JPS6326238B2 - - Google Patents
[go: Go Back, main page]

JPS6326238B2 - - Google Patents

Info

Publication number
JPS6326238B2
JPS6326238B2 JP57117947A JP11794782A JPS6326238B2 JP S6326238 B2 JPS6326238 B2 JP S6326238B2 JP 57117947 A JP57117947 A JP 57117947A JP 11794782 A JP11794782 A JP 11794782A JP S6326238 B2 JPS6326238 B2 JP S6326238B2
Authority
JP
Japan
Prior art keywords
winch
auger
wire
drive
current consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP57117947A
Other languages
Japanese (ja)
Other versions
JPS598897A (en
Inventor
Tsutomu Takaoka
Kojiro Ooiwa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Sanwa Kizai Co Ltd
Original Assignee
Kubota Corp
Sanwa Kizai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp, Sanwa Kizai Co Ltd filed Critical Kubota Corp
Priority to JP11794782A priority Critical patent/JPS598897A/en
Publication of JPS598897A publication Critical patent/JPS598897A/en
Publication of JPS6326238B2 publication Critical patent/JPS6326238B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Description

【発明の詳細な説明】 本発明は、アースオーガ機における掘削制御方
法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an excavation control method in an earth auger machine.

アースオーガ機は、1例として第1図に示すよ
うに、先端に刃口1aを有するケーシングからな
る外側オーガ1とこの外側オーガ1内に貫挿され
たオーガスクリユーからなる内側オーガ2とから
構成され、外側オーガ1の根元端に連結した外側
オーガ用駆動部3上に一端を固着したシリンダ
4,4′で内側オーガ用駆動部5が該外側オーガ
用駆動部3に対して上下動自在に支承されてい
る。なお、上記駆動部3,5には図示しないが駆
動用モータが配設されている。
As shown in FIG. 1 as an example, the earth auger machine includes an outer auger 1 consisting of a casing having a cutting edge 1a at its tip, and an inner auger 2 consisting of an auger screw inserted into the outer auger 1. The inner auger drive part 5 is movable up and down with respect to the outer auger drive part 3 by means of cylinders 4 and 4' having one end fixed on the outer auger drive part 3 connected to the root end of the outer auger 1. is supported by. Incidentally, although not shown in the drawings, a driving motor is provided in the driving sections 3 and 5.

これら両オーガ1,2及び駆動部3,5は、リ
ーダマストなどの支持体6に一端を固着し、他端
を昇降ウインチ7で巻取り可能としたワイヤー8
によりシーブ9を介して昇降自在に吊下されてい
る。
These augers 1, 2 and drive parts 3, 5 are connected to a wire 8 whose one end is fixed to a support 6 such as a leader mast, and whose other end can be wound up by an elevating winch 7.
It is suspended via a sheave 9 so that it can be raised and lowered freely.

なお、掘削時には両オーガ1,2は自重で地中
へ挿入されて行くが転石層あるいは岩盤層などに
突き当り自重のみでは掘削力が不足する場合に強
制的に引込み力を加えるため、サードウインチ1
0からの引込みワイヤー11をガイドシーブ12
を介して外側オーガ用駆動部3の下面に連結して
ある。
During excavation, both augers 1 and 2 are inserted into the ground by their own weight, but if they hit a rock layer or bedrock layer and the digging force is insufficient with their own weight alone, the third winch 1 is used to forcibly apply retraction force.
Guide wire 11 from 0 to guide sheave 12
It is connected to the lower surface of the outer auger drive section 3 via.

図中、13,13′は上記ワイヤー8のガイド
シーブ、2aはオーガ2の先端刃口14は掘削深
度及び掘削速度を検出するためのワイヤーで、上
下の固定滑車15,15′に掛け回した無端体か
らなり、その一部を例えば外側オーガ用駆動部3
の背面等に固定してオーガ1,2とともに移動す
る。
In the figure, 13 and 13' are guide sheaves for the wire 8, and 2a is a wire for detecting the excavation depth and excavation speed at the cutting edge 14 of the auger 2, which is wrapped around the upper and lower fixed pulleys 15 and 15'. It consists of an endless body, a part of which is used as an outer auger drive part 3, for example.
The augers 1 and 2 move together with the augers 1 and 2.

このように構成された二重オーガ掘削機は、外
側オーガ1と内側オーガ2の両方を同時に回転さ
せて掘削を行ない、掘削土砂は内側オーガ2のス
クリユー部で上方に搬送されて機外に排出され
る。
The double auger excavator configured in this way excavates by rotating both the outer auger 1 and the inner auger 2 at the same time, and the excavated soil is transported upward by the screw part of the inner auger 2 and discharged outside the machine. be done.

また、セツトしたオーガ1,2をすべて地中に
挿入したときは、これと駆動部3,5との連結を
解き、昇降ウインチ7でワイヤー8を巻き取るこ
とにより駆動部3,5のみを上昇させ、しかる後
新たなオーガ1′,2′を継ぎ足し更に掘削する。
Moreover, when all the set augers 1 and 2 are inserted into the ground, the connection between them and the drive parts 3 and 5 is released, and only the drive parts 3 and 5 are raised by winding up the wire 8 with the lifting winch 7. Then, new augers 1' and 2' are added and further excavation is carried out.

所望深さまで掘削した後は、オーガ1はこのま
まこれを鋼管杭として使用することもできる。
After excavating to a desired depth, the auger 1 can be used as a steel pipe pile.

従来、かかるアースオーガ機を使用するのに各
部の制御は、単純な計器を目測しながら手操作に
より行なわれており頗る煩雑となるものであつ
た。
Conventionally, when using such an earth auger machine, each part was controlled manually using a simple instrument, which was extremely complicated.

本発明の目的は上記従来例の不都合を解消し、
これらの制御をすべて自動化して作業性を高める
ようにし、中でも特に掘削機昇降用のメインウイ
ンチからのワイヤー繰り出しをオーガの作動状態
に応じて多段階に自動制御して効率のよい掘削状
態を常に保持することができるアースオーガ機に
おける掘削制御方法を提供することにある。
The purpose of the present invention is to solve the above-mentioned disadvantages of the conventional example,
All of these controls are automated to improve work efficiency, and in particular, the wire feeding from the main winch for raising and lowering the excavator is automatically controlled in multiple stages according to the operating status of the auger to ensure efficient excavation conditions at all times. An object of the present invention is to provide a method for controlling excavation in an earth auger machine that can be held.

しかしてこの目的は本発明によれば、リーダマ
ストなどの支持体に昇降ウインチの操作により巻
き取り・送り出しされるワイヤーによつて昇降自
在に吊り下げされる駆動部に連結されたオーガス
クリユーからなるアースオーガ機において、上記
駆動部の駆動モーターの実際消費電流信号を制御
装置に入力し、この制御装置で消費電流値と設定
消費電流値を比較し、その比較結果に応じて昇降
ウインチを多段階に速度制御するべく制御装置か
らの駆動信号を昇降ウインチの駆動モーター制御
回路に導入し、該ウインチのワイヤー繰出し動作
を自動的に多段階制御することにより達成され
る。
However, according to the present invention, the purpose of the lever is from an auger screw connected to a drive unit that is vertically suspended from a support such as a leader mast by a wire that is wound up and sent out by operating a lifting winch. In the earth auger machine, the actual current consumption signal of the drive motor of the drive section is input to the control device, the control device compares the current consumption value and the set current consumption value, and depending on the comparison result, the lifting winch is operated more frequently. This is achieved by introducing a drive signal from a control device into the drive motor control circuit of the lifting winch to control the speed in stages, and automatically controlling the wire payout operation of the winch in multiple stages.

以下、図面について本発明の実施例を詳細に説
明する。
Embodiments of the present invention will be described in detail below with reference to the drawings.

第1図中、16は昇降ウインチ7の駆動モータ
ー、17はサードウインチ10の駆動モーター、
18,19はそれぞれ上記駆動モーター16,1
7のモーター制御回路であり、20はシリンダ
4,4′を伸縮作動させるための制御機構である。
In FIG. 1, 16 is a drive motor for the lifting winch 7, 17 is a drive motor for the third winch 10,
18 and 19 are the drive motors 16 and 1, respectively.
7 is a motor control circuit, and 20 is a control mechanism for telescopically operating the cylinders 4, 4'.

また、21はワイヤー8に設けた荷重計で、両
オーガ1,2の先端刃口1a,2aに加わる負荷
を計測する。22は上記シリンダ4又は4′に設
けられ、シリンダ4,4′の伸縮長さによつて外
側オーガ1と内側オーガ2との距離、正確には刃
口1aと2aとのオーガ軸方向の距離を計測する
距離計である。23は外側オーガ用駆動部3の駆
動モーターへの給電回路に配設され、該モーター
の消費電流を測定する電流計、24は内側オーガ
用駆動部5の駆動モーターへの給電回路に配設さ
れ、該モーターの消費電流を測定する電流計であ
る。25は引込みワイヤー11中に設けられ、サ
ードウインチ10の引込み力を測定する引込力
計、26,27はワイヤー14又は固定滑車15
若しくは15′に設けられた掘削深度計及び速度
計である。これら速度計27及び深度計26は、
例えば固定滑車15′にこれと連動するカムスイ
ツチを設け、このカムスイツチからの出力信号の
間隔によつて測定することにより掘削速度を知
り、また出力信号をカウントして掘削深度を知る
ようにしても良い。
Moreover, 21 is a load meter provided on the wire 8, and measures the load applied to the cutting edge openings 1a and 2a of both the augers 1 and 2. 22 is provided in the cylinder 4 or 4', and the distance between the outer auger 1 and the inner auger 2, more precisely the distance in the auger axial direction between the cutting edges 1a and 2a, depends on the length of the cylinders 4 and 4'. It is a distance meter that measures the distance. Reference numeral 23 is arranged in a power supply circuit to the drive motor of the outer auger drive unit 3, and is an ammeter for measuring the current consumption of the motor, and 24 is arranged in a power supply circuit to the drive motor of the inner auger drive unit 5. , an ammeter that measures the current consumption of the motor. Reference numeral 25 indicates a drawing force meter that is provided in the drawing wire 11 and measures the drawing force of the third winch 10, and 26 and 27 indicate the wire 14 or the fixed pulley 15.
Alternatively, it is an excavation depth meter and a speed meter provided at 15'. These speedometer 27 and depth meter 26 are
For example, a cam switch linked to the fixed pulley 15' may be provided, and the excavation speed may be determined by measuring the interval of output signals from the cam switch, and the excavation depth may be determined by counting the output signals. .

図中28はプログラマプルシーケンサーやマイ
クロコンピユータからなる制御装置、この制御装
置28はモーター制御回路18,19及び制御機
構20と接続し、制御装置28からの出力信号A
をモーター制御回路18に、同じく出力信号Bを
モーター制御回路19に、同じく出力信号Cを制
御機構20に伝達する。
In the figure, 28 is a control device consisting of a programmable sequencer or a microcomputer, and this control device 28 is connected to the motor control circuits 18, 19 and the control mechanism 20, and outputs an output signal A from the control device
Similarly, the output signal B is transmitted to the motor control circuit 19, and the output signal C is transmitted to the control mechanism 20.

一方、上記荷重計21、距離計22、電流計2
3,24、引込力計25、深度計26及び速度計
27からは、入力信号D,E,F,G,H,I,
Jとして入力される。
On the other hand, the load meter 21, distance meter 22, ammeter 2
3, 24, input signals D, E, F, G, H, I,
Entered as J.

第2図はフローチヤートを示し、まず自動掘削
釦を押せば外側オーガ用駆動部3及び内側オーガ
用駆動部5の各駆動モーターに通電され、外側オ
ーガ1と内側オーガ2が同時に互に反対方向に回
転して掘削が開始される。
Figure 2 shows a flowchart. First, when the automatic digging button is pressed, the drive motors of the outer auger drive section 3 and the inner auger drive section 5 are energized, and the outer auger 1 and the inner auger 2 are simultaneously moved in opposite directions. The machine rotates and excavation begins.

掘削中、掘削機は自重で沈降し、これに伴なつ
て昇降ウインチ7からはワイヤー8が繰り出さ
れ、サードウインチ10にはワイヤー11が巻込
まれる。なお、停止釦を押せば昇降ウインチ7及
びサードウインチ10は停止する。
During excavation, the excavator sinks under its own weight, and along with this, the wire 8 is let out from the lifting winch 7 and the wire 11 is wound around the third winch 10. Note that when the stop button is pressed, the lifting winch 7 and the third winch 10 are stopped.

一方、掘削機の進行とともにワイヤー14及び
固定滑車15,15′が動き、この動きとともに
深度計26によつて掘削深度が計測され、深度信
号Iを制御装置28に入力する。
On the other hand, as the excavator advances, the wire 14 and the fixed pulleys 15, 15' move, and along with this movement, the excavation depth is measured by the depth gauge 26, and a depth signal I is input to the control device 28.

