Links
- 238000010276 construction Methods 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 12
- 239000000725 suspension Substances 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
- Movable Scaffolding (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は高速道路などの高所工事、例えば高橋
床板作業に使用する吊り足場を橋桁直下方に設置
する工法に関するものである。DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a construction method for installing suspended scaffolds used for construction work at high places such as expressways, for example, work on deck decks of elevated bridges, directly below bridge girders.
(従来の技術)
高架橋床板作業は、コンクリート又は鋼板製ピ
アを通常、道路計画にもとづいて30m乃至50m位
の間隔で立設し、そのピア上に橋梁メーカーによ
つて橋桁が設けられることによつて開始される。
橋桁はI型又はボツクス型等の桁材を用い、ピア
上間に架設される。その後架橋床板作業が施工さ
れるのであるが、この作業に先立ち、工事の安全
と架橋下の道路の安全のために吊り足場を設ける
ことが必要である。(Prior art) Viaduct deck work usually involves erecting concrete or steel plate piers at intervals of about 30m to 50m based on the road plan, and then installing bridge girders on top of the piers by the bridge manufacturer. It will start.
The bridge girder is constructed between the upper piers using I-type or box-type girder materials. Afterwards, the bridge deck work will be carried out, but prior to this work, it is necessary to install suspended scaffolding for the safety of the construction work and the road under the bridge.
従来、この吊り足場の組立工法は、大略2種が
あり、第1の方法は最も初期的なもので、橋桁の
上に必要な足場機械を吊り上げて搬入し、吊り足
場の一部を該橋桁の上で組み立てると共に、橋桁
の下に足場板を1枚づつ吊り下げて橋桁に固定
し、該足場板を相互に連結するものである。 Conventionally, there are roughly two methods for assembling this suspended scaffolding. At the same time, scaffolding boards are hung one by one under the bridge girder and fixed to the bridge girder, and the scaffolding boards are interconnected.
第2の吊り足場の組立工法は、地上にて所定さ
で全横巾の分割足場をほぼ完成してこれを1ブロ
ツクとし、ブロツクごと高所に吊り上げて橋桁に
固縛する。そして、このようなブロツクを順次位
置を移動しながら地上にて組立て吊り上げ固縛
し、長手方向に接続してゆくものである。 The second method of assembling a suspended scaffold is to complete a divided scaffold of the entire width at a predetermined level on the ground, form one block, and then lift each block to a high place and secure it to the bridge girder. Then, such blocks are assembled on the ground, lifted and secured while sequentially moving from one position to another, and connected in the longitudinal direction.
(発明が解決しようとする問題点)
従つて、前記第1の方法を実施する場合には作
業に熟練を要するので、専ら高所作業熟練者によ
つて作業が行なわれ、またこの作業中は資材等が
落下する虞があるため、少なくとも橋桁下方の道
路の通行が制限される。(Problems to be Solved by the Invention) Therefore, when carrying out the first method, since the work requires skill, the work is carried out exclusively by people skilled in working at heights, and during this work Due to the risk of materials falling, at least traffic on the road below the bridge girder will be restricted.
一方、前記第2の方法は、高所での足場組立作
業は殆どないが、地上における道路の占有面積が
大きく、横幅の広いものを水平に吊り揚げる困難
性があるばかりか、この方法も道路を長時間占有
する点において交通の停滞を招く等の欠点があ
る。 On the other hand, although the second method requires almost no scaffolding work at high places, it occupies a large area of the road on the ground, and not only is it difficult to hoist wide objects horizontally, but this method also There are disadvantages such as stagnation of traffic due to the fact that the parking lot is occupied for a long time.
本発明は上記2種類の工法が長時間にわたり道
路を占領して交通停滞などの障害をおこすに対
し、このような支障をなくし、作業の容易性と安
全の向上を計ることを目的とした吊り足場の組立
て工法を提供するものである。 While the above two construction methods occupy roads for long periods of time and cause problems such as traffic stagnation, the present invention aims to eliminate such problems and improve work ease and safety. This provides a method for assembling scaffolding.
(問題点を解決するための手段)
この発明の方法は、
(1) ピア1が所定間隔で立設され、隣接するピア
1上端間に跨がつて設けられた橋桁2の下方の
工事占用帯Bにおいて高所作業車Xを使用し、
橋桁2下端に直接又は橋桁2と直交して所定間
隔毎に取り付けたレール吊梁3を介して、橋桁
2の両端又はレール吊梁3の両端に一対のレー
ル4を平行に取り付ける。(Means for Solving the Problems) The method of the present invention is as follows: (1) Piers 1 are erected at predetermined intervals, and a construction zone below the bridge girder 2 is provided spanning between the upper ends of adjacent piers 1. In B, using aerial work vehicle X,
A pair of rails 4 are attached in parallel to both ends of the bridge girder 2 or to both ends of the rail suspension beams 3, either directly to the lower end of the bridge girder 2 or via rail suspension beams 3 attached at predetermined intervals perpendicular to the bridge girder 2.
(2) 各々のレール4にそれぞれ少なくとも2基の
モートルブロツク5を走行可能に配装する。(2) At least two motor blocks 5 are disposed on each rail 4 in a movable manner.
(3) 前記占用帯Bにおいて、レール取付作業用ゴ
ンドラ6を組み立て、このゴンドラ6をモート
ルブロツク5のチエーン5aで前記レール4直
下方まで吊り上げ、モートルブロツク5を走行
操作してゴンドラ6をレール4に沿つて橋桁2
の長手方向に移動させレール4の先端部で停止
させる。(3) Assemble the gondola 6 for rail installation work in the occupied zone B, hoist this gondola 6 up to just below the rail 4 using the chain 5a of the motor block 5, and operate the motor block 5 to move the gondola 6 to the rail 4. Bridge girder 2 along
is moved in the longitudinal direction and stopped at the tip of the rail 4.
(4) ゴンドラ6上の作業者が、既設レール4前方
において、橋桁2下に直接又は橋桁2と直交し
てレール吊梁3を所定間隔で取り付けて橋桁2
の両端又はレール吊梁3の両端に一対のレール
4を平行に取り付け、レール4を延設する。(4) A worker on the gondola 6 installs rail suspension beams 3 at predetermined intervals in front of the existing rail 4 directly under the bridge girder 2 or perpendicularly to the bridge girder 2, and
A pair of rails 4 are attached in parallel to both ends of the rail hanging beam 3 or both ends of the rail hanging beam 3, and the rails 4 are extended.
(5) モートルブロツク5を走行操作してゴンドラ
6をレール4に沿つて橋桁2の長手方向前方に
移動させ延設したレール4の先端部で停止させ
る。このような作業をくり返しながら、足場の
設置予定端までレール4を延設する。(5) Operate the motor block 5 to move the gondola 6 forward in the longitudinal direction of the bridge girder 2 along the rail 4 and stop it at the tip of the extended rail 4. By repeating such work, the rail 4 is extended to the end of the scaffold where it is planned to be installed.
(6) ゴンドラ6をレール4の始端まで戻して占用
帯Bに降ろし取りはずす。(6) Return the gondola 6 to the starting end of the rail 4, lower it onto the reserved zone B, and remove it.
(7) 占用帯Bにて所定長さの分割足場7を組み立
て、該分割足場7をモートルブロツク5のチエ
ーン5aにより吊り上げてモートルブロツク5
によりレール4に沿つて橋桁2の長手方向に移
動させレール4の先端で停止させる。(7) Assemble the divided scaffolding 7 of a predetermined length in the occupation zone B, lift the divided scaffolding 7 by the chain 5a of the motor block 5, and attach it to the motor block 5.
The bridge girder 2 is moved in the longitudinal direction along the rail 4 and stopped at the tip of the rail 4.
