Forming method for formwork-integrated cloth foundation and formwork-integrated cloth foundationInfo
- Publication number
- JPH0733675B2 JPH0733675B2 JP22919792A JP22919792A JPH0733675B2 JP H0733675 B2 JPH0733675 B2 JP H0733675B2 JP 22919792 A JP22919792 A JP 22919792A JP 22919792 A JP22919792 A JP 22919792A JP H0733675 B2 JPH0733675 B2 JP H0733675B2
- Authority
- JP
- Japan
- Prior art keywords
- base
- formwork
- mold
- support
- cloth foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Foundations (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、一般家屋、ガレージ、
鉄骨建造物、土留擁壁等を建設する場合の布基礎を形成
するのに用いて好適な型枠一体型布基礎及び型枠一体型
布基礎の成形工法に関する。BACKGROUND OF THE INVENTION The present invention is applicable to general houses, garages,
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a formwork-integrated cloth foundation suitable for forming a cloth foundation in the case of constructing a steel frame building, a retaining wall, etc. and a method for forming the formwork-integrated cloth foundation.
【0002】[0002]
【従来の技術】従来、建物の布基礎を成形する場合に
は、下記の工法が一般に行われている。即ち、根切と割
栗石の転圧を行った後、第一工程として均しコンクリー
ト用型枠の組立、均しコンクリートの打設及び養生、前
記型枠の解体及び清掃を行う。第二工程として、ベース
型枠用墨出し、ベース型枠の組立、ベース配筋の結束、
ベースコンクリートの打設及び養生、ベース型枠の解体
及び清掃を行う。更に、第三工程として、布基礎配筋の
組立、布基礎用内枠及び外枠の組立、ホームタイによる
枠間調整、単管による型枠の補強、布コンクリートの打
設と養生、内枠及び外枠の解体を行う。そして、最後に
布基礎周囲への土の埋戻しの作業を行うことにより、布
基礎成形作業が終了する。2. Description of the Related Art Conventionally, the following construction methods have been generally used for forming a cloth foundation of a building. That is, after performing root cutting and rolling compaction of stones, as a first step, assembling a formwork for leveling concrete, placing and curing leveling concrete, disassembling and cleaning the formwork. As the second step, marking out the base formwork, assembling the base formwork, binding the base reinforcement,
Placing and curing base concrete, dismantling and cleaning the base formwork. Furthermore, as the third step, assembling the fabric foundation reinforcement, assembling the inner and outer frames for the fabric foundation, adjusting the frames with the home tie, reinforcing the formwork with a single pipe, placing and curing the cloth concrete, the inner frame And dismantle the outer frame. Then, finally, the work of backfilling the soil around the cloth foundation is performed, thereby completing the cloth foundation forming operation.
【0003】[0003]
【発明が解決しようとする課題】上述の如く従来技術に
あっては、大別して三工程が必要とされるが、これらの
工程には次のような欠点がある。 (イ)根切内の均しコンクリート、ベースコンクリート
及び布コンクリートの打設、養生をそれぞれ行うため、
工期に長期間を必要とする。 (ロ)型枠をタル木で補強した後、更にホームタイによ
って内枠と外枠の幅決めを必要とするため、極めて作業
性が悪い。 (ハ)型枠(コンクリートパネル)は2〜3回の再使用
が可能であるが、使用の度毎にコンクリート片を除去す
る清掃、油塗り作業を行わなければならず、多大の労力
が必要である。また、型枠の保管場所も必要とされる。As described above, according to the prior art, roughly three steps are required, but these steps have the following drawbacks. (B) In order to place and cure leveling concrete, base concrete and cloth concrete in the root cutting respectively,
It requires a long period of construction. (B) Since the width of the inner frame and the outer frame needs to be determined by the home tie after the formwork is reinforced with the tall wood, workability is extremely poor. (C) The formwork (concrete panel) can be reused 2-3 times, but it requires a great deal of effort because cleaning and oiling work must be performed to remove concrete pieces each time it is used. Is. In addition, a storage place for the formwork is also required.
【0004】(ニ)型枠組立時に誤差ができるためにコ
ンクリートの接続部分のはつりが必要であり、作業に多
大の労力を要する。 (ホ)根切の後布コンクリートが硬化して埋戻す迄は足
場が悪いため、作業性が阻害されると共に、危険性を伴
っている。 (ヘ)ベース配筋、横筋の結束作業が必要である共に、
熟練を要する。しかも型枠の組立中や生コンクリートの
打設時に配筋の乱れが生じる場合がある。 (ト)生コンクリート打設時の内圧に対して型枠の外側
を単管(補強管)で支持しなければならず、資材、労力
が必要とされる。(D) Since there is an error in assembling the formwork, it is necessary to chip the concrete connection portion, which requires a great deal of work. (E) Since the scaffolding is bad until the concrete is hardened and backfilled after root cutting, workability is impaired and there is a risk. (F) Base bar arrangement and horizontal muscle binding work are required,
Requires skill. Moreover, there is a case where the reinforcement is disturbed during the assembling of the formwork or when pouring the ready-mixed concrete. (G) A single pipe (reinforcement pipe) must be used to support the outside of the formwork against the internal pressure when pouring fresh concrete, which requires materials and labor.
【0005】(チ)均しコンクリート、ベースコンクリ
ート、布コンクリートを3回に分けて打設するため、各
コンクリート相互間の付着性が悪く、耐久性に欠け易
い。 (リ)多くの作業工程を必要とするために工期に長期間
掛り、雨、雪、風等の天候の影響を受け易く、作業中止
を余技なくされる場合も生じる。 (ヌ)布基礎成形後の型枠、単管等の資材の解体、撤去
作業が必要とされる。 (ル)生コンクリートの打設後、多数のアンカーボルト
を所定間隔毎に植設しなければならないが、一部のアン
カーボルトの植設を忘れたり、間隔にばらつきが出た
り、アンカーボルトが傾いたりする場合が生じる。(H) Since the leveling concrete, the base concrete and the cloth concrete are placed in three times, the adhesion between the concretes is poor and the durability is likely to be impaired. (I) Since many work steps are required, it takes a long period of time for construction, and it is easily affected by weather such as rain, snow, and wind, and there are cases where the work must be stopped. (G) It is necessary to dismantle and remove materials such as formwork and single pipes after forming the fabric foundation. (L) After pouring ready-mixed concrete, a large number of anchor bolts must be planted at specified intervals, but some of the anchor bolts are forgotten to be planted, the intervals vary, and the anchor bolts tilt. There may be cases where
【0006】(オ)型枠の組立には専門家の型枠大工が
必要とされる。 (ワ)モルタルによって天端仕上げを行うため、モルタ
ルにひびや割れが生じて土台との密着性が悪くなる場
合、更には土台の変形を生じる場合がある。 (カ)地面から上方に突出する布基礎の外面は塗装仕上
げが必要とされる。 叙上の如く従来技術にあっては、多くの工程を必要と
し、また、各工程に熟練した職人を必要とするため、作
業期間が長くなるという問題及び成形作業費が嵩むとい
う問題がある。(E) A professional carpenter carpenter is required to assemble the formwork. (W) Since the top end is finished with mortar, cracks or cracks may occur in the mortar, resulting in poor adhesion to the base, or even deformation of the base. (F) The outer surface of the cloth foundation projecting upward from the ground needs to be painted. As described above, in the conventional technique, many steps are required, and a skilled worker is required for each step, so that there is a problem that the working period becomes long and a molding operation cost increases.
【0007】本発明は上述した従来技術の多くの欠点に
鑑みなされたもので、組立が簡単でしかも強度性の高い
型枠一体型布基礎、及び成形工程を従来と比較して大幅
に減少でき、また各工程を単純化してあるため、工期を
大幅に短縮することができる型枠一体型布基礎の成形工
法を提供することを目的とする。The present invention has been made in view of the above-mentioned many drawbacks of the prior art, and it is possible to greatly reduce the number of mold frame-integrated cloth foundations which are easy to assemble and have high strength, and the molding process as compared with the conventional art. Moreover, since each process is simplified, it is an object to provide a method for forming a mold-integrated cloth foundation that can significantly reduce the construction period.
【0008】[0008]
【課題を解決するための手段】上述した課題を解決する
ために構成された本発明の型枠一体型布基礎は、ベース
型枠支持板7を高さ方向に調整可能に備え、根切1の幅
方向中央で、かつ、長手方向に離間して立設する複数の
型枠支持体3と、該各型枠支持体3の下部側に位置して
該型枠支持体3間に格子状に配設固着するベース配筋部
8と、該ベース配筋部8を覆うように前記ベース型枠支
持板7に水平に支持された状態で前記根切1内に列設す
るベース型枠部9と、該ベース型枠部9の上方に位置し
て前記型枠支持体3間に架設する横筋13と、該横筋1
3及び前記型枠支持体3と係合した状態で前記ベース型
枠部9上に積重する布基礎型枠部14と、該布基礎型枠
部14からベース型枠部9内に打設する生コンクリート
Aと、前記布基礎型枠部14の上端に固着する長方形の
天端仕上板18とからなる。The formwork-integrated cloth foundation of the present invention constructed to solve the above-mentioned problems is provided with a base formwork support plate 7 adjustable in the height direction, and a root cutting 1 widthwise center at a, and a plurality of formwork support 3 erected in longitudinally spaced, grid pattern between the mold frame support 3 is positioned on the lower side of the respective mold support 3 Base reinforcement that is fixedly attached to the
8 , base mold parts 9 that are arranged in a row in the root cutting 1 while being horizontally supported by the base mold support plate 7 so as to cover the base bar arrangement parts 8 , and the base mold parts 9 A horizontal bar 13 which is located above the frame and is installed between the formwork supports 3, and the horizontal bar 1
3 and the cloth base mold part 14 that is stacked on the base mold part 9 in a state of being engaged with the mold support body 3, and is cast from the cloth base mold part 14 into the base mold part 9 . Ready-to-use concrete
A, and a rectangular top end finishing plate 18 fixed to the upper end of the cloth foundation mold part 14 .
【0009】そして、前記天端仕上板18には上、下両
面に突出した状態で複数本のアンカーボルト19を長手
方向に隔設するとよい。It is preferable that a plurality of anchor bolts 19 are provided on the top end finishing plate 18 so as to project in both upper and lower surfaces in the longitudinal direction.
【0010】また、本発明に係る型枠一体型布基礎の成
形工法は、 (1)敷地に所定深さの根切1を掘削する工程、 (2)前記根切1の底面に均一な割栗石層2を形成する
工程、 (3)ベース型枠支持板7を高さ方向に調整可能に備え
た複数の型枠支持体3を前記根切1の幅方向中央で、か
つ、長手方向に所定間隔離間して立設する工程、 (4)前記型枠支持体3の下部側で前記ベース型枠支持
板7の上方に位置して前記根切1内に格子状のベース配
筋部8を配設する工程、 (5)前記型枠支持体3に係合した状態で前記ベース配
筋部8を覆うように前記ベース型枠支持板7上にベース
型枠部9を列設する工程、 (6)前記ベース型枠部9の上方に位置して前記型枠支
持体3間に横筋13を架設する工程、 (7)前記型枠支持体3に係合した状態で前記ベース型
枠部9上に複数段の布基礎型枠部14を積重すると共
に、各段の布基礎型枠15、16、17内に前記型枠支
持体3と交差した状態で横筋13を配設する工程、 (8)前記ベース型枠部9及び布基礎型枠部14の外側
面両側に土の埋戻し及び盛土を行う工程、 (9)土の埋戻し及び盛土後、前記ベース型枠部9及び
布基礎型枠部14内に生コンクリートAを打設する工
程、 (10)前記生コンクリートAの打設後、前記布基礎型
枠部14の上端に天端仕上板18を敷設する工程、 (11)前記生コンクリートAの硬化後、前記布基礎型
枠部14の外側面両側から盛土を除去する工程、から構
成される。The method for forming a cloth foundation integrated with a formwork according to the present invention includes (1) a step of excavating a root cutting 1 having a predetermined depth in a site, (2) a uniform cutting on the bottom surface of the root cutting 1. A step of forming a cobblestone layer 2 , (3) a plurality of formwork supports 3 provided with a base formwork support plate 7 adjustable in the height direction, in the widthwise center of the root cutting 1 and in the longitudinal direction A step of standing up at a predetermined interval, (4) supporting the base formwork on the lower side of the formwork support 3
A step of arranging a lattice-shaped base reinforcing bar portion 8 in the root cutting 1 located above the plate 7 , (5) the base reinforcing bar portion 8 in the state of being engaged with the mold support 3 ; A step of arranging the base mold parts 9 on the base mold support plate 7 so as to cover them, (6) laying a horizontal streak 13 between the mold frame supports 3 located above the base mold parts 9 And (7) stacking a plurality of stages of cloth foundation form parts 14 on the base form part 9 in a state of being engaged with the form support 3 and forming cloth base forms 15 of each stage , A step of arranging the horizontal streaks 13 in 16 and 17 in a state of intersecting with the form support 3 ; (8) backfilling of soil on both outer side surfaces of the base form 9 and the cloth foundation form 14 ; step for embankment, (9) after backfilling and embankment soil, a step of pouring the fresh concrete a to the base mold part 9 and fabric foundation mold portion 14 (10) after casting of the raw concrete A, the step of laying the Tentan finishing plate 18 to the upper end of the fabric foundation formwork section 14, (11) after curing of the raw concrete A, the fabric foundation formwork section 14 The step of removing the embankment from both sides of the outer surface.
【0011】[0011]
【作用】根切内に立設する型枠支持体はベース型枠部及
び布基礎型枠部を水平及び垂直の状態に支持する。ベー
ス配筋部及び横筋にコンクリートが付着し、布基礎の強
度性を高める。布基礎の上端は天端仕上板によって平坦
に形成できる。そして、天端仕上板に植設することによ
り、アンカーボルトは等間隔に、かつ垂直に保持でき
る。The formwork supporter provided upright in the root cutting supports the base formwork part and the cloth foundation formwork part in horizontal and vertical states. Concrete adheres to the base reinforcement and horizontal reinforcement, increasing the strength of the fabric foundation. The upper end of the cloth foundation can be formed flat by a top finishing plate. The anchor bolts can be held at equal intervals and vertically by being planted on the top end finishing plate.
【0012】また、布基礎の成形工法にあっては、ベー
ス型枠部及び布基礎型枠部を積重することで型枠は簡単
に組立てられる。ベース型枠部及び布基礎型枠部に生コ
ンクリートの打設時に加わる内圧は埋戻した土及び盛土
が受承し、これら型枠部のはらみ現象を防止する。Further, in the method for forming the cloth foundation, the molds can be easily assembled by stacking the base mold part and the cloth base mold part. The internal pressure applied to the base formwork and the cloth foundation formwork at the time of pouring fresh concrete is received by the backfilled soil and the embankment, and the entrapment phenomenon of these formwork parts is prevented.
【0013】[0013]
【実施例】以下、本発明の実施例を図面に基づき詳述す
る。図において、1は敷地A内に掘削した根切を示し、
該根切は従来の布基礎を形成する場合の根切と同様に形
成してある。2は前記根切1の底面1Aに敷設した割栗
石層を示し、該割栗石層2は多数の割栗石2A、2A、
・・・を転圧手段等により均一に締固めたものからなっ
ている。Embodiments of the present invention will now be described in detail with reference to the drawings. In the figure, 1 indicates a root cutting excavated in the site A,
The root cutting is formed in the same manner as the conventional root cutting when forming a cloth foundation. Reference numeral 2 denotes a rubble stone layer laid on the bottom surface 1A of the root cutting 1, and the rubble stone layer 2 has a large number of rubble stones 2A, 2A,
Is uniformly compacted by a compaction means or the like.
【0014】3、3、・・・は後述するベース型枠部9
及び布基礎型枠部14を水平かつ垂直の状態に支持する
ための型枠支持体を示し、該各型枠支持体3はジャッキ
部4と、支持柱5、5、・・・と、プレート6と、ベー
ス型枠支持板7とから構成される。ここで、ジャッキ部
4は外周面に雄ねじを刻設し、上端側には軸方向に雌ね
じ部を凹設したピボット4Aと、該ピボット4Aの上端
側に回動可能に取着したレベル調整板4Bと、前記ピボ
ット4Aに螺合され、回動することにより該レベル調整
板4Bを昇降させる昇降用レバー4Cとから大略構成さ
れている。また、各支持柱5は下端側に雌ねじ部、上端
側に雄ねじ部を有する金属製丸棒からなっており、前記
ピボット4Aの上端或は他の支持柱5の上端に螺着する
ようになっている。.. are base mold parts 9 to be described later.
And a formwork support for supporting the cloth foundation formwork 14 in a horizontal and vertical state, wherein each formwork support 3 includes a jack part 4, support columns 5, 5 ,. 6 and a base form supporting plate 7. Here, the jack part 4 has a male screw engraved on the outer peripheral surface thereof, and a pivot 4A having an axially recessed female screw part on the upper end side, and a level adjusting plate rotatably attached to the upper end side of the pivot 4A. 4B and an elevating lever 4C which is screwed into the pivot 4A and is rotated to elevate and lower the level adjusting plate 4B. Each support column 5 is made of a metal round bar having a female screw portion on the lower end side and a male screw portion on the upper end side, and is screwed to the upper end of the pivot 4A or the upper end of another support column 5. ing.
【0015】更に、プレート6は金属製或は再生プラス
チック製の長方形状平板からなっており、幅方向中央に
位置して長手方向に複数の柱挿通穴(図示せず)とコン
クリートの付着力を高めるための抜穴6A、6A、・・
・が形成してある。そして、該プレート6はレベル調整
板4B上に固着され、根切1内の長手方向に配置され
る。7、7、・・・は前記プレート6上に固着されるベ
ース型枠支持板を示す。該各ベース型枠支持板7は長方
形平板状に形成され中心に柱挿通穴が穿設された腕部7
Aと、該腕部7Aの長手方向両端に略U字状に折曲形成
した型枠支持部7B、7Bとからなっている。Further, the plate 6 is composed of a rectangular flat plate made of metal or recycled plastic, and is located at the center in the width direction and has a plurality of pillar insertion holes (not shown) in the longitudinal direction and an adhesive force of concrete. Holes 6A, 6A for increasing
・ Has formed. Then, the plate 6 is fixed on the level adjusting plate 4B and arranged in the longitudinal direction in the root cutting 1. Reference numerals 7, 7, ... Show base formwork support plates fixed on the plate 6. Each of the base form supporting plates 7 is formed in a rectangular flat plate shape, and has an arm portion 7 having a column insertion hole at the center thereof.
A, and frame supporting portions 7B, 7B bent and formed in a substantially U shape at both longitudinal ends of the arm portion 7A.
【0016】8は前記ベース型枠支持板7、7、・・・
上に水平状態に架設したベース配筋部を示し、該ベース
配筋部8は短尺のベース横筋8A、8A、・・・と長尺
のベース縦筋8B、8B、・・・を工場で予め格子状に
結合した構成からなっており、図示しないボルトを介し
てプレート6に固着してある。Reference numeral 8 denotes the base form supporting plates 7, 7, ...
Shown above is a horizontally laid base rebar portion, and the base rebar portion 8 has short base horizontal bars 8A, 8A, ... And long base vertical bars 8B, 8B ,. It has a structure in which it is connected in a lattice shape, and is fixed to the plate 6 via a bolt (not shown).
【0017】9は前記ベース配筋部8を覆った状態で根
切1内に配設したベース型枠部を示し、該ベース型枠部
9はベース型枠支持板7の型枠支持部7B、7Bに支持
されている。ここで、ベース型枠部9には直線用ベース
型枠10と、L字状の角隅用ベース型枠11と、T字状
の連結用ベース型枠12とがあり、各型枠10、11、
12は直線状、L字状又はT字状の一対の下側側壁10
A、10A、11A、11A、12A、12Aと各下側
側壁10A、11A、12Aの上端から内向きに傾斜し
て立上がった傾斜側壁10B、11B、12Bと、該傾
斜側壁10B、11B、12Bの上端から垂直に立上が
った上側側壁10C、11C、12Cと、長手方向両端
側に形成された一対の閉塞壁10D、10D、11D、
11D、12D、12Dと、該各閉塞壁10D、11
D、12D間に位置して上側側壁10C、10C、11
C、11C、12C、12C間に連設した補強壁10
E、11E、12Eと、各閉塞壁10D、11D、12
D及び補強壁10E、11E、12Eの下部側に形成し
た切欠き状の連通口10F、11F、12F及び上部側
に形成した縦長の横筋嵌合溝10G、11G、12G
と、各補強壁10E、11E、12Eの一側に一体的に
形成した筒状支持部10H、11H、12Hとから構成
してある。Reference numeral 9 denotes a base form part which is arranged in the root cutting 1 in a state of covering the base reinforcement part 8. The base form part 9 is a form support part 7B of the base form support plate 7. , 7B. Here, the base mold part 9 has a linear base mold 10, an L-shaped corner corner base mold 11, and a T-shaped connection base mold 12, and each mold 10, 11,
12 is a pair of lower side walls 10 having a linear shape, an L shape, or a T shape.
A, 10A, 11A, 11A, 12A, 12A and the inclined side walls 10B, 11B, 12B which are inclined and rise inward from the upper ends of the respective lower side walls 10A, 11A, 12A, and the inclined side walls 10B, 11B, 12B. Upper side walls 10C, 11C, 12C rising vertically from the upper end of the, and a pair of closing walls 10D, 10D, 11D formed on both ends in the longitudinal direction,
11D, 12D, 12D and the respective closing walls 10D, 11
Upper side wall 10C, 10C, 11 located between D and 12D
Reinforcing wall 10 connected between C, 11C, 12C and 12C
E, 11E, 12E and the respective closing walls 10D, 11D, 12
D and the reinforcing walls 10E, 11E, 12E and the cutout-shaped communication ports 10F, 11F, 12F formed on the lower side and the vertically long horizontal bar fitting grooves 10G, 11G, 12G formed on the upper side.
And cylindrical support portions 10H, 11H, 12H integrally formed on one side of each of the reinforcing walls 10E, 11E, 12E.
【0018】13は型枠支持体3、3、・・・間に架設
された横筋を示す。該各横筋13はベース型枠10、1
1、12の横筋嵌合溝10G、11G、12Gに嵌合し
た状態で型枠支持柱3、3、・・・と交差した状態で架
設されている。Reference numeral 13 denotes a horizontal streak provided between the frame supports 3, 3, .... Each of the transverse lines 13 is a base formwork 10, 1.
It is erected in a state of intersecting with the formwork supporting columns 3, 3, ... In a state of being fitted in the lateral streak fitting grooves 10G, 11G, 12G of 1 and 12.
【0019】次に、14はベース型枠部9上に列設した
布基礎型枠部を示し、該布基礎型枠部14は直線状、L
字状及びT字状の布基礎型枠15、16、17の組合わ
せから構成されている。ここで各布基礎型枠15、1
6、17はベース型枠10、11、12の上端側に嵌合
するように下端側が外側に膨出した直線状、L字状或は
T字状の一対の側壁15A、15A、16A、16A、
17A、17Aと、該各側壁15A、16A、17Aの
下端側内側に形成した段部15B、16B、17Bと、
一対の側壁15A、15A、16A、16A、17A、
17Aの長手方向両端側に形成した一対の閉塞壁15
C、16C、17Cと、該各閉塞壁15C、16C、1
7Cの縦方向中間から下端にかけて冂形に形成した切欠
き状の連通口15D、16D、17Dと、各閉塞壁15
C、16C、17C間に位置して側壁15A、16A、
17A間に連設した補強壁15E、16E、17Eと、
各閉塞壁15C、16C、17C及び補強壁15E、1
6E、17Eの上部側に縦長に形成した横筋嵌合溝15
F、16F、17Fと、各補強壁15E、16E、17
Eの一側に一体的に形成した筒状支持部15G、16
G、17Gとから構成してある。そして、上記直線状、
L字状及びT字状布基礎型枠15、16、17は再生プ
ラスチックによって夫々一体に形成してある。Next, reference numeral 14 denotes a cloth base mold part arranged in a row on the base mold part 9, and the cloth base mold part 14 has a linear shape, L.
It is composed of a combination of letter-shaped and T-shaped cloth foundation forms 15, 16, 17. Here, each cloth foundation formwork 15, 1
Reference numerals 6 and 17 denote a pair of linear, L-shaped or T-shaped side walls 15A, 15A, 16A, 16A whose lower ends bulge outward so as to fit on the upper ends of the base molds 10, 11, 12. ,
17A, 17A, and step portions 15B, 16B, 17B formed inside the lower ends of the respective side walls 15A, 16A, 17A,
A pair of side walls 15A, 15A, 16A, 16A, 17A,
A pair of closing walls 15 formed at both ends in the longitudinal direction of 17A.
C, 16C, 17C and the respective closing walls 15C, 16C, 1
Notch-shaped communication ports 15D, 16D, and 17D formed in the shape of an ellipse from the middle of the vertical direction of 7C to the lower end, and each closing wall 15
Located between C, 16C, 17C, the side walls 15A, 16A,
Reinforcing walls 15E, 16E, 17E continuously provided between 17A,
Each closing wall 15C, 16C, 17C and reinforcing wall 15E, 1
Horizontally fitting groove 15 formed vertically on the upper side of 6E and 17E
F, 16F, 17F and respective reinforcing walls 15E, 16E, 17
Cylindrical support parts 15G, 16 integrally formed on one side of E
It is composed of G and 17G. And the above straight line,
The L-shaped and T-shaped cloth base molds 15, 16 and 17 are integrally formed of recycled plastic.
【0020】18、18、・・・は布基礎型枠部の上端
に固着する天端仕上板を示し、各天端仕上板18は再生
プラスチックによって長方形に形成した平板からなって
おり、上面側には複数本のアンカーボルト19、19、
・・・が上方に突出した状態で植設してある。20は改
め口で、該改め口20はベース型枠10と布基礎型枠1
5に形成した矩形状の開口に枠体20Aを嵌合したもの
からなっている。また、21は布基礎型枠部14の上部
側に設けた床下換気口を示し、該床下換気口21は布基
礎型枠15に形成した横長の開口に枠体21Aを嵌合し
たものからなっている。Reference numerals 18, 18, ... Show top end finishing plates fixed to the upper end of the cloth base form part, and each top end finishing plate 18 is a rectangular flat plate made of recycled plastic. The anchor bolts 19, 19,
... are planted so as to project upward. Reference numeral 20 designates a remodeling mouth, and the remodeling mouth 20 comprises the base mold 10 and the cloth foundation mold 1
The frame 20A is fitted in the rectangular opening formed in the frame 5. Reference numeral 21 denotes an underfloor ventilation port provided on the upper side of the cloth foundation form 14, and the underfloor ventilation port 21 is formed by fitting a frame body 21A into a horizontally long opening formed in the cloth foundation form 15. ing.
【0021】本実施例は上述の如く構成されるが、次に
布基礎成形体を用いた布基礎の成形工法について詳述す
る。まず、敷地Aに根切1を掘削する。根切1の深さは
従来の布基礎を形成する場合と同じである。根切1を形
成したら、根切1の底面1Aに割栗石2A、2A、・・
・を投入し、均一に転圧して締固めて割栗石層2を形成
する。The present embodiment is constructed as described above. Next, the method for forming the cloth base using the cloth base molded body will be described in detail. First, the root cutting 1 is excavated on the site A. The depth of the root cutting 1 is the same as when forming a conventional cloth foundation. Once the root cutting 1 has been formed, the split stones 2A, 2A, ... on the bottom surface 1A of the root cutting 1
・ Introduce, and uniformly compact and compact to form a split stone layer 2.
【0022】次に、型枠支持体3、3、・・・を根切1
の幅方向中央で、かつ長手方向に所定間隔離間して立設
する。この場合、まず各ジャッキ部4を割栗石層2から
地中にかけて打込み、昇降用レバー4Cを回動してレベ
ル調整板4Bが同一平面を形成するように調整した後、
列設したレベル調整板4B、4B、・・・上にプレート
6を水平状態に架設し、ピボット4Aの上端に支持柱5
を螺着して立設する。Next, the mold supports 3, 3, ...
Are erected at the center in the width direction and spaced apart by a predetermined distance in the longitudinal direction. In this case, first, each jack portion 4 is driven from the split stone layer 2 into the ground, and the elevating lever 4C is rotated to adjust the level adjusting plate 4B so as to form the same plane.
The plate 6 is horizontally installed on the level adjusting plates 4B, 4B, ... Lined up, and the supporting column 5 is provided on the upper end of the pivot 4A.
Is installed by screwing.
【0023】上述の如くして型枠支持体3、3、・・・
を立設したら、プレート6上に工場で予め組立てたベー
ス配筋部8をボルトで固着し配設する。その後、ベース
配筋部8を覆うようにベース型枠部9をベース型枠支持
板7、7、・・・上に載置して根切1内に列設する。そ
して、ベース型枠部9の横筋嵌合溝10G、11G、1
2Gに横筋13を横設する。これにより、各支持柱5及
びベース型枠部9は垂直の状態に保持される。As described above, the form supports 3, 3, ...
After the stand is erected, the base reinforcement 8 preassembled at the factory on the plate 6 is fixed by bolts and arranged. After that, the base form part 9 is placed on the base form supporting plates 7, 7, ... Then, the horizontal streak fitting grooves 10G, 11G, 1 of the base frame 9 are formed.
The horizontal bar 13 is provided in 2G. As a result, the support columns 5 and the base mold part 9 are held vertically.
【0024】次に、ベース型枠部9上に布基礎型枠部1
4を積重する。即ち、筒状支持部15G、16G、17
Gに支持柱5、5、・・・をそれぞれ挿嵌して1段目の
各布基礎型枠15、16、17を対応する形状のベース
型枠10、11、12に嵌合して重ねる。更に、1段目
の布基礎型枠15、16、17上に2段目の布基礎型枠
15、16、17を支持柱5、5、・・・に挿嵌した状
態で積重し、所望の高さの布基礎型枠部14を列設す
る。そして、改め口20用の枠体20A及び床下換気口
21用の枠体21Aを各型枠部9、14の開口に嵌合し
た後、これら改め口20及び床下換気口21を図示しな
い閉塞板によって仮に塞いでおく。以上の作業により、
ベース型枠部9及び布基礎型枠部14の組立が完了す
る。Next, the cloth foundation mold part 1 is placed on the base mold part 9.
Stack 4 That is, the cylindrical support portions 15G, 16G, 17
The support columns 5, 5, ... Are respectively inserted into G and the first-stage cloth foundation molds 15, 16, 17 are fitted and overlapped on the corresponding base molds 10, 11, 12. . Further, the second-stage cloth foundation molds 15, 16, 17 are stacked on the first-stage cloth foundation molds 15, 16, 17 while being inserted into the support columns 5, 5 ,. The cloth base form parts 14 having a desired height are arranged in a row. Then, after fitting the frame body 20A for the revision opening 20 and the frame body 21A for the underfloor ventilation opening 21 into the openings of the mold parts 9 and 14, the revision opening 20 and the underfloor ventilation opening 21 are not shown in the figure. I will temporarily block by. By the above work,
The assembling of the base mold part 9 and the cloth foundation mold part 14 is completed.
【0025】しかる後、各型枠部9、14の外側面両側
に根切1内から上方にかけて土の埋戻しと盛土を行う。
この埋戻しと盛土により、生コンクリート打設時の型枠
部9、14のはらみ現象を防止することができる。な
お、盛土のためのスペースが十分に確保できない場合に
は、補強材を併せて用いるとよい。次に、ベース型枠部
9から布基礎型枠14にわたって生コンクリートAを打
設する。打設された生コンクリートAは支持柱5、プレ
ート6、ベース配筋部8、横筋13等を包んで硬化する
結果、成形される布基礎は極めて高い強度性を有するこ
とができる。Thereafter, the soil is backfilled and the embankment is performed from the inside of the root cutting 1 to the upper side on both sides of the outer surface of each of the mold parts 9 and 14.
By this backfilling and embankment, it is possible to prevent the phenomenon of the mold parts 9 and 14 being caught when pouring fresh concrete. If a sufficient space for embankment cannot be secured, a reinforcing material may be used together. Next, the ready-mixed concrete A is poured from the base form part 9 to the cloth base form 14. The poured ready-mixed concrete A wraps and hardens the support columns 5, the plates 6, the base reinforcements 8, the horizontal reinforcements 13 and the like, and as a result, the formed fabric foundation can have extremely high strength.
【0026】布基礎型枠部14の上端まで生コンクリー
トAを打設したら、布基礎型枠部14の上端に天端仕上
板18を嵌合して列設する。天端仕上板18に貫通して
植設してあるアンカーボルト19の下端側が生コンクリ
ートに挿入される結果、硬化したコンクリートによって
天端仕上板18は強固に保持される。After pouring the ready-mixed concrete A up to the upper end of the cloth foundation form 14, the top end finishing plates 18 are fitted and lined up on the upper end of the cloth foundation form 14. As a result of the lower end side of the anchor bolts 19 penetrating through the top end finishing plate 18 being inserted into the fresh concrete, the top end finishing plate 18 is firmly held by the hardened concrete.
【0027】そして、打設したコンクリートが硬化した
後、盛土を除去し、改め口20及び床下換気口21を塞
いでおいた閉塞板を撤去することにより、布基礎の成形
作業が完了する。After the poured concrete is hardened, the embankment is removed, and the closing plate that has closed the re-entrant opening 20 and the underfloor ventilation opening 21 is removed, thereby completing the work of forming the cloth foundation.
【0028】本実施例は叙上の如くであって、ベース型
枠部9及び布基礎型枠部14に改め口20及び床下換気
口21の形成用の使い捨て式型枠20A、21Aを嵌着
するように構成したから、コンクリート硬化後の枠体除
去作業やはつり作業をなくすことができる。This embodiment is as described above, and the disposable molds 20A and 21A for forming the reforming opening 20 and the underfloor ventilation opening 21 are fitted to the base molding portion 9 and the cloth foundation molding portion 14, respectively. Since it is configured to do so, it is possible to eliminate the frame body removing work and the chipping work after the concrete is hardened.
【0029】また、本実施例のベース型枠部9及び布基
礎型枠部14は再生プラスチックで形成したから、産業
廃棄物の再利用を図ることができるし、製造コストも低
廉にできる。しかも、従来行っていた仕上げ塗装を不要
にできる。Further, since the base mold part 9 and the cloth base mold part 14 of this embodiment are made of recycled plastic, industrial waste can be reused and the manufacturing cost can be reduced. Moreover, the conventional finish coating can be eliminated.
【0030】更に、アンカーボルト19を植設しない天
端仕上板を用いる場合には、天端仕上板上に載置した土
台と床下換気口21の枠体21Aに略コ字状の金属製挟
持部材を一体的に嵌合し、該挟持部材の対抗する先端側
にボルトを挿通してナットで締結するように構成しても
よい。Further, when a top end finishing plate without anchor bolts 19 is used, the base placed on the top end finishing plate and a frame 21A of the underfloor ventilation port 21 are sandwiched by a substantially U-shaped metal. The members may be integrally fitted, and the bolts may be inserted into the opposing tip sides of the sandwiching member and the nuts may be fastened.
【0031】更にまた、本実施例では各布基礎型枠1
5、16、17の下端側がベース型枠10、11、1
2、又は他の布基礎型枠15、16、17の上端縁を覆
うように嵌合させたが、ベース型枠部9と布基礎型枠部
14および布基礎型枠部14同志を嵌合した場合に、外
側面が平面状となるようにこれら各ベース型枠10、1
1、12、布基礎型枠15、16、17の接続構造を変
えてもよい。なお、寒冷地においては、型枠部の内面に
断熱材を予め貼付けておくようにしてもよい。Furthermore, in this embodiment, each cloth foundation form 1
The lower side of 5, 16, 17 is the base formwork 10, 11, 1
2 or other cloth base molds 15, 16 and 17 are fitted so as to cover the upper edges thereof, but the base mold part 9, the cloth base mold part 14 and the cloth base mold part 14 are fitted together. When these are done, each of these base molds 10 and 1 is formed so that the outer surface becomes flat.
You may change the connection structure of 1, 12 and the cloth foundation formwork 15, 16, 17. FIG. In a cold region, a heat insulating material may be attached to the inner surface of the mold part in advance.
【0032】[0032]
【発明の効果】本発明による型枠一体型布基礎及び型枠
一体型布基礎の成形工法は叙上の如く構成したから、下
記の諸効果を奏する。 布基礎の全体を一回の生コンクリート打設で成形する
から、均一な強度性を持った布基礎にできると共に、工
期を大幅に短縮できる。 予め形成したベース型枠部及び布基礎型枠部を用いる
から、位置決め、寸法調整等の作業は最小限ですみ、し
かも寸法精度の高い布基礎にできる。従って、従来必要
であったはつり作業も不要にできる。 ベース型枠部及び布基礎型枠部は使い捨て式なので、
再利用のための型枠の解体清掃作業等は不要であるし、
保管場所も不要にできる。 ベース配筋部は型枠支持体に係止し、横筋は型枠支持
体とベース型枠部又は布基礎型枠部に係合するから、配
筋を正確にできるし、生コンクリート打設時に生じ易い
配筋の乱れを確実に防止できる。 天端仕上板を用いることにより、従来熟練の技術を要
した天端のモルタル仕上げ作業を不要にできる。 アンカーボルトを植設した天端仕上板を用いることに
より、必要な本数のアンカーボルトを正確な位置に垂直
の状態で列設することができる結果、土台の組付作業を
迅速に行うことができる。 従来技術と比較して工程数を少なくできる結果、工期
を大幅に短縮できると共に天候等による影響を受けるこ
ともないから、工程管理を正確に行うことができる。 ベース型枠部及び布基礎型枠部の外側面両側は埋戻し
た土と盛土によって支持するから、生コンクリートの打
設時に生じる型枠のはらみ現象を防止できるし、従来使
用していた補強材及びその組立、解体作業を不要にでき
る。Since the formwork-integrated cloth foundation and the method for forming the formwork-integrated cloth foundation according to the present invention are constructed as described above, the following effects can be obtained. Since the entire cloth foundation is formed by one-time pouring of concrete, it is possible to obtain a cloth foundation with uniform strength and to significantly shorten the construction period. Since the pre-formed base formwork and fabric base formwork are used, the work such as positioning and dimension adjustment can be minimized, and a fabric base with high dimensional accuracy can be obtained. Therefore, it is possible to eliminate the hanging work which is conventionally required. Since the base formwork and cloth foundation formwork are disposable,
There is no need to dismantle and clean the formwork for reuse,
The storage location can be eliminated. The base reinforcement is locked to the form support, and the horizontal reinforcement is engaged with the form support and the base form or the cloth foundation form, so the reinforcement can be made accurately and when placing concrete. It is possible to reliably prevent the disorder of the bar arrangement that tends to occur. By using the top finishing plate, the work of finishing the mortar on the top, which has conventionally required skill, can be eliminated. By using the top finishing plate with the anchor bolts planted, the required number of anchor bolts can be vertically arranged in a row in the correct position, and as a result, the base can be assembled quickly. . As a result of reducing the number of steps as compared with the conventional technique, the construction period can be significantly shortened, and the influence of weather and the like can be eliminated, so that process control can be accurately performed. Both sides of the outer surface of the base formwork and the cloth foundation formwork are supported by the backfilled soil and the embankment, so it is possible to prevent the formwork from encroaching when pouring fresh concrete, and to reinforce the conventional reinforcement material. Also, the assembling and disassembling work thereof can be eliminated.
【図1】本発明の実施例に係る型枠一体型布基礎の外観
斜視図である。FIG. 1 is an external perspective view of a formwork-integrated cloth foundation according to an embodiment of the present invention.
【図2】型枠一体型布基礎の組立途中を示す外観斜視図
である。FIG. 2 is an external perspective view showing the process of assembling the form-integrated cloth foundation.
【図3】型枠一体型布基礎の縦断面図である。FIG. 3 is a vertical cross-sectional view of a form-integrated cloth foundation.
【図4】根切内に型枠支持体を立設した状態を示す説明
図である。FIG. 4 is an explanatory view showing a state in which a mold support is erected in the root cutting.
【図5】型枠支持体の部分平面図である。FIG. 5 is a partial plan view of a mold support.
【図6】型枠一体型布基礎の内部構成を示す部分斜視図
である。FIG. 6 is a partial perspective view showing the internal structure of a mold-integrated cloth foundation.
【図7】角隅用ベース型枠の平面図である。FIG. 7 is a plan view of a corner corner base mold.
【図8】角隅用ベース型枠の正面図である。FIG. 8 is a front view of a corner corner base mold.
【図9】連結用ベース型枠の正面図である。FIG. 9 is a front view of a connecting base form.
【図10】連結用ベース型枠の平面図である。FIG. 10 is a plan view of a connecting base form.
【図11】直線用布基礎型枠の平面図である。FIG. 11 is a plan view of a straight cloth foundation mold.
【図12】図11中のXII−XII矢示方向断面図で
ある。FIG. 12 is a sectional view taken along line XII-XII in FIG.
【図13】角隅用布基礎型枠を一部を破断にして示す斜
視図である。FIG. 13 is a perspective view showing a cloth foundation mold for corners with a part thereof broken away.
【図14】連結用布基礎型枠の正面図である。FIG. 14 is a front view of a cloth foundation formwork for connection.
【図15】連結用布基礎型枠の平面図である。FIG. 15 is a plan view of a cloth foundation mold for connection.
1 根切 2 割栗石層 3 型枠支持体 7 ベース型枠支持板 8 ベース配筋部 9 ベース型枠部 13 横筋 14 布基礎型枠部 18 天端仕上板 19 アンカーボルト A 生コンクリート 1 Negiri 2 Split quarry stone layer 3 Formwork support 7 Base formwork support plate 8 Base reinforcement part 9 Base formwork part 13 Lateral line 14 Cloth foundation formwork part 18 Top finish plate 19 Anchor bolt A Ready-mixed concrete
Claims (3)
能に備え、根切1の幅方向中央で、かつ、長手方向に離
間して立設する複数の型枠支持体3と、該各型枠支持体
3の下部側に位置して該型枠支持体3間に格子状に配設
固着するベース配筋部8と、該ベース配筋部8を覆うよ
うに前記ベース型枠支持板7に水平に支持された状態で
前記根切1内に列設するベース型枠部9と、該ベース型
枠部9の上方に位置して前記型枠支持体3間に架設する
横筋13と、該横筋13及び前記型枠支持体3と係合し
た状態で前記ベース型枠部9上に積重する布基礎型枠部
14と、該布基礎型枠部14からベース型枠部9内に打
設する生コンクリートAと、前記布基礎型枠部14の上
端に固着する長方形の天端仕上板18とから構成してな
る型枠一体型布基礎。1. A plurality of formwork supports 3 which are provided with a base formwork support plate 7 adjustable in the height direction, and which are erected at the center in the width direction of the root cutting 1 and spaced apart in the longitudinal direction. Each formwork support
3 located on the lower side of the base reinforcement portion 8 for distribution設固wear lattice shape between the mold frame support 3, horizontally to the base mold support plate 7 so as to cover the base reinforcement portion 8 a base mold part 9 arrayed to the root switch 1 in supported state, the lateral stripe 13 extended between the mold support member 3 is positioned above the base mold part 9, lateral muscle 13 And a cloth foundation form part that is stacked on the base form part 9 while being engaged with the form support 3
14 , a raw concrete A that is cast from the cloth base mold part 14 into the base mold part 9 , and a rectangular top end finishing plate 18 fixed to the upper end of the cloth base mold part 14. Formwork-integrated cloth foundation.
出した状態で複数本のアンカーボルト19を長手方向に
隔設してある請求項1記載の型枠一体型布基礎。2. The formwork-integrated cloth foundation according to claim 1, wherein a plurality of anchor bolts 19 are spaced apart from each other in a longitudinal direction on the top end finishing plate 18 so as to project on both upper and lower surfaces.
の成形工法; (1)敷地に所定深さの根切1を掘削する工程、 (2)前記根切1の底面に均一な割栗石層2を形成する
工程、 (3)ベース型枠支持板7を高さ方向に調整可能に備え
た複数の型枠支持体3を前記根切1の幅方向中央で、か
つ、長手方向に所定間隔離間して立設する工程、 (4)前記型枠支持体3の下部側で前記ベース型枠支持
板7の上方に位置して前記根切1内に格子状のベース配
筋部8を配設する工程、 (5)前記型枠支持体3に係合した状態で前記ベース配
筋部8を覆うように前記ベース型枠支持板7上にベース
型枠部9を列設する工程、 (6)前記ベース型枠部9の上方に位置して前記型枠支
持体3間に横筋13を架設する工程、 (7)前記型枠支持体3に係合した状態で前記ベース型
枠部9上に複数段の布基礎型枠部14を積重すると共
に、各段の布基礎型枠15、16、17内に前記型枠支
持体3と交差した状態で横筋13を配設する工程、 (8)前記ベース型枠部9及び布基礎型枠部14の外側
面両側に土の埋戻し及び盛土を行う工程、 (9)土の埋戻し及び盛土後、前記ベース型枠部9及び
布基礎型枠部14内に生コンクリートAを打設する工
程、 (10)前記生コンクリートAの打設後、前記布基礎型
枠部14の上端に天端仕上板18を敷設する工程、 (11)前記生コンクリートAの硬化後、前記布基礎型
枠部14の外側面両側から盛土を除去する工程。3. A method for forming a mold-integrated cloth foundation comprising the following steps; (1) a step of excavating a root cutting 1 having a predetermined depth on a site, (2) a uniform bottom surface of the root cutting 1. A step of forming the split stone layer 2 , (3) a plurality of formwork supports 3 provided with a base formwork support plate 7 adjustable in the height direction, in the widthwise center of the root cutting 1 , and in the longitudinal direction (4) Supporting the base form on the lower side of the form support 3
A step of arranging a lattice-shaped base reinforcing bar portion 8 in the root cutting 1 located above the plate 7 , (5) the base reinforcing bar portion 8 in the state of being engaged with the mold support 3 ; A step of arranging the base mold parts 9 on the base mold support plate 7 so as to cover them, (6) laying a horizontal streak 13 between the mold frame supports 3 located above the base mold parts 9 And (7) stacking a plurality of stages of cloth foundation form parts 14 on the base form part 9 in a state of being engaged with the form support 3 and forming cloth base forms 15 of each stage , A step of arranging the horizontal streaks 13 in 16 and 17 in a state of intersecting with the form support 3 ; (8) backfilling of soil on both outer side surfaces of the base form 9 and the cloth foundation form 14 ; step for embankment, (9) after backfilling and embankment soil, a step of pouring the fresh concrete a to the base mold part 9 and fabric foundation mold portion 14 (10) after casting of the raw concrete A, the step of laying the Tentan finishing plate 18 to the upper end of the fabric foundation formwork section 14, (11) after curing of the raw concrete A, the fabric foundation formwork section 14 The step of removing the embankment from both sides of the outer surface.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22919792A JPH0733675B2 (en) | 1992-08-04 | 1992-08-04 | Forming method for formwork-integrated cloth foundation and formwork-integrated cloth foundation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22919792A JPH0733675B2 (en) | 1992-08-04 | 1992-08-04 | Forming method for formwork-integrated cloth foundation and formwork-integrated cloth foundation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06185072A JPH06185072A (en) | 1994-07-05 |
| JPH0733675B2 true JPH0733675B2 (en) | 1995-04-12 |
Family
ID=16888336
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22919792A Expired - Lifetime JPH0733675B2 (en) | 1992-08-04 | 1992-08-04 | Forming method for formwork-integrated cloth foundation and formwork-integrated cloth foundation |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0733675B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9097000B2 (en) * | 2008-10-03 | 2015-08-04 | Thomas M. Espinosa | Hold down system using hollow bearing members |
| US10870978B2 (en) | 2018-03-09 | 2020-12-22 | Cetres Holdings, Llc | Reinforced stud-framed wall |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5618730B2 (en) | 2010-09-27 | 2014-11-05 | Kddi株式会社 | Matching server and network game platform system |
-
1992
- 1992-08-04 JP JP22919792A patent/JPH0733675B2/en not_active Expired - Lifetime
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5618730B2 (en) | 2010-09-27 | 2014-11-05 | Kddi株式会社 | Matching server and network game platform system |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06185072A (en) | 1994-07-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6667850B2 (en) | Method of manufacturing concrete block for solid foundation and method of constructing solid foundation | |
| JP7112635B1 (en) | U-shaped throwaway formwork for rising foundations of buildings | |
| JP3615834B2 (en) | Retaining wall construction method | |
| KR102149662B1 (en) | Method for constructing transfer layer of building using precast concrete slab | |
| JPH0733675B2 (en) | Forming method for formwork-integrated cloth foundation and formwork-integrated cloth foundation | |
| JPH10299003A (en) | Foundation method using precast concrete members | |
| JPH03191116A (en) | How to construct underground beams | |
| KR102682632B1 (en) | Permanant form panel for buliding foundation work | |
| JP2002047660A (en) | Foundation execution method for house or the like and foundation form panel | |
| JPH07113240A (en) | Residential cloth foundation and its construction method | |
| AU647783B2 (en) | Improved building techniques | |
| JPS6123092Y2 (en) | ||
| JP2927783B1 (en) | Top level adjustment method of reinforced concrete cloth foundation and precast reinforced concrete cloth foundation member | |
| JP2824374B2 (en) | Concrete block for foundation, manufacturing method thereof, and foundation construction method using the same | |
| JPH06306874A (en) | Concrete block for footing | |
| JPH01111923A (en) | Construction of concrete foundation | |
| JP2002332648A (en) | Precast concrete block with angle adjustment and gravity retaining wall | |
| JP3095417U (en) | Large assembled culvert constructed of precast concrete and cast-in-place concrete | |
| JPH0750422Y2 (en) | Concrete retaining wall | |
| JP2724891B2 (en) | Construction method of pillar half PCa formwork | |
| JPS60341Y2 (en) | stacked block foundation frame | |
| JPS60175629A (en) | Constructing method for strip footing | |
| JPH05230837A (en) | Concrete expendable form construction method | |
| JP3088568B2 (en) | Precast concrete foundation block and construction method | |
| JPH04128433A (en) | Construction method of foundation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19951003 |