Ion implantation monitoring controller

Info

Publication number
JPH0732501B2
JPH0732501B2 JP61086669A JP8666986A JPH0732501B2 JP H0732501 B2 JPH0732501 B2 JP H0732501B2 JP 61086669 A JP61086669 A JP 61086669A JP 8666986 A JP8666986 A JP 8666986A JP H0732501 B2 JPH0732501 B2 JP H0732501B2
Authority
JP
Japan
Prior art keywords
controller
control
transmission line
supervisory
system control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61086669A
Other languages
Japanese (ja)
Other versions
JPS62242496A (en
Inventor
荘治 西村
宏 辻田
重夫 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissin Electric Co Ltd
Original Assignee
Nissin Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nissin Electric Co Ltd filed Critical Nissin Electric Co Ltd
Priority to JP61086669A priority Critical patent/JPH0732501B2/en
Publication of JPS62242496A publication Critical patent/JPS62242496A/en
Publication of JPH0732501B2 publication Critical patent/JPH0732501B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明はイオン注入装置の監視制御に用いられるイオ
ン注入監視制御装置に関するものである。
Description: TECHNICAL FIELD The present invention relates to an ion implantation monitoring control device used for monitoring control of an ion implantation device.

〔従来の技術〕[Conventional technology]

第3図は従来のメカニカルスキャン型のイオン注入装置
およびこのメカニカルスキャン型のイオン注入装置を監
視制御するイオン注入監視制御装置の構成の一例を示す
ブロック図である。メカニカルスキャン型のイオン注入
装置は、イオン電流が1mA〜10mA程度の大電流用として
供されているものである。
FIG. 3 is a block diagram showing an example of the configuration of a conventional mechanical scan type ion implantation apparatus and an ion implantation monitoring control apparatus for monitoring and controlling the mechanical scanning type ion implantation apparatus. The mechanical scan type ion implanter is provided for a large current with an ion current of about 1 mA to 10 mA.

メカニカルスキャン型のイオン注入装置は、大きく分け
ればイオンを発生するイオン源1と、イオン源1から引
き出されたイオンビーム2から必要なイオン種を選択す
る質量分析器3と、この質量分析器3から出たイオンビ
ーム2を加速する加速管4と、加速管4を出たイオンビ
ーム2をウェハ5に当ててイオン注入を行うエンドステ
ーション6とで構成され、これらの内部は真空となって
いる。イオン源1には、ガスを供給するガスボックス7
と各種電圧,電流を供給するイオン源電源8と、イオン
ビーム2を引き出すための引出し電源9がつながれてい
る。質量分析器3には、質量分析マグネット(図示せ
ず)に給電するための分析マグネット電源10が、加速管
4には、加速電源11がそれぞれつながれている。
The mechanical scan type ion implanter is roughly divided into an ion source 1 for generating ions, a mass analyzer 3 for selecting a necessary ion species from an ion beam 2 extracted from the ion source 1, and this mass analyzer 3 It is composed of an accelerating tube 4 for accelerating the ion beam 2 emitted from the ion beam 2 and an end station 6 for applying the ion beam 2 emitted from the accelerating tube 4 to the wafer 5 for ion implantation, and the inside of these is a vacuum. . A gas box 7 for supplying a gas to the ion source 1.
An ion source power supply 8 for supplying various voltages and currents and an extraction power supply 9 for extracting the ion beam 2 are connected. An analysis magnet power supply 10 for supplying power to a mass analysis magnet (not shown) is connected to the mass analyzer 3, and an acceleration power supply 11 is connected to the acceleration tube 4.

イオン源1は、例えば固体オーブン付属の熱陰極PIG型
であって、フィラメント(図示せず)とアーク電極(図
示せず)とソースマグネット(図示せず)とを有し、イ
オン型電源(フィラメント電源,アーク電源,ソースマ
グネット電源,オーブン電源等)8から前記フィラメン
ト,アーク電極,、ソースマグネット等にそれぞれ給電
されることにより、ガスボックス7からアークチャンバ
に供給されるガスをイオン化する。具体的には、アーク
チャンバ内においてフィラメントからの熱電子放出をト
リガとしてアーク放電を行うことによりプラズマを作
る。そして、引き出し電源9から供給される例えば30KV
〜40KVの引き出し電圧によってスリット状のイオン引き
出し電極1aからイオンビーム2を引き出す。このイオン
電源1は、イオン源物質として、ガスだけでなく、固体
(As,P,Sb等)の使用も可能であり、固体を使用する場
合には、固体のイオン源物質を固体オーブンで蒸発させ
てアークチャンバに導くとともに、ガスボックス7から
キャリアガス(Ar等)をアークチャンバに導き、固体イ
オン物質をイオン化する。
The ion source 1 is, for example, a hot cathode PIG type attached to a solid oven, has a filament (not shown), an arc electrode (not shown), and a source magnet (not shown). A power supply, an arc power supply, a source magnet power supply, an oven power supply, etc.) 8 supplies power to the filament, the arc electrode, the source magnet, etc., respectively, so that the gas supplied from the gas box 7 to the arc chamber is ionized. Specifically, in the arc chamber, plasma is generated by performing arc discharge using thermionic emission from the filament as a trigger. And, for example, 30KV supplied from the drawer power supply 9
The ion beam 2 is extracted from the slit-shaped ion extraction electrode 1a by the extraction voltage of -40 KV. This ion power source 1 can use not only gas but also solid (As, P, Sb, etc.) as an ion source substance. When using a solid, the solid ion source substance is evaporated in a solid oven. While being guided to the arc chamber, a carrier gas (Ar or the like) is guided from the gas box 7 to the arc chamber to ionize the solid ionic substance.

ガスボックス7は、上記したイオン源1に接続され、例
えば4個のガスボトル(例えばAr,SiF4,BCl3,PCl等)を
内蔵し、必要なイオン種に対応していずれかの種類のガ
スを選択的にイオン源1へ供給する。
The gas box 7 is connected to the above-mentioned ion source 1 and has, for example, four gas bottles (for example, Ar, SiF 4 , BCl 3 , PCl, etc.) built therein, and is of any type corresponding to the required ion species. Gas is selectively supplied to the ion source 1.

質量分析器3は、分析マグネット電源10から90度偏向の
質量分析マグネットに給電され、イオン源1から引き出
されたイオンビーム2の中から必要なイオン種を選択す
るとともに、質量分析マグネットの磁気集束作用を利用
してイオンビーム2を分析スリット3aに絞り込んで加速
管4へ導く。この質量分析器3が必要であるのは、以下
の理由によるためである。イオン源1から引き出される
イオンの中には不要イオンが混在する場合が多い。例え
ばボロンイオンを引き出す場合、 BF3ガスを使用するが、この場合、必要なボロンイオン
の他にF+,BF+,BF2 +などの不要イオンが生じ、これらの
不要イオンがウェハ5に注入されると具合が悪いためで
ある。
The mass analyzer 3 is fed from the analysis magnet power source 10 to the mass analysis magnet which is deflected by 90 degrees to select a necessary ion species from the ion beam 2 extracted from the ion source 1 and to perform magnetic focusing of the mass analysis magnet. Using the action, the ion beam 2 is narrowed down to the analysis slit 3a and guided to the acceleration tube 4. The reason why the mass spectrometer 3 is necessary is because of the following reasons. Unwanted ions are often mixed in the ions extracted from the ion source 1. For example, when extracting boron ions, BF 3 gas is used. In this case, unnecessary ions such as F + , BF + , and BF 2 + are generated in addition to the necessary boron ions, and these unnecessary ions are injected into the wafer 5. This is because if you do this, you will feel sick.

上記質量分析器3は、質量分析マグネットに供給する電
流を調整することにより、必要なボロンイオンが真空チ
ャンバ中で丁度90度偏向されて分析スリット3aに導びか
れ、加速管4に入ることになる。一方、不要イオンは、
ボロンイオンとは質量が異なるため、質量分析器3の真
空チャンバの側壁に当たってそこで吸収される等し、分
析スリット3aには達しない。
The mass analyzer 3 adjusts the current supplied to the mass analysis magnet so that the necessary boron ions are deflected by 90 degrees in the vacuum chamber to be guided to the analysis slit 3a and enter the accelerating tube 4. Become. On the other hand, unwanted ions are
Since its mass is different from that of boron ions, it hits the side wall of the vacuum chamber of the mass analyzer 3 and is absorbed there, and does not reach the analysis slit 3a.

加速管4は、例えば絶縁物と金属製電極とを多段に接着
した構造で、各電極には加速電源11から抵抗(図示せ
ず)を通して一定の加速電圧が印加され、イオンビーム
2は前記した引き出し電圧とこの加速電圧とを合わせた
電圧で加速されてエンドステーション6に入ることにな
る。この加速電圧は注入エネルギに応じて設定される。
The accelerating tube 4 has, for example, a structure in which an insulator and a metal electrode are bonded in multiple stages, a constant accelerating voltage is applied to each electrode from a accelerating power source 11 through a resistor (not shown), and the ion beam 2 is described above. The terminal station 6 is accelerated by a voltage obtained by combining the extraction voltage and this acceleration voltage and enters the end station 6. This accelerating voltage is set according to the injection energy.

エンドステーション6は、イオンビーム2を静止させた
ままでディスク12を移動させるメカニカルスキャン式で
ある。ウェハ5はディスク12の円周上に装填され、ウェ
ハ5全面にイオンビーム2が均一に照射されるように、
インダクションモータ13およびステッピングモータ14に
よって、ディスク12が回転しながらビーム領域を並進運
動する。この場合、ディスク12の回転速度は一定である
が、並進運動は、ディスク12の移動速度がディスク12の
外周部と内周部で異なること、およびビーム電流の変動
にかかわらず、注入量をウェハ5全面にわたって均一に
する必要があることから、一定ではなく、並進速度を上
記の変化に応じて制御する必要がある。
The end station 6 is a mechanical scan type that moves the disk 12 while keeping the ion beam 2 stationary. The wafer 5 is loaded on the circumference of the disk 12 so that the entire surface of the wafer 5 is uniformly irradiated with the ion beam 2.
The disk 12 is translated by the induction motor 13 and the stepping motor 14 while rotating in the beam region. In this case, the rotation speed of the disk 12 is constant, but the translational movement is performed by changing the implantation dose to the wafer regardless of that the moving speed of the disk 12 is different between the outer peripheral portion and the inner peripheral portion of the disk 12 and the fluctuation of the beam current. 5 Since it is necessary to make it uniform over the entire surface, it is not constant, but it is necessary to control the translation speed according to the above change.

また、エンドステーション6は、イオン注入前にウェハ
5をディスク12に装填し、注入終了後にウェハ5をディ
スク12から取り出す。この際、ウェハ5の装填,取り出
しは、エンドステーション6の一部に設けたエアロック
(図示せず)を介して行い、エンドステーション6およ
びその前段の真空状態は保持するようにしている。
Further, the end station 6 loads the wafer 5 on the disk 12 before the ion implantation, and takes out the wafer 5 from the disk 12 after the implantation is completed. At this time, the wafer 5 is loaded and unloaded through an air lock (not shown) provided in a part of the end station 6, and the vacuum state of the end station 6 and the preceding stage thereof is maintained.

つぎに、上記したメカニカルスキャン型のイオン注入装
置を監視制御するイオン注入監視制御装置について説明
する。このイオン注入監視制御装置は、エンドステーシ
ョンコントローラ15,用役コントローラ16,注入コントロ
ーラ19,加速カントローラ20,マスコントローラ21,イオ
ン源コントローラ26,引き出し電圧コントローラ27,ガス
セレクトコントローラ28等から構成されている。
Next, an ion implantation monitoring control device for monitoring and controlling the above mechanical scan type ion implantation device will be described. This ion implantation monitoring controller comprises an end station controller 15, a utility controller 16, an implantation controller 19, an acceleration controller 20, a mass controller 21, an ion source controller 26, an extraction voltage controller 27, a gas select controller 28, etc. There is.

用役コントローラ16は、真空系の制御および装置の状態
監視を行うもので、真空計23,バルブ24,引出系やビーム
ラインのための真空ポンプ25,その他リミットスイッチ
などが接続され、真空ポンプ25やバルブ24のシーケンス
制御を行うとともに、真空度のデータおよびその他各種
用役の状態監視を行う。
The utility controller 16 controls the vacuum system and monitors the state of the apparatus, and is connected to a vacuum gauge 23, a valve 24, a vacuum pump 25 for the drawing system and the beam line, and other limit switches. And performs sequence control of the valve 24, and also monitors the degree of vacuum and the status of various other utilities.

イオン源コントローラ26は、イオン源1におけるプラズ
マ発生のコントローラで、イオン源1のパラメータ(フ
ィラメント電圧,アーク電圧,ソースマグネット電流
等)を変化させるようになっている。
The ion source controller 26 is a controller for generating plasma in the ion source 1, and is adapted to change the parameters (filament voltage, arc voltage, source magnet current, etc.) of the ion source 1.

ガスセレクトコントローラ28はイオン源1におけるプラ
ズマ発生のためのガス試料選択を行う。
The gas select controller 28 selects a gas sample for plasma generation in the ion source 1.

マスコントローラ21は所望のマス値のイオンビーム2を
得ることができるように質量分析器3に与える分析マグ
ネット電流の調整を行う。
The mass controller 21 adjusts the analysis magnet current given to the mass analyzer 3 so that the ion beam 2 having a desired mass value can be obtained.

具体的には、マス値に応じて質量分析器3に与える分析
マグネット電流を設定し、引き出し電圧コントローラ27
によって設定した引き出し電圧と上記分析マグネット電
流とから演算したマス値を引き出し電圧コントローラ27
に表示させる。なお、この際、マスコントローラ21は、
分析マグネット電流をビーム電流が最大となるように制
御して必要なイオンが常に分析マグネット3aに達するよ
うにする。
Specifically, the analysis magnet current given to the mass analyzer 3 is set according to the mass value, and the extraction voltage controller 27 is set.
The extraction voltage controller 27 extracts the mass value calculated from the extraction voltage set by
To display. At this time, the mass controller 21
The analysis magnet current is controlled so that the beam current is maximized so that necessary ions always reach the analysis magnet 3a.

加速コントローラ20は、必要な加速エネルギに応じて加
速電圧を設定する。
The acceleration controller 20 sets the acceleration voltage according to the required acceleration energy.

注入コントローラ19は、ドーズ量,ウェハサイズ等の制
御条件のデータをもとにしてディスク12の並進運動をス
テッピングモータドライバ29を経由して制御することに
よりウェハ5全面に均一にイオン注入がなされるように
し、かつビーム電流を変換器30でデジタル変換したもの
を入力して、ビーム電流を積分し、この積分値がウェハ
サイズおよびドーズ量によって決まる値に達したときに
イオン注入を停止させる。
The implantation controller 19 controls the translational motion of the disk 12 via the stepping motor driver 29 based on the data of the control conditions such as the dose amount and the wafer size, so that the entire surface of the wafer 5 is uniformly ion-implanted. In this way, the beam current is digitally converted by the converter 30, the beam current is integrated, and when the integrated value reaches a value determined by the wafer size and the dose amount, the ion implantation is stopped.

エンドステーションコントローラ15は、ウェハハンドリ
ングの制御を行うもので、例えばエアロックの真空度を
測定する真空計31,光センサ32からの信号をもとに真空
ポンプ33,バルブ34等の制御を行う。なお、このエンド
ステーションコントローラ15と、用役コントローラ16と
注入コントローラ19とは相互にインタロックがかけられ
ている。
The end station controller 15 controls wafer handling. For example, the end station controller 15 controls the vacuum pump 33, the valve 34, and the like based on signals from a vacuum gauge 31 that measures the vacuum degree of an airlock and an optical sensor 32. The end station controller 15, the utility controller 16, and the injection controller 19 are interlocked with each other.

テレメータ35は、大地側と高電圧部36と間のデータの送
受信を行うもので、大地側ユニットと高電圧部側ユニッ
トとは絶縁するための光ファイバ等で接続している。
The telemeter 35 transmits / receives data between the ground side and the high voltage section 36, and the ground side unit and the high voltage section side unit are connected by an optical fiber or the like for insulation.

このような従来装置においては、エンドステーションコ
ントローラ15,用役コントローラ16,注入コントローラ1
9,加速コントローラ20,マスコントローラ21,イオン源コ
ントローラ26,引き出し電圧コントローラ28等に操作器
および表示器を設け、すなわち、操作器および表示器を
分散配置し、各操作器および表示器によってイオン注入
装置の監視制御を行っていたため、操作性が悪く、大形
化するという問題があった。
In such a conventional device, the end station controller 15, the utility controller 16, the injection controller 1
9. Accelerator controller 20, mass controller 21, ion source controller 26, extraction voltage controller 28, etc. are provided with operating devices and indicators, that is, operating devices and indicators are distributed and ion implantation is performed by each operating device and display device. Since the device was monitored and controlled, there was a problem that the operability was poor and the device became large.

このような問題を解消するために第4図に示すようなイ
オン注入監視制御装置が既に提案されている。
In order to solve such a problem, an ion implantation monitoring control device as shown in FIG. 4 has already been proposed.

このイオン注入監視制御装置は、マンマシンコントロー
ラ51と、3台の系統制御用コントローラ52,53,54と、伝
送部55〜60と、伝送線61,62,63と、集中監視制御器64と
から構成され、マンマシンコントローラ51と系統制御用
コントローラ52〜54とが伝送部55〜60および伝送線61〜
63を介して接続され、マンマシンコントローラ51と集中
監視制御器64とが集中監視制御用伝送線65を介して接続
され、各系統制御用コントローラ52〜54にはイオン注入
装置を構成する各種要素機器(後述)が接続されてい
る。
This ion implantation monitoring control device includes a man-machine controller 51, three system control controllers 52, 53 and 54, transmission units 55 to 60, transmission lines 61, 62 and 63, and a central monitoring controller 64. The man-machine controller 51 and the system control controllers 52 to 54 are composed of a transmission section 55 to 60 and a transmission line 61 to.
63, the man-machine controller 51 and the centralized supervisory controller 64 are connected via a centralized supervisory control transmission line 65, and the system control controllers 52 to 54 are provided with various elements constituting an ion implantation apparatus. Equipment (described later) is connected.

用役系統の系統制御用コントローラ54には、真空計や各
種リミットスイッチなどの測定器72や、バルブ73、引き
出し系やビームラインのための真空ポンプ74等が接続さ
れている。この系統制御用コントローラ54により、イオ
ン注入装置の真空ポンプやバルブのシーケンス制御およ
び電源や各種用役の状態監視を行う。このイオン注入監
視制御装置は、自動と手動のモードを備えており、自動
時には、この系統制御用コントローラ54のみでシーケン
ス制御を行うことができ、手動時には、マンマシンコン
トローラ51からこの系統制御用コントローラ54を経由し
てイオン注入装置を制御することができる。イオン注入
装置の状態は、適当なタイミングで伝送線63上に乗せら
れ、他の系統制御用コントローラ52,53,マンマシンコン
トローラ51がこれを読み込む。
The system control controller 54 of the utility system is connected with a measuring device 72 such as a vacuum gauge and various limit switches, a valve 73, a vacuum pump 74 for a drawing system and a beam line, and the like. The system control controller 54 performs sequence control of vacuum pumps and valves of the ion implantation apparatus and state monitoring of power supplies and various utilities. This ion implantation monitoring control device has an automatic mode and a manual mode. In the automatic mode, the sequence control can be performed only by the system control controller 54. In the manual mode, the man-machine controller 51 can control the system control. The ion implanter can be controlled via 54. The state of the ion implanter is placed on the transmission line 63 at an appropriate timing, and the other system control controllers 52, 53 and the man-machine controller 51 read this.

エンドステーション系統の系統制御用コントローラ53に
は、ウェハハンドリングのための光センサ75,真空ポン
プ76,バルブ77およびモータ78等が接続されている。こ
の系統制御用コントローラ53によりウェハのハンドリン
グを制御する。自動時には、この系統制御用コントロー
ラ53のみで制御を行うことができる。この場合、系統制
御用コントローラ54からの情報によりタイミングを決定
する。手動時には、マンマシンコントローラ51からこの
系統制御用コントローラ53を経由してウェハのハンドリ
ングを制御することができる。イオン注入装置の状態
(例えば、ウェハの処理状況等)は、適当なタイミング
で伝送線62上に乗せられ、他のコントローラ(主として
マンマシンコントローラ51)がこれを読み込む。
An optical sensor 75 for wafer handling, a vacuum pump 76, a valve 77, a motor 78, etc. are connected to the system controller 53 of the end station system. Wafer handling is controlled by the system control controller 53. In the automatic mode, control can be performed only by the system control controller 53. In this case, the timing is determined based on the information from the system control controller 54. At the time of manual operation, wafer handling can be controlled from the man-machine controller 51 via the system control controller 53. The state of the ion implantation apparatus (for example, wafer processing state) is placed on the transmission line 62 at an appropriate timing, and is read by another controller (mainly the man-machine controller 51).

ビーム系統の系統制御用コントローラ58には、テレメー
タ79や真空計等の測定器81等が接続されている。テレメ
ータ79には、イオン源電源,引き出し電源、分析マグネ
ット電源,加速電源等の各種の電源80が接続されてい
る。この系統制御用コントローラ52により、測定器のデ
ータの読み込み、電源のパラメータの読み込み、電源の
パラメータ制御を行う信号の出力等が行われる。読み込
まれたデータは、伝送線61に乗せられてマンマシンコン
トローラ51に渡される。また、パラメータ制御信号はマ
ンマシンコントローラ51から送られてくる。
A telemeter 79, a measuring device 81 such as a vacuum gauge, and the like are connected to the system controller 58 of the beam system. Various power sources 80 such as an ion source power source, an extraction power source, an analysis magnet power source, and an acceleration power source are connected to the telemeter 79. The system control controller 52 reads the data of the measuring instrument, reads the parameters of the power supply, and outputs the signal for controlling the parameters of the power supply. The read data is placed on the transmission line 61 and passed to the man-machine controller 51. Also, the parameter control signal is sent from the man-machine controller 51.

この系統制御用コントローラ52には、ウェハディスク駆
動機構のためのステッピングモータ83を駆動するステッ
ピングモータ82やビーム電流をA/D変換する変換器84が
接続されている。この系統制御用コントローラ61によ
り、ビーム電流に基づいてウェハの装填されたディスク
の並進速度の制御が行なわれる。
A stepping motor 82 for driving a stepping motor 83 for a wafer disk drive mechanism and a converter 84 for A / D converting the beam current are connected to the system controller 52. The system control controller 61 controls the translation speed of the disk loaded with the wafer based on the beam current.

マンマシンコントローラ51は、CPU(中央処理装置)お
よびフロッピディスク装置等を備えており、CRT表示装
置およびキーボード等からなる集中監視制御器64によっ
て設定されたイオン注入のための種々の制御条件(加速
エネルギ,ビーム量,ドーズ量,イオン種,ウェハサイ
ズ等)を記憶するとともに、この制御条件のデータを各
系統制御用コントローラ52〜54へ送り、また系統制御用
コントローラ52〜54からの監視データを読み込み、これ
を集中監視制御器64へ送って各種監視データを表示させ
る。
The man-machine controller 51 includes a CPU (central processing unit), a floppy disk device, and the like, and various control conditions (acceleration) set by a central monitoring controller 64 including a CRT display device and a keyboard. Energy, beam amount, dose amount, ion species, wafer size, etc. are stored, and the data of this control condition is sent to each system control controller 52 to 54, and the monitoring data from the system control controllers 52 to 54 is sent. It is read and sent to the centralized monitoring controller 64 to display various monitoring data.

また、マンマシンコントローラ51は、集中監視制御器64
のCRT画面上に操作のガイダンスを表示し、集中監視制
御器64におけるファンクションキー,テンキーなどのキ
ーにより操作を行う。また、自動運転時には、イオン源
の立ち上げ,ビーム引き出し,ビーム集束等の調整制御
のための制御信号を伝送線61〜63に乗せて系統制御用コ
ントローラ52〜54に与える。例えばその制御信号に基づ
き各電源等に制御信号を与える。さらに、マンマシンコ
ントローラ64は、必要に応じてホストコンピュータとの
通信を行い、外部からの条件設定の読込み、イオン注入
装置の処理情報の送信等を行う。これはユーザ側のEDP
のためのものである。
In addition, the man-machine controller 51 is a central monitoring controller 64.
The operation guidance is displayed on the CRT screen of and the operation is performed using the keys such as the function keys and ten keys in the centralized monitoring controller 64. Further, during automatic operation, control signals for adjustment control such as ion source startup, beam extraction, and beam focusing are placed on the transmission lines 61 to 63 and given to the system control controllers 52 to 54. For example, a control signal is given to each power source based on the control signal. Further, the man-machine controller 64 communicates with the host computer as necessary, reads condition setting from the outside, transmits processing information of the ion implantation apparatus, and the like. This is the user EDP
Is for.

つぎに、前述したマンマシンコントローラ51,および系
統制御用コントローラ52〜54と伝送部55〜57とについて
説明する。
Next, the man-machine controller 51, the system control controllers 52 to 54, and the transmission units 55 to 57 described above will be described.

第5図は、コントローラ90および伝送部91を示すブロッ
ク図である。コントローラ90は前述したマンマシンコン
トローラ51,系統制御用コントローラ52〜54を一般的に
示したものであり、伝送部91は前述した伝送部55〜60を
一般的に示したものである。コントローラ90は、互いに
接続されたCPU90A、メモリ90BおよびI/Oインターフェー
ス90Cを備える。I/Oインターフェース90Cには、前述し
た各種の要素機器が接続される。伝送部91は、互いに接
続された受信部91A、送信部91Bおよびインターフェース
部91Cを備える。インターフェース部91Cには、伝送線92
が接続されている。
FIG. 5 is a block diagram showing the controller 90 and the transmission unit 91. The controller 90 generally indicates the man-machine controller 51 and the system control controllers 52 to 54 described above, and the transmission unit 91 generally indicates the transmission units 55 to 60 described above. The controller 90 includes a CPU 90A, a memory 90B and an I / O interface 90C which are connected to each other. The various component devices described above are connected to the I / O interface 90C. The transmission unit 91 includes a reception unit 91A, a transmission unit 91B, and an interface unit 91C that are connected to each other. The interface section 91C has a transmission line 92
Are connected.

受信部91Aは、伝送線92から情報送られてきたらこれを
取り込み、コントローラ90に送る。一方送信部91Bは、
コントローラ90からの送信情報を読み取りこの送信情報
を伝送線92へ送出する。
When receiving information from the transmission line 92, the receiving unit 91A takes in the information and sends it to the controller 90. On the other hand, the transmitter 91B
The transmission information from the controller 90 is read and this transmission information is sent to the transmission line 92.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

上記した既提案例のイオン注入監視制御装置は、集中監
視制御を行うため、集中監視制御装置64で一括して設定
動作を行い、集中監視制御装置64で設定したデータをマ
ンマシンコントローラ51へ送り、マンマシンコントロー
ラ51から各系統制御用ントローラ52〜54へ伝送部55〜60
および伝送線61〜63を通して送り、各系統制御用コント
ローラ52〜53から客死要素機器(電源80等)へ送り、ま
た、各要素機器(測定器81等)からの監視データを各系
統制御用コントローラ52〜54で集め、各系統制御用コン
トローラ52〜54から伝送部55〜60および伝送部61〜63を
通してマンマシンコントローラ51へ送り、マンマシンコ
ントローラ51から集中監視制御器64へ送って監視データ
を表示させるようにしていた。
The ion implantation monitoring control device of the above-mentioned proposed example performs centralized monitoring control so that the centralized monitoring control device 64 collectively performs the setting operation and sends the data set by the centralized monitoring control device 64 to the man-machine controller 51. , The transmission unit 55-60 from the man-machine controller 51 to the controllers 52-54 for controlling each system
And the transmission lines 61 to 63 to send from each system control controller 52 to 53 to the customer death element device (power supply 80 etc.) and the monitoring data from each element device (measuring instrument 81 etc.) to each system control controller. Collected by 52-54, sent from each system control controller 52-54 to the man-machine controller 51 through the transmission units 55-60 and the transmission units 61-63, and sent from the man-machine controller 51 to the central monitoring controller 64 to send the monitoring data. I was trying to display it.

ところが、このような集中監視制御は、前記した従来例
の欠点を解消できるものではあるが、集中監視制御器64
から各系統制御用コントローラ52〜54までの間に、マン
マシンコントローラ51,伝送部55〜60および伝送線61〜6
3が介在するため、集中監視制御器64の操作によって設
定された各種データが系統制御用コントローラ52〜54へ
伝わるまでにかなり時間を要し、また、系統制御用コン
トローラ52〜54から出力される監視データが集中監視制
御器64に表示されるまでにかなり時間を要することにな
り、監視制御の応答性が悪いという問題があった。
However, while such centralized monitoring control can solve the above-mentioned drawbacks of the conventional example, the centralized monitoring controller 64
To the controller 52 to 54 for each system, the man-machine controller 51, the transmission unit 55 to 60 and the transmission line 61 to 6
Since 3 is involved, it takes a considerable time for various data set by the operation of the centralized monitoring controller 64 to be transmitted to the system control controllers 52 to 54, and is output from the system control controllers 52 to 54. It takes a considerable amount of time for the monitoring data to be displayed on the centralized monitoring controller 64, which causes a problem of poor responsiveness of the monitoring control.

したがって、例えばオペレータが集中監視制御器64のCR
T画面を見ながらキーボードを操作することにより、例
えば引き出し電圧を監視しながら引き出し電圧の手動調
整を行う場合に上記したように監視制御の応答性が悪い
ため、この手動調整が容易でなかった。
Therefore, for example, the operator may
When the keyboard is operated while watching the T screen, for example, when the extraction voltage is manually adjusted while monitoring the extraction voltage, the responsiveness of the monitoring control is poor as described above, and thus the manual adjustment is not easy.

この発明の目的は、必要なときには監視制御の応答性を
良くすることができるイオン注入監視制御装置を提供す
ることである。
An object of the present invention is to provide an ion implantation monitoring control device capable of improving the response of monitoring control when necessary.

〔問題点を解決するための手段〕[Means for solving problems]

この発明のイオン注入監視制御装置は、イオン注入のた
めの複数系統の制御を与えられた制御条件に基づいてそ
れぞれ局部的に分散して行うとともに複数系統の監視デ
ータをそれぞれ取り込んで出力する複数の系統制御用コ
ントローラと、前記複数の系統制御用コントローラに対
する制御条件を前記複数の系統制御用コントローラにそ
れぞれ与えるとともに前記複数の系統制御用コントロー
ラから出力された監視データを取り込むマンマシンコン
トローラと、前記複数の系統制御用コントローラおよび
マンマシンコントローラにそれぞれ設けられた伝送部
と、これらの伝送部間に接続されて前記制御条件および
監視データの前記複数の系統制御用コントローラおよび
マンマシンコントローラ間での授受を行わせる伝送線
と、前記制御条件を設定するとともに前記監視データを
表示する集中監視制御器と、前記複数の系統制御用コン
トローラからそれぞれ引き出されて前記集中監視制御器
との間で前記制御条件および監視データの授受を行う複
数の個別監視制御用伝送線と、前記マンマシンコントロ
ーラから引き出されて前記集中監視制御器との間で前記
制御条件および監視データの授受を行う集中監視制御用
伝送線と、前記複数の個別監視制御用伝送線および集中
監視制御用伝送線のいずれか一つを選択的に前記集中監
視制御器につなぐ伝送線切替器とを備えている。
The ion implantation monitoring control apparatus of the present invention performs control of a plurality of systems for ion implantation in a locally dispersed manner based on a given control condition, and a plurality of systems that capture and output monitoring data of a plurality of systems, respectively. A system control controller, a man-machine controller that gives control conditions for the plurality of system control controllers to the plurality of system control controllers, respectively, and captures monitoring data output from the plurality of system control controllers; Of the system control controller and the man-machine controller, and the transfer of the control conditions and the monitoring data between the plurality of system control controllers and the man-machine controller, which are connected between these transmission parts. Set the transmission line and the control conditions In addition, a centralized supervisory controller that displays the supervisory data, and a plurality of individual supervisory controls that exchange the control conditions and the supervisory data with the central supervisory controller that are respectively drawn from the plurality of system control controllers. Transmission line, a centralized supervisory control transmission line for exchanging the control condition and supervisory data between the centralized supervisory controller drawn from the man-machine controller, and the plurality of individual supervisory control transmission lines, And a transmission line switcher for selectively connecting any one of the centralized supervisory control transmission lines to the centralized supervisory controller.

〔作用〕[Action]

この発明の構成によれば、複数の系統制御用コントロー
ラから複数の個別監視制御用伝送線を引き出し、マンマ
シンコントローラから引き出した集中監視制御用伝送線
とともに伝送線切替器に接続し、伝送線切替器に集中監
視制御器を接続し、伝送線切替器によって集中監視制御
用伝送線および個別監視制御用伝送線のいずれか一つを
選択的に集中監視制御器につなぐようにしたため、応答
性を良くする必要がある場合には、伝送線切替器によっ
て系統制御用コントローラと集中監視制御器とをつなぐ
ようにすれば、応答性を良くすることができる。
According to the configuration of the present invention, a plurality of individual supervisory control transmission lines are drawn from a plurality of system control controllers and connected to a transmission line switching device together with a centralized supervisory control transmission line drawn from a man-machine controller to switch transmission lines. The central monitoring controller is connected to the controller, and the transmission line switching device selectively connects one of the central monitoring control transmission line and the individual monitoring control transmission line to the central monitoring controller. When it is necessary to improve the responsiveness, it is possible to improve the responsiveness by connecting the system control controller and the centralized supervisory controller with a transmission line switch.

〔実施例〕〔Example〕

この発明の一実施例を第1図および第2図に基づいて説
明する。このイオン注入監視制御装置は、第1図に示す
ように、複数の系統制御用コントローラ52〜54と、マン
マシンコントローラ51と、伝送部55〜60と、伝送線61〜
63と、集中監視制御器64と、複数の個別監視制御用伝送
線66〜68と、集中監視制御用伝送線65とを備えている。
An embodiment of the present invention will be described with reference to FIGS. 1 and 2. As shown in FIG. 1, this ion implantation monitoring control device includes a plurality of system control controllers 52 to 54, a man-machine controller 51, transmission units 55 to 60, and transmission lines 61 to.
63, a centralized supervisory controller 64, a plurality of individual supervisory control transmission lines 66 to 68, and a central supervisory control transmission line 65.

この場合において、複数の系統制御用コントローラ52〜
54は、イオン注入のための複数系統の制御を与えられた
制御条件に基づいてそれぞれ局部的に分散して行うとと
もに複数系統の監視データをそれぞれ取り込んで出力す
るように構成されており、マンマシンコントローラ51
は、前記複数の系統制御用コントローラ52〜54に対する
制御条件を前記複数の系統制御用コントローラ52〜54に
それぞれ与えるとともに前記複数の系統制御用コントロ
ーラ52〜54から出力された監視データを取り込むように
構成されている。
In this case, a plurality of system control controllers 52-
The 54 is configured to locally control multiple systems for ion implantation based on given control conditions and to capture and output monitoring data of multiple systems. Controller 51
The control conditions for the plurality of system control controllers 52 to 54 are given to the plurality of system control controllers 52 to 54, respectively, and the monitoring data output from the plurality of system control controllers 52 to 54 is captured. It is configured.

伝送部55〜60は、前記複数の系統制御用コントローラ52
〜54およびマンマシンコントローラ51にそれぞれ設けら
れ、これらの伝送部52〜54間に接続された伝送線61〜63
が前記制御条件および監視データの前記複数の系統制御
用コントローラ52〜54およびマンマシンコントローラ51
間での授受を行わせることになる。
The transmission units 55 to 60 include the plurality of system control controllers 52.
To 54 and man-machine controller 51, and transmission lines 61 to 63 connected between these transmission units 52 to 54, respectively.
Is a plurality of system control controllers 52 to 54 and a man-machine controller 51 for the control conditions and monitoring data.
It will be exchanged between them.

集中監視制御器64は、CRT表示装置およびキーボード等
からなり、制御条件を設定するとともに前記監視データ
を表示するようになっている。
The centralized supervisory controller 64 is composed of a CRT display device, a keyboard and the like, and sets the control conditions and displays the supervisory data.

複数の個別監視制御用伝送線66〜68は、前記複数の系統
制御用コントローラ52〜54からそれぞれ引き出されて前
記集中監視制御器64との間で前記制御条件および監視デ
ータの授受を行い、集中監視制御用伝送線65は、マンマ
シンコントローラ51から引き出されて前記集中監視制御
器64との間で前記制御条件および監視データの授受を行
う。
The plurality of individual supervisory control transmission lines 66 to 68 are drawn from the plurality of system control controllers 52 to 54, respectively, exchange the control conditions and supervisory data with the central supervisory controller 64, and centralize. The supervisory control transmission line 65 is drawn out from the man-machine controller 51 and exchanges the control condition and the supervisory data with the central supervisory controller 64.

伝送線切替器69は、前記複数の個別監視制御用伝送線66
〜68および集中監視制御用伝送線65のいずれか一つを選
択的に前記集中監視制御器64につなぐようになってい
る。
The transmission line switching device 69 includes the plurality of individual supervisory control transmission lines 66.
~ 68 and the centralized supervisory control transmission line 65 are selectively connected to the centralized supervisory controller 64.

このイオン注入監視制御装置は、第4図のものと比べ
て、各系統制御用コントローラ52〜54から個別監視制御
用伝送線66〜68を引き出し、マンマシンコントローラ64
から引き出した集中監視制御用伝送線65とともに伝送線
切替器69に接続し、伝送線切替器69に集中監視制御器64
および伝送線選択器70を接続した点が相違する。
Compared with that of FIG. 4, this ion implantation monitoring control device draws out individual monitoring control transmission lines 66 to 68 from the respective system control controllers 52 to 54, and uses the man-machine controller 64.
Connected to the transmission line switching device 69 together with the centralized monitoring control transmission line 65 extracted from the
The difference is that the transmission line selector 70 is connected.

伝送線切替器69および伝送線選択器70は具体的には、第
2図のように構成される。すなわち、伝送線切替器69
は、スリーステートバッファB11,B12,B21,B22,B31,B32
とからなり、伝送線選択器70はセレクトスイッチSW等か
らなり、セレクトスイッチSWを例えばaの位置にする
と、スリーステートバッファB11,B12が導通し、マンマ
シンコントローラ51と集中監視制御器64とがつながり、
セレクトスイッチSWを例えばbの位置にすると、スリー
ステートバッファB21,B22が導通し、系統制御用コント
ローラ52と集中監視制御器64とがつながり、セレクトス
イッチSWを例えばcの位置にするとスリーステートバッ
ファB31,B32が導通し、系統制御用コントローラ54と集
中監視制御器64とがつながる。なお、この図では、集中
監視制御用伝送線65および個別監視制御用伝送線66〜68
は、制御用伝送線と監視用伝送線とを分けて書いてい
る。
The transmission line switch 69 and the transmission line selector 70 are specifically configured as shown in FIG. That is, the transmission line switch 69
Is a three-state buffer B 11 ,, B 12 ,, B 21 ,, B 22 ,, B 31 ,, B 32
The transmission line selector 70 comprises a select switch SW and the like. When the select switch SW is set to, for example, the position a, the three-state buffers B 11 and B 12 are brought into conduction, and the man-machine controller 51 and the centralized supervisory controller 64. Connected to
When the select switch SW is set to, for example, the b position, the three-state buffers B 21 and B 22 are brought into conduction, the system control controller 52 and the centralized supervisory controller 64 are connected, and when the select switch SW is set to, for example, the c position, the three-state buffers are connected. The buffers B 31 and B 32 become conductive, and the system control controller 54 and the centralized monitoring controller 64 are connected. In this figure, the central supervisory control transmission line 65 and the individual supervisory control transmission lines 66 to 68 are shown.
Describes the control transmission line and the monitoring transmission line separately.

このように構成すると、例えば引き出し電圧の測定値を
見ながら引き出し電圧を手動調整する場合、伝送線切替
器70を操作して伝送線切替器69により系統制御用コント
ローラ52と集中監視制御器64とをつないでおくと、集中
監視制御器64によって例えば引き出し電圧の上昇を指令
した場合、この信号が集中監視制御器64から伝送線切替
器69,個別監視制御用伝送線66を通して系統制御用コン
トローラ52へ入り、引き出し電圧の測定値は上記と逆の
経路で集中監視制御器64へ入ることになる。
With this configuration, for example, when manually adjusting the extraction voltage while observing the measured value of the extraction voltage, the transmission line switching device 70 is operated to cause the transmission line switching device 69 to operate the system control controller 52 and the centralized monitoring controller 64. If the centralized supervisory controller 64 issues an instruction to increase the extraction voltage, for example, this signal is transmitted from the centralized supervisory controller 64 through the transmission line switch 69 and the individual supervisory control transmission line 66 to the system control controller 52. Then, the measured value of the extraction voltage enters the centralized monitoring controller 64 by a route reverse to the above.

なお、その他の構成および作用は第4図のものと同じで
ある。
The other structure and operation are the same as those in FIG.

この実施例のイオン注入監視制御装置は、系統制御用コ
ントローラ52〜54から個別監視制御用伝送線66〜68を引
き出し、マンマシンコントローラ51から引き出した集中
監視制御用伝送線65とともに伝送線切替器69を接続し、
伝送線切替器69に集中監視制御器64を接続し、伝送線選
択器70による選択によって集中監視制御用伝送線65およ
び個別監視制御用伝送線66〜68のいずれか一つを選択的
に集中監視制御器64につなぐようにしたため、例えば引
き出し電圧の手動調整時のように応答性を良くする必要
がある場合には、伝送線選択器70を操作して系統制御用
コントローラ52と集中監視制御器64とをつなぐようにす
れば、応答性を良くすることができ、その調整を容易に
行うことができる。
The ion implantation monitoring control apparatus of this embodiment draws out individual monitoring control transmission lines 66 to 68 from the system control controllers 52 to 54, and a transmission line switching device together with the centralized monitoring control transmission line 65 drawn from the man-machine controller 51. Connect 69,
The centralized supervisory controller 64 is connected to the transmission line switching device 69, and one of the centralized supervisory control transmission line 65 and the individual supervisory control transmission lines 66 to 68 is selectively concentrated by selection by the transmission line selector 70. Since it is connected to the supervisory controller 64, when it is necessary to improve the responsiveness such as when manually adjusting the extraction voltage, the transmission line selector 70 is operated to operate the system controller 52 and the centralized supervisory control. If the device 64 is connected, the response can be improved and the adjustment can be easily performed.

なお、この発明はイオン注入装置の形式には全く制限さ
れず、例えば静電スキャン型のイオン注入装置にも、こ
の発明を適用できる。また、手動調整の項目としては、
引き出し電圧だけでなく、各種電圧,電流等が考えられ
る。
It should be noted that the present invention is not limited to the type of the ion implanter, and the present invention can be applied to, for example, an electrostatic scan type ion implanter. Also, as the items of manual adjustment,
Not only the extraction voltage but also various voltages, currents, etc. are conceivable.

〔発明の効果〕〔The invention's effect〕

この発明のイオン注入監視制御装置によれば、複数の系
統制御用コントローラから複数の個別監視制御用伝送線
を引き出し、マンマシンコントローラから引き出した集
中監視制御用伝送線とともに伝送線切替器に接続し、伝
送線切替器に集中監視制御器を接続し、伝送線切替器に
よって集中監視制御用伝送線および個別監視制御用伝送
線のいずれか一つを選択的に集中監視制御器につなぐよ
うにしたため、応答性を良くする必要がある場合には、
伝送線切替器によって系統制御用コントローラと集中監
視制御器とをつなぐようにすれば、応答性を良くするこ
とができる。
According to the ion implantation monitoring control device of the present invention, a plurality of individual monitoring control transmission lines are drawn from a plurality of system control controllers and connected to a transmission line switching device together with a central monitoring control transmission line drawn from a man-machine controller. , The centralized supervisory controller was connected to the transmission line switching device, and the transmission line switching device selectively connected either one of the centralized supervisory control transmission line and the individual supervisory control transmission line to the centralized supervisory controller. If you need to improve responsiveness,
If the system control controller and the centralized supervisory controller are connected by the transmission line switch, the responsiveness can be improved.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの発明の一実施例を示すブロック図、第2図
は第1図の要部の具体的なブロック図、第3図は従来例
を示すブロック図、第4図は既提案例を示すブロック
図、第5図は第4図の要部の具体的なブロック図であ
る。 51……マンマシンコントローラ、52〜54……系統制御用
コントローラ、55〜60……伝送部、61〜63……伝送線、
64……集中監視制御器、65……集中監視制御用伝送線、
66〜68……個別監視制御用伝送線、69……伝送線切替器
FIG. 1 is a block diagram showing an embodiment of the present invention, FIG. 2 is a concrete block diagram of an essential part of FIG. 1, FIG. 3 is a block diagram showing a conventional example, and FIG. 4 is an already proposed example. FIG. 5 is a concrete block diagram of an essential part of FIG. 51 ... Man-machine controller, 52-54 ... System control controller, 55-60 ... Transmission section, 61-63 ... Transmission line,
64 …… Centralized supervisory controller, 65 …… Centralized supervisory control transmission line,
66-68 …… Transmission line for individual monitoring and control, 69 …… Transmission line switch

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】イオン注入のための複数系統の制御を与え
られた制御条件に基づいてそれぞれ局部的に分散して行
うとともに複数系統の監視データをそれぞれ取り込んで
出力する複数の系統制御用コントローラと、前記複数の
系統制御用コントローラに対する制御条件を前記複数の
系統制御用コントローラにそれぞれ与えるとともに前記
複数の系統制御用コントローラから出力された監視デー
タを取り込むマンマシンコントローラと、前記複数の系
統制御用コントローラおよびマンマシンコントローラに
それぞれ設けられた伝送部と、これらの伝送部間に接続
されて前記制御条件および監視データの前記複数の系統
制御用コントローラおよびマンマシンコントローラ間で
の授受を行わせる伝送線と、前記制御条件を設定すると
ともに前記監視データを表示する集中監視制御器と、前
記複数の系統制御用コントローラからそれぞれ引き出さ
れて前記集中監視制御器との間で前記制御条件および監
視データの授受を行う複数の個別監視制御用伝送線と、
前記マンマシンコントローラから引き出されて前記集中
監視制御器との間で前記制御条件および監視データの授
受を行う集中監視制御用伝送線と、前記複数の個別監視
制御用伝送線および集中監視制御用伝送線のいずれか一
つを選択的に前記集中監視制御器につなぐ伝送線切替器
とを備えたイオン注入監視制御装置。
1. A plurality of system control controllers for locally controlling a plurality of systems for ion implantation based on a given control condition and for capturing and outputting monitoring data of a plurality of systems, respectively. , A man-machine controller that gives control conditions for the plurality of system control controllers to the plurality of system control controllers and that captures monitoring data output from the plurality of system control controllers, and the plurality of system control controllers And a transmission section respectively provided in the man-machine controller, and a transmission line connected between these transmission sections for exchanging the control conditions and the monitoring data between the plurality of system control controllers and the man-machine controller. , Set the control conditions, and And a plurality of individual supervisory control transmission lines that are respectively drawn from the plurality of system control controllers and exchange the control conditions and supervisory data with the central supervisory controller. ,
A central supervisory control transmission line that is drawn from the man-machine controller to exchange the control conditions and supervisory data with the central supervisory controller, and a plurality of individual supervisory control transmission lines and a central supervisory control transmission line. An ion implantation monitoring and control device comprising: a transmission line switching device for selectively connecting any one of the lines to the centralized monitoring and control device.
JP61086669A 1986-04-15 1986-04-15 Ion implantation monitoring controller Expired - Lifetime JPH0732501B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61086669A JPH0732501B2 (en) 1986-04-15 1986-04-15 Ion implantation monitoring controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61086669A JPH0732501B2 (en) 1986-04-15 1986-04-15 Ion implantation monitoring controller

Publications (2)

Publication Number Publication Date
JPS62242496A JPS62242496A (en) 1987-10-23
JPH0732501B2 true JPH0732501B2 (en) 1995-04-10

Family

ID=13893438

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61086669A Expired - Lifetime JPH0732501B2 (en) 1986-04-15 1986-04-15 Ion implantation monitoring controller

Country Status (1)

Country Link
JP (1) JPH0732501B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0723901Y2 (en) * 1987-11-16 1995-05-31 日新電機株式会社 Ion implantation controller

Also Published As

Publication number Publication date
JPS62242496A (en) 1987-10-23

Similar Documents

Publication Publication Date Title
US3733484A (en) Control for electron microprobe
JPH05343019A (en) Charged particle beam device and observation thereof
JP2023501895A (en) Isolated linac resonator pickup circuit
Fan et al. Telemicroscopy
JPH0732501B2 (en) Ion implantation monitoring controller
Mous et al. Recent developments at HVEE
CN110178199A (en) Charged particle beam system and method
von Reden et al. Performance characteristics of the 3 MV Tandetron AMS system at the National Ocean Sciences AMS facility
JPH03190044A (en) Electron beam accelerator
JPS62128424A (en) Control system for ion implantation device
JPS62126536A (en) Controller for ion implanter
JPH09274883A (en) FIB / SEM combined device
JPS62126535A (en) Control system for ion implanter
JPH05135737A (en) Mass spectrometry, peak switching method and mass spectrometer
JPH0723901Y2 (en) Ion implantation controller
JPH0234151B2 (en)
JP2019169434A (en) Charged particle beam alignment device, charged particle beam radiation device, and charged particle beam alignment method
JPH10260145A (en) Energy dispersion type x-ray micro analyzer
JPH07326649A (en) Remote control system of semiconductor manufacturing equipment
JP2870891B2 (en) X-ray micro analyzer
CN118778494B (en) An electronic control system for a double-focusing mass spectrometer; a double-focusing mass spectrometer
JPS62143351A (en) Automatic optical axis adjuster
JPH0793124B2 (en) Ion implanter
JPH10302704A (en) Charged particle beam equipment
JP2000164398A (en) Tandem accelerator