Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0128171B2 - - Google Patents
[go: Go Back, main page]

JPH0128171B2 - - Google Patents

Info

Publication number
JPH0128171B2
JPH0128171B2 JP54172888A JP17288879A JPH0128171B2 JP H0128171 B2 JPH0128171 B2 JP H0128171B2 JP 54172888 A JP54172888 A JP 54172888A JP 17288879 A JP17288879 A JP 17288879A JP H0128171 B2 JPH0128171 B2 JP H0128171B2
Authority
JP
Japan
Prior art keywords
conduit
new pipe
day
stopper
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP54172888A
Other languages
Japanese (ja)
Other versions
JPS5694086A (en
Inventor
Koichi Ise
Toshiaki Tanaka
Koji Nakano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP17288879A priority Critical patent/JPS5694086A/en
Publication of JPS5694086A publication Critical patent/JPS5694086A/en
Publication of JPH0128171B2 publication Critical patent/JPH0128171B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、都市ガス導管などの埋設した気体輸
送用導管の一部である撤去対象導管を、複数日に
わたる工事により気体輸送を継続したままで新管
に入替える気体輸送用導管の入替工法に関する。
[Detailed Description of the Invention] [Industrial Application Field] The present invention is a method for removing a pipe that is part of a buried gas transport pipe, such as a city gas pipe, while continuing to transport gas through construction over several days. Concerning a method for replacing gas transport conduits with new pipes.

〔従来技術〕[Prior art]

従来、第7図イに示すように、気体輸送用導管
11の撤去対象導管11aに対して全長にわたつ
て並べた新埋設導管11bを、複数日にわたる工
事で設置し、その後、第7図ロに示すように、撤
去対象導管11aの両側近くで遮断用バツグ12
により気体輸送用導管11を遮断し、その後で撤
去対象導管11aの両端を切断して取除き、新埋
設導管11bを気体輸送用導管11に接続し、そ
の後、遮断用バツグ12を撤去して新埋設導管1
1bによる気体輸送を行い、その後、撤去対象導
管11aを複数日にわたる工事で撤去し、もつ
て、気体輸送用導管11からの気体分配中断をで
きるだけ小範囲にかつ短時間に抑えていた。
Conventionally, as shown in FIG. 7A, new buried conduits 11b were installed along the entire length of the gas transport conduits 11 to be removed, 11a, in a construction process that lasted several days. As shown in FIG.
to shut off the gas transport conduit 11, then cut and remove both ends of the conduit 11a to be removed, connect the new buried conduit 11b to the gas transport conduit 11, and then remove the blocking bag 12 and install the new one. Buried conduit 1
1b was carried out, and then the conduit 11a to be removed was removed by construction work over several days, thereby suppressing the interruption of gas distribution from the gas transporting conduit 11 in as small a range as possible and in a short period of time.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかし、新埋設導管11bの設置と撤去対象導
管11aの撤去において長い範囲の掘削工事を必
要とし、その掘削工事のために工期が長くなつ
て、交通障害を生じたり近所にめいわくをかけた
りし、また、長い範囲の掘削と埋戻し及び大量の
掘削土砂と埋戻し土砂の取扱い等のために工事費
が膨大になり、一層の改良の余地があつた。
However, the installation of the new buried conduit 11b and the removal of the conduit 11a to be removed require extensive excavation work, and the excavation work lengthens the construction period, causing traffic disturbances and disturbing the neighborhood. In addition, the construction costs were enormous due to the long range of excavation and backfilling, and the handling of large amounts of excavated and backfilling soil, leaving room for further improvement.

本発明の目的は、気体輸送用導管からの気体分
配中断をできるだけ小範囲に、かつ短時間に抑え
ながら、掘削工事範囲を大巾に短縮して、工期の
大巾短縮と工事費の大巾節減を図る点にある。
The purpose of the present invention is to greatly shorten the scope of excavation work while minimizing the interruption of gas distribution from gas transport conduits in as small an area as possible and in a short period of time, thereby greatly shortening the construction period and construction cost. The point is to save money.

〔問題を解決するための手段〕[Means to solve the problem]

本発明の特徴手段は、 埋設した気体輸送用導管の一部である撤去対象
導管のうち一端側の一日の工事で入替可能な単位
長さの撤去導管部分を掘出すと共に、その撤去導
管部分の両側近くの導管部分夫々を気密閉塞した
後、前記撤去導管部分の両端部を切断して、その
撤去導管部分を撤去する第1工程、 前記気密閉塞された導管部分のうち撤去しない
ものに接続するための新管を、その内部に移動操
作自在に入れた気密閉塞用ストツパーで気密閉塞
し、かつ、前記気密閉塞された導管部分の他方の
切断部分をカツプで気密閉塞する第2工程、 前記新管を前記撤去導管部分の設置跡に設置し
て前記撤去しない導管部分に接続し、かつ、前記
第1工程による両導管部分の気密閉塞を解除する
第3工程、 前記新管の接続端側から他端側に前記ストツパ
ーを移動させて、前記新管内の空気を前記ストツ
パーの作用によりパージする第4工程、 前記新管の非接続端部側を前記ストツパーやカ
ツプで気密閉塞する第5工程、 を含む工事を初日に行い、そして、以後の工事日
夫々において、 前記撤去対象導管のうち前記新管側の一日の工
事で入替可能な単位長さの撤去導管部分を掘出す
と共に、その撤去導管部分の一端近くの導管部分
を気密閉塞した後、前記撤去導管部分の一端部を
切断して、その撤去導管部分を撤去する第6工
程、 前記導管部分の切断端部をカツプで気密閉塞し
た後、前記第6工程による導管部分の気密閉塞を
解除する第7工程、 新管を前記撤去導管部分の設置跡に設置して既
設の前記新管に接続し、前記ストツパーを前記当
日設置の新管の遊端側に移動させて、前記当日設
置の新管内の空気を前記ストツパーの作用により
パージする第8工程、 前記第5工程と同様に前記当日設置の新管を気
密閉塞する第9工程 を含む工事を行い、さらに、最終の工事日におい
て、当日設置の新管を前記気体輸送用導管のうち
撤去しない部分に接続することにあり、その作用
効果は次の通りである。
The characteristic means of the present invention is to excavate a section of the conduit to be removed of a unit length that can be replaced in one day's work at one end of the conduit to be removed, which is a part of the buried gas transport conduit, and to A first step of airtightly closing each of the conduit sections near both sides of the conduit section, and then cutting both ends of the removed conduit section and removing the removed conduit section; connecting to the airtightly closed conduit section that will not be removed; a second step of hermetically closing the new pipe to be used for the new pipe with an airtight closing stopper that is movably inserted therein, and hermetically closing the other cut portion of the airtightly closed conduit portion with a cup; a third step of installing a new pipe on the installation site of the removed conduit portion and connecting it to the conduit portion that will not be removed, and releasing the airtight blockage of both conduit portions caused by the first step, the connecting end side of the new pipe; A fourth step of moving the stopper from the stopper to the other end side and purging the air in the new pipe by the action of the stopper; A fifth step of airtightly closing the non-connecting end side of the new pipe with the stopper or cup. , and on the first day, and on each subsequent construction day, excavate a unit length of removed conduit that can be replaced in one day's work on the new pipe side of the conduit to be removed, and A sixth step of airtightly closing the conduit portion near one end of the removed conduit portion, and then cutting one end of the removed conduit portion and removing the removed conduit portion; airtightly closing the cut end of the said conduit portion with a cup; After that, in a seventh step of releasing the airtight blockage of the conduit section from the sixth step, a new pipe is installed at the site where the removed conduit section was installed and connected to the existing new pipe, and the stopper is installed on the same day. an eighth step of moving the new pipe to the free end side and purging the air inside the new pipe installed on the day by the action of the stopper; a ninth step of airtightly closing the new pipe installed on the day as in the fifth step; The purpose is to carry out the construction work including the construction process, and then, on the final construction day, connect the new pipe installed on that day to the part of the gas transport conduit that will not be removed, and its effects are as follows.

〔作用〕[Effect]

つまり、工事日の夫々において、ストツパーや
カツプ、その他の手段によつて気体輸送用導管か
らの気体漏洩を防止しながら、単位長さの撤去導
管部分を撤去し、その撤去導管部分の設置跡に新
管を設置するから、前述の従来技術のように新管
を撤去対象導管と並べて埋設するに比して、掘削
工事範囲を半分程度に大巾短縮でき、工期の大巾
短縮と工事費の大巾節減を実現できるようになつ
た。
In other words, on each construction day, while preventing gas leakage from the gas transport conduit using stoppers, cups, or other means, a unit length of removed conduit is removed, and the installation site of the removed conduit is replaced. Because new pipes are installed, the excavation work area can be reduced by about half compared to the conventional technology described above, in which the new pipes are buried alongside the pipes to be removed.This greatly reduces the construction period and construction costs. It has become possible to achieve major savings.

また、工事日の夫々において、設置した新管を
気体輸送用導管に接続すると共に、その新管の遊
端側にストツパーを移動させるから、設置された
新管を利用しての気体分配を実行でき、また、都
市ガス導管では残つている撤去対象導管が別の気
体輸送用導管に接続されている場合が多く、した
がつて、気体輸送用導管からの気体分配中断をで
きるだけ小範囲にかつ短時間に抑えることができ
る。
Also, on each construction day, the installed new pipe is connected to the gas transport conduit and the stopper is moved to the free end side of the new pipe, so gas distribution using the installed new pipe is performed. In addition, in city gas pipelines, the remaining pipelines to be removed are often connected to other gas transportation pipelines, so interruptions in gas distribution from gas transportation pipelines should be kept as small and short as possible. It can be saved in time.

〔発明の効果〕〔Effect of the invention〕

その結果、気体輸送用導管からの気体分配中断
をできるだけ小範囲にかつ短時間に抑えられる利
点を十分に活かしながら、工期の大巾短縮により
交通への悪影響及び近所へのめいわくを大巾に少
なくでき、かつ、工事費の大巾節減により経済面
で極めて有利に施工でき、全体として一段と優れ
た気体輸送用導管の入替工法が得られた。
As a result, while taking full advantage of the advantage of suppressing the interruption of gas distribution from gas transport pipes to as small an area as possible and in a short period of time, the construction period is greatly shortened, thereby significantly reducing the negative impact on traffic and the disruption to the neighborhood. This method is extremely advantageous from an economic point of view due to the large reduction in construction costs, and an overall superior method for replacing gas transportation pipes has been obtained.

〔実施例〕〔Example〕

次に、第1図ないし第6図により実施例を示
す。
Next, an embodiment will be shown with reference to FIGS. 1 to 6.

工事初日において、下記の第1工程ないし第5
工程を含む工事を実施する。
On the first day of construction, the following steps 1 to 5 will be completed.
Implement construction including construction process.

(1) 第1工程 第1図に示すように、埋設した気体輸送用導
管の一部である範囲Aの撤去対象導管P-1
P-oにおいて、一端側の一日の工事で入替可能
な単位長さaの撤去導管部分P-1を、第2図イ
に示すように掘出すと共に、第2図ロに示すよ
うに、その撤去導管部分P-1の両側近くの導管
部分P′,P-2夫々を、それに形成した穿孔から
挿入した後で膨張させたゴムバツグ1により気
密閉塞し、その後、撤去導管部分P-1の両端部
を切断して、撤去導管部分P-1を撤去する。
(1) First step As shown in Figure 1, the pipe P -1 to be removed in range A, which is a part of the buried gas transport pipe
At P -o , the removed conduit section P -1 of unit length a, which can be replaced in one day's work, is excavated as shown in Fig. 2A, and the removed conduit section P -1 , which can be replaced in one day's work, is excavated as shown in Fig. 2A, and as shown in Fig. 2B, The conduit sections P' and P - 2 near both sides of the removed conduit section P - 1 are hermetically closed with rubber bags 1 which are inserted through the holes formed therein and then inflated, and then the removed conduit section P -1 is Cut both ends and remove the removal conduit section P -1 .

尚、適当な箇所にバルブ1′が設けられてい
る場合には、穿孔およびバツグ挿入を省略し
て、バルブ1′で気密閉塞してもよく、また、
撤去導管部分P-1に分岐管がある場合には、両
管の連結を撤去に先立つて解除しておく。
In addition, if the valve 1' is provided at an appropriate location, the drilling and bag insertion may be omitted and the valve 1' may be airtightly closed;
If there is a branch pipe in the removed conduit section P -1 , the connection between both pipes should be released prior to removal.

(2) 第2工程 第3図に示すように、気密閉塞された導管部
分P′,P-2のうち撤去しないものP′に接続する
ための新管P0-1を、その内部に移動操作自在に
入れた気密閉塞用ストツパー3で気密閉塞し、
かつ、気密閉塞された導管部分P′,P-2の他方
P-2の切断端部をカツプ5で気密閉塞する。
(2) Second step As shown in Figure 3, move the new pipe P 0-1 to connect to the airtightly closed pipe section P', P -2 that will not be removed, P'. It is airtightly closed with the airtight closing stopper 3 that can be inserted freely.
and the other of the airtightly closed conduit portions P′ and P -2
The cut end of P -2 is hermetically closed with cup 5.

尚、ストツパー3に2個の弾性シール部材3
aを設け、索条付のホース8による流体給排で
弾性シール部材3aを膨張・収縮操作できるよ
うに構成してある。
In addition, two elastic seal members 3 are attached to the stopper 3.
A is provided, and the elastic seal member 3a is configured to be able to be expanded and contracted by supplying and discharging fluid through a hose 8 with a cable.

(3) 第3工程 第4図に示すように、新管P0-1を撤去導管部
分P-1の設置跡に設置して撤去しない導管部分
P′に継手で接続し、導管部分P′,P-2夫々にお
いて、ゴムバツグ1を撤去して、プラグ2で穿
孔を蓋し、第1工程による気密閉塞を解除す
る。
(3) Third step As shown in Figure 4, a new pipe P 0-1 is installed on the site where the removed pipe section P -1 was installed, and the pipe section that will not be removed is
Connect to P' with a joint, remove the rubber bag 1 in each of the conduit sections P' and P -2 , cover the hole with a plug 2, and release the airtight blockage caused by the first step.

そして、必要に応じて、新管P0-1の端部をバ
ルブV付のカツプ6で閉じ、バルブVから新管
P0-1内に圧縮空気を入れて、新管P0-1の気密テ
ストを行う。
Then, if necessary, close the end of the new pipe P 0-1 with cup 6 with valve V, and connect the new pipe from valve V.
Inject compressed air into P 0-1 and perform an airtight test on the new pipe P 0-1 .

(4) 第4工程 第5図に示すように、カツプ6を外し、弾性
シール部材3aを収縮させ、索条付のホース8
を引つ張つてストツパー3を新管P0-1の接続端
側から他端側に移動させて、ストツパー3に付
設した舌片3bの作用により輸送気体漏洩を防
止しながら新管P0-1内の空気をパージする。
(4) Fourth step As shown in Fig. 5, remove the cup 6, contract the elastic seal member 3a, and
, and move the stopper 3 from the connecting end of the new pipe P 0-1 to the other end of the new pipe P 0-1 while preventing leakage of transport gas by the action of the tongue piece 3b attached to the stopper 3 . Purge the air inside 1 .

(5) 第5工程 第6図に示すように、新管P0-1の非接続端部
側を、弾性シール部材3aを膨張させたストツ
パー3やカツプ6により気密閉塞する。
(5) Fifth step As shown in FIG. 6, the non-connecting end side of the new pipe P 0-1 is hermetically closed by the stopper 3 or cup 6 made by expanding the elastic seal member 3a.

尚、必要に応じて、新管P0-1に先に連結解除
した分岐管を接続する。
Furthermore, if necessary, connect the previously disconnected branch pipe to the new pipe P 0-1 .

そして、以後の工事日夫々において、下記の
第6工程ないし第9工程を含む工事を実施す
る。
Then, on each subsequent construction day, construction work including the 6th to 9th steps below will be carried out.

(6) 第6工程 撤去対象導管P-2〜P-oのうち既設の新管
P0-1…P0-o-2又はP0-o-1側において、一日の工
事で入替可能な単位長さaの撤去導管部分P-2
…P-o-1又はP-oを掘出すと共に、撤去導管部分
P-2…P-o-1又はP-oの一端近くの導管部分P-3
…P-o又はP″を、第2図ロと同様にゴムバツグ
1で気密閉塞し、その後、撤去導管部分P-2
P-o-1又はP-oの一端部を切断して、その撤去導
管部分P-2…P-o-1又はP-oを撤去する。
(6) 6th process: New existing pipes among pipes P -2 to P -o to be removed
P 0-1 ...On the P 0-o-2 or P 0-o-1 side, removed conduit section P -2 of unit length a that can be replaced in one day of construction.
…In addition to excavating P -o-1 or P -o , the removed conduit part
P -2 ... P -o-1 or the conduit section P -3 near one end of P -o
... P -o or P'' is hermetically closed with rubber bag 1 in the same manner as in Fig. 2 B, and then the removed conduit section P -2 ...
Cut one end of P -o-1 or P -o and remove the conduit section P -2 ...P -o-1 or P -o is removed.

(7) 第7工程 第3図と同様に導管部分P-3…P-o又はP″の
切断端部をカツプ5で気密閉塞し、その後、第
4図と同様に、ゴムバツグ1を撤去してプラグ
2で穿孔を蓋して、第6工程による導管部分
P-3…P-o又はP″の気密閉塞を解除する。
(7) Seventh step The cut end of the conduit section P -3 ...P -o or P'' is hermetically closed with the cup 5 in the same manner as in Fig. 3, and then the rubber bag 1 is removed in the same manner as in Fig. 4. Then cover the hole with plug 2 and remove the conduit part by the 6th step.
P -3 ...Remove the airtight blockage of P -o or P''.

(8) 第8工程 第5図と同様に、新管P0-2…P0-o-1又はP0-o
を撤去導管部分P-2…P-o-1又はP-oの設置跡に
設置して既設の新管P0-1…P0-o-2又はP0-o-1
接続し、ストツパー3を当日設置の新管P0-2
P0-o-1又はP0-oの遊端側に移動させて、当日設
置の新管P0-2…P0-o-1又はP0-o内の空気をスト
ツパー3の舌片3bの作用によりパージする。
(8) 8th step Similar to Figure 5, new pipe P 0-2 ...P 0-o-1 or P 0-o
Install the removed conduit section P -2 ...P -o-1 or P -o on the installation site and connect it to the existing new pipe P 0-1 ...P 0-o-2 or P 0-o-1 , New pipe P 0-2 with stopper 3 installed on the day...
P 0-o-1 or P 0-o is moved to the free end side, and the new pipe P 0-2 installed on the day...P 0-o-1 or P 0-o is drained from the tongue piece of stopper 3. Purge by the action of 3b.

(9) 第9工程 第6図に示す前記第5工程と同様に、当日設
置の新管P0-2…P0-o-1又はP0-oの非接続側端部
をストツパー3やカツプ6で気密閉塞する。
(9) 9th process Similar to the 5th process shown in Figure 6, connect the non-connecting end of the new pipe P 0-2 ...P 0-o-1 or P 0-o installed on the day to the stopper 3 or Close it airtight with cup 6.

そして最終の工事日において、ストツパー3
を撤去して、当日設置の新管P0-oを気体輸送用
導管のうち撤去しない部分P″に接続する。
Then, on the final construction day, stopper 3
, and connect the new pipe P 0-o installed on the day to the part P'' of the gas transport conduit that will not be removed.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第6図は本発明の実施例を示す概
念図であり、第7図イ,ロは従来例の概念図であ
る。 P-1…P-o……撤去導管部分、P′,P″……撤去
しない導管部分、P0-1〜P0-o……新管、3……ス
トツパー、5,6……カツプ。
1 to 6 are conceptual diagrams showing an embodiment of the present invention, and FIGS. 7A and 7B are conceptual diagrams of a conventional example. P -1 ...P -o ...Pipe section to be removed, P', P''...Pipe section not to be removed, P 0-1 to P 0-o ...New pipe, 3...Stopper, 5, 6...Cup .

Claims (1)

【特許請求の範囲】 1 埋設した気体輸送用導管の一部である撤去対
象導管P-1〜Poを、複数日にわたる工事により気
体輸送を継続したままで新管P0-1〜P0-oに入替え
る気体輸送用導管の入替工法であつて、前記撤去
対象導管P-1〜Poのうち一端側の一日の工事で入
替可能な単位長さaの撤去導管部分P-1を掘出す
と共に、その撤去導管部分P-1の両側近くの導管
部分P′,P-2夫々を気密閉塞した後、前記撤去導
管部分P-1の両端部を切断して、その撤去導管部
分P-1を撤去する第1工程、 前記気密閉塞された導管部分P′,P-2のうち撤
去しないものP′に接続するための新管P0-1を、そ
の内部に移動操作自在に入れた気密閉塞用ストツ
パー3で気密閉塞し、かつ、前記気密閉塞された
導管部分P′,P-2の他方P-2の切断端部をカツプ
5で気密閉塞する第2工程、 前記新管P0-1を前記撤去導管部分P-1の設置跡
に設置して前記撤去しない導管部分P′に接続し、
かつ、前記第1工程による両導管部分P′,P-2
気密閉塞を解除する第3工程、 前記新管P0-1の接続端側から他端側に前記スト
ツパー3を移動させて、前記新管P0-1内の空気を
前記ストツパー3の作用によりパージする第4工
程、 前記新管P0-1の非接続端部側を前記ストツパー
3やカツプ6で気密閉塞する第5工程、 を含む工事を初日に行い、そして、以後の工事日
夫々において、 前記撤去対象導管P-2〜Poのうち既設の前記新
管P0-1…P0-o-2又はP0-o-1側の一日の工事で入替
可能な単位長さaの撤去導管部分P-2…P-o-1又は
P-oを掘出すと共に、その撤去導管部分P-2
P-o-1又はP-oの一端近くの導管部分P-3…P-o
はP″を気密閉塞した後、前記撤去導管部分P-2
P-o-1又はP-oの一端部を切断して、その撤去導管
部分P-2…P-o-1又はP-oを撤去する第6工程、 前記導管部分P-3…P-o又はP″の切断端部をカ
ツプ5で気密閉塞した後、前記第6工程による導
管部分P-3…P-o又はP″の気密閉塞を解除する第
7工程、 新管P0-2…P0-o-1又はP0-oを前記撤去導管部分
P-2…P-o-1又はP-oの設置跡に設置して既設の前
記新管P0-1…P0-o-2又はP0-o-1に接続し、前記ス
トツパー3を前記当日設置の新管P0-2…P0-o-1
はP0-oの遊端側に移動させて、前記当日設置の新
管P0-2…P0-o-1又はP0-o内の空気を前記ストツパ
ー3の作用によりパージする第8工程、 前記第5工程と同様に前記当日設置の新管P0-2
…P0-o-1又はP0-oを気密閉塞する第9工程 を含む工事を行い、さらに、最終の工事日におい
て、当日設置の新管P0-oを前記気体輸送用導管の
うち撤去しない部分P″に接続する気体輸送用導
管の入替工法。
[Scope of Claims] 1. Conduit pipes P -1 to P o that are part of the buried gas transport pipes to be removed are replaced with new pipes P 0-1 to P 0 while gas transport continues through multi-day construction work. -o is a replacement construction method for gas transportation conduits, in which the removed conduit portion P -1 of unit length a that can be replaced in one day's work on one end of the aforementioned conduits P -1 to P o to be removed. At the same time, the conduit sections P' and P -2 near both sides of the removed conduit section P -1 are hermetically sealed, and then both ends of the removed conduit section P -1 are cut and the removed conduit section P -1 is excavated. The first step of removing P - 1 is to move and manipulate the new pipe P0-1 , which is to be connected to P', which is not to be removed out of the airtightly closed conduit sections P' and P -2 , inside it. a second step of airtightly closing the new pipe with the inserted airtight closing stopper 3, and airtightly closing the cut end of the other P - 2 of the airtightly closed conduit portions P' and P -2 with a cup 5; P 0-1 is installed at the installation site of the removed conduit section P -1 and connected to the conduit section P' that will not be removed,
and a third step of releasing the airtight blockage of both conduit portions P' and P -2 caused by the first step, moving the stopper 3 from the connecting end side of the new pipe P0-1 to the other end side, a fourth step of purging the air in the new pipe P 0-1 by the action of the stopper 3; a fifth step of airtightly closing the non-connecting end side of the new pipe P 0-1 with the stopper 3 and cup 6; , on the first day, and on each subsequent construction day, the existing new pipe P 0-1 ... P 0-o-2 or P 0- of the pipes P -2 to P o to be removed. Removed conduit section of unit length a that can be replaced in one day of construction on the o-1 side P -2 ...P -o-1 or
Along with excavating P -o , the removed conduit section P -2 ...
After airtightly closing the conduit section P -3 ...P -o or P'' near one end of P -o -1 or P -o, the removed conduit section P -2 ...
A sixth step of cutting one end of P -o-1 or P -o and removing the removed conduit portion P -2 ...P -o-1 or P -o , the said conduit portion P -3 ...P - o or P'' is hermetically closed with the cup 5, and a seventh step of releasing the airtight closure of the conduit portion P -3 ...P -o or P ' ' in the sixth step, the new pipe P 0-2 …P 0-o-1 or P 0-o as the removed conduit part
P -2 ...P -o-1 or P -o is installed at the site where P -o was installed and connected to the existing new pipe P 0-1 ...P 0-o-2 or P 0-o-1 , and the stopper 3 be moved to the free end side of the new pipe P 0-2 ...P 0-o-1 or P 0-o installed on the day, and the new pipe P 0-2 ...P 0-o-1 or 8th step of purging the air in P 0-o by the action of the stopper 3, similar to the 5th step, the new pipe P 0-2 installed on the day
…The construction work including the ninth step of airtightly closing P 0-o-1 or P 0-o will be carried out, and on the final construction day, the new pipe P 0-o installed on that day will be removed from among the gas transport conduits. A method of replacing the gas transport pipe connected to the part P″ that will not be removed.
JP17288879A 1979-12-27 1979-12-27 Replacing method of conduit pipe for transporting gas Granted JPS5694086A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17288879A JPS5694086A (en) 1979-12-27 1979-12-27 Replacing method of conduit pipe for transporting gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17288879A JPS5694086A (en) 1979-12-27 1979-12-27 Replacing method of conduit pipe for transporting gas

Publications (2)

Publication Number Publication Date
JPS5694086A JPS5694086A (en) 1981-07-30
JPH0128171B2 true JPH0128171B2 (en) 1989-06-01

Family

ID=15950174

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17288879A Granted JPS5694086A (en) 1979-12-27 1979-12-27 Replacing method of conduit pipe for transporting gas

Country Status (1)

Country Link
JP (1) JPS5694086A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007198524A (en) * 2006-01-27 2007-08-09 Tokyo Gas Co Ltd Gas purge device and gas purge method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007198524A (en) * 2006-01-27 2007-08-09 Tokyo Gas Co Ltd Gas purge device and gas purge method

Also Published As

Publication number Publication date
JPS5694086A (en) 1981-07-30

Similar Documents

Publication Publication Date Title
US4062376A (en) Service connection between a main and a meter in a building and method of and equipment for installing the same
JP2520995B2 (en) Fluid transportation main replacement method, head used for replacement, and replacement main
JPH0128171B2 (en)
JP2760674B2 (en) Gas bag
JPS63115981A (en) Guide and protective device for piping
JPH0124958B2 (en)
JPH02209596A (en) Pipe extending method
JPH07109274B2 (en) Device for connecting branch pipes to existing fluid transport pipes
JPH0252160B2 (en)
JPS6222035B2 (en)
JPH03292490A (en) Lining process for branch pipe of live pipeline and apparatus thereof
JPH0252159B2 (en)
CN219432743U (en) Socket type pipeline connecting device
JPS6250611B2 (en)
JPH065119B2 (en) Pipe branching method
JPH09182267A (en) Equipment for joining handholes and pipelines
JPH11125368A (en) Replacing construction method of gas transporting conduit and pipe end seal device
JP3556040B2 (en) Lining method of existing pipeline
JPH0613918B2 (en) Pipe branching method
JPH0641716B2 (en) A method for reaching a shield excavator into a vertical shaft, and a sealing device and an airtight tank used for the method.
JPS58121395A (en) Repair method for existing pipe joints
JPH11159690A (en) Hose for mobile conduit cut-off device
JP4194807B2 (en) Pipe update method
JPH03213796A (en) Method and tool for shutting off fluid conduit
JPH0419913B2 (en)