Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH07103498B2 - Spinning machine changer - Google Patents
[go: Go Back, main page]

JPH07103498B2 - Spinning machine changer - Google Patents

Spinning machine changer

Info

Publication number
JPH07103498B2
JPH07103498B2 JP24803386A JP24803386A JPH07103498B2 JP H07103498 B2 JPH07103498 B2 JP H07103498B2 JP 24803386 A JP24803386 A JP 24803386A JP 24803386 A JP24803386 A JP 24803386A JP H07103498 B2 JPH07103498 B2 JP H07103498B2
Authority
JP
Japan
Prior art keywords
bobbin
empty
gripping
full
spindle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP24803386A
Other languages
Japanese (ja)
Other versions
JPS63105128A (en
Inventor
隆征 森田
晴佳 中村
Original Assignee
株式会社豊田自動織機製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社豊田自動織機製作所 filed Critical 株式会社豊田自動織機製作所
Priority to JP24803386A priority Critical patent/JPH07103498B2/en
Publication of JPS63105128A publication Critical patent/JPS63105128A/en
Publication of JPH07103498B2 publication Critical patent/JPH07103498B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Description

【発明の詳細な説明】 発明の目的 (産業上の利用分野) この発明はリング精紡機、撚糸機等の紡機のスピンドル
列の下方にスピンドルと対応して配設された移送装置の
ペッグ上に空ボビンを予め準備し、紡機機台の満管停止
後、機台の一端からスピンドルレールに沿って連続走行
し、スピンドル上の満ボビンとペッグ上の空ボビンとを
順次交換する紡機の管替機に関するものである。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention is provided on a peg of a transfer device which is arranged below a spindle row of a spinning machine such as a ring spinning machine and a twisting machine in correspondence with a spindle. The present invention relates to a spinning machine changer in which an empty bobbin is prepared in advance and, after the spinning machine stand is completely stopped, the bobbin on the spindle is continuously run from one end of the machine stand along the spindle rail and the empty bobbin on the peg is sequentially replaced. It is a thing.

(従来の技術) 従来この種の管替機として第9図に示す装置が特開昭60
−246828号公報に開示されている。この管替機100はス
ピンドル101上の満ボビンFを1本ずつ抜上げる満ボビ
ン抜上装置102とペッグコンベヤ103上のペッグ104から
空ボビンEを抜上げる空ボビン抜上装置105を装備し、
満ボビン抜上装置102の後方に管替機100の走行に伴って
抜上げ後の空ボビンEを満ボビン抜上げ後のスピンドル
101に1本ずつ挿入する空ボビン挿入装置106を配設し、
かつ空ボビン抜上装置105の後方に管替機100の走行に伴
って抜上げ後の満ボビンFを空ボビン抜上げ後のペッグ
104に1本ずつ挿入する満ボビン挿入装置107を備えてい
る。又、スピンドル101上から抜上げた満ボビンFを満
ボビン挿入装置107へ移送する満ボビン移送装置108と、
ペッグコンベヤ103上から抜上げた空ボビンEを空ボビ
ン挿入装置106へ移送する空ボビン移送装置109を装備し
ている。
(Prior Art) A device shown in FIG. 9 is a conventional pipe changer of this type.
-246828. This pipe changer 100 is equipped with a full bobbin removing device 102 for removing one full bobbin F on a spindle 101 and an empty bobbin removing device 105 for removing an empty bobbin E from a peg 104 on a peg conveyor 103.
Behind the full bobbin lifting device 102, the empty bobbin E after being lifted up along with the travel of the pipe changer 100 is moved to the spindle after the full bobbin is pulled out.
An empty bobbin inserting device 106 for inserting one into each 101 is provided,
In addition, the full bobbin F after the empty bobbin pulling-out device 105 is lifted as the pipe changer 100 travels, and the peg after the empty bobbin is pulled out.
A full bobbin inserting device 107 for inserting one into each 104 is provided. Further, a full bobbin transfer device 108 for transferring the full bobbin F pulled out from the spindle 101 to the full bobbin insertion device 107,
An empty bobbin transfer device 109 for transferring the empty bobbin E pulled out from the peg conveyor 103 to the empty bobbin insertion device 106 is provided.

(発明が解決しようとする問題点) ところが、前記従来装置においては満ボビン移送装置10
8と空ボビン移送装置109とが互いに干渉しないように管
替機100の機台の幅(奥行)方向にずらして配設する必
要があり、管替機100の機台の幅が大きくなり既設工場
において狭い間隔で設置された精紡機機台に適用するこ
とが難しいという問題がある。又、前記従来装置におい
ては満ボビン移送装置108がシュータ110とその通路の途
中に所定間隔をおいて出没自在に配設された係止板111
とから構成され、係止板111がシュータ110の通路へ出没
して満ボビンFの下端を係止しながら順次満ボビン挿入
装置107へ送り込むようになっている。すなわち、満ボ
ビンFはシュータ110内を自重により滑走して移動する
ため、管替の速度が比較的に遅い場合には特に問題はな
いが、1本の満ボビンの抜上げ及び挿入が1秒以下とい
うように高速で管替が行われる場合には満ボビン挿入装
置107によるペッグ104上への満ボビンの挿入タイミング
に支障を来たすという問題もある。さらに、空ボビン移
送装置109から空ボビン挿入装置106を構成するホッパー
112への受け渡しも空ボビンEの自由落下により行われ
るため、管替が高速となった場合同様な支障を来たすと
いう問題もある。
(Problems to be Solved by the Invention) However, in the conventional device, the full bobbin transfer device 10
8 and the empty bobbin transfer device 109 need to be arranged so as to be offset in the width (depth) direction of the machine stand of the pipe changer 100 so that the machine stand width of the pipe changer 100 becomes large. There is a problem that it is difficult to apply it to a spinning machine stand installed at a narrow interval in a factory. Further, in the conventional device, the full bobbin transfer device 108 is provided with a locker plate 111 which is arranged so as to be retractable at a predetermined interval in the middle of the shooter 110 and its passage.
The locking plate 111 is projected into and retracted from the passage of the shooter 110 to sequentially feed the full bobbin F to the full bobbin inserting device 107 while locking the lower end of the full bobbin F. That is, since the full bobbin F slides and moves in the shooter 110 by its own weight, there is no particular problem when the tube replacement speed is relatively slow, but one full bobbin can be pulled out and inserted for one second. There is also a problem in that the timing of inserting the full bobbin onto the peg 104 by the full bobbin inserting device 107 is disturbed when the pipe replacement is performed at high speed as described below. Further, a hopper that constitutes the empty bobbin insertion device 106 from the empty bobbin transfer device 109.
Since delivery to 112 is also performed by free fall of the empty bobbin E, there is a problem that the same trouble occurs when the pipe replacement is performed at high speed.

発明の構成 (問題点を解決するための手段) 前記の問題点を解決するためこの発明においては、紡機
のスピンドル列の下方にスピンドルと対応して配設され
た移送装置のペッグ上に空ボビンを予め準備し、紡機機
台の満管停止後、機台の一端からスピンドルレールに沿
って連続走行し、スピンドル上の満ボビンとペッグ上の
空ボビンとを順次交換する管替機に、スピンドルから満
ボビンを1本ずつ抜上げる満ボビン抜上装置と、前記満
ボビン抜上装置により抜上げられた満ボビンをほぼ垂直
状態で下方のペッグ上へ移送するため、満ボビンをほぼ
垂直状態で受け取り把持する満ボビン保持具を一定間隔
で複数個備えるとともにスピンドルレールと直交する平
面内で周回する第1のコンベヤ装置と、前記第1のコン
ベヤ装置に対して管替機の管替作業時進行方向前方位置
において該コンベヤ装置と平行に配設され、前記ペッグ
上の空ボビンをほぼ垂直状態で把持して上方へ移動する
空ボビン把持具を一定間隔で複数個備えた第2のコンベ
ヤ装置と、前記第1のコンベヤ装置に対して管替機の管
替作業時進行方向後方位置に配設され前記ペッグ上から
抜上げられた空ボビンをスピンドルに1本ずつ挿入する
空ボビン挿入装置と、前記満ボビン抜上装置の上方にお
いて前記第2のコンベヤ装置と空ボビン挿入装置上方に
わたる水平内で周回するように配設され、第2のコンベ
ヤ装置から空ボビンを受け取るとともに該空ボビンを把
持する把持具を一定間隔で複数個備えた受渡し用コンベ
ヤ装置とを設けている。
Configuration of the Invention (Means for Solving the Problems) In order to solve the above problems, according to the present invention, an empty bobbin is provided on a peg of a transfer device which is disposed below a spindle row of a spinning machine and corresponding to a spindle. In advance, after the spinning machine stand is completely stopped, the spinning machine is continuously moved from one end of the machine stand along the spindle rail and the full bobbin on the spindle and the empty bobbin on the peg are sequentially replaced. The full bobbin lifting device for lifting the bobbins one by one and the full bobbin lifted by the full bobbin lifting device are transferred to the lower pegs in a substantially vertical state, so that the full bobbin is received and gripped in a substantially vertical state. A plurality of full bobbin holders at regular intervals, and a first conveyor device that revolves in a plane orthogonal to the spindle rail; and a pipe changer for the first conveyor device. A second conveyor provided in parallel with the conveyor device at the front position in the traveling direction during replacement work and provided with a plurality of empty bobbin gripping tools for gripping the empty bobbin on the peg in a substantially vertical state and moving it upward at regular intervals. Device and an empty bobbin insertion device which is arranged at a rear position in the traveling direction of the pipe changer with respect to the first conveyor device and inserts empty bobbins pulled out from the peg into the spindle one by one. And is arranged so as to circulate in a horizontal direction above the second conveyor device and the empty bobbin insertion device above the full bobbin removing device, and receives the empty bobbin from the second conveyor device and removes the empty bobbin from the empty bobbin. The delivery conveyor device is provided with a plurality of gripping tools to be gripped at regular intervals.

(作用) この発明の管替機においては、満ボビン抜上装置により
抜上げられた満ボビンは第1のコンベヤ装置に装備され
た満ボビン把持具に把持され、ほぼ垂直状態に保持され
たままスピンドルレールの下方に位置するペッグ上まで
移送されてペッグに挿入される。すなわち、満ボビンは
常に把持された状態で移送されるため全ての満ボビンが
同一条件で移送される。一方、ペッグ上の空ボビンは第
2のコンベヤ装置に装備された空ボビン把持具により把
持されてペッグ上から抜上げられるとともに垂直状態で
上方へ移送され、受渡し用コンベヤ装置の把持具に受け
渡された後空ボビン挿入装置上方まで横方向へ移動さ
れ、満ボビンが抜上げられた後のスピンドルに空ボビン
挿入装置により1本ずつ挿入される。
(Operation) In the pipe changer of the present invention, the full bobbin pulled up by the full bobbin lifting device is held by the full bobbin gripping tool provided in the first conveyor device, and is held in a substantially vertical state. It is transferred onto a peg located below the spindle rail and inserted into the peg. That is, since the full bobbins are always transferred while being gripped, all the full bobbins are transferred under the same condition. On the other hand, the empty bobbin on the peg is gripped by the empty bobbin gripping tool mounted on the second conveyor device, lifted up from the peg, and vertically transferred upward, and passed to the gripping tool of the transfer conveyor device. The bobbin is moved laterally to the upper side of the rear empty bobbin inserting device, and the empty bobbin inserting device inserts the full bobbins one by one into the spindle after the bobbin is pulled out.

(実施例) 以下この発明を精紡機の管替機に具体化した一実施例を
第1〜8図に従って説明する。管替機1は精紡機機台に
固設されたレール2及びガイドレール3に係合するガイ
ドローラ4,5を介して精紡機機台に沿って走行可能に支
承され、レール2に所定間隔で突設されたピン6と係合
するスクリューローラ7の作用により、レール2に沿っ
て連続的に走行するようになっている。すなわち、スク
リューローラ7はモータ8の駆動軸に嵌着された歯付き
プーリ9と、スクリューローラ7の回転軸10に嵌着され
た歯付きプーリ11との間に巻掛けられた歯付きベルト12
を介してモータ8の回転に伴い回転され、その周面に形
成された溝7aが順次ピン6に係合することにより、管替
機1がレール2に沿って走行するようになっている。下
方に配設された前記ガイドレール3の上面にはスピンド
ルレール13と平行にトレイガイド14が延設され、該トレ
イガイド14にはスピンドル15のピッチとほぼ等しい直径
を有しかつ上面にペッグ16が突設されたトレイ17がベル
ト(図示せず)上に多数1列状態で摺動可能に装備され
ている。
(Embodiment) An embodiment in which the present invention is embodied in a pipe changer of a spinning machine will be described below with reference to FIGS. The pipe changer 1 is movably supported along the spinning machine base via guide rollers 4 and 5 that engage with the rails 2 and the guide rails 3 fixed to the spinning machine base, and the rails 2 are spaced at predetermined intervals. By the action of the screw roller 7 which engages with the pin 6 projecting from the above, the vehicle travels continuously along the rail 2. That is, the screw roller 7 has a toothed belt 12 wound around a toothed pulley 9 fitted on a drive shaft of a motor 8 and a toothed pulley 11 fitted on a rotation shaft 10 of the screw roller 7.
The pipe changer 1 is made to travel along the rail 2 by being rotated by the rotation of the motor 8 through the gears, and the grooves 7a formed on the peripheral surface of the motor 8 being sequentially engaged with the pins 6. A tray guide 14 extends parallel to the spindle rail 13 on the upper surface of the guide rail 3 disposed below, and the tray guide 14 has a diameter substantially equal to the pitch of the spindles 15 and a peg 16 on the upper surface. A plurality of trays 17 each having a protruding portion are slidably mounted on a belt (not shown) in a single-row state.

管替機1の中央上部には満ボビンFをスピンドル15から
1本ずつ抜上げる満ボビン抜上装置18が配設されてい
る。そして、その下方には該満ボビン抜上装置18の抜上
作業時に満ボビンFとスピンドル15との緊嵌合を解除す
る作用をなす緊嵌合解除装置(図示せず)が配設されて
いる。前記満ボビン抜上装置18に対して管替機1の管替
時進行方向前方寄り位置には、満ボビン抜上装置18によ
り抜上げられた満ボビンFをほぼ垂直状態で下方のペッ
グ16上へ移送するため、満ボビンFをほぼ垂直状態で受
け取り把持する満ボビン把持具19を一定間隔で複数個備
えた第1のコンベヤ装置20がスピンドルレール13と直交
する平面内で周回するように配設されている。又、前記
第1のコンベヤ装置20に対して管替機1の管替作業時進
行方向前方位置には、前記ペッグ16上の空ボビンEをほ
ぼ垂直状態で把持して上方へ移動する空ボビン把持具21
を一定間隔で複数個備えた第2のコンベヤ装置22が前記
第1のコンベヤ装置20と平行に配設されている。又、前
記第1のコンベヤ装置20及び満ボビン抜上装置18に対し
て管替機1の管替作業時進行方向後方位置には、ペッグ
16上から抜上げられた空ボビンEをスピンドル15に1本
ずつ挿入する空ボビン挿入装置23が配設されている。
A full bobbin removing device 18 that pulls out the full bobbins F from the spindle 15 one by one is arranged at the upper center of the pipe changer 1. A tight fitting releasing device (not shown) is provided below the full bobbin removing device 18 for releasing the tight fitting between the full bobbin F and the spindle 15 during the lifting operation of the full bobbin lifting device 18. There is. The full bobbin F lifted by the full bobbin lifting device 18 is placed on the lower peg 16 in a substantially vertical state at a position closer to the front in the moving direction of the pipe changer 1 with respect to the full bobbin lifting device 18. In order to transfer the full bobbin F in a substantially vertical state, the first conveyor device 20 provided with a plurality of full bobbin gripping tools 19 at fixed intervals is arranged so as to circulate in a plane orthogonal to the spindle rail 13. It is set up. Further, an empty bobbin gripping tool that grips an empty bobbin E on the peg 16 in a substantially vertical state and moves upward at a forward position of the tube changer 1 in the traveling direction during the pipe replacement operation with respect to the first conveyor device 20. twenty one
A second conveyor device 22 is provided in parallel with the first conveyor device 20. Further, a peg is provided at a rear position in the traveling direction of the pipe changer 1 with respect to the first conveyor device 20 and the full bobbin removing device 18.
An empty bobbin inserting device 23 for inserting the empty bobbins E pulled out from above into the spindle 15 one by one is provided.

前記満ボビン抜上装置18の上方には、前記第2のコンベ
ヤ装置22から空ボビンEを受け取るとともに該空ボビン
Eを把持する把持具24を一定間隔で複数個備えた受渡し
用コンベヤ装置25が、前記第2のコンベヤ装置22と空ボ
ビン挿入装置23の上方にわたる水平面内で周回するよう
に配設されている。
Above the full bobbin removing device 18, there is provided a delivery conveyor device 25 which receives empty bobbins E from the second conveyor device 22 and is provided with a plurality of grippers 24 for gripping the empty bobbins E at regular intervals. , Is arranged so as to circulate in a horizontal plane extending above the second conveyor device 22 and the empty bobbin inserting device 23.

又、管替機1の精紡機機台と反対側寄りには前記回転軸
10と平行に駆動軸26が回転自在に配設され、該駆動軸26
にはクラッチ27を介して一体的に回転可能にプーリ28が
取付けられ、該プーリ28と前記回転軸10に嵌着されたプ
ーリ29との間に掛装されたベルト30を介して駆動軸26が
回転駆動されるようになっている。そして、該駆動軸26
の回転がベルト伝動機構、歯車伝動機構あるいはカムリ
ンク機構等を介して前記満ボビン抜上装置18、第1のコ
ンベヤ装置20、第2のコンベヤ装置22、空ボビン挿入装
置23及び受渡し用コンベヤ装置25の駆動力として伝達さ
れ、各装置が互いに同期した状態で駆動されるようにな
っている。
Further, the rotary shaft is provided on the side opposite to the spinning machine base of the pipe changer 1.
A drive shaft 26 is rotatably arranged in parallel with the drive shaft 26.
A pulley 28 is integrally rotatably attached to the drive shaft 26 via a clutch 27, and a drive shaft 26 is provided via a belt 30 mounted between the pulley 28 and a pulley 29 fitted to the rotary shaft 10. Is driven to rotate. Then, the drive shaft 26
Is rotated by a belt transmission mechanism, a gear transmission mechanism, a cam link mechanism, or the like, the full bobbin lifting device 18, the first conveyor device 20, the second conveyor device 22, the empty bobbin insertion device 23, and the delivery conveyor device. It is transmitted as a driving force of 25 and each device is driven in a state of being synchronized with each other.

満ボビン抜上装置18は第2図に示すように、管替機1の
フレームに固定された支持ブラケット31に対して一対の
レバー32,33が管替機1の移動方向と直交する方向へ延
びる状態で軸34,35を介して回動可能に支持されるとと
もに、その先端においてリンク36を互いに連結されて平
行4節リンクを構成している。下方に配設されたレバー
33の先端にはボビン把持装置37が支持されている。又、
レバー33の下方には前記駆動軸26から伝動機構(図示せ
ず)を介して駆動される回動軸38が配設され、該回動軸
38に対して基端が一体回動可能に嵌着された回動レバー
39と前記レバー33とが連結ロッド40を介して互いにピン
連結されている。そして、回動レバー39が回動すること
によりレバー33が回動され、前記ボビン把持装置37が満
ボビン把持位置と満ボビン開放位置とに回動配置される
ようになっている。
As shown in FIG. 2, the full bobbin removing device 18 has a pair of levers 32 and 33 in a direction orthogonal to the moving direction of the pipe changing machine 1 with respect to a support bracket 31 fixed to the frame of the pipe changing machine 1. In the extended state, it is rotatably supported via shafts 34 and 35, and at the tip thereof, links 36 are connected to each other to form a parallel four-bar link. Lever arranged below
A bobbin holding device 37 is supported at the tip of 33. or,
Below the lever 33, a rotary shaft 38 driven by the drive shaft 26 via a transmission mechanism (not shown) is arranged.
Rotation lever whose base end is fitted to 38 so that it can rotate integrally
39 and the lever 33 are pin-connected to each other via a connecting rod 40. The lever 33 is rotated by the rotation of the rotation lever 39, and the bobbin holding device 37 is arranged in a full bobbin holding position and a full bobbin opening position.

ボビン把持装置37は前記リンク36とレバー33とを回動可
能に連結する支軸41の突出端に回動可能に支持され、該
支軸41との間に掛装されたねじりばね(図示せず)によ
り第2図の時計方向に回動付勢されるとともに上面に固
設された規制部材(図示せず)がリンク36と当接するこ
とにより回動が規制されて水平状態に保持されようにな
っている。又、ボビン保持装置37は第4図に示すよう
に、支軸41と直交する直線上に固定把持片42と可動把持
片43とが互いに対向する状態で配設されている。可動把
持片43は支軸41に回動可能に支承されるとともに、固定
把持片42と反対側に歯部43aが形成されている。支軸41
の後側に(第4図の左側)固定された軸44には把持解除
部材45が回動可能に支持されている。把持解除部材45は
前記可動把持片43の歯部43aと噛合する歯部45aを有する
とともに、上部には逆L字状をなす係合片46が突設され
ている。そして、把持解除部材45の底面とボビン把持装
置37の底壁との間に介装されたばね47により把持解除部
材45を介して可動把持片43が常にボビン把持方向へ回動
付勢されている。又、管替機1の上部にはボビン把持装
置37が満ボビン開放位置へ回動配置された際、前記係合
片46と係合して把持解除部材45を把持解除側すなわち第
4図の時計方向へ回動させる係合部材48が固設されてい
る。
The bobbin holding device 37 is rotatably supported by a protruding end of a support shaft 41 that rotatably connects the link 36 and the lever 33, and a torsion spring (not shown) mounted between the support shaft 41 and the support shaft 41. (2) is urged to rotate in the clockwise direction in FIG. 2 and a regulating member (not shown) fixed to the upper surface abuts on the link 36 so that the rotation is regulated and held in a horizontal state. It has become. Further, as shown in FIG. 4, the bobbin holding device 37 is arranged such that the fixed gripping piece 42 and the movable gripping piece 43 face each other on a straight line orthogonal to the support shaft 41. The movable gripping piece 43 is rotatably supported by the support shaft 41, and a tooth portion 43a is formed on the side opposite to the fixed gripping piece 42. Spindle 41
A grip release member 45 is rotatably supported on a shaft 44 fixed to the rear side (left side in FIG. 4). The grip release member 45 has a tooth portion 45a that meshes with the tooth portion 43a of the movable grip piece 43, and an engaging piece 46 having an inverted L-shape is projectingly provided on the upper portion. The movable gripping piece 43 is constantly biased in the bobbin gripping direction via the gripping release member 45 by a spring 47 interposed between the bottom surface of the gripping release member 45 and the bottom wall of the bobbin gripping device 37. . Further, when the bobbin gripping device 37 is pivotally arranged at the upper portion of the pipe changer 1 to the full bobbin open position, the bobbin gripping device 37 engages with the engaging piece 46 to move the gripping release member 45 to the grip release side, that is, as shown in FIG. An engagement member 48 that rotates in the clockwise direction is fixed.

次に第1のコンベヤ装置20について説明する。第1のコ
ンベヤ装置20を構成する上下一対のスプロケット49,50
はその回転軸51が管替機1の移動方向と平行に配設さ
れ、両スプロケット49,50間に巻掛けられたチェーン52
がスピンドルレール13と直交する平面内で周回するよう
になっている。第5図に示すように満ボビン把持具19は
チェーン52に取付けられた断面L字状をなす取付ブラケ
ット53の外側面に固定されている。満ボビン把持具19は
平面L字状をなす支持体54に固定された固定把持片55
と、固定把持片55と協働して満ボビンFの胴部を把持、
開放するように軸56を介して支持体54に回動可能に取付
られた可動把持片57とを備えている。可動把持片57をね
じりばね(図示せず)により常にボビン把持側(第5図
の反時計方向)へ回動付勢されている。可動把持片57の
基端には斜め後方へ延びる係合レバー58が一体に形成さ
れている。
Next, the first conveyor device 20 will be described. A pair of upper and lower sprockets 49, 50 constituting the first conveyor device 20.
The rotating shaft 51 is arranged parallel to the moving direction of the pipe changer 1, and the chain 52 is wound between both sprockets 49 and 50.
Circulates in a plane orthogonal to the spindle rail 13. As shown in FIG. 5, the full bobbin gripping tool 19 is fixed to the outer surface of a mounting bracket 53 attached to the chain 52 and having an L-shaped cross section. The full bobbin gripping tool 19 includes a fixed gripping piece 55 fixed to a support body 54 having a plane L shape.
Grips the body of the full bobbin F in cooperation with the fixed gripping piece 55,
The movable gripping piece 57 is rotatably attached to the support body 54 via the shaft 56 so as to be opened. The movable gripping piece 57 is constantly biased by a torsion spring (not shown) toward the bobbin gripping side (counterclockwise in FIG. 5). An engaging lever 58 that extends obliquely rearward is integrally formed at the base end of the movable gripping piece 57.

前記上部スプロケット49の近傍位置には、満ボビン抜上
装置18によりスピンドル15から抜上げられた満ボビンF
を満ボビン開放位置においてほぼ垂直状態で受取把持可
能とするため、満ボビン把持具19が前記満ボビン開放位
置近傍に達した時点から前記係合レバー58と係合して可
動把持片57を開放位置へ回動させ、ボビン把持装置37が
満ボビンFを開放すると同時に可動把持片57が満ボビン
Fの胴部を把持するようにカム面が形成されたカム59が
配設されている。又、下部スプロケット50の近傍位置に
は、満ボビン把持具19に把持された満ボビンFの底部が
ペッグ16内に挿入された際に、可動把持片57を開放側へ
回動するように係合レバー58と係合するカム60が配設さ
れている。なお、前記各カム59,60と係合レバー58とが
係合する際に満ボビン把持具19全体が移動するのを防ぐ
ため取付ブラケット53と係合する規制部材61が両カム5
9,60の近傍位置に配設されている。
In the vicinity of the upper sprocket 49, the full bobbin F pulled up from the spindle 15 by the full bobbin lifting device 18
In the full bobbin open position so that the full bobbin can be received and gripped in a substantially vertical state, the movable gripping piece 57 is released by engaging with the engagement lever 58 from the time when the full bobbin gripping tool 19 reaches the vicinity of the full bobbin open position. There is provided a cam 59 having a cam surface so that the bobbin holding device 37 opens the full bobbin F and the movable holding piece 57 holds the body of the full bobbin F at the same time when the bobbin holding device 37 is rotated to the position. Further, at a position near the lower sprocket 50, when the bottom portion of the full bobbin F gripped by the full bobbin gripping tool 19 is inserted into the peg 16, the movable gripping piece 57 is rotated to the open side. A cam 60 that engages the mating lever 58 is provided. In addition, when the cams 59 and 60 are engaged with the engagement lever 58, the restricting member 61 that engages with the mounting bracket 53 is provided to prevent the entire full bobbin gripping tool 19 from moving.
It is located near 9,60.

次にペッグ16上から空ボビンEを抜上げ、搬送する第2
のコンベヤ装置22について説明する。このコンベヤ装置
も前記第1のコンベヤ装置20と同様に、管替機1の進行
方向と平行に配設された上下一対の回転軸62に対してス
プロケット63,64がそれぞれ一体回転可能に嵌着され、
両スプロケット63,64間にチェーン65が巻掛けられてい
る。空ボビン把持具21は固定把持片55と可動把持片57の
配置間隔が空ボビンEの頂部を把持するのに適した間隔
に配置されている点を除き前記満ボビン把持具19と同様
に構成されている。そして、スプロケット64の近傍位置
には、空ボビン把持具21がペッグ16上の空ボビンEに近
づいた時点から前記係合レバー58と係合して可動把持片
57を回動側へ開放させるとともに、空ボビン把持具21が
水平状態に配置された時点で可動把持片57が把持位置に
復帰するカム面を有するカム66が配設されている。ま
た、上部スプロケット63の近傍位置には、空ボビン把持
具21により把持された空ボビンEの頂部が前記受渡し用
コンベヤ装置25の把持具24に把持される位置から一定区
間移動する間、可動把持片57を開放位置に配置させるよ
うに係合レバー58を回動させるカム面が形成されたカム
67が配設されている。なお、各カム66,67の近傍位置に
は前記第1のコンベヤ装置20の場合と同様に規制部材68
が配設されている。
Next, pull out the empty bobbin E from above the peg 16 and carry it
The conveyor device 22 will be described. Similar to the first conveyor device 20, this conveyor device is also fitted with a pair of upper and lower rotary shafts 62 arranged parallel to the traveling direction of the pipe changer 1 so that the sprockets 63 and 64 can be integrally rotated. Is
A chain 65 is wound around both sprockets 63 and 64. The empty bobbin gripping tool 21 has the same structure as the full bobbin gripping tool 19 except that the fixed gripping piece 55 and the movable gripping piece 57 are arranged at an interval suitable for gripping the top of the empty bobbin E. Has been done. Then, at a position near the sprocket 64, from the time when the empty bobbin gripping tool 21 approaches the empty bobbin E on the peg 16, the movable gripping piece is engaged with the engaging lever 58.
A cam 66 having a cam surface that allows the movable gripping piece 57 to return to the gripping position when the empty bobbin gripping tool 21 is arranged in a horizontal state is provided while opening 57 to the rotating side. Further, a movable grip is provided near the upper sprocket 63 while the top of the empty bobbin E gripped by the empty bobbin grip 21 moves from the position gripped by the grip 24 of the transfer conveyor device 25 for a certain period. A cam having a cam surface for rotating the engaging lever 58 so as to dispose the piece 57 in the open position.
67 are provided. In addition, as in the case of the first conveyor device 20, a regulating member 68 is provided in the vicinity of the cams 66, 67.
Is provided.

次に前記第2のコンベヤ装置22から空ボビン挿入装置23
へと空ボビンを移送する受渡し用コンベヤ装置25につい
て説明する。コンベヤ装置25は前記第2のコンベヤ装置
22及び空ボビン挿入装置23の上方位置にそれぞれスプロ
ケット69,70が、その回転軸71,72が垂直状態となるよう
に配設されている。第7図に示すように両スプロケット
69,70間に巻き掛けられたチェーン73には一定間隔で複
数個(この実施例では7個)の支持ブラケット74が取付
けられ、該支持ブラケット74の先端には前記把持具24が
その基端において軸75を介して回動可能に支持されてい
る。把持具24は固定把持部材76と可動把持部材77とを備
え、可動把持部材77が軸78を介して固定把持部材76に対
して回動可能に支持されるとともに、図示しないねじり
ばねの作用により常に把持側へ回動付勢されている。前
記両スプロケット69,70の下方には空ボビン挿入装置23
へのボビン受渡し位置を除いてほぼ前記チェーン73の周
回位置と対応した長円形状のガイド溝79を備えたガイド
板80が水平状態に配設されている。前記各固定把持部材
76の外面には支持片81が突設され、該支持片81には前記
ガイド溝79と係合するローラ82がピン83を介して固定さ
れている。
Next, from the second conveyor device 22 to the empty bobbin inserting device 23
A delivery conveyor device 25 for transferring an empty bobbin to the following will be described. The conveyor device 25 is the second conveyor device.
Sprockets 69, 70 are arranged above the empty bobbin insertion device 23 and the empty bobbin insertion device 23, respectively, so that their rotation shafts 71, 72 are in a vertical state. Both sprockets as shown in FIG.
A plurality of (seven in this embodiment) support brackets 74 are attached to the chain 73 wound between 69 and 70 at regular intervals, and the gripper 24 is attached to the distal end of the support bracket 74. Is rotatably supported by a shaft 75. The gripping tool 24 includes a fixed gripping member 76 and a movable gripping member 77, the movable gripping member 77 is rotatably supported with respect to the fixed gripping member 76 via a shaft 78, and by the action of a torsion spring (not shown). It is always urged to rotate toward the grip side. An empty bobbin inserting device 23 is provided below the both sprockets 69 and 70.
A guide plate 80 having an elliptical guide groove 79 corresponding to the circling position of the chain 73 except for the bobbin handing position is horizontally arranged. Each fixed gripping member
A support piece 81 is provided on the outer surface of the protrusion 76, and a roller 82 that engages with the guide groove 79 is fixed to the support piece 81 via a pin 83.

次に空ボビン挿入装置23について説明する。第3図に示
すように管替機1のフレームに固定された支持ブラケッ
ト84にはレバー85がその基端において支軸86を介して回
動可能に支持され、その先端部には軸87により空ボビン
把持装置88が回動可能に支持されている。又、レバー85
の下方には前記駆動軸26から伝動機構を介して駆動され
る回動軸89が配設され、該回動軸89に対して基端が一体
回動可能に嵌着された回動レバー90と前記レバー85とが
連結ロッド91を介して互いにピン連結されている。そし
て、回動レバー90が回動することによりレバー85が回動
され、空ボビン把持装置88が空ボビン受け取り位置と空
ボビン開放位置とに回動配置されるようになっている。
又、空ボビン把持装置88は前記支軸86と同軸上に配設さ
れた図示しないリンク機構に一端が連結されたロッド92
の他端にピン連結され、第3図に鎖線で示すように空ボ
ビン受け取り位置においては同位置において斜状に配置
される空ボビンEとほぼ直交する状態に、又、空ボビン
挿入位置においてはほぼ水平状態になるように回動配置
される。さらに、図示しないカムリンク機構により第3
図に実線で示す最上昇位置から前記把持具24に把持され
た空ボビンEが1対の把持片間に遊挿される間は開放状
態に保持され、その位置がスピンドル15上に挿入された
空ボビンの頂部と対応する位置までは把持状態に保持さ
れ、その位置から下方位置においては再び開放状態とな
るように構成されている。
Next, the empty bobbin inserting device 23 will be described. As shown in FIG. 3, a lever 85 is rotatably supported at a base end of a support bracket 84 fixed to the frame of the pipe changer 1 via a support shaft 86, and a tip end thereof is supported by a shaft 87. An empty bobbin holding device 88 is rotatably supported. Also, lever 85
A rotary shaft 89 driven by the drive shaft 26 via a transmission mechanism is disposed below the rotary shaft 90, and a rotary lever 90 having a base end integrally fitted to the rotary shaft 89 so as to be integrally rotatable. And the lever 85 are pin-connected to each other via a connecting rod 91. The lever 85 is rotated by the rotation of the rotation lever 90, and the empty bobbin gripping device 88 is rotated between the empty bobbin receiving position and the empty bobbin opening position.
The empty bobbin gripping device 88 has a rod 92 whose one end is connected to a link mechanism (not shown) coaxially arranged with the support shaft 86.
At the empty bobbin receiving position, which is pin-connected to the other end of the empty bobbin at a position substantially orthogonal to the oblique bobbin E at the same position, and at the empty bobbin insertion position. It is pivotally arranged so as to be in a substantially horizontal state. Furthermore, the cam link mechanism (not shown)
While the empty bobbin E gripped by the gripping tool 24 is loosely inserted between the pair of gripping pieces from the highest position shown by the solid line in the figure, the empty bobbin E is held in the open state, and the position is empty when inserted on the spindle 15. It is configured to be held in a gripped state up to a position corresponding to the top of the bobbin, and to be opened again from that position to a lower position.

次に前記のように構成された装置の作用を説明する。精
紡機が満管指令により停止すると、キャリヤ(図示せ
ず)によって満管機台と対応する位置に運搬された管替
機1のモータ8が駆動され、スクリューローラ7が回動
されて溝7aとピン6との係合により管替機1はレール2
に沿って移動を開始する。なお、管替機1の移動に先立
ってトレイガイド14上のトレイ17のペッグ16には空ボビ
ンEが供給されている。そして、満ボビン抜上装置18が
第1錘めのスピンドル15に近づいた時点でクラッチ27が
接続されて駆動軸26が回転駆動され、満ボビン抜上装置
18に回動軸38が回動される。これによりレバー32,33が
第2図の鎖線で示す位置から時計方向に回動され、上昇
位置に保持されていたボビン把持装置37が下降移動す
る。そしてボビン把持装置37がスピンドル15と対応する
位置に管替機1が移動した時点では、ボビン把持装置37
が満ボビンFの頂部に嵌合する状態となる。なお、ボビ
ン把持装置37が満ボビンFの頂部に嵌合する際に、満ボ
ビンFは図示しない緊嵌合解除装置によりスピンドル15
との緊嵌合が解除されている。
Next, the operation of the device configured as described above will be described. When the spinning machine is stopped by the full pipe command, the motor (8) of the pipe changer 1 transported to the position corresponding to the full pipe stand is driven by the carrier (not shown), and the screw roller 7 is rotated to rotate the groove 7a. And the pin 6 are engaged with each other so that the pipe changer 1 has the rail 2
Start moving along. An empty bobbin E is supplied to the peg 16 of the tray 17 on the tray guide 14 prior to the movement of the pipe changer 1. Then, when the full bobbin removing device 18 approaches the spindle 15 of the first weight, the clutch 27 is connected and the drive shaft 26 is rotationally driven, and the full bobbin removing device is
The rotation shaft 38 is rotated about 18. As a result, the levers 32, 33 are rotated clockwise from the position shown by the chain line in FIG. 2, and the bobbin gripping device 37 held in the raised position moves downward. When the bobbin gripping device 37 moves to the position corresponding to the spindle 15, the bobbin gripping device 37
Is in a state of being fitted to the top of the full bobbin F. When the bobbin gripping device 37 is fitted on the top of the full bobbin F, the full bobbin F is rotated by the tight fitting releasing device (not shown) to the spindle 15
The tight fitting with is released.

次に実線で示す位置から回動レバー39が時計方向に回動
され、レバー32,33が軸34,35を中心に反時計方向に回動
される。レバー33の回動に伴いボビン把持装置37は満ボ
ビンFを吊下した状態で上昇移動するとともに精紡機機
台から離れる方向へ移動する。満ボビンFがスピンドル
15から完全に抜き上げられる前にボビン把持装置37が精
紡機機台から離れる方向へ移動を開始するが、ボビン把
持装置37は支軸41を中心に第2図の反時計方向に回動さ
れるため、むりなく移動が行われる。
Next, the rotation lever 39 is rotated clockwise from the position indicated by the solid line, and the levers 32 and 33 are rotated counterclockwise about the shafts 34 and 35. With the rotation of the lever 33, the bobbin holding device 37 ascends while the full bobbin F is suspended and moves away from the spinning machine base. Full bobbin F is spindle
The bobbin gripping device 37 starts to move away from the spinning machine base before it is completely pulled out from the 15, but the bobbin gripping device 37 is rotated counterclockwise in FIG. Therefore, it is possible to move without fail.

満ボビンFがスピンドル15から完全に抜き上げられ、ボ
ビン把持装置37が最上昇位置近傍まで移動した時点でボ
ビン把持装置37に吊下された満ボビンFは第1のコンベ
ヤ装置20に装備された満ボビン把持具19の両把持片55,5
7間に遊挿された状態となる。そして、ボビン把持装置3
7が最上昇位置に移動する間に、ボビン把持装置37の係
合片46が係合部材48と係合し、把持解除部材45が第4図
の時計方向に回動されるとともに可動把持片43が支軸41
を中心に反時計方向に回動されて満ボビンFの把持が解
除される。一方、この時満ボビン把持具19の係合レバー
58もカム59の谷部と係合する状態となり、可動把持片57
は第5図に実線で示す把持位置に保持され満ボビンFは
その胴部において満ボビン把持具19に把持される。そし
て、チェーン52の移動に伴い下方に移送される。
The full bobbin F was completely lifted from the spindle 15 and the full bobbin F hung on the bobbin holding device 37 at the time when the bobbin holding device 37 moved to the vicinity of the highest position was mounted on the first conveyor device 20. Full bobbin gripping tool 19 both gripping pieces 55, 5
It will be in a state that it is loosely inserted between 7. Then, the bobbin holding device 3
While 7 moves to the highest position, the engagement piece 46 of the bobbin gripping device 37 engages with the engagement member 48, the grip release member 45 is rotated clockwise in FIG. 43 is spindle 41
The full bobbin F is released from being gripped by being rotated counterclockwise around. On the other hand, at this time, the engaging lever of the full bobbin gripping tool 19
58 also comes into a state of engaging with the valley of the cam 59, and the movable gripping piece 57
Is held at the gripping position shown by the solid line in FIG. 5, and the full bobbin F is gripped by the full bobbin gripping tool 19 at its body. Then, as the chain 52 moves, it is transferred downward.

そして、第2のコンベヤ装置22の作用により空ボビンE
が抜上げられたペッグ16と対応する位置まで満ボビンF
が移送され、その下端の一部がペッグ16に嵌挿された時
点で満ボビン把持具19の係合レバー58がカム60の山部と
係合を開始し、可動把持片57が第5図に鎖線で示す開放
位置へと回動されて満ボビン把持具19による満ボビンF
の把持が解除され、満ボビンFがペッグ16上に嵌挿され
る。以下同様に周回移動するチェーン52に取り付けられ
た満ボビン把持具19にスピンドル15上から満ボビン抜上
装置18により抜上げられた満ボビンFが順次受渡され、
前記と同様に順次ペッグ16上に嵌挿される。
Then, by the action of the second conveyor device 22, the empty bobbin E
Full bobbin F to the position corresponding to the peg 16 with the
When the lower end of the movable bobbin is transferred and the lower end of the movable bobbin is partially inserted into the peg 16, the engaging lever 58 of the full bobbin gripping tool 19 starts to engage with the mountain portion of the cam 60, and the movable gripping piece 57 is moved to the position shown in FIG. The full bobbin F by the full bobbin gripping tool 19 is rotated to the open position indicated by the chain line.
Is released, and the full bobbin F is fitted on the peg 16. Similarly, the full bobbin F lifted by the full bobbin lifting device 18 from the spindle 15 is sequentially delivered to the full bobbin gripping tool 19 attached to the chain 52 that revolves.
The pegs 16 are sequentially fitted and inserted in the same manner as described above.

一方、第2のコンベヤ装置22がペッグ16上に挿入されて
いる空ボビンEと対向する若干手前の位置で空ボビン把
持具21の係合レバー58がカム67の山部と係合し、可動把
持片57が開放状態に保持されこの状態でチェーン65の移
動とともに両把持片55,57間に空ボビンEが遊挿され
る。そして、空ボビン把持具21がチェーン65の周回部を
過ぎた時点で係合レバー58とカム67の山部との係合が解
除されて可動把持片57が把持位置に保持され、空ボビン
把持具21が空ボビンEを把持して上昇移動することによ
り、ペッグ16から空ボビンEを抜上げる。そして、空ボ
ビンEを把持した空ボビン把持具21がチェーン65の上部
周回部に到達した時点で、空ボビンEの頂部が受渡し用
コンベヤ装置25に装備された把持具24の下部に嵌挿され
る。そして、この位置から空ボビン把持具21がさらに移
動すると、係合レバー58がカム66の山部と係合して可動
把持片57が開放位置に回動され、空ボビン把持具21によ
る把持が解除されるとともに把持具24に把持された空ボ
ビンEはチェーン73の移動に伴い管替機1の進行方向と
反対側へ移送される。そして、空ボビン挿入装置23と対
応する位置へ移動した時点では、把持具24はその下部が
精紡機機台側に近くなるように斜めに配置される。
On the other hand, the engaging lever 58 of the empty bobbin gripping tool 21 engages with the mountain portion of the cam 67 at a position slightly ahead of the empty bobbin E on the peg 16 where the second conveyor device 22 is inserted, and the movable part moves. The gripping piece 57 is held in the open state, and in this state, the empty bobbin E is loosely inserted between the gripping pieces 55 and 57 as the chain 65 moves. Then, when the empty bobbin gripping tool 21 has passed the revolving part of the chain 65, the engagement between the engaging lever 58 and the ridge of the cam 67 is released, the movable gripping piece 57 is held at the gripping position, and the empty bobbin gripping part is held. When the tool 21 grips the empty bobbin E and moves upward, the empty bobbin E is pulled out from the peg 16. Then, when the empty bobbin gripping tool 21 gripping the empty bobbin E reaches the upper circumference of the chain 65, the top of the empty bobbin E is fitted and inserted into the lower part of the gripping tool 24 equipped on the transfer conveyor device 25. . Then, when the empty bobbin gripping tool 21 further moves from this position, the engaging lever 58 engages with the mountain portion of the cam 66, the movable gripping piece 57 is rotated to the open position, and the empty bobbin gripping tool 21 grips it. The empty bobbin E that is released and gripped by the gripping tool 24 is transferred to the side opposite to the traveling direction of the pipe changer 1 as the chain 73 moves. Then, when the gripping tool 24 is moved to a position corresponding to the empty bobbin inserting device 23, the gripping tool 24 is obliquely arranged so that its lower portion is close to the spinning machine base side.

一方、空ボビン挿入装置23は前記把持具24が斜めに配置
される若干前から、第3図に実線で示す最上昇位置から
移動を開始し、空ボビンEが空ボビン挿入装置23と対応
する位置に斜めに配置された時点では空ボビン把持装置
88の把持片間に該空ボビンEが遊挿された状態となり、
その状態からさらにレバー85が回動されるに伴い空ボビ
ンEが空ボビン把持装置88に把持され、レバー85の回動
に伴い把持具24から抜き取られて満ボビンFが抜上げら
れた後のスピンドル15上に挿入される。
On the other hand, the empty bobbin inserting device 23 starts moving slightly before the gripper 24 is obliquely arranged, from the highest position shown by the solid line in FIG. 3, and the empty bobbin E corresponds to the empty bobbin inserting device 23. Empty bobbin gripping device when placed diagonally in position
The empty bobbin E is loosely inserted between the gripping pieces of 88,
After the lever 85 is further rotated from that state, the empty bobbin E is gripped by the empty bobbin gripping device 88, and with the rotation of the lever 85, the empty bobbin E is withdrawn from the gripper 24 and the full bobbin F is withdrawn. It is inserted on the spindle 15.

この実施例の装置においては、満ボビン抜上装置18、第
1のコンベヤ装置20、第2のコンベヤ装置22、空ボビン
挿入装置23及びコンベヤ25が同一駆動軸26からカム機構
あるいは他の伝動機構を介して同期した状態で駆動され
るため、管替え動作速度を変更した場合でもタイミング
の調整が不要となる。
In the apparatus of this embodiment, the full bobbin removal device 18, the first conveyor device 20, the second conveyor device 22, the empty bobbin insertion device 23, and the conveyor 25 are driven by the same drive shaft 26 by a cam mechanism or another transmission mechanism. Since it is driven in a synchronized state via, it is not necessary to adjust the timing even when the pipe replacement operation speed is changed.

なお、この発明は前記実施例に限定されるものではな
く、例えば、空ボビンあるいは満ボビンの移送装置とし
て所定間隔でペッグが突設されたベルトコンベヤを使用
したり、満ボビン抜上装置18、各コンベヤ装置20,22,25
及び空ボビン挿入装置23の駆動源を別の駆動源にしても
よい。
Note that the present invention is not limited to the above-described embodiment, and for example, a belt conveyor having pegs protruding at predetermined intervals is used as a transfer device for empty bobbins or full bobbins, or a full bobbin removing device 18, Each conveyor device 20,22,25
The drive source of the empty bobbin inserting device 23 may be another drive source.

発明の効果 以上詳述したように、この発明によれば空ボビン及び満
ボビンが常に確実に把持された状態で管替作業に必要な
各工程の動作が行われるため、管替速度が高速となった
場合にも各動作が確実に行われる。又、満ボビンあるい
は空ボビンを移送するコンベヤ装置が管替機の進行方向
に対して前後に平行に配置されしかもボビンがほぼ垂直
状態で移送されるため管替機の幅が小さくなり、既設工
場において精紡機機台の間隔が狭い状態に配置された精
紡機に対しても適応でき、しかも管替機の機台がコンパ
クトとなり使用エネルギーも少なくて済むという優れた
効果を奏する。
Effects of the Invention As described in detail above, according to the present invention, since the operation of each step required for the pipe replacement work is performed with the empty bobbin and the full bobbin always being reliably gripped, the pipe replacement speed is high. Even if it happens, each operation is surely performed. Further, the conveyor device for transferring the full bobbin or the empty bobbin is arranged parallel to the front and rear with respect to the traveling direction of the pipe changer, and since the bobbin is transferred in a substantially vertical state, the width of the pipe changer becomes small and the existing factory In the above, the present invention can be applied to a spinning machine having a narrow space between the spinning machine bases, and has an excellent effect that the machine frame of the pipe changer is compact and uses less energy.

【図面の簡単な説明】[Brief description of drawings]

第1〜8図はこの発明を具体化した一実施例を示すもの
であって、第1図は管替機に装備された各装置の配置関
係を示す概略正面図、第2図は満ボビン抜上装置と第1
のコンベヤ装置の配置関係を示す概略側面図、第3図は
空ボビン挿入装置、第2のコンベヤ装置及び受渡し用コ
ンベヤ装置の配置関係を示す一部破断概略側面図、第4
図はボビン把持装置の要部断面図、第5図は満ボビン把
持具の平面図、第6図は空ボビン把持具の平面図、第7
図は受渡し用コンベヤ装置の平面図、第8図(a)〜
(d)は管替作業時の空ボビンと満ボビンの移動の変化
を示す該略図、第9図は従来装置を示す概略斜視図であ
る。 管替機1、スピンドル15、ペッグ16、満ボビン抜上装置
18、満ボビン把持具19、第1のコンベヤ装置20、空ボビ
ン把持具21、第2のコンベヤ装置22、空ボビン挿入装置
23、把持具24、受渡し用コンベヤ装置25、満ボビンF、
空ボビンE。
1 to 8 show an embodiment embodying the present invention, in which FIG. 1 is a schematic front view showing the arrangement relationship of each device equipped in a pipe changer, and FIG. 2 is a full bobbin. Lifting device and first
4 is a schematic side view showing the positional relationship of the conveyor device of FIG. 3, FIG. 3 is a partially cutaway schematic side view showing the positional relationship of the empty bobbin inserting device, the second conveyor device, and the delivery conveyor device.
FIG. 7 is a sectional view of a main part of the bobbin gripping device, FIG. 5 is a plan view of a full bobbin gripping tool, FIG. 6 is a plan view of an empty bobbin gripping tool, and FIG.
The figure is a plan view of the delivery conveyor device, and FIG.
FIG. 9D is a schematic view showing changes in movement of the empty bobbin and the full bobbin during pipe replacement work, and FIG. 9 is a schematic perspective view showing a conventional device. Pipe changer 1, spindle 15, peg 16, full bobbin removal device
18, full bobbin gripper 19, first conveyor device 20, empty bobbin gripper 21, second conveyor device 22, empty bobbin insertion device
23, gripper 24, transfer conveyor device 25, full bobbin F,
Empty bobbin E.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】紡機のスピンドル列の下方にスピンドルと
対応して配設された移送装置のペッグ上に空ボビンを予
め準備し、紡機機台の満管停止後、機台の一端からスピ
ンドルレールに沿って連続走行し、スピンドル上の満ボ
ビンとペッグ上の空ボビンとを順次交換する管替機に、 スピンドルから満ボビンを1本ずつ抜上げる満ボビン抜
上装置と、 前記満ボビン抜上装置により抜上げられた満ボビンをほ
ぼ垂直状態で下方のペッグ上へ移送するため、満ボビン
をほぼ垂直状態で受け取り把持する満ボビン把持具を一
定間隔で複数個備えるとともにスピンドルレールと直交
する平面内で周回する第1のコンベヤ装置と、 前記第1のコンベヤ装置に対して管替機の管替作業時進
行方向前方位置において該コンベヤ装置と平行に配設さ
れ、前記ペッグ上の空ボビンをほぼ垂直状態で把持して
上方へ移動する空ボビン把持具を一定間隔で複数個備え
た第2のコンベヤ装置と、 前記第1のコンベヤ装置に対して管替機の管替作業時進
行方向後方位置に配設され前記ペッグ上から抜上げられ
た空ボビンをスピンドルに1本ずつ挿入する空ボビン挿
入装置と、 前記満ボビン抜上装置の上方において前記第2のコンベ
ヤ装置と空ボビン挿入装置上方にわたる水平面内で周回
するように配設され、第2のコンベヤ装置から空ボビン
を受け取るとともに該空ボビンを把持する把持具を一定
間隔で複数個備えた受渡し用コンベヤ装置と を設けた紡機の管替機。
1. An empty bobbin is preliminarily prepared on a peg of a transfer device arranged corresponding to a spindle below a spindle row of a spinning machine, and after the spinning machine is fully stopped, a spindle rail is provided from one end of the spinning machine stand. A bobbin removal device that continuously runs along the spindle and sequentially replaces the full bobbin on the spindle with the empty bobbin on the peg, and removes the full bobbin from the spindle one by one and the full bobbin removal device. In order to transfer the lifted full bobbin to the lower peg in a substantially vertical state, a plurality of full bobbin gripping tools for receiving and gripping the full bobbin in a substantially vertical state are provided at a constant interval and in a plane orthogonal to the spindle rail. A first conveyor device that circulates, and the first conveyor device is disposed parallel to the conveyor device at a front position in the traveling direction of the pipe changer with respect to the first conveyor device. A second conveyor device provided with a plurality of empty bobbin gripping tools for gripping the upper empty bobbin in a substantially vertical state and moving the upper bobbin at a constant interval, and at the time of pipe replacement work of the pipe changer with respect to the first conveyor device. An empty bobbin inserting device which is disposed at a rear position in the traveling direction and inserts empty bobbins lifted up from the peg into the spindle one by one, and the second conveyor device and the empty bobbin above the full bobbin lifting device. A delivery conveyor device which is arranged so as to circulate in a horizontal plane over the insertion device, receives the empty bobbin from the second conveyor device, and is provided with a plurality of gripping tools for gripping the empty bobbin at regular intervals. A spinning machine changer.
JP24803386A 1986-10-17 1986-10-17 Spinning machine changer Expired - Lifetime JPH07103498B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24803386A JPH07103498B2 (en) 1986-10-17 1986-10-17 Spinning machine changer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24803386A JPH07103498B2 (en) 1986-10-17 1986-10-17 Spinning machine changer

Publications (2)

Publication Number Publication Date
JPS63105128A JPS63105128A (en) 1988-05-10
JPH07103498B2 true JPH07103498B2 (en) 1995-11-08

Family

ID=17172199

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24803386A Expired - Lifetime JPH07103498B2 (en) 1986-10-17 1986-10-17 Spinning machine changer

Country Status (1)

Country Link
JP (1) JPH07103498B2 (en)

Also Published As

Publication number Publication date
JPS63105128A (en) 1988-05-10

Similar Documents

Publication Publication Date Title
US3951399A (en) Article-handling apparatus
US4684117A (en) Method and apparatus for opening printed products which have been folded off-center
EP1249400B1 (en) A continuous bag filling machine comprising an empty bag supplying apparatus and a filled bag extraction apparatus
US6390272B1 (en) Article conveying device
US5099641A (en) Method and apparatus for exchanging roving bobbins
US3307340A (en) Apparatus for continuously effecting automatic bobbin exchange on spinning machine
US2355697A (en) Sheet delivery mechanism
US3566597A (en) Device for automatically substituting empty bobbin tubes for charged bobbins in ring spinning and twisting machines
US3908348A (en) Bobbin tube loading apparatus
EP1344638A1 (en) A supply apparatus for spouts or bags with spouts
US4068450A (en) Container capping machine
JPH07103498B2 (en) Spinning machine changer
EP0109000B1 (en) Method of and apparatus for exchanging bobbins in a flyer frame
JPH07113170B2 (en) Replacement method and device for spinning machine
JPH07113171B2 (en) Peg tray positioning device in the changer in spinning machine
JPH0756094B2 (en) Tube change method in spinning machine
US6820870B2 (en) Device for opening and inserting printed products in a gathering line
US6622852B2 (en) Continuous container-supplying apparatus
JPH0360936B2 (en)
JPS58100696A (en) Loading device for plating object
JP2503413B2 (en) Full and empty bobbin transfer equipment in spinning machines
JPS61145079A (en) Full bobbin inserting method in doffing apparatus
JPH0512306Y2 (en)
SU516580A1 (en) Automatic roll wrapping machine
JPH0523586Y2 (en)