JPH0660492B2 - Vertical underground construction method for continuous underground wall - Google Patents
[go: Go Back, main page]

JPH0660492B2 - Vertical underground construction method for continuous underground wall - Google Patents

Vertical underground construction method for continuous underground wall

Info

Publication number
JPH0660492B2
JPH0660492B2 JP60184026A JP18402685A JPH0660492B2 JP H0660492 B2 JPH0660492 B2 JP H0660492B2 JP 60184026 A JP60184026 A JP 60184026A JP 18402685 A JP18402685 A JP 18402685A JP H0660492 B2 JPH0660492 B2 JP H0660492B2
Authority
JP
Japan
Prior art keywords
wall
underground
vertical
construction method
continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP60184026A
Other languages
Japanese (ja)
Other versions
JPS6245820A (en
Inventor
克朗 小畠
賢一 入沢
利武 菊地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP60184026A priority Critical patent/JPH0660492B2/en
Publication of JPS6245820A publication Critical patent/JPS6245820A/en
Publication of JPH0660492B2 publication Critical patent/JPH0660492B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 《産業上の利用分野》 本発明は、特に大深度の地中壁間の接合に好適な連続地
中壁の鉛直接合工法に関する。
DETAILED DESCRIPTION OF THE INVENTION << Industrial Field of Application >> The present invention relates to a method for vertically joining continuous underground walls, which is particularly suitable for joining deep underground walls.

《従来の技術》 従来の地中壁相互の鉛直打継部の接合工法としては、地
中壁水平鉄筋の重ね継手形式による場合が主である。こ
の形式は先行壁と、後行壁との接合面にシャーコネクタ
や補強材を装備した仕切鋼板や、凹凸面をもつプレキャ
スト板などの仕切板が介在され、これらを介して両壁体
間で剪断力が伝達する機構になっている。
<Prior art> The conventional method of joining vertical joints between underground walls is mainly the lap joint type of horizontal reinforcement of underground walls. This type has a partition plate such as a partition steel plate equipped with shear connectors and reinforcing materials on the joint surface between the leading wall and the trailing wall, and a partition plate such as a precast plate with an uneven surface, and between these walls between them. It has a mechanism to transmit shearing force.

《発明が解決しようとする問題点》 しかしながら、の両壁間に挾まれた仕切板にはマッドケ
ーキが付着しやすく、この付着により仕切板と壁体コン
クリートとの間の付着力の劣化が生じやすく、止水性が
低下し、また剪断伝達の低下が起こりやすく、打継部の
一部性機能が低下し易い。
<Problems to be solved by the invention> However, the mud cake is apt to adhere to the partition plate sandwiched between the both walls, and this adhesion causes deterioration of the adhesive force between the partition plate and the wall concrete. Easily, the water-stopping property is lowered, the shear transmission is apt to be lowered, and the partial function of the splice part is apt to be lowered.

そしてこのことは、比較的浅深度の地中壁ではあまり問
題とならないが、例えば50〜100mもの大深度地中
壁に適用した場合には極端に表われ、施工が困難で、経
済的にも高価となる割りには上述の如き問題が生じやす
く、従って、以上の従来工法では大深度地中壁の施工は
不可能に近いものであった。
And this is not a problem in the underground wall of a relatively shallow depth, but when it is applied to a deep underground wall of, for example, 50 to 100 m, it extremely appears, construction is difficult, and economically. Although it is expensive, the above-mentioned problems are likely to occur. Therefore, it is almost impossible to construct a deep underground wall by the above conventional method.

この発明は以上の如き問題点に鑑みなされたものであっ
て、その目的とするところは、打継部の構造が簡単であ
り、施工が容易で、しかも打継部の一体性機能が向上で
き、止水性に富み、さらに経済的に施工を行える連続地
中壁の鉛直接合工法を提供することにある。
The present invention has been made in view of the above problems, and an object thereof is that the structure of the joint portion is simple, the construction is easy, and the integration function of the joint portion can be improved. The purpose of the present invention is to provide a vertical underground construction method for continuous underground walls that is highly waterproof and can be constructed economically.

《問題点を解決するための手段》 前記の目的を達成するため、本発明工法は、先行地中壁
の鉛直打継部のコンクリート面を切削により粗面化する
とともに、該コンクリート面を切削することにより縦方
向に沿って粗面の切欠部を形成し、しかる後、打継部に
後行地中壁を構成するコンクリートを打設して地中壁相
互間をほぞ組構造により一体に打継ぐことを特徴とす
る。
<< Means for Solving Problems >> In order to achieve the above-mentioned object, the method of the present invention is to roughen the concrete surface of the vertical joint of the preceding underground wall by cutting and cut the concrete surface. By doing this, a notch with a rough surface is formed along the vertical direction, and then the concrete forming the trailing underground wall is placed in the joint section and the ground walls are punched together by a tenon structure. Characterized by succession.

《実施例》 以下、本発明工法の実施例を図面に基づき詳細に説明す
る。
<Example> Hereinafter, an example of the method of the present invention will be described in detail with reference to the drawings.

第1図乃至第3図は本発明工法の第1実施例を示す。1 to 3 show a first embodiment of the method of the present invention.

この実施例は中間地盤を残して間欠的に堀削された縦孔
内にコンクリートをそれぞれ打設することによって、間
欠的に先行壁を構築し、構築された先行壁間の中間地盤
を掘削するとき、先行壁端面を切削しながら掘削するこ
とにより、粗面化された接合面を露出し、この中間孔内
にコンクリートを打設することによって後行壁を先行壁
に打ち継いでいく工法である。
In this example, the preceding ground is intermittently constructed by placing concrete in each of the vertically excavated vertical holes leaving the intermediate ground, and the intermediate ground between the constructed preceding walls is excavated. At this time, by excavating while cutting the end face of the preceding wall, the roughened joint surface is exposed, and by placing concrete in this intermediate hole, the trailing wall is spliced to the preceding wall. is there.

まず、第1図において、連続地中壁の−エレメントを構
成する先行壁1は、中間地盤2を残して間欠的に掘削さ
れた大深度の縦孔3内に、鉄筋で補強されたコンクリー
トをそれぞれ打設することよって間欠的に構築されたも
のである。
First, in FIG. 1, a leading wall 1 forming a negative element of a continuous underground wall is made of concrete reinforced by reinforcing steel in a vertical hole 3 of large depth which is intermittently excavated leaving an intermediate ground 2. It was constructed intermittently by casting each.

そして、先行壁1の後行壁6に対する打継部の中央に
は、縦方向に沿って低強度コンクリートや発泡樹脂など
からなる低強度ブロック4が予め縦方向に先行壁1の鉄
筋籠にセットされている。
Then, a low-strength block 4 made of low-strength concrete, foamed resin, or the like is set in the longitudinal direction in the center of the joining portion to the trailing wall 6 of the preceding wall 1 in advance in the longitudinal direction in the rebar cage of the preceding wall 1. Has been done.

次に、中間地盤2には第2図に示すように、掘削された
縦孔2′が形成される。この掘削の際、縦孔2内に満た
された安定液5の中で、先行壁1の打継部の端面と低強
度ブロック4の部分とを、例えばドラム式カッターなど
の如き切削手段により粗面化しながら切削する。これに
より、先行壁1の打継部は凹凸1aが形成されるととも
に、低強度ブロック4を除去した位置に凹凸1bをもつ
ほぞ孔6aが縦方向に沿って形成される。
Next, in the intermediate ground 2, as shown in FIG. 2, excavated vertical holes 2'are formed. At the time of this excavation, in the stabilizing solution 5 filled in the vertical hole 2, the end surface of the joint portion of the leading wall 1 and the portion of the low-strength block 4 are roughened by a cutting means such as a drum type cutter. Cutting while surfaceizing. As a result, concavities and convexities 1a are formed in the joint portion of the preceding wall 1, and mortises 6a having concavities and convexities 1b are formed along the vertical direction at positions where the low-strength block 4 has been removed.

次いで、第2図に示す如く中間縦孔2′の内部に、鉄筋
で補強されたコンクリートを打設することにより、第3
図に示す如く先行壁1と後行壁6との打継部分にほぞ孔
6aを形成し、打継全面を粗面化とした継手構造を形成
し、一体に打継がれることになる。
Then, as shown in FIG. 2, by placing concrete reinforced with reinforcing bars inside the intermediate vertical hole 2 ',
As shown in the figure, a mortise hole 6a is formed in the joint portion of the leading wall 1 and the trailing wall 6, and a joint structure in which the entire joint surface is roughened is formed and jointed together.

第4図は、以上のように構築された連続地中壁の配筋の
一例を示すもので、先行壁1と後行壁6の水平鉄筋は連
結はされていないが、打継部において、後行壁6の鉄筋
10がほぞ孔6aの形状に沿って突出した形状の鉄筋籠
となっているため、所要の剪断補強を発揮することにな
る。
FIG. 4 shows an example of the reinforcement of the continuous underground wall constructed as described above. The horizontal reinforcements of the preceding wall 1 and the following wall 6 are not connected, but Since the reinforcing bar 10 of the trailing wall 6 is a reinforcing bar cage having a shape protruding along the shape of the mortise hole 6a, a required shear reinforcement is exerted.

次に、第5図は本発明工法の第2実施例による打継部の
完成状態を示すものである。
Next, FIG. 5 shows a completed state of the splice part according to the second embodiment of the method of the present invention.

この実施例においては、先行壁1の断面外側にほぞ孔6
bを設け、先行壁1の中央部が突出した形状になるよう
に掘削した場合である。後行壁6にはこれを受け入れる
凹凸が形成されている。この実施例においては、前記と
は逆に図中右側に示されているように、打継部において
ほぞ孔6bの形成個所の両脇に低強度ブロック4を配置
しておき、後行壁6の掘削時においてこれを切削などに
より除去しながら、ほぞ孔面にも凹凸1cを設ければ良
い。
In this embodiment, a mortise 6 is provided outside the cross section of the leading wall 1.
This is a case where b is provided and excavation is performed so that the center portion of the leading wall 1 has a protruding shape. The trailing wall 6 is formed with irregularities for receiving it. Contrary to the above, in this embodiment, as shown on the right side of the drawing, the low-strength blocks 4 are arranged on both sides of the forming part of the mortise hole 6b in the joining portion, and the trailing wall 6 is formed. When excavating, the unevenness 1c may be provided on the mortise surface while removing it by cutting or the like.

なお、各実施例においては、先行壁1間の中間地盤を掘
削し、これに後行壁を打継ぐ工法に適用したが、先行壁
に後行壁を順次打ち足して延長していく工法にも適用で
きる。
In each of the examples, the method of excavating the intermediate ground between the leading walls 1 and joining the trailing wall to this was applied, but the method of adding the trailing wall to the leading wall one by one and extending it Can also be applied.

また、後行壁の形成する縦孔を掘削するに当たっては、
ドラムカッターなどの堀削幅が壁厚に満たない場合に、
前記ほぞ孔部分を結ぶ部分を堀削し、次いで他の部分を
堀削する方法も採用できる。
In addition, when excavating the vertical hole formed by the trailing wall,
If the excavation width of a drum cutter is less than the wall thickness,
A method of excavating the portion connecting the mortises and then excavating the other portion can also be adopted.

《発明の効果》 以上各実施例により詳細に説明したように、本発明工法
によれば、連続地中壁の打継部にシヤーコネクタ補強鋼
材などの必要がないため、堀削時に切欠きの形成工程を
加えるだけで強固なほぞ組構造で打継ぐことができ、施
工が極めて容易で、経済的である。
<Effects of the Invention> As described in detail in each of the above examples, according to the method of the present invention, since there is no need for a shear connector reinforcing steel material or the like in the joint portion of the continuous underground wall, there is no cutout at the time of excavation. It can be connected with a strong tenon structure simply by adding a forming process, and construction is extremely easy and economical.

また、ほぞ組構造によって止水性が向上し極めて強固な
打継ぎ面を得ることができる。
Further, the mortise structure improves the water blocking performance and makes it possible to obtain an extremely strong piecing surface.

【図面の簡単な説明】[Brief description of drawings]

第1図乃至第3図は本発明工法の第1の実施例による施
工順序を示す平面図、第4図は同施工方法における配筋
の一例を示す断面図、第5図は本発明工法の第2実施例
による完成状態を示す平面図である。 1……先行壁、1a……凹凸 1b,1b……ほぞ孔面の凹凸 4……低強度ブロック 6……後行壁,6a、6b……ほぞ孔
1 to 3 are plan views showing the order of construction according to the first embodiment of the method of the present invention, FIG. 4 is a cross-sectional view showing an example of bar arrangement in the same construction method, and FIG. 5 is of the method of the present invention. It is a top view which shows the completion state by 2nd Example. 1 ... Leading wall, 1a ... Asperity 1b, 1b ... Mortise surface asperity 4 ... Low strength block 6 ... Trailing wall, 6a, 6b ... Mortise

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】先行地中壁の鉛直打継部のコンクリート面
を切削により粗面化するとともに、該コンクリート面を
切削することにより縦方向に沿って粗面の切欠部を形成
し、しかる後打継部に後行地中壁を構成するコンクリー
トを打設して地中壁相互間をほぞ組構造により一体に打
継ぐことを特徴とする連続地中壁の鉛直接合工法。
1. A concrete surface of a vertical jointing portion of a preceding underground wall is roughened by cutting, and a cutout portion of the rough surface is formed along the longitudinal direction by cutting the concrete surface. A vertical jointing method for continuous underground walls, which is characterized in that concrete forming a succeeding underground wall is placed at the connecting portion and the underground walls are integrally connected by a mortise structure.
JP60184026A 1985-08-23 1985-08-23 Vertical underground construction method for continuous underground wall Expired - Lifetime JPH0660492B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60184026A JPH0660492B2 (en) 1985-08-23 1985-08-23 Vertical underground construction method for continuous underground wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60184026A JPH0660492B2 (en) 1985-08-23 1985-08-23 Vertical underground construction method for continuous underground wall

Publications (2)

Publication Number Publication Date
JPS6245820A JPS6245820A (en) 1987-02-27
JPH0660492B2 true JPH0660492B2 (en) 1994-08-10

Family

ID=16146048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60184026A Expired - Lifetime JPH0660492B2 (en) 1985-08-23 1985-08-23 Vertical underground construction method for continuous underground wall

Country Status (1)

Country Link
JP (1) JPH0660492B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3720519A1 (en) * 1987-06-20 1988-12-29 Flachglas Ag SEALING STRUCTURE FROM A VERTICAL SLOT WALL AND A SEALING WALL ARRANGED THEREOF

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS499804A (en) * 1972-05-24 1974-01-28
JPS56159419A (en) * 1980-05-15 1981-12-08 Ohbayashigumi Ltd Continuous underground wall and construction thereof

Also Published As

Publication number Publication date
JPS6245820A (en) 1987-02-27

Similar Documents

Publication Publication Date Title
US5528874A (en) Building blocks and insulated composite walls having stackable half-bond symmetry and method of making such walls
JPH0660492B2 (en) Vertical underground construction method for continuous underground wall
JPS61122320A (en) Method of coupling continuous underground wall with underground structure
JPH041811B2 (en)
JPH09273245A (en) Block joint, grooved hollow block and block base
JPH07119142A (en) Steel sheet pile and steel wall
JPH0315624Y2 (en)
JP2552860B2 (en) Basement method
JP2529088B2 (en) Precast concrete structure buried in the ground and underground wall body in which the precast concrete structure is buried
JP2583058B2 (en) Basement method
JP3812617B2 (en) Caisson for construction of underground structure and its connection method
JP2987662B2 (en) How to build a continuous underground wall
JPS606420B2 (en) Construction method of hollow synthetic continuous underground wall using precast boards
JPH026102Y2 (en)
JPH0645932B2 (en) Construction method of splicing underground continuous wall
JPS59145823A (en) Construction of joint work of continuous underground wall
JPH05132927A (en) Construction method of underground continuous wall
JP3291544B2 (en) Split assembling method for box culvert construction
JPS61257529A (en) Underground continuous wall construction work
JPS605088Y2 (en) Underground continuous wall joints
JPS607396Y2 (en) Concours sheet pile joints
JPS59145824A (en) Construction of joint work of continuous underground wall
JPH05179804A (en) Concrete placing joint method in reverse depositing
JPS6335073Y2 (en)
JPS63125725A (en) Construction of underground continuous wall