制御装置28では、設定深度と測定掘削深度と
を比較し、両者が一致した場合にはOFF指令を
内容とする信号A,Bをモーター制御回路18,
19に出力し、その結果モーター16,17は停
止して昇降ウインチ7及びサードウインチ10も
停止する。掘削深度が設定深度に到らない場合、
制御装置28からのON指令を内容とする信号A
がモーター制御回路18にに出力され、モーター
16を介して昇降ウインチ7は3速(例えば2
m/分)でワイヤー8を繰出す。
The control device 28 compares the set depth and the measured excavation depth, and if they match, sends signals A and B containing OFF commands to the motor control circuit 18,
As a result, the motors 16 and 17 are stopped, and the lifting winch 7 and third winch 10 are also stopped. If the excavation depth does not reach the set depth,
Signal A containing the ON command from the control device 28
is output to the motor control circuit 18, and the lifting winch 7 is set to 3rd speed (for example, 2nd speed) via the motor 16.
Pay out the wire 8 at a speed (m/min).

ここで電流計23,24からの消費電流信号
F,Gが制御装置28に入力され該制御装置28
で加算された両モーターの実際合計消費電流値は
設定消費電流値と比較される。この場合、実際合
計消費電流値が設定電流値よりも小さい場合は制
御装置28より信号A(a1)がモーター制御回路
18に入力され、モーター16の回転が制御され
て昇降ウインチ7は3速(2m/分)でワイヤー
8を繰り出す。
Here, the current consumption signals F and G from the ammeters 23 and 24 are input to the control device 28.
The actual total current consumption value of both motors added in is compared with the set current consumption value. In this case, if the actual total current consumption value is smaller than the set current value, the signal A (a 1 ) is input from the control device 28 to the motor control circuit 18, the rotation of the motor 16 is controlled, and the lifting winch 7 is set to 3rd speed. Pay out the wire 8 at a speed of (2 m/min).

一方消費電流値が設定電流値より大きい場合
は、信号AはA(a2),A(a3)に順次変化して昇
降ウインチ7は2速(1m/分)、1速(0.5m/
分)のワイヤー8を繰り出し速度に制御される。
On the other hand, if the current consumption value is larger than the set current value, the signal A changes to A (a 2 ) and A (a 3 ) sequentially, and the lifting winch 7 is switched to 2nd speed (1 m/min) and 1st speed (0.5 m/min).
The speed at which the wire 8 is fed out (minutes) is controlled.

さらに、昇降ウインチ7を1速で作動し続けて
もなお、実際合計消費電流値が大きい場合には、
昇降ウインチ7を停止させて掘削機を下降させず
に両オーガ1,2を回転し続ける。これでも実際
合計消費電流値の方が大きい時には、制御装置2
8より逆転のON指令を内容とする信号Aがモー
ター制御回路18に出力され、その結果モーター
16及び昇降ウインチ7は逆転してワイヤー8は
巻き取られ、アースオーガ機は多少上昇する。そ
して設定電流値よりも消費電流値の方が小さくな
つたときにはじめて昇降ウインチは停止する。
Furthermore, even if the lifting winch 7 continues to operate in 1st speed, if the actual total current consumption value is still large,
Both augers 1 and 2 continue to rotate without stopping the lifting winch 7 and lowering the excavator. Even with this, if the actual total current consumption value is larger, the control device 2
8 outputs a signal A containing an ON command for reverse rotation to the motor control circuit 18, and as a result, the motor 16 and the lifting winch 7 are reversely rotated, the wire 8 is wound up, and the earth auger is raised somewhat. The lifting winch stops only when the current consumption value becomes smaller than the set current value.

以上述べたように、本発明のアースオーガ機の
掘削制御方法は該掘削機の昇降ウインチをオーガ
作動状態に応じて自動的に制御し、しかもこの制
御は多段階で行われるので適切な掘削状態を常に
保持することができるようにしたものである。
As described above, the excavation control method for an earth auger machine of the present invention automatically controls the lifting winch of the excavator according to the auger operating state, and this control is performed in multiple stages, so that appropriate excavation conditions can be achieved. This allows it to be maintained at all times.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の実施例を示す説明図、第2図
はフローチヤートである。 1……外側オーガ、1a……刃口、2……内側
オーガ、2a……刃口、3……外側オーガ用駆動
部、4,4′……シリンダ、5……内側オーガ用
駆動部、6……支持体、7……昇降ウインチ、8
……ワイヤー、9……動滑車、10……サードウ
インチ、11……引込みワイヤー、12,13,
13′……ガイドローラー、14……ワイヤー、
15,15′……固定滑車、16,17……駆動
モーター、18,19……モーター制御回路、2
0……制御機構、21……荷重計、22……距離
計、23,24……電流計、25……引込力計、
26……深度計、27……速度計、28……制御
装置。
FIG. 1 is an explanatory diagram showing an embodiment of the present invention, and FIG. 2 is a flowchart. 1... Outer auger, 1a... Blade mouth, 2... Inner auger, 2a... Blade mouth, 3... Outer auger drive section, 4, 4'... Cylinder, 5... Inner auger drive section, 6... Support body, 7... Lifting winch, 8
...Wire, 9...Moving pulley, 10...Third winch, 11...Leading wire, 12,13,
13'...Guide roller, 14...Wire,
15, 15'... Fixed pulley, 16, 17... Drive motor, 18, 19... Motor control circuit, 2
0...Control mechanism, 21...Load meter, 22...Distance meter, 23, 24...Ammeter, 25...Retraction force meter,
26... Depth gauge, 27... Speed meter, 28... Control device.

Claims (1)

【特許請求の範囲】[Claims] 1 リーダマストなどの支持体に昇降ウインチ操
作により巻取り・送出されるワイヤーによつて昇
降自在に吊り下げされる駆動部に連結されたオー
ガスクリユーからなるアースオーガ機における掘
削制御方法であつて、駆動部の駆動モーターの実
際消費電流信号を制御装置に入力し、この制御装
置で消費電流値と設定消費電流値とを比較し、そ
の比較結果に応じて昇降ウインチを多段階に速度
制御するべく制御装置からの駆動信号を昇降用ウ
インチの駆動モーター制御回路に導入し、該ウイ
ンチのワイヤー繰出し動作を自動的に多段階制御
することを特徴とするアースオーガ機における掘
削制御方法。
1. An excavation control method in an earth auger machine consisting of an auger screw connected to a drive unit that is vertically suspended from a support such as a leader mast by a wire that is wound up and sent out by a lifting winch operation, , the actual current consumption signal of the drive motor of the drive section is input to the control device, the control device compares the current consumption value with the set current consumption value, and controls the speed of the lifting winch in multiple stages according to the comparison result. 1. An excavation control method for an earth auger machine, characterized in that a drive signal from a control device is introduced into a drive motor control circuit of an elevating winch, and the wire payout operation of the winch is automatically controlled in multiple stages.
JP11794782A 1982-07-07 1982-07-07 Excavation control method in earth auger machine Granted JPS598897A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11794782A JPS598897A (en) 1982-07-07 1982-07-07 Excavation control method in earth auger machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11794782A JPS598897A (en) 1982-07-07 1982-07-07 Excavation control method in earth auger machine

Publications (2)

Publication Number Publication Date
JPS598897A JPS598897A (en) 1984-01-18
JPS6326238B2 true JPS6326238B2 (en) 1988-05-28

Family

ID=14724165

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11794782A Granted JPS598897A (en) 1982-07-07 1982-07-07 Excavation control method in earth auger machine

Country Status (1)

Country Link
JP (1) JPS598897A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6367394A (en) * 1986-09-09 1988-03-26 日立建機株式会社 Controller for speed of excavation of earth auger
JP7354495B2 (en) * 2019-05-10 2023-10-03 株式会社竹中工務店 Drilling method and drilling device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58164892A (en) * 1982-03-26 1983-09-29 日立建機株式会社 Control apparatus of earth auger drilling speed

Also Published As

Publication number Publication date
JPS598897A (en) 1984-01-18

Similar Documents

Publication Publication Date Title
JP5959887B2 (en) Crushed stone pile formation control device and crushed stone pile formation method
JPS6326238B2 (en)
EP3921477B1 (en) Excavating machine with control system of the combined drive of two winches
JPS6326239B2 (en)
JPH0224993B2 (en)
CN115653034B (en) Continuous wall grooving machine and automatic grooving construction control method and system thereof
JPH03241118A (en) Automatic excavator of underground continuous wall
JP2735734B2 (en) Pile support layer detection method
JPH0322487B2 (en)
CN119866399A (en) Underground working machine and method for operating an underground working machine
JPH10205263A (en) Earth-removing device for excavator
JP3012900B2 (en) Auger excavation control method
US743751A (en) Dredger.
JPS622111B2 (en)
CN220284823U (en) A device for purlin construction
JPS6195197A (en) Automatic drilling control apparatus
JP2871250B2 (en) Excavator control equipment
JP7184266B2 (en) METHOD AND DEVICE FOR MEASURING CONCRETE RAISED HEIGHT IN CONCRETE PLACEMENT IN WATER
US12104488B2 (en) Construction machine and method for operating a construction machine
JPS6168992A (en) Automatic excavation controller
JP2519950B2 (en) Method and apparatus for supplying sand to hollow pipe for sand pile construction
JPH07158056A (en) Control device for soil improvement machine
JPH0380217B2 (en)
JPS62233332A (en) Controller for automatic bottom-expanding excavation
JPH03110214A (en) Gravel pile erection technique