JPH0683850B2 - Roll changing device in rolling mill - Google Patents
Roll changing device in rolling millInfo
- Publication number
- JPH0683850B2 JPH0683850B2 JP61107776A JP10777686A JPH0683850B2 JP H0683850 B2 JPH0683850 B2 JP H0683850B2 JP 61107776 A JP61107776 A JP 61107776A JP 10777686 A JP10777686 A JP 10777686A JP H0683850 B2 JPH0683850 B2 JP H0683850B2
- Authority
- JP
- Japan
- Prior art keywords
- roll
- rail
- cylinder
- roll chock
- rolling mill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005096 rolling process Methods 0.000 title claims description 29
- 230000003014 reinforcing effect Effects 0.000 description 10
- 230000008707 rearrangement Effects 0.000 description 8
- 125000006850 spacer group Chemical group 0.000 description 7
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B31/00—Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
- B21B31/08—Interchanging rolls, roll mountings, or stand frames, e.g. using C-hooks; Replacing roll chocks on roll shafts
- B21B31/10—Interchanging rolls, roll mountings, or stand frames, e.g. using C-hooks; Replacing roll chocks on roll shafts by horizontally displacing, i.e. horizontal roll changing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B13/00—Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories
- B21B13/14—Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories having counter-pressure devices acting on rolls to inhibit deflection of same under load; Back-up rolls
- B21B13/147—Cluster mills, e.g. Sendzimir mills, Rohn mills, i.e. each work roll being supported by two rolls only arranged symmetrically with respect to the plane passing through the working rolls
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Rolling (AREA)
- Straightening Metal Sheet-Like Bodies (AREA)
Description
【発明の詳細な説明】 <産業上の利用分野> 本発明は、多段クラスタ圧延機の各ロールを従来の4段
形式のミルハウジング内に組込むに当り、ワークロール
や中間ロール等を4段形式の圧延機と同様に組替えられ
るよう汎用性を持たせた構造のロール組替装置に関す
る。DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention relates to a case where each roll of a multi-stage cluster rolling mill is incorporated into a conventional four-stage type mill housing, and work rolls, intermediate rolls, etc. are four-stage type. The present invention relates to a roll reassembling device having a versatile structure so that it can be reassembled like the above rolling mill.
〈従来の技術〉 第5図(a)及び第5図(b)は、従来の4段式圧延機
のワークロール組替装置の一例を示している。同図にお
いて、駆動側ミルハウジング01及び操作側ミルハウジン
グ02からなる両ハウジングには、夫々駆動側のシリンダ
04aと操作側のシリンダ04bにて昇降可能なブロック03a
(駆動側)03b(操作側)が装置されている。そして、
駆動側と操作側の各ブロック03a,03b間には前述のハウ
ジング01,02にわたって水平に左右一本ずつレール05,06
が配置されている。すなわち、レール05,06はシリンダ0
4a,04bにて支持されワークロールの車輪付ロールチョッ
ク07,08の車輪下方に配置される。<Prior Art> FIGS. 5 (a) and 5 (b) show an example of a work roll changing device of a conventional four-high rolling mill. In the figure, the two cylinders of the drive side mill housing 01 and the operation side mill housing 02 are respectively attached to the drive side cylinders.
Block 03a that can be moved up and down by 04a and operating cylinder 04b
(Drive side) 03b (Operating side) is installed. And
Between the driving side and operating side blocks 03a, 03b, one rail on the left and one rail on the left and right on the above housing 01, 02.
Are arranged. That is, rails 05 and 06 are cylinder 0
The work rolls are supported by 4a and 04b, and are arranged below the wheels of roll chocks 07 and 08 with wheels of work rolls.
上下に配置されたワークロール091,092の組替えに当っ
ては、まず、第5図(b)に示すように上バックアップ
ロール0152を支持する上バックアップロールチョック01
2と、上ワークロール092を回転自在に支持した上ワーク
ロールチョック011とを、それぞれのシリンダ014,013で
所定寸法持上げ、ついで、下ワークロール091を支持す
る下の車輪付ロールチョック07,08に係るシリンダ04a,0
4bを作動させ、ブロック03a,03bを介して左右のレール0
5,06を持ち上げて車輪付ロールチョック07,08の車輪に
レール05,06を当て、更にレール05,06を車輪付ロールチ
ョック07,08と共に持ち上げて下バックアップロール015
1の表面と当接している下ワークロール091の表面を離
し、レール05,06の持ち上げをロール組替位置で停止す
る。この後、下ワークロールチョック07,08上にスペー
サSを挟み上ワークロールチョック011を積載する。こ
の結果、シリンダ03a,03bにて持ち上げられたレール05,
06上には車輪付ロールチョック07,08、下ワークロール0
91、上ワークロールチョック011、上ワークロール092が
載ることになる。When rearranging the work rolls 091 and 092 arranged above and below, first, as shown in FIG. 5B, an upper backup roll chock 01 that supports the upper backup roll 0152.
2 and the upper work roll chock 011 that rotatably supports the upper work roll 092 are lifted by the respective cylinders 014, 013 by a predetermined dimension, and then the cylinder 04a relating to the lower wheel chock 07, 08 supporting the lower work roll 091. , 0
4b is activated and the left and right rails 0 are passed through blocks 03a and 03b.
Lift 5,06 and apply rails 05,06 to the wheels of roll chock 07,08 with wheels, and then lift rails 05,06 together with roll chock 07,08 with wheels to lower backup roll 015.
The surface of the lower work roll 091 that is in contact with the surface of 1 is released, and the lifting of the rails 05 and 06 is stopped at the roll changing position. Thereafter, the upper work roll chock 011 is loaded on the lower work roll chock 07, 08 with the spacer S interposed therebetween. As a result, the rail 05 lifted by the cylinders 03a, 03b,
06 Roll chock with wheels 07,08 on top, work roll 0 on bottom
91, upper work roll chock 011 and upper work roll 092 will be placed.
ついで、操作側に備えられて待機中の組替台車016がシ
リンダ等(図示省略)の作動により圧延機側に前進し、
台車016上に備えられたレールの先端部016aが上述の持
ち上げられたレール05,06の端部に当接することにより
停止されロックされる。そこで、駆動側に設けたシリン
ダ010のピストン先端の接手010aを、持ち上げられレー
ル05,06上にある車輪付ロールチョック07に設けた接手0
7aと結合し、シリンダ010を作動させてロールチョック0
7,08、下ワークロール091、上ワークロールチョック01
1、上ワークロール092を一括して操作側に移動させ、第
5図(a)に示すE位置から鎖線で示すF位置(組替台
車016上)まで押し出すことにより上下ワークロール09
1,092をハウジング内から排除させることができる。Then, the rearrangement carriage 016 provided on the operation side and waiting is moved forward to the rolling mill side by the operation of the cylinder or the like (not shown),
The front end 016a of the rail provided on the carriage 016 is stopped and locked by abutting the end of the lifted rails 05 and 06. Therefore, the joint 010a on the tip of the piston of the cylinder 010 provided on the drive side is lifted to the joint 0 provided on the wheeled roll chock 07 on the rails 05 and 06.
Combined with 7a, actuating cylinder 010 to roll chock 0
7,08, lower work roll 091, upper work roll chock 01
1. The upper work rolls 092 are collectively moved to the operation side, and pushed out from the E position shown in FIG. 5 (a) to the F position shown by the chain line (on the rearrangement carriage 016) to move the upper and lower work rolls 092.
1,092 can be eliminated from the housing.
新たなワークロールの組替後は、上述と逆の手順により
ハウジングへの組込みが行なわれる。すなわち、シリン
ダ010の作動により車論付ロールチョック07,08等をハウ
ジング01,02内の所定位置に引込み、スペーサSを除去
しシリンダ04a,04bを作動して左右のレール05,06を所定
位置まで下降させてレール05,06とロールチョック07,08
の車輪とを切離し、4段の各ロールを圧延状態に当接さ
せ、圧延準備が完了するものである。After the new work roll is reassembled, it is assembled into the housing by the procedure reverse to the above. That is, the roll chock 07,08 with a car theory is pulled into a predetermined position in the housing 01,02 by the operation of the cylinder 010, the spacer S is removed, and the cylinders 04a, 04b are operated to move the left and right rails 05,06 to the predetermined positions. Lower rail 05,06 and roll chock 07,08
The wheels are separated from each other, and the four rolls are brought into contact with each other in a rolled state to complete the rolling preparation.
<発明が解決しようとする問題点> 上述の4段式圧延機と同じミルハウジング内に多段クラ
スタ圧延機を組込む場合、組替用レールとしてミルハウ
ジング内に設けてある従来の4段式圧延機用のレール0
5,06では、中間ロールや補強ロール等やこれらロールの
チョック等と干渉するためこれらの組込みが円滑にでき
ず、多段クラスタ圧延機等のワークロールや中間ロール
等の組替に当っては、多大の人手と時間を要するという
問題がある。<Problems to be Solved by the Invention> When a multi-stage cluster rolling mill is installed in the same mill housing as the above-described four-high rolling mill, a conventional four-high rolling mill provided in the mill housing as a rail for replacement. For rails 0
In 5,06, it cannot be installed smoothly because it interferes with intermediate rolls, reinforcing rolls, etc. and chocks of these rolls, and when changing the work rolls, intermediate rolls, etc. of the multi-stage cluster rolling machine, etc. There is a problem that it takes a lot of manpower and time.
そこで、本発明は、上述の欠点に鑑み多段クラスタ圧延
機を4段式圧延機と同様に同一ハウジング内で容易に組
替えることを目的とする。Therefore, in view of the above-mentioned drawbacks, the present invention has an object to easily rearrange a multi-stage cluster rolling mill in the same housing as a four-high rolling mill.
〈問題点を解決するための手段〉 上述の目的を達成する本発明は、圧延機の駆動側ミルハ
ウジング内にあってロールを支持する車輪付ロールチョ
ックの上下動による車輪の通過位置に当るレールに切欠
き部を設け、ピンを支点としてシリンダの動作にて上記
切欠き部を開閉するよう回動する可動式のレールを設
け、この可動式のレールに連続させて上記ロールを支持
する補助ロールのロールチョックの上部に固定式のレー
ルを配置し、操作側の組替台車上に上記固定式のレール
と同一平面をなしてつながるレールを配置したことを特
徴とする。<Means for Solving the Problems> The present invention that achieves the above-mentioned object is to provide a rail in a drive-side mill housing of a rolling mill that hits a wheel passing position by vertical movement of a roll chock with wheels that supports rolls. A notch is provided, and a movable rail that pivots around the pin as a fulcrum to open and close the notch by the operation of the cylinder is provided, and an auxiliary roll that supports the roll continuously to the movable rail is provided. It is characterized in that a fixed rail is arranged on the upper part of the roll chock, and a rail which is connected to the operation-side reassembling carriage in the same plane as the fixed rail is connected.
<作 用> 上記構成は、4段式のみならず多段クラスタ式の各圧延
機に適用でき、同一構造の組替装置ができる。<Operation> The above configuration can be applied not only to the four-high rolling mill but also to the multi-high rolling mill, and a recombining device having the same structure can be provided.
<実 施 例> ここで、第1図ないし第4図を参照して本発明の実施例
を説明する。第3図に示すように、圧延材Pを挟んで上
下一対のワークロールRがそれぞれロールチョックRa,R
bにより回転自在に支持され、この上下一対のワークロ
ールRを支持する上下それぞれ2本ずつの中間ロール1
が車輪4a,4b付の下ロールチョック3aと上ロールチョッ
ク3bにより回転自在に支持されている。更に、中間ロー
ル1を介してワークロールRを押圧するよう上下対称に
複数個配置された分割形の補強ロール2が、ロールチョ
ック11a,11bにより回転自在に支持され、駆動側ハウジ
ング5及び操作側ハウジング6内を各々上下動可能に配
置されている。<Example> An example of the present invention will be described with reference to FIGS. 1 to 4. As shown in FIG. 3, a pair of upper and lower work rolls R sandwiching the rolled material P are roll chocks Ra and R, respectively.
Two upper and lower intermediate rolls 1 rotatably supported by b and supporting the pair of upper and lower work rolls R.
Are rotatably supported by the lower roll chock 3a and the upper roll chock 3b with wheels 4a, 4b. Further, a plurality of split-type reinforcing rolls 2 which are vertically symmetrically arranged so as to press the work roll R via the intermediate roll 1 are rotatably supported by roll chocks 11a and 11b, and are provided on the drive side housing 5 and the operation side housing. 6 are arranged so as to be vertically movable.
機外に各ロールを押出すためのレールを敷設するに当
り、まず上面を組替台車10上のレール上面と同一平面に
配置した固定レール7を駆動側ハウジング5内の左右に
設けている。この固定レール7は車輪付下ロールチョッ
ク3aの車輪4aがハウジング5内を昇降する際に通過する
位置が一部切欠かれ、この切欠き部7aにシリンダ8b等で
ピン8aを支点として開閉自在に回動する開閉レール8を
具備している。また、固定レール7に当接して下補強ロ
ールチョック11aの上部両側にレール9を設け、このレ
ール9の端は操作側ハウジング6内を車輪付ロールチョ
ック3aの車輪4aが昇降する際の妨げにならない所定位置
までの長さとなっている。なお、図中12は下ロールチョ
ック3aを昇降するためのシリンダ、13,16はスペーサ、1
4は上ロールチョック3bを昇降するシリンダ、15は上ロ
ールチョック11bの昇降用のシリンダである。When laying the rails for pushing out the rolls outside the machine, first, fixed rails 7 whose upper surfaces are flush with the upper surfaces of the rails on the reassembling carriage 10 are provided inside the drive-side housing 5. The fixed rail 7 is partially notched at a position where the wheel 4a of the lower roll chock 3a with wheels passes when moving up and down in the housing 5, and the notched portion 7a can be freely opened and closed with a pin 8a as a fulcrum by a cylinder 8b or the like. It has a movable opening / closing rail 8. Further, rails 9 are provided on both sides of the upper portion of the lower reinforcing roll chock 11a in contact with the fixed rail 7, and the ends of the rail 9 do not hinder the wheel 4a of the roll chock 3a with wheels from moving up and down in the operation side housing 6. It is the length to the position. In the figure, 12 is a cylinder for moving the lower roll chock 3a up and down, 13 and 16 are spacers, 1
Reference numeral 4 is a cylinder for moving up and down the upper roll chock 3b, and 15 is a cylinder for moving up and down the upper roll chock 11b.
ここで、レール7,9を用いて第3図(a)に示す圧延時
から第3図(b)に示すロール組替時への組替作業の順
を説明する。Here, the order of the reassembling work from the rolling shown in FIG. 3A to the roll reassembling shown in FIG. 3B using the rails 7 and 9 will be described.
上下のワークロールチョックRa,Rb間にスペーサ13を
挿入する。A spacer 13 is inserted between the upper and lower work roll chocks Ra and Rb.
上部補強ロールチョック11bをシリンダ15により、上
部中間ロールチョック3bをシリンダ14により、それぞれ
ハウジング5,6から所定間隔持上げて上ワークロールR
とこれに当接する上部中間ロール1とを離間させる。な
お、上部中間ロールチョック3bとを組替える場合は、ワ
ークロール引出し後に下部中間ロールチョック3a上にス
ペーサ16を挿入し、その上に上部中間ロールチョック3b
をシリンダ14にて降下させる。The upper reinforcing roll chock 11b is lifted by the cylinder 15 and the upper intermediate roll chock 3b is lifted by the cylinder 14 from the housings 5, 6 by a predetermined distance.
And the upper intermediate roll 1 abutting against this are separated. When the upper intermediate roll chock 3b is recombined, the spacer 16 is inserted onto the lower intermediate roll chock 3a after the work roll is drawn out, and the upper intermediate roll chock 3b is inserted thereon.
Is lowered by the cylinder 14.
車輪付下部中間ロールチョック3aをシリンダ12によ
り、下部補強ロールチョック11aから組替所定位置まで
持上げる。The lower intermediate roll chock 3a with wheels is lifted by the cylinder 12 from the lower reinforced roll chock 11a to a predetermined rearrangement position.
固定レール7にピン8aを支点にしてシリンダ8bにより
開閉式レール8を点線位置から鎖線位置に回動して、固
定レール7の切欠き部7aを塞ぎ、レール上面を固定レー
ル7と同一平面とする。The open / close rail 8 is rotated from the dotted line position to the chain line position by the cylinder 8b with the pin 8a serving as a fulcrum on the fixed rail 7 to close the cutout portion 7a of the fixed rail 7 so that the rail upper surface is flush with the fixed rail 7. To do.
圧延機の操作側で待機中の組替台車10を図示省略のシ
リンダ等によりレール9の端に当接する所定位置まで移
動して固定する。なおこの時第5図に示す従来の組替台
車の先端部は、台車上のレールと共に第1図に示す如く
レール9に当接する位置まで延長して第1図に示す組替
台車10に改造する必要がある。On the operating side of the rolling mill, the reassembling carriage 10 on standby is moved and fixed to a predetermined position where it abuts against the end of the rail 9 by a cylinder (not shown) or the like. At this time, the tip end portion of the conventional reassembling trolley shown in FIG. 5 is extended to a position where it abuts on the rail 9 as shown in FIG. There is a need to.
シリンダ12により車輪付下部中間ロールチョック3aを
下降させ車輪4aをレール7,9,10上におろす。The lower intermediate roll chock 3a with wheels is lowered by the cylinder 12 to lower the wheels 4a onto the rails 7, 9, 10.
第5図に示す従来例と同じく駆動側に設けたシリンダ
の作動により車輪付下部中間ロールチョック3aを固定レ
ール7、レール9、及び組替台車10上のレールを用い
て、ハウジング5,6内から操作側の組替台車10上の所定
位置に移動位置決めする。こうして、組替台車10上の所
定位置に移動固定され車輪付下部中間ロールチョック3a
に支持積載されている上下のワークロールR又は中間ロ
ール1は、新旧の交換組替が行なわれる。なお、組替後
は上述と逆の手順によりシリンダ(図示省略)の作動に
より車輪付ロールチョック3b,3aをハウジング5,6内の所
定位置に引入れ、第3図(a)に示す圧延時の状態に各
ロールを当接させて組込みを行なうが、この時シリンダ
8bの作動でピン8aを支点として開閉レール8を点線位置
から鎖線位置に回動して、固定レール7の一部に中間ロ
ールチョック3bの車輪4aが通過できるよう切欠き部7aを
開く。こうして、各ロールの交換組替が行なわれるよう
設定される。As in the conventional example shown in FIG. 5, the lower intermediate roll chock 3a with wheels is operated from the inside of the housings 5 and 6 by using the fixed rail 7, the rail 9, and the rail on the reassembling carriage 10 by the operation of the cylinder provided on the drive side. It is moved and positioned at a predetermined position on the reassembling carriage 10 on the operating side. Thus, the lower intermediate roll chock 3a with wheels is moved and fixed to a predetermined position on the reassembling cart 10.
The upper and lower work rolls R or the intermediate rolls 1, which are supported and loaded on the upper and lower sides, are replaced by old and new. After the reassembling, the roll chocks with wheels 3b and 3a are drawn into predetermined positions in the housings 5 and 6 by the operation of a cylinder (not shown) in the reverse order of the above, and the rolling chocks shown in FIG. Put the rolls into contact with each other, and assemble them.
The opening / closing rail 8 is rotated from the dotted line position to the chain line position with the pin 8a as a fulcrum by the operation of 8b, and the notch portion 7a is opened so that the wheel 4a of the intermediate roll chock 3b can pass through a part of the fixed rail 7. In this way, the rolls are set to be exchanged and rearranged.
つぎに、4段式圧延機の組替を説明するに、第4図に示
すように上下のワークロール1が組替の主であり、多段
クラスタ式との違いは下部補強ロールチョック11aの上
部にレール9aを設け、このレール9aを下部補強ロールチ
ョック11aのセパレータと兼用していることにある。Next, to explain the reassembling of the four-high rolling mill, as shown in FIG. 4, the upper and lower work rolls 1 are the main ones, and the difference from the multi-high cluster type is that the upper part of the lower reinforcing roll chock 11a is different. The rail 9a is provided, and this rail 9a is also used as the separator of the lower reinforcing roll chock 11a.
組替手順を説明する。The rearrangement procedure will be described.
第4図(b)に示すように上部補強ロールチョック11
bをシリンダ15により又は上部ワークロールチョック3c
をシリンダ14により夫々ハウジング5,6の突出部から所
定間隔持上げ、更に車輪付下部ロールチョック3aをシリ
ンダ12により、下部補強ロールチョック11aから組替所
定位置まで持上げ、上下のワークロールチョック3a,3c
間にスペーサSを挿入して第4図(b)に示す圧延時に
相互に当接する上下ワークロール1及び補強ロール2を
夫々切離す。As shown in Fig. 4 (b), the upper reinforcing roll chock 11
b by cylinder 15 or upper work roll chock 3c
Cylinder 14 lifts the protrusions of housings 5 and 6 by a predetermined distance, and further lower roll chock 3a with wheels is lifted by cylinder 12 from lower reinforcing roll chock 11a to a predetermined rearrangement position, and upper and lower work roll chocks 3a, 3c.
A spacer S is inserted between them to separate the upper and lower work rolls 1 and the reinforcing roll 2 which are in contact with each other during rolling shown in FIG. 4 (b).
多段クラスタ式と同様ハウジング5に装着された固定
レール7にシリンダ8bにより回動自在に組込まれた開閉
レール8を回動し、切欠き部7aを塞ぎレール上面を固定
レール7と同一平面にする。続いて、組替台車10をシリ
ンダ等で第4図(c)に示すレール9aの端に当接する所
定位置まで移動して固定する。Similar to the multi-stage cluster system, the opening / closing rail 8 rotatably incorporated into the fixed rail 7 mounted on the housing 5 by the cylinder 8b is rotated to close the notch 7a so that the upper surface of the rail is flush with the fixed rail 7. . Subsequently, the rearrangement carriage 10 is moved and fixed by a cylinder or the like to a predetermined position where it comes into contact with the end of the rail 9a shown in FIG. 4 (c).
つぎに、シリンダ12を作動して上部ワークロールチョ
ック3cをスペーサSを介して積載した車輪付ワークロー
ルチョック3aを下降し車輪4を連続する固定レール上に
おろす。Next, the cylinder 12 is operated to lower the work roll chock 3a with wheels, on which the upper work roll chock 3c is loaded via the spacer S, and lower the wheels 4 onto a continuous fixed rail.
こうして、多段クラスタ式と同じ手順で操作側の所定位
置に押出された組替台車10上のワークロール1の交換組
替えを行ない、組替後逆の手順でハウジング5,6内の所
定位置に引入れ、開閉レール8を回動して固定レール7
の欠き部7aを開き、各ロールを第4図(a)に示す圧延
時の状態に当接させて上下ワークロールの交換組替えが
完了するよう設定される。In this way, the work roll 1 on the reassembling carriage 10 extruded to the predetermined position on the operating side is exchanged and changed in the same procedure as the multi-stage cluster type, and after the change, the work rolls 1 are pulled to the predetermined positions in the housings 5 and 6 in the reverse procedure. Insert and turn the open / close rail 8 to rotate the fixed rail 7
The notch 7a is opened, and each roll is brought into contact with the state during rolling shown in FIG. 4 (a) so that the replacement work of the upper and lower work rolls is completed.
<発明の効果> 以上説明したように本発明によれば、従来の4段式圧延
機のミルハウジングと同様なミルハウジングからなる多
段クラスタ圧延機のワークロール又は中間ロール等の組
替えを行なう場合、4段式のワークロールの組替えと多
段クラスタ式のワークロール又は中間ロールの組替えが
同一組替装置で容易に兼用でき、作業時間が大幅に短縮
されるので、稼動率が向上する。また、4段式と多段ク
ラスタ式とを同一のミルハウジングを用いて組替えるコ
ンビネーションとしての使用ができ、圧延機に合わせて
適したワークロールの径やミル型式を選定できるという
多大な効果を奏する。<Effects of the Invention> As described above, according to the present invention, when the work rolls or intermediate rolls of a multi-stage cluster rolling mill including a mill housing similar to the mill housing of the conventional four-high rolling mill are recombined, The 4-stage type work roll changeover and the multistage cluster type work roll changeover or intermediate roll changeover can be easily combined in the same changeover apparatus, and the working time is greatly shortened, so that the operating rate is improved. Further, it can be used as a combination in which the four-stage type and the multi-stage cluster type are combined by using the same mill housing, and a great effect that a work roll diameter and a mill type suitable for a rolling mill can be selected can be obtained. .
第1図ないし第4図は本発明の実施例で、第1図は平面
図、第2図(a)は第1図のA−A線の矢視図、第2図
(b)は第2図(a)のB−B線矢視図、第3図(a)
は圧延時のロール位置状態図、第3図(b)は組替時の
ロール位置状態図、第4図は4段式圧延機で第4図
(a)は圧延時のロール位置状態図、第4図(b)は組
替時のロール位置状態図、第4図(c)は第4図(b)
のC−C線の矢視図、第5図は従来例で第5図(a)は
平面図、第5図(b)は側面図である。 図中、 Rはワークロール、 1は中間ロール、 2は補強ロール、 4,4a,4bは車輪、 5,6はハウジング、 7はレール、 7aは切欠き部、 8は可動レール、 8bはシリンダ、 9は固定レール、 10は組替台車である。1 to 4 show an embodiment of the present invention. FIG. 1 is a plan view, FIG. 2 (a) is a view taken along the line AA of FIG. 1, and FIG. 2 (a) BB line arrow view, FIG. 3 (a)
Is a roll position state diagram during rolling, FIG. 3 (b) is a roll position state diagram during reassembling, FIG. 4 is a four-high rolling mill, and FIG. 4 (a) is a roll position state diagram during rolling, FIG. 4 (b) is a roll position state diagram at the time of rearrangement, and FIG. 4 (c) is FIG. 4 (b).
5 is a plan view and FIG. 5 (b) is a side view. FIG. 5 (a) is a plan view and FIG. 5 (b) is a side view. In the figure, R is a work roll, 1 is an intermediate roll, 2 is a reinforcing roll, 4,4a, 4b are wheels, 5,6 are housings, 7 is a rail, 7a is a notch, 8 is a movable rail, and 8b is a cylinder. , 9 is a fixed rail, and 10 is a rearrangement truck.
フロントページの続き (72)発明者 村本 晴正 千葉県千葉市川崎町1番地 川崎製鉄株式 会社千葉製鉄所内 (56)参考文献 特開 昭58−16718(JP,A) 実公 平1−20005(JP,Y2)Front page continued (72) Inventor Harumasa Muramoto 1 Kawasaki-cho, Chiba-shi, Chiba Kawasaki Steel Co., Ltd. Chiba Works (56) References JP, Y2)
Claims (1)
ロールを支持する車輪付ロールチョックの上下動による
車輪の通過位置に当るレールに切欠き部を設け、ピンを
支点としてシリンダの動作にて上記切欠き部を開閉する
よう回動する可動式のレールを設け、この可動式のレー
ルに連続させて上記ロールを支持する補助ロールのロー
ルチョックの上部に固定式のレールを配置し、操作側の
組替台車上に上記固定式のレールと同一平面をなしてつ
ながるレールを配置したことを特徴とする圧延機におけ
るロール組替装置。1. A notch is provided in a rail which is located in a drive side mill housing of a rolling mill and which comes into contact with a wheel through a vertical movement of a roll chock with wheels for supporting rolls, and a cylinder is operated by using a pin as a fulcrum. A movable rail that rotates so as to open and close the notch is provided, and a fixed rail is arranged above the roll chock of the auxiliary roll that supports the roll continuously to the movable rail. A roll reassembling device for a rolling mill, wherein rails that are connected to each other on the same plane as the fixed rails are arranged on a reassembling carriage.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61107776A JPH0683850B2 (en) | 1986-05-13 | 1986-05-13 | Roll changing device in rolling mill |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61107776A JPH0683850B2 (en) | 1986-05-13 | 1986-05-13 | Roll changing device in rolling mill |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62263807A JPS62263807A (en) | 1987-11-16 |
| JPH0683850B2 true JPH0683850B2 (en) | 1994-10-26 |
Family
ID=14467727
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP61107776A Expired - Fee Related JPH0683850B2 (en) | 1986-05-13 | 1986-05-13 | Roll changing device in rolling mill |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0683850B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100340561B1 (en) * | 1997-12-23 | 2002-09-18 | 주식회사 포스코 | Method for combining rolls for cluster rolling mill |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5816718A (en) * | 1981-07-21 | 1983-01-31 | Ube Ind Ltd | Roll replacing device of rolling machine |
-
1986
- 1986-05-13 JP JP61107776A patent/JPH0683850B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62263807A (en) | 1987-11-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2004538147A (en) | Apparatus and method for automatically changing work rolls, support rolls and intermediate rolls of a single-stand or multi-stand strip rolling mill | |
| JPH0683850B2 (en) | Roll changing device in rolling mill | |
| US3754426A (en) | Roll changing arrangement for a rolling mill | |
| US3864954A (en) | Roll changers | |
| JPH0322243B2 (en) | ||
| JPS5849329B2 (en) | Roll changing device for rolling mill | |
| US4314469A (en) | Rolling mill | |
| JPS629708A (en) | Roll bending device | |
| US3583196A (en) | Edge-rolling stand for steel slabs or the like | |
| JPH025487B2 (en) | ||
| US4167107A (en) | Rolling mill stand | |
| US3593554A (en) | Rolling mills | |
| WO2002047837A1 (en) | Roll assembly changing equipment and roll assembly changing method | |
| JP2898618B1 (en) | Rolling equipment | |
| RU2013148C1 (en) | Mechanism for replacing rolls in a four-high mill stand | |
| JPH0224485Y2 (en) | ||
| JPS5927655B2 (en) | Roll changing method in ERW pipe manufacturing equipment | |
| JPH0230315A (en) | Roll changing device | |
| JPH01317608A (en) | Work roll exchanger | |
| SU1444001A1 (en) | Method of replacing work rolls of working stand with t-shaped flaps of chucks | |
| JPH0649362Y2 (en) | Universal rolling mill | |
| JPH0421606Y2 (en) | ||
| JPH11169920A (en) | Rolling equipment | |
| JP2971427B2 (en) | Rolling equipment | |
| JPS58119407A (en) | Rolling mill |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |