JPH06101901B2 - Power system simulation method - Google Patents
Power system simulation methodInfo
- Publication number
- JPH06101901B2 JPH06101901B2 JP60265043A JP26504385A JPH06101901B2 JP H06101901 B2 JPH06101901 B2 JP H06101901B2 JP 60265043 A JP60265043 A JP 60265043A JP 26504385 A JP26504385 A JP 26504385A JP H06101901 B2 JPH06101901 B2 JP H06101901B2
- Authority
- JP
- Japan
- Prior art keywords
- calculation
- transient stability
- executed
- power system
- failure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、制御所員の系統操作技術・技能の維持、向
上を図るための訓練装置に適用する電力系統シミュレー
ション方式に関するものである。TECHNICAL FIELD The present invention relates to a power system simulation method applied to a training device for maintaining and improving a system operation technique / skill of a control staff.
第4図は従来の電力系統シミュレーション方式の処理概
念図であり、図において、1はCRT装置、2は事故シー
ケンスファイル、3はSV状変データファイルであり、か
かるシミュレーション方式では後述するように、訓練準
備段階では過渡安定度計算のステップを実行し、訓練
実行段階では周波数・潮流計算のステップを実行す
る。FIG. 4 is a conceptual diagram of processing of a conventional power system simulation method. In the figure, 1 is a CRT device, 2 is an accident sequence file, and 3 is an SV-like variable data file. The transient stability calculation step is executed in the training preparation stage, and the frequency / power flow calculation step is executed in the training execution stage.
次に動作について説明する。Next, the operation will be described.
まず、訓練準備段階において、トレーナはCRT画面1に
おいて、電力系統における故障発生時刻、故障点、故障
種別、さらにはこれらの系統故障により動作すると考え
られる主保護リレーあるいは後備保護リレーなどの動作
リレー(母線保護・送電線保護・変圧器保護リレー等)
と、その動作リレーによりトリップ動作するしゃ断器CB
とに関する各種データを、ライトペン4を用いて設定す
る。設定された上記データは、事故シーケンスファイル
2に記憶され、また上記各動作リレーとしゃ断器CBに関
するデータについては、SV状変データファイル3にも保
存される。First, in the training preparation stage, the trainer uses the CRT screen 1 to display the failure occurrence time in the power system, the failure point, the failure type, and the operation relays such as the main protection relay or the backup protection relay that are considered to operate due to these system failures ( Bus protection, transmission line protection, transformer protection relay, etc.)
And a circuit breaker CB that trips with its operation relay
Various data relating to and are set using the light pen 4. The set data is stored in the accident sequence file 2, and the data relating to each of the operation relays and the circuit breaker CB is also stored in the SV change data file 3.
続いて、脱調リレーの動作判定を行うのであるが、これ
はトレーナにより正しく設定することが困難なため、事
故シーケンスファイル2を入力データとして、過渡安定
度計算プログラムを実行し(ステップ)、その判定結
果として、動作SOリレーとトリップCBの状態変化をSV状
変データファイル3に記憶する。Next, the operation of the step-out relay is judged, but it is difficult to set it correctly by the trainer, so the transient stability calculation program is executed using the accident sequence file 2 as input data (step), As the determination result, the state change of the operating SO relay and the trip CB is stored in the SV state change data file 3.
過渡安定度計算が打切り時間に達した時点で、トレーナ
の指示により、SV状変データファイル3の内容を時系列
順に並べ換える。以上で、訓練準備段階は終了する。When the transient stability calculation reaches the cutoff time, the contents of the SV-like variable data file 3 are rearranged in chronological order according to an instruction from the trainer. This concludes the training preparation stage.
なお、SV状変データとは主保護・後備保護リレー、系統
保護リレーの動作内容とその動作結果によるトリップし
ゃ断器の状態変化データである。The SV state change data is the state change data of the trip breaker depending on the operation contents of the main protection / reserve protection relay and the system protection relay and the operation result.
次に、訓練実行段階では、SV状変データファイル3から
動作リレーとトリップしゃ断器CBの状態変化を時系列順
に取り出しながら、潮流計算と周波数計算プログラムを
実行し(ステップ)、過負荷リレー(OLR)、周波数
低下リレー(UFR)あるいは電圧・無効電力制御装置の
動作を模擬することにより、電力系統のリアルタイムシ
ミュレーションを行う。Next, in the training execution stage, the power flow calculation and frequency calculation programs are executed (steps) while extracting the state changes of the operation relay and trip breaker CB from the SV state change data file 3 in chronological order (step), and the overload relay (OLR). ), A real-time simulation of the power system by simulating the operation of the frequency drop relay (UFR) or the voltage / reactive power control device.
このリアルタイムシミュレーションの詳細を、第5図の
フロー図に従って以下に説明する。このリアルタイムシ
ミュレーションの全体的動作としては、T秒毎に周波数
計算と潮流計算を連結して行い、さらに周波数計算はΔ
T秒のきざみでn(=T/ΔT)回連続して行う。Details of this real-time simulation will be described below with reference to the flowchart of FIG. The overall operation of this real-time simulation is to perform frequency calculation and tidal current calculation every T seconds, and frequency calculation is Δ
It is performed continuously for n (= T / ΔT) times in steps of T seconds.
つまり、周波数計算をΔT秒きざみでn(=T/ΔT)回
繰り返し、その時点の潮流計算を1回実行し、全ての処
理を実時間のT秒で行って、リアルタイムシミュレーシ
ョンを実現している。なお、通常は、潮流計算と周波数
計算を別々の計算機で分担処理してリアルタイムシミュ
レーションを実現している。That is, the frequency calculation is repeated n (= T / ΔT) times at intervals of ΔT seconds, the power flow calculation at that point is executed once, and all processing is performed in real time T seconds to realize a real-time simulation. . Note that, usually, the power flow calculation and the frequency calculation are shared by different computers to realize the real-time simulation.
詳細な動作は、まず当該時刻のSV状変データファイル3
からトリップCBデータを取り出し、開閉器状態の変化の
有無を判定し(ステップ)、変化がある場合には、系
統分離計算を実行して、分離系統の判定、系統のアドミ
タンス行列の修正、分離系統の系統容量や合計慣性容量
などの計算を行う(ステップ)。For detailed operation, first, the SV state change data file 3 at that time
The trip CB data is extracted from the device, the presence or absence of the change in the switch condition is judged (step), and if there is a change, the system separation calculation is executed to judge the separated system, the admittance matrix of the system is corrected, and the separated system is separated. Calculate the system capacity and total inertial capacity of (step).
続いて、この系統分離計算の終了後に、潮流計算を実行
する(ステップ)。一方、ステップで変化が無いと
判定された場合には、負荷しゃ断などによる母線の有効
電力の不連続変化の有無をチェックし(ステップ)、
変化がない場合には潮流計算の終了と同様に各分離系統
毎の系統周波数計算を実行し(ステップ)、続いて系
統周波数に応動する周波数低下リレー、周波数上昇リレ
ーの動作模擬を行い(ステップ)、これらの処理をn
回(T/ΔT)繰り返す。なお、ステップにおいて不連
続変化が有ると判定された場合は、ステップの処理を
実行する。Subsequently, after the completion of the system separation calculation, the power flow calculation is executed (step). On the other hand, if it is determined that there is no change in the step, it is checked whether or not there is a discontinuous change in the active power of the bus bar due to load cutoff (step),
If there is no change, the system frequency calculation for each separated system is executed in the same way as the end of the power flow calculation (step), and then the operation of the frequency lowering relay and the frequency rising relay responding to the system frequency is simulated (step). , These processing n
Repeat (T / ΔT) times. If it is determined that there is a discontinuous change in the step, the process of the step is executed.
次に、上記処理をn回繰り返した場合には、その時点の
潮流計算を実行し(ステップ)、さらに系統電圧、送
電線潮流などに応動する過負荷リレーあるいは電圧・無
効電力制御装置の動作模擬を実行し(ステップ)、最
後に、1サイクルT秒の同期を取るためのリアルタイム
同期の処理(delay)を実行し(ステップ)、T秒間
のシミュレーションが完了する。続いて、次のサイクル
のシミュレーションに入る。Next, when the above processing is repeated n times, the power flow calculation at that time is executed (step), and the operation simulation of the overload relay or the voltage / reactive power control device that responds to the system voltage, the power flow of the transmission line, etc. Is executed (step), and finally, real-time synchronization processing (delay) for achieving synchronization for one cycle T seconds is executed (step), and the simulation for T seconds is completed. Then, the simulation of the next cycle is started.
T秒は通常3〜5秒程度であり、ΔTは0.25秒程度とな
る。T seconds are usually about 3 to 5 seconds, and ΔT is about 0.25 seconds.
T秒は実際の制御所自動化システムの情報更新周期から
決められているものであり、この性能を満足するシミュ
レーションを、リアルタイムシミュレーションと定義し
ている。T seconds are determined from the information update cycle of the actual control center automation system, and a simulation that satisfies this performance is defined as a real-time simulation.
従来の電力系統シミュレーションは以上のように構成さ
れているので、主保護・後備保護リレーの動作模擬をト
レーナの設定という形式で行う必要があり、訓練実行中
にトレーニが誤操作により接地設定をしたり、事故設備
のしゃ断器を投入したりした場合には、再び系統故障と
なるが、トレーナは訓練準備段階でこれらを事前に予測
できないため、当該故障に対するSV状変データが設定さ
れておらず、そのため、系統上は故障が発生しているの
に、電力系統シミユレーシヨン方式では、故障が発生し
ていない形で実行され、矛盾が生じ、それ以降の訓練が
意味をなさなくなるという問題点があった。また、同期
投入を要する系統並列操作なども両母線の位相角度が計
算できないために実施できないという問題点があった。Since the conventional power system simulation is configured as described above, it is necessary to simulate the operation of the main protection / reserve protection relay in the form of trainer settings. , If the circuit breaker of the accident equipment is turned on, the system will again have a system failure, but since the trainer cannot predict these in advance at the training preparation stage, SV condition change data for the failure is not set, Therefore, although there is a failure in the system, the power system simulation method has a problem that the system is executed in the form of no failure, resulting in inconsistency, and subsequent training becomes meaningless. . In addition, there is a problem that the system parallel operation that requires the synchronization input cannot be performed because the phase angles of both bus bars cannot be calculated.
この発明は上記のような問題点を解消するためになされ
たもので、系統故障発生時の主保護・後備保護リレーの
動作模擬を自動的に処理して、しゃ断器トリップの自動
判定を行うと共に、トレーニの誤操作により再び系統故
障に至った場合にも、また系統並列操作についても実系
統と同じように、電力系統の動きをシミュレーションで
きる電力系統シミュレーション方式を得ることを目的と
する。The present invention has been made to solve the above-mentioned problems, and automatically simulates the operation of the main protection / reserve protection relay in the event of a system failure and automatically determines the breaker trip. It is an object of the present invention to obtain a power system simulation method capable of simulating the movement of the power system in the same way as in the actual system even when the system failure occurs again due to an erroneous operation of the trainee and also in the system parallel operation.
この発明に係る電力系統シミュレーション方式は、電力
系統の故障に関する故障点、故障種別の条件を入力デー
タとして過渡安定度計算のプログラムを実行させ、その
計算結果を用いて主保護・後備保護リレーと系統保護リ
レーおよび電圧・無効電力制御装置の動作を模擬し、こ
れらの各種保護リレーと電圧・無効電力制御装置の動作
情報と動作結果としてのトリップ遮断器の状態変化をSV
状変データファイルに記憶する訓練準備段階を経て電力
系統の動きを模擬する電力系統シミュレーション方式に
おいて、訓練実行段階では前記過渡安定度計算は各計算
サイクル毎に実行し、前記主保護・後備保護リレーの動
作模擬は計算サイクル間に系統故障の発生があれば実行
し、前記系統保護リレーおよび電圧・無効電力制御装置
の動作模擬は過渡安定計算と同時並行に各計算サイクル
毎に実行し、また、前記過渡安定度計算は一定計算サイ
クル毎に電力系統の周波数・潮流計算を実行し該計算結
果を用いて過渡安定度計算の初期値を再計算して、再度
実行することで数値積分誤差の累積をなくし、長時間の
過渡安定度計算を可能としたものである。The power system simulation method according to the present invention executes a program for transient stability calculation by using as input data a failure point related to a failure of the power system and a condition of a failure type, and uses the calculation result to perform a main protection / reserve protection relay and a system. Simulates the operation of the protection relay and the voltage / reactive power control device, and displays the operation information of these various protection relays and the voltage / reactive power control device and the status change of the trip breaker as the operation result.
In the power system simulation method that simulates the movement of the power system after the training preparation stage stored in the state change data file, in the training execution stage, the transient stability calculation is executed every calculation cycle, and the main protection / reserve protection relay is executed. The operation simulation of is executed if a system failure occurs during the calculation cycle, and the operation simulation of the system protection relay and the voltage / reactive power control device is executed in parallel with the transient stability calculation for each calculation cycle. In the transient stability calculation, the frequency / power flow calculation of the power system is executed every fixed calculation cycle, the initial value of the transient stability calculation is recalculated using the calculation result, and the calculation is repeated to accumulate the numerical integration error. This makes it possible to calculate transient stability over a long period of time.
この発明における電力系統のシミュレーション方式は、
過渡安定度計算をベースにして主保護・後備保護リレー
の動作模擬を自動的に処理することにより、トレーナの
訓練準備段階における手動設定を不要にすると共に、訓
練実行中のトレーニによる誤操作に基づいて、再故障に
至った場合の訓練を、また同期投入を要する系統並列操
作の訓練を実系統と同じように行うことができるように
する。The simulation method of the power system in this invention is
By automatically processing the simulation of the operation of the main protection / reserve protection relay based on the transient stability calculation, the manual setting in the training preparation stage of the trainer becomes unnecessary, and it is based on the mistaken operation by the trainee during the training. , Training for re-faults and system parallel operation requiring synchronous input can be performed in the same way as for the actual system.
以下、この発明の一実施例を図について説明する。第1
図において、1はCRT装置、2は事故シーケンスファイ
ル、3はSV状変データファイルであり、この発明のシミ
ュレーション方式でも過渡安定度計算のステップと潮
流・周波数計算のステップとを実行する。An embodiment of the present invention will be described below with reference to the drawings. First
In the figure, 1 is a CRT device, 2 is an accident sequence file, and 3 is an SV state change data file, and the step of transient stability calculation and the step of power flow / frequency calculation are executed also in the simulation method of the present invention.
第2図は系統の故障の有無、過渡安定度計算および潮流
・周波数計算の動作状況を示す説明図である。FIG. 2 is an explanatory diagram showing the presence / absence of a system fault, the operating conditions of transient stability calculation and power flow / frequency calculation.
第3図は過渡安定度の詳細フロー図である。FIG. 3 is a detailed flow chart of transient stability.
次に上記実施例の動作を第1図のフロー図に従って具体
的に説明する。Next, the operation of the above embodiment will be specifically described with reference to the flowchart of FIG.
まず、訓練準備段階において、トレーナはCRTの画面1
において電力系統における故障発生時刻、故障点、故障
種別をライトペン4を用いて設定する。設定された上記
データは、事故シーケンスファイル2に記憶される。続
いて、主保護・後備保護リレーの動作判定を、事故シー
ケンスファイル2を入力データとして、過渡安定度計算
プログラムを実行することによって行い、その判定結果
としての主保護・後備保護の動作リレーとしゃ断器CBの
各状態をSV状変データファイル3に記憶する(ステップ
)。First, at the training preparation stage, the trainer uses the CRT screen 1
At, a failure occurrence time, a failure point, and a failure type in the power system are set using the light pen 4. The set data is stored in the accident sequence file 2. Next, the operation judgment of the main protection / reserve equipment protection relay is performed by executing the transient stability calculation program with the accident sequence file 2 as input data, and the operation result of the main protection / reserve equipment protection relay is cut off. The respective states of the container CB are stored in the SV state change data file 3 (step).
この過渡安定度計算は脱調リレーの動作判定が完了する
まで行う必要があるが、潮流・周波数計算の1サイクル
であるT秒(通常3〜5秒)まで実行する。なお、脱調
リレーの動作判定は通常1〜2秒であるので、上記の打
切り時間で十分である。This transient stability calculation needs to be performed until the operation determination of the step-out relay is completed, but is performed until T seconds (normally 3 to 5 seconds) which is one cycle of the power flow / frequency calculation. Since the operation determination of the step-out relay is usually 1-2 seconds, the above-mentioned cutoff time is sufficient.
次に、訓練実行段階では、第1図に示すように主保護・
後備保護リレーの動作模擬を含む過渡安定度計算と、電
力系統のシミュレーションである潮流・周波数計算を並
行して実行する また、第2図に示すように、訓練実行段階のスタートか
らT秒までは、主保護・後備保護リレーの動作判定を、
訓練準備段階の過渡安定度計算(ステップ)で行って
いるので、過渡安定度計算は実行せず、潮流計算と周波
数計算を実行する(ステップ)。Next, at the training execution stage, as shown in Fig. 1, main protection and
Performs transient stability calculation including simulation of operation of backup protection relay and power flow / frequency calculation that is power system simulation in parallel Further, as shown in FIG. 2, from the start of the training execution stage to T seconds, the operation judgment of the main protection / reserve protection relay is
Since the transient stability calculation (step) at the training preparation stage is performed, the transient stability calculation is not executed, but the power flow calculation and the frequency calculation are executed (step).
その後のシミュレーションステップでは過渡安定度計算
を行い、nT毎に潮流・周波数計算を処理する。In the subsequent simulation step, transient stability calculation is performed, and the tidal current / frequency calculation is processed every nT.
また、過渡安定度計算は第3図(a),(b)に示すフ
ロー図の通りに処理するが、事故シーケンスファイル2
から、故障発生時刻、故障点、故障種別のデータを取り
出し、当該時刻からT秒後の間に故障の発生があるなら
ば、過渡安定度計算をベースに、主保護・後備保護リレ
ーの動作模擬と、周波数応動リレーの模擬と、潮流応動
リレーおよび電圧・無効電力制御装置の動作模擬とを行
い、動作リレーとトリップしゃ断器CBのデータとを時刻
を付加して、SV状変データファイル3に記憶する。In addition, the transient stability calculation is processed according to the flow charts shown in FIGS. 3 (a) and 3 (b).
From the above, data of failure occurrence time, failure point, and failure type is extracted, and if there is a failure within T seconds after the time, the operation simulation of the main protection / reserve protection relay is simulated based on the transient stability calculation. And the frequency response relay and the operation of the power flow response relay and the voltage / reactive power control device are simulated, and the operation relay and the data of the trip breaker CB are added to the time, and the SV variation data file 3 is added. Remember.
つまり、従来のように主保護・後備保護リレーやシャ断
器CBの動作模擬をトエーナの手動設定により行うのでな
く、過渡安定度計算結果を用いて上記主保護・後備保護
リレーなどの動作模擬を行って、これをSV状変データフ
ァイル3に記憶させる。In other words, instead of manually simulating the operation of the main protection / reserve protection relay and the shear breaker CB as in the past, the operation simulation of the main protection / reserve protection relay etc. is performed using the transient stability calculation result. Then, this is stored in the SV state change data file 3.
次に、処理のフローを第3図(a),(b)について説
明すると、まず当該サイクルで潮流・周波数計算を実行
したかかを判定し(ステップ)、否の場合にはステッ
プへ分岐する。Next, the processing flow will be described with reference to FIGS. 3A and 3B. First, it is determined whether the power flow / frequency calculation is executed in the cycle (step), and if not, the process branches to step. .
一方、潮流計算を実行した場合には、当該サイクルより
1サイクル前の潮流計算結果を取込む(ステップ)。On the other hand, when the power flow calculation is executed, the power flow calculation result one cycle before the current cycle is fetched (step).
そして、発電機の内部電圧と位相角の初期値を計算し
(ステップ)、さらに負荷を定インピーダンス負荷扱
いとするために、負荷の母線電圧、有効電力と無効電力
から負荷アドミタンスを計算する(ステップ)。Then, the initial values of the generator internal voltage and phase angle are calculated (step), and in order to treat the load as a constant impedance load, the load admittance is calculated from the bus voltage of the load, active power and reactive power (step). ).
次に、故障種別に応じて、正相または逆相または零相回
路のアドミタンス行列を計算する(ステップ)。次
に、系統の接続状態に変更があるかどうかを判定し(ス
テップ)、無い場合には回路網計算の処理へ分岐す
る。Next, the admittance matrix of the positive phase, negative phase, or zero phase circuit is calculated according to the fault type (step). Next, it is judged whether or not there is a change in the connection state of the system (step), and if there is no change, the process branches to the circuit network calculation process.
一方、変更がある場合には続いて故障発生なのかどうか
を判定し(ステップ)、故障発生でなければ故障除去
の有無の判定の処理へ移行する。故障がある場合には、
故障の種別に応じて正相回路に付加する故障等価インピ
ーダンスを逆相と零相回路のアドミタンス行列に基づい
て計算する(ステップ)。On the other hand, if there is a change, it is subsequently determined whether or not a failure has occurred (step), and if there is no failure, the process proceeds to the determination processing of whether or not there is a failure removal. If there is a failure,
A fault equivalent impedance to be added to the positive-phase circuit according to the type of fault is calculated based on the admittance matrix of the negative-phase and zero-phase circuits (step).
次に、故障除去の有無を判定し(ステップ)、無い場
合にはアドミタンス行列の変更に移行し、有る場合には
故障インピーダンスを無限大扱いとする処理を行う(ス
テップ)。続いて、それらに伴う正相回路のアドミタ
ンス行列の変更の処理を行い(ステップ)、次に、回
路網の電圧、電流の計算を行う(ステップ)。Next, it is determined whether or not the fault has been removed (step), and if there is no fault, the process proceeds to change the admittance matrix, and if there is, a process of treating the fault impedance as infinite is performed (step). Subsequently, the admittance matrix of the positive-phase circuit is changed accordingly (step), and then the voltage and current of the circuit network are calculated (step).
次にステップで得た電圧、電流を用いて発電機の電気
出力を求め(ステップ)、さらに、発電機の内部位相
角を を解いて求める(ステップ)。Next, find the electrical output of the generator using the voltage and current obtained in the step (step), and further determine the internal phase angle of the generator. Solve for (step).
上記によって、回路網の電圧、電流と発電機の内部位相
角が求まるので、次に脱調リレーを含む各種の主保護・
後備保護リレー(脱調リレー、母線保護、送電線保護リ
レー等)の動作模擬と系統保護リレー(例えば、UFR、O
FR、OLR)と制御装置(例えば、電圧・無効電力制御装
置)の動作模擬を行う(ステップ)。続いて、ステッ
プの動作模擬により、上記系統保護リレーや制御装置
の動作の有無を判定し(ステップ)、無い場合には、
計算終了時間の判定の処理へ移行する。なお、上記制御
装置は、電圧・無効電力制御装置等潮流計算結果を入力
データとして動作する装置である。From the above, the voltage and current of the network and the internal phase angle of the generator can be obtained.
Operation simulation of backup protection relay (step-out relay, bus protection, transmission line protection relay, etc.) and system protection relay (eg UFR, O
The operation simulation of FR and OLR) and the control device (for example, voltage / reactive power control device) is performed (step). Then, by simulating the operation of the step, the presence or absence of the operation of the system protection relay or the control device is judged (step).
The process proceeds to the process of determining the calculation end time. The control device is a device such as a voltage / reactive power control device that operates using the power flow calculation result as input data.
一方、系統保護リレーおよび電圧・無効電力制御装置の
動作がある場合には、そのリレー動作によりトリップす
るしゃ断器CBを選択し、そのデータをSV状変データファ
イル3に保存する(ステップ)。続いて、計算時間が
T秒に達したか否かを判定し(ステップ)、達してい
なけれ時刻をΔtを更新し、ステツプ以下の処理を繰
り返す(ステツプ)。計算時間が終了していれば、各
ブランチの有効電力と無効電力の分布を求めて(ステツ
プ)計算を終了する。On the other hand, when the system protection relay and the voltage / reactive power control device are operated, the breaker CB that trips due to the relay operation is selected and the data is stored in the SV-like variable data file 3 (step). Then, it is determined whether or not the calculation time has reached T seconds (step), the time when it has not reached T seconds is updated, and Δt is updated, and the processing from step to step is repeated (step). If the calculation time has ended, the distribution of active power and reactive power of each branch is obtained (step) and the calculation is ended.
なお、この過渡安定度計算はアレイプロセッサなどの高
速演算プロセッサを用いて、リアルタイムシミユレーシ
ヨンを実現することになる。また、過渡安定度計算の数
値積分ステップ数が増加して、数値計算誤差が大きくな
る場合には、その前に潮流計算と周波数計算を実行し、
その結果を用いて過渡安定度計算を再スタートするよう
にしている。For the transient stability calculation, a high-speed arithmetic processor such as an array processor is used to realize real-time simulation. If the number of numerical integration steps for transient stability calculation increases and the numerical calculation error increases, execute the tidal current calculation and frequency calculation before that.
The result is used to restart the transient stability calculation.
以上のように、この発明によれば、主保護・後備保護リ
レーの動作模擬を、過渡安定度計算をベースに実行する
ようにしたので、訓練中におけるトレーニの誤操作によ
り事故設備のしゃ断器を投入した場合でも、系統故障が
発生したことを検出し、過渡安定度計算結果を用いて、
主保護・後備保護リレーの動作模擬を行うので、実際の
系統と同じように系統の動きを模擬でき、訓練効果を上
げることができる効果がある。As described above, according to the present invention, since the operation simulation of the main protection / reserve protection relay is executed based on the transient stability calculation, the breaker of the accident equipment is turned on by the wrong operation of the trainee during the training. Even if it does, it detects that a system fault has occurred and uses the transient stability calculation result,
Since the operation of the main protection / reserve protection relay is simulated, the movement of the system can be simulated in the same way as the actual system, and the effect of training can be increased.
第1図はこの発明の一実施例による電力系統シミュレー
ション方式の処理概念図、第2図はこの処理概念図に基
づく動作説明図、第3図は同じく過渡安定度計算の詳細
な処理フロー図、第4図は従来の電力系統シミュレーシ
ョン方式の処理概念図、第5図は同じく潮流・周波数計
算の処理フロー図である。 1はCRT装置、2は事故シーケンスファイル、3はSV状
変データファイル。 なお、図中、同一符号は同一または相当部分を示す。FIG. 1 is a conceptual diagram of a process of a power system simulation method according to an embodiment of the present invention, FIG. 2 is an operation explanatory diagram based on this conceptual diagram, and FIG. 3 is a detailed process flowchart of the transient stability calculation, FIG. 4 is a processing conceptual diagram of the conventional power system simulation method, and FIG. 5 is a processing flow diagram of the same power flow / frequency calculation. 1 is a CRT device, 2 is an accident sequence file, 3 is an SV change data file. In the drawings, the same reference numerals indicate the same or corresponding parts.
Claims (1)
の条件を入力データとして過渡安定度計算のプログラム
を実行させ、その計算結果を用いて主保護・後備保護リ
レーと系統保護リレーおよび電圧・無効電力制御装置の
動作を模擬し、これらの各種保護リレーと電圧・無効電
力制御装置の動作情報と動作結果としてのトリップ遮断
器の状態変化をSV状変データファイルに記憶する訓練準
備段階を経て電力系統の動きを模擬する電力系統シミュ
レーション方式において、訓練実行段階では前記過渡安
定度計算は各計算サイクル毎に実行し、前記主保護・後
備保護リレーの動作模擬は計算サイクル間に系統故障の
発生があれば実行し、前記系統保護リレーおよび電圧・
無効電力制御装置の動作模擬は過渡安定計算と同時並行
に各計算サイクル毎に実行し、また、前記過渡安定度計
算は一定計算サイクル毎に電力系統の周波数・潮流計算
を実行し該計算結果を用いて過渡安定度計算の初期値を
再計算して、再度実行することで数値積分誤差の累積を
なくし、長時間の過渡安定度計算を可能としたことを特
徴とする電力系統シミュレーション方式。1. A program for transient stability calculation is executed by using as input data the condition of failure point and failure type related to power system failure, and the result of the calculation is used for main protection / reserve protection relay and system protection relay and voltage. After the training preparation stage, which simulates the operation of the reactive power control device and stores the operation information of these various protection relays and the voltage / reactive power control device and the state change of the trip breaker as the operation result in the SV change data file. In the power system simulation method for simulating the movement of the power system, the transient stability calculation is executed in each calculation cycle at the training execution stage, and the operation simulation of the main protection / reserve protection relay causes a system failure between calculation cycles. If there is, execute the system protection relay and voltage
The operation simulation of the reactive power control device is executed in parallel with the transient stability calculation for each calculation cycle, and the transient stability calculation executes the frequency / power flow calculation of the electric power system for every constant calculation cycle to obtain the calculation result. A power system simulation method characterized in that the initial value of the transient stability calculation is recalculated using the method and the accumulated integral of the numerical integration error is eliminated by re-executing it to enable the long-term transient stability calculation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60265043A JPH06101901B2 (en) | 1985-11-27 | 1985-11-27 | Power system simulation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60265043A JPH06101901B2 (en) | 1985-11-27 | 1985-11-27 | Power system simulation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62126830A JPS62126830A (en) | 1987-06-09 |
| JPH06101901B2 true JPH06101901B2 (en) | 1994-12-12 |
Family
ID=17411786
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP60265043A Expired - Lifetime JPH06101901B2 (en) | 1985-11-27 | 1985-11-27 | Power system simulation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH06101901B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03256530A (en) * | 1990-03-06 | 1991-11-15 | Mitsubishi Electric Corp | Digital real-time simulator |
| CN115308535B (en) * | 2022-09-20 | 2023-07-11 | 国网江苏省电力有限公司镇江供电分公司 | 220kV bus fault discrimination method based on monitoring information eventing system |
-
1985
- 1985-11-27 JP JP60265043A patent/JPH06101901B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62126830A (en) | 1987-06-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110233477B (en) | Stability control simulation system based on three-defense line simulation | |
| JPH06101901B2 (en) | Power system simulation method | |
| JPH06101900B2 (en) | Power system simulation method | |
| JP4845526B2 (en) | System operation training equipment | |
| JP2680166B2 (en) | Power system simulation method | |
| JPH06101899B2 (en) | Power system simulation method | |
| JP4040847B2 (en) | Training simulator and power system simulation method | |
| JPH06153396A (en) | Power system frequency simulation method and power system training simulator | |
| JPS61295831A (en) | Power system simulation system | |
| JPH08110809A (en) | Power system simulator | |
| JP2645200B2 (en) | Power system operation training simulator | |
| JPH03261328A (en) | Power system simulating method | |
| JP2736133B2 (en) | Power system training simulator | |
| JP3237869B2 (en) | Power system operation training simulator | |
| JP2880827B2 (en) | Power system training simulator | |
| JP2577392B2 (en) | Pre-accident grid status creation method for automatic recovery in the event of a power grid accident | |
| JP2693440B2 (en) | System restoration system at the time of accident | |
| JPH05316651A (en) | Simulating system for electric power system | |
| JPH10210655A (en) | Power system restoration support system | |
| JP2575124B2 (en) | Method of simulating operation of protection device | |
| JPH05153731A (en) | Power system training simulator | |
| JPH02299424A (en) | Trouble restoring operation for electric power system | |
| JP2520307B2 (en) | Substation accident equipment judgment system | |
| JP2577393B2 (en) | Automatic recovery system for power system accidents | |
| JPH0341004B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| EXPY | Cancellation because of completion of term |