JPH0713405B2 - How to build a structure - Google Patents
How to build a structureInfo
- Publication number
- JPH0713405B2 JPH0713405B2 JP33154191A JP33154191A JPH0713405B2 JP H0713405 B2 JPH0713405 B2 JP H0713405B2 JP 33154191 A JP33154191 A JP 33154191A JP 33154191 A JP33154191 A JP 33154191A JP H0713405 B2 JPH0713405 B2 JP H0713405B2
- Authority
- JP
- Japan
- Prior art keywords
- girder
- guide
- column
- unit
- traveling device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 45
- 239000010959 steel Substances 0.000 claims description 45
- 239000004566 building material Substances 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 12
- 230000002093 peripheral effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 description 11
- 239000000463 material Substances 0.000 description 9
- 230000001681 protective effect Effects 0.000 description 4
- 239000004567 concrete Substances 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、鉄骨鉄筋コンクリー
ト,鉄筋コンクリートや鉄骨造等の構造物、特に中層階
若しくは低層階で平面矩形状の一般集合住宅や学校,事
務所ビルを構築する際の組立て作業の省力化を図る構築
方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an assembly work for constructing a structure such as steel reinforced concrete, reinforced concrete or steel structure, especially a general rectangular housing, a school or an office building having a flat rectangular shape on the middle floor or the lower floors. Concerning the construction method for saving labor.
【0002】[0002]
【従来の技術】従来、上記構造物を構築する作業におい
ては、クレーン車のクレーンやタワークレーン等で資材
搬入用開口部や構築物の外側からから資材を運び込み、
該建築資材を作業構台やスラブに一時置いて、多くの作
業者が適宜搬入された資材を持ち運び等して配筋または
組み立てていた。2. Description of the Related Art Conventionally, in the work of constructing the above-mentioned structure, the material is carried in from the material loading opening or the outside of the structure by a crane of a mobile crane or a tower crane.
The building materials are temporarily placed on a work gantry or a slab, and many workers carry or arrange the materials that have been appropriately carried in to arrange or assemble them.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、上述の
構築方法においては、多くの人手を必要とし作業の機械
化,ロボット化が遅れており、省力化に程遠く作業者に
多大な負担がかかり、労働者不足のおり工期の期限確保
にも支障をきたすという問題があった。また、資材の運
搬においてはスラブ上に置かれた種々の資材もしくはス
ラブ配筋等が障害となり運搬作業の能率が悪いものであ
った。そして、風雨の強いときにはしばしば作業が中断
されるので、これを避けるために防護シートで構築物の
全体を覆うことがあるが、これも構築物の組み立ての進
行に伴い防護シートの盛り替えをしなけらばならず大変
手間が掛かる、と言った欠点が存在した。However, in the above-mentioned construction method, a lot of manpower is required, and the mechanization and robotization of the work are delayed, which is far from labor saving and a great burden is imposed on the worker. There was a shortage, and there was a problem that it also hindered securing the deadline for the construction period. Further, in the transportation of the materials, various materials placed on the slab or the slab reinforcement are obstructed and the efficiency of the transportation work is poor. Since work is often interrupted when the wind and rain are strong, a protective sheet may be used to cover the entire structure to avoid this, but this also requires that the protective sheet be replaced as the building is assembled. There was a drawback that it was very time-consuming.
【0004】本発明は、上記の課題に鑑みてなされたも
ので、前記平面矩形状の構造物における構築作業の自動
化を図り、作業能率を向上させた構造物の構築方法を提
供することを目的とする。The present invention has been made in view of the above problems, and an object of the present invention is to provide a method for constructing a structure in which the construction work in the planar rectangular structure is automated and the work efficiency is improved. And
【0005】[0005]
【課題を解決するための手段】本発明の上記課題を解決
し上記目的を達成するための要旨は、構造物を構築すべ
き地盤に基礎を構築した後、前記基礎の平面外周部の長
手方向に沿ってガイド用鉄骨柱を立設し、井桁状の大梁
を形成するとともに該大梁の下部に設けられたガイドレ
ールに2方向に移動自在な走行装置を装着して形成され
た大梁ユニットを前記鉄骨柱に上下方向で摺動自在に嵌
着し、大梁ユニットが嵌着された鉄骨柱の上部にジャッ
キを取り付け、前記大梁に装着された走行装置に天井ク
レーンや組立ロボットを装着して前記大梁のガイドレー
ルを介して隣接する大梁ユニットへ必要に応じて前記走
行装置を移動させる等して建築資材の搬入や建築部材の
組み立てを行い、所定階層の組み立てが完了後に前記鉄
骨柱に取り付けたジャッキで大梁ユニットをリフトアッ
プし上階層の建築資材の搬入や組み立てを行うことに存
する。The gist of the present invention to solve the above problems and achieve the above objects is to construct a foundation on the ground where a structure is to be constructed, and then, in the longitudinal direction of the plane outer peripheral portion of the foundation. A girder unit formed by vertically arranging a steel column for guides to form a girder-shaped girder and mounting a traveling device movable in two directions on a guide rail provided under the girder is described above. The girder is slidably fitted in the steel column in the vertical direction, and a jack is attached to the upper part of the girder column where the girder unit is fitted, and an overhead crane or an assembly robot is attached to the traveling device attached to the girder. The building equipment is carried in and building members are assembled by moving the traveling device to the adjacent girder unit via the guide rails of the above as required, and the building members are attached to the steel columns after the assembly of a predetermined hierarchy is completed. A large beam unit consists in carrying out the loading and assembly of building materials of the lift up to the top hierarchy in the Yakki.