(8) 分割足場7の位置や姿勢を調整した後に、固
定用ワイヤーやチエーン8等により橋桁2から
直接に吊り下げ固定する。この後、モートルブ
ロツク5のチエーン5aを取り外し、モートル
ブロツク5をレール4の始端まで戻して占用帯
Bに降ろす。(8) After adjusting the position and posture of the divided scaffolding 7, hang it directly from the bridge girder 2 and fix it using fixing wires, chains 8, etc. Thereafter, the chain 5a of the motor block 5 is removed, and the motor block 5 is returned to the starting end of the rail 4 and lowered onto the occupied zone B.
(9) 占用帯Bで組立た次の分割足場7を同様にし
てモートルブロツク5により前記分割足場7ま
で搬送し、橋桁2に固定用ワイヤーやチエーン
8等により吊り下げ固定して一基目と二基目の
分割足場7を接続する。(9) In the same manner, the next divided scaffold 7 assembled in the occupation zone B is transported to the divided scaffold 7 by the motor block 5, and is suspended and fixed to the bridge girder 2 using fixing wires, chains 8, etc., and is used as the first scaffold. Connect the second divided scaffold 7.
(10) このような作業を繰り返すことによつて工事
予定部分の橋桁2下に吊り足場7を完成する。
上記の手順により吊り足場を組み立ることを要
旨とする。(10) By repeating these operations, the suspended scaffolding 7 is completed under the bridge girder 2 in the area scheduled for construction.
The gist is to assemble a suspended scaffold using the above steps.
(実施例および作用)
以下、この発明の吊り足場の組立工法の手順を
第1図〜第7図によつて説明する。(Example and operation) Hereinafter, the procedure for assembling a suspended scaffold according to the present invention will be explained with reference to FIGS. 1 to 7.
地上道路A上にピア1が一般に30〜40m間隔に
立設され、ピア1を含む地上部分は工事占用帯B
と称する一定幅の作業スペースが設けられる。本
工事は専らこの占用帯Bを利用して工事するもの
で自動車への交通妨害を最小限度におさえるもの
である。2は隣接するピア1上端間に跨がつて設
けられた橋桁で、例えばI型を用いるかボツクス
型の桁材から形成され、架橋業者によつて固設さ
れる。なお、高架橋道路面とする床板は橋桁2の
上面部に敷設されるものである。 Pier 1 is generally erected at intervals of 30 to 40 meters on surface road A, and the above ground portion including Pier 1 is occupied by construction zone B.
A working space of a certain width is provided. This construction work will be carried out exclusively using this zone B, and will minimize traffic disturbance to automobiles. A bridge girder 2 is provided to span the upper ends of adjacent piers 1, and is made of, for example, an I-shaped or box-shaped girder material, and is fixedly installed by a bridge construction company. Note that the floor plate serving as the road surface of the elevated bridge is laid on the upper surface of the bridge girder 2.
この床板作業の開始に先立ち、占用帯Bにおて
高所作業車Xを使用し、ピア1間に設置した橋桁
2下端のフランジに直接又は橋桁2と直交して約
1m間隔で取り付けたレール吊梁3を介して、橋
桁2の両端又はレール吊梁3の両端に一対のレー
ル4を吊金具(図示せず)により平行に取り付け
る。次に各々のレール4にそれぞれ2基づつ計4
基のモートルブロツク5を走行可能に配装する。
そして、前記占用帯Bにおいて、レール取付作業
用ゴンドラ6を組み立てる。また、ゴンドラ6に
はモートルブロツク5のチエーン5aで吊り下げ
ることの出来る取付用フツク(図示せず)を四ケ
所取り付けておく。ゴンドラ6に1.5〜2m位の
レール4とレール吊梁3及び吊金具を積み込み、
作業者も同乗する(第1図及び第2図)。次に、
ゴンドラ6の取付用フツク(図示せず)に前記チ
エーン5aを掛止し、モートルブロツク5を駆動
してチエーン5aを巻き上げゴンドラ6を前記レ
ール4直下方まで吊り上げる。 Prior to the start of this floorboard work, in the occupied zone B, using an aerial work vehicle A pair of rails 4 are attached in parallel to both ends of the bridge girder 2 or both ends of the rail suspension beam 3 via the suspension beams 3 using hanging fittings (not shown). Next, install 2 bases on each rail 4, totaling 4
The base motor block 5 is arranged so as to be movable.
Then, in the occupied zone B, the gondola 6 for rail installation work is assembled. Further, the gondola 6 is provided with four mounting hooks (not shown) that can be hung from the chain 5a of the motor block 5. Load the 1.5 to 2 m long rail 4, rail suspension beam 3, and hanging hardware onto the gondola 6.
The worker also rides along (Figures 1 and 2). next,
The chain 5a is hooked to a mounting hook (not shown) of the gondola 6, and the motor block 5 is driven to wind up the chain 5a and lift the gondola 6 to a position directly below the rail 4.
この状態で、モートルブロツク5を走行操作し
てゴンドラ6をレール4に沿つて橋桁2の長手方
向に移動させ第3図aに示すようにレール4の先
端部で停止させる。 In this state, the motor block 5 is operated to move the gondola 6 along the rail 4 in the longitudinal direction of the bridge girder 2 and stopped at the tip of the rail 4 as shown in FIG. 3a.
次に、ゴンドラ6上の作業者が、既設レールの
前方において、橋桁2下に直接又は橋桁2と直交
してレール吊梁3を約1m間隔で取り付けて橋桁
2の両端又はレール吊梁3の両端に一対のレール
4を吊金具により平行に取り付け、レール4を延
設する。そして更に、モートルブロツク5を走行
操作してゴンドラ6をレール4に沿つて橋桁2の
長手方向に移動させ第2図のようにレール4の先
端部で停止させる。このような作業をくり返しな
がら、足場の設置予定端までレール4を延設する
(第4図a)。 Next, a worker on the gondola 6 installs rail suspension beams 3 at intervals of about 1 m directly under the bridge girder 2 or perpendicularly to the bridge girder 2 in front of the existing rail, and A pair of rails 4 are attached to both ends in parallel using hanging fittings, and the rails 4 are extended. Furthermore, the gondola 6 is moved along the rail 4 in the longitudinal direction of the bridge girder 2 by running the motor block 5, and is stopped at the tip of the rail 4 as shown in FIG. By repeating such operations, the rail 4 is extended to the end of the scaffold where it is planned to be installed (Fig. 4a).
次に、ゴンドラ6をレール4の始端まで戻して
占用帯Bに降ろし取りはずす。 Next, the gondola 6 is returned to the starting end of the rail 4 and is lowered onto the reserved zone B and removed.
第4図において、地上の占用帯Bにて全横幅を
有し且つ所定長さの分割足場7を組み立てる。な
お、各分割足場7にはモートルブロツク5のチエ
ーン5aで吊り下げることの出来る取付用フツク
(図示せず)を四ケ所取り付けておく。次に、分
割足場7の取付用フツクに前記チエーン5aを掛
止し、モートルブロツク5を駆動してチエーン5
aを巻き上げ分割足場7を前記レール4直下方ま
で吊り上げる。 In FIG. 4, a divided scaffolding 7 having a full width and a predetermined length is assembled in an occupied zone B on the ground. Incidentally, each divided scaffold 7 is provided with four mounting hooks (not shown) that can be suspended by the chain 5a of the motor block 5. Next, the chain 5a is hooked to the attachment hook of the divided scaffold 7, and the motor block 5 is driven to attach the chain 5a.
a and lift the divided scaffold 7 to just below the rail 4.
この状態で、モートルブロツク5を遠隔操作し
て無人の分割足場7をレール4に沿つて橋桁2の
長手方向に移動させレール4の先端で停止させ
る。それから、分割足場7の位置や姿勢を調整し
た後に、固定用ワアヤーやチエーン8等により橋
桁2から直接に吊り下げ固定する。この後、モー
トルブロツク5のチエーン5aを取付用フツクか
ら取り外し、モートルブロツク5をレール4の始
端まで戻して占用帯Bに降ろす。次に、占用帯B
で組立た二基目の分割足場7を同様にしてモート
ルブロツク5により一基目の分割足場7まで搬送
し、橋桁2に固定用ワイヤーやチエーン8等によ
り吊り下げ固定して一基目と二基目の分割足場7
を接続する。このような作業を繰り返すことによ
つて高架橋床板工事予定部分の橋桁2下に吊り足
場7が完成する。 In this state, the motor block 5 is remotely operated to move the unmanned divided scaffold 7 along the rail 4 in the longitudinal direction of the bridge girder 2 and stop it at the tip of the rail 4. Then, after adjusting the position and attitude of the divided scaffolding 7, it is directly suspended and fixed from the bridge girder 2 using a fixing wire, a chain 8, or the like. Thereafter, the chain 5a of the motor block 5 is removed from the mounting hook, and the motor block 5 is returned to the starting end of the rail 4 and lowered onto the occupied zone B. Next, private belt B
The second divided scaffold 7 assembled in step 1 is similarly transported to the first divided scaffold 7 by the motor block 5, and suspended and fixed to the bridge girder 2 with fixing wires, chains 8, etc., and the first and second divided scaffolds are Base division scaffolding 7
Connect. By repeating such work, the suspended scaffolding 7 is completed under the bridge girder 2 in the area where the viaduct deck construction is planned.
この状態で高架橋床板工事が開始される。 Under this condition, the viaduct deck construction will begin.
そして、工事が終了したら、この吊り足場7が
解体されるが、解体する方法は上記組立ての場合
の逆の手順で行われる。 When the construction is completed, the hanging scaffold 7 is dismantled, but the dismantling method is the reverse of the above-mentioned assembly procedure.
なお、上記実施例の工法では、縦方向にだけ分
割された分割足場7を用いたが、縦方向だけでな
く横方向にも分割(例えば半分)された分割足場
7を所定位置まで搬送して一体に接続する場合も
本発明の工法に含むものである。 In addition, in the construction method of the above embodiment, the divided scaffolding 7 that was divided only in the vertical direction was used, but the divided scaffolding 7 that was divided not only in the vertical direction but also in the horizontal direction (for example, in half) was transported to a predetermined position. The construction method of the present invention also includes the case of integral connection.
(発明の効果) この発明の効果を以下に述べる。(Effect of the invention) The effects of this invention will be described below.
地上における交通の障害にならない部分、すわ
ち多くの場合中央分離帯になつている占用帯であ
るとか、橋桁下方の交通の障害にならない部分で
主な作業が行なわれるので、作業時に交通を規制
する必要が殆どなく、また、橋桁下に取り付けた
レールに沿つて、作業場から所定の所までモート
ルブロツクにより、必要な機材や分割足場等を搬
送して足場を設置するので、地上の作業スペース
は狭くても充分であり、特に立体交差や水面上方
等の、高架道路下方に作業スペースが取れない箇
所における吊り足場の設置に有効である。 Since the main work is carried out in areas that do not obstruct traffic on the ground, that is, in many cases, in private strips that are used as median strips, or in areas that do not obstruct traffic under bridge girders, traffic is regulated during the work. In addition, the necessary equipment and divided scaffolding are transported from the work site to the designated location using motor blocks along the rails installed under the bridge girder, and the scaffolding is installed, so the work space on the ground is saved. It is sufficient even if it is narrow, and is particularly effective for installing suspended scaffolds in places where there is no work space below elevated roads, such as at grade crossings or above water.
第1図乃至第7図は本発明の実施例の工法の手
順を示すもので、第1図aは正面図、同bは側面
図、第2図aは正面図、同bは側面図、第3図a
は正面図、同bは側面図、第4図aは正面図、同
bは側面図、第5図aは正面図、同bは側面図、
第6図aは正面図、同bは側面図、第7図は正面
図である。
1……ピア、2……橋桁、3……レール吊梁、
4……レール、5……モートルブロツク、5a…
…チエーン、6……ゴンドラ、7……分割足場、
8……固定用ワイヤー。
Figures 1 to 7 show the procedure of the construction method according to the embodiment of the present invention, in which Figure 1a is a front view, Figure 2b is a side view, Figure 2a is a front view, Figure 2b is a side view, Figure 3a
is a front view, Fig. 4b is a side view, Fig. 4a is a front view, Fig. 4b is a side view, Fig. 5a is a front view, Fig. 5b is a side view,
FIG. 6a is a front view, FIG. 6b is a side view, and FIG. 7 is a front view. 1...Pier, 2...Bridge girder, 3...Rail suspension beam,
4...Rail, 5...Motor block, 5a...
...Chain, 6...Gondola, 7...Divided scaffolding,
8...Fixing wire.
Claims (1)
組立工法。 (1) ピア1が所定間隔で立設され、隣接するピア
1上端間に跨がつて設けられた橋桁2の下方の
工事占用帯Bにおいて高所作業車Xを使用し、
橋桁2下端に直接又は橋桁2と直交して所定間
隔毎に取り付けたレール吊梁3を介して、橋桁
2の両端又はレール吊梁3の両端に一対のレー
ル4を平行に取り付ける。 (2) 各々のレール4にそれぞれ少なくとも2基の
モートルブロツク5を走行可能に配装する。 (3) 前記占用帯Bにおいて、レール取付作業用ゴ
ンドラ6を組み立て、このゴンドラ6をモート
ルブロツク5のチエーン5aで前記レール4直
下方まで吊り上げ、モートルブロツク5を走行
操作してゴンドラ6をレール4に沿つて橋桁2
の長手方向に移動させレール4の先端部で停止
させる。 (4) ゴンドラ6上の作業者が、既設レール4の前
方において、橋桁2下に直接又は橋桁2と直交
してレール吊梁3を所定間隔で取り付けて橋桁
2の両端又はレール吊梁3の両端に一対のレー
ル4を平行に取り付け、レール4を延設する。 (5) モートルブロツク5を走行操作してゴンドラ
6をレール4に沿つて橋桁2の長手方向前方に
移動させ延設したレール4の先端部で停止させ
る。このような作業をくり返しながら、足場の
設置予定端までレール4を延設する。 (6) ゴンドラ6をレール4の始端まで戻して占用
帯Bに降ろし取りはずす。 (7) 占用帯Bにて所定長さの分割足場7を組み立
て、該分割足場7をモートルブロツク5のチエ
ーン5aにより吊り上げてモートルブロツク5
によりレール4に沿つて橋桁2の長手方向に移
動させレール4の先端で停止させる。 (8) 分割足場7の位置や姿勢を調整した後に、固
定用ワイヤーやチエーン8等により橋桁2から
直接に吊り下げ固定する。この後、モートルブ
ロツク5のチエーン5aを取り外し、モートル
ブロツク5をレール4の始端まで戻して占用帯
Bに降ろす。 (9) 占用帯Bで組立た次の分割足場7を同様にし
てモートルブロツク5により前記分割足場7ま
で搬送し、橋桁2に固定用ワイヤーやチエーン
8等により吊り下げ固定して一基目と二基目の
分割足場9を接続する。 (10) このような作業を繰り返すことによつて工事
予定部分の橋桁2下に吊り足場7を完成する。[Scope of Claims] 1. A hanging scaffold assembly method characterized by the following steps (1) to (10). (1) Piers 1 are erected at predetermined intervals, and the aerial work vehicle
A pair of rails 4 are attached in parallel to both ends of the bridge girder 2 or to both ends of the rail suspension beams 3, either directly to the lower end of the bridge girder 2 or via rail suspension beams 3 attached at predetermined intervals perpendicular to the bridge girder 2. (2) At least two motor blocks 5 are disposed on each rail 4 in a movable manner. (3) Assemble the gondola 6 for rail installation work in the occupied zone B, hoist this gondola 6 up to just below the rail 4 using the chain 5a of the motor block 5, and operate the motor block 5 to move the gondola 6 to the rail 4. Bridge girder 2 along
is moved in the longitudinal direction and stopped at the tip of the rail 4. (4) A worker on the gondola 6 installs rail suspension beams 3 at predetermined intervals directly under the bridge girder 2 or perpendicularly to the bridge girder 2 in front of the existing rail 4, and attaches them to both ends of the bridge girder 2 or to the rail suspension beams 3. A pair of rails 4 are attached to both ends in parallel, and the rails 4 are extended. (5) Operate the motor block 5 to move the gondola 6 forward in the longitudinal direction of the bridge girder 2 along the rail 4 and stop it at the tip of the extended rail 4. By repeating such work, the rail 4 is extended to the end of the scaffold where it is planned to be installed. (6) Return the gondola 6 to the starting end of the rail 4, lower it onto the reserved zone B, and remove it. (7) Assemble the divided scaffolding 7 of a predetermined length in the occupation zone B, lift the divided scaffolding 7 by the chain 5a of the motor block 5, and attach it to the motor block 5.
The bridge girder 2 is moved in the longitudinal direction along the rail 4 and stopped at the tip of the rail 4. (8) After adjusting the position and posture of the divided scaffolding 7, hang it directly from the bridge girder 2 and fix it using fixing wires, chains 8, etc. Thereafter, the chain 5a of the motor block 5 is removed, and the motor block 5 is returned to the starting end of the rail 4 and lowered onto the occupied zone B. (9) In the same manner, the next divided scaffold 7 assembled in the occupation zone B is transported to the divided scaffold 7 by the motor block 5, and is suspended and fixed to the bridge girder 2 using fixing wires, chains 8, etc., and is used as the first scaffold. Connect the second divided scaffold 9. (10) By repeating these operations, the suspended scaffolding 7 is completed under the bridge girder 2 in the area scheduled for construction.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14648984A JPS6124710A (en) | 1984-07-13 | 1984-07-13 | Assembling construction of suspension scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14648984A JPS6124710A (en) | 1984-07-13 | 1984-07-13 | Assembling construction of suspension scaffold |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6124710A JPS6124710A (en) | 1986-02-03 |
| JPH0334524B2 true JPH0334524B2 (en) | 1991-05-23 |
Family
ID=15408784
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14648984A Granted JPS6124710A (en) | 1984-07-13 | 1984-07-13 | Assembling construction of suspension scaffold |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6124710A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4824518A (en) * | 1985-03-29 | 1989-04-25 | Sharp Kabushiki Kaisha | Method for the production of semiconductor devices |
-
1984
- 1984-07-13 JP JP14648984A patent/JPS6124710A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6124710A (en) | 1986-02-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20040117928A1 (en) | Bridge platform | |
| JP2010065378A (en) | Hanging scaffold and method for erecting the same | |
| US6227331B1 (en) | Bridge platform | |
| WO2020075511A1 (en) | Mobile scaffold installation method | |
| KR100214386B1 (en) | Jack supproting apparatus in raising the bridge super structure | |
| KR20210045111A (en) | Aerial scaffolding and installation method thereof | |
| JP7526657B2 (en) | Manufacturing method and sending tool for underpass scaffolding | |
| US20080250579A1 (en) | Modular Support Catch System | |
| JPH0312172B2 (en) | ||
| JPH0334524B2 (en) | ||
| JP4044893B2 (en) | Suspended scaffolding | |
| JPH0721166B2 (en) | Bridge scaffold repair scaffold structure and bridge scaffold repair scaffolding structure | |
| JPH0330671B2 (en) | ||
| JP7692125B1 (en) | Lifting tool and method for removing railings using the same | |
| JP2005090109A (en) | Bridge erection method and bridge superstructure unit | |
| JPS6018508Y2 (en) | Hanging scaffolding device | |
| KR20250042367A (en) | Method for installating aerial scaffolding | |
| JP2021134559A (en) | Permanent scaffold installation method and back panel | |
| JP7393814B2 (en) | How to build a suspended scaffold | |
| JP2003321806A (en) | Support beam | |
| JPH09184285A (en) | Exterior construction method for the bottom of elevated structures | |
| JP2000303411A (en) | Box beam support and bridge support | |
| SU1735522A1 (en) | Method for erection of pendant covering | |
| JPH0442434Y2 (en) | ||
| JPS5839965B2 (en) | Bridge scaffolding construction method |