JPH0718152B2 - Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor - Google Patents
[go: Go Back, main page]

JPH0718152B2 - Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor - Google Patents

Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor

Info

Publication number
JPH0718152B2
JPH0718152B2 JP9218988A JP9218988A JPH0718152B2 JP H0718152 B2 JPH0718152 B2 JP H0718152B2 JP 9218988 A JP9218988 A JP 9218988A JP 9218988 A JP9218988 A JP 9218988A JP H0718152 B2 JPH0718152 B2 JP H0718152B2
Authority
JP
Japan
Prior art keywords
concrete
screw pump
auger
casing
excess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP9218988A
Other languages
Japanese (ja)
Other versions
JPH01263314A (en
Inventor
五郎 森口
良仁 西山
誠一郎 石原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asanuma Corp
Original Assignee
Asanuma Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asanuma Corp filed Critical Asanuma Corp
Priority to JP9218988A priority Critical patent/JPH0718152B2/en
Publication of JPH01263314A publication Critical patent/JPH01263314A/en
Publication of JPH0718152B2 publication Critical patent/JPH0718152B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、地中に構築されたコンクリート構築物、例
えば場所打コンクリート杭や地中連続壁の上部に設けら
れた余盛コンクリートや孔壁安定液及び清水を除去する
ためのスクリューポンプによる余盛コンクリートの処理
工法と、そのために用いる除去装置に関するものであ
る。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to a concrete structure constructed in the ground, such as cast-in-place concrete piles or extra-strength concrete provided on top of an underground continuous wall or hole wall stabilization. The present invention relates to a method for treating surplus concrete with a screw pump for removing liquid and fresh water, and a removing device used therefor.

〔従来の技術〕[Conventional technology]

例えば、場所打コンクリート杭の構築においては、打設
コンクリートの上端にスライム混合部が生じるため、杭
の上端部分に適当な高さの量の余盛部分を設け、杭の完
成後にこの余盛部分を除去することにより、所定高さ位
置の杭頭を有する、強度の優れたコンクリート杭を得る
ようにしている。
For example, in the construction of cast-in-place concrete piles, a slime mixing part occurs at the upper end of the cast concrete, so an extra-height portion of an appropriate height is provided at the upper end of the pile, and this extra-height portion is provided after the pile is completed. Is removed to obtain a concrete pile having a pile head at a predetermined height and having excellent strength.

従来、上記のような余盛部分の除去は、一般にコンクリ
ートの凝固後にハツリ作業によって行っていた。
Conventionally, the removal of the above-mentioned extra portion has generally been performed by chipping after solidification of concrete.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

ところで、上記のようなハツリ作業による余盛部分の除
去は、除去作業に時間がかかり、ハツリガラも処分せね
ばならず作業コストが高くつくという問題がある。特
に、杭の造成時、掘削した孔へコンクリートを打設して
いる間、孔内には濁った孔壁安定液が充されているた
め、コンクリートの天端位置を目視確認できないことか
ら、コンクリートを打設し過ぎて余盛が必要以上に高く
なることがある。そのように余盛部分が過剰な厚さにな
ってしまったときには、ハツリ作業による作業コストが
非常に高くなる。
By the way, the removal of the surplus portion by the chiseling work as described above requires a long time for the removing work, and there is a problem that the chipping liquor must be disposed of and the work cost is high. In particular, during the construction of the pile, while pouring concrete into the excavated hole, it is impossible to visually confirm the top end position of the concrete because the cloudy hole wall stabilizing liquid is filled in the hole. There is a case that the surplus becomes higher than necessary due to over-mounting. When the extra portion has an excessive thickness, the work cost for chipping becomes very high.

さらに、余盛部分が地中深くに形成されたときには、ハ
ツリガラの運搬等にかかる作業コストがかさむ。
Furthermore, when the extra portion is formed deep in the ground, the work cost for transporting the chippers is high.

また、余盛部分を除去するハツリ作業には振動工具の使
用が必要になるため、大きな騒音の発生により周囲住民
に対する騒音公害の原因となり、その改善が望まれてい
るのが現状である。
Moreover, since the use of a vibrating tool is required for the chipping work for removing the extra portion, it causes the noise pollution to the surrounding residents due to the generation of a large noise, and its improvement is desired at present.

〔発明の目的〕[Object of the Invention]

この発明は、上記のような問題点を解決するためになさ
れたものであり、余盛コンクリートの除去がハツリ作業
を必要とすることなく能率的に低コストで行なえるスク
リューポンプによる余盛コンクリートの処理工法を提供
することが目的であり、さらに深い場所でも余盛コンク
リートを除去でき、また余盛部分のみを正確に除去でき
るようにすることも目的とする。
This invention was made in order to solve the above problems, the removal of surplus concrete can be efficiently carried out at low cost without the need for chipping work of the surplus concrete by a screw pump. It is an object to provide a treatment method, and it is also an object to be able to remove surplus concrete at a deeper place and to accurately remove only the surplus portion.

〔課題を解決するための手段〕[Means for Solving the Problems]

上記のような課題を解決するため、請求項1のスクリュ
ーポンプによる余盛コンクリートの処理工法は、ケーシ
ング内にオーガーを収納し、このオーガーを駆動機で回
転させるスクリューポンプを用い、このスクリューポン
プをコンクリート構築物の余盛部分の直上に垂直で上下
動するよう配置し、該スクリューポンプを下降動させて
その下端取込口を余盛部分の最下層付近まで侵入させ、
このスクリューポンプのオーガーを回転させて余盛部分
をコンクリートの凝固前に搬送除去する構成としてい
る。
In order to solve the above problems, the method for treating surplus concrete with a screw pump according to claim 1 uses a screw pump that stores an auger in a casing and rotates the auger with a driving machine. Arranged to move vertically vertically on the extra portion of the concrete structure, the screw pump is moved downward to penetrate the lower end intake port to the vicinity of the bottom layer of the extra portion,
The auger of this screw pump is rotated to convey and remove the excess portion before the concrete is solidified.

また、請求項2の余盛コンクリートの除去装置は、コン
クリート構築物の余盛部分の上側方において昇降自在に
支持された昇降アームと、この昇降アームに固定された
スクリューポンプとを備え、上記スクリューポンプは、
上端部が上記昇降アームに取り付けられたケーシング
と、このケーシングの内部に収納されたオーガと、上記
昇降アームに取り付けられ且つオーガを回転させる駆動
機と、上記ケーシングの上端部に連設された排出機構と
を備える構成としている。
Further, the excess concrete removing device according to claim 2 comprises an elevating arm that is supported to be able to ascend and descend above the extra portion of the concrete structure, and a screw pump fixed to the elevating arm. Is
A casing having an upper end attached to the elevating arm, an auger housed inside the casing, a drive unit attached to the elevating arm and rotating the auger, and a discharge connected to the upper end of the casing. And a mechanism.

〔作用〕[Action]

請求項1では、コンクリートを打設して形成した構築物
の上端余盛部分にスクリューポンプの下端取込口を挿入
し、コンクリートが凝固する前に余盛部分を搬送除去す
れば、上端が所定高さとなるコンクリート構築物ができ
上ることになる。
According to claim 1, if the lower end intake of the screw pump is inserted into the upper end surplus portion of the structure formed by casting concrete, and the surplus portion is conveyed and removed before the concrete is solidified, the upper end can reach a predetermined height. A concrete structure will be completed.

その場合、吸引等ではなく、スクリューポンプによりコ
ンクリートを搬送するから、深い場所からでも余盛コン
クリートの搬送が可能である。また、スクリューポンプ
はケージングが変形しないから、スクリューポンプの下
降量を管理することにより、その下端取込口を余盛部分
の最下層付近に正確に侵入させることが可能になる。
In that case, since the concrete is conveyed by a screw pump instead of suction or the like, it is possible to convey the overfilled concrete even from a deep place. Further, since the caging of the screw pump is not deformed, by controlling the descending amount of the screw pump, the lower end intake port can be made to accurately enter the vicinity of the lowermost layer of the extra portion.

請求項2では、コンクリートの打設が終ると、昇降アー
ムを作動させてスクリューポンプを降ろし、構築物の上
端余盛部分にスクリューポンプの下端取込口を挿入し、
駆動機の作動によりオーガを回転させて余盛部分のコン
クリートが凝固する前に余盛を搬送除去し、除去した余
盛を排出機構で排出する。
In claim 2, when the placing of concrete is completed, the elevating arm is operated to lower the screw pump, and the lower end intake port of the screw pump is inserted into the upper end extra portion of the structure.
The auger is rotated by the operation of the driving machine to convey and remove the excess deposit before the concrete in the excess deposit is solidified, and the removed excess deposit is discharged by the discharge mechanism.

〔実施例〕〔Example〕

以下、この発明の実施例を添付図面に基づいて説明す
る。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

図面はコンクリート構築物として場所打コンクリート杭
を例示しており、第1図乃至第7図は場所打コンクリー
ト杭の施工順序を、第8図と第9図は余盛部分の除去装
置を示している。
The drawings exemplify cast-in-place concrete piles as concrete structures. FIGS. 1 to 7 show the order of construction of cast-in-place concrete piles, and FIGS. 8 and 9 show a device for removing extra piles. .

余盛部分の除去装置1は、可動台2上に立設したリーダ
3に昇降アーム4を取付け、この昇降アーム4を手動式
もしくは自動式の昇降機構5と連動し、リーダ3に沿っ
て上下動させるようにすると共に、昇降アーム4にスク
リューポンプ6が取付けられている。
The device 1 for removing excess portions is provided with an elevating arm 4 attached to a reader 3 standing on a movable table 2, and the elevating arm 4 is interlocked with a manual or automatic elevating mechanism 5 to move vertically along the reader 3. A screw pump 6 is attached to the elevating arm 4 while being moved.

上記スクリューポンプ6は、土木工事において広く汎用
されている部材よりなっている。すなわち、上端部を昇
降アーム4に固定したケーシング7の内部にオーガ8を
収納し、昇降アーム4上にオーガー8を回転させる駆動
機9を設け、ケーシング7の上端部に、排出機構として
断面U字型をした樋状の排出用シュート10を突設した構
造になっており、さらに必要に応じてシュート10からの
排出物を収納するバケット11が用意されている。ここ
で、駆動機9としては油圧モータが好ましいが、電動モ
ータ等にしてもよい。
The screw pump 6 is a member widely used in civil engineering. That is, the auger 8 is housed inside the casing 7 whose upper end is fixed to the elevating arm 4, and the driving machine 9 for rotating the auger 8 is provided on the elevating arm 4, and the upper end of the casing 7 has a section U as a discharging mechanism. It has a structure in which a gutter-shaped gutter-shaped discharge chute 10 is provided in a projecting manner, and further, a bucket 11 for storing the discharge product from the chute 10 is prepared if necessary. Here, a hydraulic motor is preferable as the drive unit 9, but an electric motor or the like may be used.

次に、場所打コンクリート杭の施工を説明する。Next, construction of cast-in-place concrete piles will be described.

先ず、第1図のように、杭を構築せんとする位置に鋼管
等よりなるスタンドパイプ21で心出しをしながら掘削機
22を用いて縦孔の掘削を開始し、第2図のように所定深
さの縦孔23を掘削すると底ざらえ等を行ない、掘削機22
を抜取った後、縦孔23へ第3図のように鉄筋かご24とト
レミー管25を挿入する。次に第4図の如く、トレミー管
25を介して縦孔23内にコンクリートを打設し、縦孔23の
上部において汚水を水中ポンプ26で除去し、第5図に示
すように、杭頭レベルAに余盛Bを加えた高さ位置にま
でコンクリートを打設する。
First, as shown in FIG. 1, the excavator is aligned with the stand pipe 21 made of steel pipe at the position where the pile is to be constructed.
Starting the excavation of the vertical hole using 22, the vertical hole 23 having a predetermined depth is excavated as shown in FIG.
After pulling out, the rebar cage 24 and the tremie pipe 25 are inserted into the vertical hole 23 as shown in FIG. Next, as shown in Fig. 4, the tremie tube
Concrete is poured into the vertical hole 23 through 25, and sewage is removed at the upper part of the vertical hole 23 by the submersible pump 26, and as shown in FIG. Place concrete up to this position.

ちなみに、余盛Bの部分は、約60〜100cm程度であり、
この余盛Bはスライムの混合により強度的に不良の部分
となる。
By the way, the part of the extra B is about 60-100 cm,
The extra deposit B becomes a defective portion due to the mixture of slime.

コンクリートの打設が終ると、除去装置1をコンクリー
ト杭上に臨ませ、先ずコンクリート上部に残った孔壁安
定液または清水をスクリューポンプ6で搬送後、更にス
クリューポンプ6を下降動させてその下端取込口を余盛
Bの部分の最下層付近まで侵入させ、この余盛B部分の
コンクリートが凝固する前に杭頭レベルAまでの余盛B
を搬送除去し、除去した余盛はバケット11に回収する。
After pouring the concrete, the removing device 1 is exposed to the concrete pile, and the hole wall stabilizing liquid or the clear water remaining on the concrete is first conveyed by the screw pump 6, and then the screw pump 6 is further moved downward to lower the end. The intake port is made to penetrate to the vicinity of the bottom layer of the swell B, and the swell B up to the pile head level A before the concrete in this sill B is solidified.
Are conveyed and removed, and the removed excess is collected in the bucket 11.

これによって、第6図の如く、打設したコンクリートの
上端が杭頭レベルAに一致し、コンクリートの凝固によ
ってコンクリート杭Cが完成し、この後、第7図のよう
に、コンクリート杭Cの上端に基礎Dが構築されること
になる。
As a result, as shown in FIG. 6, the upper end of the cast concrete matches the pile head level A, and the concrete pile C is completed by solidifying the concrete. After that, as shown in FIG. 7, the upper end of the concrete pile C is completed. The foundation D will be built in.

従って、上記実施例においては、余盛部分のハツリ作業
及びハツリガラの処分が不要になり、作業コストが安く
なると共に、振動工具等の使用が不要になるため、騒音
公害が発生するおそれがない。
Therefore, in the above embodiment, the chipping work of the extra portion and the disposal of the chippings are not required, the working cost is reduced, and the use of a vibrating tool or the like is not required, so that noise pollution is not likely to occur.

その場合、余盛コンクリートの搬送に、例えばサクショ
ンホースを用いて空気と共に吸い上げて除去する等の方
法を用いずに、スクリューポンプ6により行うから、深
い場所からでも余盛コンクリートを安定して搬送でき、
従って現場への適用性に優れると共に、深い場所からの
余盛コンクリートの搬送を作業性良く行える。
In that case, since the excess pumped concrete is conveyed by the screw pump 6 without using a method of sucking up and removing it together with air using a suction hose, for example, it is possible to stably convey the supplemental concrete from a deep place. ,
Therefore, the applicability to the site is excellent and the excess concrete can be transported from a deep place with good workability.

また、スクリューポンプ6はケージング7が変形しない
から、例えばスタンドパイプ21の上端縁等を基準として
スクリューポンプ6の下降量を管理することにより、そ
の下端取込口を余盛部分の最下層付近に正確に侵入させ
ることができ、従って余盛部分のみを正確に除去でき
て、所望の高さの杭頭を必要な強度を得ながら施工でき
る。
Further, since the caging 7 of the screw pump 6 does not deform, the lower end intake port is located near the lowermost layer of the extra portion by controlling the descending amount of the screw pump 6 with reference to, for example, the upper edge of the stand pipe 21. Since it can be accurately inserted, only the extra portion can be accurately removed, and the pile head of a desired height can be constructed while obtaining the required strength.

なお、上記実施例では、ケーシング7の上端部に、排出
機構として断面U字型をした樋状の排出用シュート10を
連設したが、排出機構としては他にパイプ又はホースも
考えられ、その場合、例えばケーシング7の上端部にパ
イプ又はホースを回動ジョイントを介して取り付けても
よい。また、スクリューポンプ6を昇降アーム4に固定
したが、これに代えて、バックホーやクレーンにおいて
昇降可能に設けられたアーム等にスクリューポンプを固
定してもよい。また、上記実施例では、場所打コンクリ
ート杭の余盛コンクリートを除去する場合を示したが、
例えば地中連続壁のような地中にコンクリートを打設し
て構築するコンクリート構築物の余盛コンクリートを同
様に除去することができる。
In the above-mentioned embodiment, the gutter-shaped discharge chute 10 having a U-shaped cross section is continuously provided at the upper end of the casing 7 as the discharge mechanism. However, a pipe or a hose may be considered as the discharge mechanism. In this case, for example, a pipe or a hose may be attached to the upper end of the casing 7 via a rotary joint. Further, although the screw pump 6 is fixed to the elevating arm 4, instead of this, the screw pump may be fixed to an arm or the like provided in a backhoe or a crane so as to be able to move up and down. In addition, in the above-mentioned example, the case of removing the extra embankment concrete of the cast-in-place concrete pile was shown
For example, surplus concrete of a concrete structure constructed by pouring concrete into the ground such as an underground continuous wall can be similarly removed.

〔発明の効果〕〔The invention's effect〕

以上のように、請求項1のスクリューポンプによる余盛
コンクリートの処理工法は、打設したコンクリートの余
盛部分をケーシングとオーガーで構成したスクリューポ
ンプで搬送除去するようにしたので、余盛コンクリート
の除去がコンクリート打設直後に行なえ、ハツリ作業が
一切不要になり、作業効率の大幅な向上と作業コストの
低減を図ることができると共に、深い場所でも余盛コン
クリートを除去でき、また余盛部分のみを正確に除去で
きる。
As described above, in the method for treating excess concrete using the screw pump of claim 1, the excess portion of the placed concrete is conveyed and removed by the screw pump configured by the casing and the auger. Removal can be done immediately after placing concrete, no chipping work is required, work efficiency can be greatly improved and work cost can be reduced.Excessive concrete can be removed even in a deep place, and only extra parts can be removed. Can be removed accurately.

しかも、スクリューポンプの構成に用いるケーシングと
オーガーは、土木工事において広く汎用されている部材
であり、これらの部材を利用することにより新たな設備
コストの発生を押さえて余盛部分の除去が行える。
Moreover, the casing and the auger used for the construction of the screw pump are members that are widely used in civil engineering work, and by using these members, it is possible to suppress the generation of new equipment costs and remove the excess portion.

また、請求項2の余盛コンクリートの除去装置によれ
ば、上記処理工法に最適な装置を提供することができ
た。
Further, according to the excess concrete removing device of the second aspect, it is possible to provide the most suitable device for the processing method.

【図面の簡単な説明】[Brief description of drawings]

