JPH0242968B2 - - Google Patents
Info
- Publication number
- JPH0242968B2 JPH0242968B2 JP14284686A JP14284686A JPH0242968B2 JP H0242968 B2 JPH0242968 B2 JP H0242968B2 JP 14284686 A JP14284686 A JP 14284686A JP 14284686 A JP14284686 A JP 14284686A JP H0242968 B2 JPH0242968 B2 JP H0242968B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- water
- urethane prepolymer
- mixture
- soluble urethane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 33
- JOYRKODLDBILNP-UHFFFAOYSA-N Ethyl urethane Chemical compound CCOC(N)=O JOYRKODLDBILNP-UHFFFAOYSA-N 0.000 claims description 24
- 239000000499 gel Substances 0.000 claims description 21
- 239000011248 coating agent Substances 0.000 claims description 20
- 238000000576 coating method Methods 0.000 claims description 20
- 238000005507 spraying Methods 0.000 claims description 17
- 239000000017 hydrogel Substances 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 15
- 239000002689 soil Substances 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 6
- 238000000605 extraction Methods 0.000 claims description 4
- 238000011049 filling Methods 0.000 claims description 3
- 238000003672 processing method Methods 0.000 claims description 2
- 239000000203 mixture Substances 0.000 description 28
- 239000004568 cement Substances 0.000 description 10
- 238000010276 construction Methods 0.000 description 9
- 239000000126 substance Substances 0.000 description 7
- 238000007711 solidification Methods 0.000 description 6
- 230000008023 solidification Effects 0.000 description 6
- 239000007921 spray Substances 0.000 description 4
- LYCAIKOWRPUZTN-UHFFFAOYSA-N Ethylene glycol Chemical compound OCCO LYCAIKOWRPUZTN-UHFFFAOYSA-N 0.000 description 3
- DNIAPMSPPWPWGF-UHFFFAOYSA-N Propylene glycol Chemical compound CC(O)CO DNIAPMSPPWPWGF-UHFFFAOYSA-N 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 2
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 2
- 235000011941 Tilia x europaea Nutrition 0.000 description 2
- 239000003054 catalyst Substances 0.000 description 2
- 239000004519 grease Substances 0.000 description 2
- 239000004571 lime Substances 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 239000000314 lubricant Substances 0.000 description 2
- 229920005862 polyol Polymers 0.000 description 2
- 150000003077 polyols Chemical class 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- IMNIMPAHZVJRPE-UHFFFAOYSA-N triethylenediamine Chemical compound C1CN2CCN1CC2 IMNIMPAHZVJRPE-UHFFFAOYSA-N 0.000 description 2
- 229920001730 Moisture cure polyurethane Polymers 0.000 description 1
- UKLDJPRMSDWDSL-UHFFFAOYSA-L [dibutyl(dodecanoyloxy)stannyl] dodecanoate Chemical compound CCCCCCCCCCCC(=O)O[Sn](CCCC)(CCCC)OC(=O)CCCCCCCCCCC UKLDJPRMSDWDSL-UHFFFAOYSA-L 0.000 description 1
- 239000003513 alkali Substances 0.000 description 1
- 150000001412 amines Chemical class 0.000 description 1
- 229910000278 bentonite Inorganic materials 0.000 description 1
- 239000000440 bentonite Substances 0.000 description 1
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 239000012975 dibutyltin dilaurate Substances 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 108010025899 gelatin film Proteins 0.000 description 1
- 238000001879 gelation Methods 0.000 description 1
- 235000011187 glycerol Nutrition 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- IQPQWNKOIGAROB-UHFFFAOYSA-N isocyanate group Chemical group [N-]=C=O IQPQWNKOIGAROB-UHFFFAOYSA-N 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000005056 polyisocyanate Substances 0.000 description 1
- 229920001228 polyisocyanate Polymers 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 239000002904 solvent Substances 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【発明の詳細な説明】
(技術分野)
本発明は、地中に埋設される杭を引き抜くため
の処理方法に関する。DETAILED DESCRIPTION OF THE INVENTION (Technical Field) The present invention relates to a treatment method for pulling out piles buried underground.
(従来技術)
地中に埋設された杭、例えば土留め壁の構築に
供された杭は、地下構築物の構築の完了後、引き
抜かれ、撤去される。(Prior Art) Piles buried underground, for example, piles used for constructing earth retaining walls, are pulled out and removed after construction of the underground structure is completed.
ところで、杭を引き抜くには、杭の自重および
杭と周囲地盤との間の摩擦力を上回る引き抜き力
を杭に及ぼすことができる大規模な引き抜き設備
を必要とし、引き抜き設備の規模は杭の長さの増
大に伴なつて大きくしなければならないという問
題があつた。 By the way, in order to pull out a pile, large-scale extraction equipment that can exert a pulling force on the pile that exceeds the pile's own weight and the frictional force between the pile and the surrounding ground is required, and the scale of the extraction equipment is based on the length of the pile. There was a problem in that it had to be made larger as the size increased.
この問題を解消する一方法として、杭の埋設に
際し、杭の表面に、アルカリ性の雰囲気中におい
て経時的にグリース状に液状化する性質を有する
含水ゲルを塗布することが考えられる。杭の引き
抜きに際し、埋設された杭と地盤との間にグリー
ス状に変化した物質が介在すれば、杭の引き抜き
時における摩擦抵抗を低減し得ると考えられる。 One possible way to solve this problem is to apply a hydrous gel, which has the property of liquefying like grease over time in an alkaline atmosphere, to the surface of the pile when burying the pile. It is thought that when a pile is pulled out, if a grease-like substance is present between the buried pile and the ground, the frictional resistance when pulling out the pile can be reduced.
前記含水ゲルは、水溶性ウレタンプレポリマー
と水との混合物を所定の時間放置することにより
形成することができ、前記混合物を前記杭の表面
に塗布すれば、前記混合物は経時的に固化すなわ
ちゲル化して含水ゲルとなる。前記混合物の前記
杭の表面への塗布は、該混合物を前記杭の表面に
吹き付けることにより行なうことができるが、前
記したようにこの混合物は経時的にゲル化する性
質を有するために、前記混合物の吹き付けの間の
前記ゲル化の進行によつて、前記混合物を貯溜す
るための貯槽中、前記混合物を前記貯槽からノズ
ルに送るための送給設備内、および前記混合物を
噴出するためのノズルの先端部に固化物(含水ゲ
ル)が生成され、前記吹き付けが不能になるばか
りでなく、各種の溶剤による付着含水ゲルの洗い
落としが著しく困難であるために、これらの設備
の再使用が実質的に不可能になるという問題があ
る。この問題に対処するためには、ゲルタイムが
比較的長い混合物を用いることが考えられる。し
かし、これは、前記含水ゲルが生成されるまでの
時間を長くすることによつて前記吹き付け不能に
至るまでの時間を延長するに過ぎず、前記設備の
再使用が不可能になるということを回避すること
はできない。 The hydrogel can be formed by leaving a mixture of a water-soluble urethane prepolymer and water for a predetermined period of time, and when the mixture is applied to the surface of the pile, the mixture solidifies or gels over time. and becomes a hydrogel. The mixture can be applied to the surface of the pile by spraying the mixture onto the surface of the pile. However, as described above, since this mixture has the property of gelling over time, it is difficult to apply the mixture to the surface of the pile. As the gelation progresses during the spraying of the mixture, the mixture is stored in a storage tank, in a feeding facility for sending the mixture from the storage tank to a nozzle, and in a nozzle for jetting the mixture. A solidified substance (hydrous gel) is formed at the tip, which not only makes it impossible to spray, but also makes it extremely difficult to wash off the attached hydrogel with various solvents, making it virtually impossible to reuse these equipment. The problem is that it becomes impossible. To address this problem, it is possible to use a mixture with a relatively long gel time. However, this only prolongs the time until the water-containing gel is produced, thereby extending the time until the spraying becomes impossible, and it becomes impossible to reuse the equipment. It cannot be avoided.
(発明の目的)
したがつて、本発明は、杭の表面に、アルカリ
性の雰囲気中において経時的にグリース状に変化
する性質を有する含水ゲルを形成することにより
杭の引き抜き抵抗を大幅に小さくすることを可能
にするとともに、前記含水ゲルの形成のために杭
の表面に吹き付けられる物質の吹き付けを不可能
にしまた該吹き付けに供される設備の再使用を不
可能にする要因を除去することができる、杭の引
き抜きのための処理方法を提供することにある。(Object of the Invention) Therefore, the present invention significantly reduces the pull-out resistance of a pile by forming a hydrous gel on the surface of the pile that has the property of changing into a grease-like state over time in an alkaline atmosphere. At the same time, it is possible to eliminate factors that make it impossible to spray the substance to be sprayed onto the surface of the pile for the formation of the hydrous gel and make it impossible to reuse the equipment used for the spraying. The object of the present invention is to provide a processing method for pulling out piles.
(発明の構成)
本発明は、杭の表面の少なくとも一部に含水ゲ
ルの被膜を形成すべく水溶性ウレタンプレポリマ
ーと水とを別個にかつ同時に吹き付けることおよ
びこの杭をアルカリ性の雰囲気中において地中に
埋設することを特徴とする。(Structure of the Invention) The present invention involves separately and simultaneously spraying a water-soluble urethane prepolymer and water to form a hydrogel coating on at least a portion of the surface of a pile, and placing the pile in an alkaline atmosphere. It is characterized by being buried inside.
(発明の作用および効果)
本発明によれば、杭の表面に形成された含水ゲ
ルの被膜がアルカリ性の物質と反応することによ
り時間の経過とともにグリース状に変化し、杭と
地盤とが前記グリース状を呈する物質により確実
に分離される。前記グリース状を呈する物質は、
杭の引き抜きの際、杭および地盤間で潤滑作用を
担うことから、杭の引き抜きに要する力を大幅に
低減することができ、これにより杭の引き抜きに
要する設備の小規模化を図ることができる。(Operations and Effects of the Invention) According to the present invention, the hydrous gel coating formed on the surface of the pile reacts with an alkaline substance and turns into a grease-like coating over time, and the pile and the ground are coated with the grease. It is reliably separated by a substance that exhibits a shape. The grease-like substance is
When pulling out piles, it acts as a lubricant between the pile and the ground, so the force required to pull out the piles can be significantly reduced, making it possible to downsize the equipment required to pull out the piles. .
また、本発明によれば、水溶性ウレタンプレポ
リマーと水とを別個にかつ同時に杭の表面に吹き
付けることによりその吹き付け表面にこれらの混
合物を塗布し、含水ゲルの被膜を形成する。 Further, according to the present invention, a water-soluble urethane prepolymer and water are separately and simultaneously sprayed onto the surface of the pile, thereby coating the sprayed surface with a mixture thereof to form a hydrogel coating.
水の存在下においてゲル化する性質を有する前
記水溶性ウレタンプレポリマーは、前記水とは別
個に送給され、吹き付けられることとなるため
に、吹き付けに供される設備である前記水溶性ウ
レタンプレポリマーの貯槽容器、その送給設備、
これを外部に噴出するノズル等のいずれの箇所に
おいても固化することはなく、したがつて、含水
ゲルの被膜の形成のための水溶性ウレタンプレポ
リマーおよび水の吹き付けを長時間にわたつて連
続して行なうことができる。また、本発明によれ
ば、例えば触媒が添加されこれによりゲルタイム
が短縮された混合物の使用が可能になる。ゲルタ
イムの短い混合物は、杭表面への吹き付け後、比
較的短時間で固化するために、その垂れ落ちを少
なく、したがつて、全体に一様な厚さの含水ゲル
の被膜を形成し得る点で有利である。 The water-soluble urethane prepolymer, which has the property of gelling in the presence of water, is fed separately from the water and sprayed, so the water-soluble urethane prepolymer, which is the equipment used for spraying, Polymer storage containers, their feeding equipment,
This does not solidify at any point such as the nozzle that sprays it to the outside, so water-soluble urethane prepolymer and water are continuously sprayed over a long period of time to form a hydrous gel film. can be done. The invention also allows the use of mixtures in which, for example, a catalyst is added, thereby shortening the gel time. A mixture with a short gel time solidifies in a relatively short period of time after being sprayed onto the pile surface, which reduces the amount of dripping and can form a hydrogel coating with a uniform thickness over the entire surface. It is advantageous.
(実施例)
本発明が特徴とするところは、図示の実施例に
ついての以下の説明により、さらに明らかとなろ
う。(Embodiments) The features of the present invention will become clearer from the following description of the illustrated embodiments.
一例として土留め壁の構築の際に施す処理方法
について説明する。 As an example, a treatment method applied when constructing an earth retaining wall will be explained.
まず、地盤中に掘削した溝孔中に杭を挿入する
に先立ち、杭の表面の少なくとも一部に水溶性ウ
レタンプレポリマーと水との混合物を塗布し、こ
れを所定の時間(ゲルタイム)放置することによ
り含水ゲルの被膜を形成する。前記含水ゲルはア
ルカリに弱い性質を有する。前記混合物の塗布
は、前記水溶性ウレタンプレポリマーおよび水を
別個にかつ同時に前記杭の表面に吹き付けること
により行なう。この吹き付けは、後述する装置を
用いて行なうことができる。 First, before inserting the pile into a trench drilled in the ground, a mixture of water-soluble urethane prepolymer and water is applied to at least a portion of the surface of the pile, and this is left for a predetermined period of time (gel time). This forms a hydrogel film. The hydrogel has a property of being weak against alkali. Application of the mixture is carried out by spraying the water-soluble urethane prepolymer and water separately and simultaneously onto the surface of the pile. This spraying can be performed using a device described below.
前記水溶性ウレタンプレポリマーは、親水性ポ
リオキシアルキレンポリオールと有機ポリイソシ
アネートとをウレタン結合させて末端にイソシア
ネート基を残存させることにより得られる。前記
ポリオキシアルキレンポリオールとして、エチレ
ングリコール、プロピレングリコール、グリセリ
ン等の縮合物や共縮合物がある。 The water-soluble urethane prepolymer is obtained by urethane bonding a hydrophilic polyoxyalkylene polyol and an organic polyisocyanate to leave an isocyanate group at the end. The polyoxyalkylene polyols include condensates and co-condensates of ethylene glycol, propylene glycol, glycerin, and the like.
前記含水ゲルの被膜が形成される杭は、鋼製、
コンクリート製あるいは木製であつてもよく、ま
た、管状、ボツクス状、I形状、H形状、シート
パイルのような板状等、その形状を問わない。 The pile on which the hydrogel coating is formed is made of steel,
It may be made of concrete or wood, and may have any shape such as a tube, a box, an I-shape, an H-shape, or a plate like a sheet pile.
地盤に溝孔を形成して土留め壁10を構築する
代表例としては、第1図ないし第5図に示すいわ
ゆる泥水固化工法、第6図ないし第8図に示すい
わゆるソイルセメント柱列杭工法、第9図ないし
第12図に示すいわゆるジヨイスト工法がある。 Typical examples of constructing the earth retaining wall 10 by forming grooves in the ground include the so-called mud solidification method shown in Figures 1 to 5, and the so-called soil cement column pile method shown in Figures 6 to 8. There is a so-called joist construction method shown in FIGS. 9 to 12.
前記泥水固化工法においては、ベントナイト泥
水のような安定液を満たしながら溝孔12を掘削
し(第3図)、次いで溝孔12中に杭14を挿入
し(第4図)、その後、水ガラス、セメント等か
ら成る固化剤を溝孔12中に投入して安定液を固
化させ、これにより土留め壁10が構築される。 In the muddy water solidification method, a trench 12 is excavated while being filled with a stable liquid such as bentonite mud (Fig. 3), and then a pile 14 is inserted into the trench 12 (Fig. 4). A solidifying agent such as cement is poured into the groove 12 to solidify the stabilizing liquid, thereby constructing the earth retaining wall 10.
前記ソイルセメント柱列杭工法においては、ア
ースオーガのような掘削機により所定の深度まで
溝孔12を穿つた後、溝孔12中にセメントペー
ストやモルタルのような固化材を注入し、これと
溝孔12中に残存する土砂とを撹拌、混合する
(第7図)。次に、溝孔12中に杭14を挿入する
(第8図)。その後、杭14の周辺が固化されて土
留め壁10が形成される。 In the soil-cement column pile construction method, a trench hole 12 is bored to a predetermined depth using an excavator such as an earth auger, and then a solidifying material such as cement paste or mortar is injected into the trench hole 12. The earth and sand remaining in the trench 12 are stirred and mixed (Fig. 7). Next, the stake 14 is inserted into the slot 12 (FIG. 8). Thereafter, the area around the pile 14 is solidified to form the earth retaining wall 10.
また、前記ジヨイスト工法では、プレボーリン
グにより溝孔12を形成した(第10図)後、該
溝孔中に杭14を挿入し(第11図)、溝孔12
を土砂で埋め戻すことにより、土留め壁10が構
築される。 In addition, in the joist construction method, after forming the groove hole 12 by pre-boring (Fig. 10), the pile 14 is inserted into the groove hole (Fig. 11).
The earth retaining wall 10 is constructed by backfilling with earth and sand.
杭14の表面に前記含水ゲルの被膜を形成する
には、杭の仮集積場においてあるいは杭を溝孔の
上方に配置する際すなわち杭の建て起しの際、前
記水溶性ウレタンプレポリマーおよび水の吹き付
けにより行なう。含水ゲルの被膜の形成作業の能
率を上げかつ形成後の前記被膜の損傷機会を少な
くするために、杭14を溝孔に挿入する直前すな
わち杭の建て込み時の吹き付けによることが望ま
しい。 In order to form the water-containing gel coating on the surface of the pile 14, the water-soluble urethane prepolymer and water are added at the temporary pile pile site or when the pile is placed above the trench, that is, when the pile is erected. This is done by spraying. In order to increase the efficiency of forming the hydrous gel coating and reduce the chance of damage to the coating after formation, it is desirable to spray the water immediately before inserting the pile 14 into the trench, that is, when the pile is erected.
この場合、第13図ないし第15図に示すよう
に、溝孔12の上方の地表面に設置された吹き付
け装置16を利用することにより、前記含水ゲル
をH型鋼のような杭14の表面に形成することが
できる。 In this case, as shown in FIGS. 13 to 15, by using a spraying device 16 installed on the ground surface above the trench 12, the water-containing gel is applied to the surface of a pile 14 such as an H-shaped steel. can be formed.
この装置16には、溝孔12の開放端を取り囲
んで地表に載置された枠体18と、該枠体上に固
定された円筒状のカバー20と、該カバーの側面
を外方から内方へ貫通して伸びる、互いに90゜の
間隔角度をもつて配置された複数の管22とが設
けられている。 This device 16 includes a frame 18 that surrounds the open end of the slot 12 and is placed on the ground surface, a cylindrical cover 20 that is fixed on the frame, and a side surface of the cover that is inserted from the outside. A plurality of tubes 22 are provided extending through the tubes 22 and spaced apart from each other by 90 degrees.
管22は二重管から成り、外管22aおよび該
外管内で開口する内管22bの先端に、それぞ
れ、前記水溶性ウレタンプレポリマーおよび水を
噴出するためのノズルが形成されており、前記水
溶性ウレタンプレポリマーと水とは各ノズルから
同時に噴出され、外管22aのノズルの直前で混
合する。 The tube 22 is made of a double tube, and a nozzle for spouting out the water-soluble urethane prepolymer and water is formed at the tips of an outer tube 22a and an inner tube 22b that opens inside the outer tube, respectively. The polyurethane prepolymer and water are simultaneously ejected from each nozzle and mixed just before the nozzle of the outer tube 22a.
H型鋼から成る杭14がカバー20および枠体
18内を経て溝孔12内を下降する間、外管22
aのノズルから噴射される前記水溶性ウレタンプ
レポリマーおよび水の混合物が杭14の表面に吹
き付けられ、塗布される。 While the pile 14 made of H-shaped steel moves down inside the slot 12 through the cover 20 and the frame 18, the outer pipe 22
The mixture of the water-soluble urethane prepolymer and water is sprayed from the nozzle a and applied to the surface of the pile 14.
管22を二重管とする図示の例では、前記水溶
性ウレタンプレポリマーは、その貯蔵容器、前記
ノズルへの送給設備(図示せず)等において、こ
れと混合される水とは分離されているために、吹
き付けの間、これらの設備内で固化することはな
い。但し、前記水溶性ウレタンプレポリマーおよ
び水は外管22aの先端の前記ノズルを通過す
る。このため、前記混合物の一部が前記ノズルに
付着し、固化する。しかし、その量は、前記ノズ
ルの通過時における前記混合物の流出速度および
流出圧力は比較的高いために比較的少ない。した
がつて、前記混合物の杭表面への塗布は前記装置
16をもつて十分に行なうことができるが、前記
ノズルにおける前記混合物の付着、固化を完全に
なくすために、前記水溶性ウレタンプレポリマー
の噴出用管および前記水の噴出用管を二つの独立
した管(図示せず)とすることができる。この場
合、それぞれの管に設けられたノズルから、前記
水溶性ウレタンプレポリマーおよび前記水のそれ
ぞれを同時に噴出しながら両物質を混合させて杭
14の表面に吹き付ける。 In the illustrated example in which the pipe 22 is a double pipe, the water-soluble urethane prepolymer is separated from the water with which it is mixed, such as in its storage container, feeding equipment to the nozzle (not shown), etc. Because of this, it does not solidify in these equipment during spraying. However, the water-soluble urethane prepolymer and water pass through the nozzle at the tip of the outer tube 22a. Therefore, a portion of the mixture adheres to the nozzle and solidifies. However, the amount is relatively small because the exit velocity and exit pressure of the mixture during passage through the nozzle are relatively high. Therefore, the mixture can be sufficiently applied to the pile surface using the device 16, but in order to completely eliminate adhesion and solidification of the mixture at the nozzle, it is necessary to apply the water-soluble urethane prepolymer to the pile surface. The jetting tube and the water jetting tube can be two independent tubes (not shown). In this case, the water-soluble urethane prepolymer and the water are mixed and sprayed onto the surface of the pile 14 while simultaneously spouting the water-soluble urethane prepolymer and the water from nozzles provided in each tube.
杭14の溝孔12中への挿入は前記混合物がそ
の塗布箇所でゲル化したのちに行なう。杭14へ
の前記混合物の塗布箇所がゲル化するまでの間、
杭14を一定の高さ位置で停止させておくが、こ
の停止時間は、ゲルタイムを短縮することによつ
て短くすることができる。 The pile 14 is inserted into the slot 12 after the mixture has gelled at the point of application. Until the area where the mixture is applied to the pile 14 gels,
Although the pile 14 is stopped at a fixed height position, this stopping time can be shortened by shortening the gel time.
前記ゲルタイムは、前記水の温度を上げること
(30℃〜50℃)、前記水の量を越えない範囲で前記
水溶性ウレタンプレポリマーの混合割合を増加さ
せること、あるいはトリエチレンジアミンのよう
な高級アミン、ジブチルスズジラウレートのよう
な有機スズ化合物等の触媒を添加することによ
り、短縮することができる。 The gel time can be achieved by increasing the temperature of the water (30°C to 50°C), increasing the mixing ratio of the water-soluble urethane prepolymer within a range that does not exceed the amount of water, or adding a higher amine such as triethylene diamine. , can be shortened by adding a catalyst such as an organotin compound such as dibutyltin dilaurate.
前記水溶性ウレタンプレポリマーと水との前記
混合物15の塗布箇所は、杭14の全表面(第1
6図)、杭14の下方部分の表面(第17図)、杭
14の長手方向の複数のレベルにおける部分の表
面(第18図)、杭14の下方部分の表面と該下
方部分から上方の複数のレベルにおける部分の表
面(第19図)等があり、対象地盤、適用される
工法等を考慮して定められる。 The mixture 15 of the water-soluble urethane prepolymer and water is applied to the entire surface of the pile 14 (the first
(Fig. 6), the surface of the lower part of the pile 14 (Fig. 17), the surface of the parts of the pile 14 at several levels in the longitudinal direction (Fig. 18), the surface of the lower part of the pile 14 and the surface from the lower part upwardly. There are surfaces of parts at multiple levels (Figure 19), etc., which are determined by taking into account the target ground, the applied construction method, etc.
前記のようにして混合物15が杭14の表面に
塗布され、ゲル化した後、杭14を溝孔12中に
挿入し、次いで溝孔12をアルカリ性を有する材
料で充填する。杭14の溝孔12中への挿入は、
ソイルセメント柱列杭工法におけるように、溝孔
12中をアルカリ性を有する物質で充填したのち
であつてもよい。 After the mixture 15 is applied to the surface of the pile 14 and gelled as described above, the pile 14 is inserted into the slot 12, and the slot 12 is then filled with a material having alkaline properties. Insertion of the pile 14 into the slot 12 is as follows:
This may be done after the grooves 12 are filled with an alkaline substance, as in the soil cement column pile construction method.
この際、前記泥水固化工法およびソイルセメン
ト柱列杭工法によるときは、アルカリ性を有する
固化材により固化された杭周辺の固化層で溝孔1
2が充填される。 At this time, when using the muddy water solidification method and the soil cement column pile method, the groove hole 1 is
2 is filled.
前記ジヨイスト工法による場合、地盤がアルカ
リ性の土質のときは、掘り出された土砂をそのま
ま埋め戻せばよく、また前記地盤が非アルカリ性
の土質のときは埋め戻し土砂にセメントや石灰の
ようにアルカリ性の成分を有するものを混入す
る。また、非アルカリ性ではないがこれに近い状
態の土質のときには、埋め戻し土砂にセメントや
石灰を混入することが好ましい。 When using the joist construction method, if the ground is alkaline, the excavated soil may be backfilled as is, or if the ground is non-alkaline, an alkaline material such as cement or lime may be used in the backfilling. Mix something with ingredients. Furthermore, when the soil is not non-alkaline but is in a similar state, it is preferable to mix cement or lime into the backfill soil.
溝孔12をアルカリ性の成分を有する前記材料
で充填することにより、杭14の表面に形成され
た前記含水ゲルと前記アルカリ性の成分とが反応
して含水ゲルの被膜が徐々に軟化し、グリース状
に変化する。含水ゲルの被膜の部分的なグリース
状化に要する日数はほぼ数日であるが、一般に杭
の引き抜きが行なわれるのは杭の埋設後早くとも
数ケ月であることから、杭の引き抜き時において
は前記含水ゲルの被膜のほとんど全部がグリース
状に変化する。これにより、杭の引き抜き時には
杭と周辺の固化層あるいは埋め戻し土砂とがほぼ
完全に分離され、杭の引き抜きの際にはグリース
状に変化した前記被膜が潤滑作用をなし、引き抜
き抵抗を小さくする。 By filling the slot 12 with the material containing an alkaline component, the hydrogel formed on the surface of the pile 14 reacts with the alkaline component, and the hydrogel coating gradually softens, forming a grease-like coating. Changes to It takes about a few days for the hydrogel coating to become partially greasy, but since piles are generally pulled out at the earliest several months after they are buried, Almost all of the hydrogel coating turns into a grease-like coating. As a result, when the pile is pulled out, the pile and the surrounding solidified layer or backfill earth and sand are almost completely separated, and when the pile is pulled out, the coating that changes into a grease-like form acts as a lubricant, reducing the pulling resistance. .
予め地盤に溝孔を設け、該溝孔中に杭を挿入す
ることにより杭を地中に埋設する方法を採らず
に、杭を打ち込むことによりこれを地中に埋設す
ることができる。この場合、地盤がアルカリ性の
土質を有するときは、前記溝孔に杭を挿入する場
合と同様にして、杭の表面に前記含水ゲルの被膜
を形成したのち、地中に埋設する。 It is possible to bury the pile in the ground by driving the pile instead of using a method of burying the pile in the ground by providing a groove in the ground in advance and inserting the pile into the groove. In this case, when the ground has alkaline soil quality, the pile is buried in the ground after forming a coating of the hydrous gel on its surface in the same manner as when inserting the pile into the groove.
杭の表面の前記含水ゲルは、杭を採り囲む地盤
中のアルカリ性の成分と反応して軟化し、最終的
にグリース状になる。 The hydrous gel on the surface of the pile reacts with alkaline components in the ground surrounding the pile, softens it, and eventually becomes grease-like.
なお、予め溝孔を穿つて杭を地中に埋設する場
合および打込みにより杭を地中に埋設する場合の
いずれにあつても、杭の表面のうち根切り面を構
成する箇所への前記含水ゲルの形成を省略するこ
とができる。 In addition, whether the pile is buried in the ground by drilling a trench in advance or by driving the pile into the ground, the above-mentioned water content on the surface of the pile that constitutes the root cut surface Gel formation can be omitted.
第1図および第2図は泥水固化工法に従つて構
築された土留め壁の概略横断面図、第3図、第4
図および第5図は泥水固化工法の工程を示す概略
図、第6図はソイルセメント柱列杭工法に従つて
構築された土留め壁の概略横断面図、第7図およ
び第8図はソイルセメント柱列杭工法の工程を示
す概略図、第9図はジヨイスト工法に従つて構築
された土留め壁の概略横断面図、第10図、第1
1図および第12図はジヨイスト工法の工程を示
す概略図、第13図は水溶性ウレタンプレポリマ
ーおよび水の吹き付け装置の正面図、第14図は
吹き付け装置の平面図、第15図は二重管の部分
拡大断面図、第16図、第17図、第18図およ
び第19図は含水ゲルの形成箇所を示す杭の縦断
面図である。
12:溝孔、14:杭、15:水溶性ウレタン
プレポリマーおよび水の混合物、16:吹き付け
装置。
Figures 1 and 2 are schematic cross-sectional views of an earth retaining wall constructed according to the mud solidification method, and Figures 3 and 4 are
Figure 5 and Figure 5 are schematic diagrams showing the steps of the mud water solidification method, Figure 6 is a schematic cross-sectional view of an earth retaining wall constructed according to the soil cement column pile method, and Figures 7 and 8 are soil A schematic diagram showing the steps of the cement column pile construction method, Figure 9 is a schematic cross-sectional view of an earth retaining wall constructed according to the joist construction method, Figure 10,
Figures 1 and 12 are schematic diagrams showing the process of the Jyoist method, Figure 13 is a front view of the water-soluble urethane prepolymer and water spraying equipment, Figure 14 is a plan view of the spraying equipment, and Figure 15 is a double The partially enlarged cross-sectional view of the pipe, FIGS. 16, 17, 18, and 19 are vertical cross-sectional views of the pile showing locations where hydrogel is formed. 12: Slot, 14: Pile, 15: Mixture of water-soluble urethane prepolymer and water, 16: Spraying device.
Claims (1)
を形成すべく水溶性ウレタンプレポリマーと水と
を別個にかつ同時に吹き付けること、前記杭を溝
孔中に挿入すること、その後、前記溝孔をアルカ
リ性を有する材料で充填することを含む、杭の引
き抜きのための処理方法。 2 杭の表面の少なくとも一部に含水ゲルの被膜
を形成すべく水溶性ウレタンプレポリマーと水と
を別個にかつ同時に吹き付けること、溝孔をアル
カリ性を有する材料で充填すること、その後、前
記杭を前記溝孔中に挿入することを含む、杭の引
き抜きのための処理方法。 3 杭の表面の少なくとも一部に含水ゲルの被膜
を形成すべく水溶性ウレタンプレポリマーと水と
を別個にかつ同時に吹き付けること、その後前記
杭をアルカリ性土質の地盤中に埋設することを含
む、杭の引き抜きのための処理方法。[Scope of Claims] 1. Spraying a water-soluble urethane prepolymer and water separately and simultaneously to form a hydrogel coating on at least a portion of the surface of the pile, and inserting the pile into a groove hole; A method for the extraction of piles, the method comprising: thereafter filling the slot with a material having alkaline properties. 2. Spraying a water-soluble urethane prepolymer and water separately and simultaneously to form a hydrogel coating on at least a portion of the surface of the pile, filling the slot with an alkaline material, and then A method for extracting a pile, comprising inserting the pile into the slot. 3. A pile comprising separately and simultaneously spraying a water-soluble urethane prepolymer and water to form a hydrous gel coating on at least a portion of the surface of the pile, and then burying the pile in the ground of alkaline soil. Processing method for extraction.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14284686A JPS61290118A (en) | 1986-06-20 | 1986-06-20 | Treatment for drawing out pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14284686A JPS61290118A (en) | 1986-06-20 | 1986-06-20 | Treatment for drawing out pile |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22859782A Division JPS59122621A (en) | 1982-12-29 | 1982-12-29 | Treatment for drawing pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS61290118A JPS61290118A (en) | 1986-12-20 |
| JPH0242968B2 true JPH0242968B2 (en) | 1990-09-26 |
Family
ID=15324972
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14284686A Granted JPS61290118A (en) | 1986-06-20 | 1986-06-20 | Treatment for drawing out pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS61290118A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3274421B2 (en) | 1998-07-27 | 2002-04-15 | 株式会社日本触媒 | Coating material and method of manufacturing the same |
-
1986
- 1986-06-20 JP JP14284686A patent/JPS61290118A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS61290118A (en) | 1986-12-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4886894B1 (en) | Method for extracting buried pile and foaming water generator | |
| DE1914554C3 (en) | Method for sealing ground formations and civil engineering structures | |
| JPH0242968B2 (en) | ||
| CN116335128A (en) | Anchoring construction method capable of effectively filling reaming section | |
| US3180098A (en) | Soil solidification process | |
| CN107587502A (en) | A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method | |
| JP3213240B2 (en) | Support pile reinforcement structure of existing structure and its reinforcement method | |
| JPS6339730B2 (en) | ||
| JP3363099B2 (en) | Supporting ground improvement method for existing structures | |
| JPH0656015B2 (en) | Pile inside digging method | |
| JPH0410529B2 (en) | ||
| DE2130115A1 (en) | Concrete piles prodn - in situ, using polyethylene sheath tube | |
| JPH04128415A (en) | Method and device for improving ground | |
| JPH0432166B2 (en) | ||
| JPS6132452B2 (en) | ||
| JPH0345193B2 (en) | ||
| JPH01131786A (en) | Water-stopping method using water-stopping chemicals in deep boreholes | |
| JP2934435B1 (en) | Method for reducing lateral displacement in ground in powder injection agitation method and permeable pipe used in the method | |
| JP4046401B2 (en) | Underground anchor method | |
| JPH0442499B2 (en) | ||
| JP3305274B2 (en) | Ground reinforcement method | |
| JPH0377349B2 (en) | ||
| JP2512157B2 (en) | Reinforcement method for soft ground | |
| JPS5824019A (en) | Improvement of ground by high-speed jet stream | |
| CN116335541A (en) | An Anchor Hole Reaming Construction Method for Preventing Hole Collapse |