Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0454768B2 - - Google Patents
[go: Go Back, main page]

JPH0454768B2 - - Google Patents

Info

Publication number
JPH0454768B2
JPH0454768B2 JP14683185A JP14683185A JPH0454768B2 JP H0454768 B2 JPH0454768 B2 JP H0454768B2 JP 14683185 A JP14683185 A JP 14683185A JP 14683185 A JP14683185 A JP 14683185A JP H0454768 B2 JPH0454768 B2 JP H0454768B2
Authority
JP
Japan
Prior art keywords
excavation
flange
band
excavator
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14683185A
Other languages
Japanese (ja)
Other versions
JPS6210330A (en
Inventor
Koichiro Konishi
Hidekazu Sato
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP14683185A priority Critical patent/JPS6210330A/en
Publication of JPS6210330A publication Critical patent/JPS6210330A/en
Publication of JPH0454768B2 publication Critical patent/JPH0454768B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】 <産業上の利用分野> 本発明は土留壁を構築するのに際し、所定の間
隔で地中に打設したH形鋼のフランジ面の裏側に
残存する土砂およびフランジの裏面間を結ぶ側壁
面を機械的に掘削する、土留工における自動掘削
機(以下「掘削機」という)に関するものであ
る。
[Detailed Description of the Invention] <Industrial Field of Application> When constructing an earth retaining wall, the present invention is designed to remove soil and sand remaining on the back side of the flange surface of H-beams cast into the ground at predetermined intervals. This invention relates to an automatic excavator (hereinafter referred to as "excavator") used in earth retaining works that mechanically excavates the side wall surface connecting the back surfaces.

<従来の技術> 一般に簡易な土留壁の構築技術として親杭横矢
板工法が存在する。
<Conventional technology> Generally speaking, the main pile horizontal sheet pile method exists as a simple construction technology for earth retaining walls.

この工法は、あらかじめH形鋼等からなる親杭
を所定の間隔で地中に打ち込んでおき、掘削に並
行して木製等の横矢板を親杭間に差し込んで土留
めを行う工法である。
In this construction method, parent piles made of H-beam steel or the like are driven into the ground at predetermined intervals in advance, and horizontal piles made of wood or the like are inserted between the parent piles to retain the earth in parallel with excavation.

<本発明が解決しようとする問題点> 上記した土留壁の構築技術には、次のような問
題点が存在する。
<Problems to be Solved by the Present Invention> The above-described earth retaining wall construction technology has the following problems.

(イ) 横矢板を親杭内に差し込むためには、各親杭
のフランジの前面を結んだ直線面より後退させ
て掘削する必要がある。
(b) In order to insert the horizontal sheet pile into the parent pile, it is necessary to excavate the excavation so that it is set back from the straight line connecting the front surfaces of the flanges of each parent pile.

この作業は、バツクホー等のバスケツトを親
杭に衝突しないでギリギリまで接近して行わな
ければならず、バツクホー等の操縦者に高い操
作技術が要求される。
This work requires the basket of a box hoe to be as close as possible to the main pile without colliding with it, and requires high operating skills from the operator of the box hoe.

(ロ) フランジの裏側に残存する土砂は、バツクホ
ー等で機械的に掘削できないため、作業員がス
コツプ等で掘削して除去しなければならない。
(b) Earth and sand remaining on the back side of the flange cannot be excavated mechanically with a shovel, etc., so workers must excavate and remove it with a shovel, etc.

この作業には多くの労力を必要とする。 This work requires a lot of effort.

(ハ) フランジの裏側に残存する土砂は、作業員が
スコツプ等で手掘りするといつても、隅部まで
きれいに土砂を除去することは非常に困難であ
る。
(c) Even when workers manually dig up the remaining soil on the back side of the flange with a shovel, it is extremely difficult to remove it all the way to the corners.

土砂を十分に除去しないと、横矢板の差し込
みに余計時間がかかる。
If the earth and sand are not removed sufficiently, it will take extra time to insert the horizontal sheet piles.

(ニ) 高所でフランジの裏側に残存する土砂の掘削
を行う場合には、脚立等が使用される。
(d) When excavating soil remaining behind the flange at high places, a stepladder, etc. is used.

しかし、高所での掘削作業は人命を失う場合
もあり、大変危険な作業である。
However, excavation work at high places is extremely dangerous and can even lead to loss of life.

(ホ) フランジの裏側に残存する土砂の掘削作業
は、バツクホー等による機能掘削の終了を待つ
て行われる。
(e) Excavation work for the remaining earth and sand on the back side of the flange will be carried out after waiting for the completion of functional excavation using excavators such as the excavator.

そのため全体の作業工程を計画する際、バツ
クホー等の機械掘削の掘削速度にあまり遅れな
いように手掘りを行う人員を計画しなければな
らない。
Therefore, when planning the entire work process, it is necessary to plan the number of people who will carry out manual digging so as not to lag too much behind the excavation speed of machine excavators such as excavators.

しかし、高価な人件費を考慮すると、余分に
人員を確保する事は不経済であり、作業工程を
たてにくい。
However, considering the high labor costs, it is uneconomical to secure extra personnel and it is difficult to plan the work process.

<本発明の目的> 本発明は上記の問題点を解決するためになされ
たもので、各親杭のフランジの裏側およびフラン
ジの裏側間を結ぶ壁面を一定の深さで効率良く掘
削でき、かつ、これらの掘削作業を安全に行え
る、土留工における自動掘削機を提供することを
目的とする。
<Object of the present invention> The present invention was made in order to solve the above-mentioned problems, and it is possible to efficiently excavate the back side of the flange of each parent pile and the wall surface connecting the back sides of the flanges to a constant depth, and The purpose of the present invention is to provide an automatic excavator for earth retaining works that can perform these excavation operations safely.

<実施例> 以下、図面を参照しながら本発明に係る掘削機
について説明する。
<Example> Hereinafter, an excavator according to the present invention will be described with reference to the drawings.

<イ> 掘削機全体の構成(第1図) 掘削機1は、エンドレス帯の外周に多数の掘
削刃を有する帯状掘削体2と、この帯状掘削体
2を上下方向に昇降させる昇降手段で構成す
る。
<A> Configuration of the entire excavator (Fig. 1) The excavator 1 is composed of a belt-shaped excavator 2 having a large number of excavation blades on the outer periphery of an endless band, and a lifting means for vertically raising and lowering the belt-shaped excavator 2. do.

<ロ> 帯状掘削体 帯状掘削体2は、各親杭のフランジAの裏側
と各フランジAの裏側を結ぶ側壁面を同時に掘
削する掘削具である。
<B> Band-shaped excavation body The band-shaped excavation body 2 is an excavation tool that simultaneously excavates the side wall surface connecting the back side of the flange A of each parent pile and the back side of each flange A.

帯状掘削体2としては、例えば第1,2図に
示すようにエンドレス状の帯の外周に掘削刃2
1を植設したものを使用できる。
For example, as shown in FIGS. 1 and 2, the belt-shaped excavation body 2 has an endless belt with an excavation blade 2 on the outer periphery.
1 can be used.

エンドレス状の帯には、公知の鋼製チエーン
等を採用できる。
A known steel chain or the like can be used as the endless band.

掘削刃21の掘削巾は、親杭に差し込む1枚
の横矢板の板厚と等しいか多少厚く掘削できる
寸法とする。
The excavation width of the excavation blade 21 is set to a size that allows excavation to be equal to or somewhat thicker than the thickness of one horizontal sheet pile inserted into the parent pile.

<ハ> 帯状掘削体の張設方法 帯状掘削体2は、隣り合うフランジAの距離
変化に追随して回転掘削を行えるようう構成す
る。
<C> Method of setting up the band-shaped excavation body The band-shaped excavation body 2 is configured so that rotational excavation can be performed following the change in the distance between the adjacent flanges A.

例えば水平材3の両端にスプロケツト31,
32を回転自在に設ける。
For example, there are sprockets 31 on both ends of the horizontal member 3,
32 is rotatably provided.

水平材3の途上には伸縮性のバネ等の伸縮材
4を鉛直方向に配置して取り付ける。
An elastic member 4 such as an elastic spring is arranged and attached in the vertical direction in the middle of the horizontal member 3.

この伸縮材4の最下端にはスプロケツト41
を回転自在に設ける。
A sprocket 41 is installed at the bottom end of this elastic material 4.
is provided rotatably.

そして各スプロケツト31,32,41に帯
状掘削体2を巻き掛ける。
Then, the band-shaped excavated body 2 is wrapped around each sprocket 31, 32, 41.

さらに水平材3の途上には水平材3の全長の
伸縮を調節できるように、圧縮状態の調整バネ
33を介在させておく。
Furthermore, an adjustment spring 33 in a compressed state is interposed in the middle of the horizontal member 3 so that the expansion and contraction of the entire length of the horizontal member 3 can be adjusted.

すなわち帯状掘削体2の内周側に位置する水
平材3の両端が圧縮されたり、あるいはこの圧
縮力が解除されたときに、調整バネ33が伸縮
して水平材3の全長を所定の長さに調整できる
構造である。
That is, when both ends of the horizontal member 3 located on the inner circumferential side of the band-shaped excavation body 2 are compressed, or when this compressive force is released, the adjustment spring 33 expands and contracts to adjust the entire length of the horizontal member 3 to a predetermined length. It has a structure that can be adjusted.

従つて、水平材3が例えば伸長したときは、
伸縮材4が伸縮し、また逆に水平材3が収縮し
たときには伸縮材4が伸長するといつた具合
に、水平材3の伸縮動作に連動して伸縮材4が
全長を変化させて、常に帯状掘削体2を緊張し
た状態に維持できる。
Therefore, when the horizontal member 3 is elongated, for example,
The elastic material 4 expands and contracts, and conversely, when the horizontal material 3 contracts, the elastic material 4 expands, and so on, the elastic material 4 changes its total length in conjunction with the expansion and contraction movement of the horizontal material 3, and is constantly shaped like a strip. The excavation body 2 can be maintained in a tense state.

水平材3の途上には、帯状掘削体2に回転力
を与えられるようにモータ7を配備する。
A motor 7 is disposed in the middle of the horizontal material 3 so as to apply rotational force to the band-shaped excavation body 2.

<ニ> 係合手段 水平材3の両端近くには、係合輪5を回転自
在に設ける。
<d> Engagement means Engagement wheels 5 are rotatably provided near both ends of the horizontal member 3.

係合輪5はフランジAの縁部に走行可能に係
合させる目的の部材である。
The engagement ring 5 is a member intended to be engaged with the edge of the flange A so that it can run.

係合輪5の取り付け位置は、係合輪5がフラ
ンジAの縁部に係合したときに、掘削刃21が
親杭のリブBに接触しない位置とする。
The attachment position of the engagement ring 5 is such that when the engagement ring 5 engages with the edge of the flange A, the excavation blade 21 does not come into contact with the rib B of the parent pile.

なお本実施例では、フランジAに1つだけ係
合輪5を係合させる場合について説明するが、
フランジAの両縁部に抱き合わせるようにして
2つ配置する事も勿論可能である。
In this embodiment, a case will be described in which only one engagement ring 5 is engaged with the flange A.
Of course, it is also possible to arrange two of them so that they are hugged at both edges of the flange A.

<ホ> 昇降手段 隣り合う親杭間に係合された掘削装置1を上
下方向に昇降させる手段としては、例えば水平
材3の両端に吊下ワイヤ6を接続し、この吊下
ワイヤ6の上端側でワイヤの巻き取り操作を行
う事が考えられる。
<E> Lifting means As a means for vertically raising and lowering the excavation equipment 1 engaged between adjacent parent piles, for example, a hanging wire 6 is connected to both ends of the horizontal member 3, and the upper end of this hanging wire 6 is used. It is conceivable to perform the wire winding operation on the side.

その他の方法としては、吊下ワイヤ6の上端
側を親杭の上部に係止しておき、水平材3側に
配置したワイヤ巻き取り装置でワイヤの巻き取
り操作を行つて掘削装置1を昇降させる事も可
能である。
Another method is to lock the upper end of the hanging wire 6 to the upper part of the parent pile, and wind the wire with a wire winding device placed on the horizontal member 3 side to raise and lower the excavation equipment 1. It is also possible to do so.

さらにフランジAに係合する係合輪5に駆動
力を与えて自力で昇降できるよう構成する事も
可能である。
Furthermore, it is also possible to provide a driving force to the engaging wheel 5 that engages with the flange A so that it can move up and down by itself.

次に掘削方法について説明する。 Next, the excavation method will be explained.

<1> バツクホーによる掘削 地中に打設した親杭のフランジAにギリギ
リに接近させてバツクホー8等で掘削する。
<1> Excavation with a backhoe Excavate with a backhoe 8 etc. as close as possible to flange A of the parent pile driven into the ground.

バツクホー8では、フランジAの裏側や、
このフランジAの裏側間を結ぶ壁面までは掘
削できないので土砂が残存している。
In Backhoe 8, the back side of flange A,
Since it is not possible to excavate up to the wall surface connecting the back sides of this flange A, earth and sand remain.

<2> 掘削機のセツト 次に、地面から突出する親杭Aの上端に前
記構造の掘削機1をセツトする。
<2> Setting the excavator Next, the excavator 1 having the above structure is set on the upper end of the parent pile A protruding from the ground.

掘削機1のセツトは、単に掘削機1を吊下
ワイヤ6で吊り下げ、係合輪5をフランジA
の縁部に係合させ、かつ、帯状掘削体2をフ
ランジAの裏側に位置させて落とし込むだけ
の簡単な作業であり、手数はほとんどかから
ない。
To set up the excavator 1, simply suspend the excavator 1 with the suspension wire 6, and attach the engagement ring 5 to the flange A.
The work is as simple as engaging the edge of the flange A, positioning the band-shaped excavation body 2 on the back side of the flange A, and dropping it in, and it requires almost no effort.

<3> 掘削開始 モータ7を作動させ、掘削機1による掘削
を開始する。
<3> Start of excavation The motor 7 is activated and the excavator 1 starts excavating.

モータ7の回転力は帯状掘削体2に伝達さ
れて、フランジAの裏側に残存する土砂、お
よび両フランジAの裏側間を直線で結んだ平
面より外方に残存する壁面の土砂を掘削す
る。
The rotational force of the motor 7 is transmitted to the belt-shaped excavation body 2 to excavate the earth and sand remaining on the back side of the flange A and the earth and sand on the wall surface remaining outside of a plane connecting the back sides of both flanges A with a straight line.

掘削された土砂は、自然落下して排土され
る。
The excavated earth and sand will fall naturally and be removed.

吊下ワイヤ6を操作しながら掘削機1を降
下させて、連続して掘削を行う。
The excavator 1 is lowered while operating the hanging wire 6 to perform continuous excavation.

掘削機1を降下させる際、フランジAの縁
部間の距離が変化している場合でも、水平材
3がその変化に対応して伸縮するので、係合
輪5がフランジAの縁部から外れる心配はな
く、安定した掘削作業を行える。
When lowering the excavator 1, even if the distance between the edges of the flange A changes, the horizontal member 3 expands and contracts in response to the change, so the engagement ring 5 comes off the edge of the flange A. There is no need to worry and you can perform stable excavation work.

<4> 横矢板の設置 隣り合う両フランジAの裏側および両フラ
ンジAの裏側間に残存する土砂の掘削を終了
した直後、横矢板9を掘削済みのフランジA
の裏側に差し込み、擁壁を形成する。
<4> Installation of horizontal sheet piles Immediately after completing the excavation of the earth and sand remaining on the back sides of both adjacent flanges A and between the back sides of both flanges A, install horizontal sheet piles 9 on the flange A that has already been excavated.
Insert it into the back side of the wall to form a retaining wall.

横矢板9の差し込み作業は、少なくとも一
枚以上の横矢板9の差し込み幅分の掘削が終
了した直後に行う。
The insertion work of the horizontal sheet piles 9 is performed immediately after the excavation for the insertion width of at least one horizontal sheet pile 9 is completed.

以上のようにして隣り合う親杭のフランジ
A間に横矢板9を差し込みながら、露出する
地山の全域を被覆して、土留め作業を行う。
As described above, the earth retaining work is performed by inserting the horizontal sheet piles 9 between the flanges A of adjacent parent piles, covering the entire area of the exposed ground.

<5> 掘削機の撤去 掘削機1を最下端まで降下させたら、水平
材2を強制的に収縮させて、掘削機1を取り
外す。
<5> Removal of the excavator After the excavator 1 is lowered to the lowest point, the horizontal member 2 is forcibly contracted and the excavator 1 is removed.

<効果> 本発明は以上説明したようになるから、次のよ
うな効果が得られる。
<Effects> Since the present invention is as explained above, the following effects can be obtained.

(イ) 従来手作業に頼つていたフランジの裏側に残
存する土砂の掘削作業と、隣り合うフランジの
裏側間を結ぶ壁面間の掘削作業を、人力によら
ず機械的に掘削できる。
(b) Excavation of the remaining soil on the back side of flanges, which conventionally relied on manual labor, and excavation between the walls connecting the back sides of adjacent flanges can be done mechanically without manual labor.

従つて、掘削効果が著しく向上し、全体の工
期を大幅に短縮できる。
Therefore, the excavation effect is significantly improved and the overall construction period can be significantly shortened.

(ロ) 掘削機を親杭の上端にセツトするだけで、あ
とは掘削機を自動的に掘削させながら降下でき
るので、作業の安全性が著しく向上する。
(b) Just by setting the excavator at the top of the parent pile, the excavator can descend while automatically digging, which significantly improves work safety.

(ハ) 帯状掘削体を選択するだけで、横矢板の板厚
に応じた掘削ができる。
(c) Just by selecting the belt-shaped excavation body, excavation can be performed according to the thickness of the horizontal sheet pile.

そのうえ掘削残しもなく、フランジの裏側の
隅部まで確実に掘削できるので横矢板の差し込
みをスムーズに行える。
Furthermore, there is no excavation left behind, and the back corner of the flange can be reliably excavated, allowing for smooth insertion of horizontal sheet piles.

(ニ) フランジの裏側およびフランジの裏側間に残
存する土砂を機械的に掘削できるので、従来の
ように掘削作業のための作業員の確保や、工程
を熟案する必要から開放された。
(d) Since the earth and sand remaining on the back side of the flange and between the back sides of the flange can be mechanically excavated, it is no longer necessary to secure workers for excavation work or to carefully plan the process as in the past.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図:掘削機を使つた土留工の説明図、第2
図:掘削装置の一実施例の説明図、第3図:掘削
機の部分説明図。 1:掘削機、2:帯状掘削体、31,32,4
1:スプロケツト。
Figure 1: Explanatory diagram of earth retaining work using an excavator, Figure 2
Figure: An explanatory diagram of one embodiment of the excavating device, FIG. 3: A partial explanatory diagram of the excavating machine. 1: Excavator, 2: Band-shaped excavation body, 31, 32, 4
1: Sprocket.

Claims (1)

【特許請求の範囲】 1 エンドレス状の帯の外周に掘削刃を多数形成
した帯状掘削体と、 前記帯状掘削体の内周面で帯状掘削体に一定の
張力を与えて支持する部材であつて、 断面H形の親杭のフランジに上下方向に走行可
能に係合する係合輪を有するフレームとからな
り、 地中に打設した前記親杭に沿つて昇降自在に構
成したことを特徴とする、 土留工における自動掘削機。
[Scope of Claims] 1. A band-shaped excavation body in which a large number of excavation blades are formed on the outer periphery of an endless band, and a member that supports the band-shaped excavation body by applying a constant tension to the band-shaped excavation body on the inner peripheral surface of the band-shaped excavation body. , comprising a frame having an engaging ring that engages with the flange of a parent pile having an H-shaped cross section so as to be able to travel in the vertical direction, and is configured to be able to move up and down along the parent pile driven into the ground. Automatic excavator for earth retaining work.
JP14683185A 1985-07-05 1985-07-05 Automatic excavator for sheathing work Granted JPS6210330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14683185A JPS6210330A (en) 1985-07-05 1985-07-05 Automatic excavator for sheathing work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14683185A JPS6210330A (en) 1985-07-05 1985-07-05 Automatic excavator for sheathing work

Publications (2)

Publication Number Publication Date
JPS6210330A JPS6210330A (en) 1987-01-19
JPH0454768B2 true JPH0454768B2 (en) 1992-09-01

Family

ID=15416505

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14683185A Granted JPS6210330A (en) 1985-07-05 1985-07-05 Automatic excavator for sheathing work

Country Status (1)

Country Link
JP (1) JPS6210330A (en)

Also Published As

Publication number Publication date
JPS6210330A (en) 1987-01-19

Similar Documents

Publication Publication Date Title
US11746493B2 (en) Wall sinking construction method
JPH0377887B2 (en)
JPH01299916A (en) Device for guiding excavation tool used for forming wall structure in ground
JP3808966B2 (en) Live line tunnel widening equipment and widening method
US5263798A (en) Process for guiding the excavation tool used for the construction of a wall cast in the ground, and excavation tool for implementing this process
JPH0454768B2 (en)
JP3205485B2 (en) Civil engineering method and device and earth retaining device
US6328503B1 (en) Method for constructing an underground structure
JPH0454769B2 (en)
CN111577294A (en) Reverse-construction tunnel portal of steep rock mass in complex terrain and construction method
JPS61270419A (en) Automatic excavator in sheathing construction
JP3377444B2 (en) How to build underground side walls
JP2000008369A (en) Earth retaining wall forming method in pit excavating construction method
JP2579584B2 (en) Earth retaining method and earth retaining box
JPH07119866A (en) Underground pipe laying method
US3538629A (en) Method of digging manholes
JPH0526129Y2 (en)
JP2570599Y2 (en) Partition structure for continuous underground wall construction
JPH0454767B2 (en)
JPH04179731A (en) Simplified underground continuous wall construction method
JPH0434209Y2 (en)
JPH05156640A (en) Digging hole forming for constructing thin film wall
JPH0874257A (en) Earth retaining device for excavated groove
JPH06336749A (en) Ditch excavation method by chain cutter system
JPH07305345A (en) Impermeable membrane installation device and installation method using the same