JPS6145035B2 JP57035516A JP3551682A JPS6145035B2 JP S6145035 B2 JPS6145035 B2 JP S6145035B2 JP 57035516 A JP57035516 A JP 57035516A JP 3551682 A JP3551682 A JP 3551682A JP S6145035 B2 JPS6145035 B2 JP S6145035B2
Authority
JP
Japan
Prior art keywords
tunnel
widening
segment
ground
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP57035516A
Other languages
Japanese (ja)
Other versions
JPS58153898A (en
Inventor
Tetsuo Hatakeyama
Kazuyuki Tajima
Tadashi Suzuki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP57035516A priority Critical patent/JPS58153898A/en
Publication of JPS58153898A publication Critical patent/JPS58153898A/en
Publication of JPS6145035B2 publication Critical patent/JPS6145035B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 本発明はセグメントで覆工したトンネルの断面
形状をトンネル内部から拡げる工法に関するもの
である。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of expanding the cross-sectional shape of a tunnel lined with segments from inside the tunnel.

通常、シールド工法によつて築造されるトンネ
ルは、下水道、電力や通信用の配線坑、或いは地
下鉄等に用いられている。
Typically, tunnels constructed using the shield method are used for sewerage systems, power and communication wiring pits, subways, and the like.

このようなトンネルは、シールド工法によつて
土砂を掘削すると共に掘削壁面にコンクリートや
鋼製のセグメントを覆工して形成されるものであ
るが、地下鉄における退避場所や排水、換気設備
の設置場所、或いは配線の引込、接続部、下水道
の維持管理用の場所等、トンネル断面よりも広い
断面部分を必要とする場合には、従来のシールド
工法ではトンネルの掘削後に地上から立坑を掘削
して所要の拡巾部を築造するのが通常である。
Such tunnels are formed by excavating earth and sand using the shield method and lining the excavated walls with concrete or steel segments. , or when a cross-sectional area wider than the tunnel cross-section is required, such as a place for wiring, connections, or sewage maintenance, the conventional shield construction method involves excavating a vertical shaft from the ground after excavating the tunnel. It is normal to construct a widened section.

しかしながら、近年、道路事情の悪化、絶対的
な土地不足に加えて環境保全に関する地域住民の
関心の高まりなどにより前述した立坑の用地取得
及び工事の施工が極めて困難になつてきている。
However, in recent years, it has become extremely difficult to acquire land and construct the shafts as described above due to deteriorating road conditions, absolute land shortages, and growing local residents' interest in environmental conservation.

本発明はこのような問題点に鑑みて開発したも
のであり、地上から立坑を掘削することなくトン
ネル内部から所望の拡巾部分を築造し得るトンネ
ル拡巾工法を提供するものである。
The present invention was developed in view of these problems, and provides a tunnel widening method that can construct a desired widening section from inside the tunnel without excavating a vertical shaft from the ground.

本発明の実施例を図面について説明すると、1
は一般に使用されているコンクリート製又は鋼製
のセグメントで、シールド機によつて地盤2を掘
削することにより形成されるトンネル3を覆工す
るものである。4はトンネル3の断面形状を拡巾
すべき部分に前記セグメント1に代えて予め組込
まれ、セグメント1と共にトンネル3を形成する
鋼板製の拡巾壁形成用セグメント部材で、地盤側
又はトンネル内側から見た形状は第3図に示すよ
うに同一巾の互いに平行な上下側板8,8及び左
右側板10,10からなる長方形状の周壁枠4a
に形成されていると共に地盤2側の面にシールド
機による掘削形状に合わせた円弧面の壁板6を設
け、この壁板6の周縁を周壁枠4aの一端周端面
に一体に連設してあり、さらに周壁枠4aの他端
周端面に適宜巾を有するフランジ板14を内方に
向かつて一体に周設してなるものである。
Embodiments of the present invention will be explained with reference to the drawings: 1
is a generally used concrete or steel segment, which lines a tunnel 3 formed by excavating the ground 2 with a shield machine. Reference numeral 4 denotes a segment member for forming a widening wall made of a steel plate, which is pre-assembled in place of the segment 1 in the part where the cross-sectional shape of the tunnel 3 is to be widened, and forms the tunnel 3 together with the segment 1. As seen in FIG. 3, the peripheral wall frame 4a is rectangular in shape and consists of upper and lower side plates 8, 8 and left and right side plates 10, 10, which are parallel to each other and have the same width.
A wall board 6 with an arcuate surface that matches the shape of excavation by the shield machine is provided on the surface on the ground 2 side, and the peripheral edge of this wall board 6 is integrally connected to the peripheral end surface of one end of the peripheral wall frame 4a. Furthermore, a flange plate 14 having an appropriate width is integrally provided around the other end of the peripheral wall frame 4a facing inward.

5はこの拡巾壁形成用セグメント部材4の前記
壁板6に設けた土砂取入口で、図においては上下
2個所に方形状に開口6aしてあり、その開口部
6aの周縁から内方に向かつて角錐状の土砂導入
筒部6bを一体に突設し、該筒部6bの土砂導出
開口部に回転ヒンジ11によつて蓋板12を開閉
自在に装着し、トンネル施工時においては開口部
を閉止して土砂の流入を防いでいる。
Reference numeral 5 denotes an earth and sand intake port provided in the wall plate 6 of this widening wall forming segment member 4. In the figure, there are rectangular openings 6a at two locations, upper and lower, and inward from the periphery of the openings 6a. A pyramid-shaped earth and sand introduction cylinder 6b is integrally provided on the opposite side, and a lid plate 12 is attached to the earth and sand outlet opening of the cylinder 6b so as to be openable and closable. are closed to prevent the inflow of earth and sand.

7及び9は周壁枠4aを構成した上下、左右側
板8,10に、周方向に所定間隔毎に夫々穿設さ
れた複数個のボルト孔で、上下側板8,8に設け
たボルト孔7は上下側板8,8をトンネル周方向
に隣接するセグメント1,1と接続させるもので
あり、左右側板10,10に設けたボルト孔9は
該側板10をトンネルの長さ方向に隣接するセグ
メント1又は拡巾壁形成用セグメント部材4に接
続させるものである。
Reference numerals 7 and 9 denote a plurality of bolt holes drilled at predetermined intervals in the circumferential direction in the upper and lower, left and right side plates 8 and 10 of the peripheral wall frame 4a, respectively. The bolt holes 9 provided in the left and right side plates 10 connect the upper and lower side plates 8, 8 to the segments 1, 1 adjacent to each other in the tunnel circumferential direction, and the bolt holes 9 provided in the left and right side plates 10, 10 connect the side plates 10 to the segments 1, 1 adjacent to each other in the longitudinal direction of the tunnel. It is connected to the widening wall forming segment member 4.

13は周壁枠4aのフランジ板14に一定間隔
毎に穿設したボルト孔である。
Reference numeral 13 denotes bolt holes drilled at regular intervals in the flange plate 14 of the peripheral wall frame 4a.

15は拡巾壁形成用セグメント部材4の周壁枠
4aと同一形状を有する角形の短筒体で、第5,
6図に示すように、その両開口端縁に前記セグメ
ント部材4のフランジ板14と同一形状のフラン
ジ板18を内方に向けて一体に周設してあり、こ
のフランジ板18にセグメント部材4のフランジ
板14に設けたボルト孔13と付合する複数個の
ボルト孔17を穿設してある。
15 is a rectangular short cylinder having the same shape as the peripheral wall frame 4a of the widening wall forming segment member 4;
As shown in FIG. 6, a flange plate 18 having the same shape as the flange plate 14 of the segment member 4 is integrally provided inwardly around both opening edges, and the segment member 4 is attached to the flange plate 18. A plurality of bolt holes 17 are drilled to engage the bolt holes 13 provided in the flange plate 14 of.

19はジヤツキで、トンネル3内にトンネルの
長さ方向に敷設したレール20,20上を移動す
る台車21上にトンネルと直角方向に向けて複数
本、上下、左右に配設されてあり、そのシリンダ
ー22は台車21の一側部に立設した枠23に固
定し、ロツド24端は前記短筒体15のフランジ
板18に当接させるものである。
Reference numeral 19 denotes jacks, and a plurality of jacks are arranged perpendicularly to the tunnel on top and bottom, left and right, on a trolley 21 that moves on rails 20, 20 laid in the length direction of the tunnel in the tunnel 3. The cylinder 22 is fixed to a frame 23 erected on one side of the truck 21, and the end of the rod 24 is brought into contact with the flange plate 18 of the short cylinder 15.

25はセグメント1の内周面に当接してジヤツ
キ19の作動反力を受ける反力受で、枠23との
間に調節ジヤーナルジヤツキ26を介在させてあ
る。
Reference numeral 25 denotes a reaction force receiver that comes into contact with the inner circumferential surface of the segment 1 to receive the reaction force of the action of the jack 19, and an adjustment journal jack 26 is interposed between it and the frame 23.

今、シールド機(図示せず)によつてトンネル
を掘進しながらセグメント1を組立てる際に、ト
ンネルの拡巾すべき部分を拡巾壁形成用セグメン
ト部材4により覆工し、上下に隣接するセグメン
ト1と拡巾壁形成用セグメント部材4とを連結ボ
ルト(図示せず)によりボルト孔を介して互いに
接合すると共にトンネルの長さ方向に隣接するセ
グメント1又はセグメント部材4とを同様に連結
ボルトにより互いに接合する。
Now, when assembling the segment 1 while excavating the tunnel with a shield machine (not shown), the part of the tunnel to be widened is lined with the segment member 4 for forming widening walls, and the vertically adjacent segments 1 and the widening wall forming segment member 4 are connected to each other through bolt holes by connecting bolts (not shown), and the segment 1 or segment member 4 adjacent in the longitudinal direction of the tunnel is connected by connecting bolts in the same manner. join each other.

シールド機によるトンネル掘削が終了したの
ち、台車21を移動させてセグメント部材4の位
置に停止させ、ジヤーナルジヤツキ26を調節し
て反力受25をセグメント部材4と対向したセグ
メント1に当接する。次に、セグメント部材4の
背面側に短筒体15を配設し、そのフランジ板1
8のボルト孔17とセグメント部材4のフランジ
板14のボルト孔13とを合致させてボルトで接
合したのち、ジヤツキ19を作動させてそのロツ
ド24を短筒体15の背面側フランジ板18に当
接させる。
After tunnel excavation by the shield machine is completed, the cart 21 is moved and stopped at the position of the segment member 4, and the journal jack 26 is adjusted to bring the reaction force receiver 25 into contact with the segment 1 facing the segment member 4. Next, the short cylindrical body 15 is arranged on the back side of the segment member 4, and the flange plate 1
After aligning the bolt holes 17 of 8 with the bolt holes 13 of the flange plate 14 of the segment member 4 and joining them with bolts, operate the jack 19 to bring the rod 24 into contact with the back side flange plate 18 of the short cylinder body 15. Let them come into contact with you.

次いで拡巾壁形成用セグメント部材4の周壁枠
4aと他のセグメントとの連結ボルトを取り外
し、セグメント部材4の蓋12を開いて土砂取入
口5を開口させ、その取入口5を通して地盤の掘
削をすると同時にジヤツキ19を作動させて短筒
体15と一体のセグメント部材4を押圧し、掘削
の進行と共に地盤中に推進させる。
Next, the connecting bolts between the peripheral wall frame 4a of the widening wall forming segment member 4 and other segments are removed, the lid 12 of the segment member 4 is opened to open the soil intake port 5, and the ground is excavated through the intake port 5. At the same time, the jack 19 is activated to press the segment member 4 integrated with the short cylinder 15, and propel it into the ground as excavation progresses.

この場合、地盤の土砂が軟弱な場合は、ジヤツ
キ19の押圧力だけで土砂取入口5からトンネル
内に流入させながらセグメント部材4の推進を行
うことができ、土砂が硬い場合は人力による手掘
り或いは適宜の掘削機械によつて掘削する。
In this case, if the soil on the ground is soft, the segment member 4 can be propelled while flowing into the tunnel from the soil intake port 5 only by the pressing force of the jack 19; if the soil is hard, the segment member 4 can be manually dug. Alternatively, excavate with an appropriate excavation machine.

こうしてセグメント部材4を地盤中に推進さ
せ、該セグメント部材4と連結した短筒体15の
背面がセグメント1の内周面まで達すると推進を
中止し、蓋12を閉止すると共に短筒体15とセ
グメント1とをボルト等により適宜固定し、ジヤ
ツキ19のロツド24を縮めて次の短筒体15を
前記推進した短筒体15の背面に接続し、セグメ
ント1との固定を解いて再びジヤツキ19を作動
させてセグメント部材4と共に短筒体15を地盤
中に推進させる。
In this way, the segment member 4 is propelled into the ground, and when the back surface of the short cylindrical body 15 connected to the segment member 4 reaches the inner peripheral surface of the segment 1, the propulsion is stopped, the lid 12 is closed, and the short cylindrical body 15 is closed. Segment 1 is appropriately fixed with bolts, etc., the rod 24 of the jack 19 is retracted, the next short cylinder 15 is connected to the back of the propelled short cylinder 15, the fixation with the segment 1 is released, and the jack 19 is tightened again. is activated to propel the short cylinder 15 together with the segment member 4 into the ground.

このような作業を繰返してセグメント部材4と
短筒体15とにより所望巾の拡巾部を形成するも
のである。
By repeating such operations, the segment member 4 and the short cylindrical body 15 form an expanded portion having a desired width.

又、セグメント部材4をトンネルの長さ方向に
連続して取付けている場合には、前述した拡巾作
業をセグメント部材4に順次行うことによりトン
ネル方向に長い拡巾部を作ることができる。
Further, when the segment members 4 are attached continuously in the length direction of the tunnel, a long widened portion in the tunnel direction can be created by sequentially performing the above-mentioned width widening operation on the segment members 4.

さらに、短筒体15を2分割しておき、それを
組立てることによつて短筒体を形成できるように
すれば、運搬、組立が容易となる。
Further, if the short cylinder body 15 is divided into two parts and assembled to form the short cylinder body, transportation and assembly will be facilitated.

なお、セグメント部材1とセグメント部材4或
いは筒体15との間に止水用パツキンを施すこと
は当然である。
Note that it is a matter of course that a waterproof packing is provided between the segment member 1 and the segment member 4 or the cylindrical body 15.

以上のように本発明は、地盤側に面する壁面に
手掘り又は機械掘りが可能な大きさに開口した土
砂取入口を設けると共に該土砂取入口に開閉蓋を
装着してなる拡巾壁形成用セグメント部材をトン
ネルを覆工するセグメントの一部に、トンネルの
長さ方向に対して直角方向の外方に向かつて圧入
自在に組込んでおき、この拡巾壁形成用セグメン
ト部材をトンネルの内部側からジヤツキ等によつ
て地盤に押圧、推進させることにより、該拡巾壁
形成用セグメント部材の土砂取入口から土砂をト
ンネル内に流入させると共に地盤が硬い場合には
土砂取入口を通じて手掘り又は機械掘りを行いな
がら拡巾壁形成用セグメント部材を地盤中に推進
させてトンネルに拡巾部を形成することを特徴と
するトンネルの拡巾工法に係るものであるから、
拡巾壁形成用セグメント部材の地盤側に面する壁
面に、手掘り又は機械掘りが可能な大きさに開口
した土砂取入口を設けると共に該土砂取入口に開
閉蓋を装着しているので、セグメントの組立時に
は該土砂取入口を開閉蓋で閉止しておくことによ
つてトンネル内への土砂の自然流入を阻止できる
のは勿論、拡巾壁形成時において該開閉蓋を開放
し、拡巾壁形成用セグメント部材を地盤に押圧、
推進させると、その推進によつて土砂を取入口か
ら積極的にトンネル内に流入させることができる
と共に地盤が拡巾形成用セグメント部材の推進、
押圧により弛緩することがないので、地盤の沈下
を確実に防止でき、さらに、地盤が硬い場合には
土砂取入口を通じて手掘り又は機械掘りを行うこ
とにより地質に応じた円滑な掘削が可能となつて
トンネルの拡巾部を能率よく形成できるものであ
る。
As described above, the present invention provides an expanded wall by providing a soil intake port having a size that allows manual or mechanical digging on a wall surface facing the ground side, and attaching an opening/closing lid to the soil intake port. The segment member for forming the widening wall is assembled into a part of the segment for lining the tunnel so that it can be press-fitted outward in the direction perpendicular to the length direction of the tunnel. By pressing and propelling the earth from the inside using jacks, etc., the earth and sand are allowed to flow into the tunnel through the earth and sand intake ports of the segment members for forming widening walls, and when the ground is hard, manual digging is carried out through the earth and sand intake ports. Or, because it relates to a tunnel widening method characterized by forming a widening part in a tunnel by driving a widening wall forming segment member into the ground while performing mechanical excavation,
A soil intake port with an opening large enough to allow manual or mechanical digging is provided on the wall surface of the segment member for forming widening walls facing the ground, and an opening/closing lid is attached to the soil intake port. Of course, by closing the earth and sand intake with a lid when assembling the tunnel, natural inflow of earth and sand into the tunnel can be prevented. Press the forming segment member into the ground,
When propelled, earth and sand can be actively flowed into the tunnel from the entrance, and the ground can propel the segment members for width expansion.
Since it does not loosen due to pressure, it is possible to reliably prevent the ground from sinking.Furthermore, if the ground is hard, smooth excavation depending on the geology can be performed by hand or mechanical digging through the earth and sand intake port. This allows the widened portion of the tunnel to be formed efficiently.

このように、本発明のトンネル拡巾工法によれ
ば、地上から立坑を掘削する必要もなくトンネル
内部から所望の拡巾部分を形成でき、従つて立坑
の用地取得等の問題を全面的に解消し得るもので
あり、又、セグメント部材の圧入距離やトンネル
方向の長さに制限を受けることなく大、小の空間
面積を有する拡巾部を容易に得ることができ、分
岐トンネルや地下鉄の駅等の築造にも採用できる
ものである。
As described above, according to the tunnel widening method of the present invention, a desired widening section can be formed from inside the tunnel without the need to excavate a shaft from the ground, and therefore problems such as acquiring land for a shaft can be completely solved. Moreover, widened parts with large and small spatial areas can be easily obtained without being limited by the press-fit distance of segment members or the length in the tunnel direction, and can be used in branch tunnels and subway stations. It can also be used for construction such as.

さらに本発明方法によれば、拡巾部の形成後に
該拡巾部にシール機を据え付けて分岐トンネルの
発進口とすることもでき、又、トンネルの拡巾部
をトンネル断面に対して上下左右どちらの方向に
も形成し得るものである。
Furthermore, according to the method of the present invention, after forming the widening section, a sealing machine can be installed on the widening section to use it as the starting mouth of a branch tunnel. It can be formed in either direction.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の実施例を示すもので、第1図は
拡巾部形成前のトンネル断面図、第2図は拡巾部
形成中のトンネル断面図、第3図は拡巾壁形成用
セグメント部材の背面図、第4図はその中央縦断
面図、第5図は短筒体の正面図、第6図はその断
面図である。 1……セグメント、3……トンネル、4……拡
巾壁形成用セグメント、5……土砂取入口、15
……短筒体、19……ジヤツキ。
The drawings show an embodiment of the present invention, and FIG. 1 is a cross-sectional view of a tunnel before forming a widening section, FIG. 2 is a cross-sectional view of a tunnel during formation of a widening section, and FIG. 3 is a segment for forming a widening wall. FIG. 4 is a rear view of the member, FIG. 4 is a central vertical sectional view thereof, FIG. 5 is a front view of the short cylinder, and FIG. 6 is a sectional view thereof. 1... Segment, 3... Tunnel, 4... Segment for forming widening wall, 5... Earth and sand intake, 15
...Short cylinder, 19...Jyatsuki.

Claims (1)

【特許請求の範囲】[Claims] 1 地盤側に面する壁面に手掘り又は機械掘りが
可能な大きさに開口した土砂取入口を設けると共
に該土砂取入口に開閉蓋を装着してなる拡巾壁形
成用セグメント部材をトンネルを覆工するセグメ
ントの一部に、トンネルの長さ方向に対して直角
方向の外方に向かつて圧入自在に組込んでおき、
この拡巾壁形成用セグメント部材をトンネルの内
部側からジヤツキ等によつて地盤に押圧、推進さ
せることにより、該拡巾壁形成用セグメント部材
の土砂取入口から土砂をトンネル内に流入させる
と共に地盤が硬い場合には土砂取入口を通じて手
掘り又は機械掘りを行いながら拡巾壁形成用セグ
メント部材を地盤中に推進させてトンネルに拡巾
部を形成することを特徴とするトンネルの拡巾工
法。
1. An earth and sand intake port with an opening large enough to allow manual or mechanical digging is provided on the wall facing the ground side, and an opening/closing lid is attached to the earth and sand intake port to cover the tunnel with segment members for forming widening walls. It is assembled into a part of the segment to be constructed so that it can be press-fitted outward in a direction perpendicular to the length direction of the tunnel.
By pressing and propelling this widening wall forming segment member against the ground from the inside of the tunnel with a jack or the like, earth and sand will flow into the tunnel from the earth and sand intake port of this widening wall forming segment member, and the ground will be A tunnel widening method characterized by forming a widening part in a tunnel by driving a segment member for forming a widening wall into the ground while performing manual or mechanical digging through an earth and sand intake port when the ground is hard.
JP57035516A 1982-03-05 1982-03-05 Tunnel widening method Granted JPS58153898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57035516A JPS58153898A (en) 1982-03-05 1982-03-05 Tunnel widening method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57035516A JPS58153898A (en) 1982-03-05 1982-03-05 Tunnel widening method

Publications (2)

Publication Number Publication Date
JPS58153898A JPS58153898A (en) 1983-09-13
JPS6145035B2 true JPS6145035B2 (en) 1986-10-06

Family

ID=12443912

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57035516A Granted JPS58153898A (en) 1982-03-05 1982-03-05 Tunnel widening method

Country Status (1)

Country Link
JP (1) JPS58153898A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5106802B2 (en) * 2006-07-07 2012-12-26 西松建設株式会社 Widening part construction method of tunnel

Also Published As

Publication number Publication date
JPS58153898A (en) 1983-09-13

Similar Documents

Publication Publication Date Title
JPS6145035B2 (en)
JP2979044B2 (en) Large-scale underground structures and their construction methods
JP3194192B2 (en) Open shield method
JP2554507B2 (en) Underground space construction method
JP3165548B2 (en) Casing tube
JP2004060266A (en) Non-open-cut construction method for underground structure
JP2967095B2 (en) Steel cutting edge and method of constructing liner plate drainage well using the same
JPS6134556B2 (en)
JPS5898595A (en) Drilling method for enlarging tunnel
JP3822317B2 (en) Tunnel construction apparatus and tunnel construction method
JPH04500544A (en) Reinforcement of continuous poured concrete walls
JPS6126467Y2 (en)
JP3894423B2 (en) Promotion method
JP3646698B2 (en) Construction method for underground structures
JPH0765464B2 (en) Construction method of underground structure
JP2617418B2 (en) Construction method of underground large space structure
EP0647740B1 (en) Method and apparatus for making a lined trench in the soil; as well as a lined trench
JP7082225B1 (en) Construction method of underground structure
JP3041434B2 (en) Open shield method
JPH033039B2 (en)
JP3636320B2 (en) Diverging type propulsion machine
JPH05287983A (en) How to construct a long, large-diameter underground space
JPS6221958B2 (en)
JPS584031A (en) Construction of artitificial body divertible vertical pile in iron moor process
JPS6126466Y2 (en)