【0006】また、前記大梁ユニットの上方に仮設屋根
を前記鉄骨柱に対して上下方向で摺動自在にし、構造物
の長手方向に移動自在にして設け、仮設屋根の一部を開
口させるようにしたことである。更に、前記ガイド用鉄
骨柱は構築すべき構造物の柱用芯鉄筋に兼用されること
とするのが好ましいものである。Further, a temporary roof is provided above the girder unit so as to be slidable in the vertical direction with respect to the steel column and movable in the longitudinal direction of the structure so that a part of the temporary roof is opened. That is what I did. Further, it is preferable that the guide steel frame column is also used as a core rebar for a column of a structure to be constructed.
【0007】[0007]
【作用】本発明に係る構造物の構築方法によれば、平面
矩形状で横長の構造物を構築するに、大梁ユニットに設
けられた走行装置で天井クレーンで建築資材の搬入がで
き、また、走行装置に装着した組立ロボットで部材の組
み立てやコンクリートの打設ができて構築作業の自動化
が図れる。そして、隣接する大梁ユニットのガイドレー
ルの高さを合わせれば、該ガイドレールを介して前記走
行装置を横方向で複数の大梁ユニットに渡って移動させ
ることができるので、資材の運搬や組み立て作業の能率
が向上する。According to the method of constructing a structure according to the present invention, in constructing a horizontally long structure having a rectangular plane shape, a traveling device provided in a girder unit can carry in building materials with an overhead crane, and The assembly robot mounted on the traveling device can assemble members and place concrete to automate construction work. Then, if the heights of the guide rails of the adjacent girder units are adjusted, the traveling device can be laterally moved over the plurality of girder units via the guide rails, so that it is possible to carry out the material transportation and the assembly work. Efficiency improves.
【0008】また、請求項2に記載のようにすれば、仮
設の屋根により雨を簡易に凌ぐことができて、天候に左
右されずに構築作業ができる。さらに、この仮設屋根の
一部を横方向に移動させることができるので、仮設屋根
の一部を開口させることができて、ここから建築資材の
搬入等が可能となる。Further, according to the second aspect, the temporary roof can easily withstand the rain, and the construction work can be performed regardless of the weather. Further, since a part of the temporary roof can be moved in the lateral direction, a part of the temporary roof can be opened, and the building materials can be carried in from here.
【0009】更に、請求項3に記載のようにすれば、ガ
イド用鉄骨柱の盛り替えの必要もなくなる。Further, according to the third aspect, there is no need to refill the steel column for guide.
【0010】[0010]
【実施例】次に、本発明について図面を参照して説明す
る。図1は、本発明に係る構築方法の実施例を示す説明
図、図2は同じく正面図である。図において、符号1は
ガイド用鉄骨柱、2は大梁ユニット、3は井桁状大梁、
4はセンターホール型油圧ジャッキユニット、4aは油
圧ジャッキ、5は走行装置、6は天井クレーン、7は組
立ロボット、8は仮設屋根、9はクレーンを各々示して
いる。DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, the present invention will be described with reference to the drawings. FIG. 1 is an explanatory view showing an embodiment of a construction method according to the present invention, and FIG. 2 is a front view of the same. In the figure, reference numeral 1 is a steel column for guide, 2 is a girder unit, 3 is a girder-shaped girder,
Reference numeral 4 is a center-hole hydraulic jack unit, 4a is a hydraulic jack, 5 is a traveling device, 6 is an overhead crane, 7 is an assembling robot, 8 is a temporary roof, and 9 is a crane.
