JPH0573853B2 - - Google Patents
Info
- Publication number
- JPH0573853B2 JPH0573853B2 JP7415586A JP7415586A JPH0573853B2 JP H0573853 B2 JPH0573853 B2 JP H0573853B2 JP 7415586 A JP7415586 A JP 7415586A JP 7415586 A JP7415586 A JP 7415586A JP H0573853 B2 JPH0573853 B2 JP H0573853B2
- Authority
- JP
- Japan
- Prior art keywords
- screw
- mortar
- pile
- hole
- hydraulic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004570 mortar (masonry) Substances 0.000 claims description 62
- 239000002689 soil Substances 0.000 claims description 29
- 238000010276 construction Methods 0.000 claims description 27
- 238000000034 method Methods 0.000 claims description 5
- 238000005086 pumping Methods 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 30
- 229910052742 iron Inorganic materials 0.000 description 15
- 239000000463 material Substances 0.000 description 8
- 239000004568 cement Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002378 acidificating effect Effects 0.000 description 1
- 239000003513 alkali Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
- 239000005416 organic matter Substances 0.000 description 1
- 230000035484 reaction time Effects 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、現場モルタル杭造成工法に関し、特
に、掘削した土を排出することなく、杭孔の周囲
に圧密して地盤の改良を行うとともに、その杭孔
の内部にモルタル杭を形成するようにした現場モ
ルタル杭造成工法およびそのために用いられる杭
打ち機に関する。[Detailed Description of the Invention] (Industrial Application Field) The present invention relates to an on-site mortar pile construction method, and in particular improves the ground by compacting the excavated soil around the pile hole without discharging it. , relates to an on-site mortar pile construction method in which mortar piles are formed inside the pile holes, and a pile driver used for the method.
(従来の技術)
従来より建物を施工する場合には、その基礎の
下部に杭を打設し、地盤の支持強度を向上させる
ようにすることが一般に行なわれている。そし
て、そのためにコンクリート製の杭を用いて、杭
打ち機により打設することが行なわれるが、最近
は、杭打ち機による既成杭の打設は騒音が発生す
る等の理由により、用いられることが少なくなつ
ている。(Prior Art) When constructing a building, it has been common practice to drive piles into the lower part of the foundation to improve the supporting strength of the ground. For this purpose, concrete piles are used and driven with a pile driver, but recently, driving prefabricated piles with a pile driver is no longer used due to the noise it generates. is decreasing.
そして、それに代えて、地中にアースドリル等
によつて杭孔を掘削し、その孔に既成杭を打ち込
みむ工法や、掘削した土にセメントミルク等の固
化剤を混入し、それによつて杭を形成することが
一般に行なわれている。 Instead, there are methods of drilling pile holes in the ground with an earth drill etc. and driving existing piles into the holes, or mixing solidifying agents such as cement milk into the excavated soil, thereby forming piles. It is common practice to form
上記したような工法としては、例えば、特公昭
56−14808号公報等に示されるようなものがある。
この従来例に示される工法は、アースオーガを用
いて地盤に杭孔を掘削し、所定の深さの孔を形成
した後でオーガを逆方向に回転させながら固化材
料を混合し、掘削した土と固化材料との反応によ
り硬化させるようにするとともに、地盤の圧密を
行い、地盤の改良を行い得るようにするものであ
る。 For example, the construction method mentioned above is
There are some such as those shown in Publication No. 56-14808.
The construction method shown in this conventional example uses an earth auger to excavate a pile hole in the ground, and after forming a hole of a predetermined depth, mixes the solidifying material while rotating the auger in the opposite direction, and then mixes the solidified material into the excavated soil. This system hardens the soil through the reaction between the solidified material and the solidified material, and also consolidates the ground, making it possible to improve the ground.
また、上記した従来例の他に、掘削した土に液
状の固化材料を混合すること等も行なわれている
が、これらはいずれも掘削された土を主材料とし
て用い、その土を固化させていわゆるソイル杭を
形成するようにされていることが多い。 In addition to the above-mentioned conventional examples, there is also a method of mixing excavated soil with a liquid solidification material, but all of these methods use excavated soil as the main material and solidify the soil. They are often made to form so-called soil piles.
(発明が解決しようとする問題点)
しかしながら、現場打ち杭を構成する場合に、
その地盤の性質がセメントと良好に反応するよう
なものである場合には、硬化剤と掘削された土と
の反応が良好に行なわれるものの、現場の土質が
酸性の強い場合、または、有機質が多く混じつて
いる場合には、セメントのアルカリとの反応によ
り硬化材が固化せず、杭が形成出来ない場合があ
る。(Problems to be solved by the invention) However, when constructing cast-in-place piles,
If the nature of the ground is such that it reacts well with cement, the hardening agent will react well with the excavated soil, but if the soil at the site is highly acidic or has organic matter If a large amount of cement is mixed, the hardening material may not harden due to the reaction with the alkali of the cement, and a pile may not be formed.
また、地盤の性質によつては、セメントとの反
応時間が長くなり、杭の形成に時間を要すること
があり、それによつて基礎の工事期間が長くなる
等の好ましくない状態が発生するという欠点が生
じることがある。 In addition, depending on the nature of the ground, reaction time with cement may be longer and it may take more time to form piles, resulting in unfavorable conditions such as a longer foundation construction period. may occur.
それに加えて、従来より用いられている工法に
おいては、掘削された杭孔内の土の全てを杭とし
て形成することは出来ないために、掘削された土
の一部が排出されることになる。その掘削された
土は、多くの場合には硬化材と混合されたもので
あるから、普通の土と同様な取扱は出来ず、その
周囲に散布する等の処理を行い得ないことにな
る。 In addition, with conventional construction methods, it is not possible to form all of the soil in the excavated pile holes into piles, so some of the excavated soil is discharged. . Since the excavated soil is often mixed with a hardening material, it cannot be treated in the same way as ordinary soil, and cannot be treated by spreading it around it.
したがつて、工事現場の近くに土を捨てるスペ
ースがない場合などには、遠くの土捨場に運んで
処理することが求められており、その残土処理の
ために多くの手間を必要とし、それによつて、工
事費が上昇する等の別の欠点が発生することが多
い。 Therefore, if there is no space to dump soil near a construction site, it is necessary to transport the soil to a distant dumpsite for disposal, which requires a lot of time and effort to dispose of the remaining soil. Therefore, other drawbacks such as increased construction costs often occur.
また、従来の杭打ち機を用いてスクリユーを回
転させずに引き上げるようにすることも考えられ
るが、そのように構成する場合には、直径30cm位
の杭を造成する場合でも、その引き上げ力を30〜
40tに設定することが必要である。 It is also possible to use a conventional pile driver to pull up the screw without rotating it, but in such a configuration, even when building a pile with a diameter of about 30 cm, the pulling force will not be enough. 30〜
It is necessary to set it to 40t.
そして、そのためには能力の大きいクレーン車
を用いることが必要であり、全体の装置を大型化
することになり、小規模の工事には対応が困難で
ある。 For this purpose, it is necessary to use a crane truck with a large capacity, which increases the size of the entire device, making it difficult to handle small-scale construction work.
(発明の目的)
本発明は、上記したような従来より用いられて
いる工法の欠点を解消するもので、杭孔で掘削さ
れた土を、その孔の周囲に圧密し、その孔の内部
にモルタルで杭を形成出来、地上に土を排出する
ことのない工法を提供するとともに、小型の掘削
装置を提供することを目的としている。(Objective of the Invention) The present invention solves the drawbacks of conventional construction methods as described above. The purpose is to provide a construction method that allows piles to be formed using mortar without ejecting soil to the ground, and to provide a small excavation device.
(問題点を解決するための手段および作用)
本発明の現場モルタル杭造成工法は、スクリユ
ーを回転させることによつて地中に圧入し、その
後で該スクリユーを回転させずに引き抜き、掘削
された土砂を孔の周囲に圧密させるようにすると
ともに、該スクリユーの引き上げを行うための引
き上げ装置と、モルタルを圧送するためのモルタ
ル圧送ポンプとを同一の油圧装置により駆動し、
スクリユーの下部に対するモルタルの圧送と、引
き上げ装置によるスクリユーの引き上げとを平行
して行うようにし、モルタル杭を造成するように
したことを特徴とする工法である。(Means and effects for solving the problem) The in-situ mortar pile construction method of the present invention is such that the screw is pressed into the ground by rotating the screw, and then the screw is pulled out without rotating, and the pile is excavated. Consolidating the earth and sand around the hole, and driving a lifting device for pulling up the screw and a mortar pump for pumping the mortar by the same hydraulic device,
This construction method is characterized in that a mortar pile is created by force-feeding mortar to the lower part of the screw and pulling up the screw using a pulling device in parallel.
また、本発明の現場モルタル杭造成工法用とし
て用いられる装置は、中空ロツドの下部にスクリ
ユーを設け、油圧モータにより駆動を行うように
した杭打ち機と、該中空ロツドの所定の部分に一
体に設けたカラーに係合し、その引き上げを行わ
せるように構成してなる引き上げ装置と、モルタ
ルの圧送を行うためのモルタル圧送ポンプとを設
け、これらの装置を同一の油圧装置により供給さ
れる油圧によつて駆動するように構成している。 In addition, the device used for the on-site mortar pile construction method of the present invention includes a pile driver that has a screw provided at the bottom of the hollow rod and is driven by a hydraulic motor, and a pile driver that is integrally attached to a predetermined part of the hollow rod. A lifting device configured to engage with and pull up the provided collar, and a mortar pump for pumping mortar are provided, and these devices are connected to hydraulic pressure supplied by the same hydraulic device. It is configured to be driven by.
したがつて、所定の深さにまで圧入されたスク
リユーを引き上げる際には、引き上げ装置のシリ
ンダーとモルタル圧送ポンプとが同時に駆動され
ることになり、両部材の力のバランスを取りなが
らスクリユーの下部にモルタルの充填を行い、ス
クリユーの押し上げの作用を行うようにされてお
り、モルタル杭の造成を良好な状態で行い得るこ
とになる。 Therefore, when pulling up a screw that has been press-fitted to a predetermined depth, the cylinder of the lifting device and the mortar pump are driven simultaneously, and the lower part of the screw is pulled up while balancing the forces of both members. The screw is filled with mortar to push up the screw, and the mortar pile can be constructed in good condition.
さらに、本発明の工法によると、掘削された土
が杭孔の周囲に圧密された状態で残されることに
なるために、地上に排出されることはなく、残土
処理に手間を要することはなくなる。 Furthermore, according to the construction method of the present invention, the excavated soil is left in a compacted state around the pile hole, so it is not discharged to the ground, and there is no need to spend time disposing of the remaining soil. .
それに加えて、本発明の杭打ち機は、その装置
を小型に構成出来るために、小規模の工事に対し
て容易に対応が可能であり、機動性を向上させ得
るものとなる他に、騒音等が発生することを防止
出来るので、住宅密集地での工事を容易に行い得
るものとなる。 In addition, since the pile driver of the present invention can be constructed in a small size, it can be easily applied to small-scale construction work, improves maneuverability, and reduces noise. Since the occurrence of such problems can be prevented, construction work can be easily carried out in densely populated residential areas.
(実施例)
図示された実施例に従つて、本発明の杭打ち機
の構成を説明する。(Example) The structure of the pile driver of the present invention will be explained according to the illustrated example.
第1図に示されるように本発明の装置は、スク
リユー5を地中に圧入するための油圧モータ2よ
り構成される杭打ち機1と、引き上げ装置10、
油圧装置20、および、モルタル圧送ポンプ25
とから構成される。そして、油圧装置20により
発生された油圧を用いて、杭打ち機1の油圧モー
タ2、引き上げ装置10のシリンダー11、およ
び、モルタル圧送ポンプ25の油圧モータ26の
駆動を行うように構成されている。 As shown in FIG. 1, the apparatus of the present invention includes a pile driver 1 comprising a hydraulic motor 2 for press-fitting a screw 5 into the ground, a pulling device 10,
Hydraulic device 20 and mortar pressure pump 25
It consists of The hydraulic motor 2 of the pile driver 1, the cylinder 11 of the lifting device 10, and the hydraulic motor 26 of the mortar pump 25 are driven using the hydraulic pressure generated by the hydraulic system 20. .
本発明の杭打ち機1は、油圧モータ2により駆
動される中空ロツド3と、その中空ロツド3の先
端部に設けられるスクリユー5から構成されてい
る。また、中空ロツド3の下部には開口が設けら
れており、その上部にはジヨイント28が形成さ
れている。 The pile driver 1 of the present invention is comprised of a hollow rod 3 driven by a hydraulic motor 2 and a screw 5 provided at the tip of the hollow rod 3. Further, an opening is provided in the lower part of the hollow rod 3, and a joint 28 is formed in the upper part of the opening.
スクリユー5は、上部に向けて次第に細く形成
され、テーパ部6が形成されるとともに、その下
部には、従来より用いられているスクリユーと同
様にして掘削歯が形成される。さらに、本発明の
中空ロツド3の途中の部分には、所定の間隔でカ
ラー4,4a,4b……が固定されており、その
カラー4は後述するように、スクリユー5を持上
げる際に引き上げ装置10の係止部材15が係合
されるようになつている。 The screw 5 is formed to become gradually thinner toward the top, and a tapered portion 6 is formed, and digging teeth are formed at the bottom thereof in the same manner as conventionally used screws. Furthermore, collars 4, 4a, 4b... are fixed at predetermined intervals in the middle of the hollow rod 3 of the present invention, and the collars 4 are pulled up when lifting the screw 5, as will be described later. The locking member 15 of the device 10 is adapted to be engaged.
本発明の引き上げ装置10は、複数本の垂直に
設けられたシリンダー11と、そのシリンダー1
1の下部に設けられる脚部12、シリンダーのロ
ツドが係止される上部材13、および、上部材1
3と係止部材15との間を接続するための複数本
のリンク14,14……とから構成される。 The lifting device 10 of the present invention includes a plurality of vertically provided cylinders 11 and the cylinders 1
1, an upper member 13 to which the cylinder rod is locked, and an upper member 1.
3 and the locking member 15.
また、掘削される孔31の上部には、孔の径に
対応した孔17aを設けた下鉄板17を置き、そ
の孔を介して杭孔31の掘削を行うようにしてお
り、スクリユー5を引上げる際には、その下鉄板
17の上に2分割した上鉄板16を置くようにす
る。 Further, a lower iron plate 17 with a hole 17a corresponding to the diameter of the hole is placed above the hole 31 to be excavated, and the pile hole 31 is excavated through the hole, and the screw 5 is pulled. When raising, the upper iron plate 16 divided into two parts is placed on top of the lower iron plate 17.
この上鉄板16は、それを2枚合せた時に、そ
の中央部に中空ロツド3のカラー4が通過出来る
程度の孔16aが形成されるようになつており、
引上げられるスクリユー5によつて持上げられた
土が、その上鉄板16、下鉄板17によつて地上
に排出されることのないように押圧されるように
なつている。 When the two upper iron plates 16 are put together, a hole 16a is formed in the center of the upper iron plate 16, which is large enough to allow the collar 4 of the hollow rod 3 to pass through.
The soil lifted by the screw 5 is pressed by the upper iron plate 16 and the lower iron plate 17 so as not to be discharged to the ground.
中空ロツド3を介してモルタル杭孔31に圧入
するためのモルタル圧送ポンプ25は、従来より
一般に用いられているモルタルポンプであるが、
その駆動源として油圧モータ26を用いている。 The mortar pressure pump 25 for press-fitting the mortar into the mortar pile hole 31 through the hollow rod 3 is a mortar pump that has been commonly used in the past.
A hydraulic motor 26 is used as its driving source.
そして、そのモルタル圧送ポンプ25に設けた
ホツパにミキサー車36からモルタルを投入し、
そのホツパからモルタル圧送ホース27を介して
モルタル35を送り出し、ジヨイント28から中
空ロツド3に供給し、その中空ロツド3の中空孔
を介してスクリユー5の下部に設けられている開
口に向けて送り出し、その開口からモルタルを杭
孔31に排出するようにされる。 Then, mortar is poured from the mixer truck 36 into the hopper provided on the mortar pressure pump 25, and
The mortar 35 is sent out from the hopper via the mortar pressure feeding hose 27, supplied to the hollow rod 3 from the joint 28, and sent out through the hollow hole of the hollow rod 3 toward the opening provided at the bottom of the screw 5, The mortar is discharged into the pile hole 31 from the opening.
本発明の油圧装置20としては、油圧ポンプ2
1、油タンク22、および、油圧バルブ23と各
機器とを接続する配管24から構成されており、
シリンダー11に対しては配管24a,24bが
接続され、油圧モータ26に対しては配管24
c,24dが接続される。また、杭打ち機1の油
圧モータ2に対しては、その駆動時間が異なるた
めに、別系統の配管が設けられる。 The hydraulic system 20 of the present invention includes a hydraulic pump 2
1, an oil tank 22, and piping 24 connecting the hydraulic valve 23 and each device,
Pipes 24a and 24b are connected to the cylinder 11, and piping 24 is connected to the hydraulic motor 26.
c and 24d are connected. Further, since the driving time of the hydraulic motor 2 of the pile driver 1 is different, a separate system of piping is provided.
そして、本発明の杭打ち機を用いて杭孔31の
掘削を行い、その杭孔31を所定の深さまで掘削
した後で、引き上げ装置10とモルタル圧送ポン
プ25の駆動を行い、モルタルの圧送とスクリユ
ー5の引上の作業とを、同時に平行して行うよう
にするのである。 Then, the pile hole 31 is excavated using the pile driver of the present invention, and after the pile hole 31 has been excavated to a predetermined depth, the pulling device 10 and the mortar pressure pump 25 are driven, and the mortar is pumped. The work of pulling up the screw 5 is performed simultaneously and in parallel.
つぎに、本発明の杭打ち機を用いて現場モルタ
ル杭の造成を行う場合について説明する。 Next, a case where on-site mortar piles are created using the pile driver of the present invention will be described.
第2図Aに示されるようにして、油圧モータ2
を駆動し、所定の圧力で押し下げることによつ
て、スクリユー5により杭孔31を掘削する。そ
の際には、地盤30の掘削位置に下鉄板17を置
き、その孔17aを介してスクリユー5を圧入す
る。そして、スクリユー5が嵌入された後で、上
鉄板16を置き、その中心部の孔が中空ロツド3
を保持するようにしてセツトされる。そのままの
状態で、所定の深さの杭孔31の掘削を行い、掘
削された土32がスクリユー5の上部に残るよう
にされる。 As shown in FIG. 2A, the hydraulic motor 2
The pile hole 31 is excavated by the screw 5 by driving and pushing down with a predetermined pressure. At that time, the lower iron plate 17 is placed at the excavation position of the ground 30, and the screw 5 is press-fitted through the hole 17a. After the screw 5 is inserted, the upper iron plate 16 is placed, and the hole in the center is inserted into the hollow rod 3.
It is set so that it holds. In this state, a pile hole 31 is excavated to a predetermined depth, and the excavated soil 32 is left above the screw 5.
予定された深さに杭孔31が掘削された後で、
モルタルの充填とスクリユー5の引上の作業を行
う。この場合には、第1図に示される油圧バルブ
23を作動させて、油圧ポンプ21からの油圧を
配管24a,24cを介してシリンダー11とモ
ルタル圧送ポンプ25に送り込む。 After the pile hole 31 is drilled to the planned depth,
Filling with mortar and pulling up the screw 5 are performed. In this case, the hydraulic valve 23 shown in FIG. 1 is operated to send hydraulic pressure from the hydraulic pump 21 to the cylinder 11 and the mortar pump 25 via the pipes 24a and 24c.
したがつて、油圧ポンプ21から送り出される
油圧によつて、シリンダー11とモルタル圧送ポ
ンプ25とが同時に駆動され、第2図Bに示され
るようにしてスクリユーの引き上げと、中空ロツ
ド3の下部からのモルタルの排出が同時に行われ
ることになる。 Therefore, the hydraulic pressure sent from the hydraulic pump 21 drives the cylinder 11 and the mortar pump 25 at the same time, and as shown in FIG. The mortar will be discharged at the same time.
この場合には、モルタル圧送ポンプ25から送
り出される圧力の高いモルタルが、モルタル圧送
ホース27から中空ロツド3の中空部を通つて、
その中空ロツド3の下端部からスクリユー5の下
に排出され、空間部に充填されるとともに、その
圧力によつてスクリユー5を上昇させ、そのモル
タルによるスクリユー5への押し上げ圧力と、シ
リンダー11によるスクリユー5への引上力とが
同時に作用されることになる。 In this case, the high pressure mortar sent out from the mortar pressure pump 25 passes through the hollow part of the hollow rod 3 from the mortar pressure feed hose 27,
It is discharged from the lower end of the hollow rod 3 under the screw 5 and fills the space, and the pressure causes the screw 5 to rise. 5 will be applied at the same time.
したがつて、スクリユー5は次第に上昇される
が、そのスクリユー5の上部にある掘削された土
32は、地上部分で上鉄板16、下鉄板17によ
つて押圧されているので、杭孔31の上部に向け
て排出されずに、スクリユー5のテーパ部6によ
り孔の側方に押付けられ、その孔31の周囲の地
盤を圧密した状態にされる。 Therefore, the screw 5 is gradually raised, but the excavated soil 32 above the screw 5 is pressed by the upper iron plate 16 and the lower iron plate 17 at the above ground part, so that the pile hole 31 is Instead of being discharged upwards, it is pressed to the side of the hole by the tapered portion 6 of the screw 5, and the ground around the hole 31 is consolidated.
そして、同図Cに示されるように、スクリユー
5の上部が鉄板16,17に係合される位置ま
で、スクリユー5の引上とモルタルの充填の作業
が継続され、孔31の周囲の地盤の圧密の作業を
行うとともに、スクリユーの下部にモルタル充填
部33が形成され、その現場モルタル杭の造成が
終了する。 Then, as shown in FIG. While the consolidation work is carried out, a mortar filling section 33 is formed at the bottom of the screw, and the construction of the on-site mortar pile is completed.
このスクリユー5の引上げに際しては、地盤の
上に設置された上下の鉄板16,17は、シリン
ダー11の脚部12により押圧されるようになつ
ており、スクリユーの上昇によつて土が杭孔31
の外に排出されるようなことはなく、掘削された
土32は杭孔31の周囲に圧密され、その地盤の
強化を行うようにされる。そして、スクリユー5
の下部に充填されるモルタルは、そのモルタル圧
送ポンプ25による送り込み圧力を高く設定する
ことによつて、杭孔31に隙間なく充満されるこ
とになり、杭の強度が大きいものとして形成され
ることになる。 When the screw 5 is pulled up, the upper and lower iron plates 16 and 17 installed on the ground are pressed by the legs 12 of the cylinder 11, and as the screw rises, soil is pushed into the pile hole 31.
The excavated soil 32 is consolidated around the pile hole 31 and strengthens the ground. And Screw 5
By setting the feeding pressure of the mortar feeding pump 25 to a high level, the mortar filled in the lower part of the pile hole 31 will be filled without any gaps, and the pile will be formed with high strength. become.
なお、最後に残つたスクリユー部分の長さに相
当する深さには、上下の鉄板16,17を外した
後でモルタルを充填して、モルタル杭を造成する
ことは可能であるが、通常は、その部分を掘削
し、基礎のコンクリートを打設するようになつて
いるので、杭孔の上部にはモルタルを打設するこ
とは必要とされない。 Note that it is possible to create a mortar pile by filling mortar to a depth corresponding to the length of the last remaining screw part after removing the upper and lower iron plates 16 and 17, but normally Since the area is excavated and the foundation concrete is placed, it is not necessary to place mortar on top of the pile hole.
また、本発明の現場モルタル杭造成工法におい
ては、スクリユー5の引上の作業に際して、引き
上げ装置10の係止部材15を順次カラー4b,
4a,4……に係止させ、シリンダー11により
引上げるようにしているので、そのシリンダー1
1のストロークと、カラー4の間隔とは同一に設
定されると良い。 In addition, in the on-site mortar pile construction method of the present invention, when pulling up the screw 5, the locking member 15 of the pulling device 10 is sequentially moved to the collar 4b,
4a, 4... and is pulled up by the cylinder 11, so that the cylinder 1
The stroke of color 1 and the interval of color 4 are preferably set to be the same.
上記した本発明の引き上げ装置において、係止
部材15を油圧によつて中空ロツド3との係合部
のサイズを変化させ得るようにした装置として構
成すると、スクリユー5の引き上げに際しての手
間を少なくすることが可能になり、さらに、引き
上げ装置10の構成を任意の形状のものとして構
成すること等も必要に応じて容易に出来ることで
ある。 In the above-mentioned pulling device of the present invention, if the locking member 15 is configured as a device that can change the size of the engaging portion with the hollow rod 3 using hydraulic pressure, the effort required to pull up the screw 5 can be reduced. Furthermore, it is also possible to easily configure the pulling device 10 to have an arbitrary shape as needed.
(発明の効果)
本発明の現場モルタル杭造成工法は、上記した
ような動作を行うものであるから、現場モルタル
杭を油圧駆動装置によつて施工することが出来、
その作業に際しては、振動や騒音の発生を極力抑
制することが可能である。(Effects of the Invention) Since the on-site mortar pile construction method of the present invention performs the operations described above, the on-site mortar pile can be constructed by a hydraulic drive device.
During this work, it is possible to suppress the generation of vibration and noise as much as possible.
また、本発明の現場モルタル杭造成工法におい
ては、掘削された土を地上に排土することがない
ため、残土処理の手間を要することがなく、スク
リユーによつて掘削された土を杭孔の周囲に圧密
し、地盤の強化を行い得るものとなるので、その
杭孔に造成されるモルタル杭の摩擦力が非常に大
きくなり、建物の支持強度を増大させることが可
能になる。 In addition, in the on-site mortar pile construction method of the present invention, the excavated soil is not discharged to the ground, so there is no need to dispose of the remaining soil. Since the surrounding area can be consolidated and the ground can be strengthened, the frictional force of the mortar piles built in the pile holes becomes extremely large, making it possible to increase the supporting strength of the building.
さらに、本発明の杭打ち機は、大型の装置を用
いることなしに、施工が可能になるために、狭い
場所での工事等にも容易に適用が可能であり、ス
クリユーの引抜き力が大きいので、クレーン等の
ような他の装置を用いずに、同一の油圧源により
杭孔の掘削と、モルタル杭の造成とを行うことが
可能であるとともに、造成された杭の強度が均一
になるので、建物の支持部分の設計を容易に行い
得ることになり、建物の施工の後で不等沈下等が
発生する恐れを確実に解消出来ることになる。 Furthermore, the pile driver of the present invention enables construction without the use of large equipment, so it can be easily applied to construction work in narrow spaces, and the screw has a large pulling force. It is possible to excavate a pile hole and create a mortar pile using the same hydraulic power source without using other equipment such as a crane, etc., and the strength of the created pile is uniform. , it becomes possible to easily design the supporting parts of the building, and it is possible to reliably eliminate the possibility of uneven settlement, etc. occurring after the construction of the building.
第1図は本発明の杭打ち機の構成を示す説明
図、第2図は本発明の施工状態を示す説明図でA
〜Cは、それぞれモルタル杭の施工順序を示す説
明図である。
図中の符号、1……杭打ち機、2……油圧モー
タ、3……中空ロツド、4……カラー、5……ス
クリユー、6……テーパ部、10……引き上げ装
置、11……シリンダー、12……脚部、13…
…上部材、14……リンク、15……係止部材、
16……上鉄板、17……下鉄板、20……油圧
装置、21……油圧ポンプ、22……油タンク、
23……油圧バルブ、24……配管、25……モ
ルタル圧送ポンプ、26……油圧モータ、27…
…モルタル圧送ホース、28……ジヨイント、3
0……地盤、31……杭孔、32……掘削された
土、33……モルタル充填部、35……モルタ
ル。
Figure 1 is an explanatory diagram showing the configuration of the pile driver of the present invention, and Figure 2 is an explanatory diagram showing the construction state of the present invention.
-C are explanatory diagrams showing the construction order of mortar piles, respectively. Symbols in the diagram: 1... Pile driver, 2... Hydraulic motor, 3... Hollow rod, 4... Collar, 5... Screw, 6... Taper part, 10... Pulling device, 11... Cylinder. , 12...leg, 13...
... Upper member, 14 ... Link, 15 ... Locking member,
16...Upper iron plate, 17...Lower iron plate, 20...Hydraulic system, 21...Hydraulic pump, 22...Oil tank,
23... Hydraulic valve, 24... Piping, 25... Mortar pressure pump, 26... Hydraulic motor, 27...
...Mortar pressure feed hose, 28...Joint, 3
0... Ground, 31... Pile hole, 32... Excavated soil, 33... Mortar filling part, 35... Mortar.
Claims (1)
圧入し、その後で該スクリユーを回転させずに引
き上げ、掘削された土砂を孔の周囲に圧密させる
ようにするとともに、該スクリユーの引き上げの
動作を行うための引き上げ装置と、モルタルを圧
送するためのモルタル圧送ポンプとを同一の油圧
装置により駆動し、スクリユーの下部に対するモ
ルタルの圧送と、引き上げ装置によるスクリユー
の引き上げとを平行して行うようにして、モルタ
ル杭を造成するようにしたことを特徴とする現場
モルタル杭造成工法。 2 中空ロツドの下部にスクリユーを設け、油圧
モータにより駆動を行うように構成した杭打ち機
と、該中空ロツドの所定の部分に一体に設けたカ
ラーに係合し、その引き上げを行わせるように構
成してなる引き上げ装置と、モルタルの圧送を行
うためのモルタル圧送ポンプとを設け、これらを
同一の油圧装置により供給される油圧によつて駆
動するように構成したことを特徴とする現場モル
タル杭造成工法用の杭打ち機。 3 スクリユーを上に向けて次第に細くしたテー
パ状に構成し、そのスクリユーの引き上げによつ
て、上部の掘削された土を孔の周囲に向けて押圧
するように構成したことを特徴とする特許請求の
範囲第2項記載の杭打ち機。[Claims] 1. The screw is pressed into the ground by rotating the screw, and then the screw is pulled up without rotating to compact the excavated earth and sand around the hole, and the screw The lifting device for lifting the screw and the mortar pump for pumping the mortar are driven by the same hydraulic device, and the feeding of the mortar to the lower part of the screw and the lifting of the screw by the lifting device are performed in parallel. A method for constructing mortar piles on site, characterized in that mortar piles are constructed in a similar manner. 2 A screw is provided at the bottom of the hollow rod, and the pile driver is configured to be driven by a hydraulic motor, and the screw is engaged with a collar provided integrally at a predetermined portion of the hollow rod to cause the screw to be pulled up. An on-site mortar pile characterized in that it is provided with a lifting device consisting of the above-mentioned structure and a mortar pressure pump for force-feeding mortar, and is configured to be driven by hydraulic pressure supplied by the same hydraulic device. Pile driver for construction method. 3. A patent claim characterized in that the screw is configured in a tapered shape that gradually becomes thinner upward, and by pulling up the screw, the excavated soil in the upper part is pressed toward the periphery of the hole. A pile driver according to item 2 of the scope of the invention.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7415586A JPS62233329A (en) | 1986-04-02 | 1986-04-02 | Forming work of in-situ mortar pile and pile driver therefor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7415586A JPS62233329A (en) | 1986-04-02 | 1986-04-02 | Forming work of in-situ mortar pile and pile driver therefor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62233329A JPS62233329A (en) | 1987-10-13 |
| JPH0573853B2 true JPH0573853B2 (en) | 1993-10-15 |
Family
ID=13538983
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP7415586A Granted JPS62233329A (en) | 1986-04-02 | 1986-04-02 | Forming work of in-situ mortar pile and pile driver therefor |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS62233329A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4490710B2 (en) * | 2004-03-16 | 2010-06-30 | 千代田ソイルテック株式会社 | Pile foundation construction equipment and construction method |
| JP4795299B2 (en) * | 2007-04-13 | 2011-10-19 | 旭化成建材株式会社 | Construction method of hollow column |
-
1986
- 1986-04-02 JP JP7415586A patent/JPS62233329A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62233329A (en) | 1987-10-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US2555359A (en) | Pile structure and method of making same | |
| US20240368853A1 (en) | Method for forming a pile wall in ground and a corresponding pile wall | |
| KR100996444B1 (en) | Improved micro pile construction method, uneven section pipe of improved micro pile structure and improved micro pile structure | |
| JPH0573853B2 (en) | ||
| JPH0610344A (en) | Confirmation and increase method for support force of cast-in-place pile | |
| JP2005188237A (en) | Columnar ground improving device and columnar ground improving construction method | |
| JP4373451B2 (en) | Ground reinforcement method | |
| JP3144767B2 (en) | Underground pile forming method and apparatus | |
| JP7616772B2 (en) | On-site construction method for foundation piles | |
| GB2132667A (en) | Method of installing precast concrete piles | |
| JP3673171B2 (en) | Concrete pile setting method | |
| KR19980020441A (en) | Pile foundation construction method and device | |
| JPS5847527B2 (en) | Anti-forming method using soil condensation | |
| JPH11269874A (en) | Pile construction method for foundation pile | |
| JP4137172B1 (en) | Reinforcing bar construction in cast-in-place pile | |
| JP2014015787A (en) | Ground compaction device | |
| JP3577360B2 (en) | Construction method of underground wall and trunk pipe used for it | |
| US3534561A (en) | Method for construction of building substructure | |
| JPH0699900B2 (en) | Ground consolidation method and ground consolidation apparatus used for the method | |
| JPH045101B2 (en) | ||
| JPS6122089B2 (en) | ||
| JP2838019B2 (en) | Caisson blade framing method | |
| JPH07331666A (en) | Slope cutting method | |
| JPH10195886A (en) | Foundation construction method | |
| JPH01131717A (en) | Construction of in-situ pile |