JPS6255364B2 - - Google Patents
Info
- Publication number
- JPS6255364B2 JPS6255364B2 JP1369882A JP1369882A JPS6255364B2 JP S6255364 B2 JPS6255364 B2 JP S6255364B2 JP 1369882 A JP1369882 A JP 1369882A JP 1369882 A JP1369882 A JP 1369882A JP S6255364 B2 JPS6255364 B2 JP S6255364B2
- Authority
- JP
- Japan
- Prior art keywords
- cable
- winding
- laying
- storage device
- start end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000004804 winding Methods 0.000 claims description 21
- 238000000034 method Methods 0.000 claims description 8
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000007796 conventional method Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Description
【発明の詳細な説明】
[発明の技術分野]
本発明は、ケーブル収容具に巻収されたケーブ
ルを巻終り端と巻始め端とから2方向へ向けて布
設するケーブルの布設方法に関する。DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a cable laying method for laying a cable wound in a cable storage tool in two directions from a winding end and a winding start end.
[発明の技術的背景]
従来からケーブルの振分け延線、特に大サイズ
ケーブルの一部をマンホールから洞道や管路内に
布設し、残余のケーブルを鉄塔へ立ち上がらせた
り変電所内に引き込むような場合には、第1図に
示すようにケーブルドラム1をマンホール2の近
傍に設置し、ケーブル3を巻終り端から所定の長
さマンホール2から洞道や管路4内に布設した
後、第2図に示すように残余のケーブル3を引き
出し地上に8の字状に堆積させてケーブル3の巻
始め端を出し、次いでこの巻始め端からケーブル
3を例えば立上げ鉄塔5に引き上げたり、あるい
は変電所内へ引き込んだりすることが行われてい
た。[Technical Background of the Invention] Conventionally, cable distribution and extension, in particular, methods such as laying a part of a large cable from a manhole into a tunnel or conduit, and then raising the remaining cable to a steel tower or leading it into a substation, have been practiced. In this case, the cable drum 1 is installed near the manhole 2 as shown in FIG. As shown in Figure 2, the remaining cable 3 is pulled out and deposited on the ground in a figure 8 shape, the winding start end of the cable 3 is exposed, and then the cable 3 is raised from this winding start end, for example, and pulled up to the steel tower 5, or It was being pulled into the substation.
[背景技術の問題点]
しかしながら、このような従来のケーブル3の
布設方法では、ケーブル3を地上に8の字状に堆
積させる際、このケーブル3がねじれてしまい、
ワイヤーシールドに座屈やゆるみが生じてしまう
という欠点があつた。[Problems with the Background Art] However, in such a conventional method of laying the cable 3, when the cable 3 is piled up in a figure 8 shape on the ground, the cable 3 is twisted.
The drawback was that the wire shield could buckle or loosen.
[発明の目的]
本発明はかかる従来の欠点を解消すべくなされ
たもので、ケーブル収容具に巻取されたケーブル
を、巻終り端と巻始め端とからそれぞれ2方向に
布設する際、ケーブルにねじれを生ずるすること
なく延線可能なケーブルの布設方法を提供しよう
とするものである。[Object of the Invention] The present invention has been made in order to eliminate such conventional drawbacks. The purpose of the present invention is to provide a method of laying a cable that can be extended without twisting the cable.
[発明の概要]
すなわち、本発明のケーブルの布設方法は、ケ
ーブル収容具に巻収されたケーブルを、ケーブル
巻終り端から所定の布設路に布設した後、残余の
ケーブルのケーブル収容具から出ている部分をブ
レーキ装置を備えた案内装置に載せてケーブル収
容具から残余のケーブルを順次繰り出しながら巻
始め端がケーブル収容具から出せる位置まで吊り
上げ、次いでケーブル案内装置を下降させつつ巻
始め端から所定の布設路に布設することにより、
布設時のケーブルのねじれを防止したものであ
る。[Summary of the Invention] That is, the cable installation method of the present invention involves laying a cable wound in a cable storage tool from the end of the cable winding to a predetermined laying path, and then allowing the remaining cable to exit from the cable storage device. Place the remaining cable on a guide device equipped with a brake device, and while paying out the remaining cable from the cable storage device, lift it up until the start end can be removed from the cable storage device, then lower the cable guide device and unwind from the start end of the cable. By laying the cable on the designated route,
This prevents the cable from twisting during installation.
[発明の実施例]
以下本発明の詳細を第3図を参照して説明す
る。[Embodiments of the Invention] The details of the present invention will be explained below with reference to FIG. 3.
なお第3図において、第1図および第2図と共
通する部分には同一符号を付してある。 In FIG. 3, parts common to FIGS. 1 and 2 are designated by the same reference numerals.
第3図は本発明を鉄塔立ち上げに適用した実施
例を示している。 FIG. 3 shows an embodiment in which the present invention is applied to the erection of a steel tower.
図において立上げ鉄塔5近傍に設置された巻取
りドラム1には布設すべきケーブル3が巻収され
ている。このケーブル3は巻終り端からマンホー
ル2の洞道または管路4入口に設置されたケーブ
ルガイド6を経て、洞道あるいは管路4内に所定
の長さ引き込まれる点については従来方法と同様
である。 In the figure, a cable 3 to be laid is wound around a winding drum 1 installed near a rising steel tower 5. This cable 3 is similar to the conventional method in that it is drawn into the tunnel or pipe 4 for a predetermined length from the winding end through a cable guide 6 installed at the entrance of the tunnel or pipe 4 of the manhole 2. be.
しかして所定長洞道または管路4内に延線した
ところでケーブル3の下側に案内リール7が介挿
される。案内リール7は中心孔に挿通したシヤフ
トを介してクレーン車8のクレーン9に吊り下げ
されたワイヤー10に回動自在に吊り下げられて
おり、この案内リール7には任意に案内リール7
の回動を停止させ、かつ回転速度を調節し得るブ
レーキ装置(図示を省略)が備えられている。 A guide reel 7 is inserted below the cable 3 after it has been extended into the tunnel or conduit 4 for a predetermined length. The guide reel 7 is rotatably suspended from a wire 10 suspended from a crane 9 of a crane truck 8 via a shaft inserted through a center hole.
A brake device (not shown) is provided that can stop the rotation of the motor and adjust the rotational speed.
このブレーキ装置は、例えば案内リール7の中
心孔付近に設けられた電磁力によりシヤフトを締
めつけるブレーキシユーと、これを遠隔操作する
制御装置で構成することができる。 This braking device can be composed of, for example, a brake shoe provided near the center hole of the guide reel 7 that tightens the shaft by electromagnetic force, and a control device that remotely operates the brake shoe.
なお案内リール7は、ケーブル3の案内機能を
有する他の案内装置で代えることもできる。 Note that the guide reel 7 may be replaced with another guide device having a function of guiding the cable 3.
次いで案内リール7はクレーン9により、徐々
に吊り上げられる。 The guide reel 7 is then gradually lifted up by the crane 9.
このようにして巻取りドラム1のケーブル3の
巻量が少なくなつたところで、案内リール7のブ
レーキ装置を徐々に作動させ、ケーブル3の巻始
め端が取り出せる位置まで案内リール7を吊り上
げる。次いで鉄塔5上のケーブル立上げ位置の上
方に設置された滑車10に引き掛けられたワイヤ
ー11の先端にケーブル3の巻始め端を固定し、
地上に設置したウインチ12によりワイヤー11
を巻上げると同時にクレーン車8のクレーン9を
運転して案内リール7を徐々に下へ降ろしてい
く。このときブレーキ装置を調節してケーブル3
が巻終り端側に自重で下がることを防止するとと
もに下降速度を調節して巻始め端側に生じるU字
状のたるみが地面に接しないようにする。このよ
うにして案内リール7を外してもケーブルが地面
に接しない位置までケーブル3が引き上げられた
ところで案内リール7をケーブル3から外し、以
後所定の手順によりケーブル3を鉄塔5上に引き
上げる。 In this manner, when the amount of winding of the cable 3 on the winding drum 1 decreases, the brake device of the guide reel 7 is gradually activated to lift the guide reel 7 to a position where the winding start end of the cable 3 can be taken out. Next, the winding start end of the cable 3 is fixed to the tip of the wire 11 hooked on the pulley 10 installed above the cable starting position on the steel tower 5,
Wire 11 by winch 12 installed on the ground
At the same time as the guide reel 7 is hoisted up, the crane 9 of the crane truck 8 is operated to gradually lower the guide reel 7. At this time, adjust the brake device and
This prevents the winding from lowering due to its own weight toward the end of the winding, and adjusts the descending speed to prevent the U-shaped slack that occurs at the beginning of the winding from coming into contact with the ground. In this way, when the cable 3 is pulled up to a position where the cable does not touch the ground even if the guide reel 7 is removed, the guide reel 7 is removed from the cable 3, and thereafter the cable 3 is pulled up onto the steel tower 5 according to a predetermined procedure.
以上は鉄塔5立ち上げ部にケーブル3を引き上
げる場合に本発明を適用した実施例であるが、本
発明はかかる実施例に限定されるものではない。 The above is an example in which the present invention is applied when pulling up the cable 3 to the upright part of the steel tower 5, but the present invention is not limited to such an example.
例えばケーブルをマンホールから変電所内に引
き込む場合にも、まずケーブル収容具に巻収され
たケーブルを、ケーブル巻終り端から管路または
洞道内に布設した後、残余のケーブルのケーブル
収容具から出ている部分をブレーキ装置を備えた
案内装置に載せてケーブル収容具から残余のケー
ブルを順次繰り出しながら、巻始め端をケーブル
収容具から出せる位置まで吊り上げ、次いでケー
ブル案内装置を下降させつつ巻始め端から発電所
へ向けて布設することができる。 For example, when pulling cables into a substation from a manhole, the cables are first wound into a cable storage device and laid into a conduit or tunnel from the end of the cable winding, and then the remaining cables are pulled out from the cable storage device. Place the remaining cable on a guide device equipped with a brake device, and while paying out the remaining cable from the cable storage device, lift the winding start end to a position where it can be removed from the cable storage device. Then, while lowering the cable guide device, unwind from the winding start end. It can be laid towards power plants.
[発明の効果]
以上のように本発明によれば、ケーブルを8の
字状に堆積させる必要がなく、布設に際してケー
ブルにねじれが生じないからケーブルのワイヤー
シールドに座屈や緩みが生じたり他の特性が低下
したりするおそれは解消される。[Effects of the Invention] As described above, according to the present invention, there is no need to stack the cables in a figure-eight shape, and since the cables do not twist during installation, buckling or loosening of the wire shield of the cables, etc. This eliminates the possibility that the characteristics of the
第1図は従来のケーブル布設方法を示す説明
図、第2図は第1図に示した方法を上方から示す
説明図、第3図は本発明の実施例を示す説明図で
ある。
1……巻取りドラム、2……マンホール、3…
…ケーブル、5……鉄塔、7……案内リール、9
……クレーン、10……滑車、11……ワイヤ
ー。
FIG. 1 is an explanatory diagram showing a conventional cable laying method, FIG. 2 is an explanatory diagram showing the method shown in FIG. 1 from above, and FIG. 3 is an explanatory diagram showing an embodiment of the present invention. 1... Winding drum, 2... Manhole, 3...
... Cable, 5 ... Steel tower, 7 ... Guide reel, 9
...Crane, 10...pulley, 11...wire.
Claims (1)
ーブル巻終り端から所定の布設路に布設した後、
残余のケーブルのケーブル収容具から出ている部
分をブレーキ装置を備えた案内装置に載せてケー
ブル収容具から残余のケーブルを順次繰り出しな
がら巻始め端がケーブル収容具から出せる位置ま
で吊り上げ、次いでケーブル案内装置を下降させ
つつ巻始め端から所定の布設路に布設することを
特徴とするケーブルの布設方法。1. After laying the cable wound in the cable storage tool from the end of the cable winding to the predetermined laying path,
Place the remaining cable protruding from the cable storage device on a guide device equipped with a brake device, unwind the remaining cable from the cable storage device one by one, and lift it up to the position where the winding start end can be removed from the cable storage device. A cable laying method characterized in that the cable is laid on a predetermined laying path from the winding start end while lowering the device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP57013698A JPS58133106A (en) | 1982-01-30 | 1982-01-30 | Method of laying cable |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP57013698A JPS58133106A (en) | 1982-01-30 | 1982-01-30 | Method of laying cable |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS58133106A JPS58133106A (en) | 1983-08-08 |
| JPS6255364B2 true JPS6255364B2 (en) | 1987-11-19 |
Family
ID=11840411
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP57013698A Granted JPS58133106A (en) | 1982-01-30 | 1982-01-30 | Method of laying cable |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS58133106A (en) |
-
1982
- 1982-01-30 JP JP57013698A patent/JPS58133106A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS58133106A (en) | 1983-08-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS6255364B2 (en) | ||
| US4960266A (en) | Aerial cable installation method | |
| CN116553307B (en) | A wire feeding mechanism and a wire feeding cart including the wire feeding mechanism. | |
| US9067757B2 (en) | Method and reel device for threading tendons into ducts | |
| JP2851090B2 (en) | How to lay an optical cable around an overhead line | |
| CN208964245U (en) | Cable winder after a kind of improvement | |
| CN112290457A (en) | Construction method of carbon fiber composite core wire | |
| EP0860920A1 (en) | A method and apparatus for installing cable | |
| CN218950630U (en) | Uniform speed cable pay-off frame | |
| US3185444A (en) | Method of installing cable on existing messenger | |
| CN222138297U (en) | Power cable winch capable of stably paying off | |
| JPH034100Y2 (en) | ||
| KR200205513Y1 (en) | Cable laying device for helicopter | |
| JP2755470B2 (en) | Method of twisting and laying cable for wire drawing and wheel for cable drawing | |
| JP3155724B2 (en) | Winding method of wound optical fiber cable | |
| JPH0368608B2 (en) | ||
| JPH0424728Y2 (en) | ||
| JPS58139615A (en) | Method of laying cable | |
| JPS61226705A (en) | Aerial laying method for optical cable | |
| JPS6295910A (en) | Systematically mechanized method of stretching and hanging coaxial cable | |
| CN119582053A (en) | A vertical shaft cable laying device and method | |
| JPS6311850Y2 (en) | ||
| JPS6233806B2 (en) | ||
| JPS6233807B2 (en) | ||
| JP2001032961A (en) | How to lay deep water intake hose |