第1図乃至第7図の各々は場所打コンクリート杭の施工
順序を示す工程図、第8図は除去装置の使用状態を示す
平面図、第9図は同上の斜視図である。 1……除去装置、6……スクリューポンプ、A……杭頭
レベル、B……余盛、C……コンクリート杭。
1 to 7 are process drawings showing the order of construction of cast-in-place concrete piles, FIG. 8 is a plan view showing the usage state of the removing device, and FIG. 9 is a perspective view of the same. 1 ... removing device, 6 ... screw pump, A ... pile head level, B ... overfill, C ... concrete pile.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】ケーシング内にオーガーを収納し、このオ
ーガーを駆動機で回転させるスクリューポンプを用い、
このスクリューポンプをコンクリート構築物の余盛部分
の直上に垂直で上下動するよう配置し、該スクリューポ
ンプを下降動させてその下端取込口を余盛部分の最下層
付近まで侵入させ、このスクリューポンプのオーガーを
回転させて余盛部分をコンクリートの凝固前に搬送除去
することを特徴とするスクリューポンプによる余盛コン
クリートの処理工法。
1. A screw pump in which an auger is housed in a casing, and the auger is rotated by a driving machine,
This screw pump is arranged so as to vertically move vertically above the extra portion of the concrete structure, and the screw pump is moved downward so that the intake port at the lower end of the screw pump penetrates to the vicinity of the bottom layer of the extra portion. The method for treating excess concrete using a screw pump, characterized in that the auger is rotated to convey and remove the excess portion before the concrete solidifies.
【請求項2】コンクリート構築物の余盛部分の上側方に
おいて昇降自在に支持された昇降アームと、この昇降ア
ームに固定されたスクリューポンプとを備え、上記スク
リューポンプは、上端部が上記昇降アームに取り付けら
れたケーシングと、このケーシングの内部に収納された
オーガと、上記昇降アームに取り付けられ且つオーガを
回転させる駆動機と、上記ケーシングの上端部に連設さ
れた排出機構とを備えることを特徴とする余盛コンクリ
ートの除去装置。
2. An elevating arm that is supported so as to be able to ascend and descend above a surplus portion of a concrete structure, and a screw pump that is fixed to the elevating arm. The screw pump has an upper end portion that is attached to the elevating arm. A casing attached to the casing; an auger housed inside the casing; a drive unit attached to the elevating arm and rotating the auger; and a discharge mechanism connected to the upper end of the casing. Excessive concrete removal equipment to be used.
JP9218988A 1988-04-13 1988-04-13 Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor Expired - Fee Related JPH0718152B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9218988A JPH0718152B2 (en) 1988-04-13 1988-04-13 Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9218988A JPH0718152B2 (en) 1988-04-13 1988-04-13 Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor

Publications (2)

Publication Number Publication Date
JPH01263314A JPH01263314A (en) 1989-10-19
JPH0718152B2 true JPH0718152B2 (en) 1995-03-01

Family

ID=14047489

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9218988A Expired - Fee Related JPH0718152B2 (en) 1988-04-13 1988-04-13 Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor

Country Status (1)

Country Link
JP (1) JPH0718152B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2659675B2 (en) * 1993-09-07 1997-09-30 川崎重工業株式会社 Method for forming outer cylinder of screw pump and form structure for forming outer cylinder
JP6960771B2 (en) * 2017-05-22 2021-11-05 清水建設株式会社 Construction method of cast-in-place concrete pile
JP7271002B2 (en) * 2021-08-31 2023-05-11 東洋テクノ株式会社 Formwork for cast-in-place steel pipe concrete piles and method for constructing surplus portion of cast-in-place steel pipe concrete piles

Also Published As

Publication number Publication date
JPH01263314A (en) 1989-10-19

Similar Documents

Publication Publication Date Title
JP6645098B2 (en) Removal method of existing pile
JPH0718152B2 (en) Excessive concrete treatment method using a screw pump and excess concrete removing device used therefor
JP6077616B1 (en) Placing casing for pile construction
JP2640841B2 (en) Slime treatment method in cast-in-place pile method
JPH0776845A (en) How to lay open caisson
JP3418343B2 (en) Earth retaining wall formation method in root cutting method
CN110258653A (en) Connecting device and construction method for pile foundation construction in basement
JPH07268878A (en) Method for immersing caisson and structure of cutting face of caisson
JP3471742B2 (en) Continuous underground wall construction method
JP2006322190A (en) Pile head processing method of cast-in-place concrete pile and concrete processing agent mixing device
JPH01310011A (en) Underground continuous wall construction
JP2937766B2 (en) Continuous underground wall construction method
JPS5820819A (en) Method and apparatus for injecting grout into ground
JP2640419B2 (en) Pile head processing equipment
JP7631482B1 (en) Cast-in-place concrete pile construction method
JPS63156114A (en) Construction of cast-in-place pile
JPH079091B2 (en) Soil cement construction method
JPS598826A (en) Construction of underground wall by excavation of inside of pc plate
JPH08209687A (en) Partial casing pile method
JPH0567733B2 (en)
JPH0776844A (en) How to lay open caisson
JPS6229613A (en) Constructing method for concrete pile
JPH10121465A (en) Continuos underground wall engineering method
JPH08209678A (en) Ground improvement method and construction method of pile or underground wall
JPS61146913A (en) Method of disposing extra banking concrete in underwater concrete

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees