Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH063049B2 - Assembly type structure - Google Patents
[go: Go Back, main page]

JPH063049B2 - Assembly type structure - Google Patents

Assembly type structure

Info

Publication number
JPH063049B2
JPH063049B2 JP61176174A JP17617486A JPH063049B2 JP H063049 B2 JPH063049 B2 JP H063049B2 JP 61176174 A JP61176174 A JP 61176174A JP 17617486 A JP17617486 A JP 17617486A JP H063049 B2 JPH063049 B2 JP H063049B2
Authority
JP
Japan
Prior art keywords
stanchion
stanchions
depth direction
floor
bases
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61176174A
Other languages
Japanese (ja)
Other versions
JPS6332033A (en
Inventor
興次 石原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mabuchi KK
Original Assignee
Mabuchi KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mabuchi KK filed Critical Mabuchi KK
Priority to JP61176174A priority Critical patent/JPH063049B2/en
Publication of JPS6332033A publication Critical patent/JPS6332033A/en
Publication of JPH063049B2 publication Critical patent/JPH063049B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Control Of Motors That Do Not Use Commutators (AREA)

Description

【発明の詳細な説明】 発明に関係する分野 この発明は、駐車場、倉庫などとして利用される組立型
構造物に関する。
TECHNICAL FIELD The present invention relates to an assembled structure used as a parking lot, a warehouse, or the like.

背景技術 近年、自動車の船積や仮設駐車場には、二段、若しく
は、三段に立体的に組み立てられる組立型デッキが普及
してきている。
BACKGROUND ART In recent years, assembled decks that are three-dimensionally assembled in two or three stages have become widespread in the shipping of cars and temporary parking lots.

この種の組立型デッキは、実公昭51-1160号公報や実公
昭51-7719号公報に開示されるように、奥行方向におい
て、隣り合った支柱間に筋違いを配置する構造であるの
で、設置の際、その支柱間の位置決めが厄介で、また、
船の揺れや地震に対する強度の確保に難があり、さらに
は、そのデッキにおける自動車の移動はその筋違いによ
って制限される不具合がある。
As disclosed in Japanese Utility Model Publication No. 51-1160 and Japanese Utility Model Publication No. 51-7719, this type of assembled deck has a structure in which striations are arranged between adjacent columns in the depth direction. At that time, positioning between the columns is troublesome, and
It is difficult to secure the strength against the shaking of the ship and the earthquake, and furthermore, the movement of the car on the deck is restricted due to the misalignment.

特に、支柱受けで上下方向に継ぎ合わせられる支柱が使
用されるので、その支柱では、船の揺れや地震の際、荷
重を充分に支えるデッキ構造にするのが厄介になり、そ
の結果、そのデッキに充分な強度を確保するには、デッ
キ構造が複雑化され、また、過度にその支柱が大型化さ
れる。
In particular, since the columns that are vertically joined by the column receivers are used, it is difficult to use a deck structure that can sufficiently support the load when the ship shakes or an earthquake occurs. In order to secure sufficient strength, the deck structure is complicated and the columns are excessively enlarged.

発明の目的・課題 この発明の目的・課題は、支柱の過度の大型化および構
造物の複雑化を回避して船の揺れや地震のような振動を
吸収緩和し、船の揺れや地震に対する強度を確保し、そ
して、船の揺れや地震の際にも荷重を充分に支え、ま
た、設置の際、その支柱の位置決めを簡単にし、そし
て、設置作業や撤去作業を安全で迅速になし、さらに、
必要に応じて二段、三段に立体的に組み立てることを容
易にし、フロア上に自動車の移動や荷物の運搬を自由に
し、そして、駐車デッキ、格納庫、駐車場、倉庫などに
利用可能にするところの組立型構造物の提供にある。
Objects and problems of the invention The object and problems of the present invention are to absorb vibrations such as ship shakes and earthquakes by avoiding excessive enlargement of pillars and complication of structures, and strength against ship shakes and earthquakes. And supports the load sufficiently even in the case of a ship shake or an earthquake, and makes it easy to position the support pillars during installation, and makes installation and removal work safe and speedy. ,
Makes it easy to assemble in two or three tiers as needed, makes it easy to move cars or carry luggage on the floor, and makes it available for parking decks, hangars, parking lots, warehouses, etc. The purpose is to provide an assembled structure.

目的・課題に係る発明の概要: 請求する発明の内容 上述の目的・課題に関連して、この発明の組立型構造物
は、上面に適宜の間隔で突き出される少なくとも一対の
スタンション・サポートを有し、そして、設置箇所にお
いて間口方向および奥行方向に適宜の間隔で配置される
多数のスタンション・ベースと、下端がそのスタンショ
ン・サポートに取り外し可能に連結されてそのスタンシ
ョン・ベースに支持される多数のスタンションと、その
間口方向において隣り合ったそのスタンション・ベース
に配置されるそのスタンション間に取り外し可能に連結
される多数のメイン・ビームと、その多数のスタンショ
ンの上方部分の外側に嵌め合わせられてその上方部分の
外周面に溶接され、そして、その多数のスタンションお
よびメイン・ビームにおいてそのスタンションとそのス
タンションに連結されるそのメイン・ビームとの間に配
置されるニー・ブレイスの下端を固定的に連結する多数
の短い補強スリーブと、その間口方向には適宜の間隔を
置かれ、そして、その奥行方向においてそのメイン・ビ
ーム間に取り外し可能に配置される多数のクロス・ビー
ムと、そのクロス・ビーム上に取り外し可能に配置され
る上階フロアと、その奥行方向において隣り合ったその
スタンション・ベースに配置されるそのスタンションの
下端側間に取り外し可能に連結される多数のスタンショ
ン・スパン・ロッドとを含んで構成し、その短い補強ス
リーブが、そのニー・スレイブを経てそのメイン・ビー
ム側からそのスタンションに伝わる振動を分散し、ま
た、その振動の一部分を吸収緩和してそのスタンション
を補強し、そして、そのスタンション・スパン・ロッド
が、その奥行方向に突張りとしてそのスタンション間に
作用して船の揺れや地震に対する強度を確保し、また、
そのスタンション・スパン・ロッドが、そのスタンショ
ンの位置決めを簡単にしてそのスタンション間に筋違い
を張る作業を容易にするところである。
SUMMARY OF THE INVENTION FOR OBJECTS AND PROBLEMS Content of Claimed Invention In relation to the above objects and problems, the assembly-type structure of the present invention has at least a pair of stanchion supports projecting from the upper surface at appropriate intervals. And a large number of stanchion bases that are arranged at appropriate intervals in the frontage direction and the depth direction at the installation location, and a large number of stanchion bases that are detachably connected at their lower ends to the stanchion support. A stanchion, a number of main beams removably connected between the stanchions arranged on the stanchion bases that are adjacent to each other in the front direction, and a main beam that is fitted on the outside of the upper part of the stanchions. Welded to the outer surface of the upper part, and its numerous stanchions and main beams At this time, a number of short reinforcing sleeves for fixedly connecting the lower end of the knee brace arranged between the stanchion and the main beam connected to the stanchion, and an appropriate gap in the front direction. And a number of cross beams removably disposed between the main beams in the depth direction, and an upper floor detachably disposed on the cross beams, and adjacent in the depth direction. It comprises a number of stanchion span rods that are removably connected between the lower ends of the stanchions located on the stanchion base, with its short reinforcing sleeve passing through its knee-slave to its main・ Disperses the vibration transmitted from the beam side to the stanchion, and absorbs and relaxes a part of the vibration. Reinforce the stanchion, and the stanchion span rod acts as a bulge in the depth direction between the stanchions to secure the strength against shaking and earthquake of the ship, and
The stanchion span rod is where the positioning of the stanchion is simplified and the task of straining between the stanchions is facilitated.

具体例の説明 以下、この発明の組立型構造物の特定された具体例につ
いて、図面を参照して説明する。
Description of Specific Examples Hereinafter, specific examples of the assembled structure according to the present invention will be described with reference to the drawings.

第1ないし3図は、組立型駐車場に具体化されたこの発
明の組立型構造物の具体例10を示している。
1 to 3 show Embodiment 10 of the assembled structure of the present invention embodied in an assembled parking lot.

その組立型駐車場10は、設置箇所40において、間口
方向および奥行方向に適宜の間隔で配置される多数のス
タンション・ベース11と、そのスタンション・ベース
11に組み付けられて支持される多数のスタンション1
2と、その間口方向において、隣り合ったそのスタンシ
ョン・ベース11に配置されるそのスタンション12間
に取り外し可能に連結される多数のメイン・ビーム13
と、その多数のスタンション12の上方部分に嵌め合わ
せられてその上方部分の外周面に溶接される多数の短い
補強スリーブ23と、その間口方向には適宜の間隔を置
かれ、そして、その奥行方向においてそのメイン・ビー
ム13間に取り外し可能に配置される多数のクロス・ビ
ーム14と、そのクロス・ビーム14上に取り外し可能
に配置される上階フロア15と、その奥行方向において
隣り合ったそのスタンション・ベース11に配置される
そのスタンション12の下端側間に取り外し可能に連結
される多数のスタンション・スパン・ロッド16と、そ
の奥行方向において隣り合ったそのスタンション12間
にそれぞれ張られる一対のブレイス17と、多数のガタ
ー18と、そのガター18の端部に接続される多数のダ
ウン・パイプ(図示せず)とを含んで組み立てられる。
The assembly-type parking lot 10 has a large number of stanchion bases 11 arranged at appropriate intervals in a frontage direction and a depth direction at an installation location 40, and a large number of stanchions 1 assembled and supported on the stanchion base 11.
2 and a plurality of main beams 13 that are detachably connected between the stanchions 12 arranged on the stanchion bases 11 that are adjacent to each other in the front direction.
And a number of short reinforcing sleeves 23 fitted to the upper portions of the stanchions 12 and welded to the outer peripheral surface of the upper portions, and at appropriate intervals in the front direction, and in the depth direction thereof. , A plurality of cross beams 14 removably disposed between the main beams 13, an upper floor 15 removably disposed on the cross beams 14, and the stanchions adjacent to each other in the depth direction. A large number of stanchion span rods 16 that are detachably connected between the lower ends of the stanchions 12 arranged on the base 11, and a pair of braces 17 that are respectively stretched between the stanchions 12 that are adjacent in the depth direction. And a number of gutters 18 and a number of down pipes connected to the ends of the gutters 18 (see Assembled include without) and.

そのスタンション・ベース11は、厚肉鋼板を所定の寸
法に切断した方形プレートからなり、上面に適宜の間隔
で突出された一対のスタンション・サポート20および
ブラケット21を備え、また、周囲には、複数のボルト
孔(図示せず)が適宜の間隔で穴明けされている。
The stanchion base 11 is composed of a rectangular plate obtained by cutting a thick steel plate into a predetermined size, and is provided with a pair of stanchion supports 20 and brackets 21 protruding at appropriate intervals on the upper surface. Bolt holes (not shown) are drilled at appropriate intervals.

そのスタンション・サポート20は、スチール・パイプ
を所定の長さに切断した短管からなり、そのスタンショ
ン・ベース11の上面に溶接されている。また、そのブ
ラケット21は、厚肉鋼板を所定の寸法に切断した略逆
台形プレートからなり、両側にボルト孔22をそれぞれ
穴明けしている。
The stanchion support 20 is made of a short pipe obtained by cutting a steel pipe into a predetermined length, and is welded to the upper surface of the stanchion base 11. The bracket 21 is formed of a substantially inverted trapezoidal plate obtained by cutting a thick steel plate into a predetermined size, and has bolt holes 22 on both sides.

そのように構成されたそのスタンション・ベース11で
は、一対のスタンション12の下端が設置箇所40に固
定可能になり、また、一対のスタンション・ベース11
がボルトーナット手段で背中合わせに締め付けられるな
らば、対になったスタンション・ベース11、11は、
そのスタンション12を上下方向に継ぎ合わせ可能に
し、多数階の構造物を容易に組み立て可能にする。
In the stanchion base 11 thus configured, the lower ends of the pair of stanchions 12 can be fixed to the installation place 40, and the pair of stanchion bases 11 can be fixed.
If the bolts and nuts are tightened back to back, the pair of stanchion bases 11, 11
The stanchions 12 can be joined in the vertical direction, and a multi-story structure can be easily assembled.

そのスタンション12は、所定の長さに切断されるスチ
ール・パイプが使用され、そして、横力に抵抗して変形
を防ぐニー・ブレイス19の下端を固定するところの上
方部分の外側にその補強スリーブ23を嵌め合わせてそ
の補強スリーブ23をその上方部分の外周面に溶接する
ところの補強構造が採用される。
The stanchion 12 uses a steel pipe that is cut to length and has its reinforcing sleeve outside the upper portion where the lower end of the knee brace 19 is secured to resist lateral forces and prevent deformation. A reinforcing structure in which the reinforcing sleeve 23 is fitted and the reinforcing sleeve 23 is welded to the outer peripheral surface of the upper portion thereof is adopted.

そして、そこでは、その補強スリーブ23は、短いスチ
ール・スリーブが使用され、その多数のスタンション1
2の上方部分の外側に嵌め合わせられてその上方部分の
外周面に溶接され、そして、その多数のスタンション1
2およびメイン・ビーム13においてそのスタンション
12とそのスタンション12に連結されるそのメイン・
ビーム13との間に配置されるそのニー・ブレイス19
の下端を固定的に連結する。具体的には、その短い補強
スリーブ23は、所定の位置にブラケット24を溶接し
てそのブラケット24にそのニー・ブレイス19の下端
を連結させる。
And, there, a short steel sleeve is used as the reinforcing sleeve 23, and the large number of stanchions 1
2 is fitted on the outside of the upper part of the upper part and welded to the outer peripheral surface of the upper part of the upper part of the stanchion 1.
2 and its main stanchion 12 in the main beam 13 and its main
The knee brace 19 placed between the beam 13
The lower end of is fixedly connected. Specifically, the short reinforcing sleeve 23 welds the bracket 24 at a predetermined position and connects the lower end of the knee brace 19 to the bracket 24.

そして、そのようにそのスタンション12の上方部分の
外側に嵌め合わせられてその上方部分の外周面に溶接さ
れるところのその短い補強スリーブ23は、そのニー・
ブレイス19を経てそのメイン・ビーム13からそのス
タンション12に伝わる荷重および振動を分散させ、ま
た、その荷重および振動の一部分を吸収緩和させる。そ
の結果、そのスタンション12はその短い補強スリーブ
23で補強される。
The short reinforcing sleeve 23, which is thus fitted on the outside of the upper portion of the stanchion 12 and welded to the outer peripheral surface of the upper portion, is
The load and vibration transmitted from the main beam 13 to the stanchion 12 via the brace 19 are dispersed, and a part of the load and vibration is absorbed and relaxed. As a result, the stanchion 12 is reinforced with the short reinforcing sleeve 23.

また、このスタンション12は、そのスチール・スリー
ブ23から上方に適宜の間隔を置かれて上端側にスチー
ル・リング25を嵌め合わせ、そのスチール・リング2
5をその上端側の外周面に溶接し、そのメイン・ビーム
13の端部を載せるようにして、そのメイン・ビーム1
3を連結可能にしている。
Further, the stanchion 12 has a proper distance above the steel sleeve 23 and a steel ring 25 is fitted to the upper end side of the steel ring 23.
5 is welded to the outer peripheral surface on the upper end side of the main beam 1 so that the end of the main beam 13 is placed thereon.
3 can be connected.

そのメイン・ビーム13は、所定の長さに切断された角
形スチール・パイプからなり、両端には、スチール製の
連結スリーブ26をそれぞれ溶接している。勿論、その
メイン・ビーム13の長さは、間口方向におけるスタン
ション間隔に合わせられてあり、また、その連結スリー
ブ26はそのスタンション12の上端部分に嵌め合わせ
て、そのスチール・リング25に載せられ、その間口方
向において、隣り合ったそのスタンション・ベース11
に配置されてあるそのスタンション11間にそのメイン
・ビーム12を取り外し可能に連結可能にする。
The main beam 13 is made of a rectangular steel pipe cut into a predetermined length, and steel connecting sleeves 26 are welded to both ends thereof. Of course, the length of the main beam 13 is adjusted to the distance between the stanchions in the front direction, and the connecting sleeve 26 is fitted on the upper end portion of the stanchion 12 and placed on the steel ring 25. The stanchion bases 11 that are adjacent to each other in the width direction
The main beam 12 is removably connectable between the stanchions 11 located in the.

さらに、そのメイン・ビーム13は、両端側にブラケッ
ト27、27を溶接してあって、そのニー・ブレイス1
9の上端を連結可能にしている。
Further, the main beam 13 has brackets 27, 27 welded to both ends thereof, so that the knee brace 1
The upper end of 9 can be connected.

そのクロス・ビーム14は、所定の長さに切断された角
形スチール・パイプからなり、奥行方向におけるそのメ
イン・ビーム13のスパンに合わせられた間隔でジョイ
ント切欠き(図示せず)が形成されてあって、そのメイ
ン・ビーム13をそのジョイント切欠きに嵌め合わせ
て、そのメイン・ビーム13間に架設可能にしている。
The cross beam 14 is made of a rectangular steel pipe cut to a predetermined length, and has joint cutouts (not shown) formed at intervals corresponding to the span of the main beam 13 in the depth direction. Therefore, the main beam 13 is fitted into the joint notch so that it can be installed between the main beams 13.

その上階フロア15は、第1図に示されるように、その
間口方向であって、その一対のスタンション12,12
の奥行方向の並び上に所定の間隔を置かれ、かつ、第2
図に示されるように、その奥行方向に順次重ね継ぎに並
べられた多数のフロア・ブロツク28と、そのフロア・
ブロツク28の間隔において、その奥行方向に突き合わ
せに並べられた多数のサブ・フロア・パネル33とより
構成されている。
The upper floor 15 is, as shown in FIG. 1, in the direction of the frontage, and the pair of stanchions 12, 12 is formed.
At a predetermined interval on the row in the depth direction of the
As shown in the figure, a large number of floor blocks 28 arranged in a lap joint in the depth direction and the floor blocks 28
It is composed of a large number of sub-floor panels 33 arranged in abutting relation in the depth direction at intervals of the blocks 28.

そのフロア・ブロツク28は、フレーム29とフロア・
パネル30とより組み立てられ、そのフレーム29は、
所定の長さに切断された角形スチール・パイプの適宜の
数から枠組みに溶接されている。
The floor block 28 has a frame 29 and a floor
It is assembled with the panel 30 and its frame 29 is
Welded to the framework from a suitable number of square steel pipes cut to length.

また、そのフロア・パネル30は、鋼板をプレス機で曲
げ加工したもので、その鋼板の3辺のそれぞれにおい
て、その鋼板の側縁部分を折り曲げて、その鋼板の上面
に開口されたパネル・ジョイント・チャンネル31と、
その鋼板の残りの1辺において、その鋼板の側縁部分を
その鋼板の下面に折り曲げられたパネル・ジョイント・
フランジ32とより構成されている。
Further, the floor panel 30 is made by bending a steel plate with a press machine, and at each of the three sides of the steel plate, a side edge portion of the steel plate is bent to form a panel joint opened on the upper surface of the steel plate.・ Channel 31
A panel joint in which the side edge portion of the steel plate is bent to the lower surface of the steel plate on the remaining one side of the steel plate.
It is composed of a flange 32.

そのような構造のフレーム29およびフロア・パネル3
0から組み立てられ、そのクロス・ビーム14上に並べ
られる多数のフロア・ブロツク28は、互いに隣接され
たフロア・ブロツク28において、一方のフロア・ブロ
ツク28のフロア・パネル30のパネル・ジョイント・
チャンネル31に他方のフロア・ブロツク28のフロア
・パネル30のパネル・ジョイント・フランジ32を嵌
め合わせて重ね継ぎされ、雨水をそのパネル・ジョイン
ト・チャンネル31に溜めるようにしている。勿論、そ
の雨水はそのパネル・ジョイント・チャンネル31から
ガター18およびダウン・パイプを経て地上に流れる。
Frame 29 and floor panel 3 having such a structure
A number of floor blocks 28 assembled from 0 and arranged on the cross beam 14 of the floor block 30 of one floor block 28 of the panel joint 30 of the floor panel 30 of one floor block 28 adjacent to each other.
The channel joint 31 is fitted with the panel joint flange 32 of the floor panel 30 of the other floor block 28 so that the rainwater can be collected in the panel joint channel 31. Of course, the rainwater flows from the panel joint channel 31 to the ground through the gutter 18 and the down pipe.

そのサブ・フロア・パネル33は、細長く切断された鋼
板片の長さ方向側縁部分を下面にプレス機で折り曲げ加
工したもので、その折り曲げられたフランジ33をその
フロア・ブロツク28のフロア・パネル30のパネル・
ジョイント・チャンネル31に嵌め合わせてそのフロア
・ブロツク28、28間に重ね継ぎされ、上階フロア1
5を平坦仕上げ可能にする。
The sub-floor panel 33 is formed by bending a longitudinally-cut side edge portion of a strip of steel plate into a lower surface with a press machine. 30 panels
Fitted to the joint channel 31 and spliced between the floor blocks 28, 28, the upper floor 1
5 can be finished flat.

そのスタンション・スパン・ロッド16は、第3図から
理解されるように、所定の長さに切断されたスチール・
パイプの両端部分を板状に押し潰し、ボルト孔36をそ
れぞれ穴明けしたアイ・エンド35、35を備えた構造
に製作され、その奥行方向におけるスタンション12の
間隔を決定すると同時に、そのスタンション12とその
スタンション12とを互いに強固に連結可能にする。勿
論、そのスタンション・スパン・ロッド16は、隣り合
ったそのスタンション・ベース11のブラケット21の
ボルト孔22にそのアイ・エンド35、35のボルト孔
36を合わせ、ボルトーナット手段で締め付けられて、
そのスタンション12とそのスタンション12とを互い
に強固に連結する。
The stanchion span rod 16 is made of steel, cut to length, as can be seen from FIG.
Both ends of the pipe are crushed into a plate shape, and the structure is provided with eye ends 35 and 35 in which bolt holes 36 are respectively drilled, and at the same time determines the interval of the stanchions 12 in the depth direction, The stanchion 12 can be firmly connected to each other. Of course, the stanchion span rod 16 is fitted with the bolt holes 22 of the bracket 21 of the adjacent stanchion base 11 with the bolt holes 36 of the eye ends 35, 35, and is tightened by bolt-nut means.
The stanchion 12 and the stanchion 12 are firmly connected to each other.

従って、そのスタンション・スパン・ロッド16が使わ
れるこの組立型駐車場10では、頑丈な組立構造物にな
り、また、組立作業が非常に容易になり、その作業能率
が向上される。
Therefore, in this assembling type parking lot 10 in which the stanchion span rod 16 is used, it becomes a sturdy assembling structure, the assembling work becomes very easy, and the work efficiency thereof is improved.

そのブレイス17は、一端にフックを備え、他端にねじ
切りされたブレイス・ロッド37、38と、そのブレイ
ス・ロッド37、38のねじ部分に結合されたターン・
バックル39とよりなり、第2図に示されるように、互
いに隣り合ったそのスタンション12を嵌め合わせたス
タンション・ベース11のブラケット21間に張られ
る。
The brace 17 has a hook at one end and a brace rod 37, 38 threaded at the other end and a turn rod connected to the threaded portion of the brace rod 37, 38.
As shown in FIG. 2, the buckle 39 is stretched between the brackets 21 of the stanchion base 11 to which the stanchions 12 adjacent to each other are fitted.

そのガター18は、そのサブ・フロア・パネル33およ
びフロア・パネル30のパネル・ジョイント・チャンネ
ル31、31の下方であって、その奥行方向に伸長され
て、そのスタンション12上間に配置されている。
The gutter 18 is disposed below the panel joint channels 31, 31 of the sub-floor panel 33 and the floor panel 30, extends in the depth direction thereof, and is disposed above the stanchion 12. .

また、このガター18は、雨水を地上に流すために、端
部にそのダウン・パイプを接続している。
Also, this gutter 18 has its down pipe connected to the end portion thereof in order to flow rainwater to the ground.

次に、上述の構成になるその組立型駐車場10の組立作
業について述べるに、先ず、設置箇所40において、多
数のスタンション・ベース11を間口方向および奥行方
向に適宜の間隔で配置し、第2図に示されるように、奥
行方向において、隣り合ったスタンション・ベース11
のブラケット21間にスタンション・スパン・ロッド1
6の両端をボルトーナット手段で仮りに連結する。
Next, a description will be given of the assembling work of the assembling type parking lot 10 having the above-mentioned configuration. First, at the installation location 40, a large number of stanchion bases 11 are arranged at appropriate intervals in the width direction and the depth direction. As shown in the figure, adjacent stanchion bases 11 in the depth direction
Stanchion span rod 1 between brackets 21
Both ends of 6 are temporarily connected by bolt-nut means.

次に、そのスタンション・ベース11のスタンション・
サポート20、20にスタンション12、12の下端を
差し込み、そのスタンション・ベース11に一対のスタ
ンション12、12を組み付ける。
Next, the stance of the stanchion base 11
The lower ends of the stanchions 12 and 12 are inserted into the supports 20 and 20, and the pair of stanchions 12 and 12 is attached to the stanchion base 11.

そのように、そのスタンション・ベース11に一対のス
タンション12、12を立てながら、その間口方向にお
いて、隣り合ったそのスタンション・ベース11、11
のスタンション12、12の上端に連結スリーブ26、
26をを嵌めあわせて、その連結スリーブ26、26を
そのスタンション12、12のスチール・リング25、
25に載せ、そのスタンション12、12間にそのメイ
ン・ビーム13を架設する。
Thus, while the pair of stanchions 12 and 12 are set up on the stanchion base 11, the stanchion bases 11 and 11 that are adjacent to each other in the frontage direction.
The stanchions 12, 12 of the connecting sleeve 26,
26, and the connecting sleeves 26, 26 of the stanchions 12, 12 of the steel ring 25,
25, and the main beam 13 is installed between the stanchions 12 and 12.

そのようにメイン・ビーム13が架設されてきたなら
ば、そのスタンション・ベース11において、一対のス
タンション12、12の上端をスタンション・サポート
20、20に嵌め合わせながら、そのスタンション・サ
ポート20、20をそのメイン・ビーム13、13の連
結スリーブ26、26に嵌め合わせ、そのメイン・ビー
ム13、13をそれぞれ連結したその一対のスタンショ
ン12、12間にスタンション・ベース11を組み付け
る。
If the main beam 13 has been installed in such a manner, the stanchion support 11 is fitted on the upper ends of the pair of stanchions 12 and 12 on the stanchion base 11 while the stanchion supports 20 and 20 are fitted. The stanchion base 11 is assembled between the pair of stanchions 12, 12 connecting the main beams 13 and 13 by fitting the main beams 13 and 13 onto the connecting sleeves 26 and 26.

また、そのように、そのスタンション12の下端をその
スタンション・ベース11に、そのメイン・ビーム13
をスタンション12、12の上端間に、そして、そのス
タンション・ベース11を一対のスタンション12、1
2の上端間に順次組み付けながら、そのクロス・ビーム
14をその間口方向には適宜の間隔を置き、その奥行方
向には、ジョイント切欠きをそのメイン・ビーム13に
嵌め合わせて、そのメイン・ビーム13間に架設する。
Also, as described above, the lower end of the stanchion 12 is attached to the stanchion base 11, and the main beam 13 is
Between the upper ends of the stanchions 12 and 12, and the stanchion base 11 with a pair of stanchions 12, 1
Assembling the cross beams 14 at appropriate intervals in the front direction while assembling them between the upper ends of the two, and fitting the joint notch to the main beam 13 in the depth direction, Install between 13

そのように、多数のクロス・ビーム14がそのメイン・
ビーム13間に架設されてきたならば、間口方向におい
ては、第1図に示されるように、そのスタンション12
とそのメイン・ビーム13との間にそのターン・バック
ル付きニー・ブレイス19が仮りに組み付けられ、そし
て、奥行方向においても、第2図に示されるように、隣
り合ったスタンション12、12において、下方のスタ
ンション・ベース11のブラケット21と上方のスタン
ション・ベース11のブラケット21との間にブレイス
17、17が仮りに組み付けられ、さらに、一対のスタ
ンション12、12においては、下端のスタンション・
ベース11のブラケット21と上端のスタンション・ベ
ース11のブラケット21との間にターン・バックル付
きテンション・ロッド(図示せず)が仮に組み付けられ
る。
As such, a large number of cross beams 14
If it has been installed between the beams 13, in the direction of the frontage, as shown in FIG.
The knee brace 19 with a turn buckle is tentatively assembled between the main beam 13 and the main beam 13, and also in the depth direction, as shown in FIG. The braces 17, 17 are temporarily assembled between the bracket 21 of the lower stanchion base 11 and the bracket 21 of the upper stanchion base 11, and further, in the pair of stanchions 12, 12, the stanchion of the lower end is formed.
A tension rod (not shown) with a turn buckle is temporarily assembled between the bracket 21 of the base 11 and the bracket 21 of the upper stanchion base 11.

次いで、第1および2図から理解されるように、そのガ
ター18を奥行方向に伸長させ、その一対のスタンショ
ン12、12の上端間を連結したスタンション・ベース
11上間に配置して、そのスタンション・ベース11に
仮り止めし、そのガター18の両端にダウン・パイプを
接続する。勿論、そのダウン・パイプはそのスタンショ
ン12に沿わせられて、そのスタンション12に止めら
れる。
Then, as can be understood from FIGS. 1 and 2, the gutter 18 is extended in the depth direction, and the gutter 18 is arranged between the upper ends of the pair of stanchions 12 and 12 above the stanchion base 11 and the stanchion is formed. -Temporarily fix to the base 11 and connect the down pipes to both ends of the gutter 18. Of course, the down pipe is stopped along the stanchion 12 along the stanchion 12.

そのように多数のガター18が配置されてきたならば、
その間口方向、すなわち、そのガター18間であって、
その奥行方向において、フロア・ブロック28のフロア
・パネル30のパネル・ジョイント・チャンネル31に
隣接されたフロア・ブロック28のフロア・パネル30
のパネル・ジョイント・フランジ32を嵌め合わせなが
ら、多数のフロア・ブロック28を順次重ね継ぎして、
そのクロス・ビーム14上に並べる。
If so many gutters 18 have been placed,
In the front direction, that is, between the gutters 18,
The floor panel 30 of the floor block 28 adjacent to the panel joint channel 31 of the floor panel 30 of the floor block 28 in its depth direction.
While fitting the panel joint flanges 32 of, the multiple floor blocks 28 are successively spliced together,
They are arranged on the cross beam 14.

次には、第1図に示されるように、そのガター18上に
おいて、その多数のサブ・フロア・パネル33を互いに
向い合ったフロア・ブロック28のフロア・パネル30
のパネル・ジョイント・チャンネル31に渡しながら、
奥行方向に順次突き合わせに並べる。
Next, as shown in FIG. 1, on the gutter 18, the floor panel 30 of the floor block 28 with the plurality of sub-floor panels 33 facing each other.
While passing it to the panel joint channel 31 of
Arrange them side by side in the depth direction.

その後には、そのスタンション・スパン・ロッド16、
ブレイス17、ニー・ブレイス19、テンション・ロッ
ド、ガター18などの締付けを行なって組立作業が終了
する。
After that, the stanchion span rod 16,
The assembly work is completed by tightening the braces 17, knee braces 19, tension rods, gutters 18, and the like.

上述の組立構造が採用されるこの駐車場10では、その
スタンション12は、地震の際、その上階フロア15上
の荷重を支えると同時に、そのニー・ブレイス19を経
て伝わるその上階フロア15側の荷重および振動がその
補強スリーブ23で分散され、また、その荷重および振
動の一部分がその補強スリーブ23で吸収緩和され、支
柱としての強度が補強され、そして、支柱として過度の
大型化が避けられ、それに併せてそのスタンション・ス
パン・ロッド16がその奥行方向に突張りとしてそのス
タンション12間に作用するので、構造物としての複雑
化が回避されて構造物としての強度が確保され、それに
伴って、その駐車場10は倒壊されにくくなる。
In this parking lot 10 in which the above-described assembly structure is adopted, the stanchion 12 bears the load on the upper floor 15 at the time of an earthquake and, at the same time, the upper floor 15 side transmitted via the knee brace 19 is transmitted. Load and vibration are dispersed by the reinforcing sleeve 23, a part of the load and vibration are absorbed and relaxed by the reinforcing sleeve 23, the strength of the pillar is reinforced, and the pillar is prevented from becoming excessively large. At the same time, since the stanchion span rod 16 acts as a bulge in the depth direction between the stanchions 12, complication as a structure is avoided and strength as a structure is secured. The parking lot 10 is less likely to be collapsed.

また、上述の組立作業から理解されるように、この駐車
場10では、そのスタンション・スパン・ロッド16が
使われるので、そのスタンション・ベース11の配置間
隔の位置決めが非常に簡単になり、特に、そのスタンシ
ョン・ベース11のアンカ手段が簡単にでき、若しく
は、省かれ、組立の作業能率が向上される。
Further, as can be understood from the above-mentioned assembly work, in the parking lot 10, since the stanchion span rod 16 is used, positioning of the stanchion base 11 is very easy, and in particular, The anchor means of the stanchion base 11 can be simplified or omitted, and the work efficiency of assembly is improved.

先に図面を参照して説明されたところのこの発明の特定
された具体例から明らかであるように、この発明の属す
る技術の分野における通常の知識を有する者にとって、
この発明の内容は、その発明の性質(nature)および本質
(substance)に由来し、そして、それらを内在させると
客観的に認められるその他の態様に容易に具体化され
る。勿論、この発明の内容は、その発明の課題に相応し
てその発明の成立に必須である。
As will be apparent from the specific embodiments of the present invention described above with reference to the drawings, those having ordinary skill in the art to which the present invention pertains,
The subject matter of this invention is its nature and nature.
It is easily embodied in other manners that are derived from (substance) and are objectively accepted as having them incorporated. Of course, the contents of the present invention are essential to the establishment of the invention in accordance with the problems of the invention.

発明の利便・利益 上述から理解されるように、この発明の組立型構造物
は、上面に適宜の間隔で突き出される少なくとも一対の
スタンション・サポートを有し、そして、設置箇所にお
いて間口方向および奥行方向に適宜の間隔で配置される
多数のスタンション・ベースと、下端がそのスタンショ
ン・サポートに取り外し可能に連結されてそのスタンシ
ョン・ベースに支持される多数のスタンションと、その
間口方向において隣り合ったそのスタンション・ベース
に配置されるそのスタンション間に取り外し可能に連結
される多数のメイン・ビームと、その多数のスタンショ
ンの上方部分の外側に嵌め合わせられてその上方部分の
外周面に溶接され、そして、その多数のスタンションお
よびメイン・ビームにおいてそのスタンションとそのス
タンションに連結されるそのメイン・ビームとの間に配
置されるニー・ブレイスの下端を固定的に連結する多数
の短い補強スリーブと、その間口方向には適宜の間隔を
置かれ、そして、その奥行方向においてそのメイン・ビ
ーム間に取り外し可能に配置される多数のクロス・ビー
ムと、そのクロス・ビーム上に取り外し可能に配置され
る上階フロアと、その奥行方向において隣り合ったその
スタンション・ベースに配置されるそのスタンションの
下端側間に取り外し可能に連結される多数のスタンショ
ン・スパン・ロッドとを含むので、この発明の組立型構
造物では、そのニー・ブレイスを経て伝わるその上階フ
ロア側の荷重および振動がその補強スリーブで分散さ
れ、また、その荷重および振動の一部分がその補強スリ
ーブで吸収緩和され、そのスタンションが補強されてそ
のスタンションの過度の大型化が避けられ、それに併せ
てそのスタンション・スパン・ロッドがその奥行方向に
突張りとしてそのスタンション間に作用するに伴って構
造物の複雑化が回避されて構造物の強度が確保され、特
に、船の揺れや地震に対する強度が確保されて船の揺れ
や地震の際にも荷重を充分に支えて倒壊が避けられ、ま
た、設置箇所に配置されるその多数のスタンションの位
置決めが非常に簡単になり、そして、そのスタンション
のためのアンカ手段が簡単になるか、若しくは、省か
れ、設置作業や撤去作業が安全で迅速に行なわれ、さら
に、必要に応じて、二段、三段に積み重ねて立体的に組
み立てることが非常に容易になり、そして、フロア上に
自動車の移動や荷物の運搬が自由になり、その結果、駐
車デッキ、格納庫、駐車場、および倉庫などに広く利用
可能になる。
Convenience and Benefits of the Invention As will be understood from the above, the assembled structure of the present invention has at least a pair of stanchion supports projecting from the upper surface at appropriate intervals, and at the installation site, the front direction and the depth direction. A plurality of stanchion bases arranged at appropriate intervals in the direction, and a plurality of stanchions whose lower end is detachably connected to the stanchion support and supported by the stanchion base, and a plurality of stanchions that are adjacent to each other in the front direction. A number of main beams removably connected between the stanchions arranged on the stanchion base, and a plurality of stanchions fitted on the outside of the upper part of the stanchions and welded to the outer peripheral surface of the upper part, and In its numerous stanchions and main beams that stanchion and its star A number of short reinforcing sleeves that fixedly connect the lower end of the knee brace that is placed between the main beam and the main beam, and are appropriately spaced in the direction of the frontage, and their depth. A number of cross beams that are removably arranged between the main beams in the direction, upper floors that are removably arranged on the cross beams, and the stanchion bases that are adjacent to each other in the depth direction. The assembled structure of the present invention includes a number of stanchion span rods that are removably connected between the lower ends of the stanchions that are positioned so that the upper floor side of the upper floor that travels through the knee brace. Load and vibration are distributed in the reinforcing sleeve, and a part of the load and vibration is absorbed and relaxed in the reinforcing sleeve, Of the stanchion is reinforced to prevent the stanchion from becoming excessively large, and along with this, the stanchion span rod acts as a bulge in the depth direction to prevent the structure from becoming complicated. Therefore, the strength of the structure is ensured, and in particular, the strength against the shaking of the ship and the earthquake is ensured, and the load is sufficiently supported even in the case of the shaking and the earthquake of the ship to prevent the collapse, and the structure is installed at the installation location. The positioning of its numerous stanchions is greatly simplified, and the anchoring means for that stanchion are simplified or omitted, making installation and removal work safe and quick, and Depending on the, it becomes very easy to stack in two or three stages and assemble three-dimensionally, and it becomes possible to move cars and carry luggage on the floor, As a result, the parking deck, hangars, parking, and widely made available, such as in a warehouse.

【図面の簡単な説明】[Brief description of drawings]

第1図は、組立型駐車場に具体化されたこの発明の組立
型構造物を間口方向から見た部分正面図、第2図は第1
図の2−2線に沿って示した部分断面図、および、第3
図は第1図に示す組立型駐車場に使用されたスタンショ
ン・スパン・ロッドの正面図である。 11…スタンション・ベース、12…スタンション、1
3…メイン・ビーム、14…クロス・ビーム、15…上
階フロア、16…スタンション・スパン・ロッド、40
…設置箇所。
FIG. 1 is a partial front view of an assembled structure of the present invention embodied in an assembled parking lot viewed from a frontage direction, and FIG. 2 is a first view.
Partial cross-sectional view taken along line 2-2 of the figure, and the third
The drawing is a front view of a stanchion span rod used in the assembled parking lot shown in FIG. 11 ... stanchion base, 12 ... stanchion, 1
3 ... main beam, 14 ... cross beam, 15 ... upper floor, 16 ... stanchion span rod, 40
… Installation location.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】上面に適宜の間隔で突き出される少なくと
も一対のスタンション・サポートを有し、そして、設置
箇所において間口方向および奥行方向に適宜の間隔で配
置される多数のスタンション・ベースと、 下端がそのスタンション・サポートに取り外し可能に連
結されてそのスタンション・ベースに支持される多数の
スタンションと、 その間口方向において隣り合ったそのスタンション・ベ
ースに配置されるそのスタンション間に取り外し可能に
連結される多数のメイン・ビームと、 その多数のスタンションの上方部分の外側に嵌め合わせ
られてその上方部分の外周面に溶接され、そして、その
多数のスタンションおよびメイン・ビームにおいてその
スタンションとそのスタンションに連結されるそのメイ
ン・ビームとの間に配置されるニー・ブレイスの下端を
固定的に連結する多数の短い補強スリーブと、 その間口方向には適宜の間隔を置かれ、そして、その奥
行方向においてそのメイン・ビーム間に取り外し可能に
配置される多数のクロス・ビームと、 そのクロス・ビーム上に取り外し可能に配置される上階
フロアと、 その奥行方向において隣り合ったそのスタンション・ベ
ースに配置されるそのスタンションの下端側間に取り外
し可能に連結される多数のスタンション・スパン・ロッ
ド とを含む組立型構造物。
1. A plurality of stanchion bases having at least a pair of stanchion supports projecting from the upper surface at appropriate intervals, and arranged at appropriate intervals in the front direction and the depth direction, and a lower end. Is removably connected to the stanchion support and is removably connected between the stanchions disposed on the stanchion bases that are adjacent to each other in the front direction and are supported by the stanchion base. A large number of main beams and a large number of stanchions are fitted on the outside of the upper part and welded to the outer peripheral surface of the upper part, and are connected to the stanchions and the stanchions on the large number of stanchions and main beams. Between the main beam and A number of short stiffening sleeves that fixedly connect the lower end of the knee brace and a number of releasably arranged in the depth direction and between the main beams in the depth direction. A cross beam, an upper floor detachably arranged on the cross beam, and a lower end side of the stanchions arranged on the stanchion bases adjacent to each other in the depth direction are detachably connected. Assembled structure containing multiple stanchion span rods.
JP61176174A 1986-07-26 1986-07-26 Assembly type structure Expired - Lifetime JPH063049B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61176174A JPH063049B2 (en) 1986-07-26 1986-07-26 Assembly type structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61176174A JPH063049B2 (en) 1986-07-26 1986-07-26 Assembly type structure

Publications (2)

Publication Number Publication Date
JPS6332033A JPS6332033A (en) 1988-02-10
JPH063049B2 true JPH063049B2 (en) 1994-01-12

Family

ID=16008955

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61176174A Expired - Lifetime JPH063049B2 (en) 1986-07-26 1986-07-26 Assembly type structure

Country Status (1)

Country Link
JP (1) JPH063049B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02274974A (en) * 1989-04-17 1990-11-09 Nissan Paaking Syst:Kk Self-running type builtup parking area
JP2853213B2 (en) * 1989-11-02 1999-02-03 富士通株式会社 Object reference processor

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5327674Y2 (en) * 1974-06-26 1978-07-13

Also Published As

Publication number Publication date
JPS6332033A (en) 1988-02-10

Similar Documents

Publication Publication Date Title
US6250041B1 (en) Hold down bracket
JP2603178B2 (en) Formwork equipment
US4275534A (en) Hexagonal building structures
US7325362B1 (en) Steel roof truss system
JPH06200625A (en) Frame method of arch truss construction
JP3764020B2 (en) Steel frame structure
JPH063049B2 (en) Assembly type structure
JP7365518B1 (en) Panel support material and formwork structure using it
JP2000073495A (en) Vibration control device for buildings and precast member for use in vibration control device for buildings
JP3247749B2 (en) Construction method of long span truss beams
JPH059368Y2 (en)
JPH0536042Y2 (en)
JP3847029B2 (en) Box-type building
JPH0672454B2 (en) Struts used for structures
JPH09317021A (en) Unit building and its construction method
AU716283B1 (en) Hold down bracket
JPS637649Y2 (en)
JP2707435B2 (en) Assembling roof shingles for temporary buildings
AU739630B2 (en) Hold down bracket
JPH06317015A (en) Method of assembling beam formwork
JPH05295828A (en) Floor construction method and floor frame mounting device
JPH05113061A (en) Temporary enclosure and footing therefor
JPH07293019A (en) Structure for supporting beam and method for assembling supporting part of beam
JP4205884B2 (en) Unit building
JP2024111886A (en) Temporary Stage