JPS6261734B2 - - Google Patents
Info
- Publication number
- JPS6261734B2 JPS6261734B2 JP58193935A JP19393583A JPS6261734B2 JP S6261734 B2 JPS6261734 B2 JP S6261734B2 JP 58193935 A JP58193935 A JP 58193935A JP 19393583 A JP19393583 A JP 19393583A JP S6261734 B2 JPS6261734 B2 JP S6261734B2
- Authority
- JP
- Japan
- Prior art keywords
- flexible sheet
- concrete
- slope
- rope
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000009415 formwork Methods 0.000 claims description 19
- 239000000463 material Substances 0.000 claims description 16
- 238000010276 construction Methods 0.000 claims description 8
- 239000011295 pitch Substances 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 9
- 238000003780 insertion Methods 0.000 description 5
- 230000037431 insertion Effects 0.000 description 5
- 239000002699 waste material Substances 0.000 description 5
- 235000014121 butter Nutrition 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000004575 stone Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 241001175904 Labeo bata Species 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000008961 swelling Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Retaining Walls (AREA)
Description
【発明の詳細な説明】
本発明は、法面にコンクリートを打設する際に
供される型枠工法に係り、更に詳しくは法面の傾
斜方向に対して所定ピツチでロープアンカーを植
設し、隣接するロープアンカー相互間に締付金具
を挿通したワイヤーロープを架設して固定し、し
かも最外郭に位置するロープアンカー近傍に棲枠
を建込み、この両棲枠にフレキシブルシートを被
せ、バタ材と締付金具とワイヤーロープを介して
支保アンカーボルトで保持し、さらに法尻には基
礎を配置して、その基礎上面に該フレキシブルシ
ートの下端を圧締して構成される法型枠内にコン
クリートを打設することを特徴とするフレキシブ
ル型枠工法に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a formwork method used when pouring concrete onto a slope, and more specifically, the present invention relates to a formwork method used when pouring concrete onto a slope, and more specifically, rope anchors are planted at a predetermined pitch in the direction of slope. , a wire rope with a fastening fitting inserted between adjacent rope anchors is erected and fixed, a nesting frame is built near the outermost rope anchor, a flexible sheet is covered over this double nesting frame, and a wire rope is fixed with a fastening fitting inserted between adjacent rope anchors. The flexible sheet is held in place by supporting anchor bolts via clamping fittings and wire ropes, and a foundation is placed at the foot of the slope, and the lower end of the flexible sheet is pressed onto the top surface of the foundation. This relates to a flexible formwork construction method characterized by pouring concrete.
従来、法面にコンクリートを打設する際、法面
全体に複数のアンカーボルトを所定間隔で植設
し、タイバーを介してフレキシブルシートをアン
カーに係着させ、その法面とフレキシブルシート
の為す型枠内にコンクリートを打設していた。 Conventionally, when pouring concrete onto a slope, multiple anchor bolts are planted at predetermined intervals throughout the slope, and a flexible sheet is attached to the anchors via tie bars. Concrete was being poured inside the frame.
これらの型枠工法においては、法面全体に亘つ
て多くのアンカーボルトを植設しなければなら
ず、しかもアンカーボルトはコンクリート打設の
際にフレキシブルシートが受ける側圧によつて脱
抜しないだけの強度を有する様地山に固定しなけ
ればならなかつた。その為、法面上にアンカーボ
ルトを植設する作業が工期を遅延させ、かつコス
トを上昇させる結果となつていた。 In these formwork construction methods, many anchor bolts must be planted across the entire slope, and the anchor bolts are hard enough to prevent them from falling out due to the lateral pressure that the flexible sheet receives during concrete pouring. It had to be fixed to the ground in a way that gave it strength. As a result, the work of planting anchor bolts on the slope delays the construction period and increases costs.
又、法面の勾配や地山の地質状態によつてはア
ンカーボルトを植設する作業自体が難しく、しか
も法面には不均一な打設コンクリート層が形成さ
れることが多かつた。 Furthermore, depending on the slope of the slope and the geological condition of the ground, the work of installing anchor bolts is difficult, and moreover, an uneven layer of poured concrete is often formed on the slope.
そこで本発明は、上記問題点を解決すべく法面
上に所定間隔でロープアンカーを植設し、しかも
該ロープアンカー間には締付金具を挿通したワイ
ヤーロープを掛け渡してフレキシブルシートが受
けるコンクリート側圧を締付金具を介してワイヤ
ーロープで分散させる、所謂吊橋の応力理論を用
いてコンクリート打設応力を分散する型枠工法を
提供するものである。 In order to solve the above-mentioned problems, the present invention has been developed by planting rope anchors at predetermined intervals on the slope, and in addition, wire ropes with fastening fittings inserted between the rope anchors are stretched so that the flexible sheet can receive the concrete. The present invention provides a formwork construction method that disperses concrete placement stress using the so-called suspension bridge stress theory, in which lateral pressure is dispersed by wire ropes via fastening fittings.
以下、図面に基づき本発明のフレキシブル型枠
工法について詳細に説明する。 Hereinafter, the flexible formwork construction method of the present invention will be explained in detail based on the drawings.
地山は通常岩盤地山と土砂地山のものがあり、
前者はその岩盤に直接ロープアンカーを植設する
ことが出来るが、後者は軟弱なのでロープアンカ
ーを植設しても強固に固定することは出来ない。 There are usually two types of ground: bedrock ground and sandy ground.
The former allows a rope anchor to be planted directly into the rock, but the latter is weak and cannot be firmly fixed even if a rope anchor is planted.
そこで土砂地山上面に捨コンクリートを打設
し、この捨コンクリートにロープアンカーを植設
する方法が用いられる。 Therefore, a method is used in which sacrificial concrete is placed on the top of the soil pile and rope anchors are planted in this sacrificial concrete.
本発明では土砂地山の法面に捨コンクリートを
打設して、その上面に型枠を構成する場合を一実
施例として以下に説明する。 The present invention will be described below as an example in which concrete is placed on the slope of a sandy ground and a formwork is constructed on the top surface of the concrete.
第1図は、地山1の法頭11から法尻12に亘
つて捨コンクリート帯13が設けられた状態を示
す側面図である。 FIG. 1 is a side view showing a state in which a sacrificial concrete zone 13 is provided extending from the head 11 of the earth 1 to the foot 12 of the slope.
まず、地山1の法頭11から法尻12に亘つて
バツクホー等により根切を行ない、型枠を用いず
根切内に直接捨コンクリートを打設する。 First, root cutting is performed from the head 11 to the foot 12 of the ground 1 using a box hoe or the like, and sacrificial concrete is poured directly into the root cutting without using formwork.
この捨コンクリート打設においては、棒状バイ
ブレーター等を用いて充分な締固めを行なうとと
もに、ロープアンカー2を所定間隔で植え込み、
更には後述する棲枠を建込むために天端を均して
おく。 In pouring this waste concrete, sufficient compaction is performed using a rod-shaped vibrator, etc., and rope anchors 2 are planted at predetermined intervals.
Furthermore, the top is leveled in order to build a living frame, which will be described later.
又法尻12には法尻基礎14を設け、この法尻
基礎14にもアンカーボルトを所定間隔で植設し
ておく。 Further, a foot end foundation 14 is provided at the foot end 12, and anchor bolts are also planted at predetermined intervals on this foot foot foundation 14.
第2図は、第1図における法面を正面から見た
概略図である。 FIG. 2 is a schematic diagram of the slope in FIG. 1 viewed from the front.
すなわち捨コンクリート帯13,13…が法頭
11から法尻12に亘つて打設され、しかも最外
郭の捨コンクリート帯13aと13bとの間に複
数の捨コンクリート帯13,13…が打設される
ものである。 That is, sacrificial concrete bands 13, 13... are cast from the head of the slope 11 to the foot of the slope 12, and moreover, a plurality of sacrificial concrete bands 13, 13... are placed between the outermost sacrificial concrete bands 13a and 13b. It is something that
第2図においては、最外郭の捨コンクリート帯
13aと13bの間に一つの捨コンクリート帯1
3を打設した場合を示したものである。 In Fig. 2, there is one concrete zone 1 between the outermost concrete zones 13a and 13b.
This shows the case where No. 3 is poured.
又最外郭の捨コンクリート帯13aと13bそ
れぞれに植設されたロープアンカー2,2…の近
傍には、後述するフレキシブルシートを保持する
為の支保アンカーボルト3,3…を植設してお
く。 In addition, support anchor bolts 3, 3, etc. for holding flexible sheets, which will be described later, are installed in the vicinity of rope anchors 2, 2, etc. installed in the outermost sacrificial concrete zones 13a and 13b, respectively.
一方、法尻12において、略台形状の法尻基礎
14を最外郭捨コンクリート帯13aと13b間
に亘つて設ける。 On the other hand, at the slope end 12, a substantially trapezoidal slope foot foundation 14 is provided between the outermost concrete strips 13a and 13b.
次に、一つの捨コンクリート帯13に植設され
たロープアンカー2,2…とそれに近接する他の
捨コンクリート帯13に植設されたロープアンカ
ー2,2…との間にワイヤーロープ4,4…を張
設する。 Next, wire ropes 4, 4 are placed between the rope anchors 2, 2... planted in one waste concrete zone 13 and the rope anchors 2, 2... planted in another waste concrete zone 13 adjacent thereto. ...is set up.
第3図は、この張設状態を示した概略説明図で
ある。 FIG. 3 is a schematic explanatory diagram showing this tensioned state.
このワイヤーロープ4は、所定位置に複数の締
付金具5,5…を有し、しかも両端はロープアン
カー2,2においてワツシヤーとナツトを介して
固定されている。 This wire rope 4 has a plurality of fastening fittings 5, 5, .
第4図は、ワイヤーロープ4の平面状態を示す
説明図である。すなわちワイヤーロープ4はその
両端末がクリツプやソケツト及び圧縮止めによつ
てループ状となつている。このループ41,42
内に上記ロープアンカー2の頭部を挿入しその上
部からワツシヤーを嵌合しナツトを介して固定す
る。 FIG. 4 is an explanatory diagram showing the planar state of the wire rope 4. That is, the wire rope 4 has both ends formed into a loop by clips, sockets, and compression stops. This loop 41, 42
The head of the rope anchor 2 is inserted into the head of the rope anchor 2, and a washer is fitted from above and fixed via a nut.
第5図は、ワイヤーロープ4に取付けられた締
付金具5の分解説明図である。 FIG. 5 is an exploded explanatory view of the fastening fitting 5 attached to the wire rope 4.
この締付金具5は、ワイヤーロープ4を挿通す
るリング51とフレキシブルシートと地山の間隔
を調整するセパレータ52と、そのセパレータ5
2とフオームタイ54を螺着するアイナツト53
と、更にはバタ材を圧着させる圧締具55及びナ
ツト56からなつている。 This fastening fitting 5 includes a ring 51 through which the wire rope 4 is inserted, a separator 52 for adjusting the distance between the flexible sheet and the ground, and the separator 5.
2 and the eye nut 53 that screws the form tie 54
It further comprises a clamping tool 55 and a nut 56 for crimping the butter material.
ワイヤーロープ4にこの締付金具5を取付ける
には、まずワイヤーロープの一端を上記した端末
処理を行なつてループ41とし、他端から所定数
のリング51を挿通させて、しかる後その他端を
も端末処理してループ42とする。 To attach this fastening fitting 5 to the wire rope 4, first perform the above-described terminal treatment on one end of the wire rope to form the loop 41, insert a predetermined number of rings 51 from the other end, and then close the other end. The terminal processing is also performed in a loop 42.
尚、打設コンクリートの投入口となる最上段近
傍には、打設の際の応力に対抗する為ワイヤーロ
ープ4の代りに鉄筋を用いる場合もある。 Incidentally, in order to counter the stress during pouring, reinforcing bars may be used in place of the wire rope 4 near the top stage, which serves as the inlet for pouring concrete.
以上の様に、ワイヤーロープ4が張設された後
に最外郭の捨コンクリート帯13aと13bに棲
枠6,6を建込む。そして上面からフレキシブル
シート7を被せ、締付金具5,5…のセパレータ
52,52…に螺合させたアイナツト53,53
…をフレキシブルシート7の上面にのぞかせて、
アイナツト53,53…とフオームタイ54,5
4…を螺合させる。 As described above, after the wire rope 4 is stretched, the living frames 6, 6 are erected in the outermost concrete zones 13a and 13b. The eye nuts 53, 53 are then covered with the flexible sheet 7 from above and screwed onto the separators 52, 52... of the fastening fittings 5, 5...
Peek at the top of the flexible sheet 7,
Eye nuts 53, 53... and form ties 54, 5
4. Screw together.
このフオームタイ54,54…を介して架材、
例えばバタ材8,8…を取付ける。 Through these form ties 54, 54...
For example, attach butterfly materials 8, 8, . . . .
すなわち第6図で示すように捨コンクリート帯
13aにおいて、ロープアンカー2と支保アンカ
ーボルト3との間に法面の傾斜方向に沿つて棲枠
6を建込み、この棲枠6上にフレキシブルシート
7を被装する。そしてこのフレキシブルシート7
の上面に、それぞれ締付金具5,5…のアイナツ
ト53,53…をのぞかせてフオームタイ54,
54…を取付ける。 That is, as shown in FIG. 6, in the waste concrete zone 13a, a living frame 6 is built between the rope anchor 2 and the support anchor bolt 3 along the slope direction of the slope, and a flexible sheet 7 is placed on this living frame 6. be coated with. And this flexible sheet 7
The form ties 54, 53... of the fastening fittings 5, 5... are exposed on the upper surface, respectively.
Attach 54....
しかる後、第7図で示すように最外郭捨コンク
リート帯13aと13b上に建込まれた棲枠6,
6間にバタ材8,8…を架設し、両端では支保ア
ンカーボルト3,3によつてバタ材8,8…を固
定するとともに、フオームタイ54の取付金具5
5とナツト56を介してワイヤーロープ4,4…
をバタ材8,8…に吊設する。 After that, as shown in Fig. 7, living frames 6,
6, the butterfly materials 8, 8... are installed between the two ends, and the butterfly materials 8, 8... are fixed at both ends with support anchor bolts 3, 3, and the mounting brackets 5 of the form ties 54 are installed.
5 and the wire ropes 4, 4 through the nut 56.
are suspended from the butter materials 8, 8...
第8図は、第6図及び第7図の建込み状態を側
面図として示したものである。 FIG. 8 shows the built-in state of FIGS. 6 and 7 as a side view.
すなわち棲枠6,6はフレキシブルシート7に
覆われ、そのフレキシブルシート7の上面にはバ
タ材8,8…が両端を支保アンカーボルト3,3
…により固定され架設されている。 That is, the living frames 6, 6 are covered with a flexible sheet 7, and on the upper surface of the flexible sheet 7, butter materials 8, 8... are attached at both ends with supporting anchor bolts 3, 3.
It is fixed and constructed by...
又中間部では締付金具5,5…を介してワイヤ
ーロープ4,4…とバタ材8,8…が吊設状態に
なつている。 Further, in the intermediate portion, wire ropes 4, 4... and butterfly materials 8, 8... are suspended via clamping fittings 5, 5....
第9図は、支保アンカーボルト3の取付具31
とバタ材8とを介して、フレキシブルシート7が
棲枠6に取付けられる状態を説明する拡大図であ
る。 FIG. 9 shows the attachment 31 of the support anchor bolt 3.
FIG. 2 is an enlarged view illustrating a state in which the flexible sheet 7 is attached to the housing frame 6 via the and butter material 8.
棲枠6は、コンクリートを打設した後に出来る
フレキシブルシートの表面形状を想定して形成さ
れている。 The living frame 6 is formed assuming the surface shape of a flexible sheet formed after concrete is poured.
すなわち、支保アンカーボルト3によつてバタ
材8が取付けられる部分は凹部とし、それ以外は
幾分膨出した形状に形成してある。 That is, the portion where the butterfly material 8 is attached by the support anchor bolt 3 is a recessed portion, and the other portion is formed into a somewhat bulged shape.
またフレキシブルシート7を棲枠6の外側面に
側端が垂れ下つた状態で被せ、薄い当て木(図示
せず)を棲枠6の上端面に当接させて釘固定す
る。 Further, the flexible sheet 7 is placed over the outer surface of the living frame 6 with the side end hanging down, and a thin batten (not shown) is brought into contact with the upper end surface of the living frame 6 and fixed with nails.
そして法頭11では両棲枠6,6とフレキシブ
ルシート7を封止せず、コンクリート打設の為の
投入開口として形成する。 In the head 11, the amphibious frames 6, 6 and the flexible sheet 7 are not sealed, but are formed as an opening for pouring concrete.
一方、法尻基礎14ではフレキシブルシート7
の下端を法尻基礎14上のアンカーボルト15,
15…に刺し通し、フレキシブルシート7の端末
71をパイプ材16に巻き込み、下端を圧縮材1
7によつて圧締する。 On the other hand, at Hojiri Foundation 14, flexible sheet 7
The lower end of the anchor bolt 15 on the bottom foundation 14,
15..., wrap the end 71 of the flexible sheet 7 into the pipe material 16, and wrap the lower end into the compressed material 1.
7.
尚、地山1からの水を排出する為水抜きパイプ
9を設けるが、この水抜きパイプ9は第11図a
で示すように基管91と取付板92とから構成さ
れている。取付板92の背面には略法勾配と等し
い角度で挿入杆93が取付けられている。 A drain pipe 9 is provided to drain water from the ground 1, and this drain pipe 9 is shown in Figure 11a.
As shown, it is composed of a base tube 91 and a mounting plate 92. An insertion rod 93 is attached to the back surface of the mounting plate 92 at an angle equal to the approximate normal slope.
又挿入杆93の外周部には布テープ等を巻回し
ておき、挿入杆93が基管91に挿入された状態
において打設コンクリートが基管91内に侵入し
ない構造にしておく。 A cloth tape or the like is wrapped around the outer periphery of the insertion rod 93 so that poured concrete does not enter into the base pipe 91 when the insertion rod 93 is inserted into the base pipe 91.
更に水抜きパイプ9をフレキシブルシート7の
内面に取付けるには、第11図bで示す様にフレ
キシブルシート7の内面所要箇所に取付板92を
固定する。固定手段としては接着剤や釘打ち等が
用いられる。 Furthermore, in order to attach the drain pipe 9 to the inner surface of the flexible sheet 7, a mounting plate 92 is fixed to a required location on the inner surface of the flexible sheet 7, as shown in FIG. 11b. Adhesive, nailing, etc. are used as the fixing means.
次いで挿入杆93を基管91の先端に可動自在
の状態で挿入し、基管91の後端94を地山1に
埋め込まれている砕石95中に差し込む。 Next, the insertion rod 93 is movably inserted into the tip of the base tube 91, and the rear end 94 of the base tube 91 is inserted into crushed stone 95 embedded in the earth 1.
この時、フレキシブルシート7の膨み等により
取付板92が前後方向に動かされても、挿入杆9
3は基管91内を脱抜することなしに円滑な追従
が出来る様基管91の後端94を砕石95中に十
分に差し込み、かつ水抜きパイプ9の両側にガイ
ド鉄筋96を配設している。 At this time, even if the mounting plate 92 is moved in the front-back direction due to the expansion of the flexible sheet 7, the insertion rod 9
3, the rear end 94 of the base pipe 91 is fully inserted into the crushed stone 95 so that the base pipe 91 can be smoothly followed without falling out, and guide reinforcing bars 96 are arranged on both sides of the drain pipe 9. ing.
これによりフレキシブルシート7内にコンクリ
ート100が打設されてフレキシブルシート7が
膨んでも、第11図cで示すように水抜きパイプ
9が砕石95の埋設部分を移動して外方へ膨んだ
量だけ引出される。 As a result, even if the concrete 100 is placed inside the flexible sheet 7 and the flexible sheet 7 swells, the drain pipe 9 moves through the buried part of the crushed stone 95 and swells outward as shown in FIG. 11c. amount is withdrawn.
よつてコンクリート100が硬化した後、フレ
キシブルシート7を取外せば取付板92も一緒に
取外され、しかも第11図dで示すように基管9
1と連通した水抜き孔97がコンクリート100
の表面へと形成される。 Therefore, when the flexible sheet 7 is removed after the concrete 100 has hardened, the mounting plate 92 is also removed together with the base pipe 9 as shown in FIG. 11d.
The drainage hole 97 communicating with the concrete 100
formed on the surface of
以上の様に、構成された法型枠の法頭11の開
口から法型枠内にコンクリートを流し込み打設す
る。このコンクリート打設においては6m3/hrの
速度で流し込み、しかも棒状バイブレーターを適
宜使用して充分の締固めを行なう。 Concrete is poured into the legal formwork through the opening of the head 11 of the legal formwork constructed as described above and placed. In this concrete pouring, the concrete is poured at a rate of 6 m 3 /hr, and a rod-shaped vibrator is used as appropriate to ensure sufficient compaction.
又コンクリート打設中において、コンクリート
の打設応力によつてフレキシブルシート7の異常
な膨み等がなきよう上記打設速度を適宜変更せし
める場合もある。 Further, during concrete pouring, the above-mentioned pouring speed may be changed as appropriate to prevent abnormal swelling of the flexible sheet 7 due to concrete pouring stress.
この法型枠内にコンクリートを打設した後、法
頭の開口は別個養生シートを掛けて直射日光、風
等が当ることを避ける。 After concrete is poured into the formwork, a separate curing sheet is placed over the opening of the temple to prevent it from being exposed to direct sunlight, wind, etc.
またフレキシブルシート7の外面に対し直接散
水を行ない、フレキシブルシート7自体を湿潤状
態に保つことが養生効果を充分なものとする。 Further, by directly spraying water on the outer surface of the flexible sheet 7 and keeping the flexible sheet 7 itself in a moist state, a sufficient curing effect can be obtained.
そして打設コンクリートが硬化した後、支保ア
ンカーボルト3,3…の取付具31,31…から
バタ材8,8…を開放し、フレキシブルシート7
を取外して棲枠6,6を脱型すれば、地山表面に
躯体となるコンクリートが形成される。 After the poured concrete has hardened, the butterfly materials 8, 8... are released from the fixtures 31, 31... of the support anchor bolts 3, 3..., and the flexible sheet 7
When the housing frames 6, 6 are removed from the mold, concrete serving as a frame is formed on the surface of the ground.
以上の様に、本発明による型枠工法を用いれ
ば、法面におけるアンカーの植設施工がロープア
ンカーとワイヤーロープによつて集約的に行なう
ことが出来るので、コンクリートの打設が極めて
容易に行なえるとともに、型枠施工のコストも大
幅に低減することができる。 As described above, by using the formwork method according to the present invention, anchor planting on the slope can be carried out intensively using rope anchors and wire ropes, making concrete placement extremely easy. At the same time, the cost of formwork construction can be significantly reduced.
又フレキシブルシートに通気性の高い、例えば
布材等を用いれば打設の際の棒状バイブレーター
の振動により、コンクリート内の気泡がフレキシ
ブルシートを通過して外部へ排出され、よつてエ
アーアバタのないコンクリート面が得られる。同
様にコンクリートの硬化余剰水がフレキシブルシ
ートを通つて外部に排出されるので、養生期間の
短縮やコンクリートの初期強度が大きくなる。 In addition, if a highly breathable material such as cloth is used for the flexible sheet, the vibration of the rod vibrator during pouring will cause air bubbles in the concrete to pass through the flexible sheet and be expelled to the outside, resulting in concrete without air avatars. A surface is obtained. Similarly, surplus water from concrete hardening is discharged to the outside through the flexible sheet, thereby shortening the curing period and increasing the initial strength of the concrete.
よつて本発明のフレキシブル型枠工法は、法面
打設に用いられる型枠としては従前にない高い効
果を発揮するものである。 Therefore, the flexible formwork construction method of the present invention exhibits an unprecedentedly high effect as a formwork used for slope pouring.
第1図は、地山に捨コンクリート帯と法尻基礎
を打設した状態を示す側面図、第2図は、第1図
における正面図、第3図は、ロープアンカー間に
ワイヤーロープを張設した状態を説明する概略
図、第4図は、ワイヤーロープの平面図、第5図
は、締付金具の分解説明図、第6図は、最外郭捨
コンクリート帯に建込まれた棲枠6とその上面に
フレキシブルシートを被せた状態の拡大説明図、
第7図は、本発明に係るフレキシブル型枠の全体
概要図、第8図は、第7図のフレキシブル型枠を
側面から見た状態の概略図、第9図は、支保アン
カーボルトの取付け状態を示す拡大説明図、第1
0図は、法尻基礎でフレキシブルシートを取付た
状態の説明図、第11図a,b,c,dは、水抜
きパイプの取付状態を説明する概略図である。
1…地山、13,13…捨コンクリート帯、1
4…法尻基礎、2,2…ロープアンカー、3,3
…支保アンカーボルト、4,4…ワイヤーロー
プ、5,5…締付金具、6,6…棲枠、7…フレ
キシブルシート、8,8…バタ材。
Figure 1 is a side view showing the state in which the sacrificial concrete belt and foot foundation have been cast into the ground, Figure 2 is a front view of Figure 1, and Figure 3 is a wire rope stretched between rope anchors. Figure 4 is a plan view of the wire rope, Figure 5 is an exploded view of the fastening fittings, and Figure 6 is a living frame built in the outermost concrete zone. 6 and an enlarged explanatory diagram of the state in which a flexible sheet is covered on its top surface,
Fig. 7 is an overall schematic diagram of the flexible formwork according to the present invention, Fig. 8 is a schematic diagram of the flexible formwork of Fig. 7 viewed from the side, and Fig. 9 is a state in which the support anchor bolts are attached. Enlarged explanatory diagram showing 1st
FIG. 0 is an explanatory diagram of a state in which a flexible sheet is attached to a slope foot foundation, and FIGS. 11 a, b, c, and d are schematic diagrams illustrating a state in which a drain pipe is attached. 1... Earth, 13, 13... Waste concrete zone, 1
4...Fashion base, 2,2...Rope anchor, 3,3
... Support anchor bolt, 4, 4... Wire rope, 5, 5... Tightening fittings, 6, 6... Living frame, 7... Flexible sheet, 8, 8... Bata material.
Claims (1)
隣接するロープアンカー相互に複数の締付金具を
挿通したワイヤーロープを掛け渡して固定し、最
外郭のロープアンカー近傍に建込まれた棲枠にフ
レキシブルシートを被装し、該フレキシブルシー
トをバタ材を介して締付具と支保アンカーボルト
で保持するとともに、法尻基礎上面でフレキシブ
ルシートの下端を圧締材を介して圧締し、該両棲
枠と法尻基礎とフレキシブルシートとで構成され
る法型枠内にコンクリートを打設することを特徴
とするフレキシブル型枠工法。1. Rope anchors are planted on the slope at specified pitches, wire ropes with multiple fastening fittings inserted between adjacent rope anchors are stretched and fixed, and placed in a habitat built near the outermost rope anchor. Cover the flexible sheet, hold the flexible sheet with a fastener and support anchor bolt through a butterfly material, and press the lower end of the flexible sheet on the upper surface of the footing foundation with a pressing material. A flexible formwork construction method characterized by pouring concrete into a legal formwork consisting of a frame, a footing, and a flexible sheet.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58193935A JPS6085120A (en) | 1983-10-17 | 1983-10-17 | Construction with flexible form |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58193935A JPS6085120A (en) | 1983-10-17 | 1983-10-17 | Construction with flexible form |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6085120A JPS6085120A (en) | 1985-05-14 |
| JPS6261734B2 true JPS6261734B2 (en) | 1987-12-23 |
Family
ID=16316185
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP58193935A Granted JPS6085120A (en) | 1983-10-17 | 1983-10-17 | Construction with flexible form |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6085120A (en) |
-
1983
- 1983-10-17 JP JP58193935A patent/JPS6085120A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6085120A (en) | 1985-05-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4564316A (en) | Face panel system | |
| KR100793985B1 (en) | Concrete Lattice Slope Reinforcement Method and Slope Reinforcement Structure | |
| US20200149242A1 (en) | Methods for constructing tensionless concrete pier foundations and foundations constructed thereby | |
| JP4707838B2 (en) | Retaining wall system including engaging wall construction unit | |
| US5197245A (en) | Structural wall reinforcement apparatus and method | |
| WO1995012726A1 (en) | A flexible formwork assembly | |
| JP3419801B2 (en) | Arch structure | |
| WO2008057572A2 (en) | Modular foundation method | |
| JPS6261734B2 (en) | ||
| JP2818814B2 (en) | Manhole cover height adjustment method | |
| CN209620039U (en) | A kind of soil nail wall recoverable supporting construction | |
| JP2818815B2 (en) | Manhole cover height adjustment device | |
| JPH0931993A (en) | Installation of pressure-receiving board for side slope protection | |
| JP3187343B2 (en) | Legal structure and its construction method | |
| JPH0678641B2 (en) | Slope stabilization method | |
| JP2818818B2 (en) | Manhole cover height adjustment device | |
| JPH0513782Y2 (en) | ||
| AU689156B2 (en) | A flexible formwork assembly | |
| JP2000073377A (en) | Foundation anchor bolt, and execution method of foundation | |
| JPH08109638A (en) | Slope greening method | |
| US20130186034A1 (en) | Modular Foundation Method | |
| JPH0988082A (en) | Construction material fixing method and structure | |
| KR20200066274A (en) | Retaining Wall Unified the Finish Wood Panel Construction Method Thereof | |
| JPH0248577Y2 (en) | ||
| JPS61216930A (en) | Concrete formwork for slope |