JPH0428852B2 - - Google Patents
Info
- Publication number
- JPH0428852B2 JPH0428852B2 JP58223366A JP22336683A JPH0428852B2 JP H0428852 B2 JPH0428852 B2 JP H0428852B2 JP 58223366 A JP58223366 A JP 58223366A JP 22336683 A JP22336683 A JP 22336683A JP H0428852 B2 JPH0428852 B2 JP H0428852B2
- Authority
- JP
- Japan
- Prior art keywords
- time
- weight
- pile
- hydraulic
- output
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Fluid-Pressure Circuits (AREA)
Description
【発明の詳細な説明】
本発明は、重錘上昇用油圧シリンダに圧油を供
給することにより重錘を押上げ、該油圧シリンダ
の圧油を抜くことにより重錘を落下させて杭打ち
を行なう油圧ハンマにおける重錘駆動方法に関す
る。DETAILED DESCRIPTION OF THE INVENTION The present invention is capable of driving piles by supplying pressure oil to a hydraulic cylinder for raising the weight to push up the weight, and by releasing the pressure oil from the hydraulic cylinder to drop the weight. This invention relates to a method for driving a weight in a hydraulic hammer.
油圧ハンマにおける従来の重錘駆動方法を代表
例により説明する。まず第1図により油圧ハンマ
1の概略を代表例について説明すると、重錘2
は、杭打機のリーダ(図示せず)に沿つて上下動
自在に装着されるケース3内に上下動自在に収容
され、ケース外部または図示のようにケース内部
に設けられた油圧シリンダ4のピストン下室に対
し、油圧源5からコントロール弁6および管路7
を介して圧油を供給すれば重錘2が押上げられ、
ピストン下室をコントロール弁6等を介して油タ
ンク8やピストン上室へ連通させると、重錘2は
自由落下し、クツシヨン9を有するキヤツプ10
を介して杭11を打ち込むように構成される。 A conventional method for driving a weight in a hydraulic hammer will be explained using a representative example. First, a typical example of the hydraulic hammer 1 will be explained with reference to FIG. 1.
is vertically movably housed in a case 3 that is mounted vertically movably along the leader (not shown) of the pile driver, and is connected to a hydraulic cylinder 4 provided outside the case or inside the case as shown. A control valve 6 and a pipe line 7 are connected from the hydraulic source 5 to the piston lower chamber.
If pressurized oil is supplied through , the weight 2 will be pushed up,
When the piston lower chamber is communicated with the oil tank 8 and the piston upper chamber via the control valve 6 etc., the weight 2 falls freely and the cap 10 having the cushion 9 is connected.
It is configured such that the pile 11 is driven through the shaft.
前記コントロール弁6は、次のように制御され
る。操作用電気回路12の起動スイツチ13を押
すと、第2図に示すように落高を設定するストロ
ークタイマ14の出力aがオンとなると共に、リ
レー15の出力cがオンになり、これによつてパ
イロツト弁としてのソレノイド弁16がオンとな
り、パイロツト油圧源5′からのパイロツト圧油
により、遅れ時間τ1をもつてコントロール弁6が
油圧シリンダ4に圧油を供給する側に切換えられ
(すなわち、管路7の圧力dが高くなり)、重錘2
がeに示すように上昇し、ストロークタイマ14
の設定時間T1が経過すると、その出力aがオフ、
インターバルタイマ17の出力bがオン、リレー
15がオフ、ソレノイド弁16がオフとなり、時
間遅れτ2をもつてコントロール弁6が管路7を油
タンク8に連通させる位置に切換えられ、重錘2
は落下する。そして、インターバルタイマ17の
設定時間T2が経過すると、インターバルタイマ
17がオフ、ストロークタイマ14がオンとなつ
て再び重錘2の上昇に移行する。 The control valve 6 is controlled as follows. When the start switch 13 of the operating electric circuit 12 is pressed, the output a of the stroke timer 14, which sets the falling height, is turned on and the output c of the relay 15 is turned on, as shown in FIG. Then, the solenoid valve 16 as a pilot valve is turned on, and the control valve 6 is switched to the side that supplies pressure oil to the hydraulic cylinder 4 after a delay time τ 1 by the pilot pressure oil from the pilot oil pressure source 5' (i.e. , the pressure d in the pipe line 7 increases), the weight 2
increases as shown in e, and the stroke timer 14
When the set time T1 has elapsed, the output a turns off.
