Concrete placing adapter and concrete / mortar placing method using the adapter

Info

Publication number
JPH0643754B2
JPH0643754B2 JP7159888A JP7159888A JPH0643754B2 JP H0643754 B2 JPH0643754 B2 JP H0643754B2 JP 7159888 A JP7159888 A JP 7159888A JP 7159888 A JP7159888 A JP 7159888A JP H0643754 B2 JPH0643754 B2 JP H0643754B2
Authority
JP
Japan
Prior art keywords
concrete
mortar
placing
supply
adapter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7159888A
Other languages
Japanese (ja)
Other versions
JPH01244074A (en
Inventor
学 小川
振一 藤
達也 則行
実 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP7159888A priority Critical patent/JPH0643754B2/en
Publication of JPH01244074A publication Critical patent/JPH01244074A/en
Publication of JPH0643754B2 publication Critical patent/JPH0643754B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

【発明の詳細な説明】 (a).産業上の利用分野 本発明は、鋼管柱、壁等にコンクリート・モルタル(本
明細書において、「コンクリート・モルタル」とは、
「コンクリート」又は「モルタル」の意)を打設する際
に用いるに好適な、コンクリート打設アダプタ及び該ア
ダプタを用いたコンクリート・モルタルの打設方法に関
する。
DETAILED DESCRIPTION OF THE INVENTION (a). INDUSTRIAL APPLICABILITY The present invention relates to concrete mortar for steel pipe columns, walls, etc.
The present invention relates to a concrete pouring adapter suitable for pouring "concrete" or "mortar") and a concrete / mortar pouring method using the adapter.

(b).従来の技術 従来、鋼管柱内にコンクリート・モルタルを打設する場
合、特開昭62−174455に見られるように、コン
クリート・モルタルが貯溜されたコンクリートバケット
にコンクリート供給管を接続すると共に、締め固め用の
バイブレータを設け、更に打設されたコンクリート・モ
ルタルの量を検知するためのセンサが設けられたのもが
知られている。
(b). 2. Description of the Related Art Conventionally, when placing concrete mortar in a steel pipe column, as shown in JP-A-62-174455, a concrete supply pipe is connected to a concrete bucket in which the concrete mortar is stored and compacted. It is also known that a vibrator for use in the building is provided, and further that a sensor for detecting the amount of the cast concrete mortar is provided.

(c).発明が解決しようとする問題点 しかし、こうした装置では、コンクリート・モルタルが
貯溜されるバケットとコンクリート供給管が一体となっ
て形成されているので、バケットとコンクリート・モル
タルが吐出されるコンクリート供給管先端との距離が一
定になってしまい、打設現場に合わせた調整が出来ない
欠点が有った。
(c). DISCLOSURE OF THE INVENTION Problems to be Solved by the Invention However, in such a device, since the bucket for storing the concrete and mortar and the concrete supply pipe are integrally formed, the bucket and the tip of the concrete supply pipe for discharging the concrete and mortar are formed. There was a drawback in that the distance between and was constant, and adjustments could not be made according to the setting site.

また、締め固めに際して、バイブレータを駆動すると、
該バイブレータの振動により供給管が打設されたコンク
リート・モルタル中で揺れ動いてしまい、バケットを含
めた装置全体が不安定になってしまう不都合も有った。
When the vibrator is driven during compaction,
There is also a disadvantage that the vibration of the vibrator causes the supply pipe to rock in the concrete mortar in which it is placed, which makes the entire device including the bucket unstable.

更に、センサとして、板状のものを用いると、板の表面
にコンクリート・モルタルが付着して、誤検出の原因に
なるなど、信頼性に乏しい欠点が有る。
Further, when a plate-shaped sensor is used as the sensor, there is a drawback that the reliability is poor, such as concrete and mortar adhering to the surface of the plate, which causes erroneous detection.

本発明は、前述の欠点を解消すべく、バケット等のコン
クリートの供給手段とコンクリート供給管のコンクリー
ト・モルタル吐出部位との距離を任意に設定することが
出来、しかも締め固め等に際した供給管の揺れを極力防
止することが出来、更に打設したコンクリート・モルタ
ルの位置を正確に検出することが可能なコンクリート打
設アダプタ及び該アダプタを用いたコンクリート・モル
タルの打設方法を提供することを目的とするものであ
る。
In order to eliminate the above-mentioned drawbacks, the present invention can arbitrarily set the distance between the concrete supply means such as a bucket and the concrete / mortar discharge portion of the concrete supply pipe, and further, the distance of the supply pipe for compaction or the like. An object of the present invention is to provide a concrete placing adapter that can prevent shaking as much as possible and that can accurately detect the position of the placed concrete mortar, and a method of placing concrete and mortar using the adapter. It is what

(d).問題点を解決するための手段 即ち、本発明は、一方にコンクリート・モルタルの供給
口(2b)が設けられ、他方にコンクリート供給ホース
(10)とコンクリート供給管(2)を接続する接続手
段(2a)が設けられたコンクリート供給管(2)を有
し、前記コンクリート供給管(2)の供給口(2b)の
近傍にスタビライザ(5)を、前記供給口(2b)の、
コンクリート・モルタル供給方向(即ち、矢印B方向)
に所定距離だけ突出させる形で設け、打設されたコンク
リート・モルタルの表面(11a)の位置を検出するコ
ンクリート検知センサ(7)を設け、更に打設されたコ
ンクリート・モルタルを締め固めるバイブレータ(6)
を設置して構成される。
(d). Means for Solving the Problems That is, according to the present invention, a connection means for connecting a concrete / mortar supply port (2b) on one side and a concrete supply hose (10) and a concrete supply pipe (2) on the other side ( 2a) is provided with a concrete supply pipe (2), a stabilizer (5) is provided near the supply port (2b) of the concrete supply pipe (2), and a stabilizer (5) of the supply port (2b) is provided.
Concrete / mortar supply direction (that is, arrow B direction)
A concrete detecting sensor (7) for detecting the position of the surface (11a) of the placed concrete mortar, and a vibrator (6) for compacting the placed concrete mortar. )
Is installed and configured.

更に本発明は、一方にコンクリート・モルタルの供給口
(2b)が設けられ、他方にコンクリート供給ホース
(10)とコンクリート供給管(2)を接続する接続手
段(2a)が設けられたコンクリート供給管(2)を有
し、前記コンクリート供給管(2)の供給口(2b)の
近傍にスタビライザ(5)を、前記供給口(2b)の、
コンクリート・モルタル供給方向(即ち、矢印B方向)
に所定距離だけ突出させる形で設け、打設されたコンク
リート・モルタルの表面(11a)の位置を検出するコ
ンクリート検知センサ(7)を設け、更に打設されたコ
ンクリート・モルタルを締め固めるバイブレータ(6)
を設置して構成したコンクリート打設アダプタ(1)を
用いて、コンクリート・モルタルを打設する際には、打
設されたコンクリート・モルタル(11)の表面(11
a)が供給口(2b)の上方の一定の位置に達したもの
と前記コンクリート検知センサ(7)により検知された
ところで、コンクリート供給管(2)を介したコンクリ
ート・モルタル(11)の供給動作を中断する第1ステ
ップ、前記コンクリート打設アダプタ(1)を上方に引
き上げつつバイブレータ(6)を駆動してコンクリート
・モルタルの締め固めを行なう第2ステップ、コンクリ
ート打設アダプタ(1)の引き上げの結果、コンクリー
ト・モルタル(11)の表面(11a)が供給口(2
b)の下方の一定の位置に達したものと前記コンクリー
ト検知センサ(7)により検知されたところで、コンク
リート打設アダプタ(1)の引き上げ動作及びバイブレ
ータ(6)による締め固め動作を停止する第3ステッ
プ、コンクリート・モルタルのコンクリート供給管
(2)を介した供給を再開し、コンクリート・モルタル
表面(11a)が前記供給口(2b)の上方の一定の位
置に達するまで供給を行なう第4ステップからなる打設
ステップを、1回以上繰り返すようにして構成される。
Further, the present invention provides a concrete supply pipe provided with a concrete / mortar supply port (2b) on one side and a connecting means (2a) for connecting the concrete supply hose (10) and the concrete supply pipe (2) on the other side. (2), a stabilizer (5) is provided near the supply port (2b) of the concrete supply pipe (2), and a stabilizer (5) of the supply port (2b) is provided.
Concrete / mortar supply direction (that is, arrow B direction)
A concrete detecting sensor (7) for detecting the position of the surface (11a) of the placed concrete mortar, and a vibrator (6) for compacting the placed concrete mortar. )
When placing concrete mortar using the concrete placing adapter (1) configured by installing the above, the surface (11) of the placed concrete mortar (11)
When the concrete detection sensor (7) detects that a) has reached a certain position above the supply port (2b), the concrete mortar (11) is supplied through the concrete supply pipe (2). The first step of interrupting the step, the second step of driving the vibrator (6) while pulling up the concrete placing adapter (1) to compact concrete and mortar, and the raising of the concrete placing adapter (1). As a result, the surface (11a) of the concrete mortar (11) is connected to the supply port (2
Third, when it is detected by the concrete detection sensor (7) that it has reached a certain position below b), the pulling up operation of the concrete placing adapter (1) and the compacting operation by the vibrator (6) are stopped. Step, from the fourth step of restarting the supply of the concrete mortar through the concrete supply pipe (2) and supplying until the concrete mortar surface (11a) reaches a certain position above the supply port (2b). The setting step is repeated one or more times.

また、本発明は、一方にコンクリート・モルタルの供給
口(2b)が設けられ、他方に他のコンクリート供給ホ
ース(10)とコンクリート供給管(2)を接続する接
続手段(2a)が設けられたコンクリート供給管(2)
を有し、前記コンクリート供給管(2)の供給口(2
b)の近傍にスタビライザ(5)を、前記供給口(2
b)の、コンクリート・モルタル供給方向(即ち、矢印
B方向)に所定距離だけ突出させる形で設け、打設され
たコンクリート・モルタルの表面(11a)の位置を検
出するコンクリート検知センサ(7)を設け、更に打設
されたコンクリート・モルタルを締め固めるバイブレー
タ(6)を設置して構成したコンクリート打設アダプタ
(1)を用いて、コンクリート・モルタルを打設する際
には、コンクリート供給管(2)を介してコンクリート
・モルタルを常時供給すると共に、打設されたコンクリ
ート、・モルタル(11)の表面(11a)が供給口
(2b)の上方の一定の位置に達したものと前記コンク
リート検知センサ(7)により検知されたところで、前
記コンクリート打設アダプタ(1)を上方に引き上げつ
つバイブレータ(6)を駆動してコンクリート・モルタ
ルの締め固めを行なう第1ステップ、コンクリート打設
アダプタ(1)の引き上げの結果、コンクリート・モル
タル(11)の表面(11a)が供給口(2b)の下方
の一定の位置に達したものと前記コンクリート検知セン
サ(7)により検知されたところで、コンクリート打設
アダプタ(1)の引き上げ動作及びバイブレータ(6)
による締め固め動作を停止する第2ステップからなる打
設ステップを、1回以上繰り返すようにして構成され
る。
Further, in the present invention, the concrete / mortar supply port (2b) is provided on one side, and the connecting means (2a) for connecting the other concrete supply hose (10) and the concrete supply pipe (2) is provided on the other side. Concrete supply pipe (2)
And a supply port (2) of the concrete supply pipe (2)
A stabilizer (5) is provided near the supply port (2) in the vicinity of b).
In b), a concrete detection sensor (7) for detecting the position of the surface (11a) of the placed concrete / mortar is provided so as to project by a predetermined distance in the concrete / mortar supply direction (that is, the arrow B direction). When placing concrete mortar using the concrete placing adapter (1) which is provided and further comprises a vibrator (6) for compacting the placed concrete mortar, the concrete supply pipe (2) Concrete concrete mortar is constantly supplied via the above-mentioned concrete detection sensor and that the surface of the mortar (11) (11a) has reached a certain position above the supply port (2b) while the concrete is placed. When it is detected by (7), the concrete placing adapter (1) is pulled up and the vibrator (6) is pulled up. As a result of the first step of driving the concrete and mortar to be compacted, the concrete placing adapter (1) is pulled up, the surface (11a) of the concrete and mortar (11) is fixed below the supply port (2b). When reaching the position and when it is detected by the concrete detection sensor (7), the pulling operation of the concrete placing adapter (1) and the vibrator (6)
The placing step consisting of the second step of stopping the compaction operation by is repeated one or more times.

なお、括弧内の番号等は、図面における対応する要素を
示す、便宜的なものであり、従って、本記述は図面上の
記載に限定拘束されるものではない。以下の「(e).作
用」の欄についても同様である。
It should be noted that the numbers in parentheses indicate the corresponding elements in the drawings for the sake of convenience, and thus the present description is not limited to the description in the drawings. The same applies to the section "(e). Action" below.

(e).作用 上記した構成により、本発明は、コンクリート供給管
(2)に任意の長さのコンクリート供給ホース(10)
を接続して、スタビライザ(5)によりコンクリート打
設アダプタ(1)の動揺を防止しつつ、コンクリート・
モルタルを打設するように作用する。
(e). Action With the above-described structure, the present invention provides the concrete supply pipe (2) with the concrete supply hose (10) of any length.
, And the stabilizer (5) prevents the concrete placing adapter (1) from swinging,
It acts like placing mortar.

(F).実施例 以下、本発明の実施例を図面に基づき説明する。(F). Embodiment An embodiment of the present invention will be described below with reference to the drawings.

第1図は本発明によるコンクリート打設アダプタの一実
施例を示す図、 第2図は第1図のII−II線による断面図、 第3図はコンクリート検知センサ部分の拡大図、 第4図は本発明によるコンクリート打設アダプタの別の
例を示す図、 第5図はコンクリート検知センサの検知体の別の例を示
す図である。
FIG. 1 is a diagram showing an embodiment of a concrete placing adapter according to the present invention, FIG. 2 is a sectional view taken along line II-II of FIG. 1, FIG. 3 is an enlarged view of a concrete detection sensor portion, and FIG. Is a diagram showing another example of the concrete placing adapter according to the present invention, and FIG. 5 is a diagram showing another example of the detection body of the concrete detection sensor.

コンクリート打設アダプタ1は、第1図に示すように、
コンクリート供給管2を有しており、コンクリート供給
管2の上部にはフランジ部2aが形成されている。コン
クリート供給管2の図中下端部は供給口2bとなってお
り、更にコンクリート供給管2にはガイド管3が、コン
クリート供給管2の外周部を被覆する形で設けられてい
る。
The concrete pouring adapter 1 is, as shown in FIG.
The concrete supply pipe 2 is provided, and a flange portion 2 a is formed on the concrete supply pipe 2. A lower end portion of the concrete supply pipe 2 in the drawing is a supply port 2b, and a guide pipe 3 is provided in the concrete supply pipe 2 so as to cover an outer peripheral portion of the concrete supply pipe 2.

また、コンクリート供給管2の、図中下部には、スタビ
ライザ5が装着されており、スタビライザ5は、第2図
に示すように、取付筒5aを有している。取付筒5aは
コンクリート供給管2の外径よりもやや大なる内径に形
成されており、取付筒5aには、取付ボルト5b、5b
がコンクリート供給管2を挟んで対向する形で、しかも
その先端をコンクリート供給管2に穿設された位置決め
穴2cに嵌入係合させた形で螺合している。なお、位置
決め穴2cは、コンクリート供給管2の軸心方向、即ち
矢印A、B方向に沿って一定の間隔で穿設されており、
従って取付ボルト5bが選択的に係合する位置決め穴2
cを、矢印A、B方向にズラせることにより、スタビラ
イザ5の取付位置をコンクリート供給管2に対して矢印
A、B方向に移動させることが出来る。
Further, a stabilizer 5 is attached to the lower portion of the concrete supply pipe 2 in the figure, and the stabilizer 5 has a mounting cylinder 5a as shown in FIG. The mounting cylinder 5a is formed to have an inner diameter slightly larger than the outer diameter of the concrete supply pipe 2, and the mounting cylinder 5a has mounting bolts 5b and 5b.
Are opposed to each other with the concrete supply pipe 2 sandwiched therebetween, and are further screwed in such a manner that their tips are fitted and engaged with the positioning holes 2c formed in the concrete supply pipe 2. The positioning holes 2c are provided at regular intervals along the axial direction of the concrete supply pipe 2, that is, in the directions of arrows A and B,
Therefore, the positioning hole 2 through which the mounting bolt 5b selectively engages
By shifting c in the directions of arrows A and B, the mounting position of the stabilizer 5 can be moved in the directions of arrows A and B with respect to the concrete supply pipe 2.

取付筒5aの、第1図上下位置には、第2図に示すよう
に、腕5cが放射状に2段に亙り、設けられており、そ
れ等上下の腕5cには、短かい筒状に形成された安定板
5d、5dが、取付筒5aの周囲を取り囲む形で設けら
れている。安定板5d、5dには、両安定板5d、5d
を接続する形で短冊状に形成された垂直安定板5eが複
数枚、コンクリート供給管2の軸心と平衡な矢印A、B
方向に設けられており、それ等垂直安定板5eの先端
は、第1図下方に伸延している。垂直安定板5eの先端
には、短かい筒状に形成された安定板5fが設けられて
いる。
As shown in FIG. 2, arms 5c are radially arranged in two steps at the upper and lower positions of the mounting cylinder 5a as shown in FIG. 2, and the upper and lower arms 5c have a short cylindrical shape. The formed stabilizers 5d and 5d are provided so as to surround the periphery of the mounting cylinder 5a. The stabilizers 5d and 5d have two stabilizers 5d and 5d.
A plurality of vertical stabilizers 5e formed in the shape of strips connected to each other, and arrows A and B balanced with the axis of the concrete supply pipe 2.
The vertical stabilizers 5e extend in the downward direction in FIG. At the tip of the vertical stabilizer 5e, a stabilizer 5f formed in a short tubular shape is provided.

また、取付筒5aには、第2図に示すように、ブラケッ
ト5g、5gが取付筒5aを挟んで互いに対向する形で
設けられており、各ブラケット5gには、バイブレータ
駆動ケーブル6aが挾圧支持されている。バイブレータ
駆動ケーブル6aは、第1図上方に、ガイド管3内を矢
印A、B方向に沿った形で伸延しており、その先端は適
宜な電源設備に接続されている。また、バイブレータ駆
動ケーブル6aの、第1図下方には細長い棒状に形成さ
れたバイブレータ6が、コンクリート供給管2の供給口
2bからスタビライザ5の安定板5fに達するまで、垂
直安定板5eに沿った形で配置されており、バイブレー
タ6はバイブレータ駆動ケーブル6aにより吊下支持さ
れるのみで、スタビライザ5及びコンクリート供給管2
との間の接続支持関係は無い。
As shown in FIG. 2, brackets 5g and 5g are provided on the mounting cylinder 5a so as to face each other with the mounting cylinder 5a interposed therebetween, and a vibrator drive cable 6a is sandwiched between the brackets 5g. It is supported. The vibrator drive cable 6a extends upward in FIG. 1 in the guide tube 3 along the directions of arrows A and B, and its tip is connected to an appropriate power supply facility. Further, the vibrator 6 formed in the shape of an elongated rod in the lower part of FIG. 1 of the vibrator drive cable 6a extends along the vertical stabilizer 5e from the supply port 2b of the concrete supply pipe 2 to the stabilizer 5f of the stabilizer 5. The vibrator 6 is only suspended and supported by the vibrator drive cable 6a, and the stabilizer 5 and the concrete supply pipe 2 are arranged.
There is no connection support relationship with.

一方、スタビライザ5の第1図下方の安定板5fと、上
部の安定板5dとの間には、コンクリート検知センサ7
が設けられており、コンクリート検知センサ7は、安定
板5d、5f間に、垂直安定板5eに沿って矢印A、B
方向に設置された支柱7aを有している。支柱7aに
は、第3図に示すように、コンクリート供給管2の供給
口2bから矢印B方向に距離L1、L2の位置、更に矢
印A方向に距離L3の位置に検知体7c、7b、7dが
設けられている。
On the other hand, between the stabilizer 5f below the stabilizer 1 in FIG. 1 and the stabilizer 5d above the stabilizer 5, the concrete detection sensor 7 is provided.
Is provided, and the concrete detection sensor 7 has arrows A and B along the vertical stabilizer 5e between the stabilizers 5d and 5f.
It has a pillar 7a installed in the direction. As shown in FIG. 3, the support 7a has detectors 7c, 7b, 7d at positions L1 and L2 in the direction of arrow B from the supply port 2b of the concrete supply pipe 2, and at positions L3 in the direction of arrow A. Is provided.

コンクリート打設アダプタ1は以上のような構成を有す
るので、コンクリート打設アダプタ1を用いて、鋼管柱
等を構成する鋼管内等にコンクリート・モルタルを打設
する場合には、まずコンクリート打設アダプタ1のコン
クリート供給管2のフランジ部2aに、適宜な長さのフ
レキシブルホース等のコンクリート供給ホース10の一
端を接続し、該コンクリート供給ホースの他端をコンク
リートバケットやコンクリートポンプ等のコンクリート
供給手段に接続する。
Since the concrete placing adapter 1 has the above-described configuration, when the concrete placing adapter 1 is used to place concrete or mortar into a steel pipe or the like that constitutes a steel pipe column or the like, first, the concrete placing adapter is used. One end of a concrete supply hose 10 such as a flexible hose having an appropriate length is connected to the flange portion 2a of the concrete supply pipe 2 of No. 1, and the other end of the concrete supply hose is used as a concrete supply means such as a concrete bucket or a concrete pump. Connecting.

この状態で、コンクリート打設アダプタ1を、第1図の
フランジ部2aた上部になるようにクレーン等で吊下
し、コンクリート・モルタルを打設すべき打設位置の上
方に、コンクリート打設アダプタ1の先端のスタビライ
ザ5と打設部位を対向させる形で位置決めする。次に、
クレーンを駆動してコンクリート打設アダプタ1を矢印
B方向に、徐々に降下させ、スタビライザ5の下端の安
定板5fと、既打設コンクリート・モルタルの打ち継ぎ
面等の打設底面9とを当接させる。次に、コンクリート
打設アダプタ1をややA方向に引き上げて、打設底面9
と安定板5fとの距離をやや離し、コンクリート供給管
2の供給口2bと打設底面9との距離L4が打設に適し
た値となるように設定する。なお、コンクリート打設ア
ダプタ1とコンクリート・モルタルを供給するコンクリ
ートバケットやコンクリートポンプ等のコンクリート供
給手段とはコンクリート供給ホース10で接続されてい
るので、該コンクリート供給ホース10の長さを適宜に
設定することにより、コンクリート打設アダプタ1は、
コンクリート供給手段の設置位置とは無関係に自由に移
動させ、任意の打設位置に設定することが出来る。次
に、その状態でコンクリート供給ホース10を介してコ
ンクリート・モルタル11をコンクリートポンプ、コン
クリートバケットからコンクリート供給管2に向けて供
給すると、該供給されたコンクリート・モルタル11
は、供給口2bから打設底面9に向けて供給され、打設
される。
In this state, the concrete pouring adapter 1 is hung by a crane or the like so as to be the upper part of the flange portion 2a of FIG. 1, and the concrete pouring adapter is placed above the pouring position where concrete mortar should be poured. The stabilizer 5 at the tip of 1 and the driving portion are positioned so as to face each other. next,
By driving the crane, the concrete pouring adapter 1 is gradually lowered in the direction of the arrow B, and the stabilizer 5f at the lower end of the stabilizer 5 and the pouring bottom 9 such as the pouring joint surface of already cast concrete and mortar are touched. Contact. Next, the concrete pouring adapter 1 is pulled up in the direction A, and the pouring bottom surface 9
And the stabilizer 5f are set apart from each other, and the distance L4 between the supply port 2b of the concrete supply pipe 2 and the bottom surface 9 of the casting is set to a value suitable for driving. Since the concrete placing adapter 1 and the concrete supply means such as a concrete bucket or a concrete pump for supplying concrete / mortar are connected by the concrete supply hose 10, the length of the concrete supply hose 10 is appropriately set. As a result, the concrete pouring adapter 1
It can be freely moved regardless of the installation position of the concrete supply means, and can be set at an arbitrary pouring position. Next, when concrete mortar 11 is supplied from the concrete pump or concrete bucket toward the concrete supply pipe 2 via the concrete supply hose 10 in that state, the supplied concrete mortar 11 is supplied.
Is supplied from the supply port 2b toward the driving bottom surface 9 and driven.

こうしてコンクリート・モルタル11をコンクリート供
給管2を介して打設してゆくと、打設されたコンクリー
ト・モルタル11の表面11aは徐々に矢印A方向に上
昇してゆくが、表面11aが上昇してコンクリート・モ
ルタル11がコンクリート検知センサ7の検知体7cに
達すると、検知体7cからコンクリート・モルタルの検
出信号が出力されるので、作業者はコンクリート・モル
タル11が、打設底面9から所定距離L5だけ円滑に打
設されてきたことを知る。こうして、更に表面11aが
矢印A方向に上昇し、コンクリート・モルタル11が検
知体7bに達すると、今度は検知体7bからコンクリー
ト・モルタルの検出信号が出力されるので、作業者はコ
ンクリート・モルタル11が、打設底面9から所定距離
L6だけ円滑に打設されてきたことを知る。このよう
に、コンクリート打設アダプタ1を矢印A、B方向にお
いて停止させた状態で、更にコンクリート・モルタル1
1を打設してゆくと、表面11aは供給口2bの位置を
通過して更に上方、即ち矢印A方向に移動してゆき、最
終的に表面11aが検知体7dにまで達することにな
る。すると、検知体7dからコンクリート・モルタルの
検出信号が出力されるので、コンクリート・モルタル1
1が、打設底面9から上方に、所定距離L4だけ、従っ
て供給口2bから上方に距離L3だけ打設されたことが
判明する。
When the concrete mortar 11 is cast through the concrete supply pipe 2 in this manner, the surface 11a of the cast concrete mortar 11 gradually rises in the direction of arrow A, but the surface 11a rises. When the concrete mortar 11 reaches the detection body 7c of the concrete detection sensor 7, a detection signal of the concrete mortar is output from the detection body 7c, so that the operator can move the concrete mortar 11 from the placing bottom surface 9 by a predetermined distance L5. Only know that it has been placed smoothly. In this way, when the surface 11a further rises in the direction of the arrow A and the concrete mortar 11 reaches the detection body 7b, the detection signal of the concrete mortar is output from the detection body 7b this time, so that the worker can use the concrete mortar 11 However, it is learned that the driving has been smoothly performed by the predetermined distance L6 from the driving bottom surface 9. In this way, with the concrete placing adapter 1 stopped in the directions of arrows A and B, the concrete mortar 1
When 1 is cast, the surface 11a passes through the position of the supply port 2b and moves further upward, that is, in the direction of arrow A, and finally the surface 11a reaches the detection body 7d. Then, the detection signal of the concrete / mortar is output from the detector 7d.
It can be seen that 1 has been cast upward from the casting bottom surface 9 by a predetermined distance L4 and thus from the supply port 2b by a distance L3.

コンクリート・モルタル11が、供給口2bから距離L
3だけ打設されたところで、コンクリート供給ホース1
0を介したコンクリート供給管2へのコンクリート・モ
ルタル11の供給を停止する。次に、駆動ケーブル6a
を介してバイブレータ6に電力を供給してバイブレータ
6を駆動さると共に、クレーンを駆動してコンクリート
打設アダプタ1を矢印A方向に、ゆっくりと引き上げ
る。すると、振動するバイブレータ6により打設された
コンクリート・モルタル11が締め固められ、コンクリ
ート・モルタル11は密実な状態になる。コンクリート
打設アダプタ1がA方向に引き上げられ、コンクリート
・モルタル11の表面11aがコンクリート検知センサ
7の検知体7dから検知体7bの位置にまで移動し、供
給口2bと表面11aとの距離が、供給口2bの下方へ
向けてL2となったところで、検知体7bからの検出信
号の変化に基づきコンクリート打設アダプタ1の引き上
げを停止すると共に、バイブレータ6の駆動を停止す
る。なお、コンクリート・モルタル11の供給中及びバ
イブレータ6による締め固め中は、スタビライザ5の安
定板5d、5f、垂直安定板5eの全部又は一部が打設
されたコンクリート・モルタル11中に存在して、コン
クリート打設アダプタ1がコンクリート・モルタル中で
不用意に、第1図左右方向に揺れ動くことを防止するの
で、コンクリート・モルタルの供給及びその後の締め固
め作業は円滑に行われる。また、コンクリート検知セン
サ7の各検知体7b、7c、7dは、第3図に示すよう
に、コンクリート・モルタルの有無を検出する検知部7
eが上方に突出した鍵形に形成されているので、コンク
リート・モルタル11の表面11aが、検知部7eの上
方から下方に移動して、検知部7eが外部に露出する
と、コンクリート・モルタルは鍵形の屈曲部7fに沿っ
て自重で下方に垂れ落ち、検知部7eに残留することは
無い。従って、各検知体7b、7c、7dはコンクリー
ト・モルタル11が該検知体7b、7c、7dの検知部
7eよりも下方にその表面11aが移動すると直ちに、
その事実を検出することが出来る。
The concrete mortar 11 is at a distance L from the supply port 2b
Concrete supply hose 1
The supply of the concrete mortar 11 to the concrete supply pipe 2 via 0 is stopped. Next, the drive cable 6a
Power is supplied to the vibrator 6 via the to drive the vibrator 6, and at the same time, the crane is driven to slowly pull up the concrete placing adapter 1 in the arrow A direction. Then, the concrete mortar 11 cast by the vibrating vibrator 6 is compacted, and the concrete mortar 11 becomes a solid state. The concrete placing adapter 1 is pulled up in the direction A, the surface 11a of the concrete mortar 11 moves from the detection body 7d of the concrete detection sensor 7 to the position of the detection body 7b, and the distance between the supply port 2b and the surface 11a becomes When it becomes L2 toward the lower side of the supply port 2b, pulling up of the concrete placing adapter 1 is stopped based on the change of the detection signal from the detection body 7b, and the driving of the vibrator 6 is stopped. During the supply of the concrete mortar 11 and the compaction by the vibrator 6, the stabilizers 5d and 5f of the stabilizer 5 and the vertical stabilizers 5e are present in the concrete mortar 11 in which all or a part of them is placed. Since the concrete placing adapter 1 is prevented from inadvertently swaying in the left-right direction in FIG. 1 in the concrete mortar, the supply of the concrete mortar and the subsequent compaction work are smoothly performed. Further, as shown in FIG. 3, each of the detection bodies 7b, 7c, 7d of the concrete detection sensor 7 is a detection unit 7 for detecting the presence / absence of concrete / mortar.
Since e is formed in a key shape protruding upward, when the surface 11a of the concrete mortar 11 moves downward from above the detection unit 7e and the detection unit 7e is exposed to the outside, the concrete mortar is locked. It does not hang down downward due to its own weight along the bent portion 7f of the shape and remain on the detection portion 7e. Therefore, as soon as the concrete mortar 11 moves its surface 11a below the detecting portion 7e of the detecting bodies 7b, 7c, 7d, the detecting bodies 7b, 7c, 7d are
The fact can be detected.

