JPH0435693B2 - - Google Patents
Info
- Publication number
- JPH0435693B2 JPH0435693B2 JP62331818A JP33181887A JPH0435693B2 JP H0435693 B2 JPH0435693 B2 JP H0435693B2 JP 62331818 A JP62331818 A JP 62331818A JP 33181887 A JP33181887 A JP 33181887A JP H0435693 B2 JPH0435693 B2 JP H0435693B2
- Authority
- JP
- Japan
- Prior art keywords
- valve
- purge
- pressure
- pipe
- differential pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)
Description
(産業上の利用分野)
本発明は、原子力発電所の廃液処理施設また
は、核燃料再処理工場等の液体貯蔵容器内の液
面・密度の測定に適したパージ式液面計・密度計
に係り、とりわけ測定誤差が少なく、遠隔操作に
よつて検出器の校正を行うことのできるパージ式
液面計に関する。
(従来の技術)
原子力発電所の廃液処理施設、核燃料再処理工
場等で使用されるパージ式液面計・密度計は、パ
ージ流体として気体が使用されている。このパー
ジ式液面計を第8図に示す。
第8図は、従来のパージ式液面計を示す構成図
である。図において符号71は差圧検出器であ
り、この差圧検出器71には2本のパージ配管7
2、パージ配管73が接続されている。このパー
ジ配管72、パージ配管73には、差圧検出器7
1の操作及び校正に使用される手動弁74、手動
弁75が設けられ、さらにそれぞれエアパージ用
の空気供給配管76、空気供給配管77が接続さ
れている。一方のパージ配管72はタンク78内
の被測定溶液79内に挿入され、他方のパージ配
管73の先端部はタンク78内の気相部に位置し
ている。
パージ配管72とパージ配管73は均圧配管で
連結され、均圧配管には手動弁80が設けられて
いる。空気供給配管76、空気供給配管77の上
流側にはそれぞれパージ用エアに流量を測定する
流量計81、流量計82及び流量を一定にする流
量調整器83、流量調整器84及び圧力源85が
設けられている。
また、差圧検出器71の校正時には、差圧検出
器71の導圧口86に圧力発生器87が設けられ
た導圧配管88が接続される。
このような構成からなるパージ式液面計の通常
時の被面測定原理について説明する。
まず作業員が手動弁80を“閉”にし、手動弁
74、手動弁75を“開”の状態にする。圧力源
85から供給された空気は、流量計81、流量計
82で流量値を監視されながら流量調整器83、
流量調整器84で一定流量に調整され、パージ配
管72、パージ配管73に供給される。溶液79
内のパージ配管72の先端からは溶液79の背圧
に打ち勝つて一定流量の空気が放出される。この
結果、パージ配管72内の空気圧はタンク78の
気相部と溶液79の高さ分の背圧の和に等しくな
り、パージ配管73内の空気圧はタンク78の気
相部と等しくなる。差圧検出器71はこの両方の
圧力の差である溶液79の高さ相当分の背圧を検
出する。この背圧は溶液79の液面Aの高さに比
例するので差圧検出器71によつて液面Aを測定
することができる。
つぎに定期的にその性能を確認するために実施
しているパージ式液面計の差圧検出器71の校正
手順について説明する。まず、作業者が差圧検出
器71の設置現場まで行き。手動弁74、手動弁
75を閉にし、手動弁80を“開”にする。パー
ジ配管72とパージ配管73とを均圧にして差圧
検出器71を零差圧の状態にし、差圧検出器71
の零差圧信号の校正をおこなう。次に手動弁80
を“閉”にし、圧力発生器87で基準圧を発生さ
せ、これを差圧検出器71の導圧口86から印加
する。
この基準圧力を加えた状態で差圧検出器71の
指示値を基準圧力値とを比較することにより、ス
パン校正を行う。
(発明が解決しようとする問題点)
以上述べた様な従来の差圧検出器校正方法によ
ると、差圧検出器71が設置してある現場まで保
守員が行き、校正圧力を印加した後、制御室に設
置してある指示計の指示値と比較する必要があ
る。また、加圧器87を現場まで持つていかなけ
ればならず、差圧検出器71を1台ずつ校正しな
ければならない。このようなことにより、校正に
要する時間が長くなるため、計測器の精度の維持
がむずかしくなり、保守員の放射線被曝線量が多
くなり、ひいては、運転時間の短縮や設備利用率
を低下させる不具合がある。
本発明はこのような不具合を解決するためにな
されたもので、差圧検出器の校正を遠隔操作で行
うことにより、校正時間の短縮と校正作業の省力
化を実現できるとともに、精度の高い液面計測が
可能なエアパージ式液面計を提供することを目的
とする。
〔発明の構成〕
(問題点を解決するための手段〕
差圧検出器の高圧側に第1パージ配管を接続
し、低圧側に第2パージ配管を接続し、さらに第
1パージ配管と第2パージ配管を連絡する均圧配
管を設ける。第1パージ配管の上両側には第1入
口弁、下流側には第1出口弁、第2パージ配管の
上流側には第2入口弁、下流側には第2出口弁、
均圧配管には均圧弁を設ける。さらにこれらの各
弁には遠隔操作可能な弁開閉装置を設ける。
(作用)
本発明によると、差圧検出器の測定時、校正時
に必要な各弁の開閉操作は中央制御室からの遠隔
操作による弁開閉装置によつて行われる。
(実施例)
以下、図面を参照して本発明の実施例を説明す
る。第1図は第一実施例の構成図である。
図面において、符号1は差圧検出器であり、そ
の高圧側にはパージ配管2が、低圧側にはパージ
配管3が接続されている。このパージ配管2とパ
ージ配管3はしやへい壁4を貫通して平行に垂設
しており、パージ配管2の先端は槽5内の被測定
溶液23内に挿入され、パージ配管3の先端は槽
5の気相部に位置している。パージ配管2の上部
には電磁弁6が、その下部には電磁弁7が取り付
けられ、パージ配管3にも同様に電磁弁8、及び
電磁弁9が取り付けられている。また、パージ配
管2とパージ配管3とを連絡する均圧配管10が
設けられ、この均圧配管10には電磁弁11が取
り付けられている。さらにパージ配管2とパージ
配管3の上流側にはキヤピラリー12を介して定
流量の空気を供給するための空気タンク13が接
続されている。この空気タンク13の一端部には
空気タンクの圧力を調整する電磁弁14が取り付
けられ、その他端部には配管15が接続され、こ
の配管15には、空気タンク内の圧力を測定する
精密圧力計16、電磁弁17が取り付けられ、そ
の上流側は圧力源18が接続されている。また電
磁弁6,7,8,9,11の信号線20はコネク
タ21を介して中央制御室22へ接続されてい
る。
一般に電磁弁には「無通電開」型と「無通電
閉」型がある。前者は電磁弁の電磁コイルが無通
電になつたときに開になり、後者は無通電になつ
たときに閉になるものである。電磁弁6,7,8
は「無通電開」型、電磁弁11,9は「無通電
閉」型を採用する。
電磁弁6,7,8,9,11と差圧検出器1は
検出器モジユール24とすることにより一体化し
て故障時の交換を容易に行える構成となつてい
る。その検出器モジユール24の外観の斜視図を
第2図に、配管回路を第3図に示す。第2図に示
すように5個の電磁弁6,7,8,9,11は電
磁弁ベース25上に設置されている。電磁弁ベー
ス25内部には、パージ配管2,3の一部や均圧
配管10が収納されている。
このような構成からなる第一実施例の作用につ
いて説明する。定常の測定状態では、中央制御室
22からの遠隔操作信号により電磁弁6,7,
9,8,17は“開”、電磁弁14,11は“閉”
の状態に設定される。圧力源18より供給された
エアは空気タンク13内において約1.4Kg/cm2に
保持される。一方パージ配管2内に発生する背圧
は最大2000mmH2O程度なので、空気タンク13
とパージ配管2との差圧は1.4Kg/cm2〜1.2Kg/cm2
の間で変化する。したがつて、キヤピラリーチユ
ーブ12で空気流量を制限することにより、パー
ジ配管2,3先端から放出される空気量は数/
hの一定量に調整される。このように定常測定時
においては、差圧検出器1は、パージ配管2とパ
ージ配管3の差圧を計測することになり、この差
圧は被測定溶液23の背圧に等しいので、溶液2
3の液面Aが計測される。
次に第一実施例による校正時の動作について説
明する。(零差圧の校正は、次の手順による。)ま
ず電磁弁7,9を中央制御室22からの遠隔操作
により閉にして、槽5内で発生する放射性ガスが
差圧検出器1へ流れるのを防ぎ、同様にして電磁
弁17を“閉”にした後、電磁弁14を“開”に
設定する。これにより空気タンク13内の圧力を
約300mmH2O程度まで低下させた後、電磁弁14
を“閉”にし、電磁弁11を“開”にする。パー
ジ配管2(高圧側)とパージ配管3(低圧側)は
均圧配管11を介して同圧となり差圧検出器1の
H(高圧)側入口と、L(低圧)側入口は導通され
零差圧入力となる。ここで、差圧検出器1の零調
を行うが、この時差圧検出器1の設置場所まで行
かないで、中央制御室22で調整(回路上で行う
ハードの調整または計算機で行うソフトウエアで
の調整)を行う。この時の基準圧力は空気タンク
13内の圧力を精密圧力計16で測定する。
次にスパン校正を行う手順について述べる。ま
ず、中央制御室22からの遠隔操作で電磁弁8お
よび11を“閉”にして差圧検出器1のL側を密
閉する。次に電磁弁17を“開”にして圧縮空気
を送り空気タンク13内に校正圧力を印加する。
印加後、電磁弁17を閉にする。校正圧力値の目
安としては差圧検出器1の測定レンジの1/2程度
とする。たとえば、フルレンジが3000mmH2Oの
差圧検出器を校正する場合、H側圧力を1800mm
H2Oにすれば、差圧としては1800−300=1500mm
H2Oが印加される。差圧検出器1の指示と精密
圧力計16の指示が安定したら、両方の出力指示
を読む。以上より、差圧検出器1の指示値1500mm
H2Oと、精密圧力計16の測定値の差(測定レ
ンジの1/2の時と、零差圧入力時に差圧検出器に
印加された約300mmH2Oとの差)を比較して差圧
検出器1のスパン校正を行う。校正値を用いた機
器の調整の方法で、零差圧入力の場合と同じ方法
で実施できる。
以上の手順により、校正が終了したら電磁弁
7,8,9,17を“開”にして、その空気タン
ク13内の圧力を通常測定時の圧力まで上昇させ
て液面Aの測定状態に戻る。
次に電磁弁を通電した際の発生熱による計測上
の影響について説明する。電磁弁が無通電状態か
ら通電状態になると、各電磁弁に熱が発生し、そ
の発生熱が電磁弁ベース25を経由してパージ配
管内のエアへ伝わる。その時内部のエアが密閉状
態にあると圧力変化が生じて、測定あるいは校正
の誤差の原因となる。本実施例によると、電磁弁
6,7,8を無通電開型、電磁弁9,11を無通
電閉型とすることにより、通常測定時と校正時に
おける弁の開閉状態は以下の表のようになる。*
印があるものは通電状態、無いものは無通電状態
を表わす。
(Field of Industrial Application) The present invention relates to a purge type liquid level meter/density meter suitable for measuring the liquid level/density in a liquid storage container such as a waste liquid treatment facility of a nuclear power plant or a nuclear fuel reprocessing plant. In particular, the present invention relates to a purge type liquid level gauge which has little measurement error and whose detector can be calibrated by remote control. (Prior Art) Purge type liquid level gauges and density meters used in waste liquid treatment facilities of nuclear power plants, nuclear fuel reprocessing plants, etc. use gas as a purge fluid. This purge type liquid level gauge is shown in FIG. FIG. 8 is a configuration diagram showing a conventional purge type liquid level gauge. In the figure, reference numeral 71 is a differential pressure detector, and this differential pressure detector 71 has two purge pipes 7.
2. A purge pipe 73 is connected. A differential pressure detector 7 is installed in the purge piping 72 and the purge piping 73.
A manual valve 74 and a manual valve 75 used for the operation and calibration of 1 are provided, and furthermore, an air supply pipe 76 and an air supply pipe 77 for air purge are connected, respectively. One of the purge pipes 72 is inserted into the solution to be measured 79 in the tank 78, and the tip of the other purge pipe 73 is located in the gas phase part of the tank 78. The purge pipe 72 and the purge pipe 73 are connected by a pressure equalizing pipe, and a manual valve 80 is provided in the pressure equalizing pipe. On the upstream sides of the air supply piping 76 and the air supply piping 77, there are a flow meter 81 and a flow meter 82 for measuring the flow rate of purge air, a flow rate regulator 83 for keeping the flow constant, a flow rate regulator 84, and a pressure source 85, respectively. It is provided. Further, when calibrating the differential pressure detector 71, a pressure guide pipe 88 provided with a pressure generator 87 is connected to the pressure guide port 86 of the differential pressure detector 71. The principle of normal surface measurement using the purge type liquid level gauge having such a configuration will be explained. First, an operator closes the manual valve 80 and opens the manual valves 74 and 75. The air supplied from the pressure source 85 is passed through the flow regulator 83, while the flow value is monitored by the flowmeter 81 and the flowmeter 82.
The flow rate is adjusted to a constant flow rate by a flow rate regulator 84 and supplied to purge piping 72 and purge piping 73. solution 79
A constant flow of air is discharged from the tip of the purge pipe 72 inside, overcoming the back pressure of the solution 79. As a result, the air pressure in the purge pipe 72 becomes equal to the sum of the gas phase portion of the tank 78 and the back pressure corresponding to the height of the solution 79, and the air pressure in the purge pipe 73 becomes equal to the gas phase portion of the tank 78. The differential pressure detector 71 detects a back pressure equivalent to the height of the solution 79, which is the difference between these two pressures. Since this back pressure is proportional to the height of the liquid level A of the solution 79, the liquid level A can be measured by the differential pressure detector 71. Next, a procedure for calibrating the differential pressure detector 71 of the purge type liquid level gauge, which is carried out periodically to confirm its performance, will be explained. First, a worker goes to the installation site of the differential pressure detector 71. Close manual valve 74 and manual valve 75, and open manual valve 80. The purge piping 72 and the purge piping 73 are pressure-equalized, the differential pressure detector 71 is set to zero differential pressure, and the differential pressure detector 71 is
Calibrate the zero differential pressure signal. Next, manual valve 80
is set to "closed", a reference pressure is generated by the pressure generator 87, and this is applied from the pressure guiding port 86 of the differential pressure detector 71. Span calibration is performed by comparing the indicated value of the differential pressure detector 71 with the reference pressure value while applying this reference pressure. (Problems to be Solved by the Invention) According to the conventional differential pressure detector calibration method as described above, a maintenance person goes to the site where the differential pressure detector 71 is installed, and after applying the calibration pressure, It is necessary to compare the reading with the indicator installed in the control room. Further, the pressurizer 87 must be brought to the site, and the differential pressure detectors 71 must be calibrated one by one. This increases the time required for calibration, making it difficult to maintain the accuracy of measuring instruments, increasing radiation exposure for maintenance personnel, and causing problems that shorten operating time and reduce equipment utilization. be. The present invention was made to solve these problems.By remotely calibrating the differential pressure detector, it is possible to shorten the calibration time and save labor for the calibration work, as well as to calibrate the differential pressure detector with high accuracy. The purpose of the present invention is to provide an air purge type liquid level gauge capable of surface measurement. [Structure of the invention] (Means for solving the problem) A first purge pipe is connected to the high pressure side of the differential pressure detector, a second purge pipe is connected to the low pressure side, and further the first purge pipe and the second purge pipe are connected to the high pressure side of the differential pressure detector. A pressure equalization pipe is provided that connects the purge pipes.The first inlet valve is on both upper sides of the first purge pipe, the first outlet valve is on the downstream side, the second inlet valve is on the upstream side of the second purge pipe, and the second inlet valve is on the downstream side of the second purge pipe. has a second outlet valve,
A pressure equalization valve will be installed in the pressure equalization piping. Furthermore, each of these valves is provided with a valve opening/closing device that can be remotely operated. (Function) According to the present invention, the opening/closing operations of each valve required during measurement and calibration of the differential pressure detector are performed by a valve opening/closing device remotely controlled from a central control room. (Example) Hereinafter, an example of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram of the first embodiment. In the drawings, reference numeral 1 denotes a differential pressure detector, to which a purge pipe 2 is connected to the high pressure side and a purge pipe 3 to the low pressure side. The purge piping 2 and the purge piping 3 penetrate the thin wall 4 and are vertically installed in parallel, and the tip of the purge piping 2 is inserted into the solution to be measured 23 in the tank 5. is located in the gas phase part of tank 5. A solenoid valve 6 is attached to the upper part of the purge pipe 2, and a solenoid valve 7 is attached to the lower part thereof, and a solenoid valve 8 and a solenoid valve 9 are similarly attached to the purge pipe 3. Further, a pressure equalizing pipe 10 is provided that connects the purge pipe 2 and the purge pipe 3, and a solenoid valve 11 is attached to this pressure equalizing pipe 10. Furthermore, an air tank 13 for supplying a constant flow of air is connected to the upstream side of the purge piping 2 and the purge piping 3 via a capillary 12. A solenoid valve 14 for adjusting the pressure of the air tank is attached to one end of the air tank 13, and a pipe 15 is connected to the other end. A total of 16 solenoid valves 17 are installed, and a pressure source 18 is connected to the upstream side thereof. Further, signal lines 20 of the solenoid valves 6, 7, 8, 9, and 11 are connected to a central control room 22 via a connector 21. In general, solenoid valves come in two types: ``non-energized open'' type and ``non-energized closed'' type. The former opens when the electromagnetic coil of the solenoid valve is de-energized, and the latter closes when the solenoid coil becomes de-energized. Solenoid valve 6, 7, 8
The solenoid valves 11 and 9 are of the "non-energized closed" type. The electromagnetic valves 6, 7, 8, 9, 11 and the differential pressure detector 1 are integrated into a detector module 24, so that they can be easily replaced in the event of a failure. A perspective view of the exterior of the detector module 24 is shown in FIG. 2, and a piping circuit is shown in FIG. As shown in FIG. 2, five solenoid valves 6, 7, 8, 9, and 11 are installed on a solenoid valve base 25. Parts of the purge pipes 2 and 3 and the pressure equalization pipe 10 are housed inside the solenoid valve base 25. The operation of the first embodiment having such a configuration will be explained. In a steady measurement state, the solenoid valves 6, 7,
9, 8, 17 are "open", solenoid valves 14, 11 are "closed"
The state is set to . The air supplied from the pressure source 18 is maintained at approximately 1.4 kg/cm 2 in the air tank 13. On the other hand, the back pressure generated in the purge pipe 2 is approximately 2000 mmH 2 O at maximum, so the air tank 13
The differential pressure between and purge pipe 2 is 1.4Kg/cm 2 ~1.2Kg/cm 2
Varies between. Therefore, by restricting the air flow rate with the capillary reach tube 12, the amount of air released from the tips of the purge pipes 2 and 3 can be reduced to
h is adjusted to a certain amount. In this way, during steady measurement, the differential pressure detector 1 measures the differential pressure between the purge piping 2 and the purge piping 3, and since this differential pressure is equal to the back pressure of the solution to be measured 23, the
3 liquid level A is measured. Next, the operation during calibration according to the first embodiment will be explained. (The zero differential pressure is calibrated as follows.) First, the solenoid valves 7 and 9 are closed by remote control from the central control room 22, and the radioactive gas generated in the tank 5 flows to the differential pressure detector 1. After the electromagnetic valve 17 is similarly set to "closed", the electromagnetic valve 14 is set to "open". After this reduces the pressure inside the air tank 13 to about 300mmH 2 O, the solenoid valve 14
is "closed" and the solenoid valve 11 is "open". Purge piping 2 (high pressure side) and purge piping 3 (low pressure side) are at the same pressure via pressure equalizing piping 11, and the H (high pressure) side inlet and L (low pressure) side inlet of differential pressure detector 1 are electrically connected and zero. This is a differential pressure input. Here, the zero adjustment of the differential pressure detector 1 is performed, but at this time, without going to the installation location of the differential pressure detector 1, the adjustment is done in the central control room 22 (hard adjustment done on the circuit or software done on the computer). adjustment). The reference pressure at this time is determined by measuring the pressure inside the air tank 13 with a precision pressure gauge 16. Next, the procedure for performing span calibration will be described. First, the solenoid valves 8 and 11 are "closed" by remote control from the central control room 22 to seal the L side of the differential pressure detector 1. Next, the electromagnetic valve 17 is opened and compressed air is sent to apply a calibration pressure inside the air tank 13.
After applying the voltage, the solenoid valve 17 is closed. As a guideline for the calibration pressure value, it should be about 1/2 of the measurement range of the differential pressure detector 1. For example, when calibrating a differential pressure detector with a full range of 3000mmH2O , set the H side pressure to 1800mmH2O.
If H 2 O is used, the differential pressure will be 1800−300=1500mm
H2O is applied. When the indications from the differential pressure detector 1 and the precision pressure gauge 16 become stable, read both output instructions. From the above, the indicated value of differential pressure detector 1 is 1500 mm.
Compare the difference between H 2 O and the measured value of the precision pressure gauge 16 (difference between 1/2 of the measurement range and the approximately 300 mm H 2 O applied to the differential pressure detector when zero differential pressure is input). Perform span calibration of the differential pressure detector 1. This is a method of adjusting equipment using calibration values, and can be performed in the same way as zero differential pressure input. After the calibration is completed according to the above procedure, the solenoid valves 7, 8, 9, and 17 are opened, and the pressure inside the air tank 13 is increased to the pressure during normal measurement, and the state returns to the state of measuring liquid level A. . Next, the effect on measurement due to the heat generated when the solenoid valve is energized will be explained. When the solenoid valves change from a non-energized state to an energized state, heat is generated in each solenoid valve, and the generated heat is transmitted to the air in the purge pipe via the solenoid valve base 25. At that time, if the air inside is sealed, pressure changes will occur, causing errors in measurement or calibration. According to this embodiment, the solenoid valves 6, 7, and 8 are of the non-energized open type, and the solenoid valves 9, 11 are of the non-energized closed type, so that the open/close states of the valves during normal measurement and calibration are as shown in the table below. It becomes like this. *
Those with a mark indicate a energized state, and those without a mark indicate a non-energized state.
【表】
この場合には、通常測定時に1個の電磁弁が常
に通電状態にあるので電磁弁ベース25は予熱さ
れている。零点校正、スパン校正を行う場合、
各々2個の電磁弁がON状態になる。この場合、
温度は上昇するがその割合は小さくなり、スパン
校正時の精度が向上する。
一方、通常測定時において、すべての電磁弁を
無通電型にすると、開閉パターンと通電の関係は
以下の表のようになる。[Table] In this case, one solenoid valve is always energized during normal measurement, so the solenoid valve base 25 is preheated. When performing zero point calibration and span calibration,
Two solenoid valves each turn on. in this case,
Although the temperature rises, the rate of increase becomes smaller, improving accuracy during span calibration. On the other hand, when all solenoid valves are set to non-energized type during normal measurement, the relationship between opening/closing patterns and energization is as shown in the table below.
【表】
上記表に示すように、通常測定時には、すべて
OFFの電磁弁が零点校正、スパン校正を行う時
には3電磁弁がONになる。この発生熱の影響は
大きく、主としてL側の温度が上りパージ配管
2,3内のエアの圧力変化を生じさせ、スパン校
正の誤差原因となる。
このような背景により、スパン校正時におい
て、電磁弁の発生熱の影響を最小にするために、
本実施例は、電磁弁6,7,8は無通電開型、電
磁弁9,11は無通電閉型が採用されている。
この通電時の電磁弁の発生熱の影響を第4図に
示す。本実施例によるとこの熱の影響を小さくす
ることができ、かつ、密閉されたL側の温度変化
を少くすることができる。
このように実施例によると、電磁弁6,7,
8,9,11,14,17を中央制御室22から
の遠隔操作によつて開閉操作及び差圧検出器1の
校正ができるので省力化が図れる。また、校正時
間が短縮できるので、校正頻度を多くとれるよう
になり、差圧検出器1の信頼性が向上する。さら
に通電状態の電磁弁の発生熱の影響を最小になる
ように通電開型と通電閉型とを組み合せることに
よりスパン校正の精度が高くなるので計測精度が
向上する。
次に第二実施例について説明する。第5図は第
二実施例の全体の構成図である。
図面において、符号31は差圧検出器であり、
その高圧側にはパージ配管32が、低圧側にはパ
ージ配管33が接続されている。このパージ配管
32とパージ配管33はしやへい壁34を貫通し
て平行に垂設しており、パージ配管32の先端は
槽35内の被測定溶液53(粒位はA)内に挿入
され、パージ配管33の先端は槽35の気相部に
位置している。パージ配管32の上部には操作弁
36が、その下部には操作弁37が取り付けら
れ、パージ配管33にも同様に操作弁38、及び
操作弁39が取り付けられている。また、パージ
配管32とパージ配管33とを連絡する均圧配管
40が設けられ、この均圧配管40には操作弁4
1が取り付けられている。この操作弁36,3
7,38,39,41の開閉操作の駆動源となる
モータ49が設けられている。このモータ49と
差圧検出器31の信号線50はコネクタ51を介
して中央制御室52に接続されている。さらにパ
ージ配管32とパージ配管33の上流側にはキヤ
ピラリー42を介して定流量の空気を供給するた
めの空気タンク43が接続されている。この空気
タンク43の一端部には空気タンク内の圧力を調
整する電磁弁44が取り付けられその他端部には
配管45が接続され、この配管45には、空気タ
ンク内の圧力を測定する精密圧力計46、電磁弁
47が取り付けられ、その上流側は圧力源48が
接続されている。また、電磁弁44,47、精密
圧力計46の信号線50は中央制御室52に接続
されている。
上述した差圧検出器31、操作弁36,37,
38,39,41、パージ配管32,33、均圧
配管40、モータ49、コネクタ51は一体化さ
せることにより、一式着脱可能なように検出器モ
ジユール54を構成している。その斜視図を第6
図に、配管回路を第7図に示す。第6図に示すよ
うに5個の操作弁36,37,38,39,41
はベース55上に直列に設置され、このベース5
5内部には、パージ配管32,33の一部や均圧
配管40が収納されている。このベース55に隣
接してモータ49が設置され、このモータ49に
は回転軸56が接続されている。なおモータ49
の駆動時に生ずる熱がベース55を介してパージ
配管32,33や均圧配管40に伝達しないよう
に、モータ49とベース55とは分離されている
か、あるいは断熱処理されているのが望ましい。
この回転軸56には円盤状のカム58a,58
b,58c,58d,58eが固設され、それは
操作弁36,37,41,38,39のステム5
7a,57b,57c,57d,57eに当接可
能な位置に固設され、これらのステムの上下移動
により開閉操作がなされるように構成されてい
る。さらにカム58a,58b,58c,58
d,58eは、たとえば円盤状の円周の一部を切
り欠くことによりステムが上下に移動して、通常
測定時、零点調整時、スパン調整時において以下
のように操作弁36,37,38,39,41の
開閉の組み合わせが可能な形状にできている。[Table] As shown in the table above, during normal measurement, all
When the OFF solenoid valve performs zero point calibration or span calibration, the 3 solenoid valves turn ON. The influence of this generated heat is large, mainly because the temperature on the L side rises, causing a change in the pressure of the air in the purge pipes 2 and 3, which causes an error in span calibration. Due to this background, in order to minimize the influence of heat generated by solenoid valves during span calibration,
In this embodiment, the solenoid valves 6, 7, and 8 are of a non-energized open type, and the solenoid valves 9, 11 are of a non-energized closed type. Figure 4 shows the effect of heat generated by the solenoid valve during this energization. According to this embodiment, the influence of this heat can be reduced, and the temperature change on the sealed L side can be reduced. Thus, according to the embodiment, the solenoid valves 6, 7,
8, 9, 11, 14, and 17 can be opened and closed and the differential pressure detector 1 can be calibrated by remote control from the central control room 22, thereby saving labor. Furthermore, since the calibration time can be shortened, calibration can be performed more frequently, and the reliability of the differential pressure detector 1 is improved. Furthermore, by combining the energized open type and the energized closed type so as to minimize the influence of the heat generated by the electromagnetic valve in the energized state, the accuracy of span calibration is increased and the measurement accuracy is improved. Next, a second embodiment will be explained. FIG. 5 is an overall configuration diagram of the second embodiment. In the drawings, numeral 31 is a differential pressure detector;
A purge pipe 32 is connected to the high pressure side, and a purge pipe 33 is connected to the low pressure side. The purge piping 32 and the purge piping 33 penetrate the thin wall 34 and extend vertically in parallel, and the tip of the purge piping 32 is inserted into the solution to be measured 53 (particle size is A) in the tank 35. The tip of the purge pipe 33 is located in the gas phase portion of the tank 35. An operating valve 36 is attached to the upper part of the purge pipe 32, and an operating valve 37 is attached to the lower part thereof, and an operating valve 38 and an operating valve 39 are similarly attached to the purge pipe 33. Further, a pressure equalization pipe 40 is provided that connects the purge pipe 32 and the purge pipe 33, and this pressure equalization pipe 40 has an operation valve 4.
1 is attached. This operation valve 36,3
A motor 49 is provided as a driving source for opening and closing operations of the openings 7, 38, 39, and 41. The motor 49 and the signal line 50 of the differential pressure detector 31 are connected to a central control room 52 via a connector 51. Further, an air tank 43 for supplying a constant flow of air is connected to the upstream side of the purge piping 32 and the purge piping 33 via a capillary 42. A solenoid valve 44 for adjusting the pressure inside the air tank is attached to one end of the air tank 43, and a pipe 45 is connected to the other end. A total of 46 and solenoid valves 47 are attached, and a pressure source 48 is connected to the upstream side thereof. Further, signal lines 50 of the electromagnetic valves 44 and 47 and the precision pressure gauge 46 are connected to a central control room 52. The above-mentioned differential pressure detector 31, operation valves 36, 37,
38, 39, 41, purge piping 32, 33, pressure equalization piping 40, motor 49, and connector 51 are integrated to form a detector module 54 that can be attached and detached as a complete set. The perspective view is shown in the 6th
The piping circuit is shown in FIG. 7. As shown in Fig. 6, five operation valves 36, 37, 38, 39, 41
are installed in series on the base 55, and this base 5
Parts of the purge pipes 32 and 33 and a pressure equalization pipe 40 are housed inside the purge pipe 5 . A motor 49 is installed adjacent to this base 55, and a rotating shaft 56 is connected to this motor 49. Furthermore, the motor 49
It is preferable that the motor 49 and the base 55 are separated from each other or are heat-insulated so that the heat generated when the motor is driven is not transmitted to the purge pipes 32, 33 and the pressure equalization pipe 40 via the base 55.
This rotating shaft 56 has disk-shaped cams 58a and 58.
b, 58c, 58d, 58e are fixedly installed, which are the stems 5 of the operation valves 36, 37, 41, 38, 39.
7a, 57b, 57c, 57d, and 57e, and is configured to be opened and closed by moving these stems up and down. Furthermore, cams 58a, 58b, 58c, 58
d and 58e, for example, by cutting out a part of the disk-shaped circumference, the stem moves up and down, and the operating valves 36, 37, 38 are operated as shown below during normal measurement, zero point adjustment, and span adjustment. , 39, and 41 are shaped to allow for combinations of opening and closing.
このように本発明によると、校正時間を短縮す
ることができ、校正頻度を多くとれることができ
るので、計器精度の維持を確保できる。したがつ
て、ウラン、プルトニウム量の計量管理が向上
し、再処理工程上の工程管理が容易になる。
また、遠隔操作が可能になるので保守員の放射
線の被曝低減化を図ることができ、安全性を向上
させることができる。
As described above, according to the present invention, it is possible to shorten the calibration time and increase the frequency of calibration, thereby ensuring maintenance of instrument accuracy. Therefore, the quantitative control of the amounts of uranium and plutonium is improved, and process control in the reprocessing process becomes easier. Furthermore, since remote control is possible, the radiation exposure of maintenance personnel can be reduced, and safety can be improved.
第1図は、本発明の第一実施例を示すパージ式
液面計の構成図、第2図はその検出器モジユール
の外観斜視図、第3図はその電磁弁ベース内の配
管回路を示す図、第4図はその電磁弁の計測上の
熱影響を示す図、第5図は、第二実施例を示すパ
ージ式液面計の構成図、第6図はその検出器モジ
ユールの外観斜視図、第7図はその弁ベース内の
配管回路を示す図、第8図は従来のパージ式液面
計の構成図である。
1,31…差圧検出器、2,3,32,33…
パージ配管、4,34…しやへい壁、6,…第1
入口弁、7…第1出口弁、8…第2入口弁、9…
第2出口弁、11…均圧弁、12,42…キヤピ
ラリー、20,50…信号線、22,52…中央
制御室、49…モータ、56…回転軸、57a,
57b,57c,57d,57e…ステム、58
a,58b,58c,58d,58e…カム、3
6,37,38,39,41…操作弁。
Fig. 1 is a configuration diagram of a purge type liquid level gauge showing the first embodiment of the present invention, Fig. 2 is an external perspective view of its detector module, and Fig. 3 shows a piping circuit inside its solenoid valve base. Figure 4 is a diagram showing the thermal effect on measurement of the solenoid valve, Figure 5 is a configuration diagram of a purge type liquid level gauge showing the second embodiment, and Figure 6 is a perspective view of the external appearance of the detector module. 7 are diagrams showing the piping circuit within the valve base, and FIG. 8 is a configuration diagram of a conventional purge type liquid level gauge. 1, 31... Differential pressure detector, 2, 3, 32, 33...
Purge piping, 4, 34...Shiyahei wall, 6,...1st
Inlet valve, 7...first outlet valve, 8...second inlet valve, 9...
Second outlet valve, 11... Equalizing valve, 12, 42... Capillary, 20, 50... Signal line, 22, 52... Central control room, 49... Motor, 56... Rotating shaft, 57a,
57b, 57c, 57d, 57e...Stem, 58
a, 58b, 58c, 58d, 58e...cam, 3
6, 37, 38, 39, 41...operation valve.
Claims (1)
差圧検出器の高圧側に接続された第1パージ配管
と、この差圧検出器の低圧側に接続された第2パ
ージ配管を連絡する均圧配管と、前記第1パージ
配管の上流側に設けられた第1入口弁及び下流側
に設けられた第1出口弁と、前記第2パージ配管
の上流側に設けられた第2入口弁及び下流側に設
けられた第2出口弁と、前記均圧配管に設けられ
た均圧弁とからなるパージ式液面計において、前
記第1入口弁、第1出口弁、第2入口弁、第2出
口弁、均圧弁には、遠隔操作可能な電磁弁が設け
られ、これらの電磁弁は無通電開型と無通電閉型
の電磁弁の組合せからなることを特徴とするパー
ジ式液面計。 2 第1入口弁、第1出口弁、第2入口弁、第2
出口弁および均圧弁は検出器モジユールとして一
体化されていることを特徴とする特許請求の範囲
第1項記載のパージ式液面計。 3 第1入口弁、第1出口弁、第2入口弁は無通
電開型の電磁弁からなり、第2出口弁、均圧弁は
無通電閉型の電磁弁からなることを特徴とする特
許請求の範囲第2項記載のパージ式液面計。 4 流体の圧力差を検出する差圧検出器と、この
差圧検出器の高圧側に接続された第1パージ配管
と、この差圧検出器の低圧側に接続された第2パ
ージ配管と、この第1パージ配管と第2パージ配
管を連絡する均圧配管と、前記第1パージ配管の
上流側に設けられた第1入口弁及び下流側に設け
られた第1出口弁と、前記第2パージ配管の上流
側に設けられた第2入口弁及び下流側に設けられ
た第2出口弁と、前記均圧配管に設けられた均圧
弁とからなるパージ式液面計において、前記第1
入口弁、第1出口弁、第2出口弁、均圧弁には、
遠隔操作可能な弁開閉装置が設けられ、前記弁開
閉装置は、遠隔操作可能な回転駆動装置とこの回
転駆動装置に接続された回転軸に固設された複数
個のカムとからなり第1入口弁、第1出口弁、第
2入口弁、第2出口弁、均圧弁のシステムがこの
カムに当接し、カムの回転に従動することにより
前記弁の開閉が行われることを特徴とするパージ
式液面計。[Claims] 1. A differential pressure detector that detects a fluid pressure difference, a first purge pipe connected to the high pressure side of the differential pressure detector, and a first purge pipe connected to the low pressure side of the differential pressure detector. A pressure equalizing pipe that connects the second purge pipe, a first inlet valve provided on the upstream side of the first purge pipe, a first outlet valve provided on the downstream side, and In a purge type liquid level gauge comprising a second inlet valve provided, a second outlet valve provided downstream, and a pressure equalization valve provided in the pressure equalization pipe, the first inlet valve, the first outlet valve , the second inlet valve, the second outlet valve, and the pressure equalization valve are provided with remotely controllable solenoid valves, and these solenoid valves are a combination of non-energized open type and non-energized closed type solenoid valves. Purge type liquid level gauge. 2 First inlet valve, first outlet valve, second inlet valve, second
2. The purge type liquid level gauge according to claim 1, wherein the outlet valve and the pressure equalization valve are integrated as a detector module. 3. A patent claim characterized in that the first inlet valve, first outlet valve, and second inlet valve are non-energized open type solenoid valves, and the second outlet valve and pressure equalization valve are non-energized closed type solenoid valves. The purge type liquid level gauge according to item 2. 4 a differential pressure detector that detects a fluid pressure difference, a first purge pipe connected to the high pressure side of this differential pressure detector, and a second purge pipe connected to the low pressure side of this differential pressure detector, A pressure equalizing pipe connecting the first purge pipe and the second purge pipe, a first inlet valve provided on the upstream side of the first purge pipe, a first outlet valve provided on the downstream side of the first purge pipe, and the second purge pipe. In a purge type liquid level gauge comprising a second inlet valve provided on the upstream side of the purge pipe, a second outlet valve provided on the downstream side, and a pressure equalization valve provided on the pressure equalization pipe, the first
The inlet valve, first outlet valve, second outlet valve, and pressure equalization valve include
A remotely controllable valve opening/closing device is provided, and the valve opening/closing device includes a remotely controllable rotary drive device and a plurality of cams fixed to a rotating shaft connected to the rotary drive device. A purge type system characterized in that a system of a valve, a first outlet valve, a second inlet valve, a second outlet valve, and a pressure equalization valve is in contact with the cam, and the valves are opened and closed by following the rotation of the cam. Liquid level indicator.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP33181887A JPH01172709A (en) | 1987-12-26 | 1987-12-26 | Purging type liquid level gage |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP33181887A JPH01172709A (en) | 1987-12-26 | 1987-12-26 | Purging type liquid level gage |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01172709A JPH01172709A (en) | 1989-07-07 |
| JPH0435693B2 true JPH0435693B2 (en) | 1992-06-11 |
Family
ID=18247986
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP33181887A Granted JPH01172709A (en) | 1987-12-26 | 1987-12-26 | Purging type liquid level gage |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH01172709A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005248977A (en) * | 2004-03-01 | 2005-09-15 | Jfe Steel Kk | Gas holder seal status diagnosis device |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5517423A (en) * | 1978-07-24 | 1980-02-06 | Hitachi Plant Eng & Constr Co Ltd | Detector of powder and particle level in blow tank |
| JPS58162025U (en) * | 1982-04-23 | 1983-10-28 | 石川島播磨重工業株式会社 | Purge type liquid level gauge for vacuum chamber |
-
1987
- 1987-12-26 JP JP33181887A patent/JPH01172709A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01172709A (en) | 1989-07-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NZ229129A (en) | Butterfly valve: flowrate determined by valve disc angular displacement and shaft torque | |
| Christensen | Power-to-void transfer functions | |
| US3950137A (en) | Apparatus for measuring the presence of a weak acid or a weak base in a liquid | |
| JPH06502942A (en) | intelligent mass flow controller | |
| JP2017516183A (en) | System and method for monitoring the flow rate of a mass flow controller in real time | |
| GB2161903A (en) | Method of testing the operability of check valves | |
| EP0204065B1 (en) | Gas flow calibration device including a critical flow device | |
| CN118751144A (en) | A multi-component gas proportioning device for the semiconductor industry | |
| CN108613772B (en) | Offline Calibration Method of Differential Pressure Transmitter in Nuclear Power Plant | |
| Aumanand et al. | A novel method of using a control valve for measurement and control of flow | |
| JPH0435693B2 (en) | ||
| CN114720087A (en) | Real current testing device and method for high-voltage throttling device for nuclear power | |
| JPH048341Y2 (en) | ||
| CN209181884U (en) | A kind of flowmeter measurement and calibration device | |
| JPS63275876A (en) | Abnormality detector for regulation valve | |
| JPS62132127A (en) | Purge type level gage | |
| CN218937639U (en) | Calibrating device of intelligent pressure transmitter | |
| JPH0642938B2 (en) | Vaporized gas flow controller | |
| Liu et al. | Research on the Improvement of the Signal Detection System for Small Basket Positioning | |
| JPH0419518A (en) | Automatic calibration controller for level gauge | |
| You et al. | Analysis and Design of Calibration Scheme for Reactor Circulating Loop Coolant Flow Transmitter | |
| JPH02306141A (en) | Automatic measuring apparatus of hydrogen and oxygen concentration | |
| Lafortune et al. | Suitability of On-Line Leak Tests for CANDU Single-Unit Containment Buildings | |
| CN119845790A (en) | Method and system for measuring gas density by matching quantitative tank with flowmeter | |
| JPS62118587A (en) | Replacing method for sealed gas in container |