The output b of the interval timer 17 is turned on, the relay 15 is turned off, and the solenoid valve 16 is turned off, and with a time delay τ 2 , the control valve 6 is switched to the position where the pipe line 7 is communicated with the oil tank 8, and the weight 2
falls. Then, when the set time T2 of the interval timer 17 has elapsed, the interval timer 17 is turned off, the stroke timer 14 is turned on, and the weight 2 starts to rise again.
このような油圧ハンマ1の重錘2の駆動方法に
おいて、杭11の打設作業を能率良く行なうた
め、従来は重錘2の落下を自由落下にいかにして
近づけるかあるいは急速に落下させるかについて
専ら努力を払つてきた。そしてその対策として、
重錘2の落下時に重錘上昇用油圧シリンダ4内の
圧油を抜く管路7やコントロール弁6の流路断面
積を大としたり、圧油を抜くために供給管路とは
別の流出専用の管路を付加したり、杭11の落下
時に気圧、液圧、ばね圧等を重錘2あるいは油圧
シリンダ4のピストン上室に作用させたり、重錘
11の下室を真空吸引する等の提案がなされてい
る。しかしながら重錘作動のインターバルについ
ての配慮が不足している。 In such a method of driving the weight 2 of the hydraulic hammer 1, in order to efficiently perform the driving work of the pile 11, conventional methods have been used to determine how to bring the fall of the weight 2 closer to free fall or how to make it fall rapidly. I've been putting in a lot of effort. And as a countermeasure,
When the weight 2 falls, the flow path cross-sectional area of the conduit 7 and control valve 6 for draining the pressure oil in the hydraulic cylinder 4 for lifting the weight may be increased, or a separate flow path from the supply conduit may be used to drain the pressure oil. Adding a dedicated conduit, applying air pressure, hydraulic pressure, spring pressure, etc. to the upper chamber of the piston of the weight 2 or hydraulic cylinder 4 when the pile 11 falls, vacuum suctioning the lower chamber of the weight 11, etc. proposals have been made. However, there is a lack of consideration regarding the interval of weight operation.
すなわち、従来の重錘の駆動方法は、重錘2の
上昇高さ(ストロークS)を、重錘上昇用油圧シ
リンダ4への圧油供給時間T1を設定するストロ
ークタイマ14により設定すると共に、重錘2が
落下を開始してから次の上昇開始までの時間T2
をインターバルタイマ17により設定して重錘2
の上昇、自由落下を行なわせる方法であり、前記
2つのタイマ14,17の設定時間T1,T2は、
オペレータが手動により設定している。 In other words, in the conventional method of driving a weight, the height of rise (stroke S) of the weight 2 is set by a stroke timer 14 that sets the pressure oil supply time T1 to the hydraulic cylinder 4 for lifting the weight. Time T2 from when weight 2 starts falling until the next start of rising
is set by the interval timer 17 and the weight 2
This is a method of causing the ascent and free fall of
Manually set by the operator.
しかしながら、この従来方法によれば、ストロ
ークタイマ14の設定時間T1に対するインター
バルタイマ17の設定時間T2をオペレータが手
動によつて設定する際、作業の安全性の観点か
ら、インターバルタイマ17の設定時間T2は必
要以上に長く設定されるのが通例である。このた
め、第2図eにT3で示すように、無駄時間(仮
想線18に示すように、重錘2が落下した後だだ
ちに上昇に移行した場合に対する時間の遅れ)が
長くなり、その分だけ単位時間当りの杭の打撃回
数が少なくなり、作業能率が悪くなつている。ま
た、ストロークタイマ14の設定時間T1を変え
てストロークを変えた場合、無駄時間が短かくな
るように重錘2を動作させるにはインターバルタ
イマ17の設定時間T2の調整も行なわなければ
ならず、調整操作がわずらわしい。 However, according to this conventional method, when the operator manually sets the set time T2 of the interval timer 17 with respect to the set time T1 of the stroke timer 14, from the viewpoint of work safety, the set time T2 of the interval timer 17 is is usually set longer than necessary. For this reason, as shown by T3 in Fig. 2e, the dead time (the time delay compared to when the weight 2 suddenly starts rising after falling, as shown by the imaginary line 18) becomes longer. As a result, the number of times the pile is struck per unit time decreases, resulting in poor work efficiency. Furthermore, if the stroke is changed by changing the set time T1 of the stroke timer 14, the set time T2 of the interval timer 17 must also be adjusted in order to operate the weight 2 so that dead time is shortened. Adjustment operations are cumbersome.
