Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0622368B2 - Cable laying equipment - Google Patents
[go: Go Back, main page]

JPH0622368B2 - Cable laying equipment - Google Patents

Cable laying equipment

Info

Publication number
JPH0622368B2
JPH0622368B2 JP18212589A JP18212589A JPH0622368B2 JP H0622368 B2 JPH0622368 B2 JP H0622368B2 JP 18212589 A JP18212589 A JP 18212589A JP 18212589 A JP18212589 A JP 18212589A JP H0622368 B2 JPH0622368 B2 JP H0622368B2
Authority
JP
Japan
Prior art keywords
cable
roller
trough
slide rod
mounting bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP18212589A
Other languages
Japanese (ja)
Other versions
JPH0349513A (en
Inventor
勉禎 八田
昌司 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Cable Industries Ltd
Original Assignee
Mitsubishi Cable Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Cable Industries Ltd filed Critical Mitsubishi Cable Industries Ltd
Priority to JP18212589A priority Critical patent/JPH0622368B2/en
Publication of JPH0349513A publication Critical patent/JPH0349513A/en
Publication of JPH0622368B2 publication Critical patent/JPH0622368B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、洞道内にケーブルを布設する際に用いられる
装置に関し、特に、ケーブルラックの上の部分に配置し
たトラフ内に、ケーブルを布設することが出来るように
する装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus used for laying a cable in a cave, and particularly to laying a cable in a trough arranged in an upper portion of a cable rack. It relates to a device capable of doing.

(従来の技術) 高圧送電線用の洞道には、通常その両側にケーブルラッ
クを配置しており、それぞれのケーブルラックには上下
方向に複数のトラフ支持材を設けて、各トラフ支持材に
3本ずつの高圧送電ケーブルを収容させるようにしてい
る。また、前記ケーブルは、275KVのOFケーブル
の場合、1m当たりの重量が35kg程度で、径が13〜
4cm程度ある。
(Prior Art) Usually, cable racks are arranged on both sides of a cavern for a high-voltage power transmission line, and each cable rack is provided with a plurality of trough support members in the vertical direction. It is designed to accommodate three high-voltage power transmission cables. In the case of the 275KV OF cable, the cable has a weight of about 35kg per 1m and a diameter of 13 ~.
There is about 4 cm.

前述したような洞道において、低い位置に設けたトラフ
支持材にケーブルを布設する際には、例えば特公昭55
−38885号公報等に示されるような作業台車を用い
ることが出来る。そして、前記従来例の台車は、洞道の
中央部の床上に延線されたケーブルを、作業台車に設け
たローラ手段によって上方に案内し、その持上げたケー
ブルを端部から順にトラフ支持材内に送り込むようにし
て、布設の作業を連続して行うことが出来るようにされ
る。
When installing a cable on a trough support member provided at a low position in a cave as described above, for example, Japanese Patent Publication No.
It is possible to use a work carriage as disclosed in Japanese Patent Publication No. 38885. In the conventional truck, the cable extended on the floor at the center of the cave is guided upward by the roller means provided on the work truck, and the lifted cable is sequentially guided from the end to the trough support member. It is possible to continuously perform the laying work by feeding it to.

ところが、前述したような従来の作業台車は、ケーブル
ラックの上部のトラフ支持材が2m以上も高い位置に設
けられている場合には、台車の作業床が高い位置に設定
されることから、その安定性が悪くなる等の理由によ
り、非常に作業性が良くないという問題がある。
However, in the conventional work trolley as described above, when the trough support member on the upper part of the cable rack is provided at a position higher than 2 m, the work floor of the trolley is set at a high position. There is a problem that workability is extremely poor due to reasons such as poor stability.

そこで、上部のトラフ支持材に対しては、実公昭60−
15840号公報等に示されるように、安定性を向上さ
せた作業台車を用いるようにする場合がある。この従来
例に示される作業台車は、台車の上部にガイドレールに
案内される手段を設け、走行車輪を洞道の床に設けた溝
に沿って移動させるように構成している。また、前記台
車の作業台には、ケーブルを側部に案内するためのガイ
ド手段を設けて、ケーブルをトラフに向けて移動させる
際に、その作業を容易に行い得るようにしている。
Therefore, for the upper trough support,
As shown in Japanese Patent No. 15840, there are cases in which a work cart having improved stability is used. The work trolley shown in this conventional example is provided with a means to be guided by a guide rail on the upper part of the trolley, and the traveling wheels are configured to move along a groove provided on the floor of the tunnel. Further, the work table of the truck is provided with a guide means for guiding the cable to the side part so that the work can be easily performed when the cable is moved toward the trough.

(発明が解決しようとする問題点) しかしながら、前述したような従来のケーブル布設装置
においては、台車等の装置が比較的大きく構成される必
要がある。また、ケーブルが大容量のものとなっている
現状では、該ケーブルの単位長さ当たりの重量が大き
く、ケーブルを台車からトラフに向けて移動させる作業
を、小数の作業員によって行うことが困難であるという
問題がある。
(Problems to be Solved by the Invention) However, in the conventional cable laying apparatus as described above, a device such as a trolley needs to be relatively large. Further, under the present circumstances where the cable has a large capacity, the weight per unit length of the cable is large, and it is difficult for a small number of workers to perform the work of moving the cable from the truck to the trough. There is a problem.

これに対して、作業台車上や、トラフの部分に多くの作
業員が乗って、ケーブルの布設の作業を行うことは、安
全性等の面で大きな問題があり、必ずしも作業能率を向
上させることにならない。
On the other hand, if many workers ride on the work trolley or on the trough to carry out the cable laying work, there is a big problem in terms of safety, etc., and work efficiency is not always improved. do not become.

さらに、前述したような作業台車を用いない場合には、
上部のトラフに対応した高さに足場を組み、該足場上で
ケーブルを延線してから、そのケーブルをトラフ上に移
動させるような手段を用いることが必要であり、非常に
手間のかかる作業を強いられるという問題がある。
Furthermore, when the work cart as described above is not used,
It is necessary to construct a scaffold at a height corresponding to the upper trough, to extend the cable on the scaffold, and then to use a means for moving the cable onto the trough, which is a very troublesome work. There is a problem of being forced.

(発明の目的) 本発明は、上記したような従来より用いられている装置
の欠点を解消するもので、比較的簡単な設備を用いて、
ケーブルを洞道内に延線し得るとともに、トラフに向け
て容易に移動させ、布設の作業をより能率的に行い得る
ようなケーブル布設装置を提供することを目的としてい
る。
(Object of the Invention) The present invention solves the above-mentioned drawbacks of conventionally used apparatuses, and uses relatively simple equipment.
An object of the present invention is to provide a cable laying device that can extend a cable in a cave and easily move it toward a trough to more efficiently perform laying work.

(問題点を解決するための手段および作用) 本発明のケーブル布設装置は、洞道内でケーブルラック
の棚の高さに対応させた位置でケーブルを延線し、トラ
フ内に配置するための装置に関する。
(Means and Actions for Solving Problems) A cable laying device of the present invention is a device for extending a cable at a position corresponding to the height of a shelf of a cable rack in a cave and arranging the cable in a trough. Regarding

本発明の装置においては、洞道内の中柱に対して、棚の
高さに合せて取付けブラケットを取付け、該取付けブラ
ケットを介してケーブルを案内するためのローラを配置
し、該ケーブルの延線を行うためのケーブル送り出し装
置とを配置し、前記中柱に取付けられる取付けブラケッ
トには、ローラを支持するためのローラ支持ブロック
と、スライド棒を支持するためのブラケットとを設けて
いる。
In the device of the present invention, a mounting bracket is attached to the middle pillar in the cave according to the height of the shelf, rollers for guiding the cable through the mounting bracket are arranged, and the extension of the cable is arranged. A cable feeding device for performing the above is arranged, and a mounting bracket mounted on the center pillar is provided with a roller support block for supporting the roller and a bracket for supporting the slide rod.

また、本発明の装置においては、前記ローラはローラ支
持ブロックに対して揺動可能に設けられ、ケーブルを長
さ方向に移動させる際には、略水平な位置に固定保持さ
れ、該ローラを揺動させることにより、ケーブルをスラ
イド棒に移載するように構成し、前記スライド棒は、一
端部が取付けブラケットに支持され、他端部はアームを
介してトラフ支持材に支持されるように構成され、該ス
ライド棒を取付けブラケット側からトラフ支持材側に向
けて傾斜させて配置し、ローラがケーブルを支持する状
態から解除された際に、スライド棒に載置されたケーブ
ルを、該スライド棒の傾斜にしたがって摺動させること
により、トラフ内に移動させ得るように構成している。
Further, in the apparatus of the present invention, the roller is provided so as to be swingable with respect to the roller support block, and when the cable is moved in the length direction, the roller is fixed and held at a substantially horizontal position to swing the roller. When the cable is moved, the cable is transferred to a slide rod, and one end of the slide rod is supported by a mounting bracket, and the other end is supported by a trough support through an arm. The slide rod is arranged so as to be inclined from the mounting bracket side toward the trough support member side, and when the roller is released from the state of supporting the cable, the cable placed on the slide rod is moved to the slide rod side. It is configured so that it can be moved into the trough by sliding according to the inclination of.

したがって、本発明のケーブル布設装置においては、洞
道の中央部に所定間隔で配置された中柱に対して取付け
ブラケットを所定の高さに配置し、ケーブルに長さ方向
の案内を行うためのローラと、ケーブルを横方向に移動
させるためのスライド棒とを設けることにより、ケーブ
ルの布設の作業を容易に行うことが出来るものとなる。
Therefore, in the cable laying device of the present invention, the mounting bracket is arranged at a predetermined height with respect to the center pillars arranged at a predetermined interval in the central portion of the cave, and the cable is guided in the length direction. By providing the roller and the slide rod for moving the cable in the lateral direction, the work of laying the cable can be easily performed.

また、ケーブルの布設の作業を行うに際しては、スライ
ド棒上で自重によって摺動させることにより、該ケーブ
ルを横方向へ移動させる動作を行うことが出来るので、
トラフ上へのケーブルの移動の作業を容易に行い得るも
のとする。
In addition, when laying a cable, it is possible to move the cable laterally by sliding it on the slide rod by its own weight.
It shall be possible to easily carry out the work of moving the cable onto the trough.

(実施例) 図示された例に従って、本発明のケーブル布設装置の構
成を説明する。
(Example) The structure of the cable laying apparatus of this invention is demonstrated according to the illustrated example.

第1図および第2図に示される本発明の実施例におい
て、洞道の巾方向の中央部に列設される中柱2には、ケ
ーブルを布設するトラフ15の高さに対応させて、取付
けブラケット30を取付けるようにしている。
In the embodiment of the present invention shown in FIG. 1 and FIG. 2, the middle pillars 2 lined up in the central portion in the width direction of the cave, corresponding to the height of the trough 15 for laying a cable, The mounting bracket 30 is attached.

前記取付けブラケット30は、中柱2の上下方向に、所
定の間隔で形成されるネジ孔3………に対して、上下の
ピン孔31、31aを介してネジを差込むことによって
取付けるようにしており、該ネジ孔3、3……に対する
取付け位置を変化させることにより、中柱26の任意の
高さの位置に取付けブラケットを装着させることが出来
る。
The mounting bracket 30 is mounted in the vertical direction of the center pillar 2 by inserting screws into the screw holes 3 formed at predetermined intervals through the upper and lower pin holes 31 and 31a. Therefore, by changing the mounting position with respect to the screw holes 3, 3, ..., The mounting bracket can be mounted at a position at an arbitrary height of the center pillar 26.

前記中柱2に取付けられる取付けブラケット30に対し
て、図示されるように、ローラ支持ブロック35とブラ
ケット33とを設けている。前記ローラ支持ブロック3
5は、下部に開口を形成した溝を形成し、該溝に対して
ローラ40を支持する支持アーム41を取付けるため
に、2つのピン孔36、38を設けている。
As shown in the figure, a roller support block 35 and a bracket 33 are provided for the mounting bracket 30 mounted on the center pillar 2. The roller support block 3
5 has a groove having an opening formed in the lower part thereof, and two pin holes 36 and 38 are provided for attaching a support arm 41 supporting the roller 40 to the groove.

前記2つのピン孔のうち、一方の固定用ピン孔36に挿
入されるピン37は、支持アーム41の端部を貫通する
ように設けられ、他方のアーム支持用のピン孔38に
は、支持アーム41の下面を支持するピン39が装着さ
れる。
Of the two pin holes, the pin 37 inserted into one of the fixing pin holes 36 is provided so as to penetrate the end portion of the support arm 41, and the pin 37 for supporting the other arm is provided in the pin hole 38 for supporting the other arm. A pin 39 that supports the lower surface of the arm 41 is mounted.

なお、前記第1図に示される例において、ローラ40を
支持するアーム41の先端部に、ワイヤ固定部材42を
介して振れ止め用ワイヤ43を取付けている。このワイ
ヤ43は、片持ち状にアームに支持されたローラ40に
対して、表面にコルゲーションを有するケーブルが移動
される際に、そのケーブルの凹凸によって、上下左右方
向に振れたりすることを防止するために設けられてい
る。
In the example shown in FIG. 1, a steady wire 43 is attached to the tip of an arm 41 supporting the roller 40 via a wire fixing member 42. The wire 43 prevents the cable having corrugation on its surface from swinging in the vertical and horizontal directions due to the unevenness of the cable when the cable having the corrugation on the surface is moved with respect to the roller 40 supported by the arm in a cantilever manner. It is provided for.

すなわち、中柱に沿って配置される各ローラ40……
を、1本のワイヤを用いて接続することによって、ロー
ラ列上をケーブルが移動して、各ローラ40に対して上
下左右方向に衝撃を加えたとしても、隣接するローラの
全ての同一位相の衝撃が加えられることがないので、各
ローラの振動は互いに打消され、ローラの振動が少なく
なり、そのローラの振動による騒音の発生を防止するこ
とが出来る。
That is, each roller 40 arranged along the center pillar ...
Is connected by using a single wire, even if the cable moves on the roller row and a shock is applied to each roller 40 in the vertical and horizontal directions, all of the adjacent rollers have the same phase. Since no impact is applied, the vibrations of the rollers are canceled by each other, the vibrations of the rollers are reduced, and the generation of noise due to the vibrations of the rollers can be prevented.

また、ブラケット33は、取付けブラケット30から側
方から延長されて設けられ、ローラ30がケーブルの搬
送を行う位置にセットされた際に、該ローラに対して邪
魔にならない位置に、スライド棒50を取付けられる。
前記スライド棒50は、ブラケット33に設けた孔34
に一端部を挿入し、他端部は端部支持ブラケット53と
L字状に曲げられたアーム55を介して、トラフ支持材
12の端部に支持される。
The bracket 33 is provided so as to extend laterally from the mounting bracket 30, and when the roller 30 is set at a position for carrying a cable, the slide rod 50 is placed at a position that does not interfere with the roller. Mounted.
The slide bar 50 has a hole 34 formed in the bracket 33.
One end is inserted into the trough support member 12 and the other end is supported by the end of the trough support member 12 via the end support bracket 53 and the L-shaped bent arm 55.

前述したように、トラス支持材12の端部にアーム55
を取付けるために、本発明の実施例においては、角パイ
プにより構成されたトラフ支持材の端部に、略コの字状
のアーム取付け部材56を組合せ、固定用ネジ57で締
付けるような手段を用いている。
As described above, the arm 55 is attached to the end of the truss support member 12.
In the embodiment of the present invention, in order to attach the above, a substantially U-shaped arm attaching member 56 is combined with the end portion of the trough support member formed by a square pipe, and a means for tightening with a fixing screw 57 is provided. I am using.

そして、前述したようにして、スライド棒50の一方の
端部をブラケット33の孔34に挿入し、他方の端部付
近をアーム55を介して、トラフ支持材12に支持させ
ることによって、中柱2とトラフ支持材との間でスライ
ド棒50を支持し、ケーブル20が載置された場合にそ
の荷重を支持出来るようにする。
Then, as described above, one end of the slide rod 50 is inserted into the hole 34 of the bracket 33, and the vicinity of the other end is supported by the trough support member 12 via the arm 55, whereby the center pillar A slide rod 50 is supported between the two and the trough support material so that the load can be supported when the cable 20 is placed.

また、本発明のスライド棒50は、中柱2からトラフ1
5に向けて下降する状態に傾斜しており、その傾斜角度
はケーブルが自重で滑ることが出来る程度に設定され
る。さらに、前記スライド棒50のトラフ15側の端部
は、第2図に示されるように、傾斜角度を大きくして、
トラフの上部分に突出するようにして配置される。
Further, the slide rod 50 of the present invention is provided with the middle pillar 2 to the trough 1.
It is inclined so that it descends toward 5, and the inclination angle is set so that the cable can slide under its own weight. Further, the end of the slide rod 50 on the trough 15 side has a large inclination angle as shown in FIG.
It is arranged so as to project above the trough.

前記スライド棒のトラフ上への突出長さは、ケーブルの
配置位置等に応じて調整することが出来るもので、スラ
イド棒50の中柱側の端部をブラケット33の孔に挿入
する長さを調整することにより行う。
The protruding length of the slide rod on the trough can be adjusted according to the position of the cable and the like. The length of the slide rod 50 on the side of the center pillar is inserted into the hole of the bracket 33. It is done by adjusting.

前述したように構成されたスライド棒とローラとの2つ
の部材は、第3図に示されるようにして、洞道1内の中
柱2に取付けられる。そして、例えば、洞道1の側部に
配置されたケーブルラック10に、側柱11を介して多
数段にトラフ支持材12、12……を取付け、それぞれ
のトラフ支持材に対してトラフ15……を設けた場合
に、その最上部に設けたトラフに対してケーブルを布設
する際に、特に有効に使用することが出来る。
The two members of the slide rod and the roller configured as described above are attached to the central pillar 2 in the sinus 1 as shown in FIG. Then, for example, trough support members 12, 12, ... Are attached to the cable rack 10 arranged on the side portion of the cave 1 via the side pillars 11, and the troughs 15 are attached to the respective trough support members. .. can be used particularly effectively when the cable is laid on the trough provided at the uppermost portion.

第3図に示される実施例において、トラフ15は密閉型
防災トラフとして構成されているもので、略U字状の下
部材16に対して、接続部17、17を介して上部材1
8を取付け、上下の部材16、18によって内部を密閉
した状態で、ケーブルの収容部分を構成する。
In the embodiment shown in FIG. 3, the trough 15 is configured as a closed type disaster prevention trough, and the upper member 1 is connected to the lower member 16 having a substantially U-shape via the connecting portions 17 and 17.
8 is attached, and the inside of the cable is sealed by the upper and lower members 16 and 18 to form a cable housing portion.

前述したようなトラフ15を構成する上下の部材は、F
RPまたは鉄板等で構成されたもので、ケーブルから発
生される熱が、外部に漏れ出すことがないようにされる
とともに、外部で発生した障害が他のケーブルに影響す
ることがないようにされる。また、3本のケーブルを収
容した場合に、そのケーブルから発生される熱を除去す
るために、トラフ15の上部に冷却水用パイプ23が配
置される。そして、該パイプ23の内部に低温の水を通
すことにより、トラフの内部を冷却し、ケーブルの熱が
上昇することを防止出来るようにする。
The upper and lower members constituting the trough 15 as described above are F
It is composed of RP or iron plate, etc., so that the heat generated from the cable does not leak to the outside, and the failure that occurred outside does not affect other cables. It Further, when three cables are accommodated, a cooling water pipe 23 is arranged above the trough 15 in order to remove heat generated from the cables. Then, by passing low-temperature water through the inside of the pipe 23, the inside of the trough is cooled and the heat of the cable can be prevented from rising.

本発明の実施例において、洞道内に多数のトラフを配置
した場合に、各トラフ15にそれぞれ3本ずつのケーブ
ルを収容させて、各々が高圧送電線の回路を形成するよ
うにしている。
In the embodiment of the present invention, when a large number of troughs are arranged in a cave, each trough 15 accommodates three cables, and each trough forms a circuit of a high voltage transmission line.

また、本発明の洞道において、高い位置に配置されたロ
ーラに沿ってケーブル20を移動させるために、第4図
に示されるようなケーブル送り出し装置25を用いるこ
とが出来る。
Further, in the cavern of the present invention, a cable feeding device 25 as shown in FIG. 4 can be used to move the cable 20 along the roller arranged at a high position.

前記ケーブル送り出し装置25は、通常ケーブルの移動
に用いられるキャタピラ方式の装置を用いることが出来
るもので、ローラの位置と同じ高さに、該ケーブル送り
出し装置25を取付けブラケット30aを介して中柱2
に取付け、キャタピラ手段によってケーブル20を上下
から挟んだ状態で延線して、ケーブルの長さ方向に移動
させることが出来るようにする。
The cable feeding device 25 can use a caterpillar type device which is usually used for moving a cable, and the cable feeding device 25 is mounted at the same height as the position of the roller via the mounting bracket 30a.
And the cable 20 is extended from above and below by the caterpillar means so that it can be moved in the length direction of the cable.

前記ケーブル送り出し装置25は、一般のケーブル布設
工事を行う場合と同様に、35m程度の間隔を持って、
洞道の内部に配置され、ケーブルの延線が出来るように
される。
The cable feeding device 25 has an interval of about 35 m, as in the case of general cable laying work.
It is placed inside the cave so that the cable can be extended.

前述したように構成される本発明のケーブル布設装置に
おいて、洞道内にケーブルの布設を行う場合には、第5
図に示されるようにして、ケーブル20をローラ40に
沿って延線する。
In the cable laying device of the present invention configured as described above, when laying a cable in a cave,
The cable 20 is extended along the roller 40 as shown.

そして、その後で、ローラ40を揺動させてケーブルに
対する保持状態を解除し、ケーブル20をスライド棒5
0に移載して、該スライド棒50に沿ってトラフ15方
向に摺動させて、トラフ内に収容する作業が行われる。
Then, after that, the roller 40 is swung to release the holding state with respect to the cable, and the cable 20 is moved to the slide rod 5.
Then, the work is carried out in which it is transferred to 0, slid in the direction of the trough 15 along the slide rod 50, and accommodated in the trough.

前記第5図に示される実施例において、区間Aはケーブ
ルの延線を行っている状態を示し、区間Bはローラによ
る支持状態を解除して、スライド棒50にケーブルを支
持させた状態を、区間Cはケーブルをトラフ内に収容し
た状態を示している。
In the embodiment shown in FIG. 5, section A shows a state in which the cable is extended, and section B shows a state in which the support state by the roller is released and the cable is supported by the slide rod 50. Section C shows a state in which the cable is housed in the trough.

本発明の実施例においては、中柱に対して取付けブラケ
ットを取付ける作業と、取付けブラケットに対してロー
ラやスライド棒を取付ける作業は、第4図に示されるよ
うな作業台車を用いて行う。前記作業台車5は、例えば
実公昭60−15840号公報等に示されるようなもの
を用いることが出来るが、本発明の実施例においては、
洞道内での台車の走行方向の規制を行うために、床4に
設けた側溝4aにガイド車輪9を案内させる。
In the embodiment of the present invention, the work for attaching the mounting bracket to the center pillar and the work for attaching the roller and the slide rod to the mounting bracket are performed by using a work carriage as shown in FIG. The work carriage 5 may be, for example, one shown in Japanese Utility Model Publication No. 60-15840, but in the embodiment of the present invention,
In order to regulate the traveling direction of the truck in the cave, the guide wheel 9 is guided in the side groove 4a provided on the floor 4.

また、前記ガイド車輪9は、台車本体の側部に突出させ
た支持アーム9aに設けられ、走行車輪8が溝4aに落
ち込んだりすることがないようにされる。前記台車5の
上には作業台6が設けられ、作業員は作業台6の上に乗
って、取付けブラケットの取付けや、ローラ、スライド
棒の取付け、および、後述するようなケーブルの移載等
の各作業を行うことが出来る。
Further, the guide wheel 9 is provided on a support arm 9a protruding to the side portion of the bogie body so that the traveling wheel 8 does not fall into the groove 4a. A workbench 6 is provided on the dolly 5, and an operator rides on the workbench 6 to mount a mounting bracket, a roller and a slide rod, and transfer a cable as described later. Each work can be done.

なお、本発明の作業台車5においては、その中柱側の側
部に上ガイド部材7を設けておき、該ガイド部材7が中
柱に摺動させるようにすることによって、台車5を移動
させる際に、側溝4aによるガイドと共同させて、洞道
内の作業通路に沿って台車を移動させ得るようにする。
In the work carriage 5 of the present invention, the upper guide member 7 is provided on the side portion on the side of the center pillar, and the carriage 5 is moved by sliding the guide member 7 on the center pillar. At this time, the carriage can be moved along the work passage in the cave by cooperating with the guide by the side groove 4a.

第5図に示されるように、洞道内にケーブルの布設を行
う際には、洞道の所定の区間に亘って、例えば、ケーブ
ルの1巻きの長さ650m区間に、ローラを所定の高さ
で、各中柱2に対して取付けブラケット30を取付け、
各取付けブラケットに設けたブロック35に、ローラ4
0を取付ける作業を行う。また、所定の間隔毎にケーブ
ル送り出し装置25を配置して、ケーブルに無理な張力
を付与せずに、送りの動作を行い得るようにする。
As shown in FIG. 5, when laying a cable in a cave, a roller is set to a predetermined height over a predetermined section of the cave, for example, in a section of one cable length of 650 m. Then, attach the mounting bracket 30 to each middle pillar 2,
The roller 4 is attached to the block 35 provided on each mounting bracket.
Work to install 0. Further, the cable feeding device 25 is arranged at every predetermined interval so that the feeding operation can be performed without applying an excessive tension to the cable.

そして、洞道の一定の区間毎に配置されるマンホールの
部分に、ケーブルの繰出装置と巻き取り装置とをそれぞ
れ配置して、巻き取り装置によりケーブルの端部に接続
したワイヤ等を巻き取る。これと同時に、洞道内に設け
た各ケーブル送り出し装置25により、延線を行い、ケ
ーブルを各ローラ40に沿って移動させ、洞道内でのケ
ーブルの延線の作業を行う。
Then, the cable feeding device and the winding device are respectively arranged in the manhole portions arranged in each constant section of the cave, and the wire or the like connected to the end portion of the cable is wound by the winding device. At the same time, the cables are extended by the respective cable feeding devices 25 provided in the cave, and the cables are moved along the rollers 40 to perform the cable extension work in the cave.

全部のケーブルを洞道の所定区間に延線した状態は、該
ケーブルはローラに支持された状態にある。また、各ロ
ーラ40は、その支持アームの端部がワイヤ43により
接続されていて、ローラ上をケーブルが移動する際に、
支持アームが振れたりすることと、ローラの振動による
騒音の発生を防止することが出来る。
When all the cables are extended to a predetermined section of the cave, the cables are supported by the rollers. Further, each roller 40 has its support arm end connected by a wire 43, and when the cable moves on the rollers,
It is possible to prevent the support arm from swinging and the generation of noise due to the vibration of the roller.

前述したようにして、ローラに沿ってケーブルを延線
し、該ケーブルをトラフ15に移載する際には、一定の
区間(例えば、35m程度の長さ)毎に、取付けブラケ
ット30とトラフ支持材12との間にスライド棒50を
取付けるようにする。
As described above, when the cable is extended along the roller and the cable is transferred to the trough 15, the mounting bracket 30 and the trough support are supported at regular intervals (for example, a length of about 35 m). The slide rod 50 is attached between the member 12 and the member 12.

そして、スライド棒を設けた部分で、ローラを揺動させ
るための作業が行われる。このローラの揺動は、第1図
に示されたローラの取付けブロックから、支持ピン39
を引抜くことによって行われる。
Then, the work for swinging the roller is performed at the portion where the slide bar is provided. The rocking of the roller is performed by the support pin 39 from the roller mounting block shown in FIG.
Is done by pulling out.

つまり、ピン37を取付けブラケット30のブロック3
5に挿入し、支持アーム41の端部を支持した状態で、
支持ピン39を引き抜くと、ローラ40はピン37を中
心にして下方に揺動し、ケーブル20を支持する状態か
ら解放される。
That is, the pin 37 is attached to the block 3 of the mounting bracket 30.
5, while supporting the end portion of the support arm 41,
When the support pin 39 is pulled out, the roller 40 swings downward around the pin 37 and is released from the state of supporting the cable 20.

そして、ケーブル20はスライド棒50の上にのみ支持
される状態となり、該スライド棒の傾斜にしたがって、
ケーブルの自重により摺動され、トラフに向けて移動さ
れる。なお、前述したようにして、ローラ40を支持す
る支持アーム41が揺動された際に、該支持アームの先
端部が接続されたワイヤは、若干の余裕を持って接続さ
れているので、支持アームの揺動に支障等が発生するこ
とがない。
The cable 20 is supported only on the slide rod 50, and the inclination of the slide rod causes
The cable is slid by its own weight and moved toward the trough. As described above, when the support arm 41 that supports the roller 40 is swung, the wire to which the tip of the support arm is connected is connected with a slight margin, There is no obstacle to the swing of the arm.

前述したようにして、ローラの揺動の動作を区間Bの全
体に亘って行うと、ケーブルがトラフ15内に収容され
ている区間Cに続いて、ケーブル20は区間Cに近接す
る位置から、順次スライド棒50の上を滑って、トラフ
方向に摺動するようになる。そのケーブルの摺動に際し
て、作業員は、トラフ内の所定の位置に、該ケーブルを
位置決めする補助作業のみを行うことによって、トラフ
15内の任意の位置にケーブルを固定させることが出来
る。
As described above, when the swinging motion of the roller is performed over the entire section B, the cable 20 is moved from the position close to the section C, following the section C in which the cable is housed in the trough 15. The slide bar 50 is successively slid on the slide bar 50 to slide in the trough direction. When sliding the cable, the worker can fix the cable at an arbitrary position in the trough 15 by only performing an auxiliary work for positioning the cable at a predetermined position in the trough.

そして、所定の区間Bの部分で、ケーブルをスライド棒
に沿ってトラフ15に向けて摺動させて、移載する作業
が終了すると、その区間Bからスライド棒50を取り外
して、次の区間Aに移動させ、該区間Aで、各ローラに
対応させる位置に、スライド棒を装着する作業を行う。
Then, in the portion of the predetermined section B, the cable is slid along the slide rod toward the trough 15, and when the transfer work is completed, the slide rod 50 is removed from the section B and the next section A Then, in the section A, the work of mounting the slide bar at the position corresponding to each roller is performed.

前述したようにして、所定の区間毎に区切った状態で、
ローラからスライド棒を介してケーブルを移動させてト
ラフ内に収容される作業を繰返して行い、ケーブルの所
定の長さに亘って洞道内でのケーブルの布設を行うよう
にする。
As described above, in the state of dividing into predetermined sections,
The operation of moving the cable from the roller through the slide rod to be housed in the trough is repeated, and the cable is laid in the cave over a predetermined length of the cable.

また、本発明の実施例において、比較的短い区間毎に区
切った状態で、スライド棒を取付ける作業を行うことに
より、作業員の数の問題と、同時に設置するスライド棒
の数の問題、等に対応させることが出来るようにする。
そして、前記短いケーブル送り出し装置の区間に対応さ
せて、ケーブルをトラフに向けて移動させる作業を行う
ことによって、同時に洞道内に入る作業員の数を少なく
することが出来るとともに、スライド棒等の部材の使用
量を減らすことができる。
Further, in the embodiment of the present invention, by performing the work of mounting the slide rod in a state of being divided into relatively short sections, the problem of the number of workers, the problem of the number of slide rods installed at the same time, etc. Be able to correspond.
Then, by performing the work of moving the cable toward the trough in correspondence with the section of the short cable feeding device, it is possible to reduce the number of workers who simultaneously enter the cave, and at the same time, a member such as a slide rod. Can reduce the amount of use.

さらに、比較的短い区間を限ってケーブルの移動の作業
を行うようにすることによって、単位長さ当たりの重量
が大きいOFケーブル等を容易に取扱えるようになる。
Furthermore, by carrying out the work of moving the cable only in a relatively short section, it becomes possible to easily handle an OF cable or the like having a large weight per unit length.

なお、ケーブルをスライド棒に沿って移動させる際に、
ケーブル送り出し装置25のキャタピラー装置のケーブ
ルに対する挟持状態を解除しておくと、ケーブルはケー
ブル送り出し装置から容易に離脱されて、トラフに向け
て移動されるようになる。前記ケーブルの布設の作業
は、トラフ内に3本のケーブルを収容させる場合には、
3回繰返して行い、そのケーブルの布設の都度、短い区
間毎にスライド棒の取付け、取外しの動作を繰返して行
うものとされる。
In addition, when moving the cable along the slide bar,
When the pinching state of the cable feeding device 25 with respect to the cable of the caterpillar device is released, the cable is easily separated from the cable feeding device and moved toward the trough. The above-mentioned cable laying work is carried out when three cables are to be accommodated in the trough.
The operation is repeated three times, and every time the cable is laid, the operation of attaching and detaching the slide rod is repeated every short section.

また、前述したようにして、1本のケーブルに対応する
区間で、洞道内にケーブルを布設する作業が終了する
と、中柱に取付けたブラケットとローラ装置を全部取り
外す。そして、次の区間に対応させて中柱に対してブラ
ケットを介してローラの取付けを行い、ケールブを延線
して、トラフに収容する作業を行うことになる。
Further, as described above, when the work of laying the cable in the cave is completed in the section corresponding to one cable, the bracket and the roller device attached to the center pillar are all removed. Then, corresponding to the next section, the roller is attached to the middle pillar via the bracket, the cable is extended, and the roller is accommodated in the trough.

前記本発明の実施例において、OFケーブルをトラフ内
に布設する場合の例で説明を行ったが、CVケーブル等
の他の種類の高圧送電ケーブルにも、本発明の装置を適
用することが出来る。
In the embodiment of the present invention, the case where the OF cable is laid in the trough has been described, but the device of the present invention can be applied to other types of high voltage power transmission cables such as a CV cable. .

(発明の効果) 本発明の装置は、上記したような構成を有するものであ
るから、比較的簡単な構成の部材を用いることによっ
て、単位重量の大きなケーブルを、洞道内の所定の高さ
位置に配置されたトラフに布設することが出来る。
(Effects of the Invention) Since the device of the present invention has the above-described structure, a cable with a large unit weight can be installed at a predetermined height position in a cave by using a member having a relatively simple structure. It can be laid on the trough located at.

したがって、本発明のケーブル布設装置においては、洞
道の中央部に所定間隔で配置された中柱に対して取付け
ブラケットを所定の高さに配置し、ケーブルに長さ方向
の案内を行うためのローラと、ケーブルを横方向に移動
させるためのスライド棒とを設けることにより、ケーブ
ルの布設の作業を容易に行うことが出来るものとなる。
Therefore, in the cable laying device of the present invention, the mounting bracket is arranged at a predetermined height with respect to the center pillars arranged at a predetermined interval in the central portion of the cave, and the cable is guided in the length direction. By providing the roller and the slide rod for moving the cable in the lateral direction, the work of laying the cable can be easily performed.

また、ケーブルの布設の作業を行うに際しては、スライ
ド棒上で自重によって摺動させることにより、該ケーブ
ルを横方向へ移動させる動作を行うことが出来るので、
トラフ上へのケーブルの移動の作業を容易に出来る。
In addition, when laying a cable, it is possible to move the cable laterally by sliding it on the slide rod by its own weight.
The work of moving the cable onto the trough can be facilitated.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の装置の構成を示す斜視図、第2図はそ
の側面図、第3図は洞道内に配置されるケーブル布設装
置とトラフとの関係を示す説明図、第4図は中柱にケー
ブル送り出し装置を取付けた場合の説明図であり、第5
図は本発明のケーブルの布設の動作を示す説明図であ
る。 図中の符号 1……洞道、2……中道、4……床、5……作業台車、
10……ケーブルラック、11……側柱、12……トラ
フ支持部材、15……トラフ、20……ケーブル、23
……冷却水用パイプ、25……ケーブル送り出し装置、
30……取付けブラケット、31……ピン孔、33……
スライド棒支持ブラケット、34……孔、35……ロー
ラ支持ブロック、40……ローラ、41……支持アー
ム、43……ワイヤ、50……スライド棒、55……ア
ーム、56……アーム取付け部材。
FIG. 1 is a perspective view showing the configuration of the device of the present invention, FIG. 2 is a side view thereof, FIG. 3 is an explanatory view showing the relationship between a cable laying device arranged in a cave and a trough, and FIG. It is explanatory drawing at the time of attaching a cable sending-out device to a center pillar,
The figure is an explanatory view showing the operation of laying the cable of the present invention. Reference numerals in the figure 1 ... Cave road, 2 ... Nakamichi, 4 ... Floor, 5 ... Work trolley,
10 ... Cable rack, 11 ... Side pillar, 12 ... Trough support member, 15 ... Trough, 20 ... Cable, 23
...... Cooling water pipe, 25 …… Cable feeding device,
30 ... Mounting bracket, 31 ... Pin hole, 33 ...
Slide rod support bracket, 34 ... Hole, 35 ... Roller support block, 40 ... Roller, 41 ... Support arm, 43 ... Wire, 50 ... Slide rod, 55 ... Arm, 56 ... Arm mounting member .

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】洞道内でケーブルラックの棚の高さに対応
させた位置でケーブルを延線し、トラフ内に収納するた
めの装置において、 洞道内の中柱に対して、棚の高さに合せて取付けブラケ
ットを取付け、該取付けブラケットを介してケーブルを
案内するためのローラを配置するとともに、該ケーブル
の延線を行うためのケーブルを送り出し装置とを配置
し、 前記中柱に取付けられる取付けブラケットには、ローラ
を支持するためのローラ支持ブロックと、スライド棒を
支持するためのブラケットとを設け、 前記ローラはローラ支持ブロックに対して揺動可能に設
けられ、ケーブルを長さ方向に移動させる際には、略水
平な位置に固定保持され、該ローラを揺動させることに
より、ケーブルをスライド棒に移載するように構成し、 前記スライド棒は、一端部が取付けブラケットに支持さ
れ、他端部はアームを介してトラフ支持材に支持される
ように構成され、該スライド棒を取付けブラケット側か
らトラフ支持材側に向けて傾斜させて配置し、ローラが
ケーブルに対する支持状態から解除された際に、スライ
ド棒に載置されたケーブルを、該スライド棒の傾斜にし
たがって摺動させることにより、トラフ内に移動させ得
るように構成したことを特徴とするケーブル布設装置。
Claim: What is claimed is: 1. A device for extending a cable at a position corresponding to the height of a shelf of a cable rack in a cave and storing it in a trough, wherein the height of the shelf with respect to the middle pillar in the cave. The mounting bracket, the roller for guiding the cable through the mounting bracket is arranged, and the cable sending device for extending the cable is arranged, and the mounting bracket is mounted on the center pillar. The mounting bracket is provided with a roller support block for supporting the roller and a bracket for supporting the slide rod. The roller is provided so as to be swingable with respect to the roller support block, and the cable is provided in the length direction. When moving, the cable is fixedly held in a substantially horizontal position, and the cable is transferred to the slide rod by swinging the roller. The rod is configured such that one end is supported by the mounting bracket and the other end is supported by the trough support through the arm, and the slide rod is tilted from the mounting bracket side toward the trough support. When the roller is released from the support state for the cable, the cable placed on the slide rod is slid according to the inclination of the slide rod so that the cable can be moved into the trough. A cable laying device characterized by the above.
JP18212589A 1989-07-14 1989-07-14 Cable laying equipment Expired - Lifetime JPH0622368B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18212589A JPH0622368B2 (en) 1989-07-14 1989-07-14 Cable laying equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18212589A JPH0622368B2 (en) 1989-07-14 1989-07-14 Cable laying equipment

Publications (2)

Publication Number Publication Date
JPH0349513A JPH0349513A (en) 1991-03-04
JPH0622368B2 true JPH0622368B2 (en) 1994-03-23

Family

ID=16112767

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18212589A Expired - Lifetime JPH0622368B2 (en) 1989-07-14 1989-07-14 Cable laying equipment

Country Status (1)

Country Link
JP (1) JPH0622368B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0671796B1 (en) * 1994-03-10 1997-01-08 Werner Cielker Cable laying device
GB2383200B (en) * 2001-12-12 2005-01-12 Balfour Beatty Plc Cable installation
JP7213850B2 (en) * 2020-07-27 2023-01-27 株式会社エステック Cable conveying device and cable laying method
CN114922687B (en) * 2022-04-11 2025-06-10 中铁隧道局集团有限公司 High-voltage cable extending device and extending method in large-diameter shield tunnel

Also Published As

Publication number Publication date
JPH0349513A (en) 1991-03-04

Similar Documents

Publication Publication Date Title
KR101209242B1 (en) Underground power transmission cable and power distribution cable support device
CN217741139U (en) Electric power installation tensioner bullwheel
CN206922350U (en) A kind of supporting adn fixing device for cable testing bridge
JPH0622368B2 (en) Cable laying equipment
CN113623154B (en) Fan cable twisting device and fan
JPH0722978Y2 (en) Cable laying equipment
JPH0622367B2 (en) Cable installation method in cave
CN113178818B (en) Cable trench multi-row wiring device
SU1584014A1 (en) Trolley for moving along wires of split phase of aerial power transmission line
KR101394659B1 (en) A crane jig with flexible width apparatus
CN213058935U (en) Cross belt sorting equipment and cross belt sorting system based on single-rod wiring
CN210156819U (en) Trolley set for replacing ground wire
CN110040618B (en) A wall-mounted equipment installation tool
KR101209239B1 (en) Underground power transmission cable and power distribution cable array device
CN218320051U (en) Movable cable winding and unwinding frame
CN216922132U (en) Track mounting rack, pipeline extension device and heading machine
US20240180325A1 (en) Storage rack
JP5527864B1 (en) Temporary transfer tool for pole pole hole reconstruction and pole pole hole rebuilding method
JP2012249437A (en) Power line extending method
JP3816179B2 (en) Cable drawing method
CN114696262A (en) Cable hoisting and laying device and method, wind turbine
JP2021102415A (en) Transport trolley
CN110745652A (en) Cable guiding and fixing device and cable construction conveying and guiding structure
CN222441286U (en) A cable tray for conveniently placing cables
CN216138364U (en) Truss girder welding device with track