JPH0686771B2 - Construction method and equipment for partition wall - Google Patents
Construction method and equipment for partition wallInfo
- Publication number
- JPH0686771B2 JPH0686771B2 JP13376989A JP13376989A JPH0686771B2 JP H0686771 B2 JPH0686771 B2 JP H0686771B2 JP 13376989 A JP13376989 A JP 13376989A JP 13376989 A JP13376989 A JP 13376989A JP H0686771 B2 JPH0686771 B2 JP H0686771B2
- Authority
- JP
- Japan
- Prior art keywords
- wall material
- wall
- same
- holder
- mounting bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title claims description 21
- 238000005192 partition Methods 0.000 title claims description 13
- 239000000463 material Substances 0.000 claims description 105
- 238000000034 method Methods 0.000 claims description 3
- 239000004568 cement Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は、板状の壁材を使用して間仕切壁面を構築する
場合の工法及び装置に関する。Description: TECHNICAL FIELD The present invention relates to a method and an apparatus for constructing a partition wall surface using a plate-shaped wall material.
(従来の技術) 板状の壁材を使用して間仕切壁面を構築する場合、壁材
の重量がかなり大きいため人手による作業も大変困難で
あり作業の能率も悪かった。(Prior Art) When a partition wall surface is constructed using a plate-shaped wall material, the weight of the wall material is so large that manual work is very difficult and the work efficiency is poor.
また間仕切壁面を構築する場所には天井があって狭いこ
とが多いのでクレーン等を用いて壁材をつり下げて移動
させることができず人手による作業に頼らざるを得ない
状況であった。In addition, the place where the partition wall is constructed has a ceiling and is often narrow, so it was not possible to suspend and move the wall material using a crane or the like, and there was no choice but to rely on manual work.
従って、壁材の重量が大きくなるにつれて人手による作
業は極めて困難になるとともに危険性は増大していた。Therefore, as the weight of the wall material increases, manual work becomes extremely difficult and the danger increases.
(発明が解決しようとする課題) 本発明が解決しようとする課題は、従来の間仕切壁面の
構築工法及び装置を改良し、人手による作業が非常に少
なく、作業能率が良く、狭い工事現場においても利用可
能で、また危険性も低いような構築工法及び装置を提供
することにある。(Problem to be Solved by the Invention) The problem to be solved by the present invention is to improve the conventional construction method and device for the partition wall surface, to reduce the manual work very much, to improve work efficiency, and even in a narrow construction site. An object is to provide a construction method and a device that can be used and have low risk.
(課題を解決するための手段) かかる課題を解決した本発明の要旨は、 1)壁材取付ボルトと嵌合するようにめねじを壁材の表
面に孔をあけて埋設し、同壁材取付ボルトを備えた壁材
保持具をショベル系掘削機の自在アームの先端に取付
け、同壁材取付ボルトを同壁材のめねじに嵌合させて同
壁材面を同壁材保持具で保持し、同自在アームにより同
壁材を所定位置まで移動させて同壁材を固定し、その後
同壁材取付ボルトをゆるめて同壁材から同壁材保持具を
とりはずすことを特徴とする間仕切壁面の構築工法 2)壁材保持具で保持している壁材を同壁材面と平行な
縦軸及び同壁材面と垂直な軸をそれぞれ中心として所定
角度だけ回動させて位置調整するようにしたことを特徴
とする請求項1記載の間仕切壁面の構築工法 3)ショベル系掘削機の自在アーム先端に取付けるため
の連結器具を有する壁材保持具において、壁材面と接す
る面には壁材取付ボルトを備え、保持した壁材面と平行
な縦軸を中心として所定角度だけ回動する機構及び同壁
材面と垂直な軸を中心として所定角度だけ回動する機構
を設けたことを特徴とする間仕切壁面の構築装置にあ
る。(Means for Solving the Problems) The gist of the present invention which has solved the above problems is as follows: 1) A female screw is embedded in the surface of the wall material by forming a hole so as to fit with the wall material mounting bolt. Attach the wall material holder equipped with the mounting bolt to the tip of the free arm of the excavator excavator, and fit the wall material mounting bolt to the female screw of the same wall material so that the same wall material surface can be used as the same wall material holder. A partition characterized by holding and moving the same wall material to a predetermined position by the same free arm to fix the same wall material, and then loosening the same wall material mounting bolt and removing the same wall material holder from the same wall material. Construction method of wall surface 2) Adjust the position of the wall material held by the wall material holder by rotating the vertical axis parallel to the surface of the wall material and the axis perpendicular to the surface of the wall material by a predetermined angle. The construction method of the partition wall surface according to claim 1, which is characterized in that In a wall material holder having a connecting device for attaching to the tip of a free arm of a shaving machine, a wall material mounting bolt is provided on a surface in contact with the wall material surface, and a predetermined angle is formed around a vertical axis parallel to the held wall material surface. There is provided a partition wall construction device, which is provided with a mechanism for rotating by a predetermined angle and a mechanism for rotating by a predetermined angle about an axis perpendicular to the surface of the wall material.
(作用) 本発明においては、まず壁材取付ボルトを備えた壁材保
持具をショベル系掘削機等の建設機械の自在アームの先
端部に連結器具を利用して取付ける。次に、同壁材取付
ボルトと嵌合するようにめねじを壁材の表面に孔をあけ
て埋設する。同自在アームを作動させて先端部の同壁材
保持具を同壁材の表面に密着させる。そして同壁材取付
ボルトを同壁材の孔に埋設しためねじに嵌合させて締め
付け、同壁材面を同壁材保持具で保持する。同自在アー
ムを作動させて同壁材を所定位置まで移動させて同壁材
を固定する。その後同壁材取付ボルトをゆるめて同壁材
から同壁材保持具をとりはずせば同壁材により壁面が構
築されることになる。このような作業を繰り返すことに
より間仕切壁面を完成させる。同壁材の表面にあけた孔
は工事の適当な段階においてセメント等を用いて埋める
ようになっている。(Operation) In the present invention, first, the wall material holder provided with the wall material mounting bolt is attached to the tip of the universal arm of a construction machine such as an excavator excavator using a connecting device. Next, a female screw is embedded in the surface of the wall material by making a hole so as to fit with the wall material mounting bolt. The universal arm is operated to bring the same-wall-material holder at the front end into close contact with the surface of the same-wall material. Then, the same wall material mounting bolt is embedded in the hole of the same wall material, fitted with a screw and tightened, and the same wall material surface is held by the same wall material holder. The universal arm is operated to move the wall material to a predetermined position and fix the wall material. After that, if the same wall material mounting bolt is loosened and the same wall material holder is removed from the same wall material, the wall surface is constructed by the same wall material. The partition wall surface is completed by repeating such work. The holes made in the surface of the wall material are filled with cement or the like at an appropriate stage of construction.
本発明では、壁材保持具で保持した壁材を同壁材面と平
行な縦軸を中心として所定角度だけ回動させて位置調整
できるようにしたものもある。これは保持した壁材を工
事の現場まで移動させたとき現場の状況に合わせて微妙
に位置調整できるようにしたものである。In some embodiments of the present invention, the wall material held by the wall material holder can be rotated by a predetermined angle about a vertical axis parallel to the wall material surface to adjust the position. This is so that when the held wall material is moved to the construction site, the position can be finely adjusted according to the situation at the site.
本発明では、壁材保持具で保持した壁材を同壁材面と垂
直な軸を中心として所定角度だけ回動させて位置調整で
きるようにしたものもある。これも保持した壁材を工事
の現場まで移動させたとき現場の状況に合わせて微妙に
位置調整できるようにしたものである。In some embodiments of the present invention, the wall material held by the wall material holder can be rotated by a predetermined angle about an axis perpendicular to the surface of the wall material to adjust the position. This also allows the held wall material to be delicately adjusted according to the situation at the construction site when it is moved to the construction site.
(実施例) 以下、本発明の実施例を図面に基づいて説明する。(Example) Hereinafter, the Example of this invention is described based on drawing.
第1図は実施例の一部切欠側面図、第2図は同壁材の斜
視図、第3図は第2図のA-Aにおける一部切欠断面図、
第4図は同平面図、第5図は同正面図、第6図は同説明
図である。1 is a partially cutaway side view of the embodiment, FIG. 2 is a perspective view of the same wall material, FIG. 3 is a partially cutaway sectional view taken along line AA of FIG. 2,
FIG. 4 is the same plan view, FIG. 5 is the same front view, and FIG. 6 is the same explanatory view.
本実施例においては、まず壁材取付ボルト(1)を備え
た壁材保持具(2)をショベル系掘削機(13)の自在ア
ーム(3)の先端部に連結器具(14)を利用して取付け
る。次に、壁材取付ボルト(1)と嵌合するようにめね
じ(4)を壁材(5)の表面に孔(6)をあけて埋設す
る。自在アーム(3)を作動させて先端部の壁材保持具
(2)を壁材(5)の表面に密着させる。そして壁材取
付ボルト(1)を壁材(5)の孔(6)に埋設しためね
じ(4)に嵌合させて締め付け、壁材(5)の表面を壁
材保持具(2)で保持する。自在アーム(3)を作動さ
せて壁材(5)を工事現場の所定位置まで移動させて壁
材(5)を固定する。その後壁材取付ボルト(1)をゆ
るめて壁材(5)から壁材保持具(2)をとりはずせ
ば、固定された壁材(5)により壁面が構築されること
になる。このような作業を繰り返すことにより間仕切壁
面を完成させる。壁材(5)の表面にあけた孔(6)
は、工事の適当な段階においてセメント等を用いて埋め
るようになっている。In the present embodiment, first, a wall material holder (2) equipped with a wall material mounting bolt (1) is attached to a tip end portion of a universal arm (3) of a shovel excavator (13) using a connecting device (14). To install. Next, a female screw (4) is embedded in the surface of the wall material (5) with a hole (6) so as to fit with the wall material mounting bolt (1). The free arm (3) is operated to bring the wall material holder (2) at the tip end into close contact with the surface of the wall material (5). Then, the wall material mounting bolt (1) is embedded in the hole (6) of the wall material (5) so that it is fitted into the screw (4) and tightened, and the surface of the wall material (5) is fixed by the wall material holder (2). Hold. The free arm (3) is operated to move the wall material (5) to a predetermined position on the construction site to fix the wall material (5). After that, if the wall material mounting bolt (1) is loosened and the wall material holder (2) is removed from the wall material (5), the wall surface is constructed by the fixed wall material (5). The partition wall surface is completed by repeating such work. Holes (6) in the surface of the wall material (5)
Are to be filled with cement etc. at an appropriate stage of construction.
本実施例では第4図に示すように、壁材保持具(2)で
保持した壁材(5)を壁材(5)の面と平行な縦軸
(7)を中心として所定角度だけ回動させて位置調整で
きる機構を設けている。位置調整は手動ハンドル(8)
を任意の方向に回転させることによって行うようになっ
ている。In this embodiment, as shown in FIG. 4, the wall material (5) held by the wall material holder (2) is rotated by a predetermined angle about the vertical axis (7) parallel to the surface of the wall material (5). A mechanism that can be moved to adjust the position is provided. Manual adjustment for position adjustment (8)
It is designed to be performed by rotating in any direction.
また本実施例では第5図に示すように、壁材保持具
(2)で保持した壁材(5)を壁材(5)の面と垂直な
軸(9)を中心として所定角度だけ回動させて位置調整
できる機構を設けている。位置調整は油圧シリンダー
(10)を作動させることによって行うようになってい
る。Further, in this embodiment, as shown in FIG. 5, the wall member (5) held by the wall member holder (2) is rotated by a predetermined angle about an axis (9) perpendicular to the surface of the wall member (5). A mechanism that can be moved to adjust the position is provided. The position is adjusted by operating the hydraulic cylinder (10).
第4図及び第5図で示す機構はいずれも保持した壁材を
工事の現場まで移動させたとき、現場の状況に合わせて
微妙に位置調整できるようにしたものである。The mechanism shown in FIGS. 4 and 5 is such that when the held wall material is moved to the construction site, the position can be finely adjusted according to the situation of the site.
尚本実施例では、壁材保持具(2)に備えている壁材取
付ボルト(1)は手動ハンドル(11)を任意の方向に回
転させることによって操作し、壁材(5)の壁材保持具
(2)への取付け、とりはずしを行うようになってい
る。In this embodiment, the wall material mounting bolt (1) provided in the wall material holder (2) is operated by rotating the manual handle (11) in an arbitrary direction, and the wall material of the wall material (5) is moved. It is designed to be attached to and removed from the holder (2).
第6図は壁面の構築を行っているところを示す説明図で
ある。壁材(5)の表面を壁材保持具(2)で保持し、
自在アーム(3)で壁材(5)を所定位置まで移動させ
て壁面の構築工事を行っている。工事現場に天井(12)
があっても本発明によれば特に支障なく壁面の構築を行
うことができる。FIG. 6 is an explanatory diagram showing the construction of the wall surface. The surface of the wall material (5) is held by the wall material holder (2),
The wall material (5) is moved to a predetermined position by the free arm (3) to perform wall construction work. Ceiling on construction site (12)
However, according to the present invention, it is possible to construct the wall surface without any trouble.
(発明の効果) 本発明により人手による作業が非常に少なく、作業能率
が良く、狭い工事現場においても利用可能で、また危険
性も低いような間仕切壁面の構築方法及び装置を提供す
ることができる。(Effects of the Invention) According to the present invention, it is possible to provide a method and apparatus for constructing a partition wall surface that requires very little manual work, has good work efficiency, can be used even in a narrow construction site, and has low risk. .
第1図は実施例の一部切欠側面図、第2図は同壁材の斜
視図、第3図は第2図のA-Aにおける一部切欠断面図、
第4図は同平面図、第5図は同正面図、第6図は同説明
図である。 (1):壁材取付ボルト、(2):壁材保持具 (3):自在アーム、(4):めねじ (5):壁材、(6):孔 (7):縦軸、(8):手動ハンドル (9):軸、(10):油圧シリンダー (11):手動ハンドル、(12):天井 (13):ショベル系掘削機、(14):連結器具1 is a partially cutaway side view of the embodiment, FIG. 2 is a perspective view of the same wall material, FIG. 3 is a partially cutaway sectional view taken along line AA of FIG. 2,
FIG. 4 is the same plan view, FIG. 5 is the same front view, and FIG. 6 is the same explanatory view. (1): Wall material mounting bolt, (2): Wall material holder (3): Free arm, (4): Female screw (5): Wall material, (6): Hole (7): Vertical axis, ( 8): Manual handle (9): Shaft, (10): Hydraulic cylinder (11): Manual handle, (12): Ceiling (13): Excavator excavator, (14): Connecting device
Claims (3)
壁材の表面に孔をあけて埋設し、同壁材取付ボルトを備
えた壁材保持具をショベル系掘削機の自在アームの先端
に取付け、同壁材取付ボルトを同壁材のめねじに嵌合さ
せて同壁材面を同壁材保持具で保持し、同自在アームに
より同壁材を所定位置まで移動させて同壁材を固定し、
その後同壁材取付ボルトをゆるめて同壁材から同壁材保
持具をとりはずすことを特徴とする間仕切壁面の構築工
法。1. A wall arm for a shovel excavator, in which a female screw is embedded in the surface of the wall material so as to be fitted with the wall material mounting bolt and a hole is embedded in the surface of the wall material. Attach the same wall material mounting bolt to the female thread of the same wall material, hold the same wall material surface with the same wall material holder, and move the same wall material to a predetermined position with the same free arm. Fix the same wall material,
After that, the construction wall wall construction method is characterized in that the wall material mounting bolts are loosened and the wall material holder is removed from the wall material.
と平行な縦軸及び同壁材面と垂直な軸をそれぞれ中心と
して所定角度だけ回動させて位置調整するようにしたこ
とを特徴とする請求項1記載の間仕切壁面の構築工法。2. The position of the wall material held by the wall material holder is rotated by a predetermined angle about a vertical axis parallel to the wall material surface and an axis perpendicular to the wall material surface, respectively. The method for constructing a partition wall surface according to claim 1, wherein:
けるための連結器具を有する壁材保持具において、壁材
面と接する面には壁材取付ボルトを備え、保持した壁材
面と平行な縦軸を中心として所定角度だけ回動する機構
及び同壁材面と垂直な軸を中心として所定角度だけ回動
する機構を設けたことを特徴とする間仕切壁面の構築装
置。3. A wall material holder having a connecting device for attaching to the tip of a universal arm of an excavator excavator, wherein a wall material mounting bolt is provided on a surface in contact with the wall material surface and is parallel to the held wall material surface. An apparatus for constructing a partition wall surface, which is provided with a mechanism for rotating a predetermined angle about a vertical axis and a mechanism for rotating a predetermined angle about an axis perpendicular to the wall material surface.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13376989A JPH0686771B2 (en) | 1989-05-25 | 1989-05-25 | Construction method and equipment for partition wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13376989A JPH0686771B2 (en) | 1989-05-25 | 1989-05-25 | Construction method and equipment for partition wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02311665A JPH02311665A (en) | 1990-12-27 |
| JPH0686771B2 true JPH0686771B2 (en) | 1994-11-02 |
Family
ID=15112539
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13376989A Expired - Lifetime JPH0686771B2 (en) | 1989-05-25 | 1989-05-25 | Construction method and equipment for partition wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0686771B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2858192B2 (en) * | 1992-10-14 | 1999-02-17 | 日本車輌製造株式会社 | Interior material transport mounting device |
| CN103046760B (en) * | 2012-12-28 | 2014-12-03 | 武汉理工大学 | Composite wall board mounting machine and composite wall board mounting method |
| JP7758603B2 (en) * | 2022-03-08 | 2025-10-22 | 矢作建設工業株式会社 | Panel attachment |
| CN115822284B (en) * | 2022-12-22 | 2024-10-25 | 安徽省建设集团有限公司 | Module partition wall assembly auxiliary device |
-
1989
- 1989-05-25 JP JP13376989A patent/JPH0686771B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02311665A (en) | 1990-12-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5251993A (en) | Connecting structure | |
| JPH0686771B2 (en) | Construction method and equipment for partition wall | |
| US5850704A (en) | Assembly for the attachment of an accessory to a boom of a working machine | |
| JP2000263291A (en) | Positioner for welding | |
| JPH08284424A (en) | Construction method and adjustment jig for steel columns | |
| JPH0442366Y2 (en) | ||
| JP2918202B1 (en) | Correction method of joint of steel beam to existing steel column and correction tool therefor | |
| JPH08224669A (en) | Weaver for welding torch which can jointly be used for linear weaving and angular weaving | |
| JP2997195B2 (en) | Pipe clamp | |
| JPH0647611Y2 (en) | Jig for H type steel end drilling | |
| JPH0674719B2 (en) | Bolt fastening device | |
| JPS58181527A (en) | Automatic screw-down device for flange | |
| JPH0215948Y2 (en) | ||
| JP3858339B2 (en) | Bolt and nut supply device in segment assembly equipment | |
| JPS5810637B2 (en) | Centering of heavy objects. Installation method | |
| JPH039985Y2 (en) | ||
| JP2516011Y2 (en) | Fixture | |
| JPS6016634Y2 (en) | Jib boom storage support device | |
| JP3016897U (en) | Crawling jig for rotary saw blade | |
| JP4705809B2 (en) | Attachment mounting device for work equipment | |
| JPS5848015Y2 (en) | Rebar cutting equipment | |
| JPH0239741Y2 (en) | ||
| JPS6171992A (en) | Method of installing industrial robot | |
| JPH0434234Y2 (en) | ||
| JPH0541691U (en) | Vertical pipe cutting equipment for existing pipes |