本発明は、油圧ハンマにおいて、杭の重錘によ
る打撃が無駄時間なく高能率で行なえることが可
能となる重錘の駆動方法を提供すること目的とす
る。 SUMMARY OF THE INVENTION An object of the present invention is to provide a method for driving a weight in a hydraulic hammer, which allows the hammer to hit a pile with high efficiency without wasting time.
この目的を達成するため、本発明は、重錘駆動
用電気回路または油圧回路の上昇動作起点あるい
は実際に重錘が上昇を開始した時点から、重錘が
杭を打撃した時点までの時間を実測し、該実測時
間の長短に呼応して、次サイクルないしはそれ以
降の前記電気回路または油圧回路の上昇動作休止
時間を長短に制御することを特徴とする。また、
本発明において、前記実測時間として、重錘駆動
用電気回路または油圧回路の落下動作起点あるい
は実際に重錘が落下を開始した時点から、重錘が
杭を打撃した時点までの時間を用いても良い。 In order to achieve this objective, the present invention measures the time from the starting point of the lifting operation of the electric circuit or hydraulic circuit for driving the weight or from the time when the weight actually starts to rise until the time when the weight hits the pile. However, the present invention is characterized in that the suspension time of the rising operation of the electric circuit or hydraulic circuit in the next cycle or thereafter is controlled to be long or short in accordance with the length of the actual measurement time. Also,
In the present invention, the time from the starting point of the falling movement of the electric circuit or hydraulic circuit for driving the weight or the time when the weight actually starts falling to the time when the weight hits the pile may be used as the actual measured time. good.
以下本発明の一実施例を第3図および第4図に
より説明する。第3図において、第1図と同じ符
号は同じ構成部品を示す。本実施例においては、
まず起動スイツチ13を操作してその出力tをオ
ンとすることによつて設定時間T1が可変のスト
ロークタイマ14′を作動させ、該ストロークタ
イマ14′の出力aをオンとし、これによつてリ
レー15の出力cをオン、ソレノイド弁16をオ
ンとする。これによつて時間遅れτ1をもつてコン
トロール弁6が切換わり、油圧源5からの圧油が
管路7を介して油圧シリンダ4のピストン下室に
供給されて重錘2を第4図のeに示すように押上
げ、前記設定時間T1で決められる時間後にスト
ロークタイマ14′の出力aがオフになると、時
間遅れτ2(=τ1)をもつてコントロール弁6は油
圧シリンダ4のピストン下室を油タンク8やピス
トン上室に連通される位置に戻るので、重錘2が
落下し、キヤツプ10を介して杭11を打撃す
る。 An embodiment of the present invention will be described below with reference to FIGS. 3 and 4. In FIG. 3, the same reference numerals as in FIG. 1 indicate the same components. In this example,
First, by operating the start switch 13 and turning on its output t, the stroke timer 14' whose set time T1 is variable is activated, and the output a of the stroke timer 14' is turned on, thereby turning on the relay. The output c of 15 is turned on, and the solenoid valve 16 is turned on. As a result, the control valve 6 is switched with a time delay τ 1 , and pressure oil from the hydraulic source 5 is supplied to the lower chamber of the piston of the hydraulic cylinder 4 via the pipe 7, thereby moving the weight 2 as shown in FIG. When the output a of the stroke timer 14' is turned off after the time determined by the set time T1 , the control valve 6 is pushed up as shown in e in FIG. Since the piston lower chamber returns to a position where it is communicated with the oil tank 8 and the piston upper chamber, the weight 2 falls and hits the pile 11 through the cap 10.
本実施例においては、この杭11打撃されたこ
とを近接スイツチ19(なお、本実施例における
近接スイツチ19の取付け位置は、杭11にキヤ
ツプ10を介して油圧ハンマ1の荷重をかけ、か
つ重錘2をキヤツプ10に載せた時に近接スイツ
チ19が磁性材でなる重錘2の下端部との磁気作
用で作動する位置としている。この代わりに、重
錘2の杭打撃位置では近接スイツチが不作動でそ
の他の位置では作動状態になる取付け位置にして
もよい。)により検出し、ストロークタイマ1
4′の出力aがオンになつてから、杭打撃時に該
近接スイツチ19の出力fが第1回のバウンドで
立下がるまでの時間T4を演算部20で求めると
共に、下記の(1)式により、インターバルタイマ1
7′に設定する時間Tbを算出する。 In this embodiment, when the pile 11 is hit, the proximity switch 19 (in this embodiment, the mounting position of the proximity switch 19 is such that the load of the hydraulic hammer 1 is applied to the pile 11 via the cap 10, and When the weight 2 is placed on the cap 10, the proximity switch 19 is placed in a position where it operates due to magnetic interaction with the lower end of the weight 2 made of magnetic material.Instead, when the weight 2 is in the pile striking position, the proximity switch 19 is disabled. (The installation position may be set so that it is activated and other positions are activated.)
The calculation unit 20 calculates the time T4 from when the output a of the switch 4' turns on until the output f of the proximity switch 19 falls at the first bounce during pile striking, and calculates the time T4 from the following equation (1). , interval timer 1
Calculate the time Tb to be set at 7'.
Tb=T4−T1−τ1 ……(1)
この式のインターバルタイマ14′の設定時間
T1および動作遅れ時間τ1は、それぞれインター
バルタイマ14′およびレジスタ21から演算部
20に入力される。インターバルタイマ17′に
は、予め長い設定時間Taが初期設定されている
ので、第1回目の打撃動作の際には、前記リレー
15の出力オフの時点から該インターバルタイマ
17′の出力b′がオンとなり、この設定時間Ta後
にオフとなる。この出力b′がオフとなる時点で前
記とは別のタイマ起動用リレー22を作動させて
その出力hをオンとしてストロークタイマ14′
を起動し、該リレー22は前記リレー15の出力
cによりリセツトする。 Tb=T4−T1−τ 1 ...(1) Setting time of interval timer 14' in this equation
T1 and operation delay time τ 1 are input to the calculation unit 20 from the interval timer 14' and the register 21, respectively. Since the interval timer 17' is initially set to a long setting time Ta, during the first striking operation, the output b' of the interval timer 17' is set from the time when the output of the relay 15 is turned off. It turns on, and turns off after this set time Ta. At the point when this output b' turns off, another timer starting relay 22 is activated to turn on the output h, and the stroke timer 14' is activated.
The relay 22 is reset by the output c of the relay 15.
2回目以降のインターバル時間、すなわちスト
ロークタイマ14′の出力aがオフとなつてから
オンとなるまでの時間は、インターバルタイマ1
7′に新たに設定された前記設定時間Tbであり、
通常、重錘の前記ケース3に対する相対位置を表
わす曲線eは、ストロークが変化したり、土質が
大幅に変化しない限りほとんど変化しないので、
該設定時間Tbにより作動させた場合には、Aに
示すように、重錘のバウンドして上昇中に油圧シ
リンダ4に圧油を供給する動作に移行することに
なる。 The interval time from the second time onwards, that is, the time from when the output a of the stroke timer 14' is turned off to when it is turned on, is determined by the interval timer 1.
The set time Tb is newly set at 7',
Normally, the curve e representing the relative position of the weight with respect to the case 3 hardly changes unless the stroke changes or the soil quality changes significantly.
When activated for the set time Tb, as shown in A, the operation shifts to supplying pressure oil to the hydraulic cylinder 4 while the weight is bouncing and rising.
このように、重錘2が杭11を1回打撃するに
要する時間を実測しておいて、重錘上昇時間開始
後、該実測された時間が経過したら重錘上昇動作
を開始するようにすることにより、無駄時間が無
くなり、高能率で杭の打設作業を行なうことが可
能となる。一例をあげると、あるストロークで従
来20回/分打撃できた油圧ハンマに本発明を適用
した場合、同じストロークで25回/分前後の打撃
が可能となり、約25%程度打撃回数を増加させる
ことが可能となり、能率を大幅に上げることがで
きた。 In this way, the time required for the weight 2 to hit the pile 11 once is measured, and the weight lifting operation is started when the measured time elapses after the weight lifting time starts. This eliminates wasted time and enables highly efficient pile driving work. For example, if the present invention is applied to a hydraulic hammer that conventionally could hit 20 times/min with a certain stroke, it becomes possible to hit around 25 times/min with the same stroke, increasing the number of hits by about 25%. This made it possible to significantly increase efficiency.
また、重錘2が杭11を打撃する動作時間を実
測し、その実測時間に基づいて動作制御を行なう
ので、従来のようにインターバルタイマの時間設
定の誤りによつて重錘2の下降中に油圧回路が重
錘押上げ方向に切換わつて著るしく高い圧力が油
圧シリンダ4等に発生してこれらを損傷されるお
それがなくなり、作業上の安全性が向上する。 In addition, since the operation time for the weight 2 to hit the pile 11 is actually measured and the operation is controlled based on the measured time, it is possible to prevent the movement of the weight 2 from descending due to an error in the time setting of the interval timer, as in the past. There is no risk that the hydraulic circuit will be switched to the direction of pushing up the weight and that extremely high pressure will be generated in the hydraulic cylinder 4 and the like and damage these, improving operational safety.
なお、インターバルタイマ17′に対する時間
設定は、杭打撃毎に行なつてもよいが、同じスト
ロークで作業を行なえば動作時間はほとんど変化
しないことから、数回あるいは数十回1回に設定
するか、あるいはストロークを変化させた時、ま
ず十分に長い時間Taを設定し、その後、実測時
間を設定するようにしてもよい。 Note that the time setting for the interval timer 17' may be done every time the pile is struck, but since the operating time will hardly change if the work is done with the same stroke, it is better to set it once every few or dozens of times. Alternatively, when changing the stroke, Ta may be set for a sufficiently long time first, and then the actual measurement time may be set.
本実施例では、ストロークタイマ14′によつ
てストロークを設定するようにしたが、スイツチ
等によつて高さを設定するようにしてもよい。第
5図はその一例であり、重錘2による杭11の打
撃位置よりも高い位置に互いに高さが異なるよう
に複数個の近接スイツチ23a〜23dを設け、
どの近接スイツチの出力を参照するかはオペレー
タが各近接スイツチに対応したスイツチでなる選
択スイツチ群24を操作することによつて選択で
きるようにし、第6図に示すように、起動スイツ
チ13で自己保持回路を付帯したリレー15′を
オンとし、これによりソレノイド弁16をオンと
してコントロール弁6を切換え、油圧シリンダ4
に油圧源5からの圧油を供給して重錘2を上昇さ
せ、前記選択スイツチ群24によつて選択された
近接スイツチ(23a〜23dのうちの1つ)が
作動してその出力iが出た時にリレー15′をオ
フとし、これによりソレノイド弁16をオフとし
てコントロール弁6を元の位置に戻すことにより
重錘2を落下させる。一方、前記出力iが出た時
点でインターバルタイマ17′を起動し、初期設
定された時間Ta後にその出力b′がオフとし、そ
のオフとなつた時点でリレー起動回路25の出力
hをオンとし、これによつてリレー15′をオン
とし、リレー起動回路25は該リレー15′の出
力によつてリセツトする。 In this embodiment, the stroke is set using the stroke timer 14', but the height may also be set using a switch or the like. FIG. 5 shows an example of this, in which a plurality of proximity switches 23a to 23d are provided at positions higher than the position where the pile 11 is struck by the weight 2 and have different heights.
The operator can select which proximity switch output to refer to by operating a selection switch group 24 consisting of switches corresponding to each proximity switch, and as shown in FIG. The relay 15' with the holding circuit is turned on, which turns on the solenoid valve 16 to switch the control valve 6, and the hydraulic cylinder 4
Pressure oil from the hydraulic source 5 is supplied to raise the weight 2, and the proximity switch (one of 23a to 23d) selected by the selection switch group 24 is activated to increase the output i. When it comes out, the relay 15' is turned off, thereby turning off the solenoid valve 16 and returning the control valve 6 to its original position, thereby causing the weight 2 to fall. On the other hand, when the output i is output, the interval timer 17' is started, and the output b' is turned off after an initially set time Ta, and when the output b' is turned off, the output h of the relay starting circuit 25 is turned on. This turns on the relay 15', and the relay starting circuit 25 is reset by the output of the relay 15'.
演算部20′は、前記実施例のように重錘2の
上昇動作開始時点からの時間を計測するのではな
く、前記出力iが出た時点から、すなわち重錘落
下のための動作起点となる時点から重錘2による
杭11の打撃により重錘2が第1回のバウンドを
して前記近接スイツチ19の出力fがオフとなる
までの時間T6を計測すると共に、(2)式のように、
該時間あT6からレジスタ21に設定されている
油圧回路等による動作遅れ時間τ1を減算すること
によりインターバルタイマ17′の設定時間Tbを
算出し、該インターバルタイマ17′に設定する。 The calculation unit 20' does not measure the time from the start of the lifting movement of the weight 2 as in the above embodiment, but measures the time from the time when the output i is output, that is, the starting point of the movement for dropping the weight. The time T6 from the moment when the weight 2 bounces for the first time due to the impact of the pile 11 by the weight 2 until the output f of the proximity switch 19 is turned off is measured, and as shown in equation (2), ,
The set time Tb of the interval timer 17' is calculated by subtracting the operation delay time τ 1 due to the hydraulic circuit etc. set in the register 21 from the time T6, and is set in the interval timer 17'.
Tb=T6−τ1 ……(2)
その後は該設定時間Tbがインターバル時間と
なり、以後の動作は前記の通りである。なお、近
接スイツチ23a〜23dは重錘2による杭11
の打撃位置で作動、重錘2の上昇位置で不作動と
なるように取付けて回路を構成してもよい。 Tb=T6−τ 1 (2) After that, the set time Tb becomes the interval time, and the subsequent operation is as described above. In addition, the proximity switches 23a to 23d are connected to the stake 11 by the weight 2.
The circuit may be configured such that it is activated at the impact position of the weight 2 and deactivated when the weight 2 is raised.
この実施例によれば、第7図に示すように、オ
ペレータが近接スイツチ23a〜23dのうちの
どれを選択するかによつてストロークをS1,S2,
S3,S4のように変えることができる。 According to this embodiment, as shown in FIG. 7, the stroke is changed to S1, S2,
It can be changed like S3 and S4.
以上本発明を実施例により説明したが、本発明
の要旨を逸脱しない範囲において、種々の変更が
可能であることは言うまでもない。例えば、重錘
2が杭11を打撃した時点は、重錘2が杭11を
打撃し始めた時点(出力fの立上がり)等として
もよい。また、重錘2が杭11を打撃したことを
検出する手段としては、磁性材感応形の近接スイ
ツチのみならず、静電形や光感応形等の近接スイ
ツチを用いることができ、さらに、油圧ハンマ1
やその回りの機器の振動または振動加速度の検出
器や、打撃音の検出器や、重錘の高さによつて出
力の変わるポテンシヨンメータでなるストローク
計等、打撃等に信号を検出できるものであれば用
いることができる。また、前記ストロークの設定
に前記ストローク計を用いることも可能である。
また、前記タイマ等の制御部分をマイクロコンピ
ユータによつて実現することも可能である。ま
た、本発明が適用される油圧ハンマは、油圧シリ
ンダに圧油を供給することによつて重錘が上昇
し、圧油を抜くことによつて落下する構成であれ
ばどのようなものでもよく、重錘が油圧シリンダ
のピストンを兼ねた構成でもよい。 Although the present invention has been described above using examples, it goes without saying that various changes can be made without departing from the gist of the present invention. For example, the time when the weight 2 hits the pile 11 may be the time when the weight 2 starts hitting the pile 11 (the rise of the output f), or the like. In addition, as a means for detecting that the weight 2 hits the pile 11, not only a magnetic material sensitive type proximity switch but also an electrostatic type or a photosensitive type proximity switch can be used. Hammer 1
Detectors for vibration or vibration acceleration of surrounding equipment, detectors for impact sound, and stroke meters with potentiometers whose output changes depending on the height of the weight, etc., that can detect signals from impact, etc. If so, it can be used. It is also possible to use the stroke meter to set the stroke.
Further, it is also possible to implement the control portion such as the timer using a microcomputer. Further, the hydraulic hammer to which the present invention is applied may be of any type as long as the weight is raised by supplying pressure oil to the hydraulic cylinder and falls by removing the pressure oil. , a structure in which the weight also serves as a piston of a hydraulic cylinder may be used.
以上述べたように、本発明によれば、重錘駆動
用電気回路または油圧回路の上昇動作起点あるい
は実際に重錘が上昇を開始した時点から、重錘が
杭を打撃した時点までの時間、もしくは重錘駆動
用電気回路または油圧回路の落下動作起点あるい
は実際に重錘が落下を開始した時点から、重錘が
杭を打撃した時点までの時間を実測し、該実測時
間の長短に呼応して、次サイクルないしはそれ以
降の前記電気回路または油圧回路の上昇動作休止
時間を長短に制御するようにしたので、重錘のス
トロークの長短の如何にかかわりなく、重錘によ
る杭打撃後重錘上昇開始までの無駄時間を無くす
ることができ、従来よりも著るしく高能率に杭の
打設作業を行なうことが可能となる。また本発明
によれば、杭打撃後のインターバル時間を考慮す
る必要がなくなるため、インターバル時間設定の
手間が不要になり、このことも能率向上に役立
つ。 As described above, according to the present invention, the time from the starting point of the lifting operation of the electric circuit or hydraulic circuit for driving the weight or the time when the weight actually starts to rise until the time when the weight hits the pile; Alternatively, measure the time from the starting point of the falling movement of the electric circuit or hydraulic circuit for driving the weight, or from the time when the weight actually starts falling, to the time when the weight hits the pile, and adjust according to the length of the measured time. As a result, the suspension time of the lifting operation of the electric circuit or hydraulic circuit in the next cycle or thereafter is controlled to be long or short, so that regardless of the length of the stroke of the weight, the lifting of the weight after impacting the pile with the weight is controlled. It is possible to eliminate wasted time until the start of pile driving, and it is possible to perform pile driving work with significantly higher efficiency than before. Further, according to the present invention, there is no need to take into account the interval time after the pile is struck, so there is no need to take the time and effort to set the interval time, which also helps improve efficiency.
第1図および第2図はそれぞれ従来の重錘駆動
方法を説明する油圧ハンマの構成図およびタイム
チヤート、第3図および第4図はそれぞれ本発明
の重錘駆動方法の一実施例を説明する油圧ハンマ
の構成図およびタイムチヤート、第5図および第
6図はそれぞれ本発明の重錘駆動方法の他の実施
例を説明する油圧ハンマの構成図およびタイムチ
ヤート、第7図は該実施例の作用を説明する波形
図である。
1……油圧ハンマ、2……重錘、4……油圧シ
リンダ、5……コントロール弁、11……杭、1
3……起動スイツチ、14′……ストロークタイ
マ、15,15′,22,25……リレー、16
……ソレノイド弁、17′……インターバルタイ
マ、19,23a〜23d……近接スイツチ、2
0,20′……演算部、21……レジスタ、24
……選択スイツチ群。
FIGS. 1 and 2 are a block diagram and a time chart of a hydraulic hammer, respectively, explaining a conventional weight driving method, and FIGS. 3 and 4, respectively, illustrate an embodiment of the weight driving method of the present invention. A block diagram and a time chart of a hydraulic hammer, FIGS. 5 and 6 are respectively a block diagram and a time chart of a hydraulic hammer explaining another embodiment of the weight driving method of the present invention, and FIG. 7 is a diagram of a time chart of this embodiment. FIG. 3 is a waveform diagram illustrating the effect. 1... Hydraulic hammer, 2... Weight, 4... Hydraulic cylinder, 5... Control valve, 11... Pile, 1
3... Start switch, 14'... Stroke timer, 15, 15', 22, 25... Relay, 16
... Solenoid valve, 17' ... Interval timer, 19, 23a-23d ... Proximity switch, 2
0, 20'...Arithmetic unit, 21...Register, 24
...Selection switch group.
