Construction method of slope protection structure

Info

Publication number
JPH0678636B2
JPH0678636B2 JP29992591A JP29992591A JPH0678636B2 JP H0678636 B2 JPH0678636 B2 JP H0678636B2 JP 29992591 A JP29992591 A JP 29992591A JP 29992591 A JP29992591 A JP 29992591A JP H0678636 B2 JPH0678636 B2 JP H0678636B2
Authority
JP
Japan
Prior art keywords
haunch
formwork
porous
legal
slope protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP29992591A
Other languages
Japanese (ja)
Other versions
JPH05112943A (en
Inventor
晃代 山田
邦光 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kensetsu Kiso Engineering Co Ltd
Original Assignee
Kensetsu Kiso Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kensetsu Kiso Engineering Co Ltd filed Critical Kensetsu Kiso Engineering Co Ltd
Priority to JP29992591A priority Critical patent/JPH0678636B2/en
Publication of JPH05112943A publication Critical patent/JPH05112943A/en
Publication of JPH0678636B2 publication Critical patent/JPH0678636B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は法面の崩壊を防ぐため
の法面保護構造物の施工法に関するものであり、特に施
工が容易な法面保護構造物の施工法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a slope protection structure for preventing collapse of a slope, and more particularly to a method for constructing a slope protection structure which is easy to construct.

【0002】[0002]

【従来の技術】本件出願人は特願昭61ー142322
号(特開昭63ー533号広報)にかかる発明を開示し
ている。当該発明は、法面上に格子状に型枠を設置し、
さらに格子状の交差部にはこれを囲むよう型枠を設置す
るものである。コンクリートなどの硬化材を型枠に打設
して、格子状に法枠部分と交差部のハンチ部分を構築す
るものである。ハンチ部分が応力の集中する交差部分を
保護して、強度の大きな法面保護構造物とするものであ
る。
2. Description of the Related Art The applicant of the present application filed Japanese Patent Application No. 61-142322.
The invention disclosed in Japanese Patent Laid-Open No. 63-533 is disclosed. According to the invention, the formwork is installed on the slope in a grid pattern,
Further, a formwork is installed at the grid-like intersection so as to surround it. Hardening material such as concrete is cast on the formwork to construct a grid-like method frame and crossing haunches. The haunch part protects the intersection where stress is concentrated to form a slope protection structure with high strength.

【0003】[0003]

【発明が解決しようとする課題】このような発明で問題
となるのは、ハンチ部分の構築の施工に手間がかかるこ
とである。法枠部分を構築するための型枠に四枚のハン
チ部分用の型枠を現場で結び付けるのは煩雑で、大きな
労力を必要とする。またハンチ部分を形成する型枠を金
網状の部材によって形成すると、強度が小さく、ハンチ
部分が大きく膨れ上がってしまうことがあり、設計通り
の構造物ができないことがある。
A problem with such an invention is that it takes time and effort to construct the haunch portion. It is cumbersome and labor-intensive to tie the formwork for the four haunch parts to the formwork for constructing the legal form part on site. Further, when the frame forming the haunch portion is formed of a wire mesh-like member, the strength may be low and the haunch portion may bulge greatly, and a structure as designed may not be obtained.

【0004】この発明は以上のような課題を解決するた
めになされたもので、施工が容易で設計通りの構造物の
施工が可能な法面保護構造物の施工法を提供することを
目的とする。
The present invention has been made to solve the above problems, and an object thereof is to provide a method for constructing a slope protection structure which is easy to construct and enables construction of a structure as designed. To do.

【0005】[0005]

【課題を解決するための手段】この発明は、リング状筋
とそれに多孔性堰板を張ったハンチ型枠を使用して、施
工を容易にするものである。リング状筋を上下に平行に
配置して、このリング状筋の間に適宜間隔置いて多孔性
堰板を張設してハンチ型枠を構成する。ハンチ型枠は工
場で予めリング状に組んでおいてもよいが、二本の鉄筋
間に多孔性堰板を張っていたものを現場で組んでリング
状にしてもよい。ハンチ型枠の四方には多孔性堰板の各
間隙が形成され、この間隙に左右に平行に起立した法型
枠ぽ挿入する。四方から挿入した法型枠はハンチ型枠内
にて突き合わせる。このハンチ型枠と法型枠内にセメン
ト系硬化材を打設してハンチ部と法枠部を構築する。
SUMMARY OF THE INVENTION The present invention uses a haunch form having a ring-shaped streak and a porous dam plate stretched thereon to facilitate construction. The ring-shaped streaks are arranged vertically in parallel, and a porous weir plate is stretched between the ring-shaped streaks at appropriate intervals to form a haunch form. The haunch formwork may be assembled in a ring shape in advance at the factory, but it may be assembled on site with a porous dam plate stretched between two reinforcing bars to form a ring shape. Each gap of the porous dam plate is formed on all four sides of the haunch form, and the normal form frame is inserted into the gaps in parallel with each other. The legal formwork inserted from all sides is butted in the haunch formwork. A cement-based hardening material is placed in the haunch form and the method form to construct the haunch part and the method frame part.

【0006】また先に法型枠を地山に縦横に並べて法面
に格子状に組む。その後この法型枠に交差部分を囲むよ
うにリング状筋を上下に配筋する。リング状筋は法型枠
の多孔性堰板の孔に通して地山に対して水平に配筋す
る。この上下のリング状筋の間であって、法型枠の隅角
部を覆うように多孔性堰板を張設してハンチ型枠を構成
することも可能である。以上のような多孔性堰板として
エキスパンドメタルやクリンプ金網が使用できる。
[0006] First, the legal form frames are arranged in the vertical and horizontal directions on the ground and assembled on the slope in a grid pattern. After that, ring-shaped streaks are arranged in the vertical direction so as to surround the intersecting portion in the legal form. The ring-shaped streaks are arranged horizontally with respect to the ground by passing through the holes of the porous dam plate of the standard formwork. It is also possible to construct a haunch formwork by stretching a porous dam plate between the upper and lower ring-shaped streaks so as to cover the corners of the normal formwork. Expanded metal or crimp wire mesh can be used as the porous dam plate as described above.

【0007】[0007]

【実施例】以下、図に示す一実施例に基づきこの発明を
詳細に説明する。図において1はハンチ型枠であって、
上下に配筋したリング状筋2・2とこの間に張った多孔
性堰板より構成されている。多孔性堰板として実施例で
はクリンプ金網3が使用されている。ハンチ型枠1は工
場で予めリング形状に構成してもよく、また二本の鉄筋
の間にクリンプ金網3を溶接等によって張ったものを形
成しておき、現場にてリング状に曲げて構成することも
できる。クリンプ金網3は適宜間隔を置いて張設してお
くもので、ハンチ型枠1の四方にクリンプ金網3間の間
隙4が開口するようにする。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below based on an embodiment shown in the drawings. In the figure, 1 is a haunch form,
It is composed of ring-shaped streaks 2 and 2 arranged vertically and a porous dam plate stretched between them. In the embodiment, a crimp wire net 3 is used as the porous dam plate. The haunch formwork 1 may be preliminarily configured into a ring shape at the factory, or a crimp wire net 3 may be stretched by welding or the like between two rebars and bent into a ring shape on site. You can also do it. The crimp wire nets 3 are stretched at appropriate intervals, and gaps 4 between the crimp wire nets 3 are opened in four directions of the haunch formwork 1.

【0008】このハンチ型枠1の各間隙から、左右に平
行にクリンプ金網5・5を起立した法型枠6を挿入す
る。法型枠6を挿入する前に予めこの法型枠6の間に配
筋する下端鉄筋7を地山に沿って配設しておく。法型枠
6はハンチ型枠1の中にて突き合わせるようにしておく
ものであり、したがって法型枠6はハンチ型枠の四方に
伸びることになる。その後法型枠6の左右のクリンプ金
網5・5間をスペーサーにて保持し、上端鉄筋8を法型
枠6に沿って配筋する。このハンチ型枠1と法型枠6内
にセメント系硬化材であるコンクリート9を打設して、
図4に示すような法枠部分10が格子状に地山に伸び、
その交差部分にハンチ部分11が形成された法面保護構
造物を構築する。
From each gap of the haunch formwork 1, a legal formwork 6 in which the crimp wire nets 5, 5 are erected upright is inserted in parallel to the left and right. Before inserting the legal form 6, a lower end reinforcing bar 7 to be reinforced between the legal forms 6 is arranged in advance along the ground. The legal formwork 6 is made to abut in the haunch formwork 1, so that the legal formwork 6 extends in all directions of the haunch formwork. After that, the space between the left and right crimp wire nets 5, 5 of the legal form 6 is held by a spacer, and the upper end reinforcing bar 8 is arranged along the legal form 6. Concrete 9 which is a cement-based hardening material is placed in the haunch formwork 1 and the method formwork 6,
The method frame portion 10 as shown in FIG. 4 extends in a grid pattern in the ground,
A slope protection structure in which a haunch portion 11 is formed at the intersection is constructed.

【0009】図5と図6に示すのは他の施工法を示すも
のであり、まず法型枠6を地山に縦横に格子状に組む。
この縦横の法型枠の交差部分を囲むように、上下にリン
グ状筋2・2を配筋する。リング状筋2は法型枠6の堰
板の孔、すなわち実施例ではクリンプ金網5の網目を通
して、水平となるように維持するものであり、クリンプ
金網5によってリング状筋2・2が支持されることにな
る。この上下のリング状筋2・2間に法型枠6・6の隅
角部を覆うようにクリンプ金網3を張る。クリンプ金網
3はリング状筋2・2の間隔より高さを若干高くしてお
き、リング状筋2・2の内側から張り、溶接などにより
固定する。
FIG. 5 and FIG. 6 show another construction method. First, the method form 6 is assembled in a vertical and horizontal grid pattern on the ground.
The ring-shaped streaks 2 are arranged vertically so as to surround the intersection of the vertical and horizontal formwork. The ring-shaped streaks 2 are to be maintained horizontally through the holes of the dam plate of the legal form 6, that is, the mesh of the crimp wire net 5 in the embodiment, and the ring-shaped streaks 2 and 2 are supported by the crimp wire net 5. Will be. A crimp wire mesh 3 is stretched between the upper and lower ring-shaped streaks 2 and 2 so as to cover the corners of the normal formwork 6 and 6. The height of the crimp wire mesh 3 is set to be slightly higher than the interval between the ring-shaped streaks 2 and 2, and the crimped wire net 3 is stretched from the inside of the ring-shaped streaks 2 and fixed by welding or the like.

【0010】図7と図8に示すのは他の実施例であり、
ハンチ型枠1のリング状筋2を八角形に屈曲してハンチ
部分11が三角形となるようにしたもものである。その
他リング状筋3を四角形など他の多角形にしてもよい。
FIG. 7 and FIG. 8 show another embodiment,
The ring-shaped muscle 2 of the haunch form 1 is bent into an octagon so that the haunch portion 11 becomes a triangle. In addition, the ring-shaped streak 3 may be another polygon such as a quadrangle.

【0011】以上のような構成によると、ハンチ型枠1
のリング状筋2・2に多孔性堰板を張るため、現場での
施工が著しく容易となるとともにリング状筋2・2によ
ってハンチ型枠1の形状が硬化材の重みなどによって変
わることがない。また法型枠6の多孔性堰板がハンチ型
枠1の中央部まで深く入り込むこになる。これはその部
分の堰板に対する硬化材のかぶりが大きくなることであ
り、法型枠6の堰板がハンチ部分11内にて構造材とし
て充分機能することになる。したがって応力の集中する
交差部分がハンチ部分11とともに、その中の堰板によ
って強度が著しく大きくなる。
According to the above configuration, the haunch form 1
Since a porous dam plate is stretched over the ring-shaped streaks 2.2, the construction at the site is remarkably easy and the shape of the haunch formwork 1 is not changed by the ring-shaped streaks 2.2 due to the weight of the hardening material. . Further, the porous dam plate of the legal form 6 is deeply inserted into the central portion of the haunch form 1. This means that the cover of the hardening material on the dam plate at that portion becomes large, and the dam plate of the legal formwork 6 sufficiently functions as a structural material in the haunch portion 11. Therefore, the strength of the intersecting portion where the stress is concentrated remarkably increases together with the haunch portion 11 and the dam plate therein.

【0012】[0012]

【発明の効果】この発明は以上のような構成を有するた
め、上下のリング状筋を使用してハンチ型枠を組むもの
であり、現場おける作業が著しく軽減され、施工が簡易
化できる。またリング状筋によってハンチ型枠の形状が
維持されるため、硬化材の重みによっても変形すること
がなく、設計通りの施工が可能となる。法型枠の堰板が
ハンチ部分に入り込んで構造材として機能するため、応
力の集中する部分の強度が極めて大きな構造物となる。
EFFECTS OF THE INVENTION Since the present invention has the above-mentioned construction, the haunch formwork is assembled by using the upper and lower ring-shaped streaks, and the work on site can be remarkably reduced and the construction can be simplified. Further, since the shape of the haunch form is maintained by the ring-shaped streaks, the haunch form is not deformed by the weight of the hardening material, and the construction can be performed as designed. Since the weir plate of the legal form enters the haunch portion and functions as a structural material, the strength of the portion where stress is concentrated becomes extremely large.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明にかかる法面保護構造物の施工状態の
一実施例の斜視図である。
FIG. 1 is a perspective view of an embodiment of a construction state of a slope protection structure according to the present invention.

【図2】型枠を組んだ状態の斜視図である。FIG. 2 is a perspective view showing a state in which a mold is assembled.

【図3】その平面図である。FIG. 3 is a plan view thereof.

【図4】法面保護構造物の全体図である。FIG. 4 is an overall view of a slope protection structure.

【図5】他の施工例の平面図である。FIG. 5 is a plan view of another construction example.

【図6】そのA−A線断面図である。FIG. 6 is a sectional view taken along the line AA.

【図7】ハンチ型枠の斜視図である。FIG. 7 is a perspective view of a haunch formwork.

【図8】その平面図である。FIG. 8 is a plan view thereof.

【符号の説明】 1 ハンチ型枠 2 リング状筋 3 クリンプ金網 4 間隙 5 クリンプ金網 6 法型枠 7 下端鉄筋 8 上端鉄筋 9 コンクリート 10 法枠部分 11 ハンチ部分 4[Explanation of symbols] 1 haunch form 2 ring-shaped streak 3 crimp wire net 4 gap 5 crimp wire net 6 method formwork 7 bottom rebar 8 upper end rebar 9 concrete 10 method frame part 11 haunch part 4

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 上下のリング状筋の間に適宜間隔を置い
て多孔性堰板を張設したハンチ型枠を地山上に設置し
て、このハンチ型枠の四方に開口した多孔性堰板間の各
間隙から、左右に平行に多孔性堰板を起立した法型枠を
挿入してハンチ型枠内にて突き合わせ、このハンチ型枠
と法型枠内にセメント系硬化材を打設してハンチ部と法
枠部を構築する法面保護構造物の施工法。
1. A porous weir plate having a porous weir plate stretched at appropriate intervals between upper and lower ring-shaped streaks is installed on the ground, and the porous weir plate is opened on all four sides of the haunch form frame. From each gap between them, insert a legal form in which the porous weir plates are erected in parallel to the left and right, but abut in the haunch form, and place a cement-based hardening material in the haunch form and the form. Construction method of slope protection structure that constructs haunch part and slope frame part.
【請求項2】 左右に平行に多孔性堰板を起立した法型
枠を法面上に縦横に並べ、この法型枠の交差部分を囲む
ようにリング状筋を前記法型枠の多孔性堰板の孔に通し
て上下に平行に配筋し、法型枠の隅角部を覆うように多
孔性堰板を張設してハンチ型枠を構成し、このハンチ型
枠と法型枠内にセメント系硬化材を打設してハンチ部と
法枠部を構築する法面保護構造物の施工法。
2. A legal formwork in which porous dam plates are erected in parallel to the left and right are arranged vertically and horizontally on a slope, and ring-shaped streaks are formed so as to surround the intersection of the legal formwork. The haunch formwork is constructed by arranging bars vertically through the holes of the weir plate and stretching a porous weir plate so as to cover the corners of the legal formwork. A construction method for slope protection structures in which a cement-based hardening material is placed inside to construct a haunch part and a slope frame part.
【請求項3】 多孔性堰板としてエキスパンドメタルを
採用したことを特徴とする請求項1又は2記載の法面保
護構造物の施工法。
3. The method for constructing a slope protection structure according to claim 1, wherein expanded metal is used as the porous dam plate.
【請求項4】 多孔性堰板としてクリンプ金網を採用し
たことを特徴とする請求項1又は2記載の法面保護構造
物の施工法。
4. The method for constructing a slope protection structure according to claim 1, wherein a crimp wire net is adopted as the porous dam plate.
JP29992591A 1991-10-19 1991-10-19 Construction method of slope protection structure Expired - Lifetime JPH0678636B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29992591A JPH0678636B2 (en) 1991-10-19 1991-10-19 Construction method of slope protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29992591A JPH0678636B2 (en) 1991-10-19 1991-10-19 Construction method of slope protection structure

Publications (2)

Publication Number Publication Date
JPH05112943A JPH05112943A (en) 1993-05-07
JPH0678636B2 true JPH0678636B2 (en) 1994-10-05

Family

ID=17878591

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29992591A Expired - Lifetime JPH0678636B2 (en) 1991-10-19 1991-10-19 Construction method of slope protection structure

Country Status (1)

Country Link
JP (1) JPH0678636B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119392696B (en) * 2024-12-31 2025-03-25 福州大学 A prefabricated slope reaction structure with built-in core tube and its design optimization method

Also Published As

Publication number Publication date
JPH05112943A (en) 1993-05-07

Similar Documents

Publication Publication Date Title
JPH0678636B2 (en) Construction method of slope protection structure
JPS63533A (en) Slope frame construction work
JPH0678638B2 (en) Construction method of slope protection structure
JPH04261915A (en) Slope frame constructing block and method for constructing slope frame thereof
JPH0742114A (en) Construction method of concrete filled steel pipe multi-column type pier
CN222730924U (en) Steel reinforcement cage with hidden column and prefabricated reinforced concrete superposed wall member thereof
JP2505351Y2 (en) Slope protection structure
JP2700637B2 (en) Slope stable structure
KR102175474B1 (en) Rebar assembly
JPH02120446A (en) Precast version
JPH0685441U (en) Reinforcing bar assembly unit with weir plate
JP2003236815A (en) A method for manufacturing a concrete block for a civil structure using natural stone and a concrete block for a civil structure using natural stone.
JP3229249B2 (en) Construction method of reinforced concrete shear walls
JP2654597B2 (en) Reinforcement method of wall type rigid frame structure
JPH0197744A (en) Shear reinforcement structure of shear head part in flat plate structure building
JP2651322B2 (en) Construction method of wall type rigid frame structure
JPH03212513A (en) Slope protection engineering method
JP2817967B2 (en) Fabric foundation and construction method
JP2651321B2 (en) Anchoring method of beam in wall type rigid frame structure
JPH0547790Y2 (en)
JPH101952A (en) Formwork forming member and formwork unit
JPH09217448A (en) Wall structure
JPH0431912U (en)
JPH0588331B2 (en)
JPH0849214A (en) Construction method for installing arch concrete bar arrangement body