JPH0534555B2 - - Google Patents
[go: Go Back, main page]

JPH0534555B2 - - Google Patents

Info

Publication number
JPH0534555B2
JPH0534555B2 JP62279337A JP27933787A JPH0534555B2 JP H0534555 B2 JPH0534555 B2 JP H0534555B2 JP 62279337 A JP62279337 A JP 62279337A JP 27933787 A JP27933787 A JP 27933787A JP H0534555 B2 JPH0534555 B2 JP H0534555B2
Authority
JP
Japan
Prior art keywords
pipeline
short pipe
trench
excavator
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP62279337A
Other languages
Japanese (ja)
Other versions
JPH01126485A (en
Inventor
Kohei Ueda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP62279337A priority Critical patent/JPH01126485A/en
Publication of JPH01126485A publication Critical patent/JPH01126485A/en
Publication of JPH0534555B2 publication Critical patent/JPH0534555B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】 <産業上の利用分野> 本発明は海底ケーブルやパイプライン等(以下
「パイプライン」という)の敷設方法に関するも
のである。
[Detailed Description of the Invention] <Industrial Application Field> The present invention relates to a method of laying submarine cables, pipelines, etc. (hereinafter referred to as "pipelines").

<従来の技術> 海底ケーブルやパイプラインやその他の線状体
等(以下『パイプライン』という)は投錨や走錨
による破損を回避するため、海底面下3m〜4m
程度に埋設する必要がある。
<Conventional technology> Submarine cables, pipelines, and other linear bodies (hereinafter referred to as "pipelines") are installed 3m to 4m below the seabed surface to avoid damage due to dropping or dragging anchors.
It is necessary to bury it to a certain extent.

パイプラインを海底に埋設する方法として次の
二方法が知られている。
The following two methods are known as methods for burying pipelines under the sea.

その一つはパイプラインを曳出する前にグラブ
船またはポンプ船を使用して海底地盤を開削した
後、開削した溝内にパイプラインを落とし込んで
埋設する方法である。
One method is to excavate the seabed using a grab ship or pump ship before pulling out the pipeline, and then drop the pipeline into the excavated trench and bury it.

もう一つは高圧水の噴射装置とサンドポンプを
装備した水中掘削機を用いて敷設する方法で、ま
ず敷設全範囲に渡つて海底にパイプラインを仮置
きする。
The other method is to use an underwater excavator equipped with a high-pressure water injection device and a sand pump to lay the pipeline, first by temporarily placing the pipeline on the seabed throughout the entire area.

その後、このパイプラインに水中掘削機が跨が
せパイプラインを滑走させながらパイプラインの
下方の地盤を開削してパイプラインを溝内に落と
し込み、最後に埋め戻しをする方法である。
Thereafter, an underwater excavator straddles the pipeline, excavates the ground below the pipeline while sliding the pipeline, lowers the pipeline into the trench, and finally backfills the trench.

<本発明が解決しようとする問題点> 前記した従来のパイプラインの敷設技術にはつ
ぎのような問題がある。
<Problems to be Solved by the Present Invention> The conventional pipeline laying technology described above has the following problems.

(イ) 前者の敷設方法にあつては、工事費が高くか
かるうえに工期も長くかかる。
(b) The former method of installation requires high construction costs and a long construction period.

(ロ) 後者の敷設方法にあつてはパイプラインの仮
置き作業と掘削作業とがそれぞれ独立して行わ
れるため工期が長くかかる。
(b) In the latter method, the temporary laying of the pipeline and the excavation work are carried out independently, resulting in a long construction period.

(ハ) また、後者の敷設方法にあつて、工期の短縮
を目的としてパイプラインを仮置きする前に水
中掘削機をガイド部材なしで掘削してパイプラ
インを敷設することも考えられるが、ガイド部
材がないと水中掘削機の掘進方向が定まらず実
現性に乏しい。
(c) Regarding the latter method of laying the pipeline, it is conceivable to use an underwater excavator to excavate without a guide member and lay the pipeline before temporarily placing the pipeline in order to shorten the construction period. Without these parts, the direction of excavation by the underwater excavator cannot be determined, making it impractical.

(ニ) その他のパイプラインの敷設方法としては米
国特許第3333432号公報に開示されている。
(d) Other pipeline laying methods are disclosed in US Pat. No. 3,333,432.

この敷設方法は、敷設予定のパイプラインに掘
削装置を跨がせ、溝の掘削とパイプラインの敷設
を同時に行う方法である。
This laying method involves placing an excavator over the pipeline to be laid, and excavating the trench and laying the pipeline at the same time.

