JPH046813B2 - - Google Patents
[go: Go Back, main page]

JPH046813B2 - - Google Patents

Info

Publication number
JPH046813B2
JPH046813B2 JP13510083A JP13510083A JPH046813B2 JP H046813 B2 JPH046813 B2 JP H046813B2 JP 13510083 A JP13510083 A JP 13510083A JP 13510083 A JP13510083 A JP 13510083A JP H046813 B2 JPH046813 B2 JP H046813B2
Authority
JP
Japan
Prior art keywords
concrete
reinforcing bars
static crushing
excess
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP13510083A
Other languages
Japanese (ja)
Other versions
JPS6026719A (en
Inventor
Kenzo Tanaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiheiyo Cement Corp
Original Assignee
Nihon Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nihon Cement Co Ltd filed Critical Nihon Cement Co Ltd
Priority to JP13510083A priority Critical patent/JPS6026719A/en
Publication of JPS6026719A publication Critical patent/JPS6026719A/en
Publication of JPH046813B2 publication Critical patent/JPH046813B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/005Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 本発明は静的破砕剤を用いた場所打コンクリー
ト杭頭部の除去方法に関し、さらに詳しくは突起
部材を有する鉄筋を使用することにより、静的破
砕剤を膨張させて場所打コンクリート杭頭部を小
割に破砕する除去方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for removing the head of a cast-in-place concrete pile using a static crushing agent, and more specifically, the present invention relates to a method for removing the head of a cast-in-place concrete pile using a static crushing agent. This invention relates to a method for removing cast-in-place concrete pile heads by breaking them into small pieces.

場所打コンクリート杭の場合、その杭頭部の余
盛りコンクリートを除去することは不可欠であ
る。この除去作業は一般に手はつりまたは機械を
用いて行われているが、振動、騒音、発塵の公害
問題を生じるだけでなく、手間と時間が非常に
かゝり非能率であつた。そのため余盛りコンクリ
ート内に位置する鉄筋をあらかじめ被覆材で被覆
し、鉄筋とコンクリートとの付着を防止すること
が提案されているがそれだけでは上記の諸問題は
十分解決したとは言えない。
In the case of cast-in-place concrete piles, it is essential to remove the excess concrete at the head of the pile. This removal work is generally carried out manually or mechanically, but this not only causes pollution problems such as vibration, noise, and dust, but is also very time consuming and inefficient. Therefore, it has been proposed to cover the reinforcing bars located in the excess concrete with a covering material in advance to prevent the reinforcing bars from adhering to the concrete, but this alone cannot be said to have sufficiently solved the above problems.

一方近年静的破砕剤を用いてコンクリートを破
砕除去する方法が行われている。本出願人はこの
方法についての改良を特願昭57−68070(特開昭58
−185823号)で提案したが、杭頭部をコンクリー
ト切断予定面から切断はできても、切断された杭
頭部を廃棄処理するのに、さらにこれを小割しな
ければならなかつた。
On the other hand, in recent years, a method of crushing and removing concrete using a static crushing agent has been used. The present applicant proposed improvements to this method in Japanese Patent Application No. 57-68070 (Japanese Unexamined Patent Publication No.
-185823), but even though the pile head could be cut from the planned cutting surface of the concrete, the cut pile head had to be further divided into smaller pieces in order to be disposed of.

本発明は、この小割作業を杭頭の切断と同時に
行うことのできる方法で、その要旨は余盛りコン
クリート内に位置する鉄筋に突起部材を設け、該
鉄筋はコンクリートの付着を防止するため被覆材
で被覆してコンクリートを打設し、コンクリート
の硬化後、コンクリート切断予定面に設けた複数
本の孔に静的破砕材を充填し、ついで該静的破砕
材を膨張させて破砕する場所打コンクリート杭頭
部の除去方法にある。
The present invention is a method that can perform this subdivision work at the same time as cutting the pile cap, and its gist is that protruding members are provided on the reinforcing bars located in the excess concrete, and the reinforcing bars are coated to prevent concrete from adhering. In place casting, concrete is covered with concrete and placed, and after the concrete has hardened, static crushing material is filled into multiple holes made in the planned cut surface of the concrete, and then the static crushing material is expanded and crushed. This is in the method for removing the head of a concrete pile.

場所打コンクリートの切断予定面に設けた複数
本の孔に静的破砕剤を充填し膨張させれば杭の横
方向に亀裂が生じると同時に縦方向への力が生じ
る。この際余盛りコンクリート内に位置する鉄筋
に強固に取付けられた突起部材が上記の力を受け
れば、その反力が余盛りコンクリートに働き、く
さび作用でその余盛りコンクリートに縦方向の亀
裂を生じせしめる。なおこの場合、鉄筋にはコン
クリートの付着を防止するための被覆材を被覆し
ているので上記の力を妨害することはない。
When a static crushing agent is filled into multiple holes in the planned cutting surface of cast-in-place concrete and allowed to expand, cracks occur in the horizontal direction of the pile, and at the same time, force is generated in the vertical direction. At this time, if the protruding member firmly attached to the reinforcing steel located in the excess concrete receives the above force, the reaction force will act on the excess concrete, causing vertical cracks in the excess concrete due to a wedge effect. urge In this case, the reinforcing bars are coated with a covering material to prevent concrete from adhering to them, so the above-mentioned force will not be interfered with.

鉄筋に設けた突起部材はこのような働きをする
ものであるから、その形状としてはくさび状のも
の、おの状のもの、また断面が円形または星状の
錐体あるいは鉄筋の先端を180゜折り曲げたもので
もよいが、その中でもくさび状のものを杭の中心
に向けておけば効率のよい小割ができる。また鉄
筋に設ける突起部材の歯の位置は余盛りコンクリ
ートの上部から20〜30%下の位置が望ましい。
The protruding members installed on the reinforcing bars function in this way, so they can be wedge-shaped, hatchet-shaped, cone-shaped with a circular or star-shaped cross section, or the tip of the reinforcing bar can be bent 180 degrees. You can use bent ones, but if you point the wedge-shaped ones toward the center of the pile, you can make small cuts more efficiently. In addition, the teeth of the protruding members provided on the reinforcing bars are preferably positioned 20 to 30% below the top of the excess concrete.

突起部材は小割りしたい大きさに合せて鉄筋の
周囲に適宜数設ける。
An appropriate number of protruding members are provided around the reinforcing bars according to the desired size of subdivision.

鉄筋用の被覆材としては市販されている紙製、
発泡スチロール製、筒状のシース管でもよく、ま
た粘着性テープを鉄筋に巻き付けてもよい。
Commercially available paper coverings for reinforcing bars,
It may be a cylindrical sheathed tube made of styrofoam, or it may be wrapped with adhesive tape around the reinforcing steel.

本発明方法を図によつて説明する。 The method of the present invention will be explained using figures.

第1図はコンクリート杭頭部の平面図であり、
第2図はその側断面図である。鉄筋1がコンクリ
ート内に多数植えられ、被覆材5で被覆されてい
る。この中の数本、例えば第1図では6本の鉄筋
にくさび状の突起部材2が設けられている。第3
図は鉄筋のくさび状突起部材の拡大図でAは側面
図、Bは突起部材の正面図である。
Figure 1 is a plan view of the concrete pile head.
FIG. 2 is a side sectional view thereof. A large number of reinforcing bars 1 are planted in concrete and covered with a covering material 5. Wedge-shaped protruding members 2 are provided on some of these reinforcing bars, for example, six in FIG. 1. Third
The figures are enlarged views of a wedge-shaped protruding member of reinforcing bars, with A being a side view and B being a front view of the protruding member.

余盛りコンクリート8の破砕はまず切断予定面
6で幅約2mmの横の亀裂を起させてから、さらに
その幅を広げる段階ではじめて突起部材2の歯3
が余盛りコンクリートに対し作用するよう、余盛
りコンクリート8と歯3との間が垂直方向で約2
mm程度縮む余地を設けておく方がよい。この縮む
余地を設けておかないと、切断予定面での横の亀
裂と余盛りコンクリートの小割のための縦の亀裂
とを同時に行わせることになるため、多大の膨張
圧を必要とするだけでなく、杭の残す部分10に
まで縦方向の亀裂が及んでしまうおそれがある。
To crush the excess concrete 8, first, a horizontal crack with a width of about 2 mm is caused at the planned cutting surface 6, and only when the width is further widened is the tooth 3 of the protruding member 2
The distance between the extra concrete 8 and the tooth 3 is approximately 2 in the vertical direction so that the extra concrete acts on the extra concrete.
It is better to allow room for shrinkage of about mm. If this shrinkage room is not provided, horizontal cracking at the planned cutting surface and vertical cracking due to the subdivision of the excess concrete will occur at the same time, which will only require a large amount of expansion pressure. Instead, there is a risk that the vertical cracks will extend to the remaining portion 10 of the pile.

この縮む余地を設ける手段としては突起部材の
歯に強い力で縮む被覆材9、例えば発泡スチロー
ル、ゴム、紙等の弾性のあるもので被覆してもよ
く、あるいは突起部材を鉄筋に取付ける場合、突
起部材に長穴を設ける等の細工をして、突起部材
は最初に約2mm余盛りコンクリートと一緒に膨張
力によつて縦方向に動くが、それ以上は動かない
ようにしてもよい。
As a means for providing room for this contraction, the teeth of the protruding member may be covered with a covering material 9 that shrinks with a strong force, for example, an elastic material such as styrofoam, rubber, paper, etc., or when the protruding member is attached to a reinforcing bar, the protruding member may be It is also possible to make elongated holes in the member so that the projecting member initially moves vertically along with the approximately 2 mm excess concrete due to the expansion force, but does not move any further.

かくして静的破砕剤の膨張圧によつて余盛りコ
ンクリートは切断予定面で小割に破砕される。
In this way, the excess concrete is crushed into small pieces at the planned cutting surface by the expansion pressure of the static crushing agent.

本発明によれば、コンクリート杭頭部の切断と
同時に縦方向の小割ができる。したがつて従来の
手または機械による小割作業あるいは縦に穿孔し
て静的破砕剤で破砕する小割作業に比べ、極めて
簡単でしかも効率よく小割作業が行える。
According to the present invention, the concrete pile head can be cut into small pieces in the vertical direction at the same time. Therefore, compared to the conventional dicing operation by hand or machine, or the dicing operation in which vertical holes are drilled and crushed using a static crushing agent, the dicing operation can be carried out extremely easily and efficiently.

次に実施例によつて本発明を具体的に説明す
る。
Next, the present invention will be specifically explained with reference to Examples.

実施例 第1図の如き直径1400mmの場所打コンクリート
杭の頭部約1mの余盛りコンクリートを除去する
ため、突起部材を6個用いた。この突起部材は鉄
筋にはめ込むための管、歯、ボルト、被覆材から
なる。歯は長さ200mm、厚さ30mm、歯の部分の高
さ26mm、角度60゜からなり、さらに被覆材(発泡
スチロール)で約2mm被覆されている。この突起
部材の管を余盛りコンクリート内に位置する鉄筋
にはめ込みボルトで固定した。また鉄筋(外径54
mm)はコンクリートの付着を防止するためポリス
チレン保温筒(内径34mm)により鉄筋に被覆し
た。
Example Six projecting members were used to remove approximately 1 m of excess concrete from the head of a cast-in-place concrete pile with a diameter of 1400 mm as shown in Fig. 1. This projecting member consists of a tube, teeth, bolts, and sheathing material for fitting into the reinforcing steel. The teeth are 200 mm long, 30 mm thick, 26 mm high, and angled at 60 degrees, and are further covered with approximately 2 mm of covering material (styrofoam). The tube of this projecting member was fitted into the reinforcing bars located in the excess concrete and fixed with bolts. Also reinforcing bars (outer diameter 54
mm) was covered with a polystyrene heat-insulating cylinder (inner diameter 34 mm) on the reinforcing bars to prevent concrete from adhering.

コンクリートを打設し、その硬化後コンクリー
ト切断予定面に設けた8本の孔に静的破砕剤を充
填し、静的破砕剤を膨張させたところ、16時間後
に切断予定面に亀裂が生じ、さらにその後間もな
く余盛りコンクリートに縦の亀裂が生じ6個に分
割破砕された。
After concrete was placed and hardened, a static crushing agent was filled into the eight holes made on the concrete surface to be cut, and when the static crushing agent was expanded, cracks appeared on the surface to be cut after 16 hours. Shortly thereafter, vertical cracks appeared in the excess concrete and it was broken into six pieces.

【図面の簡単な説明】[Brief explanation of drawings]

第1図および第2図は本発明方法の説明用コン
クリート杭頭部図で第1図は平面図、第2図は側
面図を示す。第3図は本発明のくさび状突起部材
の拡大図でAは側面図、Bは正面図である。 1……鉄筋、2……突起部材、3……突起部材
の歯、4……ボルト、5……被覆材、6……切断
予定面、7……静的破砕剤用孔、8……余盛りコ
ンクリート、9……突起部材の被覆材、10……
コンクリートの残す部分。
1 and 2 are views of the head of a concrete pile for explaining the method of the present invention, with FIG. 1 showing a plan view and FIG. 2 showing a side view. FIG. 3 is an enlarged view of the wedge-shaped projection member of the present invention, with A being a side view and B being a front view. DESCRIPTION OF SYMBOLS 1...Reinforcement bar, 2...Protrusion member, 3...Teeth of protrusion member, 4...Bolt, 5...Coating material, 6...Planned cutting surface, 7...Hole for static crushing agent, 8... Excess concrete, 9... Covering material for protrusion members, 10...
The remaining part of the concrete.

Claims (1)

【特許請求の範囲】 1 余盛りコンクリート内に位置する鉄筋に突起
部材を設け、該鉄筋はコンクリートの付着を防止
するため被覆材で被覆してコンクリートを打設
し、コンクリートの硬化後、コンクリート切断予
定面に設けた複数本の孔に静的破砕剤を充填し、
ついで該静的破砕剤を膨張させて破砕することを
特徴とする場所打コンクリート杭頭部の除去方
法。 2 突起部材がくさび状である特許請求の範囲第
1項記載の除去方法。
[Scope of Claims] 1. Protruding members are provided on reinforcing bars located in excess concrete, the reinforcing bars are covered with a covering material to prevent adhesion of concrete, concrete is poured, and after the concrete hardens, the concrete is cut. Static crushing agent is filled into multiple holes made on the planned surface,
A method for removing a cast-in-place concrete pile head, the method comprising: then expanding the static crushing agent to crush the head. 2. The removal method according to claim 1, wherein the protrusion member is wedge-shaped.
JP13510083A 1983-07-26 1983-07-26 Removal of head of cast-in-place concrete pile Granted JPS6026719A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13510083A JPS6026719A (en) 1983-07-26 1983-07-26 Removal of head of cast-in-place concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13510083A JPS6026719A (en) 1983-07-26 1983-07-26 Removal of head of cast-in-place concrete pile

Publications (2)

Publication Number Publication Date
JPS6026719A JPS6026719A (en) 1985-02-09
JPH046813B2 true JPH046813B2 (en) 1992-02-07

Family

ID=15143835

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13510083A Granted JPS6026719A (en) 1983-07-26 1983-07-26 Removal of head of cast-in-place concrete pile

Country Status (1)

Country Link
JP (1) JPS6026719A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH085247B2 (en) * 1986-10-06 1996-01-24 大日本印刷株式会社 Uzukuri wood grain decorative material
CN103452114A (en) * 2013-09-23 2013-12-18 甘肃路桥建设集团有限公司 Bridge cast-in-place pile head chiseling method

Also Published As

Publication number Publication date
JPS6026719A (en) 1985-02-09

Similar Documents

Publication Publication Date Title
JPH046813B2 (en)
JPS6047119A (en) Vibration and noise-free breaking of head of cast-in-place pile
JPH03107017A (en) Pile head treatment method for cast-in-place concrete pile
JP2942807B2 (en) Seismic retrofitting method for existing RC structures
KR102123542B1 (en) Construction method of cast-in-placed-pile using steel rebar banding
JP2001182054A (en) Method and implement for removing pile head extra-fill of cast-in-place concrete pile
JPS6145726B2 (en)
JP3979646B2 (en) Concrete building repair method
JP2576756B2 (en) Pile head treatment method for ready-made prestressed concrete pile
JPH11236769A (en) Breaking method for increase of reinforced concrete building
JP2003306906A (en) Method for removing laminated rubber body in laminated rubber bearing
JPS61242262A (en) Surface delamination of structure
JP4152234B2 (en) Fiber reinforced column for shield excavation
JPH0771032A (en) Prefabricated pile and installation method thereof
JP2741458B2 (en) Rebar spacing holder and rebar holder
JP3648670B2 (en) Seismic isolation device installation method for existing foundation deep piles
JP2931475B2 (en) Concrete structure head shaving method
JPH0438007Y2 (en)
JPH0626295A (en) Adjusting method for building frame surface
JP2003082676A (en) Verge off member and construction of face of slope
JPS63523A (en) Treatment of heat of cast-in-place concrete pile
JPS6133932B2 (en)
JPS586906Y2 (en) concrete pile
JPH02221561A (en) Method for constituting plastic hinge in existing pillar of reinforced concrete structure
JPS5955943A (en) Flange trimming and slitting of waist wall and suspended wall