Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH064994B2 - Excavation management method - Google Patents
[go: Go Back, main page]

JPH064994B2 - Excavation management method - Google Patents

Excavation management method

Info

Publication number
JPH064994B2
JPH064994B2 JP63114149A JP11414988A JPH064994B2 JP H064994 B2 JPH064994 B2 JP H064994B2 JP 63114149 A JP63114149 A JP 63114149A JP 11414988 A JP11414988 A JP 11414988A JP H064994 B2 JPH064994 B2 JP H064994B2
Authority
JP
Japan
Prior art keywords
excavation
depth
load
drive motor
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63114149A
Other languages
Japanese (ja)
Other versions
JPH01284691A (en
Inventor
洋一 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitani Sekisan Co Ltd
Original Assignee
Mitani Sekisan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitani Sekisan Co Ltd filed Critical Mitani Sekisan Co Ltd
Priority to JP63114149A priority Critical patent/JPH064994B2/en
Publication of JPH01284691A publication Critical patent/JPH01284691A/en
Publication of JPH064994B2 publication Critical patent/JPH064994B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は、駆動モータで掘削機を回転させて、杭穴を
掘削するに際し、地盤状態を適確に把握して、掘削作業
を能率よく行えるように管理する掘削管理方法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention makes it possible to efficiently grasp excavation work by accurately grasping the ground condition when excavating a pile hole by rotating an excavator with a drive motor. The present invention relates to an excavation management method for managing the excavation.

(従来の技術) 周知のように、地中に基礎杭を設置する際には、所望の
杭強度が得られるように、地盤の状態を適確に把握する
必要がある。
(Prior Art) As is well known, when installing a foundation pile in the ground, it is necessary to accurately grasp the state of the ground so that a desired pile strength can be obtained.

従来は、これに対処すべく、施工場所の適当箇所を複数
選択してテストボーリングを行ない、これらのデータか
ら施工場所の地盤状態を推定していた。
Conventionally, in order to deal with this, test boring was performed by selecting a suitable portion of the construction site, and the ground condition of the construction site was estimated from these data.

尚、このテストボーリングでは、掘削機の駆動モータの
負荷電流を掘削時間とともに測定して、地盤の状態を把
握する方法も用いられている。
Incidentally, in this test boring, a method of measuring the load current of the drive motor of the excavator along with the excavation time and grasping the state of the ground is also used.

(発明が解決しようとする課題) しかしながら、従来のテストボーリングでは、実際の杭
穴形成部と、テストボーリングの場所とが異なるため、
推定した地盤構成と実際の地盤とが異なる場合があり、
正確性に欠けるという問題点がある。
(Problems to be solved by the invention) However, in the conventional test boring, since the actual pile hole forming portion and the location of the test boring are different,
The estimated ground structure may differ from the actual ground,
There is a problem of lack of accuracy.

さらに、地盤の状態を経時的に変化する駆動モータの負
荷電流で把握しようとしても、負荷電流は仕事率に比例
した数値に示すにすぎず、特定深度で掘削に要する時間
が異なっても、負荷電流は変化せず、地盤の固さが適確
に示されないという問題点がある。
Furthermore, even if we try to understand the state of the ground by the load current of the drive motor, which changes with time, the load current only shows a value proportional to the power, and even if the time required for excavation at a specific depth differs, There is a problem in that the current does not change and the hardness of the ground is not accurately shown.

この発明は、上記問題点を解決することを基本的な目的
とし、杭穴掘削位置の地盤を正確に把握して、能率よく
掘削作業を行なうことができる掘削管理方法を提供する
ものである。
The present invention has as its basic purpose to solve the above problems, and provides a digging management method capable of accurately grasping the ground at a pile hole digging position and performing digging work efficiently.

(課題を解決するための手段) 上記課題を達成するため本願発明の掘削管理方法は、駆
動モータで掘削機を回転させて杭穴を掘削するに際し、
掘削深度と、駆動モータの負荷電流またはトルクのいず
れか一方から構成される負荷値とを、単位時間毎または
連続的に検出し、前記掘削深度に対応して、前記負荷値
の時間積を演算回路で算出し、この時間積を前記掘削深
度との関係において、表示手段で表示し、この表示に基
づいて掘削完了時点を制御することを特徴とするもので
ある。
(Means for Solving the Problem) In order to achieve the above object, the excavation management method of the present invention is to excavate a pile hole by rotating an excavator with a drive motor,
The excavation depth and the load value composed of either the load current or the torque of the drive motor are detected for each unit time or continuously, and the time product of the load values is calculated corresponding to the excavation depth. It is characterized in that it is calculated by a circuit, this time product is displayed on the display means in relation to the excavation depth, and the excavation completion time point is controlled based on this display.

尚、演算回路には、マイクロコンピュータのCPUを使
用することができ、この出力をブラウン管や液晶ディス
プレイ、さらにプリンターなどの表示手段に表示する。
A CPU of a microcomputer can be used for the arithmetic circuit, and this output is displayed on a cathode ray tube, a liquid crystal display, and a display means such as a printer.

尚、この表示手段への表示においては、負荷値の時間積
を掘削深度との関係においてグラフ化するのが望まし
い。
In the display on this display means, it is desirable to graph the time product of load values in relation to the excavation depth.

この表示に基づいて、杭穴掘削作業の制御を行なう。The pile hole excavation work is controlled based on this display.

すなわち、掘削深度および負荷値の時間積を表示手段に
おいて、視覚で認識・把握し、これら表示に基づいて、
十分な杭穴強度を有していると判断される時点で杭穴掘
削を終了する。その後は常法により、現場打ち杭を構築
したり、既製杭を設置する。
That is, the time product of the excavation depth and the load value is visually recognized and grasped by the display means, and based on these displays,
The pile hole excavation is terminated when it is judged that the pile hole has sufficient strength. After that, in-situ piles will be constructed and ready-made piles will be installed by the usual method.

(作用) この発明によれば、掘削時に単位時間毎または連続し
て、駆動モータの負荷値が掘削深度とともに得られ、さ
らに演算回路で掘削深度に対応した負荷値の時間積が得
られる。この時間積は単なる負荷値と異なり、時間を要
素とするものであるから、仕事量に比例した数値とな
り、地盤の固さを反映した数値が得られることになる。
この数値は、掘削深度との関係において、表示手段で表
示され、地盤の状態が視覚により容易に把握される。
(Operation) According to the present invention, the load value of the drive motor is obtained together with the excavation depth at every unit time or continuously during excavation, and the time product of the load values corresponding to the excavation depth is obtained by the arithmetic circuit. This time product is different from a simple load value and has time as an element. Therefore, it is a value proportional to the amount of work, and a value reflecting the hardness of the ground can be obtained.
This numerical value is displayed by the display means in relation to the excavation depth, and the state of the ground can be easily grasped visually.

したがって、杭穴の掘削を過不足なく行なうことがで
き、良質の杭が効率よく構築されることになる。
Therefore, excavation of pile holes can be performed without excess or deficiency, and high-quality piles can be efficiently constructed.

(実施例) 以下にこの発明の一実施例を添付図面に基づき説明す
る。
(Embodiment) An embodiment of the present invention will be described below with reference to the accompanying drawings.

第1に、この方法の実施に用いる掘削装置全体の概略を
第1図に基づいて説明する。
First, the outline of the entire excavation equipment used for carrying out this method will be described with reference to FIG.

キャタビラ移動式の杭打ち機1には、アーム2が起立さ
れており、このアーム2の先端に設けたシーブ3を介し
て、ワイヤ4が昇降自在に吊り下げられ、ワイヤ4の先
端にオーガマシン5が接続されている。オーガマシン5
の基端には、駆動モータ6を収納したボックス7が取付
けられており、このボックス7の下部には、駆動モータ
6で回転駆動される回転ロッド8が垂下されている。
An arm 2 is erected on a caterpillar-movable pile driving machine 1, and a wire 4 is hung up and down via a sheave 3 provided at the tip of the arm 2, and an auger machine is provided at the tip of the wire 4. 5 is connected. Auger machine 5
A box 7 accommodating the drive motor 6 is attached to the base end of the, and a rotary rod 8 rotatably driven by the drive motor 6 is hung below the box 7.

回転ロッド8の下端には、掘削刃9が設けられていると
共に、回転ロッド8の外壁には、所定間隔を置いて、軸
方向に沿って多数の攪拌棒10…10が突設されてお
り、さらに、数個の練り付けドラム11が配設されてい
る。
A drilling blade 9 is provided at the lower end of the rotary rod 8, and a large number of stirring rods 10 ... 10 are provided on the outer wall of the rotary rod 8 at predetermined intervals along the axial direction. Further, several kneading drums 11 are arranged.

次に、この装置の制御系統を第2図に基づき説明する。Next, the control system of this device will be described with reference to FIG.

前記駆動モータ6には、駆動モータ6の負荷電流を測定
する負荷電流計12が接続されている。またシーブ3に
は、シーブ3の回転によりパルスを発生するパルス式測
定器が近接配置されている。このパルス式測定器では、
シーブ3の回転によりワイヤ4が1m宛移動した際に、
10パルス(1パルス当り0.1m)を発生するもので
あり、オーバマシン5の降下量、すなわち掘削深度を検
知する深度計13として機能する。
A load ammeter 12 for measuring the load current of the drive motor 6 is connected to the drive motor 6. Further, a pulse-type measuring device that generates a pulse by the rotation of the sheave 3 is arranged in proximity to the sheave 3. In this pulse type measuring instrument,
When the wire 4 moves 1 m due to the rotation of the sheave 3,
It generates 10 pulses (0.1 m per pulse) and functions as a depth gauge 13 for detecting the amount of descent of the overmachine 5, that is, the excavation depth.

これら負荷電流計12および深度計13には、マイクロ
コンピュータのCPU14が接続されている。さらに、
CPU14は、表示手段であるCRT15および記録装
置16に接続されている。
A CPU 14 of a microcomputer is connected to the load ammeter 12 and the depth meter 13. further,
The CPU 14 is connected to a CRT 15 and a recording device 16 which are display means.

次に、この装置における掘削制御方法を第3図に基づい
て説明する。
Next, the excavation control method in this device will be described with reference to FIG.

杭打ち機1を所望の杭打ち位置に移動し、駆動モータ6
で回転ロッド8を回転させつつ、ワイヤ4を介してオー
ガマシン5を徐々に下降させる。
Move the pile driver 1 to the desired pile driving position, and drive the drive motor 6
While rotating the rotating rod 8 with, the auger machine 5 is gradually lowered through the wire 4.

上記オーガマシン5の下降量は、掘削深度として、深度
計13で検出されており、掘削刃9が地面と接した位置
で深度を0とするように初期設定する(ステップ1)。
The descending amount of the auger machine 5 is detected as the excavation depth by the depth gauge 13, and the depth is initially set to 0 at the position where the excavation blade 9 contacts the ground (step 1).

また駆動モータ6の負荷電流は、負荷電流計12で連続
的に検出されており、無負荷時の測定電流を初期電流A
として設定する(ステップ2)。
The load current of the drive motor 6 is continuously detected by the load ammeter 12, and the measured current when no load is applied is the initial current A.
It is set as 0 (step 2).

オーガマシン5を引き続き下降させることにより、掘削
刃9で地面が掘削され、攪拌棒10…10で泥土を攪拌
しつつ、練り付けドラム11で杭穴14の壁面に練り付
ける。
By continuing to lower the auger machine 5, the ground is excavated by the excavating blade 9, and the mud is stirred by the stirring rods 10 ... 10 while being kneaded on the wall surface of the pile hole 14 by the kneading drum 11.

掘削に際し、地盤の固さにより、駆動モータ6に対する
負荷が変わり、これに応じて負荷電流が変化する。
At the time of excavation, the load on the drive motor 6 changes due to the hardness of the ground, and the load current changes accordingly.

上記負荷電流Aおよび深度Dは、1秒毎に負荷電流計1
2および深度計13で測定され(ステップ3)、その出
力値がCPU14へと入力される。CPU14では、負
荷電流A、深度D、さらに掘削開始からの経過時間をデ
ータとして記録装置16に送出して記録保存する。さら
に、上記負荷電流Aおよび深度DをCRT15で数値と
して表示する(ステップ4)。引き続きCPU14では
以下の処理がなされる。
The load current A and the depth D are the load ammeter 1 every 1 second.
2 and the depth meter 13 (step 3), and the output value is input to the CPU 14. The CPU 14 sends the load current A, the depth D, and the elapsed time from the start of excavation as data to the recording device 16 for recording and storage. Further, the load current A and the depth D are displayed as numerical values on the CRT 15 (step 4). Subsequently, the CPU 14 performs the following processing.

次いで、測定深度Dが掘削作業中において測定された最
大の掘削深度Dmaxを超えているか否かの判別、すな
わち、杭穴が掘り進められたものであるか否かの判別を
行なう(ステップ5)。ここでD<Dmaxの場合、す
なわち、掘削刃が最深掘削位置から後退した状態では、
処理をステップ3に戻し、単位時間毎の深度D、電流A
の測定を行なう。尚、D<Dmaxの状態では、測定さ
れた電流Aは掘削に寄与していないものと考えられるの
で、これは初期電流Aに加え、加算結果をAに置き
換えるのが望ましい。また、ステップ5でD>Dmax
の判別がなされた場合、すなわち掘削が進行している状
態では、第4図に詳細が示されるステップ6のグラフィ
ック表示処理がなされ、最大掘削深度Dmaxを測定深
度Dで置き換えた後(ステップ7)、ステップ8へと処
理を進める。
Next, it is determined whether or not the measured depth D exceeds the maximum excavation depth D max measured during excavation work, that is, whether or not the pile hole has been dug (step 5). ). Here, in the case of D <D max , that is, when the excavating blade is retracted from the deepest excavation position,
The process is returned to step 3, and the depth D and the current A are set every unit time.
Measure. In addition, in the state of D <D max , it is considered that the measured current A does not contribute to the excavation. Therefore, it is desirable that the addition result is replaced with A 0 in addition to the initial current A 0 . In step 5, D> D max
If the determination is made, that is, in the state where the excavation is in progress, the graphic display process of step 6 whose details are shown in FIG. 4 is performed, and the maximum excavation depth D max is replaced with the measurement depth D (step 7 ), The process proceeds to step 8.

また、ステップ5で、D=Dmaxの判別がなされた場
合、すなわち同一深度で掘削がなされている場合には、
ステップ5から直接ステップ8へと処理が進められる。
In addition, when it is determined in step 5 that D = D max , that is, when excavation is performed at the same depth,
The process proceeds from step 5 directly to step 8.

ステップ8では、深度Dで掘削0.1mに要した電流の
積算値S(D)に測定電流Aを加え、これをS
(D)に置き換えるとともに、深度D−0.1から深
度Dに至る間の測定度数n(D)に1を加える。
In step 8, the measured current A is added to the integrated value S A (D) of the current required for excavation 0.1 m at the depth D, and this is S
While replacing with A (D), 1 is added to the measurement frequency n (D) from the depth D-0.1 to the depth D.

ステップ8の後には、処理を終了するか否かの判別を行
ない、処理を続行する場合には、ステップ3に処理を戻
し、前記処理を繰り返す(ステップ9)。
After step 8, it is determined whether or not the process is to be ended. When the process is to be continued, the process is returned to step 3 and the process is repeated (step 9).

次に、ステップ6のグラフィック表示処理を第4図に基
づいて詳細に説明する。
Next, the graphic display process of step 6 will be described in detail with reference to FIG.

グラフ画面上で縦軸(Y)を掘削深度に設定し、横軸
(X)を電流の積算値に設定する。そして、深度D−
0.1をYとし(ステップ61)、掘削深度D−0.
1のときに掘削0.1mに要した電流の積算値(S
(Y)−A*n(Y)をXとする(ステップ
62)。
On the graph screen, the vertical axis (Y) is set to the excavation depth, and the horizontal axis (X) is set to the integrated value of current. And the depth D-
0.1 as Y 1 (step 61), and the excavation depth D-0.
In the case of 1, the integrated value of the current required for excavation 0.1 m (S
A (Y 1) -A 0 * n (Y 1) is referred to as X 1 (step 62).

さらに測定深度DをYとし(ステップ63)、掘削深
度Dのときに、掘削0.1mに要した電流の積算値(S
(Y)−A*n(Y)をXとする(ステップ
64)。
Further, the measurement depth D is set to Y 2 (step 63), and when the excavation depth D is set, the integrated value of the current required for excavation 0.1 m (S
Let A (Y 2 ) −A 0 * n (Y 2 ) be X 2 (step 64).

以上求めた(X、Y)および(X、Y)をグラ
フ画面上の座標点として、両者を結線することによりグ
ラフを作成する(ステップ65)。
Using (X 1 , Y 1 ) and (X 2 , Y 2 ) thus obtained as coordinate points on the graph screen, the two are connected to create a graph (step 65).

上記グラフ処理は、CPU14で行なわれ、その出力が
CRT15に送出される。CRT15に表示されるグラ
フは、第5図に示されるように、掘削深度と、負荷電流
の時間積との関係が示されており、掘削深度に応じて時
間積が増減変化する。但し、その基調は、掘削深度が大
きくなるに従い、時間積が増大する傾向にある。
The above graph processing is performed by the CPU 14, and its output is sent to the CRT 15. As shown in FIG. 5, the graph displayed on the CRT 15 shows the relationship between the excavation depth and the time product of the load current, and the time product increases or decreases according to the excavation depth. However, the keynote is that the time product tends to increase as the excavation depth increases.

このように、時間積が増大する場合には、特定の深度に
おいて、負荷電流が増大したものか、あるいは、その深
度における掘削に長時間を要したものであり、地盤が固
い状態にあることを示している。したがって、上記時間
積が所望の数値(杭打場所の条件などにより予め設定し
たもの)に達した際には、所望の地盤強度が得られたも
のとして掘削を停止し、杭穴下端部を支持地盤として、
杭を現場にて構築し、または既製杭を設置する。得られ
た杭は、最適な強度を有する地盤で支持されており、杭
としての機能が十分に果されることになる。
In this way, if the time product increases, it means that the load current has increased at a specific depth, or that excavation at that depth has taken a long time, and the ground is in a solid state. Shows. Therefore, when the above time product reaches the desired value (preset according to the conditions of the pile driving place, etc.), the excavation is stopped assuming that the desired ground strength has been obtained, and the bottom end of the pile hole is supported. As the ground,
Build piles on site or install ready-made piles. The obtained pile is supported by the ground having the optimum strength, and the function as the pile is sufficiently fulfilled.

尚、記録装置16に保存したデータは、再度呼び出すこ
とにより、各種データとして活用することができる。さ
らに上記実施例では、負荷電流を負荷値としてそのまま
用いたが、モータの特性により、負荷値と負荷電流と
は、比例関係からややずれた関係にあるので、負荷電流
に修正を加えて後の処理を行なうのが望ましい。さら
に、土質などによって、負荷電流に対応した負荷値も異
なるので、掘削土質に応じて比率を定め、この比率を負
荷電流に乗じて負荷値とし、これをグラフ表示すること
も可能である。
The data stored in the recording device 16 can be utilized as various data by recalling it. Further, in the above embodiment, the load current is used as it is as the load value, but because of the characteristics of the motor, the load value and the load current are in a relationship that is slightly deviated from the proportional relationship. It is desirable to perform processing. Further, since the load value corresponding to the load current also differs depending on the soil quality, it is possible to determine the ratio according to the excavated soil quality, multiply the load current by this ratio to obtain the load value, and display this as a graph.

尚、上記実施例では、深度および負荷電流の測定は、一
定時間毎に測定して行なったが、連続して測定すること
も可能であり、またCPU14においても連続して算出
を行なうことも可能である。
In the above embodiment, the depth and the load current are measured at fixed time intervals, but they can also be measured continuously, and the CPU 14 can also calculate continuously. Is.

また、上記実施例では駆動モータの負荷電流を測定して
時間積を求めたが、これに代えて駆動モータのトルクを
測定して時間積を求めて表示することも可能である。
Further, in the above-described embodiment, the load current of the drive motor is measured and the time product is obtained, but instead of this, the torque of the drive motor is measured and the time product can be obtained and displayed.

(発明の効果) 以上説明したように、本願発明の掘削管理方法によれ
ば、駆動モータで掘削機を回転させて杭穴を掘削するに
際し、掘削深度と、駆動モータの負荷電流またはトルク
のいずれか一方から構成される負荷値とを、単位時間毎
または連続的に検出し、前記掘削深度に対応して、負荷
値の時間積を演算回路で算出し、この時間積を掘削深度
との関係において、表示手段で表示し、この表示に基づ
いて掘削制御するので、現実の杭穴掘削時に、リアルタ
イムで正確な地盤状態を知ることかできるので、過不足
なく杭穴掘削の作業を行なうことができると共に、杭に
適した杭穴を効率よく掘削することができるという効果
がある。
(Effects of the Invention) As described above, according to the excavation management method of the present invention, when excavating a pile hole by rotating the excavator with the drive motor, any of the excavation depth and the load current or torque of the drive motor. A load value composed of either one of them is detected for each unit time or continuously, and a time product of the load values is calculated by an arithmetic circuit in accordance with the excavation depth, and the time product is related to the excavation depth. In the above, since it is displayed by the display means and the excavation is controlled based on this display, it is possible to know the accurate ground condition in real time during the actual excavation of the pile hole. In addition to that, there is an effect that a pile hole suitable for a pile can be efficiently excavated.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの発明の一実施例における掘削作業を示す概
略図、第2図は同じく制御系統を示すブロック図、第3
図は同じく掘削作業の手順を示すフローチャート、第4
図は同じく一部処理工程を詳細に示すフローチャート、
第5図は掘削深度と負荷電流の時間積との関係を示すグ
ラフである。 1…杭打ち機、5…オーガマシン 6…駆動モータ、12…負荷電流計 13…深度計、14…CPU 15…CRT、16…記録装置
FIG. 1 is a schematic view showing excavation work in one embodiment of the present invention, FIG. 2 is a block diagram showing the same control system, and FIG.
The figure is the same flowchart showing the procedure of excavation work, No. 4
The figure is also a flowchart showing in detail some processing steps,
FIG. 5 is a graph showing the relationship between excavation depth and time product of load current. DESCRIPTION OF SYMBOLS 1 ... Pile driver, 5 ... Auger machine 6 ... Drive motor, 12 ... Load ammeter 13 ... Depth meter, 14 ... CPU 15 ... CRT, 16 ... Recording device

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】駆動モータで掘削機を回転させて杭穴を掘
削するに際し、掘削深度と、駆動モータの負荷電流また
はトルクのいずれか一方から構成される負荷値とを、単
位時間毎または連続的に検出し、前記掘削深度に対応し
て、前記負荷値の時間積を演算回路で算出し、この時間
積を前記掘削深度との関係において、表示手段で表示
し、この表示に基づいて掘削完了時点を制御することを
特徴とした掘削管理方法
1. When excavating a pile hole by rotating an excavator with a drive motor, the excavation depth and the load value composed of either the load current or the torque of the drive motor are set for each unit time or continuously. Detected, the time product of the load values is calculated by an arithmetic circuit in accordance with the excavation depth, the time product is displayed on the display means in relation to the excavation depth, and excavation is performed based on this display. Excavation management method characterized by controlling completion time
【請求項2】表示手段は、ブラウン管または液晶ディス
プレイのいずれか一方から構成する請求項1記載の掘削
管理方法
2. The excavation management method according to claim 1, wherein the display means comprises either a cathode ray tube or a liquid crystal display.
JP63114149A 1988-05-11 1988-05-11 Excavation management method Expired - Lifetime JPH064994B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63114149A JPH064994B2 (en) 1988-05-11 1988-05-11 Excavation management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63114149A JPH064994B2 (en) 1988-05-11 1988-05-11 Excavation management method

Publications (2)

Publication Number Publication Date
JPH01284691A JPH01284691A (en) 1989-11-15
JPH064994B2 true JPH064994B2 (en) 1994-01-19

Family

ID=14630374

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63114149A Expired - Lifetime JPH064994B2 (en) 1988-05-11 1988-05-11 Excavation management method

Country Status (1)

Country Link
JP (1) JPH064994B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008095502A (en) * 2001-02-16 2008-04-24 Mitani Sekisan Co Ltd Pile hole drilling method and foundation pile constructing method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6356953B2 (en) * 2013-10-16 2018-07-11 株式会社アイチコーポレーション Earth auger device
JP6926441B2 (en) * 2016-10-27 2021-08-25 株式会社大林組 Ground drilling drill control method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5617511A (en) * 1979-07-23 1981-02-19 Sony Corp Variable attenuating circuit
JPS6195197A (en) * 1984-10-16 1986-05-13 日立建機株式会社 Automatic drilling control apparatus
JPS61142216A (en) * 1984-12-12 1986-06-30 Japan Steel & Tube Constr Co Ltd Calculator for kinetic supporting capacity of pile being driven
JPH0320392Y2 (en) * 1985-02-25 1991-05-01
JPH0426555Y2 (en) * 1986-04-08 1992-06-25

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008095502A (en) * 2001-02-16 2008-04-24 Mitani Sekisan Co Ltd Pile hole drilling method and foundation pile constructing method

Also Published As

Publication number Publication date
JPH01284691A (en) 1989-11-15

Similar Documents

Publication Publication Date Title
JP3437108B2 (en) Management method of ground improvement method and management device of ground improvement machine
JP6969212B2 (en) Support layer arrival judgment method and judgment support system
JP6699135B2 (en) Electric resistivity detector and quality control method for soil cement body
JP5819152B2 (en) Support layer arrival estimation method and support layer arrival estimation support device used in pile embedding method
JP3831181B2 (en) Construction management system and construction management method for rotary press-fit piles
JPH064994B2 (en) Excavation management method
JP2010275851A (en) Method for improving surface layer soil
JP4753132B2 (en) Pile hole drilling method
JP2001064954A (en) Method and apparatus for conducting loading test at front end of cast-in-place pile
JP2789381B2 (en) Geological discrimination method for pile holes
JP3224686B2 (en) Drilling rig depth detector
JP2018071320A (en) Ground excavation method
JP3352812B2 (en) Method and apparatus for measuring ground hardness
JPH09137449A (en) Control method for automatic formation of soil cement columns in foundation ground
JP3753240B2 (en) Management method for ground improvement method and management device for ground improvement machine
JP2895677B2 (en) Ground hardness judgment device
JP3788728B2 (en) Device that displays the construction status of the ground improvement method
JP2873397B2 (en) Land Survey System
JP7597324B2 (en) Method and system for determining reach to support group
JP4695056B2 (en) Construction management device
JP3002075B2 (en) Excavator rope replacement alarm
JP2022178028A (en) work machine
CN113153272A (en) CFG pile drilling construction depth detection and construction control system and method
JPH09126771A (en) Underground tip position detection system for excavator and agitator
JP2656742B2 (en) Bucket type excavator and its excavation method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090119

Year of fee payment: 15

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090119

Year of fee payment: 15