Claims (1)
作起点あるいは実際に重錘が上昇を開始した時点
から、重錘が杭を打撃した時点までの時間を実測
し、該実測時間の長短に呼応して、次サイクルな
いしはそれ以降の前記電気回路または油圧回路の
上昇動作休止時間を長短に制御することを特徴と
する油圧ハンマの重錘駆動方法。 2 重錘駆動用電気回路または油圧回路の落下動
作起点あるいは実際に重錘が落下を開始した時点
から、重錘が杭を打撃した時点までの時間を実測
し、該実測時間の長短に呼応して、次サイクルな
いしはそれ以降の前記電気回路または油圧回路の
上昇動作休止時間を長短に制御することを特徴と
する油圧ハンマの重錘駆動方法。[Scope of Claims] 1. The time from the starting point of the lifting operation of the electric circuit or hydraulic circuit for driving the weight, or from the time when the weight actually starts to rise, to the time when the weight hits the pile, and the actual measurement. 1. A method for driving a weight of a hydraulic hammer, characterized in that the suspension time of the lifting operation of the electric circuit or the hydraulic circuit in the next cycle or thereafter is controlled to be long or short in accordance with the length of the time. 2. Measure the time from the starting point of the falling movement of the electric circuit or hydraulic circuit for driving the weight, or from the time when the weight actually starts falling, to the time when the weight hits the pile, and calculate the time according to the length of the measured time. A method for driving a weight of a hydraulic hammer, characterized in that the duration of the lifting operation of the electric circuit or the hydraulic circuit is controlled to be long or short in the next cycle or thereafter.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22336683A JPS60116908A (en) | 1983-11-29 | 1983-11-29 | Method of driving weight of hydraulic hammer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22336683A JPS60116908A (en) | 1983-11-29 | 1983-11-29 | Method of driving weight of hydraulic hammer |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60116908A JPS60116908A (en) | 1985-06-24 |
| JPH0428852B2 true JPH0428852B2 (en) | 1992-05-15 |
Family
ID=16797014
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22336683A Granted JPS60116908A (en) | 1983-11-29 | 1983-11-29 | Method of driving weight of hydraulic hammer |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60116908A (en) |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS58135226A (en) * | 1982-02-03 | 1983-08-11 | Maeda Seikan Kk | Controller for oil-pressure or air-pressure hammer |
-
1983
- 1983-11-29 JP JP22336683A patent/JPS60116908A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS60116908A (en) | 1985-06-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100387403C (en) | Rotary impact tool | |
| US9863112B2 (en) | Method for soil compaction with an attachable compactor, attachable compactor as well as an excavator with an attachable compactor | |
| JP4317017B2 (en) | Method and apparatus for monitoring operation of impact device | |
| US4534419A (en) | Method for pile driving and dragging | |
| EP2103393B1 (en) | Powered hammer with a vibration dampening mechanism | |
| CN105716816A (en) | Modal test device | |
| JPH0428852B2 (en) | ||
| SE421985B (en) | DEVICE FOR A PLANTING MACHINE WITH A HALT-RECORDING PLANTING DEVELOP THE MARKET EASILITY FOR PLANTING | |
| US4580640A (en) | Stroke control responsive to impact of hydraulic hammer | |
| JP3299515B2 (en) | Impact control device for hydraulic hammer | |
| JPS60156823A (en) | Stake driving apparatus and its operation | |
| JPS60116906A (en) | Weight driving method for hydraulic hammer | |
| JPS60116907A (en) | Method of driving weight of hydraulic hammer | |
| JPS6138287B2 (en) | ||
| KR20070081957A (en) | Vibration-free driving measuring device and batch recording method using the device | |
| JPH0842277A (en) | Hydraulic drive in drifter | |
| JPH0941375A (en) | Hydraulic hammer | |
| JP2004082257A (en) | Striking speed-variable impact tool | |
| JPH0659128B2 (en) | Riding rice transplanter | |
| SU1546563A1 (en) | Device for compacting soil specimens | |
| JPH11315538A (en) | Method and device for adjusting percussion force of hydraulic drop hammer | |
| FI126410B (en) | Peel method and device | |
| CN108776000A (en) | A kind of automatic rebounding device of free-falling hammer for bridge hammering detection | |
| JPH04244943A (en) | Hydraulic high speed impact tester | |
| EP1475164A2 (en) | Generator of simulated walking for phonometric measurements in the building industry |