Cable Bundler for Flexible Rebar Assembly Processing

Info

Publication number
JPH0715223B2
JPH0715223B2 JP32554090A JP32554090A JPH0715223B2 JP H0715223 B2 JPH0715223 B2 JP H0715223B2 JP 32554090 A JP32554090 A JP 32554090A JP 32554090 A JP32554090 A JP 32554090A JP H0715223 B2 JPH0715223 B2 JP H0715223B2
Authority
JP
Japan
Prior art keywords
cable
guide tube
flexible
tube group
focusing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP32554090A
Other languages
Japanese (ja)
Other versions
JPH04198565A (en
Inventor
楠弘 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Rope Manufacturing Co Ltd
Original Assignee
Tokyo Rope Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Rope Manufacturing Co Ltd filed Critical Tokyo Rope Manufacturing Co Ltd
Priority to JP32554090A priority Critical patent/JPH0715223B2/en
Publication of JPH04198565A publication Critical patent/JPH04198565A/en
Publication of JPH0715223B2 publication Critical patent/JPH0715223B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Wire Processing (AREA)
  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、山留め工、斜面安定工、各種構造物の安定工
等で施工される各種の抑止杭等において、現場組立て加
工に好適なフレキシブル鉄筋組立加工用ケーブル集束装
置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention provides a flexible structure suitable for on-site assembly processing in various restraint piles and the like constructed by mountain retaining works, slope stabilizing works, stabilizing works of various structures, and the like. The present invention relates to a cable focusing device for reinforcing bar assembly processing.

(従来の技術) 山留め工、斜面安定工、地下掘削工、各種構造物の安定
工等において、現場で複数本のPC鋼より線をケーブルに
組立て加工し、地中深く掘削した削孔内に同ケーブルを
挿入して、コンクリート打設により定着、緊張し抑止杭
として施工するアンカー工法や、現場で複数本のより鉄
筋をケーブルに組立て加工して、多数本の同ケーブルを
集束用リングに取付け固着して鉄筋かごとし、削孔内に
建て込まれている鋼管内に同鉄筋かごを建て込み、コン
クリートを打設し抑止杭として施工するフレキシブル鉄
筋コンクリート工法が広く採用されており、前記工法に
は、複数本のフレキシブル鉄筋(PC鋼より線やより鉄
筋)で形成された長尺ケーブル(20〜30m)使用の抑止
杭が多量に施工され、ジョイントのない連続的な配筋と
なり、可撓性に富み、地盤条件への追随性、設計の自由
性を有するなど構造材としての信頼性が高く、小規模の
機器設備、狭いスペースで現場組立て加工、施工でき、
工事全体としては比較形に高能率で経済的に施工できる
等の特徴を有しているが、 前記現場組立て加工は、殆ど手作業となり、複数本のフ
レキシブル鉄筋(PC鋼より線やより鉄筋)を長尺(20〜
30m)に切断し引き揃えて束ねるケーブル形成作業、多
数本のケーブルを集束用リングの周囲に取付けて固着す
る鉄筋かごの形成作業等に際して、捩じれ癖による絡み
等が発生し易く、多くの手数、時間を要し困難な作業に
なつている。
(Prior art) For earth retaining work, slope stabilization work, underground excavation work, stabilization work of various structures, etc., by assembling and processing multiple PC steel strands into cables at the site, and drilling deep into the ground. The same cable is inserted, anchored by concrete placement, tensioned and tensioned to construct a restraint pile, or multiple strands are assembled into a cable at the site, and a number of the same cable is attached to the focusing ring. A flexible reinforced concrete construction method is widely adopted, in which the steel bars are fixed and fixed, and the steel bars are built in the steel pipes that are built in the drilled hole, and concrete is placed and used as restraining piles. , A large amount of restraining piles using a long cable (20 to 30 m) formed of multiple flexible reinforcing bars (PC steel stranded wire or more reinforcing bar) are constructed, and continuous reinforcing bars without joints are possible. It is highly reliable as a structural material because of its high flexibility, conformability to ground conditions, and freedom of design, and it can be assembled and processed on-site in a small-scale equipment and small space.
The overall construction has features such as comparatively high efficiency and economical construction, but the on-site assembly processing is almost manual work, and multiple flexible rebars (PC steel strands and more rebars) Long length (20 ~
(30 m), forming and bundling cables by bundling them, or forming a reinforcing bar cage that attaches and fixes many cables around the bundling ring, etc. It is a time-consuming and difficult task.

(発明が解決しようとする課題) 従来の前記ケーブルや前記鉄筋かごの現場組立て加工
は、前記のように困難な作業となつて多くの手数、時間
を要し、杭の耐力や施工精度、信頼性等に問題点があ
り、省力化とともに、組立て加工、施工精度等の向上が
課題になつている。
(Problems to be solved by the invention) The conventional on-site assembly processing of the cable and the rebar cage requires a lot of labor and time as the above-mentioned difficult work, and the pile strength, construction accuracy, and reliability are high. There is a problem in terms of performance, and labor saving and improvement in assembly processing, construction accuracy, etc. are becoming issues.

本発明は、上記課題に対処するために開発されたもので
あつて、その目的とする処は、載架台に載架されて回転
操作される集束用ガイド管群、その伸縮調整機構、集束
用リングの組合わせによつて、多数本のケーブル形成、
その伸縮調整、鉄筋かごの形成を容易にして、現場組立
て加工能率、省力化とともに施工精度を向上したフレキ
シブル鉄筋組立加工用ケーブル集束装置を提供するにあ
る。
The present invention was developed in order to address the above-mentioned problems, and an object of the present invention is to provide a focusing guide tube group which is mounted on a mounting table and is rotatably operated, its expansion / contraction adjusting mechanism, and focusing. With the combination of rings, multiple cable formations,
It is an object of the present invention to provide a cable concentrating device for flexible rebar assembling and processing, which facilitates the expansion and contraction adjustment and the formation of a rebar cage to improve the on-site assembling work efficiency, labor saving and construction accuracy.

(課題を解決するための手段) 本発明は、複数本のフレキシブル鉄筋を挿通して束ねる
ケーブル形成用ガイド管の複数本を断面円周上の配置に
並列してなる集束用ガイド管群と、集束用ガイド管群を
回転操作可能に支持する載架台により、多数本のケーブ
ル形成、及びその並列配置を可能とし、組立て加工能
率、精度を高めている。
(Means for Solving the Problems) The present invention provides a focusing guide tube group formed by arranging a plurality of cable forming guide tubes that are inserted through a plurality of flexible reinforcing bars and bundled together in a circumferential arrangement in section, A mounting table that rotatably supports the focusing guide tube group enables the formation of a large number of cables and their parallel arrangement, thereby improving the assembly processing efficiency and accuracy.

また、前記集束用ガイド管群を長手方向に複数個に分割
し着脱可能に連結して伸縮調節機構付き構成にしたこと
により、ケーブル長さを伸縮自在にしている。
Further, the cable length can be freely expanded and contracted by dividing the focusing guide tube group into a plurality of pieces in the longitudinal direction and detachably connecting them so as to have an expansion and contraction adjusting mechanism.

さらに、前記集束用ガイド管群によつて束ね形成された
各ケーブルを円周上に固着する集束用リングを組合わせ
たことにより、鉄筋かごの形成を容易にしている。
Further, by combining a focusing ring for fixing the respective cables formed by bundling by the focusing guide tube group on the circumference, the formation of the reinforcing bar cage is facilitated.

(作用) 載架台に載架されている集束用ガイド管群のケーブル形
成用ガイド管に、複数本のフレキシブル鉄筋を挿通する
と、ケーブル形成用ガイド管によつて引き揃えられフレ
キシブル鉄筋群に束ねられて、ケーブルに形成されて支
持され、集束用ガイド管群を回転して前記ケーブル鉄筋
群の束ねを繰り返し、前記フレキシブル鉄筋群ごとにグ
リップ等で結束して、多数本のケーブルが容易、迅速に
精度良く形成され、断面円周上に並列されて支持され
る。
(Operation) When a plurality of flexible reinforcing bars are inserted into the cable forming guide tube of the focusing guide tube group mounted on the mounting table, they are aligned by the cable forming guide tube and bundled into the flexible reinforcing bar group. The cable is formed and supported, and the bundling guide tube group is rotated to repeat the bundling of the cable reinforcing bar group, and each flexible reinforcing bar group is bundled with a grip or the like, so that a large number of cables can be easily and quickly It is formed with high precision and is supported in parallel on the circumference of the cross section.

また、伸縮調節機構による集束用ガイド管群の長さ調節
によつて、前記ケーブルの形成長さが杭長さに対応させ
て自在に調整される。
Further, by adjusting the length of the focusing guide tube group by the expansion and contraction adjusting mechanism, the formation length of the cable can be freely adjusted corresponding to the pile length.

さらに、前記集束用ガイド管群によつて形成され並列に
支持されている多数本のケーブルを、集束用リングの円
周に取り付けて固着し、鉄筋かごを容易に高精度で形成
でき、高能率、高精度の抑止杭として施工される。
Further, a large number of cables, which are formed by the focusing guide tube group and are supported in parallel, are attached to the circumference of the focusing ring and fixed, so that a reinforcing bar cage can be easily formed with high accuracy, and high efficiency is achieved. It will be constructed as a high-precision deterrent pile.

(実施例) 第1図ないし第5図に本発明の実施例を示し、図中aは
フレキシブル鉄筋(より鉄筋)、Aは複数本のフレキシ
ブル鉄筋aで形成されたケーブル、1は集束用ガイド管
群、2はケーブル形成用ガイド管、3は各ケーブル形成
用ガイド管2を断面円周上に配置して並列した管支持リ
ング、4a,bは集束用ガイド管群1に設けた伸縮調節機
構、5は載架台、10は集束用リングであつて、複数本の
フレキシブル鉄筋aを挿通して束ねるケーブル形成用ガ
イド管2の複数本を断面円周上の配置に並列してなる集
束用ガイド管群1と、集束用ガイド管群1を回転操作可
能に支持する載架台5を具備したフレキシブル鉄筋組立
加工用ケーブル集束装置になつている。
(Embodiment) An embodiment of the present invention is shown in FIGS. 1 to 5, in which a is a flexible rebar (more rebar), A is a cable formed of a plurality of flexible rebars, and 1 is a focusing guide. Tube group 2 is a cable forming guide tube, 3 is a tube support ring in which the cable forming guide tubes 2 are arranged in parallel on the circumference of the cross section, and 4a and 4b are expansion and contraction adjustments provided in the focusing guide tube group 1. A mechanism, 5 is a mounting base, and 10 is a focusing ring for converging a plurality of cable forming guide tubes 2 for inserting and bundling a plurality of flexible reinforcing bars a in parallel in a circumferential arrangement in section. The flexible-rebar-assembling cable focusing device is provided with a guide tube group 1 and a mounting table 5 that rotatably supports the focusing guide tube group 1.

また、上記フレキシブル鉄筋組立加工用ケーブル集束装
置において、集束用ガイド管群1を長手方向に複数個に
分割し着脱可能に連結して伸縮調整機構4a,b付き構成に
したフレキシブル鉄筋組立加工用ケーブル集束装置にな
つている。
Further, in the flexible reinforcing bar assembling cable converging device, the flexible reinforcing bar assembling and processing cable is configured such that the converging guide tube group 1 is divided into a plurality of pieces in the longitudinal direction and detachably connected to each other to provide the expansion and contraction adjusting mechanism 4a, 4b It is a focusing device.

さらに、上記フレキシブル鉄筋組立加工用ケーブル集束
装置において、前記集束用ガイド管群1によつて形成さ
れた各ケーブルAを円周上に固着する集束用リング10を
組合わせたフレキシブル鉄筋組立加工用ケーブル集束装
置になつている。
Further, in the flexible rebar assembly cable converging device, a flexible rebar assembly cable combined with a converging ring 10 for fixing each cable A formed by the converging guide tube group 1 on the circumference. It is a focusing device.

さらに詳述すると、集束用ガイド管群1は、多数本(図
示例では32本)のケーブル形成用ガイド管2、各ケーブ
ル形成用ガイド管を断面円周上に適宜手段で固着、配置
して並列した複数の管支持リング3、及び各ケーブル形
成用ガイド管2を長手方向に複数に分割して付設された
連結用鍔部4aと連結用ボルト4bで構成された伸縮調節機
構4a,bからなり、載架台5のローラ群6で管支持リング
3を介して回転操作可能に載架され、作業現場では、第
1図に示すようにより鉄線(フレキシブル鉄筋)aの繰
出テーブル21、高速の切断機22、切断されたより鉄線a
の支持台23、載架台5上に載架された集束用ガイド管群
1、製品の架台24、引出し用のウインチ25等を配置して
組立て加工される。
More specifically, the focusing guide tube group 1 includes a large number (32 in the illustrated example) of cable forming guide tubes 2 and respective cable forming guide tubes fixed and arranged on the circumference of the cross section by appropriate means. From the expansion and contraction adjusting mechanism 4a, b composed of a plurality of juxtaposed tube support rings 3 and a brim 4a for connection and a bolt 4b for connection, which are attached by dividing each cable forming guide tube 2 into a plurality in the longitudinal direction. And is rotatably mounted by the roller group 6 of the mounting table 5 via the pipe support ring 3, and at the work site, as shown in FIG. 1, the feeding table 21 of the iron wire (flexible rebar) a, high speed cutting Machine 22, cut twisted iron wire a
The supporting base 23, the focusing guide tube group 1 mounted on the mounting base 5, the product mounting base 24, and the pull-out winch 25 are arranged and assembled.

第5図に示すフレキシブル鉄筋コンクリート杭の組立て
加工、施工について説明すると、例えば、長さ26mのケ
ーブルを形成する場合は、集束用ガイド管群1は24mに
調節され、より鉄線a(1×7−16.5mmφ)を支持台23
上に繰出し26mに切断し、切断された7本のより線aの
先端部をグリツプ30等で束ね、ケーブル形成用ガイド管
2内に挿入すると、容易に挿通、引き揃えられ束ねられ
て支持されより線a束となり、集束用ガイド管群1を回
転操作して前記挿通、束ねを繰り返し、各ケーブル形成
用ガイド管2内に前記より線a束が形成されて並列さ
れ、各より線a束をケーブル形成用ガイド管2からウイ
ンチ25で引出しながら結束して、多数本のケーブルAが
容易、迅速に精度良く形成される。
Assembling and processing the flexible reinforced concrete pile shown in FIG. 5 will be described. For example, when forming a cable with a length of 26 m, the focusing guide tube group 1 is adjusted to 24 m, and the twisted iron wire a (1 × 7- 16.5 mmφ) support stand 23
When it is cut up to 26 m, and the tips of the 7 stranded wires a that have been cut are bundled with a grip 30 or the like and inserted into the cable forming guide tube 2, they are easily inserted, aligned and supported in a bundle. The stranded wire a bundle is formed, the focusing guide tube group 1 is rotated, and the insertion and bundling are repeated, and the stranded wire a bundle is formed in each cable forming guide tube 2 and arranged in parallel. A plurality of cables A are easily, quickly and accurately formed by bundling them while pulling them out from the cable forming guide tube 2 with a winch 25.

また、前記集束用ガイド管群1は、長手方向に複数個に
分割して連結用鍔部4aと連結用ボルト4bからなる伸縮調
節機構4a,bで伸縮調整され、地盤条件等に対応させて前
記ケーブルAの長さ、杭長を容易に自在に調整される。
また、より鉄線aの径、本数等の調整、ケーブルの形成
本数の調整が自在に行われる。前記伸縮調節機構は、図
示例に限らず各種の機構によることができる。
In addition, the focusing guide tube group 1 is divided into a plurality of pieces in the longitudinal direction and is expanded and contracted by expansion and contraction adjusting mechanisms 4a and 4b each of which is composed of a connecting collar portion 4a and a connecting bolt 4b. The length of the cable A and the pile length can be easily and freely adjusted.
Further, the diameter and the number of the iron wire a and the number of formed cables can be adjusted more freely. The expansion / contraction adjusting mechanism is not limited to the illustrated example, but various mechanisms can be used.

さらに、集束用リング10は、第3図に示すように本体リ
ング11、本体リング11の外周に突設された多数の区画板
12、本体リング11内から突設され集束用ガイド管群1の
端部に嵌合可能な嵌合用突起10、本体リング11から突設
され鋼管36の上端部に係合される吊り鉄筋14等からな
り、第4図に示すように集束用リング10の各外周側区画
内に、集束用ガイド管群1の各ケーブル形成用ガイド管
2に挿通し支持されている各より線a束の先端部が配置
されて、溶接等の手段で取付け固着され、ウインチ25に
より集束用リング10を介して各より線a束を引出し、必
要に応じて各より線a束をワイヤ等で結束し、フープ筋
32を取付け、後端部に集束用リング31を取付けて固着し
鉄筋かごに形成される。
Further, as shown in FIG. 3, the focusing ring 10 includes a body ring 11 and a large number of partition plates protruding from the outer periphery of the body ring 11.
12, a fitting projection 10 protruding from the inside of the main body ring 11 and capable of being fitted to the end of the focusing guide tube group 1, a suspending bar 14 protruding from the main body ring 11 and engaged with the upper end of the steel pipe 36, etc. As shown in FIG. 4, the tip of each bundle of strands a inserted into and supported by each cable forming guide tube 2 of the focusing guide tube group 1 in each outer peripheral section of the focusing ring 10. The parts are arranged and fixed by welding or other means. The winches 25 pull out the individual strands of the wire a through the focusing ring 10, and if necessary, bundle the individual strands of the wire a with a hoop. muscle
32 is attached, and a focusing ring 31 is attached to the rear end portion and fixed to form a reinforcing bar cage.

第5図に示すようにクレーン(図示省略)等で削孔35内
に鋼管36が建て込まれ、鋼管36内に前記鉄筋かごが建て
込まれて、鋼管36内、外にモルタル(セメント)が中詰
42、外詰43され抑止杭に施工される。図中41は一次中詰
モルタル、44は杭頭部の保護コンクリートである。
As shown in FIG. 5, a steel pipe 36 is built in the drilled hole 35 with a crane (not shown), and the rebar cage is built in the steel pipe 36 so that mortar (cement) is put inside and outside the steel pipe 36. Stuffing
42, 43 is packed outside and installed on the restraining pile. In the figure, 41 is the primary filling mortar, and 44 is the protective concrete for the pile head.

(発明の効果) 本発明は、上述のような構成からなり、載架台に回転可
能に載架された集束用ガイド管群によつて、フレキシブ
ル鉄筋により多数本のケーブルが容易、迅速に精度良く
形成され、伸縮調節機構によつて、集束用ガイド管群の
長さが杭長に対応して容易に伸縮調節され、所望長のケ
ーブルが容易に形成されるとともに、集束用ガイド管群
によつて形成されて支持されている各ケーブルを、集束
用リングの円周に容易に取付け固着して容易に高精度の
鉄筋かごに形成でき、現場組立て加工、施工精度、能率
が格段に向上され、著しく省力化されコスト節減され
る。
(Advantages of the Invention) The present invention is configured as described above, and by the focusing guide tube group rotatably mounted on the mounting table, a large number of cables can be easily, quickly and accurately formed by flexible reinforcing bars. By the expansion and contraction adjusting mechanism, the length of the focusing guide tube group is easily expanded and contracted according to the pile length to easily form a cable of a desired length and the focusing guide tube group. It is possible to easily attach and fix each cable that is formed and supported on the circumference of the focusing ring to easily form a high-precision rebar cage, which greatly improves field assembly processing, construction accuracy, and efficiency. Significant labor savings and cost savings.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の使用態様を示す全体の斜視図、第2図
(A)(B)は第1図のII−II視図と要部拡大側面図、
第3図(A)(B)は集束用リングの正面図と縦断図、
第4図は集束用リングの使用態様図、第5図はフレキシ
ブル鉄筋コンクリート杭の縦断図である。 a:フレキシブル鉄筋、A:ケーブル 1:集束用ガイド管群 2:ケーブル形成用ガイド管 4a,b:伸縮調節機構、5:載架台 10:集束用リング
FIG. 1 is an overall perspective view showing a mode of use of the present invention, and FIGS. 2 (A) and 2 (B) are II-II perspective views of FIG.
3 (A) and 3 (B) are a front view and a vertical sectional view of the focusing ring,
FIG. 4 is a view of a mode of use of the focusing ring, and FIG. 5 is a vertical sectional view of a flexible reinforced concrete pile. a: Flexible rebar, A: Cable 1: Focusing guide tube group 2: Cable forming guide tube 4a, b: Expansion / contraction mechanism, 5: Mounting stand 10: Focusing ring

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】複数本のフレキシブル鉄筋を挿通して束ね
るケーブル形成用ガイド管の複数本を断面円周上の配置
に並列してなる集束用ガイド管群と、同集束用ガイド管
群を回転操作可能に支持する載架台を具備したことを特
徴とするフレキシブル鉄筋組立加工用ケーブル集束装
置。
1. A focusing guide tube group formed by arranging a plurality of cable forming guide tubes, which are bundled by inserting a plurality of flexible reinforcing bars, in a circumferential arrangement in cross section, and rotating the focusing guide tube group. A cable concentrating device for flexible rebar assembling and processing, characterized in that it has a pedestal that operably supports it.
【請求項2】請求項1のフレキシブル鉄筋組立加工用ケ
ーブル集束装置において、前記集束用ガイド管群を長手
方向に複数個に分割し着脱可能に連結して伸縮調節機構
付き構成にしたことを特徴とするフレキシブル鉄筋組立
加工用ケーブル集束装置。
2. The flexible-rebar-assembling cable converging device according to claim 1, wherein the converging guide tube group is divided into a plurality of parts in the longitudinal direction and detachably connected to each other so as to have an expansion and contraction adjusting mechanism. A cable concentrator for flexible rebar assembly processing.
【請求項3】請求項1又は請求項2のフレキシブル鉄筋
組立加工用ケーブル集束装置において、前記集束用ガイ
ド管群によつて形成された各ケーブルを円周上に固着す
る集束用リングを組合わせたことを特徴とするフレキシ
ブル鉄筋組立加工用ケーブル集束装置。
3. A flexible rebar assembly cable converging device according to claim 1 or 2, wherein a converging ring for concentrating each cable formed by the converging guide tube group on the circumference is combined. A cable concentrating device for flexible rebar assembling and processing.
JP32554090A 1990-11-29 1990-11-29 Cable Bundler for Flexible Rebar Assembly Processing Expired - Fee Related JPH0715223B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32554090A JPH0715223B2 (en) 1990-11-29 1990-11-29 Cable Bundler for Flexible Rebar Assembly Processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32554090A JPH0715223B2 (en) 1990-11-29 1990-11-29 Cable Bundler for Flexible Rebar Assembly Processing

Publications (2)

Publication Number Publication Date
JPH04198565A JPH04198565A (en) 1992-07-17
JPH0715223B2 true JPH0715223B2 (en) 1995-02-22

Family

ID=18178026

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32554090A Expired - Fee Related JPH0715223B2 (en) 1990-11-29 1990-11-29 Cable Bundler for Flexible Rebar Assembly Processing

Country Status (1)

Country Link
JP (1) JPH0715223B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4846017B2 (en) * 2009-12-18 2011-12-28 鹿島建設株式会社 Housing installation apparatus and housing installation method
JP2014050881A (en) * 2012-09-07 2014-03-20 Keishin Kogyo:Kk Reinforcement pulling-in device and reinforced cage horizontal assembling method thereof
JP6871781B2 (en) * 2017-03-31 2021-05-12 東日本旅客鉄道株式会社 Reinforcing bar cage pile head fixing and holding structure
CN108772506A (en) * 2018-07-09 2018-11-09 贵州新联爆破工程集团有限公司 A kind of full-automatic prestress wire blanking volume bundle device

Also Published As

Publication number Publication date
JPH04198565A (en) 1992-07-17

Similar Documents

Publication Publication Date Title
JP6871781B2 (en) Reinforcing bar cage pile head fixing and holding structure
JP3158383U (en) Body reinforcement assembly jig
JPH0715223B2 (en) Cable Bundler for Flexible Rebar Assembly Processing
CN113737789B (en) Self-drilling reinforcement system and self-drilling reinforcement method for soft soil layers
CN113089657B (en) Use method of built-in tubular pile connecting device
CN110260052B (en) Group pipe laying device at exit of pipe gallery on two sides of road and using method thereof
JP3735828B2 (en) Pile construction method using foldable rebar
JP3308916B2 (en) Ring cable insertion device for shield segment
CN218263909U (en) Soil body protective structure between foundation pit supporting structure bored concrete piles
KR101640139B1 (en) Method for constructing the foundation of steel tower and linker for ring irons
JPH0464697A (en) Construction of tunneling space
JP7809356B2 (en) Horizontal hole formation method
JP2001140592A (en) Tunnel lining segment and its construction method
JP3622173B2 (en) Concrete pile construction method using high strength strands
CN218060332U (en) Foundation pit supporting structure with spray anchor hanging net
JP3700074B2 (en) Reinforcing bar building device and method
CN216130118U (en) Pile-anchor supporting device capable of realizing bidirectional cushion block of anchor rod opposite pulling
JP3754365B2 (en) Telescopic beam for pier construction and pier construction method using this telescopic beam
JP2694070B2 (en) Earth anchor
CN221919387U (en) Anti-collapse hole structure of anchor cable hole
CN215053217U (en) A subway entrance and exit structure passing through underground pipelines
CN219954625U (en) Pre-buried spool protective bracket
CN210658017U (en) Support arrangement for steel strand wires construction
KR102382870B1 (en) supply and packing apparatus of the ground anchor
JP3990999B2 (en) Reinforcing material arrangement method for concrete electric pole, concrete electric pole reinforcing method, reinforced concrete electric pole, and concrete electric pole reinforcing material suspension jig

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees