JPH0475994B2 - - Google Patents
Info
- Publication number
- JPH0475994B2 JPH0475994B2 JP1392287A JP1392287A JPH0475994B2 JP H0475994 B2 JPH0475994 B2 JP H0475994B2 JP 1392287 A JP1392287 A JP 1392287A JP 1392287 A JP1392287 A JP 1392287A JP H0475994 B2 JPH0475994 B2 JP H0475994B2
- Authority
- JP
- Japan
- Prior art keywords
- box
- propulsion
- shaft
- cart
- starting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000001125 extrusion Methods 0.000 claims 1
- 230000001681 protective effect Effects 0.000 description 14
- 238000000034 method Methods 0.000 description 12
- 230000032258 transport Effects 0.000 description 10
- 238000010276 construction Methods 0.000 description 9
- 239000004567 concrete Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 239000004576 sand Substances 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000000945 filler Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000002542 deteriorative effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【発明の詳細な説明】
《産業上の利用分野》
この発明は、例えば市街地などにおける地下ト
ンネルの老朽化に伴ない、トンネルの使用に支障
を与えることなくこれを外部より補強するための
既存トンネルの防護工法に用いられる函体推進装
置に関する。[Detailed Description of the Invention] <<Industrial Application Field>> This invention is a method for reinforcing existing tunnels from the outside without interfering with the use of the tunnels, as underground tunnels in urban areas become obsolete. This article relates to a box propulsion device used in protection construction methods.
《従来の技術》
地下トンネルの老朽化に伴ない、このトンネル
を壊さずにそのままの状態で使用し、しかもトン
ネルの補強工事を行うための工法として、最も簡
単には第7図に示すように、既存トンネル1の両
側部を地下連続壁2で囲い、その状態で既存トン
ネル1の上部を開削し、コンクリート頂版3を架
設し、既存トンネル1を包囲することである。《Prior art》 As underground tunnels age, the easiest way to use them as they are without destroying them and to carry out tunnel reinforcement work is as shown in Figure 7. , both sides of the existing tunnel 1 are surrounded by underground continuous walls 2, and in this state, the upper part of the existing tunnel 1 is excavated, a concrete top slab 3 is erected, and the existing tunnel 1 is surrounded.
《発明が解決しようとする問題点》
しかし、市街地などでこの工事を行うために
は、地上部における既存建物との関係や、既存ト
ンネル1の上部の地中内に配置されているガス管
や上下水道管、電話ケーブルの埋設管など種々の
地下埋設物を考慮しなければならない。特に繁華
街において老朽化が進んでいる地下鉄のトンネル
1などではその上部の埋設物が錯雑に配置され、
どの位置にあるかも解らないし、既存建物がトン
ネル1上部の地表面に位置している場合もあり、
したがつて、実質的にはこの種の工法は採用範囲
が非常に限定される。<<Problems to be solved by the invention>> However, in order to carry out this construction in urban areas, etc., it is necessary to consider the relationship between the above-ground parts and existing buildings, the gas pipes placed underground above the existing tunnel 1, etc. Various underground structures such as water and sewage pipes and telephone cable pipes must be considered. Particularly in areas such as subway tunnel 1, which is deteriorating in downtown areas, the buried objects above are arranged in a complicated manner.
We do not know where it is located, and there are cases where existing buildings are located on the ground surface above Tunnel 1.
Therefore, the range of application of this type of construction method is actually very limited.
また、この種の防護工事において既存トンネル
1を壊して新たなトンネルを構築する場合にも営
業用の線路を迂回させるための代替地を予め確保
しなければならないため、代替地の余裕がない状
態では建替え工事もままにならないものとなつて
いた。 In addition, in this type of protection work, when the existing tunnel 1 is to be demolished and a new tunnel constructed, an alternative site must be secured in advance to detour the commercial track, so there is no room for an alternative site. The rebuilding work was also at a standstill.
そこで、本願発明者は、以上の実情に鑑みて新
たな既存トンネルの防護工法として、既存トンネ
ルを挾んでその側方に一対の導坑を掘削し、この
導坑間に推進工法で中空函体を多列状態に密接配
置し、しかる後に中空函体の内部にコンクリート
を打設して既存トンネルを覆う頂版を形成する工
法を開発した。かかる工法については、本願出願
人により同日付で出願された特願昭62−13921号
(特開昭63−184693号公報参照)に記載されてい
る。 Therefore, in view of the above-mentioned circumstances, the inventor of the present application proposed a new method for protecting existing tunnels by excavating a pair of guide shafts on the sides of the existing tunnel, and using a propulsion method to construct a hollow box between the guide shafts. We developed a construction method in which tunnels are closely arranged in multiple rows, and then concrete is poured inside the hollow box to form a top slab that covers the existing tunnel. Such a construction method is described in Japanese Patent Application No. 13921/1982 (see Japanese Patent Application Laid-Open No. 184693/1983) filed on the same date by the applicant of the present invention.
そして、この工法では、中空状の函体を推進工
法により順次多列状態に密接配置してゆくもので
あるが、かかる工法に適した函体推進装置は開発
されていなかつた。 In this construction method, hollow boxes are successively arranged closely in multiple rows using a propulsion method, but a box propulsion device suitable for this construction method has not yet been developed.
すなわち、管路の布設等に用いられていた従来
の推進工法用の装置では、上記工法に用いる場
合、各列に対応した推進作業位置に迅速に移動す
るための手段を備えていないので装置の据付け作
業に手間がかかるとともに、各列に対応した推進
作業位置への函体の運搬及び位置決め作業が困難
なため、既存トンネルを覆う頂版を能率よく施工
することができないという問題があつた。 In other words, when using conventional propulsion method equipment used for laying pipes, etc., when used in the above method, it is difficult to use the equipment because it does not have a means to quickly move to the propulsion work position corresponding to each row. There was a problem in that the top slab covering the existing tunnel could not be efficiently constructed because the installation work was time-consuming and it was difficult to transport and position the boxes to the propulsion work positions corresponding to each row.
この発明は以上の実状に鑑みなされたものであ
り、その目的とするところは、既存トンネルを壊
さずに外部から防護用の頂版を推進工法で構築す
る際に、多列状態で密接配置される函体の設置が
能率よく行なえる函体推進装置を提供することに
ある。 This invention was made in view of the above-mentioned circumstances, and its purpose is to provide a method for constructing protective top slabs from the outside using the propulsion method without destroying existing tunnels, so that they can be closely spaced in multiple rows. An object of the present invention is to provide a box propulsion device that can efficiently install a box.
《問題点を解決するための手段》
上記目的を達成するために、この発明の函体推
進装置は、地中に掘削された導坑に沿つて複数列
敷設した軌条と、該軌条上に移動可能に配置され
る函体の運搬台車と、前記軌条上に移動可能に配
置され、所定の位置にセツトされるとともに前記
運搬台車から前記函体を受承して前記導坑の一側
面に前記函体を位置決めする函体発進台車と、前
記軌条のうち前記函体発進台車が移動する軌条と
隣接する軌条上を移動し、前記函体発進台車と隣
接してセツトされるとともに、前記函体発進台車
上に設置された前記函体を前記導坑の一側面から
導坑に対し略垂直方向に向けて押圧する押出し手
段を備える推進台車とからなることを特徴とする
ものである。<Means for Solving the Problems> In order to achieve the above object, the box propulsion device of the present invention includes a plurality of rails laid in multiple rows along a shaft excavated underground, and a movement on the rails. a carriage for transporting the box, which is movably disposed on the rail, is set at a predetermined position, receives the box from the carriage, and carries the box on one side of the shaft; a box starting cart that positions the box; a box starting cart that moves on a rail adjacent to the rail on which the box starting cart moves among the rails, is set adjacent to the box starting cart; The present invention is characterized by comprising a propulsion truck equipped with a pushing means for pressing the box installed on the starting truck from one side of the shaft in a direction substantially perpendicular to the shaft.
ここで、前記所定の位置とは、前記軌条上にお
ける、多列状態で密接配置される函体の各列に対
応した推進作業位置をいう。 Here, the predetermined position refers to a propulsion work position corresponding to each row of boxes closely arranged in multiple rows on the rail.
なお、前記函体を押圧する略垂直方向とは、幾
何学的に厳密な垂直方向のみならず、函体を導坑
の側方に押出すべく、施工性等を鑑みて適宜選択
される略垂直方向を含むことを意味するものであ
る。 Note that the substantially vertical direction in which the box is pressed is not limited to the strictly vertical direction geometrically, but may also be an approximate direction that is appropriately selected in consideration of workability, etc. in order to push the box to the side of the shaft. This is meant to include the vertical direction.
《作用》
上記構成の推進装置によれば、導坑間に多数の
函体を多段且つ多列状態に密接渡設する場合に、
順次函体を運搬台車で搬送しながら、函体を受承
した函体発進台車で位置決めして、推進台車上の
ジヤツキで押圧推進でき、これらの作業を一連の
流れ作業として行なえるので、函体の設置が能率
よく行なえる。<<Operation>> According to the propulsion device having the above configuration, when a large number of boxes are closely placed between the shafts in multiple stages and in multiple rows,
While the boxes are being transported one by one on a transport cart, the boxes can be positioned using the received box starting cart, and then pushed and pushed by the jacks on the propulsion cart. These operations can be performed as a series of assembly operations, so that the boxes can be The body can be set up efficiently.
《実施例》
以下、この発明の好適な実施例について、添附
図面を参照にして詳細に説明する。<<Example>> Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
第1図から第5図は、この発明に係る函体推進
装置の一実施例を示しており、また、第6図は同
装置を用いて既存トンネルに防護工を構築した場
合の完成図である。 Figures 1 to 5 show an embodiment of the box propulsion device according to the present invention, and Figure 6 is a completed diagram of a protection structure constructed in an existing tunnel using the same device. be.
この実施例の推進装置は、第4図のように、既
存トンネル10の側方に一対の導坑12,12を
掘削した状態で使用される。 The propulsion device of this embodiment is used with a pair of shafts 12, 12 excavated on the sides of an existing tunnel 10, as shown in FIG.
導坑12の構築方法について簡単に説明する
と、この実施例では、まず、既存トンネル10の
両側部において、導坑12,12を掘削するため
の発進竪坑11(第1図参照)を導坑12,12
の延長線上に構築設置する。 To briefly explain the method of constructing the guide shaft 12, in this embodiment, first, a starting shaft 11 (see FIG. 1) for excavating the guide shafts 12, 12 is constructed on both sides of the existing tunnel 10. ,12
Constructed and installed on the extension line of.
発進竪坑11を設置したら、これから既存トン
ネル10の両側面に沿つて一対の下段導坑12a
を掘削する。 After installing the starting shaft 11, a pair of lower guide shafts 12a will be installed along both sides of the existing tunnel 10.
excavate.
下段導坑12aは、この実施例では既存トンネ
ル10の底版とほぼ同じレベルに、手掘工法、ロ
ツクボルトを併用した機械掘工法などで掘り進め
られ、断面矩形型の支保工14を適宜間隔で設置
するとともに、支保工14,14の間にはコンク
リートの吹き付けによる覆工が行なわれる。 In this embodiment, the lower guide shaft 12a is dug at approximately the same level as the bottom slab of the existing tunnel 10 by a hand digging method, a mechanical digging method using lock bolts, etc., and shoring structures 14 having a rectangular cross section are installed at appropriate intervals. At the same time, a lining is performed between the shorings 14, 14 by spraying concrete.
そして、既存トンネル10に防護工を施工する
区間が掘削されると、下段導坑12aの内部から
場所打ち杭工法により、適宜間隔をおいて、防護
壁体の鉛直荷重および土圧による水平荷重を支持
する杭16,16が造成され、杭16の頭部には
鉄筋コンクリート製の下段防護壁18aを構築し
て、その後に下段導坑12aの間隙に気泡コンク
リートなどの充填材20が注入される。 When a section of the existing tunnel 10 where protection is to be constructed is excavated, the vertical load of the protective wall and the horizontal load due to earth pressure are removed from the inside of the lower shaft 12a at appropriate intervals using the cast-in-place pile construction method. Supporting piles 16, 16 are constructed, a lower protective wall 18a made of reinforced concrete is constructed at the head of the pile 16, and then a filler material 20 such as aerated concrete is injected into the gap of the lower guide shaft 12a.
次いで、下段導坑12aの上方に中段導坑12
bを掘削し、下段防護壁18aの上部に鉄筋コン
クリート製の中段防護壁18bを構築した後、充
填材20が注入される。 Next, the middle shaft 12 is placed above the lower shaft 12a.
b is excavated and a middle protection wall 18b made of reinforced concrete is constructed on top of the bottom protection wall 18a, and then the filler 20 is injected.
しかる後、中段導坑12bの上部に上段導坑1
2cが掘削され、この状態で本発明に係る推進装
置が発進側の一方の上段導坑12c内に設置され
る。 After that, an upper shaft 1 is installed above the middle shaft 12b.
2c is excavated, and in this state, the propulsion device according to the present invention is installed in one of the upper shafts 12c on the starting side.
推進装置は、第1図から第3図に示すように、
上段導坑12c内に敷設された掘削土砂の搬出用
軌条30と、中空函体60の運搬用軌条32と、
搬出用軌条30上に設置された、掘削土砂搬出台
車34及び押出し手段としての推進ジヤツキ35
が載置された推進台車36と、運搬用軌条32上
に設置された、中空函体60の運搬台車38及び
発進台車40とを有し、各台車34,36,3
8,40は上段導坑12cに沿つて走行するとと
もに、搬出台車34および運搬台車38にはそれ
ぞれ牽引車42,42が連結されている。 The propulsion device, as shown in Figs. 1 to 3,
A rail 30 for transporting excavated earth and sand laid in the upper shaft 12c, a rail 32 for transporting the hollow box 60,
An excavated earth and sand transport cart 34 and a propulsion jack 35 as a pushing means are installed on the transport rail 30.
It has a propulsion trolley 36 on which is mounted, a transport trolley 38 for the hollow box 60 and a starting trolley 40 installed on the transportation rail 32, and each trolley 34, 36, 3
8 and 40 run along the upper guide shaft 12c, and tow cars 42 and 42 are connected to the carry-out cart 34 and the transport cart 38, respectively.
また、推進台車36、中空函体60の運搬台車
38、発進台車40には、それぞれ架台の上下レ
ベルを調整するジヤツキが付設されている。 Further, the propulsion truck 36, the transport truck 38 for the hollow box 60, and the starting truck 40 are each provided with a jack for adjusting the vertical level of the mount.
さらに、上段導坑12cの天井面には、ホイス
トクレーン44の案内軌条46が固設され(第2
図参照)、ホイストクレーン44は上記推進台車
36と搬出用台車34との間に設置されるベルト
コンベア48を支持している。 Furthermore, a guide rail 46 of a hoist crane 44 is fixedly installed on the ceiling surface of the upper shaft 12c (second
(see figure), a hoist crane 44 supports a belt conveyor 48 installed between the propulsion truck 36 and the carry-out truck 34.
第3図は、上記推進ジヤツキ35の設置状態の
詳細を示している。推進ジヤツキ35は、この実
施例では4本用いられ、推進台車36の架台36
a上に反力スライド装置50および反力受鋼材5
2を介して、ほぼ水平状態に支持されている。 FIG. 3 shows details of the installation state of the propulsion jack 35. In this embodiment, four propulsion jacks 35 are used.
A reaction force slide device 50 and reaction force receiving steel material 5 are mounted on a.
2, it is supported in a substantially horizontal state.
そして、推進ジヤツキ35の伸縮プランジヤ側
には押輪54が装着されている。 A push ring 54 is attached to the telescopic plunger side of the propulsion jack 35.
一方、他方の上段導坑12c内には、軌条56
と走行台車58だけが設置されている。 On the other hand, a rail 56 is provided in the other upper shaft 12c.
Only the traveling trolley 58 is installed.
以上の如く構成された推進装置で中空函体60
を上段導坑12c,12c間に配置するには、ま
ず推進ジヤツキ35を載置した推進台車36と発
進台車40とが、既存トンネル10の上部に施工
される、多列状態で密接配置される函体からなる
防護工の一端側において、各列に対応する推進作
業位置にセツトされる。 The hollow box 60 is constructed using the propulsion device configured as described above.
In order to arrange the tunnel between the upper shafts 12c and 12c, first, the propulsion truck 36 on which the propulsion jack 35 is mounted and the starting truck 40 are constructed in the upper part of the existing tunnel 10, and are closely arranged in multiple rows. At one end of the protective work consisting of a box, it is set at a propulsion work position corresponding to each row.
次いで、運搬台車38に中空函体60を載せて
発進台車40の近傍まで走行した後、中空函体6
0を発進台車40に移し替え、上段導坑12cの
内壁に一端が当接するようにセツトする。 Next, the hollow box 60 is placed on the transport trolley 38 and the hollow box 60 is moved to the vicinity of the starting trolley 40.
0 to the starting truck 40, and set it so that one end is in contact with the inner wall of the upper guide shaft 12c.
この場合、第1段目の中空函体60の先端には
刃口62が装着される。 In this case, a cutting edge 62 is attached to the tip of the first stage hollow box 60.
次いで、推進ジヤツキ35を伸長して中空函体
60の後端を押圧し、既存トンネル10の延長方
向と直交するようにして、上段導坑12cに対し
て略垂直方向にこれを圧入する。 Next, the propulsion jack 35 is extended to press the rear end of the hollow box 60, and it is press-fitted into the upper shaft 12c in a substantially perpendicular direction so as to be orthogonal to the extension direction of the existing tunnel 10.
圧入に当つて、推進ジヤツキ35のジヤツキス
トロークが短い場合には、押輪54と中空函体6
0との間に間挿輪64を挿入する。 When press-fitting, if the jacking stroke of the propulsion jack 35 is short, the push ring 54 and the hollow box 6
0, an intervening ring 64 is inserted between the two.
また、中空函体60の圧入と同時に、その内部
の土砂を掘削し、掘削された土砂はベルトコンベ
ア48を介して掘削土砂搬出台車34に収容して
外部に排出する。 Further, at the same time as the hollow box 60 is press-fitted, the earth and sand inside the hollow box 60 is excavated, and the excavated earth and sand is stored in the excavated earth and sand carrying cart 34 via the belt conveyor 48 and discharged to the outside.
第1段目の中空函体60が所定位置まで圧入さ
れると、その間に運搬台車38で運ばれた2段目
の中空函体60が、発進台車40上に移し替えら
れ、函体60,60同士をカラーで接合して、推
進ジヤツキ35による圧入と内部の掘削が行なわ
れる。 When the first-stage hollow box 60 is press-fitted to a predetermined position, the second-stage hollow box 60, which was carried by the transport cart 38, is transferred onto the starting cart 40, and the box 60, 60 are joined together with a collar, and press-fitting and internal excavation are performed using the propulsion jack 35.
以上の作業を繰返すことにより、第1段目の中
空函体60の先端が他方の導坑12cに到達する
と、刃口62を脱着して走行台車58によつて上
段導坑12c内を搬送し、次回以降の推進作業に
繰返し使用される。 By repeating the above operations, when the tip of the first stage hollow box 60 reaches the other shaft 12c, the cutting edge 62 is attached and detached, and the carriage 58 transports it inside the upper shaft 12c. , will be used repeatedly for subsequent propulsion operations.
そして、1列分の中空函体60の導坑12c,
12c間の渡設が終了すると、推進台車36、発
進台車40を中空函体60の幅にほぼ相当する距
離だけ移動させて次の列に対応する推進作業位置
にセツトし、上記と同様な作業を繰返して第2列
以降の中空函体60の渡設が行なわれる。 And the guide shaft 12c of the hollow box 60 for one row,
When the transfer between 12c and 12c is completed, the propulsion cart 36 and the starting cart 40 are moved by a distance approximately equivalent to the width of the hollow box 60, set at the propulsion work position corresponding to the next row, and the same work as above is performed. By repeating this process, the hollow boxes 60 from the second row onwards are transferred.
ここで、この実施例で用いられる中空函体60
について説明すると、中空函体60は矩形断面の
2種類のものが使用されている。 Here, the hollow box 60 used in this example
To explain, two types of hollow boxes 60 with rectangular cross sections are used.
一種類の中空函体60aは、両端が開口し4側
面に鋼板を固着したものであつて、防護用頂版6
8の第1列と最終列とに用いられる。もう一種類
の中空函体60bは、中間部分の各列に使用する
ものであつて、その詳細を第5図に示している。 One type of hollow box 60a is open at both ends and has steel plates fixed to four sides, and has a protective top plate 6.
8 is used for the first and last columns. Another type of hollow box 60b is used for each row in the middle section, and its details are shown in FIG.
中空函体60bは、天板601および底板60
2は前記と同様の鋼板製であるが、一側部が開口
したコ字形断面をなし、他側部はラスなどの金網
板603から構成されている。また、両側部の上
下にはアングル板604で補強されているととも
に、各アングル板604の側面には互いに逆向の
鉤形フツク部605が側面に突出状態で一体化さ
れ、隣り合う列間の各中空函体60b同士が鉤形
に係合しあつた状態で接合されるようになつてお
り、隣接列間の中空函体60b同士が繋がれた状
態で密接配置できるようにしてある。 The hollow box 60b has a top plate 601 and a bottom plate 60.
2 is made of the same steel plate as above, but has a U-shaped cross section with one side open, and the other side is made of a wire mesh plate 603 such as lath. In addition, the upper and lower sides of both sides are reinforced with angle plates 604, and hook-shaped hooks 605 in opposite directions are integrated into the side surfaces of each angle plate 604, and each side of each angle plate 604 is The hollow boxes 60b are joined together in a hook-shaped manner, so that the hollow boxes 60b in adjacent rows can be closely arranged in a connected state.
なお、フツク部605の係合面内部にコーキン
グ材66を充填することによつて、各中空函体6
0b同士の接合面は完全にシールされ、水密状態
を保つことができる。またフツク部605の係合
だけでは結合が弱いので、前記と同様に一推進作
業完了ごとに前後段の中空函体60bのアングル
板604同士をボルトBによつて結合すれば各中
空函体60b同士は縦横に結合し、強固な結合と
なる。 Note that by filling the inside of the engaging surface of the hook portion 605 with caulking material 66, each hollow box 6
The joint surfaces between the 0b's are completely sealed and a watertight state can be maintained. In addition, since the connection is weak only by engaging the hook portion 605, if the angle plates 604 of the front and rear hollow boxes 60b are connected with each other with bolts B each time one propelling operation is completed, each hollow box 60b They connect vertically and horizontally, creating a strong bond.
さらに、第1列ないしは最終列の中空函体60
aと上記中空函体60bとをフツク部605およ
びボルトBによつて結合させることも勿論可能で
ある。 Furthermore, the first row or the last row of hollow boxes 60
Of course, it is also possible to connect the hollow box 60b with the hook portion 605 and the bolt B.
さて、以上の手順を繰り返しつつ防護工区全体
に中空函体60を配置すれば、隣接する列同士は
金網板603を通じて横に連通した状態で縦横マ
トリツクス状に接合され、平板状の一つの空間を
各中空函体60で囲んだ状態に形成する。 Now, by repeating the above steps and arranging the hollow boxes 60 throughout the protection area, adjacent rows will be joined in a vertical and horizontal matrix with horizontal communication through the wire mesh plates 603, and one flat space will be formed. It is formed in a state surrounded by each hollow box 60.
そして、推進作業が終了し、中空函体60部分
と導坑12c,12cとが連通した後は、各機材
を撤去し、既存トンネル10の天井面上部に形成
された空間内部に縦横に鉄筋を配筋し、コンクリ
ートを打設して頂版68を構築する。 After the propulsion work is completed and the hollow box 60 portion communicates with the guide shafts 12c, 12c, each piece of equipment is removed and reinforcing bars are installed vertically and horizontally inside the space formed above the ceiling surface of the existing tunnel 10. The top slab 68 is constructed by placing reinforcement and pouring concrete.
そして、頂版68が構築されると、上段導坑1
2c,12c内に、前記中段導坑12b,12b
内に構築した前記中段防護壁18b,18bと、
前記頂版68の両端とを連結するL字形の上段防
護壁18cを鉄筋コンクリートで構築し、さらに
上段導坑12c,12c内の空隙に充填材20を
充填して、既存トンネル10の両側面および頂部
を囲む、鉄筋コンクリート製の防護壁70と頂版
68の構築工事を終了する。 Then, when the top plate 68 is constructed, the upper shaft 1
2c, 12c, the middle stage shaft 12b, 12b
The middle protective walls 18b, 18b constructed within the
An L-shaped upper protective wall 18c connecting both ends of the top slab 68 is constructed of reinforced concrete, and the gaps in the upper guide shafts 12c are filled with filler 20, thereby protecting both sides and the top of the existing tunnel 10. Construction of the reinforced concrete protective wall 70 and top slab 68 surrounding the building has been completed.
なお、この実施例では既存トンネルの両側部に
形成される導坑12a〜12cを三段重ね状態に
形成したが、既存トンネル10の高さや、作業性
を考慮して一段であつてもいいし、それ以上あつ
てもよい。 In addition, in this embodiment, the guide shafts 12a to 12c formed on both sides of the existing tunnel are formed in a three-tier stacked state, but considering the height of the existing tunnel 10 and workability, they may be one-tier. , there may be more.
また、この実施例では既存トンネル10の上部
にのみ防護用の頂版68を設けたが、既存トンネ
ル10の底面側にも防護版を設けるようにしても
良い。 Further, in this embodiment, the protective top plate 68 is provided only on the top of the existing tunnel 10, but a protective plate may also be provided on the bottom side of the existing tunnel 10.
さらに、上記実施例で示した断面コ字形の中空
函体60bの一側開口は、着脱可能な鋼板で構成
しておき、設置後にこれを除去するようにしても
よく、また、中空函体60bは上段導坑12c,
12c間に渡設するだけでなく、一方の上段導坑
12c側からだけ延長するように設けてもよく、
さらに、上段導坑12cから水平方向に圧入する
だけでなく、斜め方向に圧入してもよい。 Furthermore, one side opening of the hollow box 60b having a U-shaped cross section shown in the above embodiment may be made of a removable steel plate and removed after installation. is the upper shaft 12c,
In addition to being installed between 12c, it may be provided so as to extend only from one upper stage shaft 12c side.
Furthermore, it may be press-fitted not only in the horizontal direction from the upper stage guide shaft 12c but also in the diagonal direction.
さらにまた、他方の金網板603は、適宜個所
に孔部を穿設した孔あき板であつてもよく、ま
た、防護壁18a〜18cは、各導坑12a〜1
2c内に配筋を施してコンクリートを打設して、
その断面積全体を防護壁70とすることもでき
る。 Furthermore, the other wire mesh plate 603 may be a perforated plate with holes bored at appropriate locations, and the protective walls 18a to 18c may be
Place reinforcement within 2c and pour concrete.
The entire cross-sectional area can also be used as the protective wall 70.
《発明の効果》
以上詳細に説明したように、本発明の函体推進
装置は、導坑に沿つて複数列敷設した軌条と、該
軌条上を移動する、函体の運搬台車と、函体を位
置決めする函体発進台車と、函体発進台車と隣接
してセツトされるとともに押出し手段を備える推
進台車とからなり、密接配置される函体の各列に
対応する推進作業位置に、函体を容易に運搬及び
位置決めするとともに、推進台車を容易に推進作
業位置に移動することにより、一対の導坑間に函
体を効率よく多列状態に密接配置して、既存トン
ネルを覆う頂版を容易に形成することができる。<<Effects of the Invention>> As explained in detail above, the box propulsion device of the present invention comprises a plurality of rails laid along a shaft, a box transporting cart that moves on the rails, and a box transporting cart that moves on the rails. It consists of a box starting cart that positions the boxes, and a propulsion cart that is set adjacent to the box starting cart and is equipped with pushing means. By easily transporting and positioning the boxes and easily moving the propulsion truck to the propulsion work position, the boxes can be efficiently arranged in multiple rows between a pair of shafts, and the top plate covering the existing tunnel can be installed. Can be easily formed.
第1図は本発明装置の導坑内設置状態の平面
図、第2図は同側面図、第3図は同装置の使用状
態の説明図、第4図は同装置が設置される導坑の
説明図、第5図は中空函体の詳細説明図、第6図
は同装置を用いて構築された防護工の完成説明
図、第7図は従来の防護工の説明図である。
12……導坑、35……推進ジヤツキ、36…
…推進台車、38……運搬台車、40……発進台
車、60……中空函体。
Fig. 1 is a plan view of the device of the present invention installed in a shaft, Fig. 2 is a side view of the same, Fig. 3 is an explanatory diagram of the device in use, and Fig. 4 is a diagram of the shaft in which the device is installed. 5 is a detailed explanatory diagram of a hollow box, FIG. 6 is a completed explanatory diagram of a protective work constructed using the same device, and FIG. 7 is an explanatory diagram of a conventional protective work. 12... Guide shaft, 35... Propulsion jack, 36...
...Propulsion trolley, 38...Transportation trolley, 40...Starting trolley, 60...Hollow box.
Claims (1)
た軌条と、該軌条上に移動可能に配置される函体
の運搬台車と、前記軌条上に移動可能に配置さ
れ、所定の位置にセツトされるとともに前記運搬
台車から前記函体を受承して前記導坑の一側面に
前記函体を位置決めする函体発進台車と、前記軌
条のうち前記函体発進台車が移動する軌条と隣接
する軌条上を移動し、前記函体発進台車と隣接し
てセツトされるとともに、前記函体発進台車上に
設置された前記函体を前記導坑の一側面から導坑
に対し略垂直方向に向けて押圧する押出し手段を
備える推進台車とからなることを特徴とする函体
推進装置。1. A plurality of rails laid in multiple rows along a shaft excavated underground, a carrier for carrying a box that is movably arranged on the rails, and a carriage that is movably arranged on the rails and placed in a predetermined position. a box starting cart that receives the box from the transport cart and positions the box on one side of the shaft; and a box starting cart that is adjacent to a rail on which the box starting cart moves among the rails. The box is set adjacent to the box starting cart, and the box installed on the box starting cart is moved from one side of the shaft in a direction substantially perpendicular to the shaft. 1. A box propulsion device comprising: a propulsion truck equipped with extrusion means for pushing toward the object;
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1392287A JPS63184698A (en) | 1987-01-26 | 1987-01-26 | Box body propeller |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1392287A JPS63184698A (en) | 1987-01-26 | 1987-01-26 | Box body propeller |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63184698A JPS63184698A (en) | 1988-07-30 |
| JPH0475994B2 true JPH0475994B2 (en) | 1992-12-02 |
Family
ID=11846673
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1392287A Granted JPS63184698A (en) | 1987-01-26 | 1987-01-26 | Box body propeller |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63184698A (en) |
-
1987
- 1987-01-26 JP JP1392287A patent/JPS63184698A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63184698A (en) | 1988-07-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2019120115A (en) | Method of constructing tunnel lining structure | |
| JP3453553B2 (en) | Continuous construction method of precast concrete column wall members | |
| JP4295272B2 (en) | Friction cut plate used in open shield method and its fixing method | |
| JPH0475994B2 (en) | ||
| KR100362810B1 (en) | Shield tunneling apparatus and method | |
| JPH05256083A (en) | Underground tunnel widening method and branching / merging section construction method | |
| JPH07331997A (en) | Constructing method of rock cavern | |
| JP3348052B2 (en) | Open shield machine | |
| JP2656892B2 (en) | Underground structure construction method and continuous underground wall construction method | |
| JP2668648B2 (en) | Construction method of underground structure and starting pit used for it | |
| JPS63201295A (en) | Method of protective construction of existing tunnel | |
| CN100491696C (en) | Method and device for constructing tunnel by propulsion of underground box | |
| JPH06288189A (en) | Laying method for portal culvert | |
| JP4402640B2 (en) | Open shield method | |
| JP4705467B2 (en) | Construction method of underground structure | |
| JP2769941B2 (en) | How to build the basement of the building | |
| JP2026035935A (en) | Open shield construction method and U-shaped concrete open channel for the open shield construction method | |
| JP2963802B2 (en) | How to build an underground parking | |
| JP7082225B1 (en) | Construction method of underground structure | |
| JP3233692B2 (en) | Two-piece open shell construction method | |
| JPS63184693A (en) | Method of protection construction of existing tunnel | |
| JPH0355640B2 (en) | ||
| JPH0416599B2 (en) | ||
| JP2000045299A (en) | How to support underground objects | |
| JP2002339691A (en) | Earth retaining equipment and open-cut construction method using this equipment |