Mounting method of sinkage measuring rod in underground

Info

Publication number
JPH07113213B2
JPH07113213B2 JP62011562A JP1156287A JPH07113213B2 JP H07113213 B2 JPH07113213 B2 JP H07113213B2 JP 62011562 A JP62011562 A JP 62011562A JP 1156287 A JP1156287 A JP 1156287A JP H07113213 B2 JPH07113213 B2 JP H07113213B2
Authority
JP
Japan
Prior art keywords
rod
pipe
underground
measuring rod
buried object
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP62011562A
Other languages
Japanese (ja)
Other versions
JPS63181819A (en
Inventor
洋 阿守
光雄 加藤
忠幸 松本
浩司 大迫
哲 溝内
勝 北田
容一 佐々木
正弘 形鍬
信雄 広山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Cable Industries Ltd
Kansai Electric Power Co Inc
Original Assignee
Mitsubishi Cable Industries Ltd
Kansai Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Cable Industries Ltd, Kansai Electric Power Co Inc filed Critical Mitsubishi Cable Industries Ltd
Priority to JP62011562A priority Critical patent/JPH07113213B2/en
Publication of JPS63181819A publication Critical patent/JPS63181819A/en
Publication of JPH07113213B2 publication Critical patent/JPH07113213B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は地中埋設物における沈下量測定棒の取付方法の
改良に関するものである。
DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention relates to an improvement in a method of attaching a sinking amount measuring rod in an underground buried object.

〈先行技術と問題点〉 マンホールとか排水溝等を構築する場合、その掘削地の
近傍に地中埋設物(ガス管、水道管、ケーブル等)が存
在すると、その埋設物が地盤のゆるみ、地下水の湧出等
により沈下する虞れがある。
<Prior art and problems> When constructing manholes or drains, if underground buried objects (gas pipes, water pipes, cables, etc.) exist near the excavated site, the buried objects will loosen the ground and cause groundwater. There is a risk of subsidence due to springing up.

而して、マンホール等の構築後において、上記埋設物の
沈下量を測定することが必要である。このため、従来に
おいては、上記埋設物の埋設地を掘削し、第4図に示す
ように埋設物P′にボルト締結式の2つ割れリング1′
を抱合し、このリングに棒体2′の下端を結着し、而る
のち埋戻しを行い、棒体上端の変位量より埋設物の沈下
量を測定している。なお、第4図中、3′は土砂侵入防
止用のプラスチックパイプである。
Therefore, it is necessary to measure the subsidence amount of the buried object after the construction of the manhole and the like. For this reason, conventionally, the buried site of the above-mentioned buried object is excavated, and as shown in FIG.
, The lower end of the rod 2'is bound to this ring, and then backfilling is performed, and the subsidence amount of the buried object is measured from the displacement amount of the upper end of the rod. In FIG. 4, 3'denotes a plastic pipe for preventing intrusion of sediment.

しかしながら、上記2つ割れリングの抱合には、埋設物
の直下をも掘削しなければならず、埋設物を支持する基
盤の軟弱化が避けられず、また、直径が600mmφ以上に
も達する下水管等の場合には、埋戻し部分が相当に多く
なり、この大量の埋戻し土砂がかたまるまでの間、埋設
物の沈下が相当顕著に生じる等、埋戻し後での埋設物の
沈下量が大であり、埋設物の破損が懸念される。
However, in order to tie the two split rings together, it is necessary to excavate just below the buried object, inevitable weakening of the foundation that supports the buried object, and a sewer pipe with a diameter of 600 mmφ or more. In this case, the backfilling area will be considerably large, and until the large amount of backfilling soil has hardened, the settlement of the buried material will occur significantly. Therefore, there is a concern that the buried object may be damaged.

〈発明の目的〉 本発明の目的は、埋戻し後での埋設物の沈下量を充分に
軽減できる沈下量測定棒の取付方法を提供することにあ
る。
<Object of the Invention> An object of the present invention is to provide a method of mounting a sinkage measuring rod capable of sufficiently reducing the sinkage of a buried object after backfilling.

〈発明の構成〉 本発明に係る地中埋設物における沈下量測定棒の取付方
法は、地中埋設物の上面に達する深さまで掘削して地中
埋設物の上面を露出させ、その露出上面に棒体の下端を
接着剤により固着し、而るのち、埋戻しを行い、棒体上
端部を地面上に表出させることを特徴とする方法であ
る。
<Structure of the Invention> The method of mounting the sinkage measuring rod in the underground buried object according to the present invention is such that the upper surface of the underground buried object is exposed by excavating to a depth reaching the upper surface of the underground buried object, and the exposed upper surface The method is characterized in that the lower end of the rod is fixed with an adhesive, and then backfilling is performed to expose the upper end of the rod on the ground.

〈実施例の説明〉 以下、図面により本発明を説明する。<Description of Embodiments> The present invention will be described below with reference to the drawings.

第1図において、mは構築予定のマンホール、Pは沈下
測定の対象となる埋設パイプであり、マンホール下端コ
ーナーOを基点とする45°の斜線より上側に存在する埋
設パイプのみが測定対象となる。
In FIG. 1, m is the manhole to be constructed, P is the buried pipe to be measured for settlement, and only the buried pipe existing above the diagonal line of 45 ° from the lower corner O of the manhole is the measurement target. .

本発明により沈下量測定棒の取付時期は、マンホール構
築地の掘削作業前である。
According to the present invention, the subsidence amount measuring rod is attached before the excavation work on the manhole construction site.

本発明を実施するには、第2図Aに示すように、埋設パ
イプ上面Sに達する深さまで掘削して、埋設パイプ上面
Sを露出させる。而るのち、その露出パイプ上面に取付
金具1を接着剤(例えば、エポキシ樹脂)により固着
し、この取付金具1の螺子穴突部11に棒体2の下端を螺
結する。取付金具1の円弧角θは通常2π/6〜2π/8で
あり、取付金具1の接着のためのパイプの露出高さh
は、パイプ直径Dに対し、 であり、θ=2π/6〜2π/8のもとでは、h≒0.07〜0.
04Dである。とりわけ、h=1/20Dとするのが望ましい。
In order to carry out the present invention, as shown in FIG. 2A, the buried pipe upper surface S is exposed by excavating to a depth reaching the buried pipe upper surface S. After that, the mounting member 1 is fixed to the upper surface of the exposed pipe with an adhesive (for example, epoxy resin), and the lower end of the rod 2 is screwed to the screw hole projection 11 of the mounting member 1. The arc angle θ of the mounting bracket 1 is normally 2π / 6 to 2π / 8, and the exposed height h of the pipe for bonding the mounting bracket 1 is h.
Is the pipe diameter D, And under θ = 2π / 6 to 2π / 8, h≈0.07 to 0.
It is 04D. Especially, it is desirable to set h = 1 / 20D.

このようにして棒体2の下端を埋設パイプに結着したの
ちは、第2図Bに示すように棒体2土砂侵入防止用のに
プラスチックパイプ(塩化ビニルパイプ)3を挿通し、
一次埋戻しを行い(4で示す)充分に転圧を行ったうえ
で第2図Cに示すように、コンクリートブロック5を敷
きプロテクター(鋳鉄製)6を据置き、現地盤まで埋戻
しを行う(7で示す)。
After the lower end of the rod body 2 is bonded to the buried pipe in this manner, a plastic pipe (vinyl chloride pipe) 3 is inserted to prevent the rod body 2 from entering the earth and sand as shown in FIG. 2B.
After carrying out primary backfilling (shown by 4) and sufficiently rolling, as shown in FIG. 2C, a concrete block 5 is laid and a protector (made of cast iron) 6 is placed and backfilled to the local board. (Indicated by 7).

而して、プロテクターの蓋を開けば、棒体上端を地上に
表出でき、棒体の沈下量は例えば、次のようにして測定
できる。第1図に示すように、掘削に影響を及ぼさな
い位置に、測定基準点Aを設ける。基準点Aと棒体上
端Bとを観ることができる場所にレベル器を据える。
基準点Aに箱尺を立て高さを読む。プロテクターの蓋
を開け、棒体の上端に箱尺をおいて高さを読む。工事
の進捗に応じて随時〜の作業を繰り返し、パイプの
沈下量を測定する。
Thus, by opening the lid of the protector, the upper end of the rod can be exposed on the ground, and the sinking amount of the rod can be measured, for example, as follows. As shown in FIG. 1, a measurement reference point A is provided at a position that does not affect excavation. Place the level gauge where the reference point A and the upper end B of the rod can be seen.
Set a box measure at reference point A and read the height. Open the lid of the protector and place a box measure on the top of the stick to read the height. Repeat the work from time to time according to the progress of construction to measure the subsidence amount of the pipe.

上記において、第3図Aに示すように、パイプの露出上
面に楔形のスペーサ8,8を接着剤により固着し、これら
のスペーサ上に取付金具1を固定してもよい。この取付
金具の固定には接着剤を使用することもできるが、第3
図Bに示すように、アリ溝と凸条とによる嵌合方式を用
いることもでき、更に、第3図Bの9で示すようにビス
止め方式を併用することもできる。
In the above, as shown in FIG. 3A, wedge-shaped spacers 8, 8 may be fixed to the exposed upper surface of the pipe with an adhesive, and the fitting 1 may be fixed on these spacers. An adhesive may be used to fix the mounting bracket, but the third
As shown in FIG. B, a fitting method using a dovetail groove and a ridge can be used, and as shown by 9 in FIG. 3B, a screw fixing method can be used together.

〈発明の効果〉 上述した通り、本発明に係る地中埋設物における沈下量
測定棒の取付方法によれば、埋設パイプの上面のみを露
出する程度に掘削を行えばよいから、埋設パイプの直下
をも掘削しなければならない従来法に較べ、埋設パイプ
直下の地盤をもとの堅牢な地盤のままに保持でき、更に
パイプ両端部の埋戻しが不要であり、それだけ埋戻し量
を少なくできる。従って、埋設地の地盤のゆるみ、乃至
は軟弱化をよく排除して、埋設パイプに沈下量測定棒を
取付けることができ、埋戻し後での埋設パイプの沈下を
軽度なものにとどめることができる。
<Effects of the Invention> As described above, according to the method of attaching the sinkage measurement rod in the underground buried object according to the present invention, since it is sufficient to perform the excavation to the extent that only the upper surface of the buried pipe is exposed, it is possible to directly under the buried pipe. Compared to the conventional method that requires excavation, the ground directly under the buried pipe can be retained as the original solid ground, and backfilling at both ends of the pipe is unnecessary, and the backfilling amount can be reduced accordingly. Therefore, loosening or softening of the ground in the burial ground can be eliminated well, and the subsidence amount measuring rod can be attached to the burial pipe, and the subsidence of the burial pipe after backfilling can be limited to a slight one. .

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明により取付けた測定棒を用いた地中埋設
物の沈下量測定方法を示す説明図、第2図A、第2図B
並びに第2図Cは本発明に係る測定棒の取付方法の作業
手順を示す説明図、第3図Aは本発明の別実施例を示す
説明図、第3図Bは第3図Aにおけるb−b断面図、第
4図は従来例を示す説明図である。 図において、Sは地中埋設物の上面、1は取付金具、2
は棒体である。
FIG. 1 is an explanatory view showing a method of measuring the subsidence amount of an underground buried object using a measuring rod attached according to the present invention, FIGS. 2A and 2B.
In addition, FIG. 2C is an explanatory view showing a work procedure of the measuring rod mounting method according to the present invention, FIG. 3A is an explanatory view showing another embodiment of the present invention, and FIG. 3B is a b in FIG. 3A. 4B is a sectional view and FIG. 4 is an explanatory view showing a conventional example. In the figure, S is the upper surface of the underground buried object, 1 is a mounting bracket, 2
Is a stick.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 松本 忠幸 大阪府大阪市北区中之島3丁目3番22号 関西電力株式会社内 (72)発明者 大迫 浩司 大阪府大阪市北区中之島3丁目3番22号 関西電力株式会社内 (72)発明者 溝内 哲 大阪府大阪市北区中之島3丁目3番22号 関西電力株式会社内 (72)発明者 北田 勝 大阪府大阪市北区中之島3丁目3番22号 関西電力株式会社内 (72)発明者 佐々木 容一 大阪府大阪市西淀川区千舟3丁目1番7号 菱星電設株式会社内 (72)発明者 形鍬 正弘 大阪府大阪市西淀川区千舟3丁目1番7号 菱星電設株式会社内 (72)発明者 広山 信雄 大阪府大阪市住之江区中加賀屋4丁目4番 12号 住ノ江工業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tadayuki Matsumoto 3-3-2 Nakanoshima, Kita-ku, Osaka City, Osaka Prefecture Kansai Electric Power Co., Inc. (72) Koji Ohsako 3-chome Nakanoshima, Kita-ku, Osaka City, Osaka Prefecture No. 22 Inside Kansai Electric Power Co., Inc. (72) Inventor Satoshi Mizouchi 3-3 Nakanoshima, Kita-ku, Osaka City, Osaka Prefecture No. 22 Inside Kansai Electric Power Co., Inc. (72) Masaru Kitada 3-3 Nakanoshima, Kita-ku, Osaka City, Osaka Prefecture No. 22 in Kansai Electric Power Co., Inc. (72) Inventor Yoichi Sasaki, 3-1, 7 Chisune, Nishiyodogawa-ku, Osaka-shi, Osaka Prefecture Ryosei Electric Co., Ltd. (72) Inventor Masahiro Kataho Chifune, Nishi-yodogawa-ku, Osaka City, Osaka Prefecture 3-17 No. 1 Ryosei Densetsu Co., Ltd. (72) Inventor Nobuo Hiroyama 4-4-12 Nakagagaya, Suminoe-ku, Osaka City, Osaka Prefecture Suminoe Kogyo Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】地中埋設物の上面に達する深さまで掘削し
て地中埋設物の上面を露出させ、その露出上面に棒体の
下端を接着剤により固着し、而るのち、埋戻しを行い、
棒体上端部を地面から表出させることを特徴とする地中
埋設物における沈下量測定棒の取付方法。
1. Excavation is performed to a depth reaching the upper surface of the underground buried object to expose the upper surface of the underground buried object, and the lower end of the rod is fixed to the exposed upper surface with an adhesive. Done,
A method for mounting a sinking amount measuring rod in an underground buried object, characterized in that the upper end of the rod is exposed from the ground.
JP62011562A 1987-01-20 1987-01-20 Mounting method of sinkage measuring rod in underground Expired - Fee Related JPH07113213B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62011562A JPH07113213B2 (en) 1987-01-20 1987-01-20 Mounting method of sinkage measuring rod in underground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62011562A JPH07113213B2 (en) 1987-01-20 1987-01-20 Mounting method of sinkage measuring rod in underground

Publications (2)

Publication Number Publication Date
JPS63181819A JPS63181819A (en) 1988-07-27
JPH07113213B2 true JPH07113213B2 (en) 1995-12-06

Family

ID=11781374

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62011562A Expired - Fee Related JPH07113213B2 (en) 1987-01-20 1987-01-20 Mounting method of sinkage measuring rod in underground

Country Status (1)

Country Link
JP (1) JPH07113213B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4995168A (en) * 1989-08-07 1991-02-26 Shiner James A Technique for locating submerged and buried pipelines
JP4839026B2 (en) * 2005-07-05 2011-12-14 矢崎総業株式会社 Instrument
KR100634483B1 (en) * 2006-05-08 2006-10-19 (주)테스콤엔지니어링 Hydraulic measuring device for measuring settlement of underground structures
KR100667585B1 (en) 2006-09-15 2007-01-11 주식회사 한국종합기술 Settlement measuring device for water and sewage pipe
KR100667581B1 (en) 2006-09-16 2007-01-11 주식회사 한국종합기술 Water and sewage pipe subsidence measuring device embedded in soft ground
KR100723013B1 (en) 2006-11-18 2007-05-30 (주) 장맥엔지니어링 Underground buried safety inspection and diagnosis structure
KR100725140B1 (en) 2006-12-29 2007-06-13 주식회사 한국종합기술 Railway Box Tunnel Settling System
CN112697010A (en) * 2020-12-18 2021-04-23 陕西理工大学 Efficient installation structure of displacement measuring instrument and construction method thereof

Also Published As

Publication number Publication date
JPS63181819A (en) 1988-07-27

Similar Documents

Publication Publication Date Title
Carder Ground movements caused by different embedded retaining wall construction techniques
JPH07113213B2 (en) Mounting method of sinkage measuring rod in underground
JP2776695B2 (en) Prevention of settlement of buried pipeline by civil engineering sheet
JPS5820832A (en) Split manhole construction work and blocks therefore
JPS6128772B2 (en)
JPS6124628Y2 (en)
JPH01198920A (en) Reinforcing method for underground earth guarding wall by earth anchor
JPH0663269B2 (en) Pipe burying method
JPS6124625Y2 (en)
JPH0452301Y2 (en)
KR0167035B1 (en) Method of laying hume pipes
JP2810957B2 (en) Pile foundation method
JPH0823141B2 (en) Road surface excavation method
JPS6215343Y2 (en)
JPH057316Y2 (en)
JPH0687811U (en) Surveying tool for underground pipe position
JP2524536B2 (en) Foundation structure of underground structure
Jenkins et al. 23 Market Street, Alton, Hampshire
Brief Old Forge, Pearson Road, Sonning, Berkshire
Cambefort DEEP FOUNDATIONS, PILES, WALLS, CAISSONS
McNicoll-Norbury Old Forge, Pearson Road, Sonning, Berkshire
Hiller et al. Dartford Fastrack Scheme Sections A, B & D; Dartford Fastrack Scheme section C; Dartfrod Fastrack Scheme section E & F
Taylor Huntswood Farm House, Mill Lane, Hurley, Berkshire
Davis et al. STRUCTURAL BEHAVIOR OF A REINFORCED CONCRETE ARCH CULVERT-PHASE II POSEY CANYON
Ford 48 Braybrooke Road, Wargrave, Berkshire

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees