JPH06100028B2 - Prefabricated construction method of pillar reinforcement - Google Patents
[go: Go Back, main page]

JPH06100028B2 - Prefabricated construction method of pillar reinforcement - Google Patents

Prefabricated construction method of pillar reinforcement

Info

Publication number
JPH06100028B2
JPH06100028B2 JP18978686A JP18978686A JPH06100028B2 JP H06100028 B2 JPH06100028 B2 JP H06100028B2 JP 18978686 A JP18978686 A JP 18978686A JP 18978686 A JP18978686 A JP 18978686A JP H06100028 B2 JPH06100028 B2 JP H06100028B2
Authority
JP
Japan
Prior art keywords
bar
column main
muscles
lock nut
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP18978686A
Other languages
Japanese (ja)
Other versions
JPS6347469A (en
Inventor
義規 永井
孝一 山本
清治 花田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP18978686A priority Critical patent/JPH06100028B2/en
Publication of JPS6347469A publication Critical patent/JPS6347469A/en
Publication of JPH06100028B2 publication Critical patent/JPH06100028B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、原子力発電所建屋のごとき大型構造物の配筋
工事において特に柱筋の先組工法に関する。
Description: [Industrial field of use] The present invention particularly relates to a pre-assembly method of column reinforcements in the reinforcement work of a large structure such as a nuclear power plant building.

〔従来の技術〕[Conventional technology]

かかる大型構造物の太径鉄筋には第9図、第10図に示す
ようにネジフシ鉄筋1を使用し、これを継手部材2とし
てのロックナット2aとカップラー2bを用いて機械的に接
合する鉄筋継手工法が採用されている。これは圧接その
他の面で時間のかかる継手工法に代わるものとして旋工
の合理化が図れるもので、一方の差筋側のネジフシ鉄筋
1にロックナット2aとカップラー2bを、他方の継ぐべき
ネジフシ鉄筋1側にロックナット2aを予めセットしてお
き、両ネジフシ鉄筋1の端を突き合わせカップラー2bを
これらに跨らせるように移動しその両側をロックナット
2aを回動させて締付ける。
As shown in FIGS. 9 and 10, a screw bar reinforcement 1 is used for the large-diameter rebar of such a large-scale structure, and the bar is mechanically joined using a lock nut 2a and a coupler 2b as a joint member 2. The joint construction method is adopted. This is to rationalize the turning as an alternative to the joint construction method that takes time in other aspects such as pressure welding. The lock nut 2a and the coupler 2b are connected to the screw bar reinforcement 1 on one side of the differential and the screw bar reinforcement 1 to be connected to the other side. Set the lock nut 2a on the side in advance, move the ends of both screw bush rebars 1 against each other and straddle the coupler 2b, and lock both sides of the lock nut 2a.
Rotate 2a and tighten.

ところで、このようなネジフシ鉄筋1を用いた従来の柱
筋の配筋方法を説明すると、第11図に示すように既設躯
体から突出するものとしてすでに配筋されている差筋3
の内側に仮設鉄骨架台4をセットし、ネジフシ鉄筋によ
る柱主筋5をクレーン等で1本ずつ吊り上げ所定配筋位
置に移動する。
By the way, the conventional method of arranging the column reinforcing bar using the screw bar reinforcement 1 will be explained. As shown in FIG. 11, the reinforcing bar 3 which has already been arranging as protruding from the existing skeleton.
The temporary steel frame base 4 is set inside, and the column main bar 5 made of screw bar reinforcement is lifted one by one with a crane or the like and moved to a predetermined bar arrangement position.

次いで、前記継手部材2を用いたロックナット継手で柱
主筋5と差筋3とを接合し、接合された柱主筋5の上端
は水平方向の倒れ防止及び配筋ピッチ保持のために前記
仮設鉄骨架台4の上端と柱筋受具6で仮止めする。図中
8は足場を示す。
Next, the column main reinforcement 5 and the differential reinforcement 3 are joined together with a lock nut joint using the joint member 2, and the upper end of the joined main column reinforcement 5 is the temporary steel frame for preventing horizontal collapse and maintaining the bar arrangement pitch. Temporarily fix it with the upper end of the gantry 4 and the column braces 6. In the figure, 8 indicates a scaffold.

その後フープ筋7を柱主筋5に巻回し、結束線14でこれ
らを止めて柱部分の組立ては完了する。一方、図示は省
略するが、該柱間には壁タテ筋が配設され、この壁タテ
筋と柱主筋とに壁ヨコ筋を沿わせ結束線で固定して配筋
作業は一工程終了する。
After that, the hoop muscles 7 are wound around the pillar main muscles 5, and these are stopped by the binding wires 14 to complete the assembly of the pillar portion. On the other hand, although illustration is omitted, a vertical wall wall is arranged between the columns, and the horizontal wall bar is laid along the vertical bar wall and the main bar of the column, and fixed with a binding line to complete one step of the bar arrangement work. .

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

このような従来の柱筋の配筋方法は、柱主筋5は1本ず
つ配筋しているため作業能率が非常に悪い。また、大型
クレーンにて鉄筋を1本ずつ吊り上げて配筋するために
クレーン稼動効率が悪く、揚重費のコストアップにな
る。さらに、鉄筋工の労力負担が大きく、熟練工不足も
影響して労力確保に問題を生じ、安全性にも問題があ
る。
In such a conventional method of arranging columnar bars, the work efficiency is very poor because the columnar main bars 5 are arranged one by one. Also, since the reinforcing bars are lifted up one by one with a large crane and arranged, the operating efficiency of the crane is poor and the cost of lifting costs increases. Further, the labor load on the reinforcing bar work is large, and a shortage of skilled workers also influences, which causes a problem in securing labor, and there is also a problem in safety.

なお、鉄筋を地上で先行地組するいわゆるプレハブ化も
考えらえるが、特に太径鉄筋の場合は1本の重量が大で
あり組立の容易性や地組した物の吊り上げ時の安定性に
問題があり、またネジフシ鉄筋を使用しロックナット継
手に必要とされる、吊り込み後接合時に鉄筋を回転ある
いは押引きする自由度が失われてしまうおそれがある。
A so-called prefabricated structure in which the reinforcing bars are pre-assembled on the ground can be considered, but especially in the case of large diameter reinforcing bars, the weight of one piece is large, which makes it easier to assemble and stabilize the assembled structure when it is lifted. There is a problem, and there is a possibility that the degree of freedom for rotating or pushing / pulling the reinforcing bar at the time of joining after suspending, which is required for the lock nut joint using the screw bar reinforcing bar, may be lost.

本発明の目的は前記従来例の不都合を解消し、地上で簡
単に先組みでき、組立てられたものは安定した状態で一
挙に建込むことが可能で、しかもネジフシ鉄筋接合の際
の鉄筋の自由度も確保できる柱筋の先組工法を提供する
ことにある。
The object of the present invention is to eliminate the inconvenience of the above-mentioned conventional example, can be easily assembled on the ground, and the assembled ones can be installed all at once in a stable state. The purpose is to provide a pre-assembly method for the pillar reinforcement that can secure the degree of accuracy.

〔問題点を解決するための手段〕[Means for solving problems]

本発明は前記目的を達成するため、配筋間隔の通し孔を
有する枠組プレートを架台により直立させて並べ、該枠
組プレートにネジフシ鉄筋による柱主筋を貫通させて柱
主筋に螺合する割ロックナット係止し、また柱主筋にフ
ープ筋を適宜数巻回し、このフープ筋に棒状固定材を添
設しその接合個所を結束し、一方柱主筋とフープ筋とは
4隅の柱筋を除いて任意ピッチ間隔で結束することを要
旨とするものである。
In order to achieve the above-mentioned object, the present invention achieves the above-mentioned object by arranging frame plates having through holes of bar arrangement upright by a frame, and arranging the frame plates through a column main bar made of screw bar reinforcement to screw into the column main bar. Hoop muscles are wound around the column main muscles as appropriate, and a bar-shaped fixing material is attached to the hoop muscles to bind the joints. On the other hand, the column main muscles and the hoop muscles except for the four corners. The idea is to bind at an arbitrary pitch interval.

〔作用〕[Action]

本発明によれば、柱主筋は枠組プレートに挿入するだけ
で組立てられ、その両者の係止は割ロックナットを使用
したので該ナットの取付けが回転移動させることなく簡
単につ迅速に行える。また、柱主筋は前記枠組プレート
で組まれるので吊り上げ時及び建込み後も剛性の高い安
定した状態を保ち、フープ筋と柱主筋とはすべてを結束
しているわけでないので、接合時に柱主筋の回転や押引
きなどが行える。
According to the present invention, the column main bar is assembled by only inserting it into the frame plate, and the locking of both of them is performed by using the split lock nut, so that the nut can be easily and quickly mounted without rotating. Also, since the column main bar is assembled with the frame plate, it maintains a high rigidity and stable state even after lifting and construction, and since the hoop muscle and the column main bar do not bind all together, the column main bar of the It can be rotated and pushed and pulled.

〔実施例〕〔Example〕

以下、図面について本発明の実施例を詳細に説明する。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

第1図は本発明の柱筋の先組工法の1実施例を示す側面
図で、図中9はH型鋼を2本平行に並べた架台を示す。
FIG. 1 is a side view showing one embodiment of the pre-assembly method for the column bars of the present invention, and in the figure, 9 shows a mount in which two H-shaped steels are arranged in parallel.

該架台9の上面には、アングル材を直立させ長ボルトで
中央を連結したH型の支承部材9aを後述の枠組プレート
10が入る巾だけあけて2連設けてあり、このような架台
9を地上に適宜数(図示では3個)間隔を損じて平行に
並べ、ボルト等で下部を床面に固定しておく。
On the upper surface of the pedestal 9, an H-shaped support member 9a in which an angle member is erected and the centers are connected by long bolts is provided with a frame plate described later.
Two racks are provided with a width that allows 10 to be accommodated. Such racks 9 are arranged in parallel on the ground at an appropriate number (three in the figure), and the lower portion is fixed to the floor with bolts or the like.

また、架台9の支承部材9aが形成する隙間に、平板10a
を矩形に組み対角線状のバー10bで固定した枠組フレー
ム10を差入れてボルトで仮止めするなどしてセットする
が、この枠組フレーム10は柱筋のゲージプレート兼固定
プレートとしての役割を有し、予め配筋間隔で通し孔10
cを形成してある。
In addition, the flat plate 10a is provided in the gap formed by the support member 9a of the pedestal 9.
Is set in a rectangular shape by inserting a frame frame 10 fixed with a diagonal bar 10b and temporarily fixing it with bolts, etc., but this frame frame 10 has a role as a gauge plate and a fixing plate of a column bar, Through holes 10 at the bar arrangement in advance
has formed c.

このように、架台9により通し孔10cを有する枠組プレ
ート10を直立状態で並べておき、柱主筋5を横にして前
記通し孔10cを介して枠組プレート10間に順次貫通させ
る。
In this way, the frame plates 10 having the through holes 10c are arranged in an upright state by the gantry 9, and the column main bars 5 are laid side by side so that the frame plates 10 are sequentially penetrated through the through holes 10c.

所定本数柱主筋5を枠組プレート10にセットさせたなら
ば、柱主筋5の該プレート10からの貫通突出個所にロッ
クナットを取付け吊り上げ時にこの枠組プレート10が柱
主筋5からずれないようにするが、このロックナットに
は第5図に示すようなロックナット部分11aが2分割さ
れ、一方を蝶番11bで連結し、他方をボルトナット11cで
固定するようにした割ロックナット11を使用し、第6図
に示すように、柱主筋5の外側部から一端を枠組プレー
ト10に当接するようにして螺合した。
When a predetermined number of column main bars 5 are set on the frame plate 10, a lock nut is attached to a protruding portion of the column main bar 5 penetrating from the plate 10 to prevent the frame plate 10 from being displaced from the column main bar 5 at the time of lifting. , A lock nut portion 11a as shown in FIG. 5 is divided into two, one is connected with a hinge 11b, and the other is fixed with a bolt nut 11c. As shown in FIG. 6, one end of the column main bar 5 was screwed so as to abut the frame plate 10 from the outer side.

なお、この割ロックナット11は組立てられた柱主筋5等
の吊り上げ時にこれが縦になっても柱主筋5と枠組プレ
ート10がずれないように係止するもので、その取付位置
は柱主筋5の適宜なもの(特に四隅の柱主筋5)の途中
で縦にした時に割ロックナット11が枠組プレート10の下
側にくるように設定する。そして、端に位置する枠組プ
レート10の一つのみはすべての柱主筋5について両側に
割ロックナット11を取付け、この割ロックナット11で枠
組プレート10を挟み込んでしっかりと柱主筋5に固定す
るようにした。
The split lock nut 11 locks the column main bar 5 and the frame plate 10 so that the column main bar 5 and the frame plate 10 do not shift even when the column main bar 5 assembled is lifted when the column main bar 5 is mounted. It is set so that the split lock nut 11 comes to the lower side of the frame plate 10 when it is made vertical in the middle of an appropriate one (particularly, the column main bars 5 at the four corners). Then, only one of the frame plates 10 located at the end is fitted with split lock nuts 11 on both sides of all the column main bars 5, and the frame plate 10 is sandwiched between these split lock nuts 11 so as to be firmly fixed to the column main bars 5. I chose

その次の工程として、枠組プレート10で組まれた柱主筋
5にフープ筋12を所定量、所定間隔に巻回する。そし
て、巻かれた多数のフープ筋12の横に細径鉄筋等による
棒状固定材13を添設し、各フープ筋12とこの棒状固定材
13とを結束線14でそれぞれ結束する。
As the next step, the hoop muscles 12 are wound around the column main bars 5 assembled by the frame plate 10 at a predetermined amount and at predetermined intervals. Then, a bar-shaped fixing material 13 such as a small-diameter reinforcing bar is attached to the side of a large number of wound hoop bars 12, each hoop bar 12 and this bar-shaped fixing material.
13 and 13 are tied together by binding wires 14.

一方、柱主筋5とフープ筋12とは四隅の角部に位置する
柱主筋5を除いて、任意ピッチのフープ筋12のみを結束
線14で結束した。前記四隅の柱主筋5とフープ筋12と
は、全く結束しないものとする。
On the other hand, the column main muscles 5 and the hoop muscles 12 are tied together with the tie lines 14 except for the column main muscles 5 located at the corners of the four corners. The column main muscles 5 and the hoop muscles 12 at the four corners are not tied at all.

以上で本発明による柱主筋の先組は完了するが、このよ
うにして完成した柱ユニットAの両側に玉掛けワイヤ15
を取付け、その一方に吊上げクレーン親フック16a、他
方に子フック16bを引っかけて架台9の支承部材9aと枠
組プレート10の係止を解いてから全体を吊り上げれば、
枠組プレート10は支承部材9a間の隙間から抜け出て第7
図に示すように縦になって吊り下がる。
With the above, the pre-assembly of the column main bars according to the present invention is completed. The sling wires 15 are attached to both sides of the column unit A thus completed.
Attach the lifting crane parent hook 16a to one side and the child hook 16b to the other side to unlock the support member 9a of the pedestal 9 and the frame plate 10 and then lift up the whole.
The frame plate 10 comes out from the gap between the support members 9a
As shown in the figure, it hangs vertically.

この時のユニットA自体の形状維持と剛性保持は枠組プ
レート10で発揮され、また先に述べたように割ロックナ
ットが枠組プレート10を両側から挟み込むか若しくは下
面にあるので充分係止され、主鉄筋5から該プレート10
がずれ落ちることはない。
At this time, the shape maintenance and rigidity retention of the unit A itself are exhibited by the frame plate 10, and as described above, the split lock nuts sandwich the frame plate 10 from both sides or are on the lower surface, so that they are sufficiently locked. Reinforcing bar 5 to the plate 10
Does not fall off.

さらに、フープ筋12相互は棒状固定材13で連結され、ま
た該フープ筋12の一端は結束線14で柱主筋5に固定され
ているので、これらフープ筋12が吊り下げ時に柱主筋5
からずれ落ちることもない。
Furthermore, since the hoop muscles 12 are connected to each other by a rod-shaped fixing member 13 and one end of the hoop muscles 12 is fixed to the column main bar 5 by a binding line 14, these hoop muscles 12 are suspended when the column main bar 5 is suspended.
It does not fall off.

そして、第8図に示すように差筋3がある所定位置まで
建込んだならば、前記のごとくロックナット2aとカップ
ラー2bによる継手部材2でロックナット継手を行うが、
この時柱主筋5はフープ筋12のすべてと結束しているわ
けでなく、必要最少限の個所しか結束していないので、
押引きや回転等の自由度が与えられ差筋3との接合をス
ムーズに行うことができる。かかる作業を行うにあたっ
ては割ロックナット11を必要に応じて外すこともある
が、これを足場上等から簡単かつ迅速に行える。
Then, as shown in FIG. 8, if the streak 3 is installed up to a predetermined position, the lock nut joint is performed by the joint member 2 including the lock nut 2a and the coupler 2b as described above.
At this time, the column main muscles 5 are not tied to all of the hoop muscles 12, and only the minimum necessary points are tied,
The degree of freedom such as pushing and pulling or rotation is given, and the joint with the differential bar 3 can be smoothly performed. In performing such work, the split lock nut 11 may be removed as necessary, but this can be easily and quickly performed from the standpoint of scaffolding or the like.

〔発明の効果〕〔The invention's effect〕

以上述べたように、本発明の柱筋の先組工法は、1本1
本建込む労力を省き、安定性を高めるためにネジフシ鉄
筋を柱主筋とする柱ユニットを地上で先組する場合に、
簡単にかつ精度よく組立てることができ、しかもこの組
立てられた柱ユニットは吊り上げ時も安定した状態を保
ち、また、ロックナット接合の際の柱主筋の自由度も確
保でき、全般的に施工の合理化を図ることが可能なもの
である。
As described above, the pre-assembly method for the column bar of the present invention is
In order to save the labor of constructing and to improve stability, when assembling the pillar unit with the screw bar reinforcement as the pillar main bar on the ground,
It can be assembled easily and accurately, and the assembled column unit maintains a stable state even when hoisting, and the flexibility of the column main bar when connecting the lock nut can be secured, thus streamlining the overall construction. Is possible.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の柱筋の先組工法の1実施例を示す側面
図、第2図は第1図の側面図、第3図は同上A−A線断
面図、第4図は同上B−B線断面図、第5図は割ロック
ナットの斜視図、第6図は割ロックナットの取付状態を
示す側面図、第7図は本発明による柱ユニットの吊り上
げ時の正面図、第8図は同上建込み時の正面図、第9図
はロックナット継手の正面図、第10図は同上一部切欠い
た正面図、第11図は従来例を示す側面図である。 1……ネジフシ鉄筋、2……継手部材 2a……ロックナット、2b……カップラー 3……差筋、4……仮設鉄骨架台 5……柱主筋、6……柱筋受具 7……フープ筋、8……足場 9……架台、9a……支承部材 10……枠組プレート、10a……平板 10b……バー、10c……通し孔 11……割ロックナット、11a……ロックナット部分 11b……蝶番、11c……ボルトナット 12……フープ筋、13……棒状固定材 14……結束線、15……玉掛けワイヤ 16a……クレーン親フック 16b……クレーン子フック A……柱ユニット
FIG. 1 is a side view showing an embodiment of the pre-assembly method for the column reinforcement of the present invention, FIG. 2 is a side view of FIG. 1, FIG. 3 is a sectional view taken along line AA of the same as above, and FIG. BB line sectional view, FIG. 5 is a perspective view of the split lock nut, FIG. 6 is a side view showing a mounting state of the split lock nut, FIG. 7 is a front view of the pillar unit according to the present invention when it is lifted, FIG. 8 is a front view of the same at the time of installation, FIG. 9 is a front view of a lock nut joint, FIG. 10 is a front view of the lock nut joint with a part thereof cut out, and FIG. 11 is a side view showing a conventional example. 1 ... Screw bar Reinforcing bar, 2 ... Joint member 2a ... Lock nut, 2b ... Coupler 3 ... Reinforcing bar, 4 ... Temporary steel frame mount 5 ... Column main bar, 6 ... Column bar receiver 7 ... Hoop Struts, 8 ... Scaffolding 9 ... Frame, 9a ... Supporting member 10 ... Frame plate, 10a ... Flat plate 10b ... Bar, 10c ... Through hole 11 ... Split lock nut, 11a ... Lock nut part 11b ...... Hinges, 11c ...... Bolts and nuts 12 ...... Hoop bars, 13 ...... Standing materials 14 ...... Bundling wire, 15 …… Sliding wire 16a …… Crane parent hook 16b …… Crane child hook A …… Pillar unit

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭63−47469(JP,A) 特開 昭63−47471(JP,A) 実願 昭61−124279号(実開 昭63− 30545号)の願書に添付した明細書及び図 面の内容を撮影したマイクロフィルム(J P,U) ─────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-63-47469 (JP, A) JP-A-63-47471 (JP, A) Practical application JP-A-61-124279 (JP-A-63-30545) Microfilm (JP, U), which is a photograph of the details and drawings attached to the application

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】配筋間隔の通し孔を有する枠組プレートを
架台により直立させて並べ、該枠組プレートにネジフシ
鉄筋による柱主筋を貫通させて柱主筋に螺合する割ロッ
クナットで係止し、また柱主筋にフープ筋を適宜数巻回
し、このフープ筋に棒状固定材を添設しその接合個所を
結束し、一方柱主筋とフープ筋とは4隅の主筋を除いて
任意ピッチ間隔で結束することを特徴とした柱筋の先組
工法。
1. A frame plate having through-holes with a reinforcing bar spacing is arranged upright by a gantry, and the frame plate is pierced by a column main bar made of screw bar reinforcement and locked by a split lock nut screwed to the column main bar, In addition, the hoop muscles are wound around the column main bars as appropriate, and a bar-shaped fixing material is attached to the hoop muscles to bind the joints. On the other hand, the column main muscles and the hoop muscles are bound at arbitrary pitch intervals except for the four corners The pre-assembly method of the pillar reinforcement characterized by doing.
JP18978686A 1986-08-12 1986-08-12 Prefabricated construction method of pillar reinforcement Expired - Fee Related JPH06100028B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18978686A JPH06100028B2 (en) 1986-08-12 1986-08-12 Prefabricated construction method of pillar reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18978686A JPH06100028B2 (en) 1986-08-12 1986-08-12 Prefabricated construction method of pillar reinforcement

Publications (2)

Publication Number Publication Date
JPS6347469A JPS6347469A (en) 1988-02-29
JPH06100028B2 true JPH06100028B2 (en) 1994-12-12

Family

ID=16247181

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18978686A Expired - Fee Related JPH06100028B2 (en) 1986-08-12 1986-08-12 Prefabricated construction method of pillar reinforcement

Country Status (1)

Country Link
JP (1) JPH06100028B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4817945B2 (en) * 2006-04-12 2011-11-16 株式会社泉州イワタニ Method for preventing deformation of reinforcing bar, fixing bracket used for the method, reinforcing bar, and method for installing reinforcing bar

Also Published As

Publication number Publication date
JPS6347469A (en) 1988-02-29

Similar Documents

Publication Publication Date Title
EP3147425B1 (en) A hub
US4602470A (en) Dismountable framework
JPH04269229A (en) Space frame structural body
US20020166722A1 (en) Mobile outrigger scaffolding system
EP0117643B1 (en) Dismountable framework
JPH0826585B2 (en) Joints for three-dimensional frames in steel structures
JPH06100028B2 (en) Prefabricated construction method of pillar reinforcement
JP3568167B2 (en) Temporary hanging stairs
CN215631489U (en) Building templates operation platform
JP3671061B2 (en) Suspension staircase and its temporary method
JP2562206Y2 (en) Structure of entrance scaffolding scaffold
CN223753500U (en) A lifting platform for hydraulic synchronous lifting of steel structures
JPS6347470A (en) Method of construction for preassembly of wall vertical reinforcement
JPH0311298Y2 (en)
GB1565498A (en) Portable buildings
JP2542018Y2 (en) End support frame of stacked temporary support frame
JPH06257291A (en) Temporary support by use of stacking type temporary support frame
JP3892240B2 (en) Working scaffold and assembly method thereof
JPH0472023B2 (en)
JPH049801Y2 (en)
JPH07166539A (en) Construction method for steel framed reinforced concrete continuous underground wall
JPH0724530Y2 (en) Curing shelf
JPH078718Y2 (en) Top handrail device for suspended scaffolding
KR960008860Y1 (en) Bracing device for wall forms
JPH0327166Y2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees