JPH0461957B2 - - Google Patents
[go: Go Back, main page]

JPH0461957B2 - - Google Patents

Info

Publication number
JPH0461957B2
JPH0461957B2 JP61128254A JP12825486A JPH0461957B2 JP H0461957 B2 JPH0461957 B2 JP H0461957B2 JP 61128254 A JP61128254 A JP 61128254A JP 12825486 A JP12825486 A JP 12825486A JP H0461957 B2 JPH0461957 B2 JP H0461957B2
Authority
JP
Japan
Prior art keywords
annular
wire mesh
lining
formwork
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61128254A
Other languages
Japanese (ja)
Other versions
JPS62288299A (en
Inventor
Kazunari Mitsuishi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP61128254A priority Critical patent/JPS62288299A/en
Publication of JPS62288299A publication Critical patent/JPS62288299A/en
Publication of JPH0461957B2 publication Critical patent/JPH0461957B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、地中に構築するシールドトンネル
の場所打ちPCライニング施工法に関するもので
ある。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a cast-in-place PC lining construction method for a shield tunnel constructed underground.

〔従来技術〕[Prior art]

近年、シールドトンネルのライニングを構築す
る場合、経済性等の観点から、在来の鋼製もしく
はプレキヤストコンクリート製のセグメントに代
つて、場所打ちコンクリートにより構築すること
が試みられているが、シールド機を推進する際に
ライニング用生コンクリートの移動が著しく、そ
のため生コンクリート中に配置された鉄筋やPC
鋼材を所定の位置に保持することが困難になる。
In recent years, when constructing shield tunnel linings, attempts have been made to construct them using cast-in-place concrete instead of conventional steel or precast concrete segments from the viewpoint of economy. When the concrete for lining is moved, there is a significant movement of the fresh concrete for lining, and as a result, the reinforcing bars and PC
It becomes difficult to hold the steel in place.

従来、シールドトンネルの場所打ちコンクリー
トライニングの施工方法として、(1)第18図およ
び第19図に示すように、コ字状断面の鋼製補強
用環状セグメント14をトンネル長手方向に間隔
をおいて配置し、その各補強用環状セグメント1
4の間に覆工用コンクリート15を打設し、かつ
前記環状セグメント14内にPC鋼材16を収容
し、これにプレストレスを導入した後に、セグメ
ント内にコンクリート17を充填する方法、(2)シ
ールドトンネル内に、多数の鉄筋を単独であるい
は籠状に組立てて配置したのち覆工用コンクリー
トを打設する方法が知られている。
Conventionally, as a construction method for cast-in-place concrete lining for shield tunnels, (1) as shown in Figs. Arrange each reinforcing annular segment 1
(2) A method in which lining concrete 15 is cast between 4 and 4, and prestressed prestress is introduced into the annular segment 14, and then concrete 17 is filled into the segment; (2) A method is known in which a large number of reinforcing bars are placed individually or in a cage-like manner in a shield tunnel, and then lining concrete is poured.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかるに、前記(1)の方法の場合は、補強用環状
セグメントが大型になるので、経済的に不利であ
り、かつトンネルライニング全体にわたるプレス
トレスの円滑な導入が期待できないという問題が
ある。前記(2)の方法の場合は、地山とライニング
内周面型枠との間への鉄筋籠の挿入が困難であ
り、かつ推進用ジヤツキのストロークが一定でな
いため、所定の鉄筋かぶり厚さを確保することが
難しい。また鉄筋を単独で使用したときは、推進
用ジヤツキの反力によりコンクリートが移動する
ので、鉄筋を所定の正確な位置に保持することが
困難であるという問題がある。
However, in the case of method (1), the reinforcing annular segment becomes large, which is economically disadvantageous, and there is a problem in that smooth introduction of prestress throughout the tunnel lining cannot be expected. In the case of method (2) above, it is difficult to insert the reinforcing bar cage between the ground and the lining inner peripheral formwork, and the stroke of the propulsion jack is not constant, so it is difficult to reach the specified reinforcing bar cover thickness. difficult to secure. Furthermore, when reinforcing bars are used alone, there is a problem in that it is difficult to hold the reinforcing bars in a predetermined and accurate position because the concrete moves due to the reaction force of the propelling jack.

〔発明の目的、構成〕[Purpose and structure of the invention]

この発明は前述の問題を有利に解決できるシー
ルドトンネルの場所打ちPCライニング施工法を
提供することを目的とするものであつて、この発
明の要旨とするところは、鋼製環状体1の後部の
内周側に複数の定着部型枠嵌込用凹部2を設けて
構成した加圧用リング3を、シールド機4におけ
る推進用ジヤツキ5の後部に取付け、次に後方に
突出する多数のアンカー鉄筋9を取付けた環状金
網6を、前記加圧用リング3の後面に当接し、環
状金網6の内周面に設けた複数の切欠部内に定着
部型枠7を配置すると共に、定着部型枠7の前部
を前記凹部2に嵌入し、かつ環状金網6の後面に
配置した複数本の円弧状PC鋼材8の端部を前記
定着部型枠7における側板に挿通すると共に、そ
のPC鋼材8を環状金網6に結束して環状補強接
合部材10を構成する環状補強接合部材設置工程
と、既設コンクリートライニング11と前記加圧
用リング3および定着部型枠7とライニング内周
面型枠12との間に生コンクリート13を注入す
る工程と、前記推進用ジヤツキ5を伸長動作させ
ることにより生コンクリート13を圧縮すると共
にシールド機4を前進移動させる工程と、その生
コンクリート13が凝結を開始し自立したのち、
前記推進用ジヤツキ5を短縮動作させて加圧用リ
ング3を前進移動させる工程とを反復して行なう
ことを特徴とするシールドトンネルの場所打ち
PCライニング施工法にある。
The purpose of this invention is to provide a cast-in-place PC lining construction method for shield tunnels that can advantageously solve the above-mentioned problems. A pressurizing ring 3, which has a plurality of recesses 2 for fitting the fixing part formwork on the inner circumferential side, is attached to the rear of the propulsion jack 5 in the shield machine 4, and then a large number of anchor reinforcing bars 9 protrude rearward. The annular wire mesh 6 with the attached pressure ring 3 is placed in contact with the rear surface of the pressurizing ring 3, and the fixing part formwork 7 is disposed within the plurality of notches provided on the inner peripheral surface of the annular wire mesh 6. The front portions of the arc-shaped PC steel materials 8 are fitted into the recess 2, and the ends of the plurality of arc-shaped PC steel materials 8 placed on the rear surface of the annular wire mesh 6 are inserted through the side plates of the fixing part formwork 7, and the PC steel materials 8 are inserted into the annular shape. An annular reinforcing joining member installation process in which the annular reinforcing joining member is bound to a wire mesh 6 to form an annular reinforcing joining member 10, and between the existing concrete lining 11, the pressure ring 3, the anchoring part formwork 7, and the lining inner peripheral surface form 12. A step of pouring the ready-mixed concrete 13, a step of compressing the ready-mixed concrete 13 by extending the propulsion jack 5 and moving the shield machine 4 forward, and after the ready-mixed concrete 13 starts setting and stands on its own.
Place casting of a shield tunnel characterized by repeatedly performing the steps of shortening the propulsion jack 5 and moving the pressurizing ring 3 forward.
In the PC lining construction method.

〔実施例〕〔Example〕

次にこの発明を図示の実施例によつて詳細に説
明する。
Next, the present invention will be explained in detail with reference to illustrated embodiments.

第5図および第6図はこの発明の実施例におい
て用いられる加圧用リング3を示すものであつ
て、鋼製環状体1の内周の後部に、複数(図示の
場合は3箇所)の定着部型枠嵌込用凹部2が、リ
ング周囲方向に等間隔で設けられている。また第
7図ないし第11図は加圧リング3の後部に設置
された環状補強接合部材10を示し、第12図お
よび第13図は環状補強接合部材10を示してい
る。
5 and 6 show a pressurizing ring 3 used in an embodiment of the present invention, in which a plurality of fixings (three in the case of illustration) are fixed to the rear part of the inner circumference of the steel annular body 1. Part formwork fitting recesses 2 are provided at equal intervals in the ring circumferential direction. Further, FIGS. 7 to 11 show an annular reinforcing joining member 10 installed at the rear of the pressure ring 3, and FIGS. 12 and 13 show the annular reinforcing joining member 10.

環状補強接合部材10を加圧用リング3の後部
に設置する場合の例について説明すると、加圧用
リング3の後面に予め所定ピツチで突起物(図示
を省略した)を固定しておく。また環状金網6を
構成する複数の円弧状金網の内周側および外周側
に、後方に窪む多数の凹部を円弧状金網の周囲方
向に間隔をおいて設け、各凹部の底部には、前端
側に係合フランジ19を固定したアンカー鉄筋9
の前端部を挿通し、そのアンカー鉄筋9の前端突
出部には、座金20を嵌設すると共に固定用ナツ
ト21を螺合して、アンカー鉄筋付きの円弧状金
網を構成する。
To explain an example in which the annular reinforcing joining member 10 is installed at the rear of the pressure ring 3, protrusions (not shown) are fixed in advance to the rear surface of the pressure ring 3 at a predetermined pitch. Further, on the inner and outer circumferential sides of the plurality of arc-shaped wire meshes constituting the annular wire mesh 6, a large number of recesses recessed backward are provided at intervals in the circumferential direction of the arc-shaped wire meshes, and the bottom of each recess has a front end. Anchor reinforcing bar 9 with engagement flange 19 fixed on the side
A washer 20 is fitted into the front end protrusion of the anchor reinforcing bar 9, and a fixing nut 21 is screwed together to form an arcuate wire mesh with an anchor reinforcing bar.

次に複数の前記円弧状金網を円形に配置して加
圧用リング3の後面に当接すると共に、前記突起
物を金網の網目に挿通し、かつ箱状の鋼製定着部
型枠7の中間部を環状金網6の円周側に設けられ
たコ字状切欠部に嵌入すると共に、その定着部型
枠7の開口部を環状金網6の内側に開口させ、さ
らに定着部型枠7の前部を加圧用リングの凹部2
に嵌入し、加圧用リング3の上部に設置される定
着部型枠7には、第11図に示すように、加圧用
リング3に予め固定されたピン27を嵌挿する。
Next, the plurality of arc-shaped wire meshes are arranged in a circular manner and are brought into contact with the rear surface of the pressurizing ring 3, and the protrusions are inserted into the meshes of the wire meshes, and the intermediate part of the box-shaped steel fixing part formwork 7 is inserted. is fitted into a U-shaped notch provided on the circumferential side of the annular wire mesh 6, and the opening of the anchoring portion formwork 7 is opened inside the annular wire mesh 6, and the front portion of the anchoring portion formwork 7 is Pressure ring recess 2
As shown in FIG. 11, a pin 27 fixed in advance to the pressurizing ring 3 is fitted into the fixing part formwork 7 which is fitted into the pressurizing ring 3 and installed above the pressurizing ring 3.

次に複数本(図示の場合は3本)の円弧状PC
鋼材8を環状金網6の後面において環状金網周囲
方向に間隔をおいて配置し、各PC鋼材8の端部
を定着部型枠7における環状金網周囲方向の側板
に挿通し、さらに各PC鋼材8を環状金網6に対
し結束線18により結束する。
Next, multiple arc-shaped PCs (three in the case of illustration)
The steel materials 8 are arranged at intervals in the circumferential direction of the annular wire mesh on the rear surface of the annular wire mesh 6, and the ends of each PC steel material 8 are inserted into the side plates of the anchoring part formwork 7 in the circumferential direction of the annular wire mesh. are bound to the annular wire mesh 6 with a binding wire 18.

なおPC鋼材としては、合成樹脂のシースとそ
の中に挿通されたPC鋼棒との間にグリースを充
填したアンボンドPC鋼材を使用するのが望まし
いが、シース管内にPC鋼材を挿通したものを使
用してもよい。アンボンドPC鋼材を使用する場
合は、予め工場でアンボドPC鋼材に所定の円弧
状の曲げ加工を施しておくのが望ましい。
As for the PC steel material, it is preferable to use an unbonded PC steel material that is filled with grease between a synthetic resin sheath and a PC steel rod inserted into it, but it is preferable to use a PC steel material that is inserted into the sheath pipe. You may. When using unbonded PC steel, it is desirable to bend the unbonded PC steel into a predetermined arc shape in advance at a factory.

この発明を実施してシールドトンネルの場所打
ちPCライニングを施工する場合は、第1図およ
び第7図ないし第11図に示すように、シールド
機4におけるシールドテール部22内に加圧用リ
ング3を配置し、シールド機4における各推進用
ジヤツキ5の後端部を加圧用リング3の前部にボ
ルト等により固定し、かつ前述のようにして、加
圧用リング3の後部に環状補強接合部材10を設
置する。
When carrying out this invention to construct a cast-in-place PC lining for a shield tunnel, as shown in FIG. 1 and FIGS. The rear end of each propulsion jack 5 in the shield machine 4 is fixed to the front part of the pressure ring 3 with bolts, etc., and the annular reinforcing joint member 10 is attached to the rear part of the pressure ring 3 as described above. Set up.

次いで第2図に示すように、コンクリート打設
予定部分の内側をライニング内周面型枠12によ
り被覆し、かつライニング内周面型枠12の注入
口23に開閉弁24を介して注入ホースを接続し
たのち、既設コンクリートライニング11の前端
部と前記加圧用リング3および定着部型枠7と、
ライニング内周面型枠12と、地山の露出部分お
よびシールドテール部22とにより囲まれた環状
空間に、前記注入ホース、開閉弁24および注入
口23から生コンクリート13を注入し、注入終
了後に、前記開閉弁24を閉じる。
Next, as shown in FIG. 2, the inside of the area to be concreted is covered with a lining inner peripheral surface form 12, and an injection hose is connected to the injection port 23 of the lining inner peripheral surface form 12 via an on-off valve 24. After connecting, the front end of the existing concrete lining 11, the pressurizing ring 3 and the anchoring part formwork 7,
Fresh concrete 13 is poured into the annular space surrounded by the lining inner circumferential formwork 12, the exposed part of the ground, and the shield tail part 22 through the injection hose, the on-off valve 24, and the injection port 23, and after the injection is finished, , closes the on-off valve 24.

次に第3図に示すように、推進用ジヤツキ5を
伸長動作させることによりシールド機4を前方の
切羽25に向かつて推進移動させる。このように
すると、推進反力は環状補強接合部材10および
生コンクリート13を介して既設コンクリートラ
イニング11に伝達され、生コンクリート13が
圧縮力を受ける。
Next, as shown in FIG. 3, the shield machine 4 is propelled toward the forward face 25 by extending the propulsion jack 5. In this way, the propulsion reaction force is transmitted to the existing concrete lining 11 via the annular reinforcing joint member 10 and the ready-mixed concrete 13, and the ready-mixed concrete 13 receives compressive force.

その生コンクリート13が凝結を開始し自立し
たのち、推進用ジヤツキ5を短縮動作させること
により、第4図に示すように前記環状補強接合部
材10をコンクリートライニング11の前端部に
残置して、加圧用リング3を推進用ジヤツキ5の
ピストンロツドと共に前進移動させる。
After the fresh concrete 13 starts to set and becomes self-supporting, the propulsion jack 5 is shortened to leave the annular reinforcing joint member 10 at the front end of the concrete lining 11 as shown in FIG. The pressure ring 3 is moved forward together with the piston rod of the propulsion jack 5.

次に前述のように、加圧用リング3の後部に対
し環状補強接合部材10を設置する工程と、ライ
ニング内周面型枠12を設置する工程と、生コン
クリート13を注入する工程と、前記推進用ジヤ
ツキ5を伸長動作させる工程と、推進用ジヤツキ
5を短縮動作させる工程とを反復して行なつて、
コンクリートライニングを順次継ぎ足し施工して
いく。
Next, as described above, the process of installing the annular reinforcing joint member 10 on the rear part of the pressurizing ring 3, the process of installing the lining inner circumferential surface form 12, the process of pouring ready-mixed concrete 13, and the process of Repeating the steps of extending the propulsion jack 5 and shortening the propulsion jack 5,
Concrete lining will be added and constructed in stages.

コンクリートライニングの養成期間を経過した
のち、ライニング内周面型枠12を脱型し、次い
で各PC鋼材8にプレストレスを導入したのち、
定着部型枠7内にモルタルを充填する。
After the concrete lining has undergone a curing period, the lining inner peripheral surface formwork 12 is removed from the mold, and then prestress is introduced into each PC steel material 8.
The fixing part formwork 7 is filled with mortar.

PC鋼材8にプレストレスを導入する場合の例
について説明すると、第14図に示すように、定
着部枠7内において、一方のPC鋼材8の端部の
雄ねじ部28に、係合用ナツト29を螺合すると
共に枠型継手金具30の一端部を嵌挿し、かつそ
の枠形継手金具30内において前記雄ねじ部28
に固定用ナツト31を螺合し、他方のPC鋼材8
の端部の雄ねじ部32に、係合用ナツト33およ
び前記枠形継手金具30の他端部のナツト34を
螺合する。なお、第14図において、35はシー
スである。
To explain an example of introducing prestress into the PC steel material 8, as shown in FIG. While screwing together, one end of the frame-shaped joint fitting 30 is inserted, and the male threaded portion 28 is inserted into the frame-shaped joint fitting 30.
Screw the fixing nut 31 onto the other PC steel material 8.
An engaging nut 33 and a nut 34 at the other end of the frame-shaped joint fitting 30 are screwed into the male threaded portion 32 at the end. In addition, in FIG. 14, 35 is a sheath.

次に第15図および第16図に示すように、中
間部を支軸36により枢着した一対の緊張部材3
7,38と各緊張部材37,38の基端部にピン
39により枢着された液圧式緊張用ジヤツキ40
とからなる緊張装置41における緊張部材37,
38の先端部を各係合用ナツト29,33に係合
し、次いで緊張用ジヤツキ41を伸長動作させ
て、前記PC鋼材8を緊張することによりプレス
トレスを導入し、次いで第17図に示すように固
定用ナツト31を枠形継手金具30の一端部の内
側に締付係合させ、次いで緊張装置41を撤去し
たのち、各係合用ナツト29,33を枠形継手金
具30に締付係合する。
Next, as shown in FIGS. 15 and 16, a pair of tension members 3 whose intermediate portions are pivotally connected by a support shaft 36
7, 38, and a hydraulic tensioning jack 40 pivotally connected to the proximal end of each tensioning member 37, 38 by a pin 39.
A tensioning member 37 in a tensioning device 41 consisting of
38 is engaged with each engagement nut 29, 33, and then the tensioning jack 41 is extended to tension the PC steel material 8 to introduce prestress, and then as shown in FIG. The fixing nut 31 is tightened and engaged inside one end of the frame-shaped joint fitting 30, and then the tensioning device 41 is removed, and each of the engagement nuts 29 and 33 is tightened and engaged with the frame-shaped joint fitting 30. do.

この発明を実施する場合、アンカー鉄筋9の前
端部を環状金網6に対し溶接により固着してもよ
い。また各円弧状PC鋼材8に圧縮プレストレス
を導入した状態で、隣り合うPC鋼材8の端部を
公知の耐圧縮連結金具により連結してもよい。
When carrying out this invention, the front end portion of the anchor reinforcing bar 9 may be fixed to the annular wire mesh 6 by welding. Further, with compressive prestress applied to each arc-shaped PC steel material 8, the ends of adjacent PC steel materials 8 may be connected using a known compression-resistant connecting fitting.

加圧用リング3の後面に、金網の網目に挿通す
るための突起物を設けないで、金網に固定された
アンカー鉄筋を金網から前方に突出させ、その突
出端部を加圧用リングの後部に設けた嵌挿孔に嵌
挿して、金網を加圧用リングに係止してもよい。
An anchor reinforcing bar fixed to the wire mesh is made to protrude forward from the wire mesh without providing a protrusion on the rear surface of the pressure ring 3 for passing through the mesh of the wire mesh, and the protruding end is provided at the rear of the pressure ring. The wire mesh may be locked to the pressurizing ring by fitting it into the fitting hole.

〔発明の効果〕〔Effect of the invention〕

この発明によれば、PC鋼材を収容するための
環状セグメントをトンネル長手方向に間隔をおい
て設置する必要がないので、一体のPC構造体と
して評価できるシールドトンネルの場所打ちPC
ライニングを容易にかつ経済的に施工することが
でき、かつコンクリートの打継境界に環状金網6
が介在されているので、応力を確実に伝達するこ
とができ、さらに前記環状金網6に設けられた切
欠部に定着部型枠7が嵌入されると共に、環状金
網6に結束された円弧状PC鋼材8の端部が定着
部型枠7の側板に挿通され、前記環状金網6にア
ンカー鉄筋9の前端部が固定されて、環状補強接
合部材10が構成され、その環状補強接合部材1
0における環状金網6が加圧用リング3の後面に
当接されると共に、定着部型枠7の前部が加圧用
リング3の凹部2に嵌入されているので、推進用
ジヤツキ5の伸長動作により生コンクリート13
が移動しても、円弧状PC鋼材8をずれ動かない
ように正確な位置に保持することができ、しかも
加圧用リング3の後面とコンクリートとの間に環
状金網6が配置されているので、加圧用リング3
が前進移動されるとき、その加圧用リング3とコ
ンクリートとの縁切りをスムーズに行なわせるこ
とができると共に、コンクリート面が乱される恐
れを排除することができる。また円弧状PC鋼材
8を環状金網6の任意の位置に配置して結束する
ことができるので、ライニングコンクリートに生
じる曲げモーメント(特に引張側の曲げモーメン
ト)を打消す位置にPC鋼材8を配置して結束固
定することができ、かつライニングコンクリート
に発生する断面力の変化に応じて、PC鋼材8を
偏心配置することもできるので、ライニングコン
クリートに作用する土水圧の変化に対応する配置
にすることもでき、さらに前記アンカー鉄筋9に
配力筋としての役割を果たさせることができる等
の効果が得られる。
According to this invention, there is no need to install annular segments for accommodating the prestressing steel material at intervals in the longitudinal direction of the tunnel, so the cast-in-place PC of the shield tunnel can be evaluated as an integrated PC structure.
Lining can be easily and economically constructed, and a circular wire mesh 6 is used at the boundary of concrete pouring.
is interposed, so that stress can be reliably transmitted.Furthermore, the fixing part formwork 7 is fitted into the notch provided in the annular wire mesh 6, and the arc-shaped PC tied to the annular wire mesh 6 The end of the steel material 8 is inserted through the side plate of the anchoring part formwork 7, and the front end of the anchor reinforcing bar 9 is fixed to the annular wire mesh 6, thereby forming an annular reinforcing joining member 10.
Since the annular wire mesh 6 at 0 is in contact with the rear surface of the pressure ring 3 and the front part of the fixing part formwork 7 is fitted into the recess 2 of the pressure ring 3, the extension action of the propulsion jack 5 causes Fresh concrete 13
Even if the arc-shaped PC steel material 8 moves, it is possible to hold it in an accurate position so that it does not shift, and since the annular wire mesh 6 is placed between the rear surface of the pressurizing ring 3 and the concrete, Pressure ring 3
When the pressurizing ring 3 is moved forward, the edge of the pressurizing ring 3 and the concrete can be smoothly cut, and the possibility of disturbing the concrete surface can be eliminated. Furthermore, since the arc-shaped prestressed steel material 8 can be placed and bound at any position on the annular wire mesh 6, the prestressed steel material 8 can be placed in a position that cancels out the bending moment (especially the bending moment on the tension side) that occurs in the lining concrete. The prestressing steel material 8 can be tied and fixed, and the prestressing steel material 8 can also be arranged eccentrically according to changes in the cross-sectional force generated in the lining concrete, so the arrangement can be made to correspond to changes in the soil water pressure acting on the lining concrete. Furthermore, the anchor reinforcing bars 9 can be made to play the role of distribution bars.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図ないし第17図はこの発明の実施例を示
すものであつて、第1図は加圧用リングの後部に
環状補強接合部材を設置した状態を示す縦断側面
図、第2図はコンクリート打設予定部分の内側を
ライニング内周面型枠により被覆しかつ生コンク
リートを打設した状態を示す縦断側面図、第3図
は生コンクリート打設後にシールド機を推進した
状態を示す縦断側面図、第4図はコンクリート硬
化後に加圧用リングを前進移動させた状態を示す
縦断側面図である。第5図は加圧用リングの正面
図、第6図は第5図のA−A線拡大断面図であ
る。第7図ないし第11図は加圧用リングの後部
に環状補強接合部材を設置した状態を示すもので
あつて、第7図は正面図、第8図は第7図のB−
B線拡大断面図、第9図は第7図のC−C線拡大
断面図、第10図は下部の定着部型枠付近を示す
拡大平面図、第11図は上部の定着部型枠の支持
状態を示す縦断側面図である。第12図は環状補
強接合部材の側面図、第13図はその一部を示す
拡大横断平面図、第14図は定着部型枠内のPC
鋼材のプレストレス導入前の状態を示す平面図、
第15図は緊張装置の正面図、第16図は緊張装
置の先端部とPC鋼材との関係を示す一部縦断側
面図、第17図は隣り合うPC鋼材にプレストレ
スを導入して連結した状態を示す平面図、第18
図は従来の施工方法による場所打ちライニングを
示す縦断側面図、第19図は第14図の一部を拡
大して示す縦断側面図である。 図において、1は鋼製環状体、2は定着部型枠
嵌込用凹部、3は加圧用リング、4はシールド
機、5は推進用ジヤツキ、6は環状金網、7は定
着部型枠、8は円弧状PC鋼材、9はアンカー鉄
筋、10は環状補強接合部材、11は既設コンク
リートライニング、12はライニング内周面型
枠、13は生コンクリート、18は結束線、19
は係合フランジ、21は固定用ナツト、22はシ
ールドテール部、23は注入孔、24は開閉弁、
26はモルタルである。
1 to 17 show embodiments of the present invention, in which FIG. 1 is a longitudinal cross-sectional side view showing a state in which an annular reinforcing joint member is installed at the rear of a pressurizing ring, and FIG. 2 is a concrete A vertical side view showing a state in which the inside of the planned construction area is covered with a lining inner circumferential surface formwork and ready-mixed concrete is poured; FIG. FIG. 4 is a longitudinal sectional side view showing a state in which the pressurizing ring is moved forward after the concrete has hardened. FIG. 5 is a front view of the pressurizing ring, and FIG. 6 is an enlarged sectional view taken along the line A--A in FIG. 5. 7 to 11 show the state in which the annular reinforcing joining member is installed at the rear of the pressurizing ring, FIG. 7 is a front view, and FIG. 8 is a B--B in FIG.
FIG. 9 is an enlarged sectional view taken along the line C-C in FIG. 7, FIG. 10 is an enlarged plan view showing the vicinity of the lower anchoring part formwork, and FIG. 11 is an enlarged cross-sectional view of the upper anchoring part formwork. FIG. 3 is a longitudinal side view showing a supported state. Fig. 12 is a side view of the annular reinforcing joint member, Fig. 13 is an enlarged cross-sectional plan view showing a part of it, and Fig. 14 is a PC in the anchoring part formwork.
A plan view showing the state of the steel material before prestressing,
Fig. 15 is a front view of the tensioning device, Fig. 16 is a partially longitudinal side view showing the relationship between the tip of the tensioning device and the prestressing steel, and Fig. 17 is a connection by introducing prestress into adjacent prestressing steels. Plan view showing the state, No. 18
The figure is a vertical side view showing cast-in-place lining by a conventional construction method, and FIG. 19 is a vertical side view showing an enlarged part of FIG. 14. In the figure, 1 is a steel annular body, 2 is a recess for fitting the fixing part formwork, 3 is a pressurizing ring, 4 is a shield machine, 5 is a propulsion jack, 6 is a circular wire mesh, 7 is a fixing part formwork, 8 is an arc-shaped PC steel material, 9 is an anchor reinforcing bar, 10 is an annular reinforcing joint member, 11 is an existing concrete lining, 12 is a lining inner peripheral surface form, 13 is a ready-mixed concrete, 18 is a binding wire, 19
is an engagement flange, 21 is a fixing nut, 22 is a shield tail portion, 23 is an injection hole, 24 is an on-off valve,
26 is mortar.

Claims (1)

【特許請求の範囲】[Claims] 1 鋼製環状体1の後部の内周側に複数の定着部
型枠嵌込用凹部2を設けて構成した加圧用リング
3を、シールド機4における推進用ジヤツキ5の
後部に取付け、次に後方に突出する多数のアンカ
ー鉄筋9を取付けた環状金網6を、前記加圧用リ
ング3の後面に当接し、環状金網6の内周側に設
けた複数の切欠部内に定着部型枠7を配置すると
共に、定着部型枠7の前部を前記凹部2に嵌入
し、かつ環状金網6の後面に配置した複数本の円
弧状PC鋼材8の端部を前記定着部型枠7におけ
る側板に挿通すると共に、そのPC鋼材8を環状
金網6に結束して環状補強接合部材10を構成す
る環状補強接合部材設置工程と、既設コンクリー
トライニング11と前記加圧用リング3および定
着部型枠7とライニング内周面型枠12との間に
生コンクリート13を注入する工程と、前記推進
用ジヤツキ5を伸長動作させることにより生コン
クリート13を圧縮すると共にシールド機4を前
進移動させる工程と、その生コンクリート13が
凝結を開始し自立したのち、前記推進用ジヤツキ
5を短縮動作させて加圧用リング3を前進移動さ
せる工程とを反復して行なうことを特徴とするシ
ールドトンネルの場所打ちPCライニング施工法。
1. A pressurizing ring 3 configured by providing a plurality of recesses 2 for fitting the fixing part formwork on the inner peripheral side of the rear part of the steel annular body 1 is attached to the rear part of the propulsion jack 5 in the shielding machine 4, and then An annular wire mesh 6 to which a large number of anchor reinforcing bars 9 that protrude rearward are attached is brought into contact with the rear surface of the pressurizing ring 3, and a fixing part formwork 7 is placed within a plurality of notches provided on the inner circumferential side of the annular wire mesh 6. At the same time, the front part of the fixing part formwork 7 is fitted into the recess 2, and the ends of the plurality of arc-shaped PC steel members 8 arranged on the rear surface of the annular wire mesh 6 are inserted into the side plates of the fixing part formwork 7. At the same time, an annular reinforcing joining member installation step is performed in which the PC steel materials 8 are tied together in an annular wire mesh 6 to form an annular reinforcing joining member 10, and the existing concrete lining 11, the pressure ring 3, the anchoring part formwork 7, and the inside of the lining are A step of injecting the ready-mixed concrete 13 between the peripheral formwork 12, a step of compressing the ready-mixed concrete 13 by extending the propulsion jack 5 and moving the shield machine 4 forward, and a step of moving the ready-mixed concrete 13 forward. A method for constructing a cast-in-place PC lining for a shield tunnel, characterized in that the process of repeatedly moving the pressurizing ring 3 forward by shortening the propulsion jack 5 and moving the pressurizing ring 3 forward after it starts condensing and stands on its own.
JP61128254A 1986-06-04 1986-06-04 Cast-in-place pc lining execution method of shielding tunnel Granted JPS62288299A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61128254A JPS62288299A (en) 1986-06-04 1986-06-04 Cast-in-place pc lining execution method of shielding tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61128254A JPS62288299A (en) 1986-06-04 1986-06-04 Cast-in-place pc lining execution method of shielding tunnel

Publications (2)

Publication Number Publication Date
JPS62288299A JPS62288299A (en) 1987-12-15
JPH0461957B2 true JPH0461957B2 (en) 1992-10-02

Family

ID=14980304

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61128254A Granted JPS62288299A (en) 1986-06-04 1986-06-04 Cast-in-place pc lining execution method of shielding tunnel

Country Status (1)

Country Link
JP (1) JPS62288299A (en)

Also Published As

Publication number Publication date
JPS62288299A (en) 1987-12-15

Similar Documents

Publication Publication Date Title
JPH0461957B2 (en)
JPS5916621B2 (en) How to build side walls of underground tanks
JP2612522B2 (en) Tunnel lining method and tunnel lining structure
JP2002235453A (en) Pre-stressed concrete storage tank
JPH0393929A (en) Method of constructing composite beam using prestressed u-like precast concrete member
JP2612525B2 (en) Tunnel lining method and tunnel lining structure
JP2005008240A (en) Concrete storage tank and its construction method
JPH02128098A (en) Method of shield lining construction
JP7144341B2 (en) Concrete floor slab joint structure and concrete floor slab joint method
JP3455950B2 (en) Tunnel formwork and joints and their connection structures
JP2941172B2 (en) Manufacturing method of PC segment
JPS6233380B2 (en)
JP7537982B2 (en) Pile head seismic isolation structure and construction method thereof
JP2560483B2 (en) Construction method of annular girder in underground wall.
JPH0251040B2 (en)
CN223661055U (en) A prefabricated vertical component bottom connection device
JP2003285315A (en) Precast pc member, manufacturing method therefor and joining method for precast pc member and another member
JPH0114395B2 (en)
JP2713650B2 (en) Manufacturing method of prestressed steel plate concrete pipe
JPH066877B2 (en) Overcast shield construction method
JPS6315435Y2 (en)
JPS6322216Y2 (en)
JP2551082B2 (en) Lining method in shield method
JPH07292861A (en) Connecting structure of beam and wall
JPS5932684Y2 (en) Grout cap for anchorage in prestressed concrete construction