JPS6220357B2 - - Google Patents
Info
- Publication number
- JPS6220357B2 JPS6220357B2 JP57146647A JP14664782A JPS6220357B2 JP S6220357 B2 JPS6220357 B2 JP S6220357B2 JP 57146647 A JP57146647 A JP 57146647A JP 14664782 A JP14664782 A JP 14664782A JP S6220357 B2 JPS6220357 B2 JP S6220357B2
- Authority
- JP
- Japan
- Prior art keywords
- shaft
- blasting
- explosives
- blast
- central shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Description
【発明の詳細な説明】
本発明は岩盤に所望深さの孔を安全且つ合理的
に施工し得る立坑築造法に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a vertical shaft that can safely and rationally construct a hole of a desired depth in rock.
従来から、岩盤に立坑を築造するには、第12
〜17図に示すように、発破孔の穿孔作業、発破
作業、〓出し作業、立坑覆工作業等の一連の作業
を地表面から下部に向かつて1ステージ毎に繰返
し行つている。 Traditionally, in order to build a shaft in bedrock, the 12th
As shown in Figures 1 to 17, a series of operations such as drilling a blast hole, blasting, unloading, and lining the shaft are repeated in each stage from the ground surface downward.
この方法において、1ステージ毎に順次掘削す
るに際して1ステージ分の発破孔を穿設するもの
であるが、立坑aの周辺部の穿孔は、先に形成さ
れた直上ステージの覆工壁のコンクリートbが存
在する等の理由で、計画の掘削壁面に沿つて垂直
に穿孔することができなく、傾斜させて穿孔cし
なければならない。従つてこの傾斜孔cは必然的
に計画掘削線よりも外方寄りとなるため、掘削断
面dが大きくなつて覆工コンクリートの使用量も
多くなる。 In this method, one stage's worth of blast holes are drilled when sequentially excavating each stage, but the holes around the shaft a are drilled through the concrete b of the lining wall of the stage immediately above, which was previously formed. Due to the presence of the excavation wall, etc., it is not possible to perpendicularly drill holes along the planned excavation wall surface, and the holes must be drilled at an angle. Therefore, since this inclined hole c is necessarily located outward from the planned excavation line, the excavation cross section d becomes large and the amount of lining concrete used increases.
又、〓出し作業は、1ステージ分の発破作業が
終了後に適宜の荷上げ昇降装置を使用して立坑坑
口まで運搬しなければならず、そのための設備も
大規模なものとなる上に〓出し作業に長時間を要
するという問題点があつた。 In addition, for unloading work, after one stage of blasting work is completed, the load must be transported to the shaft entrance using an appropriate lifting and lowering device, and the equipment for this is large-scale. There was a problem that the work required a long time.
このため、最近、第18〜24図に示すような
新規な掘削法が開発された。 For this reason, a new excavation method as shown in FIGS. 18 to 24 has recently been developed.
この工法は、既に掘削を終了した横坑eに連ら
なる立坑fを掘削する場合に採用されるもので、
予め計画立孔断面の周辺部と該周辺部に囲まれた
内部とに地表面から横坑eに貫通する所定数の発
破孔gを穿設し、各発破孔の下部に所要量の爆薬
を装填したのちこの爆薬をほぼ同時に爆発させて
立坑下部の1ステージh分の発破を完了し、発破
によつて生じた〓を横坑を使用して外部に運搬、
排出する。しかるのち、再び発破孔gの適所に爆
薬を装填して発破したのち〓を排出し、この作業
を繰返し行つて横坑e側から地表面に達する立坑
fを形成する。 This method is used when excavating a vertical shaft f that is connected to a horizontal shaft e that has already been excavated.
A predetermined number of blasting holes g penetrating from the ground surface into the horizontal shaft e are drilled in advance in the peripheral area of the planned hole cross section and the interior surrounded by the peripheral area, and the required amount of explosives is placed in the lower part of each blasting hole. After loading, the explosives were detonated almost simultaneously to complete the blasting of one stage of the lower part of the shaft, and the 〓 produced by the blasting was transported outside using the side shaft.
Discharge. Thereafter, explosives are again loaded into the appropriate locations in the blast hole g, and the blast is discharged, and this operation is repeated to form a vertical shaft f that reaches the ground surface from the horizontal shaft e side.
次に、立坑f内に昇降足場iを組立てて立坑f
の下部或いは上部側から順次型枠jを用いてコン
クリートkを打設し、立坑fを覆工するものであ
る。 Next, assemble the elevating scaffold i in the shaft f and
Concrete k is placed sequentially from the lower or upper side using formwork j to line the vertical shaft f.
この工法によれば、前記方法に比べて掘削量及
びコンクリート量が共に計画通りとなるが、型枠
の組立て及びコンクリート打設のための昇降用足
場iを必要とする上に高所作業となつて安全上問
題があり、さらに、掘削後、〓を完全に排出する
ので立坑壁面の岩盤は応力的に解放状態となり、
コンクリートで完全に覆工するまでに相当の時間
を要するので立坑周囲の岩盤に緩み領域mが形成
される。 According to this construction method, both the amount of excavation and the amount of concrete are as planned compared to the above method, but it requires a lifting scaffold i for assembling formwork and pouring concrete, and requires work at heights. This poses a safety problem, and furthermore, after excavation, the rock mass on the shaft wall becomes stressed and released because the water is completely discharged.
Since it takes a considerable amount of time to completely line the shaft with concrete, a loose area m is formed in the rock around the shaft.
このため、覆工コンクリートkの肉厚を大きく
する必要があり、又、特に大断面の立坑を築造す
る場合には前記緩み領域mの形成が顕著になつて
現在ではこの工法を採用することは問題とされて
いる。 For this reason, it is necessary to increase the wall thickness of the lining concrete k, and especially when building a shaft with a large cross section, the formation of the loosened area m becomes noticeable, so it is no longer possible to adopt this construction method. It is considered a problem.
本発明はこのような問題点をなくするために、
奥行き方向に適宜長さ毎に爆薬を発破させながら
所望深さの岩盤孔を掘削する工法において、予め
地表面から適宜深さの部分に設けられている横坑
に向かつて計画立坑部分に所要本数の発破孔を貫
通、穿設し、この計画立坑の中央部以外の外周部
に設けられた発破孔のみ砂等の充填材を充填する
と共に計画立坑の中央部に設けられた各発破孔の
下部に地表面から爆薬を装填したのち発破させて
横坑に連通する適宜高さの立坑中央部を形成し、
この立坑中央部下部より上方に向かつて1ステー
ジ毎に前記発破を繰返すことにより地表面に達す
る中央立坑を形成し、しかるのち、前記の砂等を
充填した発破孔内の該充填材を地表面から適宜長
さ部分だけ除去して爆薬を装填し、該爆薬を発破
させてその発破により発生する〓を前記中央立坑
内に排除し、この発破作業を順次中央立坑の下方
に向かつて繰返し行つて大径の立坑を形成すると
共に中央立坑内に排除された〓を横坑から排出す
ることを特徴とする岩盤掘削工法を提供するもの
である。 In order to eliminate such problems, the present invention has the following features:
In this construction method, a rock hole of a desired depth is excavated while blasting explosives at appropriate lengths in the depth direction. Only the blast holes provided on the outer periphery other than the center of this planned shaft are filled with filler such as sand, and the lower part of each blast hole provided in the center of the planned shaft is filled with filler such as sand. Explosives are loaded from the ground surface and then detonated to form a central shaft of an appropriate height that communicates with the horizontal shaft.
A central shaft is formed by repeating the above-mentioned blasting in an upward direction from the lower part of the central part of the shaft, reaching the ground surface, and then the filling material in the blast hole filled with the sand, etc. is deposited on the ground surface. A suitable length portion is removed from the shaft, an explosive is loaded, the explosive is detonated, and the 〓 generated by the blasting is expelled into the central shaft, and this blasting operation is repeated successively moving down the central shaft. The present invention provides a rock excavation method characterized by forming a large-diameter shaft and discharging the waste that has been removed into a central shaft from a side shaft.
本発明の実施例を図面について説明すると、第
1図乃至第11図に示すように、岩盤1の地表面
2とこの地表面2から適宜深さの部分に設けられ
ている横坑3間に大断面の立坑4を築造する工法
である。 To explain the embodiment of the present invention with reference to the drawings, as shown in FIGS. 1 to 11, there is a space between a ground surface 2 of a bedrock 1 and a horizontal shaft 3 provided at an appropriate depth from this ground surface 2. This is a method of constructing a vertical shaft 4 with a large cross section.
まず、第1図に示すように、ポーリングマシン
5を使用して計画立坑の外周辺部とその内側に地
表面2から横坑3に向かつて複数の発破孔6を貫
通、穿設する。この発破孔6は、計画立坑の中央
部において、第9図に示すように心抜用6a、払
用6bを複数本配設すると発破の効率が良好とな
り、外周辺部の発破孔6c,6dにおいては、そ
の下端を栓11で閉塞してその内部に全長に亘り
砂7を充填する。 First, as shown in FIG. 1, a plurality of blast holes 6 are penetrated and drilled in the outer periphery of the planned shaft and its inner side from the ground surface 2 toward the horizontal shaft 3 using the poling machine 5. For this blasting hole 6, if a plurality of coring holes 6a and blowing holes 6b are arranged in the central part of the planned shaft as shown in FIG. In this case, the lower end is closed with a plug 11, and the inside thereof is filled with sand 7 over its entire length.
さらに、砂7を充填していない計画立坑中央部
の各発破孔6a,6b内に該孔よりもやや小径の
木製栓12をロープ13で地表面2から吊り下ろ
す。 Furthermore, a wooden plug 12 having a diameter slightly smaller than that of each blast hole 6a, 6b in the central part of the planned shaft not filled with sand 7 is suspended from the ground surface 2 with a rope 13.
この栓12の下端中央には、第11図に示すよ
うに発破孔6の径よりも長い棒状材14の略々中
央を紐15によつて吊設していると共に上面には
紐で形成した輪環16を取付けてあり、この輪環
16にロープ13の下端に取付けたフツク17を
引掛けて発破孔6に吊り下ろされる。 At the center of the lower end of this stopper 12, as shown in FIG. 11, approximately the center of a rod-shaped material 14, which is longer than the diameter of the blasting hole 6, is suspended by a string 15, and a string is formed on the upper surface. A ring 16 is attached to the ring 16, and a hook 17 attached to the lower end of the rope 13 is hooked onto the ring 16, and the rope 13 is suspended into the blast hole 6.
この時、発破孔6内を棒状材14が傾斜した状
態で吊り下ろされ、横坑3内に達すると略水平状
態になる。 At this time, the rod-shaped material 14 is suspended in the blast hole 6 in an inclined state, and when it reaches the inside of the horizontal shaft 3, it becomes approximately horizontal.
この状態からロープ13を引き上げると棒状材
14が横坑上壁に当接、係止し、栓12は発破孔
6の下端部所定位置で停止する。次いで、第10
図に示すように発破孔6内に適量のバラスト18
を投入して該孔6の内周壁と栓12との間にバラ
スト18を詰まらせることにより孔6内に栓12
を固定、保持させ、しかるのち、ロープ13を緩
めてフツク17を輪環12から外し、ロープ13
を回収する。 When the rope 13 is pulled up from this state, the bar 14 comes into contact with the upper wall of the shaft and is locked, and the plug 12 is stopped at a predetermined position at the lower end of the blast hole 6. Then the 10th
As shown in the figure, an appropriate amount of ballast 18 is placed inside the blast hole 6.
The plug 12 is inserted into the hole 6 by inserting the ballast 18 into the space between the inner circumferential wall of the hole 6 and the plug 12.
is fixed and held, then the rope 13 is loosened and the hook 17 is removed from the ring 12, and the rope 13 is
Collect.
次に、地表から検尺しながら該中央部の各発破
孔6a,6bに適量のバラスト18、導火線1
9′を接続した爆薬19、タンピング材20をセ
ツトする。 Next, while measuring from the ground surface, an appropriate amount of ballast 18 and a fuse 1 are placed in each blast hole 6a, 6b in the center.
Explosive 19 and tamping material 20 connected to 9' are set.
こうして計画立孔中央部の全ての孔6a,6b
内の所定部位に爆薬19を装填した後(第2
図)、これらの爆薬19をほぼ同時に発破させる
と、横坑3に通じる1ステージ分21の計画立坑
4の中央下部が掘削、形成される(第3図)。こ
の発破によつて発生した〓22は横坑3を通じて
外部に排出されるものであるが、その量は次のス
テージ23の発破によつて発生する〓の増量分だ
けであり、該所定量の〓の排出によつて次に形成
されるステージ23の下端面と〓天端間に適宜広
さの空洞24が生じる。この空洞24ができる
と、再び棒状材14を吊り下げた新たな栓12を
発破孔6a,6b内に吊下して該棒状材14を空
洞24の天壁面に係止させ、バラスト18の投入
によつて前述同様に各発破孔6a,6bの空洞2
4から所定長さ上方部位に栓12を固定し、装
薬、発破を行つて次のステージ20の発破掘削を
行う。 In this way, all the holes 6a, 6b in the central part of the planned holes
After loading explosives 19 into the specified part of the
When these explosives 19 are exploded almost simultaneously, the lower center of the planned vertical shaft 4 of one stage 21 leading to the horizontal shaft 3 is excavated and formed (FIG. 3). The 〓22 generated by this blasting is discharged to the outside through the horizontal shaft 3, but the amount is only the increased amount of 〓 generated by the blasting of the next stage 23, and the predetermined amount is A cavity 24 of an appropriate size is created between the lower end surface of the stage 23 and the top end of the stage 23 to be formed next. Once this cavity 24 is formed, a new plug 12 with a rod-shaped material 14 suspended therein is suspended again in the blast holes 6a, 6b, the rod-shaped material 14 is locked to the ceiling wall surface of the cavity 24, and the ballast 18 is inserted. As described above, the cavity 2 of each blast hole 6a, 6b is
The plug 12 is fixed at a predetermined length above the stage 4, and the next stage 20 is blasted and excavated by charging and blasting.
この発破作業を中央部の全ての発破孔6a,6
bに順次上方へ所定長さ毎に繰返し行うことによ
り内部に天端まで〓22が充満した小断面の立坑
4′を、計画立坑中央において地表面2と横坑3
間に形成される(第4図)。 This blasting work is carried out to all the blasting holes 6a, 6 in the central part.
By repeating the process upwards every predetermined length, a vertical shaft 4' with a small cross section filled with 22 up to the top is created at the center of the planned vertical shaft on the ground surface 2 and the horizontal shaft 3.
(Fig. 4).
このように、計画の大断面立坑4の周囲から一
定巾aを残して小口径の立坑4′が掘削されるの
で、例え、該小径立坑4′内の〓を全て排出して
も周辺岩盤の応力解放による緩み領域は前記残し
た範囲a内に治めることができる。 In this way, a small-diameter shaft 4' is excavated leaving a certain width a around the planned large-section shaft 4, so even if all the water in the small-diameter shaft 4' is discharged, the surrounding rock The loosened region due to stress release can be contained within the above-mentioned remaining range a.
次に、横孔3側から適量の〓を排出して立坑
4′内の〓天端が地表面から1ステージ分だけ降
下させてバーンホール25を形成すると共に外周
方の発破孔6c,6d内の砂7を1ステージ分に
応じた長さ部分だけ圧縮空気或いは高圧水によつ
て排除したのち、その中空下部内に所要量の爆薬
26を装填して発破させ、計画立坑周囲と中央立
坑4′間の岩盤を崩す。この際、発生した〓は、
横坑3から適量排出することによつて〓天端を降
下させ、その降下によつて生じた小口径立坑4′
の凹所内に投入して1ステージ分の掘削を完了
し、足場27を形成する(第5図,第6図)。 Next, an appropriate amount of 〓 is discharged from the horizontal hole 3 side, and the top of the shaft 4' is lowered by one stage from the ground surface to form a burn hole 25, and inside the blast holes 6c, 6d on the outer periphery. After removing the sand 7 by a length corresponding to one stage using compressed air or high-pressure water, the required amount of explosives 26 is loaded into the hollow lower part and exploded, and the area surrounding the planned shaft and the central shaft 4 is removed. ' Break down the bedrock between. At this time, the 〓 that occurred is
By discharging an appropriate amount from the horizontal shaft 3, the top is lowered, and the small-diameter shaft 4' created by the lowering
One stage of excavation is completed, and a scaffolding 27 is formed (FIGS. 5 and 6).
しかるのち、ロツクボルト28の打込み、コン
クリートの吹付、或いは型枠を用いてコンクリー
ト29を打設することにより大断面立坑上部の覆
工を施す。 Thereafter, the upper part of the large cross-section shaft is lined by driving lock bolts 28, spraying concrete, or placing concrete 29 using a formwork.
次いで、前述同様に、発破孔6c,6d内の砂
を所望長さだけ排除して装薬、発破させると共に
発生した〓を小口径立坑4′において〓天端の降
下により形成される凹所内に投入して足場を形成
し、大断面立坑の覆工を行う。 Next, in the same manner as described above, the sand in the blasting holes 6c and 6d is removed by a desired length, charged and blasted, and the resulting sand is poured into the small-diameter shaft 4' into the recess formed by the descent of the top. It will be used to form scaffolding and line the large-section shaft.
この作業を地表部から横坑3に向かつて順次繰
返し行うことにより、第8図に示すように大断面
の立坑4を築造するものである。 By repeating this operation sequentially from the ground surface toward the horizontal shaft 3, a vertical shaft 4 with a large cross section is constructed as shown in FIG.
なお、以上の実施例においては、発破孔内に充
填する材料として砂を使用したが、圧縮空気や高
圧水等で容易に排除できる材料であればよい。 In the above embodiments, sand was used as the material to fill the blast holes, but any material may be used as long as it can be easily removed with compressed air, high pressure water, or the like.
以上のように本発明は、奥行方向に適宜長さ毎
に爆薬を発破させながら所望深さの岩盤孔を掘削
する工法において、予め地表面から適宜深さの部
分に設けられている横坑に向かつて計画立坑部分
に所要本数の発破孔を貫通、穿設し、この計画立
坑の中央部以外の外周部に設けられた発破孔のみ
砂等の充填材を充填すると共に計画立坑の中央部
に設けられた各発破孔の下部に地表面から爆薬を
装填したのち発破させて横坑に連通する適宜高さ
の立坑中央部を形成し、この立坑中央部下部より
上方に向かつて1ステージ毎に前記発破を繰返す
ことにより地表面に達する中央立坑を形成し、し
かるのち、前記の砂等を充填した発破孔内の該充
填材を地表面から適宜長さ部分だけ除去して爆薬
を装填し、該爆薬を発破させてその発破により発
生する〓を前記中央立坑内に排除し、この発破作
業を順次中央立坑の下方に向かつて繰返し行つて
大径の立坑を形成すると共に中央立坑内に排除さ
れた〓を横坑から排出することを特徴とする岩盤
孔掘削工法に係るものであるから、予め計画した
孔の深さに応じて該計画孔内に所要本数の長尺発
破孔を穿設しておくので、爾後の掘削量やコンク
リート量が計画量よりも多くなることはなく、し
かも1ステージ毎に発破孔を穿設する場合に比べ
て効率的に作業が行えるものであり、さらに発破
は所定長さ間隔毎に行われてその時に形成される
所定深さの孔部底面を足場に利用でき、従来のよ
うな昇降足場を不必要にして安全且つ能率良く覆
工作業ができるものである。さらに、計画立坑の
中央部以外の外周部に設けられた発破孔には砂等
の充填材を充填しておくので、発破を行つた際に
発破孔が〓によつて埋まる虞れがなく、次の発破
作業時には該発破孔の開口端が容易に見つけ出す
ことができて円滑な爆薬装填が行えるものであ
る。 As described above, the present invention is a method of excavating a rock hole of a desired depth while blasting explosives at appropriate lengths in the depth direction. Before proceeding, the required number of blast holes will be penetrated and drilled in the planned shaft part, and only the blast holes provided on the outer periphery other than the central part of the planned shaft will be filled with filler such as sand, and Explosives are loaded from the ground surface into the lower part of each blast hole provided and then blasted to form a central shaft of an appropriate height that communicates with the horizontal shaft. By repeating the blasting, a central shaft reaching the ground surface is formed, and then the filling material in the blast hole filled with sand, etc. is removed from the ground surface by an appropriate length, and explosives are loaded. The explosives are blasted and the resulting blast is expelled into the central shaft, and this blasting operation is repeated successively toward the bottom of the central shaft to form a large-diameter shaft. Since this involves a rock hole excavation method characterized by discharging water from a horizontal shaft, the required number of long blast holes are drilled in the planned hole according to the depth of the hole planned in advance. This prevents the amount of excavation and concrete from exceeding the planned amount, and the work can be done more efficiently than when drilling holes for each stage. The bottom surface of holes of a predetermined depth formed at predetermined length intervals can be used as scaffolding, making it possible to perform lining work safely and efficiently without the need for conventional lifting and lowering scaffolding. . Furthermore, since the blast holes provided on the outer periphery of the planned shaft other than the central area are filled with filler such as sand, there is no risk that the blast holes will be filled by sand when blasting is carried out. During the next blasting operation, the open end of the blast hole can be easily found and explosives can be loaded smoothly.