しかしながらこの方法にあつては、パイプライ
ンに掘削装置の掘削方向をガイドする機能を期待
できないために、溝が蛇行し易く敷設予定線に沿
つた正確な溝を掘削できない不都合がある。
However, in this method, since the pipeline cannot be expected to have the function of guiding the excavation direction of the excavation device, there is a disadvantage that the groove tends to meander and it is not possible to excavate an accurate groove along the planned installation line.

またこの敷設方法にあつては、高圧水を噴射さ
せて掘削する方式であるから、噴射圧力に限界が
あり、掘削できる溝の深さに制限を受ける。
Furthermore, since this method of laying trenches excavates by jetting high-pressure water, there is a limit to the jetting pressure, and there is a limit to the depth of the trench that can be excavated.

くわえて、この敷設方法の場合は、溝の掘削位
置とパイプラインの落とし込み位置がほぼ同位置
であるから、敷設可能なパイプラインが可撓性に
優れたものに限定される。
In addition, in this laying method, the trench excavation position and the pipeline drop-in position are approximately the same, so the pipelines that can be laid are limited to those with excellent flexibility.

<本発明の目的> 本発明は以上の点に鑑みて成されたもので、そ
の目的とするところはパイプラインの敷設予定線
に沿つて正確に溝を掘削できると共に、パイプラ
インの埋設深さを自由に変えられる、パイプライ
ンの敷設方法を提供することにある。
<Objective of the present invention> The present invention has been made in view of the above points, and its purpose is to be able to excavate a trench accurately along the pipeline installation line, and to improve the depth of burial of the pipeline. The goal is to provide a method for laying pipelines that can be freely changed.

<本発明の構成> 以下、第1,2図を参照しながら本発明の一実
施例について説明するが、まず本発明に使用する
水中掘削機について説明する。
<Configuration of the Present Invention> An embodiment of the present invention will be described below with reference to FIGS. 1 and 2. First, an underwater excavator used in the present invention will be described.

(イ) 水中掘削機 第1,2図に水中掘削機1の一例を示す。(a) Underwater excavator An example of an underwater excavator 1 is shown in FIGS. 1 and 2.

この水中掘削機1は、本体2の下方に向け高
圧水を噴射する複数のノズル3と、複数のサン
ドポンプ4と、排土部を遮蔽する遮蔽手段を備
えている。
This underwater excavator 1 includes a plurality of nozzles 3 that inject high-pressure water toward the lower part of a main body 2, a plurality of sand pumps 4, and a shielding means for shielding an earth removal section.

水中掘削機1の構造の詳細については後述す
るが、本発明ではこの水中掘削機1を短管5に
一体に組み付けて使用することを特徴の一つと
する。
The details of the structure of the underwater excavator 1 will be described later, but one of the features of the present invention is that the underwater excavator 1 is used by being integrally assembled with the short pipe 5.

短管5は水中掘削機1の掘進方向を安定させ
るための案内部材であり、例えば敷設予定のパ
イプラインPを所定長に切り取つたものを使用
できる。
The short pipe 5 is a guide member for stabilizing the direction of excavation of the underwater excavator 1, and can be made by cutting a pipeline P to be laid into a predetermined length, for example.

(ロ) 本体 本体2の最上部には吊下用フツク11を有
し、その両側部には水平方向に延びるステー1
2を有し、各ステー12の自由端側は下向きに
折曲してありその端に海底を滑走するための板
状のスキー13がそれぞれ設けてある。
(B) Main body The top of the main body 2 has a hanging hook 11, and on both sides there are stays 1 extending horizontally.
2, the free end side of each stay 12 is bent downward, and a plate-shaped ski 13 for sliding on the seabed is provided at each end.

本体2を短管5に跨がせ、溶接またはボルト
止め等により両者を固定する。
The main body 2 is placed over the short pipe 5, and both are fixed by welding, bolting, or the like.

(ハ) ノズル ノズル3は高圧水を噴射して海底地盤8に溝
81を開削する掘削具であり、本体2の両側に
複数設け、海上の作業船6に搭載した圧送ユニ
ツトから供給される高圧水を噴射できるよう構
成してある。
(C) Nozzle The nozzle 3 is an excavating tool that excavates a groove 81 in the seabed ground 8 by injecting high-pressure water. Multiple nozzles are provided on both sides of the main body 2, and the nozzle 3 is a drilling tool that sprays high-pressure water to excavate a groove 81 in the seabed ground 8. It is designed to spray water.

(ニ) サンドポンプ サンドポンプ4はスラリー状の土砂を吸引す
る機能を有する公知のポンプであり、本体2の
下部に複数固定してある。
(d) Sand pump The sand pump 4 is a well-known pump having a function of suctioning slurry-like earth and sand, and a plurality of sand pumps are fixed to the lower part of the main body 2.

各サンドポンプ4に接続する排土管41は、
本体2の両側の真横に突出し、その端部が下向
きに折曲して配管してある。
The earth discharge pipe 41 connected to each sand pump 4 is
It protrudes right sideways on both sides of the main body 2, and its ends are bent downward for piping.

(ホ) 遮蔽手段 掘削土砂は海中に排土されるから海水が濁る
心配がある。
(e) Shielding measures Since the excavated soil will be discharged into the sea, there is a concern that the sea water will become cloudy.

そのため、本体2の両側に突出する各排土管
41群の吐出部の周囲を遮蔽できるよう各排土
管41の上方および側部に遮断材7が取り付け
てある。
Therefore, shielding members 7 are attached above and on the sides of each soil discharge pipe 41 so as to shield the periphery of the discharge portion of each soil discharge pipe 41 group that protrudes from both sides of the main body 2.

遮断材7は例えば鋼板、樹脂製シート、布体
等の土砂の透過を阻止できる素材からなり、遮
断材7がシート状のように可撓性を有する場合
は、各排土管41の上方に補強部材14を取り
付けて遮断材7の形状を維持する。
The barrier material 7 is made of a material that can prevent the permeation of earth and sand, such as a steel plate, a resin sheet, or a cloth body. If the barrier material 7 is flexible, such as a sheet, reinforcement is provided above each earth discharge pipe 41. The shape of the blocking material 7 is maintained by attaching the member 14.

また、遮断材7の縁部に簾71を設けると遮
蔽効果がより向上する。
Furthermore, if a screen 71 is provided at the edge of the shielding material 7, the shielding effect will be further improved.

なお、本実施例では遮断材7を設けた水中掘削
機1を用いて施工する場合について説明するが、
遮断材7のない公知の水中掘削機や、機械的に掘
削する掘削機等の種々の掘削機を用いることも可
能である。
In addition, in this example, a case will be described in which construction is performed using an underwater excavator 1 equipped with a shielding material 7, but
It is also possible to use various types of excavators, such as a known underwater excavator without the barrier 7 or an excavator that excavates mechanically.

<作用> 次にパイプラインの敷設方法について説明す
る。
<Function> Next, the method of laying the pipeline will be explained.

(イ) 掘削作業 水中掘削機1を組み付けた短管5を海底地盤
8上に着底させる。
(a) Excavation work The short pipe 5 with the underwater excavator 1 attached is brought to the bottom on the seabed ground 8.

水中掘削機1の作動を開始し同時に短管5の
先端に接続した牽引用ロープ61を作業船6で
牽引する。
The operation of the underwater excavator 1 is started, and at the same time, the towing rope 61 connected to the tip of the short pipe 5 is towed by the work boat 6.

その結果、水中掘削機1の各ノズル3から高
圧水が短管5の下方の海底地盤に向け噴射さ
れ、短管5の着底する海底地盤8に溝81が開
削される。
As a result, high-pressure water is injected from each nozzle 3 of the underwater excavator 1 toward the seabed ground below the short pipe 5, and a groove 81 is excavated in the seabed ground 8 where the short pipe 5 touches the bottom.

水中掘削機1はスキー13を介して海底地盤
8上を滑走しながら溝81を開削していく。
The underwater excavator 1 excavates a groove 81 while sliding on the seabed ground 8 via skis 13.

溝81の開削作業中、短管5が案内機能を果
たすため、水中掘削機1の蛇行は確実に防止さ
れる。
During the excavation work of the groove 81, the short pipe 5 performs a guiding function, so that meandering of the underwater excavator 1 is reliably prevented.

(ロ) 排土 水中掘削機1で掘削された土砂は、サンドポ
ンプ4で吸引され、排土管41を経て溝81の
両側の海底地盤8に吐出される。
(b) Earth and sand excavated by the underwater excavator 1 is sucked by the sand pump 4 and discharged to the seabed ground 8 on both sides of the trench 81 via the earth and earth discharge pipe 41.

掘削土砂が溝81の両側の海底地盤8と遮断
材7および簾71によつて遮蔽された海域に吐
出されるから、海水の濁りや土砂の拡散が規制
される。
Since the excavated earth and sand are discharged into the sea area shielded by the seabed ground 8 on both sides of the trench 81, the shielding material 7, and the screen 71, turbidity of seawater and the spread of earth and sand are restricted.

最終的に掘削土砂は溝81の両側の海底地盤
8上に遮蔽幅で残置される。
Finally, the excavated soil is left on the seabed ground 8 on both sides of the trench 81 with a shielding width.

(ハ) パイプラインの敷設作業 別途の作業船62を用いて短管5の通過跡に
開設された溝81内にパイプラインPを順次落
とし込む。
(c) Pipeline installation work A separate work boat 62 is used to sequentially drop the pipeline P into the groove 81 that has been opened where the short pipe 5 has passed.

従来の水中掘削機を用いた敷設方法によれ
ば、パイプラインPの仮置き作業の完了を待つ
て掘削していた。
According to the conventional laying method using an underwater excavator, excavation was carried out after waiting for the completion of the temporary laying work of the pipeline P.

これに対し本発明では、短管5に水中掘削機
1を組み付けて先行掘削が可能であるから、水
中掘削機1による開削作業とパイプラインPの
敷設作業を並行して行える。
On the other hand, in the present invention, the underwater excavator 1 can be attached to the short pipe 5 to carry out preliminary excavation, so the excavation work by the underwater excavator 1 and the laying work of the pipeline P can be performed in parallel.

(ニ) 埋め戻し 溝81内にパイプラインPの落とし込みみを
少量した終了したら、順次溝81を埋め戻しパ
イプラインPを埋設する。
(d) Backfilling After filling a small amount of the pipeline P into the trench 81, the trench 81 is sequentially backfilled with the pipeline P.

埋戻材としては、溝81の両側に残置した土
砂を利用できる。
Earth and sand left on both sides of the trench 81 can be used as backfilling material.

掘削土砂が軟弱で埋戻材として不適当である
ときは、良質の埋戻材を持いることは従前と同
様である。
If the excavated soil is too soft to be used as backfill material, it is still necessary to use good quality backfill material.

<その他の実施例>(第3図) 前記実施例は、掘削土砂を海底に吐出する場合
について説明したが、短管5を移送管の一部とし
て利用する掘削土砂を海上の積込船63で回収す
ることも可能である。
<Other Embodiments> (Fig. 3) In the above embodiment, the case where excavated earth and sand are discharged onto the seabed has been described, but the excavated earth and sand are transferred to a loading ship 63 on the sea using the short pipe 5 as a part of the transfer pipe. It is also possible to collect it.

すなわち、短管5の先端に別途の移送管9を接
続するとともに、移送管9の一端を積積船63に
案内する。
That is, a separate transfer pipe 9 is connected to the tip of the short pipe 5, and one end of the transfer pipe 9 is guided to the loading ship 63.

各排土管41を短管5に接続し、短管5の尾端
側の開口を閉塞処理しておくと、水中掘削機1で
掘削した土砂を海中に吐出させずに、海上の積込
船63で回収できる。
By connecting each earth discharge pipe 41 to the short pipe 5 and blocking the opening on the tail end side of the short pipe 5, the earth and sand excavated by the underwater excavator 1 can be prevented from being discharged into the sea, and a loading ship at sea can It can be collected at 63.

なお、掘削土砂の移送力としてサンドポンプ4
の吐出力が不足する場合は、積込船63上に図示
しない補助ポンプを設置して回収する。
In addition, sand pump 4 is used to transfer the excavated soil.
If the discharge force is insufficient, an auxiliary pump (not shown) is installed on the loading vessel 63 to recover the liquid.

<本発明の効果> 本発明は以上説明したようになるからつぎのよ
うな効果を期待することができる。
<Effects of the Present Invention> Since the present invention is as described above, the following effects can be expected.

(イ) 掘削機が短管に一体に取り付けてあるため、
掘削機の蛇行を防止して敷設予定線に沿つた正
確な位置に溝を掘削できる。
(b) Since the excavator is integrally attached to the short pipe,
It is possible to prevent the excavator from meandering and excavate a trench at an accurate position along the planned laying line.

(ロ) 掘削機による溝の掘削位置から離れたところ
でパイプラインを溝内へ落とし込むことができ
る。
(b) The pipeline can be dropped into the trench at a distance from the location where the trench is excavated by the excavator.

そのため、撓み難い性質のパイプラインであ
つても、敷設することができる。
Therefore, even pipelines that are difficult to bend can be laid.

(C) (ハ) 高圧水の噴射により攪拌した土砂を負圧吸引
して回収するので、溝の掘削深度を自由に設定
できる。
(C) (C) The excavation depth of the trench can be freely set because the soil is stirred by high-pressure water injection and collected by negative pressure suction.

そのため、高圧水の噴射圧力を上げなくとも
深い溝を掘削でき、パイプラインの敷設深度が
大きい場合に有利である。
Therefore, deep trenches can be excavated without increasing the injection pressure of high-pressure water, which is advantageous when the pipeline is laid at a large depth.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図:本発明に係るパイプラインの敷設方法
の一実施例の説明図、第2図:第1図の−の
断面図、第3図:その他の実施例の説明図。
FIG. 1: An explanatory diagram of one embodiment of the pipeline laying method according to the present invention, FIG. 2: A cross-sectional view taken at - in FIG. 1, and FIG. 3: An explanatory diagram of another embodiment.

Claims (1)

【特許請求の範囲】 1 掘削方向ガイド用の独立した短管を使用し、 前記短管は、高圧水を水低に向け噴射して攪拌
する機能と攪拌した土砂を吸引回収する機能を有
すると共に、短管に一体に取り付けた掘削機を具
備し、 掘削方向を短管でガイドしながら短管を牽引し
てパイプラインの敷設予定線に沿つた溝を掘削す
る第1工程と、 溝の掘削作業と並行して溝内にパイプラインを
落とし込む第2工程と、 パイプラインの落とし込みが完了した溝を埋め
戻してパイプラインを埋設する第3工程とにより
構成する、 パイプラインの敷設方法。
[Claims] 1. An independent short pipe is used for guiding the excavation direction, and the short pipe has the function of spraying high-pressure water toward the water level and stirring it, and the function of suctioning and collecting the stirred earth and sand. , a first step in which an excavator is attached to the short pipe, and the short pipe is guided in the excavation direction and the short pipe is towed to excavate a trench along the line where the pipeline is planned to be laid; A pipeline laying method comprising a second step of dropping the pipeline into the trench in parallel with the work, and a third step of backfilling the trench where the pipeline has been dropped and burying the pipeline.
JP62279337A 1987-11-06 1987-11-06 How to lay a pipeline Granted JPH01126485A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62279337A JPH01126485A (en) 1987-11-06 1987-11-06 How to lay a pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62279337A JPH01126485A (en) 1987-11-06 1987-11-06 How to lay a pipeline

Publications (2)

Publication Number Publication Date
JPH01126485A JPH01126485A (en) 1989-05-18
JPH0534555B2 true JPH0534555B2 (en) 1993-05-24

Family

ID=17609774

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62279337A Granted JPH01126485A (en) 1987-11-06 1987-11-06 How to lay a pipeline

Country Status (1)

Country Link
JP (1) JPH01126485A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2264733B (en) * 1992-03-03 1995-10-18 British Gas Plc Apparatus intended to be buried in ground beneath water

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3333432A (en) * 1964-12-29 1967-08-01 Bell Telephone Labor Inc Adjustable depth submarine cable burier

Also Published As

Publication number Publication date
JPH01126485A (en) 1989-05-18

Similar Documents

Publication Publication Date Title
US8939678B2 (en) Method and system of laying underwater pipelines in the bed of a body of water
US3462963A (en) Apparatus for pipelaying and trenching operations in a body of water
US8899877B2 (en) Method and system for laying underground a continuous elongated member in a bed of a body of water
US9562343B2 (en) Cable-laying plow attachment for a backhoe and method for using the same
US2693085A (en) Hydraulic submarine ditcher
US2992537A (en) Plow for laying and uncovering pipe
US4312144A (en) Multi-blade ditching machine
CN116163353A (en) High-pressure water jet device based on seabed sandy stratum and deep excavation method
JPH0534555B2 (en)
KR101140789B1 (en) Sea-bottom cable laying apparatus
CA1043112A (en) Horizontal wellpointing method and apparatus
JPH0624436Y2 (en) Underwater excavator for pipelines
US4643613A (en) Underwater trenching and pipe-laying devices
JPH10136524A (en) Submarine cable laying device and laying method
JPH06141430A (en) Water jet drill type drilling/laying/burying device
EA026276B1 (en) Method and vehicle for laying with post-trenching a continuous linear structure in a bed of a body of water
US6149348A (en) Tool for burying hose
JP3979727B2 (en) Earth removal structure of buried equipment
JP3360906B2 (en) Drilling method for buried undersea pipe
JP2003139272A (en) How to lay pipes under water
JP3402437B2 (en) Burial method of pipe
JP4121305B2 (en) Submarine ground excavation plow and submarine pipe laying method using this plow
JPS5835005B2 (en) Striatal submarine burial machine
JPS591364Y2 (en) Suitei Cable Maisetsukino Annaigu
JPS6255366B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees