圧
空気の給排気を行なう管路43および44が、接
続口57および59に接続され、さらに、前後操
作用シリンダ42に連絡される。1対のガイド5
4内を摺動する可動爪49は、連結部材53を介
して前後操作用シリンダ42内のピストン(図示
せず)に連結されるピストンロツド45に取付け
られる。固定爪46は、インコアモニタ4を挿入
する切欠部47を有している。切欠部47の上面
には、円形凹陥部48が形成される。また、U字
形凹陥部48が、切欠部47の下面に形成され
る。ガイド54の固定用ネジを挿入するネジ穴5
6が、固定爪46に設けられる。可動爪49は、
インコアモニタ4を挿入する切欠部50を有して
いる。円形凹陥部51が、切欠部50の下面に設
けられる。可動爪49の側面には、段付部52が
形成される。この段付部52が、ガイド54に押
えられる。
The detailed structure of the lower part of the in-core monitor exchange device 30 will be explained based on FIGS. 7 and 8. The fixing pawl 46 is slidably attached to the guide rod 34 and is further fixed to the lower end of the bracket 41. A cylinder 42 for longitudinal operation and a pair of guides 54 are installed on the fixed claws 46. Pipe lines 43 and 44 for supplying and exhausting pressurized air for operation are connected to connection ports 57 and 59, and further communicated with cylinder 42 for front and rear operation. A pair of guides 5
A movable pawl 49 that slides within the piston rod 45 is attached to a piston rod 45 that is connected to a piston (not shown) in the longitudinal operation cylinder 42 via a connecting member 53. The fixing claw 46 has a notch 47 into which the in-core monitor 4 is inserted. A circular recess 48 is formed on the upper surface of the notch 47 . Further, a U-shaped recess 48 is formed on the lower surface of the notch 47 . Screw hole 5 for inserting the fixing screw of the guide 54
6 is provided on the fixed claw 46. The movable claw 49 is
It has a notch 50 into which the in-core monitor 4 is inserted. A circular recess 51 is provided on the lower surface of the cutout 50. A stepped portion 52 is formed on the side surface of the movable claw 49. This stepped portion 52 is held down by a guide 54.

以下に、インコアモニタ4の交換作業を説明す
る。沸騰水型原子炉の運転が停止された後、原子
炉圧力容器3の上蓋が取外され、第11図に示す
原子炉ウエル58内に冷却水が充填される。炉心
部60内に配置されている交換すべきインコアモ
ニタ4の周囲を取囲む4体の燃料集合体が、炉心
部60より取出される。
The replacement work of the in-core monitor 4 will be explained below. After the operation of the boiling water reactor is stopped, the upper cover of the reactor pressure vessel 3 is removed, and cooling water is filled into the reactor well 58 shown in FIG. 11. Four fuel assemblies surrounding the in-core monitor 4 to be replaced, which is disposed within the core section 60, are taken out from the core section 60.

その後、第12図に示す据付雇65は、交換対
象のインコアモニタ4をまたぐように炉心部60
の引抜いた燃料集合体の位置に挿入される。すな
わち、据付雇65の据付ガイド66および68
は、格子状のトツプガイド5の格子部材交叉部6
4をまたいで第13図のようにトツプガイド5内
に挿入される。この格子部材交叉部64の下部
に、交換対象のインコアモニタ4のプラグ24が
挿入される凹部27が存在する。据付ガイド66
と据付ガイド68の上端部は、連結金具70で連
結される。吊り金具71が、連故金具70に取付
けられる。据付ガイド66および68の底部は、
コアサポート(炉心支持板)7に取付けられる燃
料支持金具73の孔部内に挿入されて支持され
る。インコアモニタ4の下端部をインコアモニタ
ハウジング8内に導くガイド板67が、傾斜状態
で据付ガイド66内の下部に設けられる。装着確
認装置(例えば鏡)72が、据付ガイド68内に
設けられる。鏡72付近で、凹部27に対向する
据付ガイド68の部分に開口69が設けられる。
据付雇65の移動は、吊り金具71を把持して行
なう。63は、炉心部60に挿入されている燃料
集合体である。
Thereafter, the installer 65 shown in FIG.
The fuel assembly is inserted into the position of the pulled out fuel assembly. That is, the installation guides 66 and 68 of the installation staff 65
is the lattice member intersection part 6 of the lattice-shaped top guide 5.
4 and inserted into the top guide 5 as shown in FIG. A recess 27 into which the plug 24 of the in-core monitor 4 to be replaced is inserted is present below the grid member intersection 64. Installation guide 66
and the upper end of the installation guide 68 are connected by a connecting fitting 70. A hanging fitting 71 is attached to the successive fitting 70. The bottoms of the installation guides 66 and 68 are
It is inserted into the hole of a fuel support fitting 73 attached to the core support (core support plate) 7 and is supported. A guide plate 67 that guides the lower end of the in-core monitor 4 into the in-core monitor housing 8 is provided at the lower part of the installation guide 66 in an inclined state. A mounting confirmation device (eg, a mirror) 72 is provided within the installation guide 68 . An opening 69 is provided in a portion of the installation guide 68 that faces the recess 27 near the mirror 72 .
The installation member 65 is moved by gripping the hanging fitting 71. 63 is a fuel assembly inserted into the reactor core 60.

インコアモニタ交換装置30の吊上げ部33の
上端に、ホイスト17に保持される吊り部材が取
付けられる。燃料交換台車10およびホイスト1
7を操作し、インコアモニタ交換装置30を、ト
ツプガイド5が完全にガイド杆32内に挿入され
るまで据付ガイド66内を下降させる。ガイド杆
32内へのトツプガイド5の挿入が完了した時、
インコアモニタ交換装置30の位置決めが完了す
る。その後、管路44から加圧空気を前後操作用
シリンダ42内に供給してピストンロツド45を
押出し、可動爪49を矢印74(第4図)の方向
に移動させる。これによつて、可動爪49の切欠
部50内に、炉心部60内に配置されているイン
コアモニタ4のつば部25Aより上方のプランジ
ヤ23の部分が挿入される。可動爪49は、上下
操作用シリンダ37内に管路39を通して加圧空
気を供給することによつて、あらかじめつば部2
5Aより上方に位置するように調節されている。
プランジヤ23が切欠部50内に挿入された時、
管路38から上下操作用シリンダ37内に加圧空
気を供給してピストンロツド40を押出し、固定
爪46を下降させる。つば部25Aの上部が可動
爪49の円形凹陥部51内に挿入され、さらに、
コイルバネ26が圧縮されてプランジヤ23が下
降する。プラグ24が凹部27より引抜かれた
時、固定爪46の下降を停止する。プラグ24の
凹部27からの引抜きは、鏡72を見ることによ
つて確認できる。管路43から前後操作用シリン
ダ42内に加圧空気を供給し、可動爪49を矢印
74の逆方向に移動させ、可動爪49の円形凹陥
部51と固定爪46の円形凹陥部48とを一致さ
せる。つば部25Bは、固定爪46のU字形凹陥
部48内に挿入され、つば部25Aは円形凹陥部
48および51の相互間に介在する。ここでホイ
スト17を操作してインコアモニタ交換装置30
を引上げ、インコアモニタ4を炉心部60より取
出す。
A hanging member held by the hoist 17 is attached to the upper end of the lifting part 33 of the in-core monitor exchange device 30. Fuel exchange trolley 10 and hoist 1
7 to lower the in-core monitor replacement device 30 within the installation guide 66 until the top guide 5 is completely inserted into the guide rod 32. When the insertion of the top guide 5 into the guide rod 32 is completed,
The positioning of the in-core monitor exchange device 30 is completed. Thereafter, pressurized air is supplied from the conduit 44 into the cylinder 42 for forward and backward operation to push out the piston rod 45 and move the movable pawl 49 in the direction of arrow 74 (FIG. 4). As a result, the portion of the plunger 23 above the collar portion 25A of the in-core monitor 4 disposed within the reactor core portion 60 is inserted into the notch portion 50 of the movable claw 49. The movable claw 49 is moved in advance by supplying pressurized air through the pipe line 39 into the cylinder 37 for vertical operation.
It is adjusted to be located above 5A.
When the plunger 23 is inserted into the notch 50,
Pressurized air is supplied from the pipe line 38 into the vertical operation cylinder 37 to push out the piston rod 40 and lower the fixed claw 46. The upper part of the collar 25A is inserted into the circular recess 51 of the movable claw 49, and further,
The coil spring 26 is compressed and the plunger 23 descends. When the plug 24 is pulled out from the recess 27, the fixing claw 46 stops lowering. The withdrawal of the plug 24 from the recess 27 can be confirmed by looking at the mirror 72. Pressurized air is supplied from the conduit 43 into the cylinder 42 for forward and backward operation, and the movable claw 49 is moved in the opposite direction of the arrow 74, so that the circular recess 51 of the movable claw 49 and the circular recess 48 of the fixed claw 46 are moved. Match. The collar 25B is inserted into the U-shaped recess 48 of the fixed claw 46, and the collar 25A is interposed between the circular recesses 48 and 51. Here, operate the hoist 17 to replace the in-core monitor exchange device 30.
is pulled up and the in-core monitor 4 is taken out from the reactor core section 60.

このように、インコアモニタ4を炉心部60か
ら取外す場合、インコアモニタ交換装置30がト
ツプガイド5に装着されて固定されているので、
上下操作用シリンダ37および前後操作用シリン
ダ42の操作によつて可動爪49の位置決めが精
度良く行なえ、かつインコアモニタ4の取外しも
簡単に行なえる。このため、インコアモニタ4の
取外しに要する時間が短縮される。可動爪49の
位置決めは、ピストンロツド40および45の移
動距離を検出することによつて行なわれる。ま
た、上下操作用シリンダ37内のピストンが最上
端にきた時、可動爪49がつば部25Aより上方
に位置し、前後操作用シリンダ42内のピストン
が第4図で最も左側にきた時、可動爪49の切欠
部50内にプランジヤ23が挿入されるように、
あらかじめ、可動爪49の動きを調節しておいて
もよい。ガイド杆32を据付ガイド66の上端に
係合させてもよい。
In this way, when removing the in-core monitor 4 from the reactor core 60, since the in-core monitor replacement device 30 is attached and fixed to the top guide 5,
By operating the vertical operation cylinder 37 and the longitudinal operation cylinder 42, the movable claw 49 can be positioned accurately, and the in-core monitor 4 can be easily removed. Therefore, the time required to remove the in-core monitor 4 is shortened. Positioning of movable pawl 49 is performed by detecting the distance traveled by piston rods 40 and 45. Furthermore, when the piston in the vertical operation cylinder 37 is at the uppermost end, the movable claw 49 is located above the collar 25A, and when the piston in the longitudinal operation cylinder 42 is at the leftmost position in FIG. so that the plunger 23 is inserted into the notch 50 of the claw 49.
The movement of the movable claw 49 may be adjusted in advance. The guide rod 32 may engage the upper end of the installation guide 66.

炉心部60から引抜かれたインコアモニタ4は
プラグ24が下部にくるように逆転される。これ
は、プラグ24の部分が最も放射化され、放射能
レベルが高いためである。その後、インコアモニ
タ4は、燃料プール(図示せず)移動され、そこ
で吊下げられたまま、または軸方向に切断されて
貯蔵される。
The in-core monitor 4 pulled out from the reactor core 60 is reversed so that the plug 24 is at the bottom. This is because the plug 24 portion is the most radioactive and has a high radioactivity level. Thereafter, the in-core monitor 4 is moved to a fuel pool (not shown), where it is stored suspended or cut axially.

前述のように、インコアモニタ4が取外された
炉心部60の位置に、新しいインコアモニタ4が
装着される。この作業について述べる。
As described above, a new in-core monitor 4 is installed at the position of the reactor core 60 from which the in-core monitor 4 was removed. This work will be described below.

5階床2にて、新しいインコアモニタ4が、第
14図に示すストロングバツク75に取付けられ
る。
On the 5th floor floor 2, a new Incore monitor 4 is attached to the strong back 75 shown in FIG.

フレーム76に取付けられる複数のカート台車
77は、連結棒81によつて連結される。リンク
機構84は、連結棒81および82に回転可能に
取付けられる。掴み機構87は、リンク機構84
の先端部に取付けられる。
A plurality of cart carts 77 attached to the frame 76 are connected by a connecting rod 81. Link mechanism 84 is rotatably attached to connecting rods 81 and 82. The gripping mechanism 87 is connected to the link mechanism 84
Attached to the tip of the

インコアモニタ4の掴み機構87への装着は、
掴み機構87の可動把持部89の位置の設定によ
つて行なわれる。すなわち、可動把持部89が第
16図のEの位置にある時は、インコアモニタ4
は掴み機構87によつて把持される。掴み機構8
7からインコアモニタ4を離す時は、可動把持部
89を第16図のFの位置に移動させる。インコ
アモニタ4の掴み機構87への装着が完了した
時、ロツクピン91を、可動把持部89に設けら
れた突出部の孔部90内に挿入し、可動把持部8
9の動きを阻止する。
Attaching the Incore monitor 4 to the gripping mechanism 87 is as follows:
This is done by setting the position of the movable gripping part 89 of the gripping mechanism 87. That is, when the movable grip part 89 is in the position E in FIG. 16, the in-core monitor 4
is gripped by a gripping mechanism 87. Grasping mechanism 8
When separating the in-core monitor 4 from the in-core monitor 7, move the movable grip portion 89 to the position F in FIG. When the attachment of the in-core monitor 4 to the grip mechanism 87 is completed, the lock pin 91 is inserted into the hole 90 of the protrusion provided in the movable grip part 89, and
Block the movement of 9.

インコアモニタ4をストロングバツク75に取
付ける時は、リンク機構84は第15図に示すよ
うに縮んでいる。これは、リンク機構84が伸び
ていると、インコアモニタ4が取付けられている
ストロングバツク75を第11図のように垂直に
立てる操作によつてインコアモニタ4が損傷を受
ける可能性が大きい。したがつて、ストロングバ
ツク75を垂直に立て終わるまでは、リンク機構
84を縮め、インコアモニタ4をできるだけフレ
ーム76に近接させていたほうがよい。これによ
つてインコアモニタ4が損傷する危険性が減少す
る。この時、リンク機構28は、図示されていな
いロツク機構によつて開かないように固定されて
いる。カート台車77とバランスウエート78を
ローラチエーン79で連結しているので、カート
台車77を移動させることにより、ストロングバ
ツク75に取付けられるインコアモニタ4の頭部
掴み位置を自由に変えられる。インコアモニタ4
がストロングバツク75に取付けられた後、移動
防止器80を締付けることによつてカート台車7
7がフレーム76に固定される。
When the in-core monitor 4 is attached to the strong bag 75, the link mechanism 84 is retracted as shown in FIG. This is because if the link mechanism 84 is extended, there is a high possibility that the in-core monitor 4 will be damaged by the operation of vertically standing the strong back 75 to which the in-core monitor 4 is attached as shown in FIG. Therefore, it is better to retract the link mechanism 84 and bring the in-core monitor 4 as close to the frame 76 as possible until the strong bag 75 is vertically erected. This reduces the risk of damage to the in-core monitor 4. At this time, the link mechanism 28 is fixed so as not to open by a lock mechanism (not shown). Since the cart truck 77 and the balance weight 78 are connected by a roller chain 79, by moving the cart truck 77, the position of gripping the head of the in-core monitor 4 attached to the strong bag 75 can be freely changed. incore monitor 4
After the cart is attached to the strong back 75, the cart 7 can be moved by tightening the anti-movement device 80.
7 is fixed to the frame 76.

インコアモニタ4を装着したストロングバツク
75は、天井クレーン11の補助フツク14に吊
下げられる。補助フツク14の移動によりストロ
ングバツク75を原子炉の炉心部60上方へ移動
させ、ストロングバツク75を垂直に立てる。次
に、ストロングバツク75から燃料交換台車10
のホイスト17に取付けられるインコアモニタ交
換装置30に、インコアモニタ4に掴み替える。
この時、インコアモニタ4のつば部25Aは、固
定爪46と可動爪49の各々の円形凹陥部48お
よび51の間に存在する。リンク機構84を固定
しているロツク機構(図示せず)をはずし、リン
ク機構84を第16図に示すように伸ばす。これ
によつて、インコアモニタ交換装置30を、スト
ロングバツク25に取付けられたインコアモニタ
4の軸心上に容易に位置合わせすることができ
る。したがつて、作業台16上の作業員の操作に
よつて、インコアモニタ4をストロングバツク7
5からインコアモニタ交換装置30に短時間で簡
単に移すことができる。
The strong bag 75 equipped with the Incore monitor 4 is suspended from the auxiliary hook 14 of the overhead crane 11. By moving the auxiliary hook 14, the strong back 75 is moved above the reactor core 60, and the strong back 75 is erected vertically. Next, from the strong back 75 to the fuel exchange trolley 10
The in-core monitor 4 is replaced by the in-core monitor exchange device 30 attached to the hoist 17 of the in-core monitor 4.
At this time, the collar portion 25A of the in-core monitor 4 is present between the circular recesses 48 and 51 of the fixed claw 46 and the movable claw 49, respectively. The lock mechanism (not shown) fixing the link mechanism 84 is removed, and the link mechanism 84 is extended as shown in FIG. Thereby, the in-core monitor exchange device 30 can be easily aligned on the axis of the in-core monitor 4 attached to the strong bag 25. Therefore, the in-core monitor 4 can be moved to the strong back 7 by the operation of the worker on the workbench 16.
5 to the in-core monitor exchange device 30 in a short time and easily.

ホイスト17を駆動し、インコアモニタ交換装
置30を降下させることによつて、インコアモニ
タ4が据付ガイド66内に挿入される。インコア
モニタ4の下端部がガイド67に接触すると、イ
ンコアモニタ4の下端部は、ガイド67の傾斜面
に沿つて下降し、やがて、コアサポート7に取付
けられるインコアモニタハウジング8内に挿入さ
れる。インコアモニタ交換装置30が下降するに
伴つて、インコアモニタ4は、インコアモニタハ
ウジング8内を徐々に下降する。インコアモニタ
4の下端部が、インコアフランジ6のシート面9
に着座した時、ホイスト17の駆動を停止してイ
ンコアモニタ交換装置30の下降を停止する。ガ
イド杆32は、前述したようにトツプガイド5に
装着される。この時、インコアモニタ4のつば部
25Aの位置は、第3図のB点と同じレベルに存
在する。前後操作用シリンダ42内に加圧空気を
供給して、可動爪49を矢印74の方向に移動さ
せ、プラグ24を凹部27の真下に位置させる。
次に、管路39から加圧空気を上下操作用シリン
ダ37内に供給し、固定爪46を上昇させ、プラ
グ24を凹部27内に挿入する。
By driving the hoist 17 and lowering the in-core monitor exchange device 30, the in-core monitor 4 is inserted into the installation guide 66. When the lower end of the in-core monitor 4 comes into contact with the guide 67, the lower end of the in-core monitor 4 descends along the slope of the guide 67, and is eventually inserted into the in-core monitor housing 8 attached to the core support 7. As the in-core monitor exchange device 30 descends, the in-core monitor 4 gradually descends within the in-core monitor housing 8. The lower end of the in-core monitor 4 is connected to the seat surface 9 of the in-core flange 6.
When the in-core monitor exchange device 30 is seated, the drive of the hoist 17 is stopped and the descent of the in-core monitor exchange device 30 is stopped. The guide rod 32 is attached to the top guide 5 as described above. At this time, the position of the collar portion 25A of the in-core monitor 4 is at the same level as point B in FIG. Pressurized air is supplied into the longitudinal operation cylinder 42 to move the movable claw 49 in the direction of the arrow 74 and position the plug 24 directly below the recess 27 .
Next, pressurized air is supplied from the pipe line 39 into the vertical operation cylinder 37, the fixed claw 46 is raised, and the plug 24 is inserted into the recess 27.

インコアモニタ4のプラグ24が凹部27内に
完全に装着されているかどうかは、鏡28で確認
される。すなわち、5階床2にいる作業員が鏡2
8にうつつている凹部27付近の状態を見ること
によつて確認できる。インコアモニタ4の炉心部
60への装着が完了する。完了後、可動爪49が
矢印74の反対方向に移動される。インコアモニ
タ交換装置30および据付雇65を炉心部60か
ら取外し、装着されたインコアモニタ4の周囲に
4体の燃料集合体を装荷する。
Whether the plug 24 of the in-core monitor 4 is completely inserted into the recess 27 is checked using a mirror 28. In other words, a worker on floor 2 on the 5th floor looks at mirror 2.
This can be confirmed by looking at the state of the vicinity of the recess 27 extending into the area 8. The attachment of the in-core monitor 4 to the reactor core 60 is completed. After completion, movable pawl 49 is moved in the opposite direction of arrow 74. The in-core monitor replacement device 30 and the installation gear 65 are removed from the reactor core 60, and four fuel assemblies are loaded around the attached in-core monitor 4.

インコアモニタ4を炉心部60に装着する場合
も、プラグ24と凹部27の位置決めが精度良く
行なえ、かつ、装着作業が簡単に行なえる。装着
に要する時間が短縮される。交換作業全体を通し
て、著しく作業時間が短縮され、作業員の被ばく
の危険性も減少する。
Even when the in-core monitor 4 is installed in the reactor core 60, the plug 24 and the recess 27 can be positioned with high accuracy, and the installation work can be performed easily. The time required for installation is shortened. The entire replacement process will significantly save time and reduce the risk of exposure for workers.

さらに、つば部25Aは、インコアモニタの装
着時に炉心部60内で可動爪49によつて常に真
下に押えられているので、プランジヤ23が曲が
り、インコアモニタ4のプランジヤ23が挿入さ
れる孔部85とプランジヤ23がかじつて、イン
コアモニタ4の炉心部60への装着が不可能にな
る可能性はない。第17図に示すインコアモニタ
取扱具でインコアモニタ4の炉心部60への装着
を行なう場合は、プランジヤ23と孔部85とが
かじる危険性がある。すなわち、シリンダ86の
操作でピストンロツド88が下降すると、リンク
92が矢印93の方向に回転し、インコアモニタ
4のつば部25Aを保持している可動爪94が矢
印95の方向に移動する。この操作によつて、二
点鎖線で示すようにインコアモニタ4が凹部27
の真下に移動される。インコアモニタ4がシート
面9に着座した後、インコアモニタ4が凹部27
の真下に移動するまで、つば部25Aは斜めにな
つている可動爪94のために、矢印95方向の斜
めの力で押付けられている。したがつて、直径約
12mm前後のプランジヤ23は曲つて孔部85と接
触し、プランジヤ23と孔部85の間でかじりを
起しやすくなる。第17図の実線の位置で可動爪
94を水平にすると、その図の二点鎖線の位置で
可動爪94が斜めとなり、上記のような危険性が
生じる。本実施例では、このような危険性はな
く、確実にインコアモニタ4の交換作業を行なう
ことができる。
Further, since the flange portion 25A is always held directly below by the movable claw 49 within the reactor core 60 when the in-core monitor is attached, the plunger 23 bends and the hole 85 into which the plunger 23 of the in-core monitor 4 is inserted is There is no possibility that the plunger 23 would become jammed and the in-core monitor 4 would become impossible to attach to the reactor core 60. When attaching the in-core monitor 4 to the reactor core 60 using the in-core monitor handling tool shown in FIG. 17, there is a risk that the plunger 23 and the hole 85 may be jammed. That is, when the piston rod 88 is lowered by operating the cylinder 86, the link 92 rotates in the direction of arrow 93, and the movable claw 94 holding the collar 25A of the in-core monitor 4 moves in the direction of arrow 95. By this operation, the in-core monitor 4 moves to the recess 27 as shown by the two-dot chain line.
will be moved directly below. After the in-core monitor 4 is seated on the seat surface 9, the in-core monitor 4 is placed in the recess 27.
Until it moves directly below the flange 25A, the flange 25A is pressed by an oblique force in the direction of the arrow 95 due to the oblique movable claw 94. Therefore, the diameter of approx.
The plunger 23, which is about 12 mm in diameter, is bent and comes into contact with the hole 85, which tends to cause galling between the plunger 23 and the hole 85. If the movable claw 94 is placed horizontally at the position indicated by the solid line in FIG. 17, the movable claw 94 will become oblique at the position indicated by the two-dot chain line in the figure, resulting in the above-mentioned danger. In this embodiment, there is no such danger, and the in-core monitor 4 can be replaced reliably.

従来、インコアモニタ4を炉心部に取付る際、
シート面9とインコアフランジ6のシール部に原
子炉圧力容器3内のクラツドの堆積および不純物
の付着等のため、シート面が完全に密着しなかつ
たり、シート面の損傷により、シート漏れが発生
する危険性があつた。これを防止するためにフラ
ツシング雇(図示せず)を設け、インコアモニタ
4下端のシール面9への着座寸前で挿入を停止さ
せ、原子炉炉水の流速でシート面9の洗浄を行つ
ている。
Conventionally, when installing the in-core monitor 4 in the reactor core,
Due to the accumulation of crud and adhesion of impurities in the reactor pressure vessel 3 to the seal between the seat surface 9 and the in-core flange 6, the seat surface may not be in complete contact with each other, or seat leakage may occur due to damage to the seat surface. It was dangerous. In order to prevent this, a flushing mechanism (not shown) is provided to stop the insertion just before the lower end of the in-core monitor 4 seats on the sealing surface 9, and the seat surface 9 is washed with the flow rate of the reactor water. .

本発明によれば、インコアモニタの交換作業を
短時間で確実に行なうことができる。
According to the present invention, the replacement work of the in-core monitor can be performed reliably in a short time.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来のインコアモニタ装着作業の説明
図、第2図はインコアモニタを従来のストロング
バツクに取付けた時の説明図、第3図はインコア
モニタの頭部を炉心部のトツプガイドに取付ける
操作を示す説明図、第4図は本発明の好適な一実
施例であるインコアモニタ交換装置の構造図、第
5図は第4図の−矢視図、第6図は第4図の
−矢視図、第7図は第4図の−断面図、
第8図は第7図の−矢視図、第9図は第8図
に示す固定爪のインコアモニタ把持部付近の斜視
図、第10図は第8図に示す可動爪のインコアモ
ニタ把持部付近の斜視図、第11図は第4図のイ
ンコアモニタ交換装置を用いたインコアモニタ交
換作業を示す説明図、第12図は第11図に示す
据付雇の側面図、第13図は第12図のXII方向の
矢視図、第14図は第11図に示すストロングバ
ツクの側面図、第15図は第14図の−
断面図、第16図は第14図の−断面で
リンク機構を伺ばした状態を示す説明図、第17
図は従来のインコアモニタ取扱具の可動爪の動作
を示す説明図である。 3……原子炉圧力容器、4……インコアモニ
タ、5……トツプガイド、17……ホイスト、3
0……インコアモニタ交換装置、31……上部支
持板、34……ガイドロツド、35……支柱、3
7……上下操作用シリンダ、42……前後操作用
シリンダ、46……固定爪、47,50……切欠
部、48,51……円形凹陥部、49……可動
爪、65……据付雇、66,68……据付ガイ
ド、72……鏡、75……ストロングバツク。
Figure 1 is an explanatory diagram of the conventional In-Core monitor installation work, Figure 2 is an explanatory diagram of the In-Core monitor being attached to a conventional strongback, and Figure 3 is the installation of the In-Core monitor head to the top guide of the reactor core. An explanatory diagram showing the operation, FIG. 4 is a structural diagram of an in-core monitor exchange device which is a preferred embodiment of the present invention, FIG. 5 is a view taken from the − arrow in FIG. 4, and FIG. A view in the direction of arrows, FIG. 7 is a sectional view of FIG. 4,
FIG. 8 is a view taken from the − arrow in FIG. 7, FIG. 9 is a perspective view of the vicinity of the in-core monitor gripping part of the fixed claw shown in FIG. 8, and FIG. 10 is a view of the in-core monitor gripping part of the movable claw shown in FIG. A perspective view of the vicinity, FIG. 11 is an explanatory diagram showing the in-core monitor replacement work using the in-core monitor replacement device shown in FIG. 4, FIG. 12 is a side view of the installation work shown in FIG. 11, and FIG. 14 is a side view of the strong back shown in FIG. 11, and FIG. 15 is a view in the direction of arrow XII in the figure.
16 is an explanatory diagram showing a state in which the link mechanism is viewed from the − cross section of FIG. 14, and FIG. 17 is a sectional view.
The figure is an explanatory diagram showing the operation of a movable claw of a conventional in-core monitor handling tool. 3... Reactor pressure vessel, 4... In-core monitor, 5... Top guide, 17... Hoist, 3
0... Incore monitor exchange device, 31... Upper support plate, 34... Guide rod, 35... Support column, 3
7... Cylinder for vertical operation, 42... Cylinder for longitudinal operation, 46... Fixed claw, 47, 50... Notch, 48, 51... Circular recess, 49... Movable claw, 65... Installation work , 66, 68...Installation guide, 72...Mirror, 75...Strong back.

Claims (1)

【特許請求の範囲】[Claims] 1 原子炉炉心部の燃料集合体の上部を支持する
格子部材内に挿入されて上部につば部を有するイ
ンコアモニタをハウジングに向つて導く据付ガイ
ドの上端部もしくは前記格子部材に係合する支持
部材と、前記支持部材に取付けられて前記支持部
材の下方に向つて延びるガイド部材と、前記ガイ
ド部材に沿つて前記ガイド部材の軸方向に移動
し、かつ前記インコアモニタの前記つば部の下部
と係合する切欠部を有する固定爪と、前記インコ
アモニタの前記つば部の上部と係合する切欠部を
有して前記固定爪と共に前記つば部を挾持する可
動爪と、前記固定爪と共に前記ガイド部材の軸方
向に移動し、かつ前記可動爪を実質的に水平方向
に移動させる第1操作手段と、前記支持部材もし
くは前記ガイド部材に取付けられて前記摺動部材
を前記ガイド部材の軸方向に移動させる第2操作
手段とからなるインコアモニタ交換装置。
1. A support member that engages with the upper end of an installation guide that is inserted into a lattice member that supports the upper part of the fuel assembly in the reactor core and that guides the in-core monitor having a flange portion at the upper part toward the housing or the lattice member. a guide member attached to the support member and extending downward of the support member; a fixed pawl having a notch that fits together; a movable pawl that has a notch that engages with the upper part of the flange of the in-core monitor and clamps the flange together with the fixed pawl; and the guide member together with the fixed pawl. a first operating means that moves in the axial direction of the movable claw and moves the movable pawl in a substantially horizontal direction; and a first operating means that is attached to the support member or the guide member and moves the sliding member in the axial direction of the guide member. An in-core monitor exchange device comprising a second operation means for controlling the in-core monitor.
JP6056380A 1980-05-09 1980-05-09 Incore monitor exchanging device Granted JPS56157898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6056380A JPS56157898A (en) 1980-05-09 1980-05-09 Incore monitor exchanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6056380A JPS56157898A (en) 1980-05-09 1980-05-09 Incore monitor exchanging device

Publications (2)

Publication Number Publication Date
JPS56157898A JPS56157898A (en) 1981-12-05
JPS6143676B2 true JPS6143676B2 (en) 1986-09-29

Family

ID=13145852

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6056380A Granted JPS56157898A (en) 1980-05-09 1980-05-09 Incore monitor exchanging device

Country Status (1)

Country Link
JP (1) JPS56157898A (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50114297U (en) * 1974-03-04 1975-09-18

Also Published As

Publication number Publication date
JPS56157898A (en) 1981-12-05

Similar Documents

Publication Publication Date Title
CN116913564A (en) Nuclear power plant inner plug-in unit operation sleeve device and inner plug-in unit loading and reloading method
ZA200208929B (en) Method and device for loading the core of a nuclear reactor with fuel assemblies.
JPS6143676B2 (en)
JPH10132985A (en) Replacing furnace internals
US4243484A (en) Method and apparatus for use to exchange O-ring interposed between in-core housing and in-core flange in nuclear reactor
JPS6143675B2 (en)
US4666658A (en) Refueling of nuclear reactors
CN119964860B (en) A nuclear reactor detector assembly recovery system and method
JP3786009B2 (en) Reactor vessel handling
JPS639192B2 (en)
JP4178081B2 (en) Removal device for reactor neutron flux monitor
JP4000806B2 (en) Refueling equipment for nuclear facilities
JPH0531756B2 (en)
EP1184878A1 (en) Refueling mast retaining tool for a nuclear reactor
CN223598419U (en) Nuclear reactor detector assembly shielding device and recovery system
CN119964860A (en) A nuclear reactor detector component recovery system and method
JP7198715B2 (en) Fuel loading work support system
JP2839776B2 (en) Fuel channel attachment / detachment machine
JP2656410B2 (en) Neutron source installation method and neutron source holder rack used in this method
JP2000249791A (en) How to replace core shroud
JPH0252296A (en) Inserting method and handling tool for neutron measuring tube
JP2003177197A (en) Reactor structure replacement method and replacement device
JPH03252596A (en) Replacing device for fuel assembly
JPH0584478B2 (en)
JPS6137595B2 (en)