又、本発明によれば、中央立坑を形成したの
ち、その周囲を地表面から適宜深さ毎に発破によ
り順次拡径していくので、大断面の立坑を容易に
築造でき、その際、中央立坑の形成時にその周囲
の岩盤部分が残存しているので、応力解放による
岩盤緩み領域を該残存部分に形成することができ
て大断面の立坑周辺の岩盤を緩めることがなく、
従つて立坑内周壁の覆工の肉厚を薄くすることが
できるものである。しかも前記中央立坑下端を予
め設けておいた横坑に連通させて該横坑から〓を
排出し得るので、〓排出用の昇降設備を必要とす
ることがないと共にこの〓の排出は覆工コンクリ
ートの硬化時間内に行えるので工期の短縮を計る
ことができるものであり、その上、地表部から発
破によつて中央立坑外周を所定長さ毎に順次拡大
させていく際に、中央立坑内の〓天端を横坑から
の〓排出により降下させてその時に生じる凹所内
に発破により生じた〓を投入することができ、従
つて〓の排出が簡単に行えると共に大断面立坑形
成時の足場が容易に形成できてコンクリート覆工
作業を円滑に行えるものである。 Further, according to the present invention, after forming the central shaft, the diameter of the surrounding area is sequentially expanded by blasting at appropriate depths from the ground surface, so that it is possible to easily construct a shaft with a large cross section. When the shaft is formed, the surrounding rock remains, so a rock loosening area due to stress release can be formed in the remaining part, and the rock around the large cross-section shaft does not loosen.
Therefore, the thickness of the lining of the inner circumferential wall of the shaft can be made thinner. Moreover, since the lower end of the central shaft is connected to a pre-prepared horizontal shaft and the 〓 can be discharged from the lateral shaft, there is no need for lifting equipment for discharging the 〓, and the 〓 can be discharged from the lined concrete. This method can shorten the construction period because it can be carried out within the curing time of It is possible to lower the top of the shaft by discharging it from the side shaft, and to throw the debris produced by blasting into the recess that is created at that time.This makes it easy to discharge the debris, and it also makes it easier to use the scaffolding when forming a large-section shaft. It is easy to form and enables smooth concrete lining work.
第1図乃至第11図は本発明の実施例を示すも
ので、第1図〜第8図はその工程図、第9図は発
破孔の穿孔状態を示す平面図、第10図は爆薬装
填状態を示す縦断面図、第11図は栓の正面図、
第12図乃至第17図は従来工法の簡略工程図、
第18図乃至第22図は同じく従来の別な工法の
簡略工程図、第23図は発破孔の穿孔状態を示す
平面図、第24図は緩み領域部を示す平面図であ
る。
1……岩盤、2……地表面、3……横坑、4…
…立坑、6……発破孔、7……砂、19……爆
薬、22……〓。
Figures 1 to 11 show an embodiment of the present invention, Figures 1 to 8 are process diagrams, Figure 9 is a plan view showing the drilling state of the blast hole, and Figure 10 is the loading of explosives. A vertical sectional view showing the state, FIG. 11 is a front view of the stopper,
Figures 12 to 17 are simplified process diagrams of the conventional method;
18 to 22 are simplified process diagrams of another conventional construction method, FIG. 23 is a plan view showing the drilling state of the blast hole, and FIG. 24 is a plan view showing the loosened region. 1... Bedrock, 2... Ground surface, 3... Side shaft, 4...
...shaft, 6...blast hole, 7...sand, 19...explosives, 22...〓.
Claims (1)
ら所望深さの岩盤孔を掘削する工法において、予
め地表面から適宜深さの部分に設けられている横
坑に向かつて計画立坑部分に所要本数の発破孔を
貫通、穿設し、この計画立坑の中央部以外の外周
部に設けられた発破孔にのみ砂等の充填材を充填
すると共に計画立坑の中央部に設けられた各発破
孔の下部に地表面から爆薬を装填したのち発破さ
せて横坑に連通する適宜高さの立坑中央部を形成
し、この立坑中央部下部より上方に向かつて1ス
テージ毎に前記発破を繰返すことにより地表面に
達する中央立坑を形成し、しかるのち、前記の砂
等を充填した発破孔内の該充填材を地表面から適
宜長さ部分だけ除去して爆薬を装填し、該爆薬を
発破させてその発破により発生する〓を前記中央
立坑内に排除し、この発破作業を順次中央立坑の
下方に向かつて繰返し行つて大径の立坑を形成す
ると共に中央立坑内に排除された〓を横坑から排
出することを特徴とする岩盤掘削工法。1. In a method of excavating a rock hole of a desired depth while blasting explosives at appropriate lengths in the depth direction, the necessary amount is A number of blast holes will be penetrated and drilled, and filler such as sand will be filled only in the blast holes provided on the outer periphery other than the center of the planned shaft, and each blast hole provided in the center of the planned shaft will be filled with filler such as sand. By loading explosives from the ground surface at the bottom of the shaft and blasting them to form a central shaft of an appropriate height that communicates with the horizontal shaft, the blasting is repeated for each stage upward from the bottom of the central shaft. A central shaft reaching the earth's surface is formed, and then a suitable length of the filling material in the blast hole filled with sand, etc. is removed from the earth's surface, explosives are loaded, and the explosives are detonated. The 〓 generated by the blasting is expelled into the central shaft, and this blasting work is repeated successively downward in the central shaft to form a large-diameter shaft, and the 〓 expelled into the central shaft is removed from the side shaft. A rock excavation method characterized by discharge.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14664782A JPS5938494A (en) | 1982-08-24 | 1982-08-24 | Rock hole drilling method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14664782A JPS5938494A (en) | 1982-08-24 | 1982-08-24 | Rock hole drilling method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5938494A JPS5938494A (en) | 1984-03-02 |
| JPS6220357B2 true JPS6220357B2 (en) | 1987-05-06 |
Family
ID=15412456
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14664782A Granted JPS5938494A (en) | 1982-08-24 | 1982-08-24 | Rock hole drilling method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5938494A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2555387Y2 (en) * | 1991-04-26 | 1997-11-19 | 株式会社丸島アクアシステム | Screen cage for dust remover |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5774600A (en) * | 1980-10-29 | 1982-05-10 | Youichi Shiba | Blasting of rock bed or the like |
-
1982
- 1982-08-24 JP JP14664782A patent/JPS5938494A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5938494A (en) | 1984-03-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101596660B1 (en) | Apparatus and method for removing waste PHC pile of reclaimed land | |
| JPS587765B2 (en) | Method and apparatus for forming columns of underground fillings | |
| CN114961803B (en) | A construction method for crushing chamber system engineering | |
| CN112943260A (en) | Tunnel middle partition wall step excavation method | |
| JP6971170B2 (en) | How to build an underground structure | |
| SG180105A1 (en) | Tunnel reinforcement structure and tunnel construction method capable of controlling ground displacement using pressurization | |
| US1681883A (en) | Method of producing and placing piles | |
| CN113847029A (en) | Surrounding column mining method for high and large point column of underground mine | |
| US4069760A (en) | Method for driving a shaft with shaped charges | |
| US3921410A (en) | System and method of permafrost pile forming | |
| KR100743453B1 (en) | Vertical Gang Excavation Method | |
| JPS6220357B2 (en) | ||
| JPS6220358B2 (en) | ||
| KR20230025512A (en) | Non-vibration rock excavating method that can shorten the construction period | |
| KR102079190B1 (en) | weight down type perpendicular hole hive-cut press in mehthod of construction | |
| CN118531786A (en) | A kind of artificial excavated pile wall protection construction method | |
| JPH09511036A (en) | How to drill a rock cavity | |
| RU2166631C2 (en) | Method of opening of mine horizons from deep openpits in mining of kimberlite deposits | |
| JP2001207774A (en) | Shaft excavating method | |
| GB2132667A (en) | Method of installing precast concrete piles | |
| US1372856A (en) | Method of building sewers and tunnels | |
| JPH0637830B2 (en) | Vertical shaft for shield method | |
| JP2514514B2 (en) | How to build an underground cavity | |
| JP6844082B2 (en) | Underground pile crushing method | |
| RU2037602C1 (en) | Method to manufacture club-footed piles |