【0011】前記ガイド用鉄骨柱1は、所定長さの鉄骨
柱であり、その断面形状は矩形もしくはH型である。そ
して、鉄骨鉄筋コンクリート造や鉄骨造の構造物ではそ
のまま本設の柱用として兼用することができるものであ
る。前記大梁ユニット2は、H型鋼を井桁状に組み立て
た大梁3と、該大梁3の下部に、構造物の長手方向に沿
って、溶接して固着された一対のガイドレール10に走
行装置5を装着して形成される。The guide steel frame column 1 is a steel frame column having a predetermined length, and its cross-sectional shape is rectangular or H-shaped. In addition, a steel-framed reinforced concrete structure or a steel-framed structure can be used as it is for the main column. The girder unit 2 includes a girder 3 in which H-shaped steel is assembled in a cross beam shape, and a traveling device 5 on a lower part of the girder 3 on a pair of guide rails 10 fixed by welding along the longitudinal direction of the structure. It is formed by mounting.
【0012】前記大梁3の長手方向の各端部には、前記
ガイド用鉄骨柱1が挿通され、更にボルト等で締め付け
られて前記ガイド用鉄骨柱1に固定される嵌着部3bが
設けられている。更に、この嵌着部3bの両端に係止用
ピン3aが突設されている。この係止用ピン3aは、後
述の油圧ジャッキ4aで巻上げ材4bの先端で係止され
て、大梁ユニット2をリフトアップさせるためのもので
ある。At each end of the girder 3 in the longitudinal direction, the guide steel frame columns 1 are inserted, and fitting portions 3b are provided which are fixed to the guide steel frame columns 1 by tightening with bolts or the like. ing. Further, locking pins 3a are provided at both ends of the fitting portion 3b so as to project. The locking pin 3a is locked by a hydraulic jack 4a, which will be described later, at the tip of the hoisting material 4b to lift up the girder unit 2.
【0013】前記走行装置5は、図2と図4に示すよう
に、前記大梁3のガイドレール10,10間に架設され
るとともに該ガイドレール10に沿って(即ち、構造物
の長手方向に)摺動自在にされた走行レール5aと、該
走行レール5aの長手方向(即ち、構造物の短手方向)
に沿って摺動自在にされた走行レール5bとから形成さ
れている。As shown in FIGS. 2 and 4, the traveling device 5 is installed between the guide rails 10 of the girder 3 and along the guide rails 10 (that is, in the longitudinal direction of the structure). ) Traveling rail 5a that is slidable and the longitudinal direction of the traveling rail 5a (that is, the lateral direction of the structure)
And a traveling rail 5b slidable along the rail.
【0014】このようにして走行装置5は構造物に対し
て2方向に移動自在となっている。そして、この走行装
置5に、図4(イ)、(ロ)に示すように天井クレーン
6や組立ロボット7を装着するものである。In this way, the traveling device 5 is movable in two directions with respect to the structure. Then, as shown in FIGS. 4A and 4B, an overhead crane 6 and an assembly robot 7 are mounted on the traveling device 5.
【0015】前記走行装置5における走行レール5a,
5bの摺動自在にさせる手段は、例えば、図4(イ)に
示すように、H型鋼のフランジ部にその外形に合わせて
スライド溝を形成して跨設させた構造があり、勿論他の
摺動もしくは移動手段でもよい。A traveling rail 5a in the traveling device 5,
As shown in FIG. 4 (a), the slidable means 5b has, for example, a structure in which a slide groove is formed on the flange portion of the H-shaped steel so as to conform to the outer shape and the slide groove is provided. Sliding or moving means may be used.
【0016】前記天井クレーン6は、図4(イ)に示す
ように、駆動モータや巻き上げドラムを備えた駆動部6
aと、走行レール5bから前記駆動部6aを懸吊させか
つ走行レール5bに対して移動自在にさせる懸吊部6b
およびフック部6cとから構成されている。As shown in FIG. 4 (a), the overhead crane 6 has a drive unit 6 including a drive motor and a hoisting drum.
a and a suspension part 6b for suspending the drive part 6a from the traveling rail 5b and making it movable with respect to the traveling rail 5b.
And a hook portion 6c.
【0017】また、組立ロボット7は、図4(ロ)に示
すように、運搬用ロボット7aやコンクリート打設用ロ
ボット7b等があり、適宜構築作業に応じて各種組立ロ
ボットを走行レール5bに装着して使用するものであ
る。勿論これら組立ロボットは遠隔操作されるものであ
る。As shown in FIG. 4B, the assembling robot 7 includes a carrying robot 7a, a concrete placing robot 7b, etc., and various assembling robots are mounted on the traveling rail 5b according to the construction work. To use. Of course, these assembly robots are remotely operated.
【0018】前記油圧ジャッキユニット4は、センター
ホール型油圧ジャッキ4aを本体に4個備え、そのうち
各々一対の油圧ジャッキ4aが一の前記ガイド用鉄骨柱
1に対応せしめて設けられ、巻上げ材4bが大梁3の嵌
着部3bの係止用ピン3aの上に位置するようになされ
ている。この油圧ジャッキユニット4の本体はガイド用
鉄骨柱1の上部に取付るようにしているが、該本体に貫
通孔を設けて(図示せず)、前記鉄骨柱1に摺動自在に
嵌着させるようにしてもよい。The hydraulic jack unit 4 is provided with four center-hole type hydraulic jacks 4a in its main body, and a pair of hydraulic jacks 4a are provided so as to correspond to one guide steel column 1 and a hoisting material 4b is provided. It is arranged so as to be located on the locking pin 3a of the fitting portion 3b of the girder 3. The main body of the hydraulic jack unit 4 is attached to the upper part of the guide steel frame column 1. A through hole (not shown) is provided in the main body to slidably fit the steel frame column 1. You may do it.
【0019】前記仮設屋根8は、屋根支持枠体8aと屋
根本体8bとから構成されている。前記屋根支持枠体8
aは、正面山形で平面矩形状の鉄骨枠体からなり、その
平面矩形状の四隅にはガイド鉄骨柱1に嵌着される嵌着
部8cが各々設けられ(図2参照)、該嵌着部8cの端
縁から保護シート11が懸吊されている。The temporary roof 8 is composed of a roof support frame 8a and a roof body 8b. The roof support frame 8
a is a front-mountain-shaped plane-rectangular steel frame body, and the fitting portions 8c to be fitted to the guide steel-framed pillars 1 are provided at the four corners of the plane-rectangular shape (see FIG. 2). The protective sheet 11 is suspended from the edge of the portion 8c.
【0020】そして、前記屋根支持枠体8aは、前記大
梁ユニット2が油圧ジャッキユニット4でリフトアップ
されると同時に、この大梁ユニット2の嵌着部3aの上
端面の当接していることにより、ガイド鉄骨柱1に対し
てスライドし上昇せしめられるものである。In the roof support frame 8a, the girder unit 2 is lifted up by the hydraulic jack unit 4 and, at the same time, the upper end surface of the fitting portion 3a of the girder unit 2 is in contact with the roof support frame 8a. It is a slide with respect to the guide steel column 1 and can be raised.
【0021】前記屋根本体8bは、前記屋根支持枠体8
aの上部に設けられ、かつ、摺動自在になされている。
この屋根本体8bは一の大梁ユニット2を略全面覆う大
きさであり、図2に示すように、構造物の短手方向では
ガイド用鉄骨柱1,1間に収まる長さとなっている。こ
れは、図3(ロ)に示すように、作業空間全面を覆う屋
根本体8b,8b、…のうち互いに隣接する屋根本体8
bの一方を他方に重畳させて開口部12を形成するため
である。The roof body 8b is the roof support frame 8
It is provided on the upper part of a and is slidable.
The roof main body 8b has a size that substantially covers the entire single girder unit 2 and, as shown in FIG. 2, has a length that can fit between the guide steel columns 1 and 1 in the lateral direction of the structure. As shown in FIG. 3B, this is the case where the roof main bodies 8b, 8b, ...
This is because one side b is overlapped with the other side to form the opening 12.
【0022】この屋根本体8bを互いに重畳させるに
は、屋根本体の上にレールを設けてそこに他の屋根本体
を乗せてスライドさせたり、一方の屋根本体が他方の屋
根本体を内側に収容できるように片方の屋根本体を大き
く形成したりするものである。In order to superimpose the roof main bodies 8b on each other, a rail is provided on the roof main body and another roof main body is placed on the rail and slid, or one roof main body can accommodate the other roof main body inside. In this way, one roof body is formed large.
【0023】次に、本発明の構築方法を図5乃至図9を
参照して手順を追って説明する。先ず、構造物を構築す
べき地盤13に基礎14を構築する。そして、図5に示
すように、前記基礎14の平面外周部の長手方向に沿っ
て所要数のガイド用鉄骨柱1をクローラクレーン15を
使用して立設する。Next, the construction method of the present invention will be described step by step with reference to FIGS. First, the foundation 14 is constructed on the ground 13 where the structure is to be constructed. Then, as shown in FIG. 5, a required number of guide steel frame columns 1 are erected by using a crawler crane 15 along the longitudinal direction of the outer peripheral portion of the plane of the foundation 14.
【0024】これに先だって予め工場で、井桁状の大梁
3を形成するとともに、該大梁3の下部に設けられたガ
イドレール10に2方向に移動自在な走行装置5を装着
して形成された大梁ユニット2を前記ガイド用鉄骨柱1
の上方から摺動自在にして前記クローラクレーン15を
使用して所要高さ位置で嵌着する。この大梁ユニット2
を構造物の長手方向に必要数連架させてセットする。Prior to this, a girder formed in advance in a factory by forming a girder-shaped girder 3 and mounting a traveling device 5 movable in two directions on a guide rail 10 provided under the girder 3. Unit 2 is the steel column for guide 1
It is slidable from above and is fitted at the required height position using the crawler crane 15. This crossbeam unit 2
Are set up by connecting the required number of them in the longitudinal direction of the structure.
【0025】そして、図1と図3(イ),(ロ)に示す
ように、構造物の長手方向にて中央部に自昇型クレーン
9を構台9a上にセットする。この自昇型クレーン9の
作業範囲は図3(イ)に示すように構造物の略全範囲を
カバーしている。Then, as shown in FIGS. 1 and 3A and 3B, the self-elevating crane 9 is set on the gantry 9a at the center in the longitudinal direction of the structure. The working range of the self-propelled crane 9 covers almost the entire range of the structure as shown in FIG.
【0026】次に、大梁ユニット2が嵌着されたガイド
用鉄骨柱1の上部に油圧ジャッキユニット4を取り付け
る。そして、前記大梁3に装着された走行装置5に天井
クレーン6や組立ロボット7等の作業装置を装着する。Next, the hydraulic jack unit 4 is attached to the upper portion of the guide steel frame column 1 to which the girder unit 2 is fitted. Then, working devices such as an overhead crane 6 and an assembly robot 7 are mounted on the traveling device 5 mounted on the girder 3.
【0027】そして、図6に示すように、作業空間を仮
設屋根8で覆う。こうして、前記走行装置5の走行レー
ル5bを構造物の外側にまで突出させて移動させ、建築
資材を天井クレーン6で構造物内側に搬入したりハーフ
PCバルコニー16を取り付けたり、また、建築部材を
組立ロボット7で組み立てる。そして、ガイド用鉄骨柱
1を本設の柱の芯鉄筋に利用するならば、型枠を組んで
コンクリートを打設するものである。Then, as shown in FIG. 6, the work space is covered with a temporary roof 8. In this way, the traveling rails 5b of the traveling device 5 are projected and moved to the outside of the structure, and the building materials are carried into the inside of the structure by the overhead crane 6, the half PC balcony 16 is attached, and the building members are installed. Assemble with the assembly robot 7. If the guide steel column 1 is used as the core rebar of the permanently installed column, a formwork is assembled and concrete is poured.
【0028】また、前記大梁3のガイドレール10を介
して、隣接する大梁ユニット2へ必要に応じて前記走行
装置5を移動させることができるので(図4(イ)参
照)、連設した大梁ユニット2の全てに走行装置5を装
着する必要がなく、適宜な間隔にて大梁3に走行装置5
を装着すればよい。Further, since the traveling device 5 can be moved to the adjacent girder unit 2 via the guide rail 10 of the girder 3 as required (see FIG. 4A), the girders connected in series are provided. It is not necessary to mount the traveling device 5 on all of the units 2, and the traveling device 5 is mounted on the girder 3 at appropriate intervals.
You can put on.
【0029】そして、前記仮設屋根8も通常は一部を重
畳させて開口部12を設け、作業場所を明るくしかつ大
きな建築資材の搬入を可能にして、雨が降ってきたら作
業空間の全面を覆うようにして、作業が中断しないよう
にする。また、仮設屋根8の嵌着部8cの端縁からは保
護シート11が懸吊されるので、風の影響を防ぎそして
資材等の落下を防ぐことができる。The temporary roof 8 is usually provided with an opening 12 by overlapping a part of the temporary roof 8 to make the work place bright and to carry in large building materials. Cover it so that work is not interrupted. Further, since the protective sheet 11 is suspended from the edge of the fitting portion 8c of the temporary roof 8, it is possible to prevent the influence of the wind and prevent the falling of materials and the like.
【0030】このようにして所定階層の組み立てが完了
したら、次に、前記ガイド用鉄骨柱1に取り付けた油圧
ジャッキユニット4で大梁ユニット2をリフトアップ
し、上階層の建築資材の搬入や組み立てを行う。また、
ガイド用鉄骨柱1の長さが足りなくなったら、図7に示
すように、一旦油圧ジャッキユニット4を自昇型クレー
ン9で外して新しい鉄骨柱1を継ぎ足し、また油圧ジャ
ッキユニット4を新しいガイド用鉄骨柱1の上部に取り
付け、該油圧ジャッキユニット4で大梁ユニット2と仮
設屋根8とを共々リフトアップさせるものである。After the assembly of the predetermined layer is completed in this way, next, the girder unit 2 is lifted up by the hydraulic jack unit 4 attached to the guide steel column 1 to carry in and assemble the building material of the upper layer. To do. Also,
When the length of the guide steel column 1 is insufficient, as shown in FIG. 7, the hydraulic jack unit 4 is temporarily removed by the self-elevating crane 9 to add a new steel column 1, and the hydraulic jack unit 4 is used for a new guide. It is attached to the upper portion of the steel frame column 1 and the girder unit 2 and the temporary roof 8 are lifted up together by the hydraulic jack unit 4.
【0031】前記油圧ジャッキユニット4は、ガイド用
鉄骨柱1に摺動自在自在に嵌着しておいて、この油圧ジ
ャッキユニット4をガイド用鉄骨柱1から取り外すこと
なく、自昇型クレーン9で上方にスライドさせるように
することもできる。The hydraulic jack unit 4 is slidably fitted on the guide steel frame column 1, and the hydraulic jack unit 4 is removed from the guide steel frame column 1 by the self-elevating crane 9 without removing it. It can also be slid upward.
【0032】また、自昇型クレーン9は、これが載置さ
れている大梁ユニット2と構台9aと共どもに油圧ジャ
ッキユニット4でリフトアップされるものである。この
ようにして、所望階層まで建築資材の搬入を行い、そし
て、その組み立てを行って省力化を図るものである。The self-elevating crane 9 is lifted up by the hydraulic jack unit 4 together with the girder unit 2 on which it is mounted and the gantry 9a. In this way, the building materials are carried in to the desired floor, and the assembling is performed to save labor.
【0033】[0033]
【発明の効果】以上説明したように、本発明の構造物の
構築方法は、構造物を構築すべき地盤に基礎を構築した
後、前記基礎の平面外周部の長手方向に沿ってガイド用
鉄骨柱を立設し、井桁状の大梁を形成するとともに該大
梁の下部に設けられたガイドレールに2方向に移動自在
な走行装置を装着して形成された大梁ユニットを前記ガ
イド用鉄骨柱に上下方向で摺動自在に嵌着し、大梁ユニ
ットが嵌着されたガイド用鉄骨柱の上部にジャッキを取
り付け、前記大梁に装着された走行装置に天井クレーン
や組立ロボットを装着し、前記大梁のガイドレールを介
して隣接する大梁ユニットへ必要に応じて前記走行装置
を移動させる等して建築資材の搬入や建築部材の組み立
てを行い、所定階層の組み立てが完了後に、前記ガイド
用鉄骨柱に取り付けたジャッキで大梁ユニットをリフト
アップし上階層の建築資材の搬入や組み立てを行うとい
う方法なので、建築資材の搬入や組立部材の組立を自動
化することができ建築作業の大幅な省力化となる。As described above, according to the method of constructing a structure of the present invention, after the foundation is constructed on the ground where the structure is to be constructed, the guide steel frame is provided along the longitudinal direction of the plane outer peripheral portion of the foundation. A girder unit is formed by vertically arranging a pillar to form a girder-shaped girder and mounting a traveling device movable in two directions on a guide rail provided under the girder. In the direction of the girder, a jack is attached to the upper part of the steel column for the guide in which the girder unit is fitted, an overhead crane or an assembly robot is attached to the traveling device attached to the girder, and the girder guide is attached. If necessary, move the traveling device to the adjacent girder unit via a rail to carry in building materials and assemble building members, and after the assembly of a predetermined level is completed, mount them on the guide steel columns. Since a method of the girders unit carrying in and assembly of building materials of the lift-up upper hierarchy jack, a substantial labor-saving can be building work to automate the assembly of the loading and assembly elements of building materials.
【0034】また、請求項2のように前記大梁ユニット
の上方に仮設屋根を前記ガイド用鉄骨柱に対して上下方
向で摺動自在にし、構造物の長手方向に移動自在にして
設け、仮設屋根の一部を開口させるようにしたことによ
り、雨天時においても作業が中断しないので、能率的で
あるとともに工期の短縮となる。Further, as in claim 2, a temporary roof is provided above the girder unit so as to be slidable in the vertical direction with respect to the guide steel column and movable in the longitudinal direction of the structure. By opening a part of it, the work is not interrupted even in the rain, which is efficient and shortens the construction period.
【0035】更に、請求項3のように前記ガイド用鉄骨
柱は構築すべき構造物の柱用芯鉄筋に兼用されるので、
当該鉄骨柱を盛り替える必要がなくなり作業能率がよく
なってコストの軽減ともなる。Further, as in claim 3, since the guide steel frame column is also used as the core rebar for the column of the structure to be constructed,
It is not necessary to refill the steel columns, which improves work efficiency and reduces costs.
【図1】本発明に係る構築方法の実施例を示す説明図で
ある。FIG. 1 is an explanatory diagram showing an embodiment of a construction method according to the present invention.
【図2】同じく正面図である。FIG. 2 is a front view of the same.
【図3】(イ)は平面図、(ロ)は仮設屋根の一部を開
閉したときの平面図である。3A is a plan view, and FIG. 3B is a plan view when a part of the temporary roof is opened and closed.
【図4】(イ)は走行レールに天井クレーンを装着した
状態を示す正面図、(ロ)は、同じく組立ロボットを走
行レールに装着した状態の正面図である。FIG. 4A is a front view showing a state in which an overhead crane is mounted on the traveling rail, and FIG. 4B is a front view showing a state in which the assembly robot is also mounted on the traveling rail.
【図5】構築物の組立手順を示す正面図である。FIG. 5 is a front view showing the assembly procedure of the construct.
【図6】同じく構築物の組立手順を示す正面図である。FIG. 6 is a front view showing the assembly procedure of the same.
【図7】構築物の組立手順を示し、鉄骨柱を継ぎ足して
いる様子を示す正面図である。FIG. 7 is a front view showing a procedure for assembling the structure and showing a state where the steel frame columns are replenished.
【図8】構築物の組立手順を示す正面図である。FIG. 8 is a front view showing the assembly procedure of the construct.
【図9】構築物の組立手順を示し、最終段階の組立が終
了した様子を示す正面図である。FIG. 9 is a front view showing a procedure for assembling the structure and showing a state where the final assembly step is completed.
1 ガイド用鉄骨柱、2 大梁ユニット、3 井桁状大
梁、4 センターホール型油圧ジャッキユニット、4a
油圧ジャッキ、5 走行装置、6 天井クレーン、7
組立ロボット、8 仮設屋根、9 自昇型クレーン。1 Guide steel column, 2 girder unit, 3 girder girder, 4 center hole type hydraulic jack unit, 4a
Hydraulic jack, 5 traveling device, 6 overhead crane, 7
Assembly robot, 8 temporary roof, 9 self-propelled crane.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 段 志信 東京都中央区京橋1丁目7番1号戸田建設 株式会社内 (72)発明者 吉原 長吉 東京都中央区京橋1丁目7番1号戸田建設 株式会社内 (72)発明者 宮森 金栄 東京都中央区京橋1丁目7番1号戸田建設 株式会社内 (72)発明者 岩波 光一 東京都中央区京橋1丁目7番1号戸田建設 株式会社内 (72)発明者 舘野 孝信 東京都中央区京橋1丁目7番1号戸田建設 株式会社内 (72)発明者 正木 和夫 東京都中央区京橋1丁目7番1号戸田建設 株式会社内 (72)発明者 樋口 忠 東京都中央区京橋1丁目7番1号戸田建設 株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Shishin Shin 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Nagayoshi Yoshihara 1-1-7 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor, Kinei Miyamori 1-7-1, Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor, Koichi Iwanami 1-1-7, Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Takanobu Tateno 1-7-1, Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Kazuo Masaki 1-7-1, Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Invention Tadashi Higuchi 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd.
Claims (3)
た後、前記基礎の平面外周部の長手方向に沿ってガイド
用鉄骨柱を立設し、井桁状の大梁を形成するとともに該
大梁の下部に設けられたガイドレールに2方向に移動自
在な走行装置を装着して形成された大梁ユニットを前記
ガイド用鉄骨柱に上下方向で摺動自在に嵌着し、大梁ユ
ニットが嵌着されたガイド用鉄骨柱の上部にジャッキを
取り付け、前記大梁に装着された走行装置に天井クレー
ンや組み立てロボットを装着し、前記大梁のガイドレー
ルを介して隣接する大梁ユニットへ必要に応じて前記走
行装置を移動させる等して建築資材の搬入や建築部材の
組み立てを行い、所定階層の組み立てが完了後に、前記
ガイド用鉄骨柱に取り付けたジャッキで大梁ユニットを
リフトアップし上階層の建築資材の搬入や組み立てを行
うことを特徴としてなる構造物の構築方法。1. After constructing a foundation on the ground where a structure is to be constructed, steel pillar columns for guides are erected along the longitudinal direction of the plane outer peripheral portion of the foundation to form a girder-shaped girder and the girder. A girder unit formed by mounting a traveling device movable in two directions on a guide rail provided in the lower part of the rail is slidably fitted in the guide steel frame pillar in the vertical direction, and the girder unit is fitted. Attaching a jack to the upper part of the guide steel frame, mounting an overhead crane or an assembly robot on the traveling device mounted on the girder, and moving the traveling device to the adjacent girder unit via the guide rail of the girder as necessary. The building materials are carried in and the building members are assembled by moving, etc., and after the assembly of the predetermined level is completed, the girder unit is lifted up by the jack attached to the steel column for the guide and the upper floor is raised. A method of constructing a structure, characterized by carrying in and assembling a layer of building materials.
記ガイド用鉄骨柱に対して上下方向で摺動自在にし、構
造物の長手方向に移動自在にして設け、仮設屋根の一部
を開口させるようにしたことを特徴としてなる請求項1
に記載の構造物の構築方法。2. A temporary roof is provided above the girder unit so as to be vertically slidable with respect to the guide steel column and movable in the longitudinal direction of the structure, and a part of the temporary roof is opened. Claim 1 which is characterized by doing so.
The method for constructing a structure according to.
の柱用芯鉄筋に兼用されることを特徴としてなる請求項
1又は請求項2に記載の構造物の構築方法。3. The method for constructing a structure according to claim 1, wherein the guide steel frame column is also used as a core rebar for a column of a structure to be constructed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP33154191A JPH0713405B2 (en) | 1991-11-21 | 1991-11-21 | How to build a structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP33154191A JPH0713405B2 (en) | 1991-11-21 | 1991-11-21 | How to build a structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05141092A JPH05141092A (en) | 1993-06-08 |
| JPH0713405B2 true JPH0713405B2 (en) | 1995-02-15 |
Family
ID=18244818
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP33154191A Expired - Fee Related JPH0713405B2 (en) | 1991-11-21 | 1991-11-21 | How to build a structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0713405B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100863592B1 (en) * | 2007-08-14 | 2008-10-14 | (주)씨.에스 구조 엔지니어링 | Automated Construction System and Automated Construction Method Using the Same |
-
1991
- 1991-11-21 JP JP33154191A patent/JPH0713405B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH05141092A (en) | 1993-06-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA1329633C (en) | Construction apparatus and construction method | |
| CN115467515A (en) | Ultrahigh frame column construction structure and ultrahigh frame column construction method | |
| KR100863592B1 (en) | Automated Construction System and Automated Construction Method Using the Same | |
| JP3732586B2 (en) | Method and apparatus for constructing steel structure | |
| JP2957328B2 (en) | Peripheral holding self-elevating construction method | |
| JPH0571225A (en) | Temporarily set roof of complete weather type | |
| JPH0713405B2 (en) | How to build a structure | |
| JPH04161566A (en) | Constructing apparatus for large space building | |
| JPH0782897A (en) | All weather type building method of building | |
| JPH09273311A (en) | How to build a structure | |
| JP2000257266A (en) | Construction method of building frame | |
| US3435583A (en) | Method of forming buildings | |
| JPH04161565A (en) | Construction of large space building | |
| JP3234442B2 (en) | Building and scrap type building method | |
| JP2590671B2 (en) | Construction method of steel frame using overhead crane frame | |
| JP2957323B2 (en) | Lift-up construction method | |
| JPS6237439A (en) | Traveling method | |
| JP2761527B2 (en) | How to build structures | |
| JPH0447072A (en) | Construction method for multistory building and its device | |
| JP2761528B2 (en) | How to build structures | |
| JPH08105229A (en) | How to build a building | |
| JP3337262B2 (en) | Caisson automatic production equipment | |
| JP2834589B2 (en) | Jack-up type building construction apparatus and its construction method | |
| JPH04118438A (en) | Method and apparatus for construction of building | |
| JP2717154B2 (en) | Building method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |