JPH0444938B2 - - Google Patents
[go: Go Back, main page]

JPH0444938B2 - - Google Patents

Info

Publication number
JPH0444938B2
JPH0444938B2 JP58156962A JP15696283A JPH0444938B2 JP H0444938 B2 JPH0444938 B2 JP H0444938B2 JP 58156962 A JP58156962 A JP 58156962A JP 15696283 A JP15696283 A JP 15696283A JP H0444938 B2 JPH0444938 B2 JP H0444938B2
Authority
JP
Japan
Prior art keywords
pipe
gas
elastic seal
hole
gas conduit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP58156962A
Other languages
Japanese (ja)
Other versions
JPS6047935A (en
Inventor
Ryoichi Hasegawa
Shinji Ashida
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP58156962A priority Critical patent/JPS6047935A/en
Publication of JPS6047935A publication Critical patent/JPS6047935A/en
Publication of JPH0444938B2 publication Critical patent/JPH0444938B2/ja
Granted legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow in pipes or hoses
    • F16L55/12Means for stopping flow in pipes or hoses by introducing into the pipe a member expandable in situ
    • F16L55/128Means for stopping flow in pipes or hoses by introducing into the pipe a member expandable in situ introduced axially into the pipe or hose
    • F16L55/1283Plugging pig
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow in pipes or hoses
    • F16L55/12Means for stopping flow in pipes or hoses by introducing into the pipe a member expandable in situ
    • F16L55/124Means for stopping flow in pipes or hoses by introducing into the pipe a member expandable in situ introduced radially into the pipe or hose

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Examining Or Testing Airtightness (AREA)

Description

【発明の詳細な説明】 本発明は、主として地中に埋設されている即設
ガス導管を切断して、その管末を閉塞処理する工
法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of cutting a temporary gas conduit that is mainly buried underground and blocking the end of the pipe.

従来工法では、第5図、第6図で示すように、
ガス導管1の管末を次の工程を経て閉塞処理して
いる。
In the conventional construction method, as shown in Figures 5 and 6,
The end of the gas conduit 1 is closed through the following steps.

(イ) ガス導管1の切断予定箇所aよりもガス流動
方向上手側に、ガス導管1内を一時的にガス遮
断可能なガスバツクから成る遮断具3の挿入孔
4を穿設する。(第5図イ参照) (ロ) 前記挿入孔4を通して遮断具3を挿入し、ガ
ス導管1内を遮断する。
(a) An insertion hole 4 for a cutoff tool 3 made of a gas bag capable of temporarily blocking gas inside the gas pipe 1 is bored on the upper side in the gas flow direction than the planned cutting point a of the gas pipe 1. (See FIG. 5A) (B) Insert the shutoff tool 3 through the insertion hole 4 to shut off the inside of the gas conduit 1.

(ハ) ガス導管1を前記の予定箇所において切断す
る。(第5図ロ参照) (ニ) ガス導管1の開口端部側に同軸線状態で適宜
間隔を隔ててキヤツプ20付き短管21を対向
配置する。(第5図ハ参照) (ホ) ガス導管1とキヤツプ付短管21との間に亘
つて、管軸線方向両側の内周面部22a,22
aを外拡がり状のテーバー面に形成してある筒
状体22と、この筒状体22の一方のテーパー
内周面22aとガス導管1の外周面との間及び
前記筒状体22の他のテーバー内周面22aと
キヤツプ付短管21の外周面との間に夫々介在
される弾性シール23,23とを備え、かつ、
前記筒状体22に貫通保持されたボルト24と
ナツト25による管軸線方向からの締付け操作
に伴う相対近接移動により、前記両弾性シール
23,23を前記テーパー内周面22a,22
aの小径側に押圧する一対の押圧板26,26
を設けてある閉塞治具Bを外嵌し、この閉塞治
具Bのボルト・ナツト24,25を締付け操作
して弾性シール23,23を管外周面及び筒状
体22の内周面に密着させる。(第5図ニ参照) (ヘ) 前記遮断具3を管1外に取出し、管内をエア
ーパージしたのち挿入孔4をプラグ28にて閉
塞する。(第5図ホ参照) (ト) 前記ガス導管1とキヤツプ月短管21との間
に亘つて、前記閉塞治具B全体を覆う半割状の
保護ケース27を溶接する。(第5図ヘ参照) (チ) 前記プラグ28を溶接する。(第5図ト参照) (リ) 前記保護ケース27と筒状体22との間の空
間内にN2ガス等の専用の試験ガスを封入して
弾性シール部分の気密試験を行なう。
(c) Cut the gas conduit 1 at the above-mentioned planned location. (See FIG. 5B) (d) Short pipes 21 with caps 20 are disposed on the open end side of the gas conduit 1 so as to be coaxial and facing each other at appropriate intervals. (See Figure 5 C) (E) Inner peripheral surface portions 22a, 22 on both sides in the tube axis direction between the gas conduit 1 and the short tube 21 with a cap.
A between a cylindrical body 22 having an outwardly expanding tapered surface 22a, one tapered inner peripheral surface 22a of this cylindrical body 22 and the outer peripheral surface of the gas conduit 1, and the other parts of the cylindrical body 22. and elastic seals 23, 23 interposed between the Taber inner circumferential surface 22a and the outer circumferential surface of the short pipe 21 with a cap, and
Due to the relative proximity movement of the bolt 24 and nut 25, which are held through the cylindrical body 22, by the tightening operation from the tube axis direction, the elastic seals 23, 23 are connected to the tapered inner circumferential surfaces 22a, 22.
A pair of pressing plates 26, 26 that press against the small diameter side of a.
Fit the closure jig B provided with the above, and tighten the bolts and nuts 24 and 25 of this closure jig B to tightly seal the elastic seals 23 and 23 to the outer circumferential surface of the tube and the inner circumferential surface of the cylindrical body 22. let (Refer to FIG. 5D) (f) The blocking device 3 is taken out of the pipe 1, and after the inside of the pipe is air purged, the insertion hole 4 is closed with the plug 28. (See FIG. 5E) (G) Weld a half-shaped protective case 27 that covers the entire closure jig B between the gas conduit 1 and the cap short tube 21. (See Figure 5) (H) Weld the plug 28. (See Figure 5-G) (I) A special test gas such as N 2 gas is sealed in the space between the protective case 27 and the cylindrical body 22 to perform an airtightness test on the elastic seal portion.

この従来工法による場合は次のような問題があ
つた。
This conventional construction method had the following problems.

〔〕 ガス導管1の管末を閉塞するための閉塞治
具B、保護ケース27、キヤツプ付短管21が
管軸線方向及び管径方向に大きく突出するた
め、ガス導管の切断に当つて、本来切断したい
地点よりも既設管側で切断する必要があり、し
かも、材料使用量が多くなるばかりでなく、掘
削面積及び溶接作業時間が増大し、全体として
施工に多大の手間と労力を労するとともに、施
工コストの高騰を招来し易い。
[] Since the closing jig B for closing the end of the gas pipe 1, the protective case 27, and the short pipe with cap 21 protrude largely in the pipe axis direction and the pipe diameter direction, it is difficult to cut the gas pipe when cutting the gas pipe. It is necessary to cut on the side of the existing pipe rather than the desired cutting point, and not only does the amount of material used increase, but the excavation area and welding work time also increase, and the overall construction requires a lot of time and effort. , which can easily lead to a rise in construction costs.

〔〕 管末まで確実にエアーパージすることがで
きない。
[] It is not possible to reliably purge air to the end of the pipe.

〔〕 弾性シール23,23と、管外周面及び筒
状体22の内周面と密着性が悪い場合、それら
間から、ガス導管1内のガスとは異なるN2
ス等の試験ガスがガス導管1内に入つてしまう
危険性が高い。
[] If the elastic seals 23, 23 have poor adhesion to the outer circumferential surface of the tube and the inner circumferential surface of the cylindrical body 22, a test gas such as N 2 gas different from the gas in the gas conduit 1 may be inserted between them. There is a high risk of it entering the conduit 1.

本発明は、上述のような従来工法による欠点を
改善する点に目的を有する。
The present invention has an object to improve the drawbacks of the conventional construction methods as described above.

かかる目的を達成するために講じられた本発明
によるガス導管の管末閉塞処理工法の特徴は、次
の工程を経て管末を閉塞処理する点にある。
A feature of the method for blocking the end of a gas conduit according to the present invention, which has been adopted to achieve the above object, is that the end of the pipe is blocked through the following steps.

(イ) ガス導管の切断予定箇所よりもガス流動方向
上手側に操作孔を穿設し、かつ、この操作孔よ
りも更にガス流動方向上手側に、ガス導管内を
一時的にガス遮断可能なガスバツクから成る遮
断具の挿入孔を穿設する。
(b) An operation hole is drilled on the upper side of the gas flow direction than the planned cutting point of the gas pipe, and further above this operation hole in the gas flow direction, it is possible to temporarily shut off the gas inside the gas pipe. Drill an insertion hole for a shutoff device consisting of a gas bag.

(ロ) 前記挿入孔を通して遮断具を挿入し、ガス導
管内を遮断する。
(b) Insert a shutoff device through the insertion hole to shut off the inside of the gas pipe.

(ハ) ガス導管を前記切断予定箇所において切断す
る。
(c) Cut the gas pipe at the planned cutting location.

(ニ) ガス導管の管軸線方向からの締付け操作に伴
う半径方向外方への膨出により管内周面に弾性
密着する弾性シールとこの弾性シールよりもガ
ス流動方向下手側の内周面に接当可能な抜止め
部材とを備え、かつ、これら弾性シール及び抜
止め部材に亘つて貫通保持された流体管の管切
断側端部に開閉弁を付設してある閉塞治具を、
前記両孔間のガス導管部分内に前記弾性シール
を管内周面に密着させる状態に挿設する。
(d) An elastic seal that elastically adheres to the inner circumferential surface of the pipe due to bulging outward in the radial direction when the gas pipe is tightened in the direction of the pipe axis, and an elastic seal that contacts the inner circumferential surface on the downstream side in the direction of gas flow than this elastic seal. A closing jig is provided with a stopper member that can be used as a stopper, and an on-off valve is attached to the cut-side end of the fluid pipe that is held through the elastic seal and the stopper member.
The elastic seal is inserted into the gas conduit portion between the two holes so as to be in close contact with the inner circumferential surface of the tube.

(ホ) 前記遮断具を管外に取出し、管内をエアーパ
ージしたのち挿入孔をプラグ止めする。
(E) Take out the shutoff device outside the pipe, purge the inside of the pipe with air, and then plug the insertion hole.

(ヘ) 前記閉塞治具の抜止め部材を管内周面に溶接
して閉塞治具を固定する。
(F) Weld the retaining member of the closing jig to the inner peripheral surface of the pipe to fix the closing jig.

(ト) ガス導管の端部にキヤツプを溶接して管末を
閉塞する。
(g) Weld a cap to the end of the gas pipe to close off the end of the pipe.

(チ) 前記操作孔を通して開閉弁を開操作し、管末
までエアーパージしたのち、開閉弁を開の状態
に保持したまま操作孔をプラグ止めする。
(H) Open the on-off valve through the operation hole, purge air to the end of the pipe, and then plug the operation hole while keeping the on-off valve open.

上記特徴を有する本発明の作用・効果は次の通
りである。
The functions and effects of the present invention having the above characteristics are as follows.

〔〕 ガス導管の管末を閉塞するための構成部材
である閉塞治具がガス導管内に挿設され、ガス
導管の切断端部にはキヤツプが直接固着されて
いるだけであるため、従来工法に比して閉塞構
成部材の管軸線方向及び管径方向での突出量を
可及的に減少することができる。それ故に、材
料使用量が少なくなるばかりでなく、管軸線方
向での施工長さ及び掘削面積が小さくて済み、
加えて、溶接作業時間も大幅に短縮することが
できるから、全体として施工に要する手間及び
労力を可及的に軽減することができるともも
に、施工コストの低廉化を図ることができる。
[] A closing jig, which is a structural member for closing the end of the gas pipe, is inserted into the gas pipe, and a cap is directly fixed to the cut end of the gas pipe, so it is not possible to use conventional construction methods. The amount of protrusion of the closing component in the tube axis direction and tube radial direction can be reduced as much as possible. Therefore, not only the amount of material used is reduced, but the construction length and excavation area in the direction of the pipe axis are also small.
In addition, since the welding work time can be significantly shortened, the overall time and effort required for construction can be reduced as much as possible, and construction costs can also be reduced.

また、ガスバツクからなる遮断具で管路を閉
塞したうえで、閉塞治具によつてさらに管路を
閉塞するから、中圧または高圧のガスもこの閉
塞治具で確実に遮断することができる。
In addition, since the pipe line is blocked by the gas bag blocking device and then the pipe line is further blocked by the blocking jig, intermediate pressure or high pressure gas can also be reliably blocked by the blocking jig.

〔〕 前記閉塞治具の抜出し移動を、ガス導管内
周面と弾性シール材との間の摩擦力のみなら
ず、この弾性シールのガス流動方向下手側に位
置する抜止め部材による突張り作用を利用して
阻止するから、この閉塞治具の抜出し移動に伴
う漏洩を防止することができる。
[] The removal movement of the closing jig is controlled not only by the frictional force between the inner circumferential surface of the gas conduit and the elastic sealing material, but also by the tensioning action of a retaining member located on the downstream side of the elastic seal in the direction of gas flow. Since this is utilized to prevent leakage due to removal and movement of this closing jig, it is possible to prevent leakage.

〔〕 前記弾性シール及び抜止め部材に亘つて開
閉弁付きの流体管が貫通保持されているから、
ガス導管内のガスを流体及び開閉弁を通してキ
ヤツプ内に導くことにより、ガス導管内のエア
ーを、この流体管と操作孔とを通して、また、
キヤツプ内のエアーを、操作孔を通して確実、
且つスムーズにパージすることができるばかり
なく、上記のようにガス導管内のガスをキヤツ
プ内に導くことで、このガス導管内のガスの保
有圧力を利用して必要とする溶接部の気密試験
を直接行なうことができるから、例えば、従来
のように、ガス導管内のガスとは異なるN2
ス等の試験ガスがガス導管内に入る危険性を防
止でき、かつ、施工コストの低廉化を促進し乍
ら気密調査を正確、容易にかつ安全に行ない得
るに至つた。
[] Since a fluid pipe with an on-off valve is held through the elastic seal and the retaining member,
By guiding the gas in the gas conduit into the cap through the fluid and the on-off valve, the air in the gas conduit is passed through the fluid conduit and the operation hole, and
Ensure that the air inside the cap passes through the operation hole.
Not only is it possible to purge smoothly, but by guiding the gas in the gas pipe into the cap as described above, the required pressure of the gas in the gas pipe can be used to conduct the necessary airtightness test of the welded part. Because it can be performed directly, for example, it is possible to prevent the risk of a test gas such as N2 gas, which is different from the gas inside the gas pipe, entering the gas pipe as in the past, and it also helps reduce construction costs. However, it has now become possible to conduct airtightness surveys accurately, easily, and safely.

以下、本発明工法の実施例を図面に基づいて説
明する。
Hereinafter, embodiments of the construction method of the present invention will be described based on the drawings.

(イ) ガス導管1の内圧を低圧(1Kg/cm2未満)状
態にしたのち、ガス導管1の切断位置a、後述
の閉塞治具Aの開閉弁9に対する操作孔2の位
置b(例えば、管端より50mm以上で、かつ、開
閉弁9の真上相当位置に1インチ以下の孔を穿
設)、この操作孔穿設位置よりもガス流動方向
上手側のガス導管1内にガスバツク(ガス導管
1内を一時的にガス遮断可能な遮断具の一例で
ある。)3,3を挿入するための孔形成位置c
(例えば、操作孔2との間隔が650mm以上)を
夫々決定する。(第1図イ参照) (ロ) 上述の決定に基づいてガス導管1に操作孔2
及び、ガスパツク操作孔4を穿設する。穿孔後
各々プラグ5,6止めする。(第1図ロ参照) (ハ) 前記挿入孔4のプラグ6を取外し、穿孔時の
カエリに注意し乍ら第1バツク3及び第2バツ
ク3を挿入し、ガス導管1内を遮断する。(第
1図ハ参照) (ニ) ガス導管1を前記の予定箇所において切断す
る。切断後切口(刃口)のカエリに注意し、ウ
エス等で閉塞治具挿入付近の管内周面を清掃す
る。(第1図ニ参照) (ホ) 前記操作孔2のプラグ5を取外す。穿孔時の
カエリに注意する。
(b) After reducing the internal pressure of the gas pipe 1 to a low pressure state (less than 1 Kg/cm 2 ), cut the gas pipe 1 at the cutting position a and position b of the operation hole 2 relative to the on-off valve 9 of the closing jig A (described later) (for example, A hole of 1 inch or less is drilled at a position 50 mm or more from the pipe end and directly above the on-off valve 9), and a gas bag (gas This is an example of a shutoff device that can temporarily shut off gas inside the conduit 1.) Hole forming position c for inserting 3 and 3.
(For example, the distance from the operation hole 2 is 650 mm or more). (See Figure 1 A) (B) Based on the above decision, open the operation hole 2 in the gas pipe 1.
Then, a gas pack operation hole 4 is bored. After drilling, plug plugs 5 and 6 respectively. (See Figure 1B) (c) Remove the plug 6 from the insertion hole 4, insert the first bag 3 and the second bag 3 while being careful not to burr when drilling, and shut off the inside of the gas conduit 1. (See Figure 1 C) (d) Cut the gas conduit 1 at the planned location. After cutting, be careful not to burr the cut end (blade edge) and clean the inner surface of the tube near the insertion of the closing jig with a rag, etc. (See Figure 1 D) (E) Remove the plug 5 from the operation hole 2. Be careful of burrs when drilling.

(ヘ) 前記ガス導管1の、前記操作孔2と挿通孔4
との間に位置する管部分内に閉塞治具Aを挿入
する。(第1図ホ参照) この閉塞治具Aは、第2図乃至第4図で示す
ように、ガス導管1の管軸線方向からの締付け
操作に伴なう半径方向外方への膨出により管末
内周面に弾性密着する弾性シール7と、この弾
性シール7よりもガス流動方向下手側の内周面
に対してその周方向の2箇所に接当することに
より前記弾性シール7の管開口側への抜出し移
動を阻止する部材8とを設けるとともに、前記
弾性シール7の構成部材で、ガス導管1の管軸
線方向に沿う筒状の締付け操作軸7Aをもつ
て、弾性シール7及び抜止め部材8に亘つて貫
通する流体管を兼用構成し、かつ、前記操作軸
7Aの管開口側端部には開閉操作自在な弁9を
付設して構成されている。
(f) The operation hole 2 and the insertion hole 4 of the gas conduit 1
Insert the closing jig A into the pipe section located between the (See Fig. 1 E) As shown in Figs. 2 to 4, this closing jig A is caused by bulging outward in the radial direction accompanying the tightening operation of the gas conduit 1 from the pipe axis direction. An elastic seal 7 that elastically adheres to the inner circumferential surface of the tube end, and a tube of the elastic seal 7 that contacts the inner circumferential surface on the downstream side in the gas flow direction at two points in the circumferential direction of the elastic seal 7. A member 8 that prevents the extraction movement toward the opening side is provided, and a cylindrical tightening operation shaft 7A that is a constituent member of the elastic seal 7 and extends in the axial direction of the gas conduit 1 is provided to prevent the elastic seal 7 and the extraction movement. A fluid pipe passing through the stop member 8 is also used, and a valve 9 which can be opened and closed is provided at the end of the operating shaft 7A on the pipe opening side.

前記弾性シール7は、前記操作軸7Aに、ガ
ス導管1の内周面に弾性密着可能な2のゴムリ
ング7B,7Bを夫々管軸線方向の両側から挟
持可能な円形状の挟持板7C,7D及び7D,
7Dを外嵌し、そのうち、ガス流動方向の最上
手側に位置する挟持板7Cのみを操作軸7Aに
固着するとともに、前記操作軸7Aの管開口側
端部には、Oリング7E,7Eを備えた筒部材
7F,7F及びスリーブ7Gを介して可動挟持
板7D……を固定挟持板7C側に締付け押圧す
ることにより、前記ゴムリング7B,7Bを半
径方向外方に膨出させるナツト7Hを螺合して
構成されている。
The elastic seal 7 includes circular clamping plates 7C and 7D that can clamp two rubber rings 7B and 7B, which can be elastically tightly attached to the inner circumferential surface of the gas conduit 1, from both sides in the tube axis direction, respectively, on the operating shaft 7A. and 7D,
7D, and fix only the clamping plate 7C located on the uppermost side in the gas flow direction to the operating shaft 7A, and O-rings 7E, 7E are attached to the end of the operating shaft 7A on the tube opening side. By tightening and pressing the movable clamping plate 7D to the fixed clamping plate 7C side through the provided cylindrical members 7F, 7F and the sleeve 7G, a nut 7H is activated to bulge the rubber rings 7B, 7B outward in the radial direction. It is constructed by screwing together.

前記抜止め部材8は、前記弾性シール7のス
リーブ7Gとナツト7Hとの間に位置する操作
軸7A部分に外嵌保持されていて、かつ、ガス
導管1の内周面に接当する部分8a,8aが外
嵌保持部8bよりもガス流動方向下手側に位置
するようなくの字状に構成されている。
The retaining member 8 is externally fitted and held on a portion of the operating shaft 7A located between the sleeve 7G and the nut 7H of the elastic seal 7, and has a portion 8a that comes into contact with the inner circumferential surface of the gas conduit 1. , 8a are formed in a dogleg shape so that they are located on the lower side in the gas flow direction than the external fitting holding portion 8b.

なお、この閉塞治具Aを挿入するに当つて
は、ナツト7Hを戻し、ゴムリング7B,7B
を点検清掃したのち、治具Aを持ち上げ気味で
ゆつくりと挿入する。
In addition, when inserting this closure jig A, return the nut 7H and remove the rubber rings 7B, 7B.
After inspecting and cleaning, lift jig A slightly and insert it slowly.

(ト) 閉塞治具Aを適正位置にセツトし、ナツト7
Hを締付け操作してゴムリング7B,7Bをガ
ス導管1の内周面に強く弾性密着させる。この
場合、前記開閉弁9は取外す。また、前記操作
孔2の真下に開閉弁9のツマミが位置するよう
に、また、前記抜止め部材8が水平又はほぼ水
平に姿勢する状態でセツトする。
(G) Set the closing jig A in the proper position and tighten the nut 7.
By tightening H, the rubber rings 7B, 7B are brought into strong elastic contact with the inner peripheral surface of the gas conduit 1. In this case, the on-off valve 9 is removed. Further, the knob of the on-off valve 9 is positioned directly below the operation hole 2, and the retaining member 8 is set in a horizontal or almost horizontal position.

(チ) 前記抜止め部材8を握つて手前に引き、治具
Aが動かないか調べる。もし、動くようなこと
があれば再度ナツトを締め付ける。
(H) Grasp the retaining member 8 and pull it toward you to check if jig A does not move. If it moves, tighten the nut again.

(リ) 前記開閉弁9を取付ける。この場合、ツマミ
が「閉」になつているか確認する。(第1図ヘ
参照) なお、このように、両バツク3で管路を閉塞し
たうえで、閉塞治具を用いて管路を閉塞するの
は、両バツク3のみでは、一般に中圧、又は高圧
のガスの遮断には信頼性が低いからであり、ま
た、中・高圧のガスに対する信頼性の高い閉塞治
具のみで管路を閉塞しようとしても、ガス導管1
に穿設した挿入孔からは、この閉塞治具を挿入す
ることができないからである。
(li) Install the on-off valve 9. In this case, check to see if the knob is in the "closed" position. (Refer to Fig. 1) In addition, in this way, after blocking the pipe line with both bags 3, using a closing jig to close the pipe line is generally done at medium pressure or with only both bags 3. This is because it is unreliable to shut off high-pressure gas, and even if you try to block the pipe only with a blocking jig that is highly reliable for medium and high-pressure gas,
This is because the closing jig cannot be inserted through the insertion hole drilled in the hole.

(ヌ) 第2バツク3のエアーを少し抜き、越しガス
の有無を確認する。なお、越しガスとは、弾性
シール7とガス導管1の内面との間から、この
弾性シール7を越えて洩れてくるガスをいう。
閉塞治具について万一洩れがあれば第2バツク
3に再びエアーを圧入し、コツクを取外して再
度ナツト7Hを締め付ける。
(N) Bleed out a little air from the second bag 3 and check for overflow gas. Note that the overflow gas refers to gas that leaks from between the elastic seal 7 and the inner surface of the gas conduit 1 beyond the elastic seal 7.
If there is any leakage in the closing jig, press air into the second bag 3 again, remove the plug, and tighten the nut 7H again.

(ル) 前記バツク3,3を管外に取出し、管内を
エアーパージしたのち挿入孔4をプラグ6止め
する。プラグ部の洩れを調べ、洩れがある時は
粘土で止める。(第1図ト参照) (オ) 開閉弁9を「開」に操作して、ガスバツク操
作位置とゴムリング7B,7Bとの間の残存エ
アーをパージしたのち、再び「閉」に操作す
る。その後、ガス導管1の切断開口よりゴムリ
ング7B及び開閉弁部分を石鹸水とガス洩れ検
出器にて漏洩検査を行なう。
(l) Take the bags 3, 3 out of the tube, purge the inside of the tube with air, and then plug the insertion hole 4 with the plug 6. Inspect the plug for leaks, and if there is any leak, stop it with clay. (See Figure 1.) (e) Open the on-off valve 9 to purge the remaining air between the gas bag operation position and the rubber rings 7B, 7B, and then close it again. Thereafter, a leak test is performed on the rubber ring 7B and the opening/closing valve portion through the cut opening of the gas conduit 1 using soapy water and a gas leak detector.

尚、万一洩れがあれば、前記挿入孔4より第
1バツク3及び第2バツク3を挿入し、開閉弁
9を取外して再度ナツト7Hを締め直し、ステ
ツプ(リ)に戻る。
If there is any leakage, insert the first bag 3 and the second bag 3 through the insertion hole 4, remove the on-off valve 9, retighten the nut 7H, and return to step (R).

(ワ) 前記抜止め部材8をガス導管1の内周面に
水平姿勢で隅肉溶接したのち、ガス導管1の切
断開口端部にキヤツプ10を突合せ溶接する。
(第1図チ参照) この場合、ガス導管1の切断時のカエリは確
実に取り除く。
(W) After fillet welding the retaining member 8 to the inner peripheral surface of the gas conduit 1 in a horizontal position, the cap 10 is butt welded to the cut open end of the gas conduit 1.
(See Figure 1, H) In this case, be sure to remove any burrs when cutting the gas pipe 1.

(カ) 溶接終了10分経過後、前記操作孔2を通
して開閉弁9を「開」に操作し、キヤツプ10
のエアーをパージしたのち、開閉弁9を「開」
の状態に保持したまま操作孔2をプラグ5にて
閉塞する。(第1図リ参照) この場合、パージ確認計にて置換確認し、ま
た、プラグ部の洩れを調べる。
(f) After 10 minutes have passed since the end of welding, open the on-off valve 9 through the operation hole 2, and open the cap 10.
After purging the air, open the on-off valve 9.
The operation hole 2 is closed with the plug 5 while maintaining the state. (Refer to Figure 1) In this case, use a purge checker to confirm replacement, and check for leaks at the plug.

(ヨ) 前記操作孔2及び挿入孔4の各プラグ5,
6を溶接する。尚、挿入孔4を再利用する場合
には、特殊ネジプラグ又はフランジ付短管を溶
接のこと。
(Y) Each plug 5 of the operation hole 2 and insertion hole 4,
Weld 6. If the insertion hole 4 is to be reused, a special screw plug or flanged short pipe should be welded to it.

(タ) ガス導管1内のガス圧を低圧状態から保有
圧力(中圧)に昇圧したのち、石鹸水やガス洩
れ検知器等を用いて各プラグやキヤツプ部の各
溶接部の気密試験を行なう。
(T) After increasing the gas pressure in the gas pipe 1 from a low pressure state to the holding pressure (medium pressure), perform an airtightness test on each welded part of each plug and cap using soapy water, a gas leak detector, etc. .

【図面の簡単な説明】[Brief explanation of the drawing]

第1図乃至第4図は本発明に係るガス導管の管
末閉塞処理工法の実施例を示し、第1図イ乃至リ
は管末閉塞処理工程図、第2図は閉塞治具の一部
切欠平面図、第3図は第2図の−線矢視図、
第4図は第2図の−線矢視図である。第5
図、第6図は従来のガス導管の管末閉塞処理工程
を示し、第5図イ乃至トは管末閉塞処理工程図、
第6図は閉塞治具の拡大断面図である。 A……閉塞治具、1……ガス導管、2……操作
孔、3……遮断具、4……挿入孔、7……弾性シ
ール、7A……流体管、8……抜止め部材、9…
…開閉弁、10……キヤツプ。
Figures 1 to 4 show an embodiment of the method for closing the end of a gas pipe according to the present invention, Figures 1A to 4 are process diagrams of the process for closing the end of the gas pipe, and Figure 2 is a part of the closing jig. A cutaway plan view, Figure 3 is a view taken along the - line in Figure 2,
FIG. 4 is a view taken along the - line in FIG. 2. Fifth
Figures 6 and 6 show the conventional process for blocking the end of a gas pipe, and Figures 5A to 5C show the process of blocking the end of the pipe,
FIG. 6 is an enlarged sectional view of the closure jig. A... Closing jig, 1... Gas conduit, 2... Operation hole, 3... Blocker, 4... Insertion hole, 7... Elastic seal, 7A... Fluid pipe, 8... Removal prevention member, 9...
...Opening/closing valve, 10...Cap.

Claims (1)

【特許請求の範囲】 1 ガス導管1の管末を次の工程を経て閉塞処理
する工法。 (イ) ガス導管1の切断予定箇所aよりもガス流動
方向上手側に操作孔2を穿設し、かつ、この操
作孔2よりも更にガス流動方向上手側に、ガス
導管1内を一時的にガス遮断可能なガスバツク
から成る遮断具3の挿入孔4を穿設する。 (ロ) 前記挿入孔4を通して遮断具3を挿入し、ガ
ス導管1内を遮断する。 (ハ) ガス導管1を前記切断予定箇所aにおいて切
断する。 (ニ) ガス導管1の管軸線方向からの締付け操作に
伴う半径方向外方への膨出により管内周面に弾
性密着する弾性シール7とこの弾性シール7よ
りもガス流動方向下手側の内周面に接当可能な
抜止め部材8とを備え、かつ、これら弾性シー
ル7及び抜止め部材8に亘つて貫通保持された
流体管7Aの管切断側端部に開閉弁9を付設し
てある閉塞治具Aを、前記両孔2,4間のガス
導管1部分内に前記弾性シール7を管内周面に
密着させる状態に挿設する。 (ホ) 前記遮断具3を管1外に取出し、管内をエア
ーパージしたのち挿入孔4をプラグ止めする。 (ヘ) 前記閉塞治具Aの抜止め部材8を管内周面に
溶接して閉塞治具Aを固定する。 (ト) ガス導管1の端部にキヤツプ10を溶接して
管末を閉塞する。 (チ) 前記操作孔2を通して開閉弁9を開操作し、
管末までエアーパージしたのち、開閉弁9を開
の状態に保持したまま操作孔2をプラグ止めす
る。
[Claims] 1. A construction method in which the end of the gas conduit 1 is blocked through the following steps. (b) Drill an operating hole 2 on the upper side in the gas flow direction than the planned cutting point a of the gas pipe 1, and temporarily cut the inside of the gas pipe 1 on the upper side in the gas flow direction than the operation hole 2. An insertion hole 4 for a shutoff device 3 made of a gas bag capable of shutting off gas is bored in the hole. (b) Insert the shutoff tool 3 through the insertion hole 4 to shut off the inside of the gas conduit 1. (c) Cut the gas conduit 1 at the planned cutting point a. (d) An elastic seal 7 that elastically adheres to the inner circumferential surface of the pipe due to bulging outward in the radial direction when the gas pipe 1 is tightened from the pipe axis direction, and an inner periphery on the downstream side of the elastic seal 7 in the direction of gas flow. A shut-off valve 9 is attached to the cut-side end of the fluid pipe 7A, which is provided with a retaining member 8 that can come into contact with a surface, and is held through the elastic seal 7 and the retaining member 8. The closing jig A is inserted into the portion of the gas conduit 1 between the holes 2 and 4 in such a manner that the elastic seal 7 is brought into close contact with the inner peripheral surface of the pipe. (e) Take out the blocking device 3 outside the pipe 1, purge the inside of the pipe with air, and then plug the insertion hole 4. (f) The closure jig A is fixed by welding the retaining member 8 of the closure jig A to the inner peripheral surface of the pipe. (G) Weld the cap 10 to the end of the gas conduit 1 to close the end of the pipe. (h) Opening the on-off valve 9 through the operation hole 2;
After air purging to the end of the pipe, the operation hole 2 is plugged while the on-off valve 9 is kept open.
JP58156962A 1983-08-26 1983-08-26 End closure processing method for gas conduit Granted JPS6047935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP58156962A JPS6047935A (en) 1983-08-26 1983-08-26 End closure processing method for gas conduit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP58156962A JPS6047935A (en) 1983-08-26 1983-08-26 End closure processing method for gas conduit

Publications (2)

Publication Number Publication Date
JPS6047935A JPS6047935A (en) 1985-03-15
JPH0444938B2 true JPH0444938B2 (en) 1992-07-23

Family

ID=15639118

Family Applications (1)

Application Number Title Priority Date Filing Date
JP58156962A Granted JPS6047935A (en) 1983-08-26 1983-08-26 End closure processing method for gas conduit

Country Status (1)

Country Link
JP (1) JPS6047935A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04107600U (en) * 1991-03-01 1992-09-17 日本鋼管株式会社 Seal jig for residual gas in combustible pipes

Also Published As

Publication number Publication date
JPS6047935A (en) 1985-03-15

Similar Documents

Publication Publication Date Title
CA2704427C (en) Double block and bleed plug
US9644779B2 (en) Gate valves for installation in pressurized pipes
US7281543B2 (en) Apparatus, systems and methods for plugging a high temperature pipe
EP0694727A1 (en) Method of sealing an outlet opening
USRE35116E (en) Method and apparatus to facilitate the injection of sealant into a pressurized fluid member
GB2597113A (en) Piping structure and construction method, and pipe construction method
CN108708427B (en) Non-stop production collision opening construction method for pipeline under pressure
JPH0444938B2 (en)
JP4092751B2 (en) Flange face sealing method and apparatus for flange joints of piping
EP2210033B1 (en) Purge tee assembly
JP4642536B2 (en) Non-continuous water flow path treatment equipment for existing fluid pipes
JP4027065B2 (en) Pipeline repair method
JP4879576B2 (en) How to repair a branch pipe
JP2006112541A (en) Rust prevention method for the cutting edge in the installation work of the insert
JPH1030749A (en) Welding connection method for existing gas pipes with coating layers on the inner surface
JP3090580B2 (en) Rust prevention method for branch entrance and closing device for rust prevention work
JPH0389091A (en) Repair and replacement of water gate main valve
JPS634078B2 (en)
JPS5921350Y2 (en) Repair tools for plastic pipes
KR20220007955A (en) Device for Checking the Tightness of Pipes
JPH09229289A (en) Tube rupture emergency seal
JPH0552270A (en) Valves with fittings for hot taps
JP2007024283A (en) Gas leak repair method and leak repair device
JPH10132181A (en) Bypass forming method
JPH0579595A (en) Valve installed by using fitting for hot tap

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees