JPH0623447B2 - Pile head processing bucket device - Google Patents
[go: Go Back, main page]

JPH0623447B2 - Pile head processing bucket device - Google Patents

Pile head processing bucket device

Info

Publication number
JPH0623447B2
JPH0623447B2 JP30044990A JP30044990A JPH0623447B2 JP H0623447 B2 JPH0623447 B2 JP H0623447B2 JP 30044990 A JP30044990 A JP 30044990A JP 30044990 A JP30044990 A JP 30044990A JP H0623447 B2 JPH0623447 B2 JP H0623447B2
Authority
JP
Japan
Prior art keywords
bucket
concrete
pile
shutter
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP30044990A
Other languages
Japanese (ja)
Other versions
JPH04174127A (en
Inventor
孝夫 湯谷
敏昭 服部
宣樹 奥野
芳郎 白塚
啓一 佐竹
秋良 乙部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Konoike Construction Co Ltd
Original Assignee
Konoike Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Konoike Construction Co Ltd filed Critical Konoike Construction Co Ltd
Priority to JP30044990A priority Critical patent/JPH0623447B2/en
Publication of JPH04174127A publication Critical patent/JPH04174127A/en
Publication of JPH0623447B2 publication Critical patent/JPH0623447B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は鉄筋コンクリート場所打杭のコンクリート打設
の際に、杭孔の頭部にたまる泥土を含む劣質の余盛コン
クリートを容易に取り除くようになした杭頭処理バケッ
ト装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial application] The present invention is intended to easily remove poor quality overfill concrete containing mud accumulated at the head of a pile hole during concrete placing of reinforced concrete cast-in-place pile. The present invention relates to a pile head processing bucket device.

〔従来の技術〕[Conventional technology]

場所打ちコンクリート杭工法においては、孔壁の崩壊を
防止するためにベントナイト溶液などの安定液を孔内に
満たして削孔し、孔内に鉄筋篭を挿入した後、トレミー
管を介してコンクリートを打設して孔内の安定液と置換
させて杭を構築する。構築された杭の頭部はコンクリー
ト打設中にスライムや安定液が混入して脆弱になるた
め、一般的にはコンクリートが硬化した後にブレーカー
などで杭頭部を50cm〜1m程度斫り取る方法をとってい
る。
In the cast-in-place concrete pile method, in order to prevent the collapse of the hole wall, a stable solution such as bentonite solution is filled into the hole for drilling, and after inserting the rebar cage into the hole, concrete is poured through the tremie pipe. A pile is constructed by placing it and replacing it with the stabilizing solution in the hole. Since the heads of the constructed piles become brittle due to slime and stabilizing liquid being mixed during concrete pouring, generally, a method of scraping off the pile heads with a breaker for about 50 cm to 1 m after the concrete hardens. Is taking.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

ブレーカーによる斫り作業は騒音や振動、塵埃を発生さ
せ、労働環境を悪化させるばかりでなく、近隣に対して
大きな影響を与え、工費や工期の点においても問題は大
きい。
Scavenging work using a breaker not only causes noise, vibration, and dust to deteriorate the working environment, but also has a large impact on the neighborhood, and there are major problems in terms of construction cost and construction period.

そのため、このような杭頭部を斫る方法としてブレーカ
ーによる方法のほか、 1)コンクリートを打設した直後に水、安定液、空気など
流体を余盛コンクリート内に高圧で噴射し、安定液中で
余盛コンクリートを撹拌し、砂利、砂、セメントに分離
させて極めて脆い杭頭部を形成して斫り作業を容易にす
る方法。
Therefore, in addition to the method using a breaker as a method of removing such pile heads, 1) Immediately after placing concrete, a fluid such as water, stabilizing liquid, or air is injected at high pressure into the surplus concrete to Method to stir the surplus concrete and separate it into gravel, sand, and cement to form extremely brittle pile heads to facilitate picking work.

2)静的破砕剤によって杭頭部に亀裂を発生させ、余盛コ
ンクリートを小割にする方法。
2) A method of cracking the pile head with a static crushing agent and breaking the surplus concrete into small pieces.

3)鉄筋篭の内側の余盛コンクリートをバケットで除去
し、鉄筋篭周囲に残された壁状の余盛コンクリートをブ
レーカーで斫り取る方法がある。
3) There is a method to remove excess concrete inside the reinforced basket with a bucket and scrape the wall-shaped excess concrete left around the reinforced basket with a breaker.

しかし、上記1)の方法は装置が大がかりとなり、また杭
本体の健全なコンクリートまで撹拌・分離させる恐れも
ある。さらに、ベントナイト溶液などの安定液がコンク
リートと撹拌されるためゲル化し、安定液を廃棄処分し
なければならなくなるという欠点がある。
However, the method of 1) above requires a large-scale device and may even mix and separate sound concrete in the pile body. Further, a stabilizing solution such as a bentonite solution is agitated with the concrete, so that it gelates and the stabilizing solution must be discarded.

上記2)の方法は杭本体の健全なコンクリートまで亀裂が
入る恐れがある上、亀裂の入った杭頭部をブレーカーで
さらに小割にしなければならず、結局斫り作業は必要と
なる。
In the method of 2) above, cracks may occur even in the concrete of the pile main body, and the cracked pile head must be further broken into small pieces with a breaker, which eventually requires scavenging work.

上記3)の方法においては、バケットを引抜いたのち、鉄
筋篭周囲に余盛コンクリートを壁状に残すためには、余
盛コンクリートが半ば硬化していなければならず、コン
クリート打設終了からバケットの引き抜きまで少なくと
も2〜3時間は要する。また、杭頭部の鉄筋篭周囲に残
された余盛コンクリートをブレーカーなどで斫り取らな
ければならない。
In the method of 3) above, after pulling out the bucket, in order to leave the extra concrete around the rebar cage in a wall shape, the extra concrete must be hardened halfway, and after the concrete pouring, It takes at least 2 to 3 hours to pull out. In addition, the surplus concrete left around the reinforced steel baskets on the pile heads must be removed with a breaker.

等の欠点がある。There are drawbacks such as.

〔課題を解決するための手段〕[Means for Solving the Problems]

本発明は上記目的を達成するためになしたものであっ
て、余盛コンクリートを取り込むために底板に設けられ
た開口を開閉するシャッターと、このシャッターを案内
するローラを内蔵したバケット本体と、バケット吊垂用
ワイヤー巻上装置を具備した吊り治具とより成り、シャ
ッターの両端と巻上装置をワイヤーロープで連結し、巻
上装置を駆動してシャッターを移動させ、開口を開閉さ
せるようになしたことを要旨とする。
The present invention has been made to achieve the above object, and includes a shutter for opening and closing an opening provided in a bottom plate for taking in extra concrete, a bucket body having a roller for guiding the shutter, and a bucket. It consists of a hoisting jig equipped with a wire hoisting device for hanging, and connects both ends of the shutter and the hoisting device with wire ropes, and drives the hoisting device to move the shutter to open and close the opening. What is done is summarized.

〔作 用〕[Work]

杭孔内には泥水がたまっており、バケット使用時、装置
の内外がこの泥水で汚れ、装置の故障の原因となるが、
本発明ではバケット内にはローラ、シャッター、ロープ
のみで他の駆動機構をバケット上方に配設しているので
故障の可能性が少なくなり、さらに地上からバケット内
の駆動装置にエアホース、電源ケーブルで連結する必要
がない。
Muddy water is accumulated in the pile holes, and when using the bucket, the inside and outside of the device become dirty with this muddy water, which causes the device to malfunction.
In the present invention, since the other drive mechanism is arranged above the bucket only by the roller, shutter, and rope in the bucket, the possibility of failure is reduced, and further, the air hose and the power cable from the ground to the drive device in the bucket. No need to connect.

〔実施例〕〔Example〕

以下本発明を図示の実施例にもとづいて説明する。 The present invention will be described below with reference to the illustrated embodiments.

図において1はケーシングKを用いて掘削した所要径と
深さを有する杭孔で、この杭孔1内に未硬化状態にある
泥土を含んだ余盛コンクリートを除去するための杭頭処
理バケット2を挿入する。このバケット2はケーシング
K内に挿入できる径を有し、かつこの下端面に開口3を
形成し、この開口3の両側でバケット内に対向してガイ
ドローラ4,4を配設し、このガイドローラ4,4に案
内されて開口3を開閉するシャッター5を配設する。
In the figure, 1 is a pile hole having a required diameter and depth excavated by using a casing K, and a pile head treatment bucket 2 for removing surplus concrete containing unhardened mud in this pile hole 1 Insert. The bucket 2 has a diameter that allows it to be inserted into the casing K, and has an opening 3 formed in its lower end surface. Guide rollers 4 and 4 are arranged on both sides of the opening 3 so as to face the inside of the bucket. A shutter 5 that opens and closes the opening 3 by being guided by the rollers 4 and 4 is provided.

このシャッター5は少なくとも開口3を完全に閉じる幅
と長さを有し、かつガイドローラに導かれて屈曲可能と
したもので、開口3を開閉する方向の両端に開閉操作用
のワイヤー6,6を結合し、このワイヤー6,6を第2
図に示すようにV字形となるようにし、このワイヤー6
とバケット2のワイヤガイドストッパー7にて導かれる
吊垂用のワイヤー8とを結合し、かつこの両ワイヤー
6,8の結合位置にストッパー9を設け、これによりシ
ャッター5の移動量を規制するようになす。
The shutter 5 has at least a width and a length for completely closing the opening 3, and is made bendable by being guided by a guide roller. Wires 6 and 6 for opening and closing are provided at both ends in the direction of opening and closing the opening 3. Connect the wires 6 and 6 to the second
As shown in the figure, make the wire 6
And the wire 8 for hanging, which is guided by the wire guide stopper 7 of the bucket 2, are connected to each other, and a stopper 9 is provided at the connecting position of the both wires 6 and 8 to regulate the movement amount of the shutter 5. Eggplant

14はバケット2の内周面に設けたトレミー管ガイド、10
はバケット下端側外周面に備えた袋状のパッキンで、こ
のパッキン10内に空気を送り込むことによりケーシング
とバケット間の隙間を閉塞し、バケットを安定させ、か
つ泥水、余盛コンクリート等がケーシング、バケット間
隙間より杭上方へ流出するのを防止する。またワイヤー
8の上端は吊り治具11に設けた巻上装置12(例えばチェ
ンブロック、チルクライマー等)に係止させ、この巻上
装置12の駆動にてシャッター5を開閉せしめるものであ
る。
14 is a tremie pipe guide provided on the inner peripheral surface of the bucket 2, 10
Is a bag-shaped packing provided on the outer peripheral surface on the lower end side of the bucket, by closing the gap between the casing and the bucket by sending air into the packing 10, the bucket is stabilized, and muddy water, surplus concrete, etc. are the casing, Prevents outflow from the gap between buckets to above the pile. The upper end of the wire 8 is locked to a hoisting device 12 (for example, a chain block, a chill climber or the like) provided on the hanging jig 11, and the hoisting device 12 is driven to open and close the shutter 5.

バケット2の上端にはバケット吊垂用ワイヤー13の下端
を係止し、このワイヤー13の上端を吊り治具11に係止
し、この吊り治具11をクレーン等にて吊垂し、ワイヤー
13を介してバケット2を杭孔内にて昇降せしめるもので
ある。
The lower end of the wire 13 for suspending the bucket is locked to the upper end of the bucket 2, the upper end of the wire 13 is locked to the hanging jig 11, and the hanging jig 11 is hung by a crane or the like.
The bucket 2 is moved up and down in the pile hole via the 13.

次に上述の如く構成した杭頭処理バケット装置の使用に
ついて説明する。
Next, the use of the pile head processing bucket device configured as described above will be described.

杭の補強筋として地上で予め組まれた鉄筋篭にバケット
本体2を固定し、鉄筋篭をバケット本体とともに杭孔内
に挿入する。このバケット2の外周にはゴムチューブ袋
状のパッキン10が装着されており、このパッキン10内に
圧搾空気を送り込んで、パッキン10をふくらませ、鉄筋
篭と杭孔壁(ケーシング内周面)との間隙を所定の高さ
で閉ぐ。
The bucket main body 2 is fixed to a reinforcing bar cage preassembled on the ground as a reinforcing bar for the pile, and the reinforcing bar cage is inserted into the pile hole together with the bucket main body. A rubber tube bag-shaped packing 10 is attached to the outer periphery of the bucket 2, and compressed air is sent into the packing 10 to inflate the packing 10 to reinforce the rebar cage and the pile hole wall (inner casing inner surface). Close the gap at the specified height.

次にバケット底板の開口3を貫通して、トレミー管を垂
下し、このトレミー管内を流下させて杭孔の下部よりコ
ンクリートを打設し、このコンクリートに押し上げられ
て上方へ移動する泥土を含む劣質の余盛コンクリートが
バケット底部の開口よりバケット内部へ取り込まれる。
Next, penetrating through the opening 3 in the bottom plate of the bucket, the tremie pipe is hung down, the tremie pipe is made to flow down, concrete is placed from the bottom of the pile hole, and the poor quality including mud pushed up by this concrete and moving upward. The surplus concrete is taken into the bucket through the opening at the bottom of the bucket.

このようにして所定位置までコンクリートを打設した
後、トレミー管を撤去し、クレーン等で吊り治具11をバ
ケット上方へ吊り上げ、シャッターの両端から上方へ延
長されたワイヤー6,8の他端とチルクライマー12と連
結しこのチルクライマー12の駆動にてこのワイヤー8を
巻き上げてシャッター5をガイドローラ4にて規制され
つつ移動させ、バケット底部の開口3を閉塞する。その
後、吊り治具11とバケット2とを連結するワイヤー13を
介し吊り治具とともにバケットをともに揚垂し、杭孔上
方の所定位置例えばトラック上方にてシャッターを開い
てバケット内の余盛コンクリートを排出する。
After pouring concrete to the predetermined position in this way, the tremie pipe is removed, the lifting jig 11 is lifted above the bucket with a crane, and the other ends of the wires 6 and 8 extended upward from both ends of the shutter. This wire 8 is wound by driving the chill climber 12, and the shutter 5 is moved while being regulated by the guide roller 4 by driving the chill climber 12 to close the opening 3 at the bottom of the bucket. Then, the bucket is hoisted together with the hoisting jig through the wire 13 that connects the hoisting jig 11 and the bucket 2, and the shutter is opened at a predetermined position above the pile hole, for example, above the truck to remove excess concrete in the bucket. Discharge.

〔発明の効果〕〔The invention's effect〕

本発明によるときはバケットを挿入した杭孔内に泥水が
たまっていてもバケット内にはシャッターとこれを移動
させるワイヤーのみ以外を配設されず、駆動部はバケッ
ト上方に位置しているため、故障の可能性が少なく、信
頼性が向上するとともに余盛コンクリートが未硬化時に
バケット内に収納排出するため、打設コンクリート上端
面は平滑で高さ精度も良好となる等の利点を有する。
According to the present invention, even if muddy water is accumulated in the pile hole in which the bucket is inserted, only the shutter and the wire for moving the shutter are arranged in the bucket, and the drive unit is located above the bucket. The possibility of failure is low, the reliability is improved, and the surplus concrete is stored and discharged in the bucket when it is not cured. Therefore, the upper end surface of the cast concrete is smooth and the height accuracy is good.

【図面の簡単な説明】[Brief description of drawings]

第1図は杭頭処理バケット装置の縦断正面図、第2図は
同縦断側面図、第3図は平面図、第4図は全体の概略図
である。 1は杭孔、2はバケット、3は開口、5はシャッター、
6,8はワイヤー、10はパッキン、11は吊り治具、12は
巻上装置、13は吊り治具とバケットを連結し、吊り治具
を揚重すると同様にバケットを杭引より撤去させるため
の吊りワイヤー。
FIG. 1 is a vertical sectional front view of a pile head processing bucket device, FIG. 2 is a vertical sectional side view of the same, FIG. 3 is a plan view, and FIG. 4 is an overall schematic diagram. 1 is a pile hole, 2 is a bucket, 3 is an opening, 5 is a shutter,
6, 8 is a wire, 10 is a packing, 11 is a hoisting jig, 12 is a hoisting device, 13 is a hoisting jig and a bucket are connected, and when the hoisting jig is lifted, the bucket is removed from the pile puller similarly. Hanging wire.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 乙部 秋良 京都府京都市西京区大原野上里勝山町12― 10 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Akiyoshi Otobe 12-10 Katsuyama-cho, Nohara, Ohara Nohara, Nishikyo-ku, Kyoto City, Kyoto Prefecture

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】鉄筋コンクリート場所打杭のコンクリート
打設の際に杭孔の頭部にたまる泥土を含む劣質の余盛コ
ンクリートを取り除くための装置であって、 余盛コンクリートを取り込むために底板に設けられた開
口を開閉するシャッターと、このシャッターを案内する
ローラを内蔵したバケット本体と、バケット吊垂用ワイ
ヤー巻上装置を具備した吊り治具とより成り、シャッタ
ーの両端と巻上装置をワイヤーロープで連結し、巻上装
置を駆動してシャッターを移動させ、開口を開閉させる
ようになしたことを特徴とする杭頭処理バケット装置。
1. A device for removing inferior quality surplus concrete containing mud accumulated in the head of a pile hole when placing reinforced concrete cast-in-place concrete, which is provided on a bottom plate for taking in surplus concrete. A shutter that opens and closes the opening, a bucket body that incorporates a roller that guides the shutter, and a lifting jig that includes a wire hoisting device for hanging the bucket. The pile head processing bucket device is characterized in that the opening is opened and closed by driving the hoisting device by moving the shutter.
JP30044990A 1990-11-06 1990-11-06 Pile head processing bucket device Expired - Lifetime JPH0623447B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30044990A JPH0623447B2 (en) 1990-11-06 1990-11-06 Pile head processing bucket device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30044990A JPH0623447B2 (en) 1990-11-06 1990-11-06 Pile head processing bucket device

Publications (2)

Publication Number Publication Date
JPH04174127A JPH04174127A (en) 1992-06-22
JPH0623447B2 true JPH0623447B2 (en) 1994-03-30

Family

ID=17884933

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30044990A Expired - Lifetime JPH0623447B2 (en) 1990-11-06 1990-11-06 Pile head processing bucket device

Country Status (1)

Country Link
JP (1) JPH0623447B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6153764B2 (en) * 2013-04-23 2017-06-28 株式会社サンエイ Slime removal bucket and pile head processing method using the same

Also Published As

Publication number Publication date
JPH04174127A (en) 1992-06-22

Similar Documents

Publication Publication Date Title
CN108330995A (en) Construction method of steel sheet pile cofferdam in deep water thick silt layer environment
KR100880439B1 (en) Slime removal device and method of cast-in-place pile drilling machine
CN102383421A (en) Earth discharging pile-forming device arranged at bottom end of synchronous earth-taking pouring pile body vibration sinking pipe and method
JP5441723B2 (en) Pile construction method
JP5041960B2 (en) Method for processing surplus concrete and surplus concrete processing tool
JP4137173B1 (en) Reinforcing bar construction in cast-in-place pile
JPH0623447B2 (en) Pile head processing bucket device
JP3077747B2 (en) Method and apparatus for removing concrete at pile head extra
JPH11350529A (en) Drilling shear receiving and pumping equipment for drilling equipment
CN109930602A (en) A kind of Water Cutting vibration immersed tube pile pulling device
JPH0925724A (en) Concrete placing hopper
JP2500112B2 (en) Bonded steel plate cleaning device for underground wall joints
JP3796012B2 (en) Slime removal device for continuous underground wall
JP2023079031A (en) Pile driving device and pile driving method
JPS6235742Y2 (en)
JP2007224657A (en) Cast-in-place concrete pile construction method
JP2008223337A (en) Foundation pile construction method, and washing device of hollow pile inner peripheral wall used in construction method
JP3745645B2 (en) Earth drill
JPH068533B2 (en) Pile head processing method for cast-in-place piles
JP2002146775A (en) Diaphragm-wall construction method
JP3076720B2 (en) Underground diaphragm wall
JPH0417661Y2 (en)
JPH0718152B2 (en) Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor
JP3230113B2 (en) Method and apparatus for supplying mud solidified slurry into excavation trench
CN1244615A (en) Pile foundation of high-pressure rotatively sprayed reinforced concrete in triple pipe and its concretion method