JPH0555647B2
JPH0555647B2 JP17293188A JP17293188A JPH0555647B2 JP H0555647 B2 JPH0555647 B2 JP H0555647B2 JP 17293188 A JP17293188 A JP 17293188A JP 17293188 A JP17293188 A JP 17293188A JP H0555647 B2 JPH0555647 B2 JP H0555647B2
Authority
JP
Japan
Prior art keywords
block
pile
precast concrete
joint
blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP17293188A
Other languages
Japanese (ja)
Other versions
JPH0224407A (en
Inventor
Isao Tatsumi
Yoshito Hatayama
Shuichiro Minanami
Takuro Odawara
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP17293188A priority Critical patent/JPH0224407A/en
Publication of JPH0224407A publication Critical patent/JPH0224407A/en
Publication of JPH0555647B2 publication Critical patent/JPH0555647B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は、予め打ち込んだ杭を挿通させるよう
に複数のプレキヤストコンクリートブロツクを積
み重ね、これらブロツクをそれぞれ挿通するよう
に鋼材を配し、該鋼材とブロツクの鋼材挿通孔と
の間にグラウトを施すことによつてRC構造物を
形成し、かつ前記杭と該RC構造物の杭挿通孔の
間にモルタルまたはコンクリートを充填すること
によつて該RC構造物と杭とが一体化構造になる
連結ブロツク構造物の目地構造に関するものであ
る。
Detailed Description of the Invention "Industrial Application Field" The present invention is based on stacking a plurality of precast concrete blocks so that pre-driven piles can be inserted through them, and arranging steel materials so that they can be inserted through each of these blocks. An RC structure is formed by applying grout between the steel material and the steel material insertion hole of the block, and by filling mortar or concrete between the pile and the pile insertion hole of the RC structure. This invention relates to a joint structure of a connected block structure in which the RC structure and the pile are integrated.

「従来の技術」 連結ブロツク構造物として、例えば防波堤等の
海洋構造物に適用されている杭打連結ブロツク構
造物がある。これは、例えば第13図および第1
4図に示すように、海底1に打ち込んだ複数本の
杭2が基礎とされ、孔3を有しかつ上面および下
面が平坦のプレキヤストコンクリートブロツク
(以下ブロツクと称す)4が、杭2を孔3に緩挿
させた状態で杭2の間を架け渡されて格子状に複
数段積み重ねられている。そして、前記杭2とブ
ロツク4とは、杭2の上端部付近から孔3を通る
鋼材7によりつり下げられて杭2を把持するとと
もにブロツク4を下方から保持するくさび締結装
置5と、コンクリートブロツク4の孔3と杭2の
間に充填された中詰めモルタル6とによつて一体
に結合されている。
``Prior Art'' An example of a connected block structure is a piled connected block structure that is applied to marine structures such as breakwaters. This is true for example in Figures 13 and 1.
As shown in Figure 4, a plurality of piles 2 driven into the seabed 1 serve as a foundation, and a precast concrete block (hereinafter referred to as block) 4 having holes 3 and flat upper and lower surfaces supports the piles 2. They are loosely inserted into the holes 3, spanned between the piles 2, and stacked in multiple stages in a grid pattern. The pile 2 and the block 4 are connected to a wedge fastening device 5 which is suspended from near the upper end of the pile 2 by a steel member 7 passing through a hole 3 to grip the pile 2 and hold the block 4 from below, and a concrete block. The holes 3 of 4 and the piles 2 are integrally connected by filling mortar 6 filled between the holes 3 and the piles 2.

前記構造の杭打連結ブロツク構造物によれば、
ほとんど地盤改良や水中作業等を行うことなく、
迅速・安全に軟弱地盤に構造物を構築することが
でき、海上での作業性が良いといつた利点があ
る。
According to the piled connected block structure of the above structure,
Almost no ground improvement or underwater work is required.
It has the advantage of being able to quickly and safely construct structures on soft ground and being easy to work with at sea.

「発明が解決しようとする課題」 しかしながら、前記した構造物にあたつては、
鋼材7から杭2挿通用の孔3に通されていること
から、次のような問題が生じていた。
"Problem to be solved by the invention" However, regarding the above-mentioned structure,
Since the steel material 7 is passed through the hole 3 for inserting the pile 2, the following problems have arisen.

強度上、コンクリート断面図心と複数の鋼材
7の図心とを一致させるのが好ましいが、鋼材
7が孔3内で自由に動くため、図心を一致させ
るのが難かしい。
In terms of strength, it is preferable to match the centroid of the concrete cross section with the centroids of the plurality of steel members 7, but since the steel members 7 move freely within the hole 3, it is difficult to match the centroids.

圧縮縁から鋼材7までの距離が短く、かつ鋼
材7の配置数が限られるため、形状の割に曲げ
耐力が小さい。
Since the distance from the compression edge to the steel material 7 is short and the number of steel materials 7 disposed is limited, the bending strength is small considering the shape.

ブロツク4同士を水中で接合する場合、面と
面とがずれないよう、潜水夫が監視しつつ誘導
したり特別な案内治具を用いる等、特別な工夫
が必要となる。
When joining the blocks 4 underwater, special measures are required such as having a diver monitor and guiding them or using a special guide jig so that the surfaces do not become misaligned.

そこで、本発明者らは、これらの問題点を解決
すべく鋭意研究した結果、プレキヤストコンクリ
ートブロツクに、杭挿通孔とは別個に鋼材挿通孔
を、杭挿通孔の外側に周方向に間隔をあけて設け
る構造とすれば、プレキヤストコンクリートブロ
ツクに鋼材を挿通させて下降させるとき、鋼材を
ガイドとして利用することができ、前記したもの
に比べブロツクの配置精度が向上するまた鋼材を
断面縁端部に近い位置に配置することができ、曲
げ耐力を大きくなる等の利点が生じることに着目
した。
Therefore, as a result of intensive research to solve these problems, the present inventors created steel insertion holes in the precast concrete block separately from the pile insertion holes, and set intervals in the circumferential direction on the outside of the pile insertion holes. If the structure is provided with an opening, the steel material can be used as a guide when passing the steel material through the precast concrete block and lowering it, improving the accuracy of block placement compared to the above method. We focused on the fact that it can be placed close to the body, resulting in advantages such as increased bending strength.

ところが、このような構造を採るにしても、プ
レキヤストコンクリートブロツク同士の接合強度
をある程度高くしかつ第15図に示すように両接
合面の凸部に応力集中が起こらないようにするこ
とが前提となる。プレキヤストコンクリートブロ
ツク同士の接合強度等を高めるためには両者間に
目地部材料を介装することが有力であるが、プレ
キヤストコンクリートブロツクの積み重ねは水中
で行なうことから、それらプレキヤストコンクリ
ートブロツクの上面に目地部材料を塗布したとこ
ろで、それらが波や潮流によつて流れ出てしまう
不具合が生じる。
However, even if such a structure is adopted, it is necessary to increase the joint strength between the precast concrete blocks to a certain extent and to prevent stress concentration from occurring on the convex portions of both joint surfaces, as shown in Figure 15. becomes. In order to increase the joint strength between precast concrete blocks, it is effective to insert a joint material between them, but since the precast concrete blocks are stacked underwater, Even when joint materials are applied to the upper surface, there is a problem in that they are washed away by waves and currents.

本発明は前記事情に鑑みて提案されたもので、
その目的とすることろは上記した問題を解決する
ことができる連結ブロツク構造物の目地構造を提
供することにある。
The present invention was proposed in view of the above circumstances, and
The aim is to provide a joint structure for connecting block structures which can solve the above-mentioned problems.

「課題を解決するための手段」 そこで本発明の連結ブロツク構造物の目地構造
は、プレキヤストコンクリートブロツクに形成さ
れる複数の鋼材挿通孔が、杭挿通孔とは別個に該
杭挿通孔の外側に周方向に間隔をあけて設けら
れ、かつ前記プレキヤストコンクリートブロツク
同士の間には大小2重のリング状パツキンが前記
複数の鋼材挿通孔が形成された部分を囲むように
設けられ、それら2重のリング状パツキンの間に
は目地部材料が介在されていることを特徴として
いる。
``Means for Solving the Problems'' Therefore, the joint structure of the connecting block structure of the present invention is such that a plurality of steel insertion holes formed in the precast concrete block are arranged outside the pile insertion holes separately from the pile insertion holes. are provided at intervals in the circumferential direction, and double-sized ring-shaped packings are provided between the precast concrete blocks so as to surround the portions in which the plurality of steel insertion holes are formed, and these two It is characterized by a joint material interposed between the heavy ring-shaped packings.

「作用」 目地部材料は大小2重のリング状パツキンの間
に介装されているので、該プレキヤストコンクリ
ートブロツク上に目地部材料が塗布されて水中に
沈められるときでも、該目地部材料が波や潮流等
によつて流されたり剥がされたりすることが少な
く、施工が簡単に行なえる。
``Function'' Since the joint material is interposed between two large and small ring-shaped packings, even when the joint material is applied onto the precast concrete block and submerged in water, the joint material remains intact. It is less likely to be washed away or peeled off by waves or currents, and is easy to install.

「実施例」 以下、本発明の実施例について第1図ないし第
12図を参照して説明する。
"Embodiments" Examples of the present invention will be described below with reference to FIGS. 1 to 12.

これらの図において、符号10は海底1に打ち
込まれた杭であつて、この杭10の下部には受け
ブロツク11が固定されるとともに、この受けブ
ロツク11の上に環状のプレキヤストコンクリー
トブロツク12,13……,が積み重ねられ、ま
た下端をブロツク12に定着されかつ各ブロツク
13……,を挿通するよう上方に延びる複数本の
鋼材14が配されている。そして、剥材14とブ
ロツク12,13の鋼材挿通孔との間にグラウト
が施されることにより、各ブロツク12,13は
RC構造として一体化されている。
In these figures, reference numeral 10 is a pile driven into the seabed 1, and a receiving block 11 is fixed to the lower part of this pile 10, and on top of this receiving block 11, an annular precast concrete block 12, 13..., are stacked on top of each other, and a plurality of steel members 14 are arranged, each having its lower end fixed to the block 12 and extending upward so as to pass through each block 13.... Then, by applying grout between the stripped material 14 and the steel material insertion holes of the blocks 12 and 13, each block 12 and 13
It is integrated as an RC structure.

前記ブロツク12,13……,の各接合面には
水中硬化型の樹脂系接着材料もしくは水中不分離
性モルタル材料よりなる目地部15が設けられて
いる。ここで、水中硬化型の樹脂系接着材料とし
ては、サブコートS(ベネチアニゾンカ ベルニ
チ社製)等が用いられ、また、水中硬化型の水中
不分離性モルタル材料としては、早強ポルトラン
ドセメントに、細骨材、特殊混和剤(例えば商品
名アクリス12 日曹マスタービルダーズ社製等)
を所定の配合で加えたもの等が用いられる。これ
ら目地部材料はコンクリートと同程度あるいはそ
れ以上の強度を持つ。
Each joint surface of the blocks 12, 13, . . . is provided with a joint portion 15 made of an underwater curable resin adhesive material or an underwater inseparable mortar material. Here, Subcoat S (manufactured by Venetian Sonca Bernici) is used as an underwater-curable resin-based adhesive material, and early-strength Portland cement is used as an underwater-curable non-separable mortar material. Fine aggregate, special admixture (for example, product name Akris 12 manufactured by Nisso Master Builders, etc.)
A mixture containing the following in a predetermined proportion is used. These joint materials have strength comparable to or greater than concrete.

また、上記のようにRC構造とされた各ブロツ
ク12,13……,は、さらに杭10と杭挿通孔
3との間にモルタル等を充填材16が注入される
ことにより杭10と一体化されている。
Further, each block 12, 13, . has been done.

次いで、前記ブロツク12,13等について詳
細に説明すると、前記ブロツク12は連結ブロツ
ク構造物の最下端に配設されるもので、内部に補
強筋が埋設されるとともに、前記鋼材14の下端
の定着部17が埋設され、さらにこの定着部17
から上端に向けて鋼材14を被覆するようにして
シース管18が設けられている。シース管18は
杭挿通孔3とは別個に、該杭挿通孔3の外側に周
方向に間隔をあけて配置されている。なお、この
シース管18の下端にはグラウト注入孔19が連
通している。
Next, the blocks 12, 13, etc. will be explained in detail. The block 12 is arranged at the lowest end of the connecting block structure, and reinforcing bars are embedded inside, and the lower end of the steel material 14 is fixed. The fixing section 17 is buried, and the fixing section 17
A sheath pipe 18 is provided so as to cover the steel material 14 from the top toward the top end. The sheath tube 18 is arranged separately from the pile insertion hole 3 at intervals in the circumferential direction on the outside of the pile insertion hole 3. Note that a grout injection hole 19 communicates with the lower end of this sheath pipe 18 .

一方、このブロツク12の上に積み重ねられる
ブロツク13はブロツク12と同様に内部に補強
筋が埋設されるとともに、コンクリートの内部
に、第4図に示すように、鋼材14の挿通孔を形
成するシース管18が埋設されている。
On the other hand, the block 13 stacked on top of this block 12 has reinforcing bars buried inside it like the block 12, and a sheath that forms an insertion hole for a steel material 14 inside the concrete, as shown in FIG. A pipe 18 is buried.

また前記各ブロツク12,13……,の接合部
の構造は、第6図および第7図に示すようになつ
ている。すなわち、上下に隣接する両ブロツク1
2,13の対向する接合面の内上部に臨む接合面
12aには、目地部材料によつて閉塞されないよ
う、シース管18が接合面12aよりも上方に突
出しており、一方、下部に臨む接合面13aには
前記シース管18の突出部を緩挿しかつ鋼材挿通
孔に連通する嵌合孔20が形成され、しかも、こ
の嵌合孔20の奥面20aは、奥側に向かうに従
ち先すぼまりになるテーパ状(例えば円錐状)に
形成されている。
The structure of the joints of the blocks 12, 13, . . . is as shown in FIGS. 6 and 7. In other words, both vertically adjacent blocks 1
A sheath pipe 18 protrudes above the joint surface 12a so as not to be blocked by the joint material on the joint surface 12a facing the inner upper part of the joint surfaces facing each other. A fitting hole 20 is formed in the surface 13a, into which the protrusion of the sheath tube 18 is loosely inserted and which communicates with the steel material insertion hole. It is formed in a tapered shape (for example, a conical shape).

ここで、前記シース管18の突出長Hは、第6
図に示すように、接合面に設ける目地部15の厚
みTよりも高ければ良く、例えば目地材料の塗布
厚は、通常、接合面の凹凸を吸収することのでき
る大きさ(10mm〜3mm)であるから、この大きさ
の範囲に対応した高さに設定される。
Here, the protrusion length H of the sheath tube 18 is the sixth
As shown in the figure, it is sufficient that the thickness is higher than the thickness T of the joint portion 15 provided on the joint surface.For example, the thickness of the joint material applied is usually large enough to absorb the unevenness of the joint surface (10 mm to 3 mm). Therefore, the height is set to correspond to this size range.

なお、前記ではブロツク12,13の接合部の
例を説明したが、ブロツク13どうしの接合部の
構造も、ブロツク12,13の接合部と同様であ
るので、その説明を省略する。
Although the example of the joint between the blocks 12 and 13 has been described above, the structure of the joint between the blocks 13 is also similar to that of the joint between the blocks 12 and 13, so a description thereof will be omitted.

前記充填材16の付着力は杭10とRC構造の
各ブロツク12,13……との結合力を左右する
ことになり、該結合力を高めるため、充填材16
としては高強度、ノーブリージングのプレパクト
モルタルまたは水中コンクリートが用いられる。
また、杭10には外面にリブRはジベルが形成さ
れた鋼管が用いられる。
The adhesion force of the filler material 16 influences the bonding force between the pile 10 and each block 12, 13 of the RC structure, and in order to increase the bonding force, the filler material 16
High-strength, non-breathing prepact mortar or underwater concrete is used.
Further, the pile 10 is made of a steel pipe having ribs R and dowels formed on the outer surface.

次に、前記連結ブロツク構造物の施工方法につ
いて説明する。
Next, a method of constructing the connecting block structure will be explained.

この杭打連結ブロツク構造物を構築するには、
まず第1図に示すように、海底1に杭10を打ち
込み、この杭10の下部に受けブロツク11をセ
ツトした上で、この受けブロツク11の上にブロ
ツク12を載せ、このブロツク12の上に鋼材1
4をシース管18に挿入しながら、第2図に示す
ように、ブロツク13を順に積み重ねていく。
To construct this piled connected block structure,
First, as shown in FIG. 1, a pile 10 is driven into the seabed 1, a receiving block 11 is set at the bottom of this pile 10, a block 12 is placed on top of this receiving block 11, and a block 12 is placed on top of this receiving block 11. Steel material 1
4 into the sheath tube 18, the blocks 13 are stacked in order as shown in FIG.

鋼材14の挿入操作は、鋼材14の先端を、ブ
ロツク13の下部に臨む接合面13aの嵌合孔2
0に挿入する作業であり、特に、嵌合孔20の奥
面20aは、奥側に行くに従つてテーパ状に形成
されているので、鋼材14は挿入とともにテーパ
に沿つてシース管18へ案内されることになり、
したがつて、鋼材14の挿入が容易で、施工性を
向上することができる。
The insertion operation of the steel material 14 involves inserting the tip of the steel material 14 into the fitting hole 2 of the joint surface 13a facing the lower part of the block 13.
In particular, since the inner surface 20a of the fitting hole 20 is tapered toward the inner side, the steel material 14 is guided into the sheath pipe 18 along the taper as it is inserted. will be
Therefore, the steel material 14 can be easily inserted and workability can be improved.

なお、ブロツク12,13を積み重ねる際、ブ
ロツク間に配される目地部材料として例えば水中
硬化型の樹脂系接着材料を用いる場合には、第6
図に示すよう陸上にて上側のブロツク13の下側
目地部材料を塗布した後海中に吊り下ろし、予め
設置してある下部ブロツク12と面合わせされて
接合される。その際、第1図に示すようにアンカ
ーブロツク12より上方に突出している鋼材14
がガイドになり、第2図に示すように各ブロツク
13を高精度で下降設置できる。
Note that when stacking the blocks 12 and 13, if an underwater curing resin adhesive material is used as the joint material between the blocks, the sixth
As shown in the figure, after the lower joint material of the upper block 13 is applied on land, it is lowered into the sea, and is mated and joined with the lower block 12 that has been installed in advance. At that time, as shown in FIG.
serves as a guide, and each block 13 can be lowered and installed with high precision as shown in FIG.

また、前記目地部材料が、例えば水中硬化型の
樹脂系接着材料の場合、主剤と硬化剤との配合等
によりその硬さを調整することができ、硬化前は
セメントペースト状の硬さにできるので、ブロツ
ク接合面に容易に塗布することができる。しか
も、前記目地部材料は、密着性があつてコンクリ
ートに良く付くので、水中でのブロツク据付時に
波や潮流で流されたり、剥がされたりすることが
なく、さらに接着材料の硬化前にブロツク13を
据え付けるから、据え付けと同時にブロツク自身
の重量で接着材料が変形し、ブロツクどうしの〓
間を完全に充填することができる利点がある。
In addition, if the joint material is, for example, an underwater curing resin-based adhesive material, its hardness can be adjusted by mixing the main agent and a hardening agent, and it can have a hardness similar to that of a cement paste before hardening. Therefore, it can be easily applied to the joint surfaces of blocks. Moreover, since the joint material has good adhesion and sticks well to concrete, it will not be washed away by waves or currents or peeled off when the block is installed underwater. Since the blocks are installed, the adhesive material deforms due to the weight of the blocks themselves, and the blocks become closer to each other.
It has the advantage that the space can be completely filled.

他方、目地部材料として、水中不分離性のモル
タル材料を用いる場合には、第9図に示すように
ブロツク12,13の上面外縁、内縁に大小2重
のリング状パツキン30,31を張り付け、第1
0図に示すようにモルタル15を敷いてから水中
へ吊り下ろし、その目地部材料が硬化する前に次
のブロツク13を設置するという手順を踏む。
On the other hand, when a mortar material that is not separable in water is used as the joint material, as shown in FIG. 1st
As shown in Figure 0, mortar 15 is laid down, suspended into water, and the next block 13 is installed before the joint material hardens.

前記作業によりすべてのブロツク12,13の
設置を完了した後、それらブロツク12,13に
反力を採つて、任意本数の鋼材14にジヤツキを
用いて5〜6Kg/cm2程度の引張力を導入する。こ
れにより、ブロツク12,13間の接合状態をよ
り確実にする。この状態で、注入口19からグラ
ウエトを注入し、ブロツク12,13を一体RC
構造にする。
After completing the installation of all blocks 12 and 13 through the above-mentioned work, a reaction force is taken on these blocks 12 and 13, and a tensile force of about 5 to 6 kg/cm 2 is introduced to an arbitrary number of steel members 14 using jacks. do. This makes the bonding state between the blocks 12 and 13 more reliable. In this state, grout is injected from the injection port 19, and the blocks 12 and 13 are integrated into the RC
Make it a structure.

続いて、杭10と杭挿通孔3との間にモルタル
またはコンクリートを充填し、杭10とRC構造
のブロツク12,13を一体化させるのである
(第3図参照)。
Next, mortar or concrete is filled between the pile 10 and the pile insertion hole 3, and the pile 10 and the blocks 12 and 13 of the RC structure are integrated (see Fig. 3).

上記構成の連結ブロツク構造物によれば、各ブ
ロツク12,13同士がRC構造により一体化さ
れているに止どまらず、杭10と杭挿通坑3との
間に注入された充填材16によりRC構造とされ
たブロツク12,13と杭10とが一体化されて
いるため、全体として強い剛性を持つこととな
る。
According to the connected block structure having the above configuration, not only the blocks 12 and 13 are integrated with each other by the RC structure, but also the filler 16 injected between the pile 10 and the pile insertion hole 3 Since the blocks 12 and 13, which have an RC structure, and the pile 10 are integrated, the entire structure has strong rigidity.

加えて、杭10として外周部にリブRやジベル
が形成されたものを用いれば、杭10と中詰コン
クリート(モルタル)との結合強度をより強くす
ることができ、その場合曲げ力が加わつた際に
は、杭10と中詰コンクリートとブロツク12,
13が一体となつて変形することとなり、より強
い耐力が発揮できる。
In addition, if a pile 10 with a rib R or dowel formed on the outer periphery is used, the bonding strength between the pile 10 and the filling concrete (mortar) can be further strengthened, and in that case, bending force is applied. In this case, pile 10, filling concrete and block 12,
13 are deformed as one, and stronger yield strength can be exhibited.

また、本実施例では、各ブロツク12,13間
に、ブロツク表面の不陸を吸収すべくコンクリー
トと同等以上の強度を持つ目地部15を設けてい
るので、杭10と平行な軸方向の力あるいは曲げ
モーメントが加わつた場合、各ブロツク12,1
3の接合面に生じる応力を均一化でき、第15図
に示すように凸部に応力集中が起こり、クラツク
が発生するといつた不具合が未然に防止できる。
Furthermore, in this embodiment, a joint 15 having a strength equal to or higher than that of concrete is provided between each block 12 and 13 in order to absorb the unevenness of the block surface, so that the force in the axial direction parallel to the pile 10 is Or if a bending moment is applied, each block 12, 1
It is possible to equalize the stress generated on the joint surfaces of No. 3, and to prevent problems such as stress concentration on the convex portions and cracks as shown in FIG. 15.

第11図は本発明の他の実施例を示すものであ
る。この例の特徴部分は、隣接するシース管(鋼
材挿通孔)18同士を連通孔40で連通させた点
にある。
FIG. 11 shows another embodiment of the invention. The feature of this example is that adjacent sheath pipes (steel material insertion holes) 18 are communicated with each other through a communication hole 40.

このようにすれば、シース管18内にグラウト
を施す場合、1つ置きあるいは2つ置きにグラウ
トをすれば足り、グラウト部分が多数ある場合特
に有利となる。
In this way, when grouting the inside of the sheath pipe 18, it is sufficient to grout every other or every second part, which is particularly advantageous when there are many grouted parts.

第12図は本発明のさらに他の実施例を示すも
のである。この例の特徴部分は、最下端にあるブ
ロツク12ではなく途中のブロツク13の途中に
定着部17(埋め殺しアンカー)を設け、ブロツ
クの途中から鋼材14を上方に延ばした点であ
る。
FIG. 12 shows still another embodiment of the present invention. The feature of this example is that a fixing part 17 (filling anchor) is provided not in the block 12 at the lowest end but in the middle of the middle block 13, and the steel material 14 is extended upward from the middle of the block.

こうすることによつて、RC構造のブロツク1
2,13からなる柱断面の途中から鋼材量を変化
させることができ、加わる荷重に応じた理想の鋼
材配置が可能となる。
By doing this, block 1 of the RC structure
The amount of steel material can be changed from the middle of the cross section of the column consisting of 2 and 13, making it possible to ideally arrange the steel material according to the applied load.

「発明の効果」 以上説明したように本発明によれば、次のよう
な優れた効果を奏するものである。
"Effects of the Invention" As explained above, the present invention provides the following excellent effects.

目地部材料は大小2重のリング状パツキンの間
に介装されているので、該プレキヤストコンクリ
ートブロツク上に目地部材料が塗布されて水中に
沈められるときでも、該目地部材料が波や潮流等
によつて流されたり剥がされたりすることが少な
く、施工が簡単に行なえる。
Since the joint material is interposed between two large and small ring-shaped packings, even when the joint material is applied onto the precast concrete block and submerged in water, the joint material will not be affected by waves or currents. It is less likely to be washed away or peeled off by dirt, etc., making it easy to install.

また、前記のように間に目地部材料を介装され
た状態で上下のプレキヤストコンクリートブロツ
クが互いに接近するよう、鋼材を介して荷重が加
えられるときでも、前記2重のリング状パツキン
の作用により、目地部材料が両プレキヤストコン
クリートブロツク間から外部にはみ出して流出す
るのを防止することができ、この結果、施工がよ
り一層容易かつ確実に行なえることとなる。
In addition, even when a load is applied through the steel material so that the upper and lower precast concrete blocks approach each other with the joint material interposed between them, the action of the double ring-shaped packing is Therefore, it is possible to prevent the joint material from leaking out from between the two precast concrete blocks, and as a result, the construction can be carried out even more easily and reliably.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図ないし第10図は本発明の一実施例を示
すもので、第1図ないし第3図はそれぞれ杭打連
結ブロツク構造物の施工手順を示す半断面図、第
4図はブロツクの斜視図、第5図はシース管の周
囲にパツキンを取り付けた状態を示す平面図、第
6図および第7図はそれぞれブロツクの接合部を
示す断面図、第8図は作用を説明するために示し
た断面図、第9図および第10図はそれぞれ目地
材として水中硬化型の水中不分離性モルタル材料
を使用した場合のブロツクの構成を示すもので、
第9図はブロツクの平面図、第10図は要部の断
面図、第11図、第12図は本発明の他の実施例
を示す図である。第13図ないし第15図はそれ
ぞれ防波堤の場合の杭打連結ブロツク構造物の従
来例を示すもので、第13図は一部を切り欠いた
斜視図、第14図は構築方法を説明するために示
した断面図、第15図は接合部の断面図である。 1……海底、3……杭挿通孔、体10……杭、
11……受けブロツク、12,13……プレキヤ
ストコンクリートブロツク、14……鋼材、15
……目地部、16……充填材、17……定着部、
18……シース管(鋼材挿通孔)。
Figures 1 to 10 show an embodiment of the present invention, and Figures 1 to 3 are half-sectional views showing the construction procedure of a pile driving connected block structure, and Figure 4 is a perspective view of the block. Figure 5 is a plan view showing the packing attached around the sheath tube, Figures 6 and 7 are cross-sectional views showing the joints of the blocks, and Figure 8 is a diagram for explaining the action. The cross-sectional views shown in FIG. 9 and FIG. 10 respectively show the structure of the block when an underwater hardening type underwater non-separable mortar material is used as the joint material.
FIG. 9 is a plan view of the block, FIG. 10 is a sectional view of the main part, and FIGS. 11 and 12 are views showing other embodiments of the present invention. Figures 13 to 15 each show conventional examples of piled connecting block structures for breakwaters, with Figure 13 being a partially cutaway perspective view, and Figure 14 for explaining the construction method. FIG. 15 is a cross-sectional view of the joint portion. 1... seabed, 3... pile insertion hole, body 10... pile,
11...Receiving block, 12, 13...Precast concrete block, 14...Steel material, 15
... joint part, 16 ... filler, 17 ... fixing part,
18...Sheath pipe (steel material insertion hole).

Claims (1)

【特許請求の範囲】[Claims] 1 上部が突出するように杭を打ち込み、該杭を
挿通させた状態で複数のプレキヤストコンクリー
トブロツクを積み重ね、該複数のプレキヤストコ
ンクリートブロツクをそれぞれ挿通するように複
数の鋼材を配し、該鋼材と前記プレキヤストコン
クリートブロツクの鋼材挿通孔との間にグラウト
を注入するとともに前記杭とプレキヤストコンク
リートブロツクの杭挿通孔との間にモルタルまた
はコンクリートを充填することにより、前記杭と
前記複数のプレキヤストコンクリートブロツクが
一体化構造となる連結ブロツク構造物のプレキヤ
ストコンクリートブロツク間の目地構造であつ
て、前記プレキヤストコンクリートブロツクに形
成される複数の鋼材挿通孔は、前記杭挿通孔とは
別個に該杭挿通孔の外側に周方向に間隔をあけて
設けられ、かつ前記プレキヤストコンクリートブ
ロツク同士の間には大小2重のリング状パツキン
が前記複数の鋼材挿通孔が形成された部分を囲む
ように設けられ、それら2重のリング状バツキン
の間には目地部材料が介装されていることを特徴
とする連結ブロツク構造物の目地構造。
1. Drive piles so that the upper part protrudes, stack a plurality of precast concrete blocks with the piles inserted, arrange a plurality of steel members so that they are inserted through each of the plurality of precast concrete blocks, and By injecting grout between the pile and the steel insertion hole of the precast concrete block, and filling mortar or concrete between the pile and the pile insertion hole of the precast concrete block, the pile and the plurality of precast concrete blocks are connected. A joint structure between precast concrete blocks of a connected block structure in which cast concrete blocks are integrated, and a plurality of steel insertion holes formed in the precast concrete blocks are separate from the pile insertion holes. A double-sized ring-shaped packing is provided outside the pile insertion holes at intervals in the circumferential direction and between the precast concrete blocks so as to surround the portion where the plurality of steel insertion holes are formed. 1. A joint structure of a connecting block structure, characterized in that a joint material is interposed between the double ring-shaped butts.
JP17293188A 1988-07-12 1988-07-12 Connected block structure Granted JPH0224407A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17293188A JPH0224407A (en) 1988-07-12 1988-07-12 Connected block structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17293188A JPH0224407A (en) 1988-07-12 1988-07-12 Connected block structure

Publications (2)

Publication Number Publication Date
JPH0224407A JPH0224407A (en) 1990-01-26
JPH0555647B2 true JPH0555647B2 (en) 1993-08-17

Family

ID=15951006

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17293188A Granted JPH0224407A (en) 1988-07-12 1988-07-12 Connected block structure

Country Status (1)

Country Link
JP (1) JPH0224407A (en)

Also Published As

Publication number Publication date
JPH0224407A (en) 1990-01-26

Similar Documents

Publication Publication Date Title
AU2008243212A1 (en) Earth Retention and Piling Systems
CN110042844B (en) Construction method of cast-in-situ large-diameter foundation pit supporting tubular pile
WO2006030893A1 (en) Foundation structure of tower
KR20190089284A (en) Reinforcement pile with fiber sheet for ground improvement and earthquake-proof
JP4771244B2 (en) Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile
JP2009057817A (en) Synthetic friction pile construction method
KR100786360B1 (en) Concrete pile file
KR20190109890A (en) Composite phc pile for soil retaining wall
JP3831737B2 (en) Steel tower basic structure
JP6532512B2 (en) Quay or revetment structure and its construction method
KR102580530B1 (en) Bridge lower structure of assembly type having elastic duct coupler of socket type, and construction method for the same
US3491497A (en) Earth anchor and method of forming same
JPH0555647B2 (en)
CN109898505B (en) Composite tubular pile with reinforcing structure in weak stratum
KR101838219B1 (en) Variable pile for increasing horizontal force and method for constructing foundation of structure
JP4473400B2 (en) Foundation of construction and construction method
JP4329068B2 (en) Yamauchi composite wall and method for constructing Yamauchi composite wall
CN213597006U (en) An assembled slope protection device for high fill slope
CN203514305U (en) Pressure dispersing type prestressing force anti-pulling anti-floating pile
CN211973471U (en) Precast pile combination and pile foundation
JP2023001572A (en) Pile foundation and its design method
KR102171787B1 (en) Soil retaining wall using phc pile
KR20100101240A (en) Connecting structure for pile foundation
CN112240028A (en) Prefabricated UHPC slope anchoring plate device and installation method thereof
CN211973474U (en) Combined pile and pile foundation

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term