こうして、コンクリート・モルタル11の表面11aが
検知体7bの位置にまで達し、コンクリート打設アダプ
タ1の引き上げが停止されると共に、バイブレータ6の
駆動が停止されたところで、再度、コンクリート供給管
2を介したコンクリート・モルタル11の供給が開始さ
れる。こうして、コンクリート打設アダプタ1を停止保
持させた状態で、コンクリート・モルタル表面11aが
再度検知体7dの位置に達するまでコンクリート・モル
タルの供給を継続し、表面11aが該位置に達すると、
コンクリート・モルタルの供給を停止して、コンクリー
ト打設アダプタ1を矢印A方向に、表面11aが検知体
7bの位置になるまで引き上げると共にバイブレータ6
を駆動して、打設されたコンクリート・モルタル11を
締め固める。以後、コンクリート・モルタルの供給とバ
イブレータ6による締め固め及びコンクリート打設アダ
プタ1の引き上げを繰り返すことにより、コンクリート
・モルタル11は打設されてゆく。
In this way, when the surface 11a of the concrete mortar 11 reaches the position of the detection body 7b, the pulling up of the concrete placing adapter 1 is stopped, and the driving of the vibrator 6 is stopped, the concrete supply pipe 2 is inserted again. The supply of the concrete and mortar 11 is started. Thus, with the concrete placing adapter 1 stopped and held, the supply of concrete mortar is continued until the concrete mortar surface 11a reaches the position of the detection body 7d again, and when the surface 11a reaches the position,
The supply of concrete and mortar is stopped, and the concrete placing adapter 1 is pulled up in the direction of arrow A until the surface 11a reaches the position of the detection body 7b and the vibrator 6
To drive the concrete mortar 11 to be compacted. After that, by repeatedly supplying concrete / mortar, compacting by the vibrator 6 and pulling up the concrete placing adapter 1, the concrete / mortar 11 is placed.

なお、上述の実施例は、コンクリート・モルタル11の
供給とコンクリート打設アダプタ1の引き上げ動作を交
互に行った場合につて述べたが、コンクリート・モルタ
ルの打設方法としては、打設されるコンクリート・モル
タル表面11aが、コンクリート・モルタルが供給され
るコンクリート供給管2の供給口2bに対して、打設に
適正な所定距離L2、L3を維持することが出来る限
り、どのような態様でもよく、他にも各種の態様が考ら
れる。以下に、別の打設方法を説明する。
In the above-mentioned embodiment, the case where the supply of the concrete / mortar 11 and the pulling up operation of the concrete placing adapter 1 are alternately performed, the concrete / mortar placing method is as follows. -As long as the mortar surface 11a can maintain the predetermined distances L2 and L3 suitable for casting with respect to the supply port 2b of the concrete supply pipe 2 to which the concrete mortar is supplied, any form may be used, Various other modes can be considered. Hereinafter, another placing method will be described.

即ち、コンクリート・モルタル11のコンクリート供給
管2を介した供給動作は、中断すること無く、常に行な
うと共に、コンクリート・モルタルの表面11aがコン
クリート検知センサ7の検知体7dに達するまでは、コ
ンクリート打設アダプタ1のA方向の引き上げ動作は行
わず、一定位置に保持する。表面11aが検知体7dに
達すると、バイブレータ6を駆動すると共にコンクリー
ト打設アダプタ1をA方向に低速で引き上げ、締め固め
動作を行う。なお、この間も、コンクリート供給管2を
介したコンクリート・モルタル11の供給動作は途切れ
ることなく継続される。しかし、通常、クレーンの矢印
A方向への引き上げ速度は、コンクリート・モルタル表
面11aが打設によりA方向に上昇する速度よりも早い
ので、両者の速度差から、コンクリート打設アダプタ1
は徐々に表面11aに対してA方向に移動してゆく。こ
うして、表面11aが検知体7bにまで相対的に降下す
ると、検知体7bからの信号でコンクリート打設アダプ
タ1のA方向の引き上げ及びバイブレータ6による締め
固め動作は停止され、その後は、なおも継続して打設さ
れるコンクリート・モルタルの表面11aが検知体7d
に達するまで、コンクリート打設アダプタ1は停止保持
される。表面11aが検知体7dに達すると、再度コン
クリート打設アダプタ1のA方向への引き上げ及びバイ
ブレータ6による締め固めが開始され、以後同様な手順
で打設は継続される。
That is, the supply operation of the concrete / mortar 11 through the concrete supply pipe 2 is always performed without interruption, and the concrete placement is continued until the surface 11a of the concrete / mortar reaches the detection body 7d of the concrete detection sensor 7. The adapter 1 is not pulled up in the A direction and is held at a fixed position. When the surface 11a reaches the detection body 7d, the vibrator 6 is driven and at the same time the concrete pouring adapter 1 is pulled up in the direction A at low speed to perform the compaction operation. During this period, the supply operation of the concrete mortar 11 via the concrete supply pipe 2 is continued without interruption. However, since the speed of pulling up the crane in the direction of arrow A is usually faster than the speed at which the concrete / mortar surface 11a rises in the direction of A, due to the speed difference between the two, the concrete placing adapter 1
Gradually moves in the A direction with respect to the surface 11a. In this way, when the surface 11a is relatively lowered to the detection body 7b, the signal from the detection body 7b stops the pulling up of the concrete placing adapter 1 in the A direction and the compaction operation by the vibrator 6, and after that, it continues. The surface 11a of the concrete and mortar that is placed by the
Until the concrete pouring adapter 1 is stopped and held. When the surface 11a reaches the detection body 7d, pulling up of the concrete placing adapter 1 in the direction A and compaction by the vibrator 6 are started again, and then placing is continued in the same procedure.

また、所定量のコンクリート・モルタル11が打設さ
れ、更に打ち継ぎを行う場合には、アダプタ1を矢印B
方向に降下させて、コンクリート打継面を供給口2bの
第1図矢印B方向に距離L2だけ下方に位置させる。す
ると、バイブレータ6は既に打設されたコンクリート・
モルタル11内に図中半分程、沈入するので、この状態
でバイブレータ6を駆動しつつコンクリート・モルタル
11を供給口2bから供給することにより、打継部のコ
ンクリート・モルタルが十分に攪拌されて、良好な打設
が行われる。
Further, when a predetermined amount of concrete mortar 11 is placed and further splicing is performed, the adapter 1 is indicated by the arrow B.
And the concrete joint surface is positioned below the supply port 2b in the direction of arrow B in FIG. 1 by a distance L2. Then, the vibrator 6 is
About half of the mortar 11 in the figure sinks, so by supplying the concrete mortar 11 from the supply port 2b while driving the vibrator 6 in this state, the concrete mortar in the joint portion is sufficiently agitated. Good placement is done.

なお、バイブレータ6の装着方法も、各種の態様が考え
られる。即ち、本実施例のように、バイブレータ6(こ
こで言う、バイブレータ6とは、直接振動が発生する部
分であり、該バイブレータ6に動力を供給する駆動ケー
ブル6a部分等は含まない)をスタビライザ5及びコン
クリート供給管2とは独立させて設置する構造の他に、
バイブレータ6をスタビライザ5に装着してスタビライ
ザ5を振動させる構造や、バイブレータ6をコンクリー
ト供給管2に装着してコンクリート供給管2を振動させ
る構造等が考えられる。
Various modes can be considered for the method of mounting the vibrator 6. That is, as in the present embodiment, the stabilizer 5 (the vibrator 6 here is a portion where direct vibration is generated, and does not include the drive cable 6a portion for supplying power to the vibrator 6). In addition to the structure that is installed independently of the concrete supply pipe 2,
A structure in which the vibrator 6 is attached to the stabilizer 5 to vibrate the stabilizer 5 and a structure in which the vibrator 6 is attached to the concrete supply pipe 2 to vibrate the concrete supply pipe 2 are conceivable.

更に、スタビライザ6の形状も、各種のものが考えられ
るが、第4図に示すように、スタビライザ5の先端部5
hをコンクリート・モルタル打設時、下方に突出した形
に形成することにより、鋼管12内にコンクリート・モ
ルタル11を打設する場合等において、鋼管12内にス
ティフナ12aが突出していても、該先端部5hにガイ
ドされる形でアダプタ1を所定の打設位置まで降下させ
ることが出来、アダプタ1が鋼管12内で引っかかって
しまうようなことはない。また、コンクリート検知セン
サ7の検知体7b、7c、7dの形状も、第3図に示
す、上方に屈曲した形状に限らず、各種の形状が考えら
れる。例えば、第5図に示すように、検知体7b、7
c、7dの先端部の幅Wを下方に向けて広げた形で形成
すると、コンクリート・モルタル11内の骨材等が検知
部7e、7e間に引っかかって誤検出を生じることが少
なくなるので、信頼性を高めることが可能となる。
Further, the stabilizer 6 may have various shapes, but as shown in FIG.
By forming h into a shape projecting downward when concrete / mortar is cast, when the concrete / mortar 11 is cast into the steel pipe 12, even if the stiffener 12a projects into the steel pipe 12, The adapter 1 can be lowered to a predetermined driving position while being guided by the portion 5h, and the adapter 1 will not be caught in the steel pipe 12. Further, the shape of the detection bodies 7b, 7c, 7d of the concrete detection sensor 7 is not limited to the shape bent upward as shown in FIG. 3, but various shapes are conceivable. For example, as shown in FIG.
When the width W of the tips of the c and 7d is widened downward, aggregates and the like in the concrete mortar 11 are less likely to be caught between the detection units 7e and 7e, resulting in less false detection. It is possible to improve reliability.

(g).発明の効果 以上、説明したように、本発明によれば、一方にコンク
リート・モルタルの供給口2bが設けられ、他方にフラ
ンジ部2a等の、コンクリート供給ホースとコンクリー
ト供給管2を接続する接続手段が設けられたコンクリー
ト供給管2を有し、前記コンクリート供給管2の供給口
2bの近傍にスタビライザ5を、前記供給口2bの、コ
ンクリート・モルタル供給方向(即ち、矢印B方向)に
所定距離だけ突出させる形で設け、打設されたコンクリ
ート・モルタルの表面11aの位置を検出するコンクリ
ート検知センサ7を設け、更に打設されたコンクリート
・モルタルを締め固めるバイブレータ6を設置して構成
したので、コンクリート供給管2の接続手段に任意の長
さのコンクリート供給ホース10を接続することによ
り、バケット等のコンクリート・モルタルの供給手段と
供給口2b等のコンクリート・モルタルの吐出部位の距
離を任意に設定することが可能となる。また、スタビラ
イザ5により、コンクリート・モルタル供給中及び締め
固め時におけるコンクリート供給管2の揺れを防止する
ことが出来る。
(g). EFFECTS OF THE INVENTION As described above, according to the present invention, the connection means for connecting the concrete supply hose and the concrete supply pipe 2 such as the concrete / mortar supply port 2b is provided on one side and the flange portion 2a or the like is provided on the other side. And a stabilizer 5 near the supply port 2b of the concrete supply pipe 2, and a predetermined distance in the concrete / mortar supply direction (that is, arrow B direction) of the supply port 2b. Since the concrete detection sensor 7 for detecting the position of the surface 11a of the placed concrete mortar is provided so as to project, and the vibrator 6 for compacting the placed concrete mortar is installed, the concrete is constructed. By connecting the concrete supply hose 10 of an arbitrary length to the connecting means of the supply pipe 2, It is possible to arbitrarily set the distance between the concrete / mortar supply means such as a mortar and the discharge portion of the concrete / mortar such as the supply port 2b. Further, the stabilizer 5 can prevent the concrete supply pipe 2 from swinging during the concrete / mortar supply and the compaction.

更に、コンクリート検知センサ7として、検知部7e
が、コンクリート・モルタルの打設時において、上方に
突出した形に形成すると、コンクリート・モルタルが検
知部7eに残留することが無く、コンクリート・モルタ
ルの位置を正確に検出することが出来る。
Further, as the concrete detection sensor 7, the detection unit 7e
However, when the concrete mortar is formed so as to project upward when the concrete mortar is cast, the concrete mortar does not remain in the detection unit 7e and the position of the concrete mortar can be accurately detected.

また、一方にコンクリート・モルタルの供給口2bが設
けられ、他方にフランジ部2a等の、コンクリート供給
ホースとコンクリート供給管2を接続する接続手段が設
けられたコンクリート供給管2を有し、前記コンクリー
ト供給管2の供給口2bの近傍のスタビライザ5を、前
記供給口2bの、コンクリート・モルタル供給方向(即
ち、矢印B方向)に所定距離だけ突出させる形で設け、
打設されたコンクリート・モルタルの表面11aの位置
を検出するコンクリート検知センサ7を設け、更に打設
されたコンクリート・モルタルを締め固めるバイブレー
タ6を設置して構成したコンクリート打設アダプタ1を
用いて、コンクリート・モルタルを打設する際には、打
設されたコンクリート・モルタル11の表面11aが供
給口2bの上方の一定の位置に達したものと前記コンク
リート検知センサ7により検知されたところで、コンク
リート供給管2を介したコンクリート・モルタル11の
供給動作を中断する第1ステップ、前記コンクリート打
設アダプタ1を上方に引き上げつつバイブレータ6を駆
動してコンクリート・モルタルの締め固めを行なう第2
ステップ、コンクリート打設アダプタ1の引き上げの結
果、コンクリート・モルタル11の表面11aが供給口
2bの下方の一定の位置に達したものと前記コンクリー
ト検知センサ7により検知されたところで、コンクリー
ト打設アダプタ1の引き上げ動作及びバイブレータ6に
よる締め固め動作を停止する第3ステップ、コンクリー
ト・モルタルのコンクリート供給管2を介した供給を再
開し、コンクリート・モルタル表面11aが前記供給口
2bの上方の一定の位置に達するまで供給を行なう第4
ステップからなる打設ステップを、1回以上繰り返すよ
うにして構成したので、コンクリート打設アダプタ1を
用いて適正な状態でコンクリート・モルタルを打設する
ことが可能となる。
The concrete supply pipe 2 is provided with a concrete / mortar supply port 2b on one side, and a connection means for connecting the concrete supply hose and the concrete supply pipe 2, such as a flange portion 2a, is provided on the other side. The stabilizer 5 in the vicinity of the supply port 2b of the supply pipe 2 is provided so as to protrude by a predetermined distance in the concrete / mortar supply direction of the supply port 2b (that is, the arrow B direction),
Using a concrete placing adapter 1 configured by providing a concrete detection sensor 7 for detecting the position of the surface 11a of the placed concrete mortar, and further installing a vibrator 6 for compacting the placed concrete mortar, When pouring concrete / mortar, when it is detected by the concrete detection sensor 7 that the surface 11a of the cast concrete / mortar 11 has reached a certain position above the supply port 2b, the concrete is supplied. A first step of interrupting the supply operation of the concrete mortar 11 via the pipe 2, a second step of driving the vibrator 6 while pulling up the concrete placing adapter 1 to compact the concrete mortar
When the concrete detecting sensor 7 detects that the surface 11a of the concrete mortar 11 has reached a certain position below the supply port 2b as a result of the step and pulling up of the concrete placing adapter 1, the concrete placing adapter 1 Step of stopping the pulling up operation and the compacting operation by the vibrator 6, the supply of the concrete and mortar through the concrete supply pipe 2 is restarted, and the concrete and mortar surface 11a is brought to a certain position above the supply port 2b. Fourth supply until reaching
Since the placing step consisting of steps is configured to be repeated once or more, it becomes possible to place concrete / mortar in an appropriate state using the concrete placing adapter 1.

また、一方にコンクリート・モルタルの供給口2bが設
けられ、他方にフランジ部2a等の、コンクリート供給
ホースとコンクリート供給管2を接続する接続手段が設
けられたコンクリート供給管2を有し、前記コンクリー
ト供給管2の供給口2bの近傍にスタビライザ5を、前
記供給口2bの、コンクリート・モルタル供給方向(即
ち、矢印B方向)に所定距離だけ突出させる形で設け、
打設されたコンクリート・モルタルの表面11aの位置
を検出するコンクリート検知センサ7を設け、更に打設
されたコンクリート・モルタルを締め固めるバイブレー
タ6を設置して構成したコンクリート打設アダプタ1を
用いて、コンクリート・モルタルを打設する際には、コ
ンクリート供給管2を介してコンクリート・モルタルを
常時供給すると共に、打設されたコンクリート・モルタ
ル11の表面11aが供給口2bの上方の一定の位置に
達したものと前記コンクリート検知センサ7により検知
されたところで、前記コンクリート打設アダプタ1を上
方に引き上げつつバイブレータ6を駆動してコンクリー
ト・モルタルの締め固めを行なう第1ステップ、コンク
リート打設アダプタ1の引き上げの結果、コンクリート
・モルタル11の表面11aが供給口2bの下方の一定
の位置に達したものと前記コンクリート検知センサ7に
より検知されたところで、コンクリート打設アダプタ1
の引き上げ動作及びバイブレータ6による締め固め動作
を停止する第2ステップからなる打設ステップを、1回
以上繰り返すようにして構成したので、コンクリート打
設アダプタ1を用いて適正な状態でコンクリート・モル
タルを打設することが可能となる。
The concrete supply pipe 2 is provided with a concrete / mortar supply port 2b on one side, and a connection means for connecting the concrete supply hose and the concrete supply pipe 2, such as a flange portion 2a, is provided on the other side. A stabilizer 5 is provided in the vicinity of the supply port 2b of the supply pipe 2 in such a manner as to protrude by a predetermined distance in the concrete / mortar supply direction (that is, the arrow B direction) of the supply port 2b,
Using a concrete placing adapter 1 configured by providing a concrete detection sensor 7 for detecting the position of the surface 11a of the placed concrete mortar, and further installing a vibrator 6 for compacting the placed concrete mortar, When pouring concrete mortar, the concrete mortar is constantly supplied through the concrete supply pipe 2, and the surface 11a of the placed concrete mortar 11 reaches a certain position above the supply port 2b. And the concrete detection sensor 7 detects that the concrete placing adapter 1 is pulled up and the vibrator 6 is driven to compact the concrete and mortar, and the concrete placing adapter 1 is pulled up. As a result, of concrete mortar 11 When the surface 11a is detected by the concrete detection sensor 7 to have reached a predetermined position below the feed opening 2b, concreting adapter 1
Since the pouring step consisting of the second step of stopping the pulling up operation and the compacting operation by the vibrator 6 is repeated one or more times, the concrete pouring adapter 1 is used to remove concrete and mortar in an appropriate state. It is possible to set.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明によるコンクリート打設アダプタの一実
施例を示す図、 第2図は第1図のII−II線による断面図、 第3図はコンクリート検知センサ部分の拡大図、 第4図は本発明によるコンクリート打設アダプタの別の
例を示す図、 第5図はコンクリート検知センサの検知体の別の例を示
す図である。 1……コンクリート打設アダプタ 2……コンクリート供給管 2a……接続手段(フランジ部) 2b……供給口 5……スタビライザ 5h……先端部 6……バイブレータ 7……コンクリート検知センサ 7e……検知部 10……コンクリート供給ホース 11……コンクリート・モルタル 11a……表面
FIG. 1 is a diagram showing an embodiment of a concrete placing adapter according to the present invention, FIG. 2 is a sectional view taken along line II-II of FIG. 1, FIG. 3 is an enlarged view of a concrete detection sensor portion, and FIG. Is a diagram showing another example of the concrete placing adapter according to the present invention, and FIG. 5 is a diagram showing another example of the detection body of the concrete detection sensor. 1 ... Concrete casting adapter 2 ... Concrete supply pipe 2a ... Connecting means (flange) 2b ... Supply port 5 ... Stabilizer 5h ... Tip 6 ... Vibrator 7 ... Concrete detection sensor 7e ... Detection Part 10 …… Concrete supply hose 11 …… Concrete mortar 11a …… Surface

フロントページの続き (72)発明者 近藤 実 千葉県流山市駒木518番地1号 三井建設 株式会社技術研究所内 (56)参考文献 特開 昭62−174455(JP,A) 特開 昭62−185962(JP,A)Front page continued (72) Inventor Minoru Kondo 518-1 Komagaki, Nagareyama City, Chiba Mitsui Construction Co., Ltd. Technical Research Institute (56) Reference JP 62-174455 (JP, A) JP 62-185962 ( JP, A)

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】一方にコンクリート・モルタルの供給口が
設けられ、他方にコンクリート供給ホースとコンクリー
ト供給管を接続する接続手段が設けられたコンクリート
供給管を有し、 前記コンクリート供給管の供給口の近傍にスタビライザ
を、前記供給口の、コンクリート・モルタル供給方向に
所定距離だけ突出させる形で設け、 打設されたコンクリート・モルタルの表面の位置を検出
するコンクリート検知センサを設け、 更に打設されたコンクリート・モルタルを締め固めるバ
イブレータを設置して構成したコンクリート打設アダプ
タ。
1. A concrete / mortar supply port is provided on one side, and a concrete supply pipe is provided on the other side with a connection means for connecting a concrete supply hose and a concrete supply pipe. A stabilizer is provided in the vicinity of the supply port so that it projects a predetermined distance in the concrete / mortar supply direction, and a concrete detection sensor for detecting the position of the surface of the cast concrete / mortar is provided. A concrete pouring adapter constructed by installing a vibrator that compacts concrete and mortar.
【請求項2】コンクリート検知センサは、コンクリート
・モルタルを検知する検知部を有し、該検知部を、コン
クリート・モルタルの打設時において、上方に突出した
形に形成して構成した特許請求の範囲第1項記載のコン
クリート打設アダプタ。
2. The concrete detection sensor has a detection portion for detecting concrete mortar, and the detection portion is formed so as to project upward when the concrete mortar is placed. Concrete pouring adapter according to the first section.
【請求項3】バイブレータがコンクリート供給管及びス
タビライザとは独立した形で設けられている特許請求の
範囲第1項記載のコンクリート打設アダプタ。
3. The concrete placing adapter according to claim 1, wherein the vibrator is provided independently of the concrete supply pipe and the stabilizer.
【請求項4】バイブレータがコンクリート供給管に固着
されている特許請求の範囲第1項記載のコンクリート打
設アダプタ。
4. The concrete pouring adapter according to claim 1, wherein the vibrator is fixed to the concrete supply pipe.
【請求項5】バイブレータがスタビライザに固着されて
いる特許請求の範囲第1項記載のコンクリート打設アダ
プタ。
5. The concrete placing adapter according to claim 1, wherein the vibrator is fixed to the stabilizer.
【請求項6】スタビライザの先端部をコンクリート・モ
ルタル打設時に下方に突出した形に形成して構成した特
許請求の範囲第1項記載のコンクリート打設アダプタ。
6. The concrete pouring adapter according to claim 1, wherein the stabilizer has a tip portion formed so as to project downward when pouring concrete and mortar.
【請求項7】一方にコンクリート・モルタルの供給口が
設けられ、他方にコンクリート供給ホースとコンクリー
ト供給管を接続する接続手段が設けられたコンクリート
供給管を有し、 前記コンクリート供給管の供給口の近傍にスタビライザ
を、前記供給口の、コンクリート・モルタル供給方向に
所定距離だけ突出させる形で設け、 打設されたコンクリート・モルタルの表面の位置を検出
するコンクリート検知センサを設け、 更に打設されたコンクリート・モルタルを締め固めるバ
イブレータを設置して構成したコンクリート打設アダプ
タを用いて、 コンクリート・モルタルを打設する際には、打設された
コンクリート・モルタルの表面が供給口の上方の一定の
位置に達したものと前記コンクリート検知センサにより
検知されたところで、コンクリート供給管を介したコン
クリート・モルタルの供給動作を中断する第1ステッ
プ、 前記コンクリート打設アダプタを上方に引き上げつつバ
イブレータを駆動してコンクリート・モルタルの締め固
めを行なう第2ステップ、 コンクリート打設アダプタの引き上げの結果、コンクリ
ート・モルタルの表面が供給口の下方の一定の位置に達
したものと前記コンクリート検知センサにより検知され
たところで、コンクリート打設アダプタの引き上げ動作
及びバイブレータによる締め固め動作を停止する第3ス
テップ、 コンクリート・モルタルのコンクリート供給管を介した
供給を再開し、コンクリート・モルタル表面が前記供給
口の上方の一定の位置に達するまで供給を行なう第4ス
テップからなる打設ステップを、 1回以上繰り返すようにして構成したコンクリート打設
アダプタを用いたコンクリート・モルタルの打設方法。
7. A concrete mortar supply port is provided on one side, and a concrete supply pipe is provided on the other side with a connecting means for connecting the concrete supply hose and the concrete supply pipe. A stabilizer is provided in the vicinity of the supply port so that it projects a predetermined distance in the concrete / mortar supply direction, and a concrete detection sensor for detecting the position of the surface of the cast concrete / mortar is provided. When placing concrete mortar using a concrete placing adapter configured by installing a vibrator for compacting concrete mortar, the surface of the placed concrete mortar is located at a certain position above the supply port. When the concrete detection sensor detects that First step of interrupting the concrete / mortar supply operation through the concrete supply pipe, second step of driving the vibrator while pulling up the concrete placing adapter to compact the concrete / mortar, concrete placing adapter When the concrete detection sensor detects that the surface of the concrete mortar has reached a certain position below the supply port as a result of the pulling up, the pulling up operation of the concrete placing adapter and the compacting operation by the vibrator are stopped. A third step, a placing step comprising a fourth step of restarting the supply of concrete / mortar through the concrete supply pipe and supplying until the surface of the concrete / mortar reaches a certain position above the supply port; To repeat more than once A method for placing concrete and mortar using the concrete placing adapter configured as above.
【請求項8】一方にコンクリート・モルタルの供給口が
設けられ、他方にコンクリート供給ホースとコンクリー
ト供給管を接続する接続手段が設けられたコンクリート
供給管を有し、 前記コンクリート供給管の供給口の近傍にスタビライザ
を、前記供給口の、コンクリート・モルタル供給方向に
所定距離だけ突出させる形で設け、 打設されたコンクリート・モルタルの表面の位置を検出
するコンクリート検知センサを設け、 更に打設されたコンクリート・モルタルを締め固めるバ
イブレータを設置して構成したコンクリート打設アダプ
タを用いて、 コンクリート・モルタルを打設する際には、 コンクリート供給管を介してコンクリート・モルタルを
常時供給すると共に、 打設されたコンクリート・モルタルの表面が供給口の上
方の一定の位置に達したものと前記コンクリート検知セ
ンサにより検知されたところで、前記コンクリート打設
アダプタを上方に引き上げつつバイブレータを駆動して
コンクリート・モルタルの締め固めを行なう第1ステッ
プ、 コンクリート打設アダプタの引き上げの結果、コンクリ
ート・モルタルの表面が供給口の下方の一定の位置に達
したものと前記コンクリート検知センサにより検知され
たところで、コンクリート打設アダプタの引き上げ動作
及びバイブレータによる締め固め動作を停止する第2ス
テップからなる打設ステップを、 1回以上繰り返すようにして構成したコンクリート打設
アダプタを用いたコンクリート・モルタルの打設方法。
8. A concrete mortar supply port is provided on one side, and a concrete supply pipe is provided on the other side with a connecting means for connecting the concrete supply hose and the concrete supply pipe, and the supply port of the concrete supply pipe is provided. A stabilizer is provided in the vicinity of the supply port so that it projects a predetermined distance in the concrete / mortar supply direction, and a concrete detection sensor for detecting the position of the surface of the cast concrete / mortar is provided. When placing concrete mortar using a concrete placing adapter configured by installing a vibrator for compacting concrete and mortar, the concrete mortar is always supplied through the concrete supply pipe and is placed. The surface of the concrete mortar is When the concrete placing adapter is reached and when it is detected by the concrete detecting sensor, the first step of compacting the concrete and mortar by driving the vibrator while pulling up the concrete placing adapter, As a result, when it is detected by the concrete detection sensor that the surface of the concrete mortar has reached a certain position below the supply port, the second step of stopping the lifting operation of the concrete placing adapter and the compaction operation by the vibrator A method for placing concrete and mortar using a concrete placing adapter configured by repeating the placing step consisting of 1 or more times.
JP7159888A 1988-03-25 1988-03-25 Concrete placing adapter and concrete / mortar placing method using the adapter Expired - Lifetime JPH0643754B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7159888A JPH0643754B2 (en) 1988-03-25 1988-03-25 Concrete placing adapter and concrete / mortar placing method using the adapter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7159888A JPH0643754B2 (en) 1988-03-25 1988-03-25 Concrete placing adapter and concrete / mortar placing method using the adapter

Publications (2)

Publication Number Publication Date
JPH01244074A JPH01244074A (en) 1989-09-28
JPH0643754B2 true JPH0643754B2 (en) 1994-06-08

Family

ID=13465258

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7159888A Expired - Lifetime JPH0643754B2 (en) 1988-03-25 1988-03-25 Concrete placing adapter and concrete / mortar placing method using the adapter

Country Status (1)

Country Link
JP (1) JPH0643754B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008075333A (en) * 2006-09-21 2008-04-03 Toda Constr Co Ltd CFT column concrete filling method and system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0399099U (en) * 1990-01-31 1991-10-16
JP7850980B2 (en) * 2021-12-27 2026-04-24 株式会社竹中土木 Drop height measuring device, drop height management system, and construction method for concrete members

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008075333A (en) * 2006-09-21 2008-04-03 Toda Constr Co Ltd CFT column concrete filling method and system

Also Published As

Publication number Publication date
JPH01244074A (en) 1989-09-28

Similar Documents

Publication Publication Date Title
KR100430342B1 (en) A formative installation and construction method of concrete file that projection is protruded into a radial shape
JP2001140256A (en) Concrete casting equipment
JP6855273B2 (en) Concrete pile compaction device and concrete pile placement management method
JP4013182B2 (en) Self-supporting mountain retaining wall method and self-supporting mountain retaining wall
CN108999394A (en) Console mode scaffold turns the construction technology of overhanging scaffold
JPH0643754B2 (en) Concrete placing adapter and concrete / mortar placing method using the adapter
JP2809007B2 (en) Concrete compaction equipment
JP2002302382A (en) Vertical suspension of long objects
JP2023135052A (en) Vibrator unit and compaction method for columnar concrete
JP4311625B2 (en) Cast-in-place concrete pile construction method and rebar cage
JPH11117235A (en) Cantilever installation equipment
JP2015134987A (en) Apparatus and method for compacting cast-in-place concrete pile
JP2855082B2 (en) Automatic concrete compaction method and device
JP2996113B2 (en) How to build a shaft
CN114016546A (en) Hole-pile method station steel pipe column hoisting and fixing device and construction method
JPH0711606A (en) Expansion tremie pipe
JPS62174455A (en) Concrete bucket with vibrator
JPS6278359A (en) Concrete vertical pouring method and pouring equipment
JPH0447102B2 (en)
JPH0313626A (en) Suspending method for reverse-wound side formwork
JPH0649976B2 (en) How to build a true pillar
JP2640419B2 (en) Pile head processing equipment
JPS62178624A (en) Driver for concrete under water
CN217651628U (en) Novel pier stud vibrating device
KR20010105498A (en) Method for nearing construction and construction system of build type breast wall

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080608

Year of fee payment: 14