Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0742701B2 - Underwater laying equipment for asphalt - Google Patents
[go: Go Back, main page]

JPH0742701B2 - Underwater laying equipment for asphalt - Google Patents

Underwater laying equipment for asphalt

Info

Publication number
JPH0742701B2
JPH0742701B2 JP3262812A JP26281291A JPH0742701B2 JP H0742701 B2 JPH0742701 B2 JP H0742701B2 JP 3262812 A JP3262812 A JP 3262812A JP 26281291 A JP26281291 A JP 26281291A JP H0742701 B2 JPH0742701 B2 JP H0742701B2
Authority
JP
Japan
Prior art keywords
asphalt
bucket
opening
asphalts
buckets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3262812A
Other languages
Japanese (ja)
Other versions
JPH0579039A (en
Inventor
勝夫 松崎
好 有馬
Original Assignee
日本海上工事株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本海上工事株式会社 filed Critical 日本海上工事株式会社
Priority to JP3262812A priority Critical patent/JPH0742701B2/en
Publication of JPH0579039A publication Critical patent/JPH0579039A/en
Publication of JPH0742701B2 publication Critical patent/JPH0742701B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は海底等にアスファルト類
を打設する装置に関し、特に、広い面積に亘ってアスフ
ァルト類を均一な厚さで打設できるようにする装置に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a device for driving asphalts on the seabed or the like, and more particularly to a device for driving asphalts with a uniform thickness over a wide area.

【0002】[0002]

【従来の技術】防波堤や護岸等の海岸構造物の工事を行
う場合には、その構造物の基礎として捨石基礎を施工
し、その上部を平らに均してから、ケーソン等の上部構
造物を施工し、その構造物の側部にテトラポッド等の消
波部材を配置する手段が一般に用いられている。前記海
岸構造物を波の荒い場所で施工する際には、捨石基礎が
波により破壊されることを防止するために、捨石基礎の
間にアスファルト類を流し込み、捨石基礎を固結させる
ようにする手段を用いる場合がある。また、比較的潮の
流れの速い場所でも、捨石基礎の保護手段として、海底
に捨石基礎を施工すると同時に、アスファルト類を流し
込み、捨石基礎を保護することも行われている。
2. Description of the Related Art When constructing a coastal structure such as a breakwater or a seawall, a rubble foundation is constructed as the foundation of the structure, and the upper portion of the foundation is leveled and then the upper structure such as caisson is removed. A means for constructing and arranging a wave breaking member such as a tetrapod on the side of the structure is generally used. When constructing the coastal structure in a place with rough waves, in order to prevent the rubble foundation from being destroyed by the waves, asphalt is poured between the rubble foundation to consolidate the rubble foundation. Means may be used. In addition, even in places where the tide is relatively fast, as a means of protecting the rubble foundation, it is practiced to construct a rubble foundation on the sea floor and at the same time pour in asphalt to protect the rubble foundation.

【0003】前記アスファルト類の施工するためには、
例えば、特公昭55−42205号公報に示されるよう
に、ホースを用いてアスファルト類を海底に打設する方
法等が用いられている。前記従来例で用いられる打設装
置は、図7に示されるように構成されているもので、海
上のクレーン等にワイヤ18を介して吊り下げられる打
設装置10のホッパ11から、二重管12とフレキシブ
ルホース13とを延長し、該フレキシブルホース13の
先端部が海底まで届くように構成されている。そして、
前記ホッパ11に投入されたアスファルト類は、二重管
とフレキシブルホースとを押し拡げる状態で流下し、捨
石基礎等に向けて供給される。そして、そのアスファル
ト類の流動性により、捨石の間に流れ込み、捨石の隙間
を充填するとともに、石をアスファルト類により固結さ
せ、捨石基礎を保護できるようにされる。
In order to apply the asphalt,
For example, as disclosed in Japanese Examined Patent Publication No. 55-42205, a method of driving asphalts to the seabed using a hose is used. The placing device used in the above-mentioned conventional example is configured as shown in FIG. 7, and is constructed from the hopper 11 of the placing device 10 suspended by a marine crane or the like via the wire 18 to the double pipe. 12 and the flexible hose 13 are extended so that the tip of the flexible hose 13 reaches the seabed. And
The asphalt thrown into the hopper 11 flows down in a state where the double pipe and the flexible hose are expanded and is supplied toward a rubble foundation or the like. Then, due to the fluidity of the asphalts, the asphalts flow between the rubbles to fill the gaps between the rubbles, and the stones are solidified by the asphalts to protect the rubble foundation.

【0004】また、前記ホースを用いたアスファルト類
の打設工法の他に、図8に示されるような、打設装置1
5を用いる場合もある。前記図8に示される打設装置で
は、アスファルト類を収容するバケット16を、クレー
ン等にワイヤ18を介して吊り下げ、施工現場の海中に
までバケット16を下してから、開閉蓋17を開いてア
スファルト類を捨石基礎の上に流下させるようにする。
そして、該アスファルト類を前記図7の場合と同様にし
て、捨石基礎の石の間にまで流し込み、石の隙間を充填
する方式を用いている。
In addition to the asphalt driving method using the hose, a driving apparatus 1 as shown in FIG.
5 may be used in some cases. In the driving apparatus shown in FIG. 8, the bucket 16 containing the asphalt is hung on a crane or the like via a wire 18, and the bucket 16 is lowered into the sea at the construction site, and then the opening / closing lid 17 is opened. So that the asphalts will flow down on the rubble foundation.
Then, as in the case of FIG. 7, the asphalt is poured into between the stones of the rubble foundation to fill the gaps between the stones.

【0005】前述したようなアスファルト類の施工方法
は、例えば、潮の流れの速い海域や、波の荒い地域での
護岸の保護等に使用されるものであり、捨石基礎を保護
することにより、その上部に建設した構造物を波の影響
から保護する手段として用いられる。なお、前記捨石基
礎の保護のために使用されるアスファルト類は、サンド
マスチック、グラベルマスチック等とよばれるアスファ
ルトと砂や骨材等を混合したものを用いている。そし
て、前記アスファルト類を、高温で流動性を有する状態
のままで、海底等で施工するようにしている。
The asphalt construction method as described above is used, for example, for protection of seawalls in fast-flowing sea areas and in areas with rough waves. By protecting the rubble foundation, It is used as a means of protecting the structure constructed above it from the effects of waves. The asphalt used to protect the rubble foundation is a mixture of asphalt called sand mastic, gravel mastic, etc. and sand or aggregate. Then, the asphalts are constructed on the seabed or the like in a state of having fluidity at high temperature.

【0006】[0006]

【発明が解決しようとする課題】前記図7または、図8
に示されるようなアスファルト類の水中敷設装置は、例
えば、アスファルト類を海底に施工する際には、図9に
示されるように、最初に施工するアスファルト類は、捨
石基礎1の石の間に入り込ませる状態にする打設層3を
施工する。次いで、2回目の打設作業を行うことによ
り、その捨石基礎の表面に保護層4を施工することが行
われている。そして、その打設作業を行う都度、潜水夫
がフレキシブルホース13の先端部を打設箇所に位置決
めし、図7に示されたような打設装置のホッパにアスフ
ァルト類を投入させて、捨石基礎の所定の位置にアスフ
ァルト類2を施工するようにしている。また、バケット
を用いる打設装置の場合にも、潜水夫が施工現場でバケ
ットの底板を開いて、アスファルト類を施工する手段を
用いている。
7 or 8 described above.
The underwater laying device for asphalts as shown in, for example, when the asphalts are installed on the seabed, as shown in FIG. 9, the asphalts to be installed first are between the stones of the rubble foundation 1. The casting layer 3 is made to be in a state of being allowed to enter. Next, the protection layer 4 is constructed on the surface of the rubble foundation by performing the second placing work. Then, every time the placing work is performed, the diver positions the tip of the flexible hose 13 at the place of placing, and asphalts are put into the hopper of the placing device as shown in FIG. The asphalt 2 is constructed at a predetermined position of. Further, also in the case of a placing device using a bucket, a diver uses a means for opening the bottom plate of the bucket at the construction site and constructing asphalt.

【0007】ところが、前記アスファルト類を深い海底
で施工する場合には、前述したような従来の工法による
と、その作業能率が非常に悪いものとなり、工事期間等
で大きな問題が発生する。つまり、バケットを用いる方
式の場合には、1回の開閉蓋の操作により1つの点とし
てアスファルト類を打設するのみであり、捨石基礎の面
積が広い場合には、多数のバケットを装備する作業船を
用いたとしても、その施工の能率がよくないという問題
が発生する。また、深い海底では潜水夫の作業可能時間
が短いために、長い時間連続して作業を行うことができ
ないという問題もある。さらに、従来より用いられてい
るバケット類では、その内面にアスファルトが付着しや
すいものであり、作業の後でそのバケットの清掃等にも
大きな問題を有している。
However, when the asphalts are to be constructed on the deep seabed, the conventional construction method as described above results in a very poor work efficiency, which causes a serious problem during the construction period. In other words, in the case of the method using a bucket, asphalts are only placed as one point by operating the opening / closing lid once, and when the area of the rubble foundation is large, work to equip a large number of buckets Even if a ship is used, there is a problem that the efficiency of the construction is not good. There is also a problem that the diving worker cannot work continuously for a long time because the diving worker's workable time is short on the deep sea bottom. Further, in the buckets that have been conventionally used, asphalt is apt to adhere to the inner surface of the bucket, and there is a great problem in cleaning the bucket after the work.

【0008】これに対して、フレキシブルホースを用い
るアスファルト類の施工法を用いる場合には、ホースか
ら連続して排出されるアスファルト類を、捨石基礎の上
に線状に順次打設するために、バケット方式に比較して
能率を向上させることができる。しかし、深い海底でホ
ースを移動させることは、潜水夫に対して非常に困難な
作業を強いることにもなり、作業性の点でも多くの問題
を持っている。
On the other hand, in the case of using the asphalt construction method using the flexible hose, in order to sequentially drive the asphalts discharged from the hose linearly on the rubble foundation, The efficiency can be improved as compared with the bucket method. However, moving the hose on the deep sea bottom also forces the diver to perform extremely difficult work, and has many problems in terms of workability.

【0009】[0009]

【発明の目的】本発明は前述したような従来のアスファ
ルト類の施工の問題を解消するもので、多数の小さなバ
ケットを縦横に接続して配置した打設装置を用い、それ
等のバケットの底板を連動させて開閉させることによっ
て、広い面積にアスファルト類を一度に均一に打設でき
るようにするとともに、水中基礎の斜面部に対するアス
ファルトの施工を容易に行い得る装置を提供することを
目的としている。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned problems in the construction of conventional asphalts by using a placing device in which a large number of small buckets are connected vertically and horizontally, and the bottom plate of such buckets is used. The purpose of the present invention is to provide an apparatus that enables the asphalts to be uniformly placed in a large area at once by opening and closing them in conjunction with each other, and also allows the asphalt to be easily installed on the slope of the underwater foundation. .

【0010】[0010]

【課題を解決するための手段】本発明のアスファルト類
の水中敷設装置は、クレーン等により吊り下げられるフ
レームに対して、多数のバケットを縦横方向に並べてバ
ケット装置を取り付け、各バケットの底部分には各々開
閉蓋を配置するとともに、バケットの内部にはアスファ
ルトが付着することを防止する手段を施し、前記フレー
ムを水中の基礎等の傾斜角度に対応させて構成し、バケ
ット装置を構成する各開閉蓋を、段違い状に配置すると
ともに、前記各バケットに設ける開閉蓋を、連動させて
開き得るように構成することができる。
A submerged laying apparatus for asphalts according to the present invention has a large number of buckets arranged vertically and laterally with respect to a frame suspended by a crane or the like, and the bucket device is attached to the bottom portion of each bucket. Each has an opening / closing lid and means for preventing asphalt from adhering to the inside of the bucket, and the frame is configured to correspond to the inclination angle of the underwater foundation etc. The lids may be arranged in different steps, and the opening / closing lids provided on the buckets may be configured to be opened in conjunction with each other.

【0011】[0011]

【作用】前述したように構成することにより、本発明の
アスファルト類の水中敷設装置では、多数のバケットを
連接した状態に設け、それ等のバケットの底板を一度に
開くことにより、広い面積の部分に対して、1度でアス
ファルト類の打設作業を行うことができる。また、捨石
基礎の傾斜部分等に対しても、その傾斜に応じてバケッ
トを配置することにより、その傾斜面に沿ってアスファ
ルト類の施工を行うことができ、施工作業を容易に行い
得るものとなる。したがって、深い海底でのアスファル
ト類の施工作業を能率よく行うことができるので、潜水
夫の1回の潜水により、広い面積にアスファルト類の施
工を行うことが可能になる。さらに、本発明の装置で
は、バケットの内面にテフロンをコーティングする等
の、アスファルトの付着防止手段を施すことにより、ア
スファルトが付着しないので、作業の後で、バケットを
清掃する等の手間を省くことができる。
With the above construction, in the asphalt underwater laying apparatus of the present invention, a large number of buckets are provided in a connected state, and the bottom plates of those buckets are opened at once so that a large area can be obtained. On the other hand, the asphalt piling work can be performed once. In addition, by arranging buckets according to the slope of the sloped part of the rubble foundation, asphalt can be constructed along the sloped surface, and the construction work can be performed easily. Become. Therefore, it is possible to efficiently perform the asphalt construction work on the deep seabed, so that it is possible to perform the asphalt construction on a large area by one dive of the diver. Further, in the device of the present invention, by applying an asphalt adhesion preventing means such as coating the inner surface of the bucket with Teflon, the asphalt does not adhere, so the labor of cleaning the bucket after the work can be saved. You can

【0012】[0012]

【実施例】図示される例にしたがって、本発明のアスフ
ァルト類の水中敷設装置を説明する。まず、図1および
図2に示される打設装置20は、アスファルト類の打設
装置の基本的な構成を示すもので、装置本体の四隅の部
分に脚部材22……を設けて構成するフレーム21の内
部に、バケット装置23を配置し、前記バケット装置2
3は、碁盤目状に多数のバケット24……を配置して構
成している。前記バケット24としては、例えば、図示
されるように、四角の形状のものを連接し、それと同様
なものを横方向に複数列に並べたものとして構成するこ
とができるものであるが、その他に、円筒形状のバケッ
ト等を多数設けたものでもよい。前述したようにして、
多数のバケット24を連接した打設装置20は、例え
ば、脚部材の上部に設けた取り付け手段(例えばアイ
部)を介してワイヤ18を接続し、クレーンのフック1
9を介して吊り下げるようにする。なお、前記装置にお
いては、バケットの内面、およびアスファルトが接する
部分には、テフロンやシリコン樹脂等をコーティング
し、アスファルト類が付着することを防止出来るように
している。
EXAMPLE An underwater laying apparatus for asphalts according to the present invention will be described with reference to the illustrated example. First, a placing device 20 shown in FIGS. 1 and 2 shows a basic configuration of an asphalt placing device, and is a frame formed by providing leg members 22 at the four corners of the device body. A bucket device 23 is arranged inside the device 21, and the bucket device 2
3 is configured by arranging a large number of buckets 24 ... In a grid pattern. As the bucket 24, for example, as shown in the drawing, it is possible to connect square-shaped ones and arrange the same ones in a plurality of rows in the lateral direction. Alternatively, a large number of cylindrical buckets or the like may be provided. As mentioned above,
The placing device 20 in which a large number of buckets 24 are connected to each other connects the wire 18 via, for example, an attaching means (for example, an eye portion) provided on the upper portion of the leg member, and the hook 1 of the crane is connected.
Suspend via 9. In the above apparatus, the inner surface of the bucket and the portion in contact with the asphalt are coated with Teflon, silicone resin or the like to prevent the asphalt from adhering.

【0013】前記バケット装置23を構成する各バケッ
ト24……には、底の部分に開閉蓋25……を各々設け
ており、それ等の各バケット25……は、連動させた状
態で同時に開閉可能に設けている。前記バケットを開閉
するための手段としては、例えば、図3に示されるよう
な連動手段を用いることができる。前記図3に示される
例では、開閉蓋25をヒンジ31を介して開閉可能に設
け、前記開閉蓋の他端部にピン部材32を突出させてい
る。そして、開閉装置30では、ロッド33に対して所
定の間隔でフック34を取り付けておき、前記フック3
4が開閉蓋25のピン32の下部にある際には、その開
閉蓋を保持して、バケットの内部に収容されたアスファ
ルト類が洩れ出さないようにする。
Each of the buckets 24 ... Comprising the bucket device 23 is provided with an opening / closing lid 25 ... at the bottom portion thereof, and each of the buckets 25. It is possible. As the means for opening and closing the bucket, for example, interlocking means as shown in FIG. 3 can be used. In the example shown in FIG. 3, the opening / closing lid 25 is provided so as to be openable / closable via a hinge 31, and a pin member 32 is projected at the other end of the opening / closing lid. In the opening / closing device 30, the hooks 34 are attached to the rod 33 at predetermined intervals, and the hook 3
When 4 is below the pin 32 of the opening / closing lid 25, the opening / closing lid is held so that the asphalt contained in the bucket does not leak out.

【0014】また、前記ロッド33は、その軸方向に摺
動可能に設けられており、図3の矢印方向に摺動させる
と、フック34がピン32から外れる状態となり、開閉
蓋に対する支持状態を解放する。なお、前記ロッドの端
部には、図示を省略する駆動手段として、例えば、クレ
ーンオペレータがロープを引くと、ロッドを移動させる
ことができるような機構、または、潜水夫が操作する部
材を配置し、それ等のロッドを駆動する部材を、隣接す
る開閉蓋にも連動させる機構を設けることができる。そ
して、全部のバケットに対して、所定の量のアスファル
ト類を収容させた状態で、海底に構築した捨石基礎の上
に下し、図1に示されるように、脚部材の下部を捨石基
礎1の上に位置決めさせた状態で、各バケットの開閉蓋
25を一度に開くようにする。
Further, the rod 33 is provided so as to be slidable in its axial direction. When the rod 33 is slid in the direction of the arrow in FIG. release. At the end of the rod, as a driving means not shown, for example, a mechanism for moving the rod when a crane operator pulls a rope or a member operated by a diver is arranged. It is possible to provide a mechanism for interlocking the members for driving the rods with the adjacent opening / closing lid. Then, in a state where a predetermined amount of asphalts are stored in all the buckets, the buckets are put down on a rubble foundation constructed on the sea floor, and as shown in FIG. The opening / closing lid 25 of each bucket is opened at a time in a state of being positioned above the bucket.

【0015】前記開閉蓋を開く作用によって、各バケッ
トに収容されているアスファルト類2は、捨石基礎1の
上部に一斉に排出されるが、各バケットには、その面積
に応じた量のアスファルト類が収容されているものであ
るから、その打設装置20の広さに対応する面積で、小
さい山状にアスファルト類が排出されることになる。そ
して、そのアスファルト類2の持つ流動性により、捨石
隙間に流下させて隙間を充填し、第1回目の打設をそ前
記作業を継続することにより行うようにする。次いで、
第2回目のアスファルト類の層を形成する場合には、最
初に打設した層の上に、同様な作業によってアスファル
ト類を打設することができる。したがって、前記打設装
置20を用いる場合には、多数のバケットに各々収容し
たアスファルト類を、広い面積に亘って一度に打設する
ことができ、各打設作業に際しては、開閉蓋を開く動作
を1回行うのみでよいことになる。
By the action of opening the opening / closing lid, the asphalts 2 contained in each bucket are discharged to the upper part of the rubble foundation 1 all at once, and each bucket has an amount of asphalts according to its area. Therefore, the asphalts are discharged in a small mountain shape in an area corresponding to the size of the driving apparatus 20. Then, due to the fluidity of the asphalts 2, the asphalt 2 is made to flow down into the rubble gap to fill the gap, and the first casting is performed by continuing the work. Then
When the second layer of asphalts is formed, the asphalts can be cast by the same operation on the layer that was first cast. Therefore, when the placing device 20 is used, asphalts stored in a large number of buckets can be placed at a time over a wide area, and the opening / closing lid is opened during each placing operation. You only have to do once.

【0016】前記図1ないし図3に示されるような構成
の打設装置20を用いる場合では、バケット24には一
方にのみ開閉可能な開閉蓋25を設けているが、前記バ
ケット24では、図4または図5に示されるように、異
なる構成の開閉蓋を用いることもできる。前記図4に示
される例では、両開き方式の開閉蓋26を用いることが
できる。前記図4に示される開閉蓋26では、2つの開
閉蓋を中央部のヒンジ26aを介して、各々開き得る状
態に設けて、バケットに収容したアスファルト類を両側
に分けて排出させ得るようにしている。また、図5に示
されるバケットでは、開閉蓋27の所定の部分をヒンジ
27aにより支持し、係止手段を外した際に、その開閉
蓋27が一方に傾斜するように設けている。そして、前
記開閉蓋27を開くことにより、バケットに収容された
アスファルト類を排出させるようにする。
In the case of using the placing device 20 having the structure shown in FIGS. 1 to 3, the bucket 24 is provided with the opening / closing lid 25 which can be opened and closed only on one side. As shown in FIG. 4 or FIG. 5, opening / closing lids having different configurations can be used. In the example shown in FIG. 4, the double-sided opening / closing lid 26 can be used. In the opening / closing lid 26 shown in FIG. 4, two opening / closing lids are provided such that they can be opened via a hinge 26a at the central portion so that the asphalts contained in the bucket can be discharged separately on both sides. There is. Further, in the bucket shown in FIG. 5, a predetermined portion of the opening / closing lid 27 is supported by a hinge 27a, and the opening / closing lid 27 is provided so as to be inclined to one side when the locking means is removed. Then, the asphalt contained in the bucket is discharged by opening the opening / closing lid 27.

【0017】なお、前記各実施例に示される開閉蓋に対
しては、全部の開閉蓋、または、列毎のバケットからア
スファルト類を一度に排出できるようにする連動機構を
設けることにより、アスファルト類の打設の作業を容易
に行うことができるような機構を構成する。前述したよ
うに、多数のバケットを配置して、一度に広い面積でア
スファルト類を打設する場合に、各バケットの面積等
は、任意に設定することができる。また、例えば、水深
が50m程度の非常に深い海底で、アスファルト類の打
設を行うような場合には、前記打設装置により一度に施
工する面積は、出来るだけ広い方がよいものであり、そ
れによって潜水夫の一度の潜水による作業能率を向上さ
せることができるものとなる。
As for the opening / closing lids shown in the above-mentioned respective embodiments, by providing an interlocking mechanism that allows the asphalts to be discharged from all the opening / closing lids or buckets for each row at a time, A mechanism is constructed so that the work of placing can be done easily. As described above, when a large number of buckets are arranged and asphalts are placed in a large area at a time, the area of each bucket and the like can be set arbitrarily. Further, for example, when asphalt is to be laid on a very deep seabed with a water depth of about 50 m, it is preferable that the area to be constructed by the laying device at one time is as large as possible. As a result, the work efficiency of the diver's single dive can be improved.

【0018】[0018]

【傾斜面に対するアスファルト類の打設装置】前述した
ような本発明の基本的な打設装置の例では、捨石基礎等
の上部にアスファルト類を施工する装置について説明を
行ったものであり、前記打設装置20を用いる場合に
は、ほぼ平らな場所に対して、能率よくアスファルト類
の施工を行うことができる。ところが、捨石基礎の斜面
部等のように、傾斜した部分にアスファルト類を施工す
る場合には、前述したような水平面に対応する打設装置
20を用いると、一方の端部の捨石基礎に近接する位置
で、合材を排出させ得るものの、他方の端部では非常に
高い位置からアスファルト類を排出するために、その合
材を均一に施工することが困難であるという問題が発生
する。そこで、本発明においては、捨石基礎の傾斜部分
等のような場所に対しては、図6に示される打設装置4
0のように構成された装置を用いることができる。
[Asphalt Placing Device for Inclined Surface] In the example of the basic placing device of the present invention as described above, the device for constructing asphalt on the upper part of a rubble foundation or the like is explained. When the placing device 20 is used, asphalts can be efficiently installed on a substantially flat place. However, when asphalts are to be constructed on a sloped portion such as a sloped portion of a rubble foundation, if the placing device 20 corresponding to the horizontal plane as described above is used, one end of the rubble foundation is close to the rubble foundation. However, since the asphalts are discharged from a very high position at the other end, it is difficult to uniformly apply the mixture. Therefore, in the present invention, for a place such as an inclined part of a rubble foundation, the placing device 4 shown in FIG. 6 is used.
A device configured as 0 can be used.

【0019】前述したように、捨石基礎の傾斜面に対応
させて構成する打設装置40は、前記図1の場合と同様
に、平面から見て四角形状に構成されるフレーム41に
対して、下方に向けて垂直な脚部材42を四隅に立設し
て設けている。また、前記フレーム41は、捨石基礎の
傾斜部1a等に対応させて傾斜させて構成するもので、
前記フレームの脚部剤42の上に吊り上げ用の部材を配
置し、前記吊り上げ用の部材をワイヤ18を接続して、
クレーンのフック19に吊り下げるようにする。なお、
前記打設装置40のフレーム41は、側面から見て略菱
形に構成されるが、平面から見た状態では、略角型の構
成のものとされる。
As described above, the placing device 40 configured to correspond to the inclined surface of the rubble foundation is similar to the case of FIG. Vertical leg members 42 are provided upright at four corners downward. Further, the frame 41 is configured to be inclined in correspondence with the inclined portion 1a of the rubble foundation, etc.,
A lifting member is arranged on the leg material 42 of the frame, and the lifting member is connected to the wire 18,
Make sure to hang it on the hook 19 of the crane. In addition,
The frame 41 of the driving device 40 is formed into a substantially rhombic shape when viewed from the side, but has a substantially rectangular shape when viewed from the top.

【0020】前記打設装置40のフレーム41に対して
は、多数のバケット44……を横方向に接続したバケッ
トの列を、その捨石基礎の傾斜部1aに対応させて段違
い状に配置している。そして、各々のバケットの列のも
のに対して、開閉蓋47……をヒンジ47aを介して揺
動可能に設け、前記開閉蓋を連動させて開閉出来るよう
に設けている。また、段違い状に配置したバケットの開
閉蓋に対しては、全部の開閉蓋を一度に開き得るように
する開閉手段を設けることも出来るもので、前記図3〜
5に示すような蓋の開閉手段を設けることができる。例
えば、図6の打設装置40のバケットに配置する開閉蓋
47を、図5に示すようなものとして構成した場合に
は、蓋の一方の端部に配置する固定部材に対する係止を
解除することにより、開閉蓋の揺動を行わせることがで
きる。さらに、開閉蓋を図3のように構成する場合に
は、開閉の動作をより容易に行い得る機構を構成するこ
とができるものとされる。
On the frame 41 of the placing device 40, a row of buckets in which a large number of buckets 44 ... Are connected in the lateral direction are arranged in a staggered pattern corresponding to the inclined portion 1a of the rubble foundation. There is. Further, opening / closing lids 47 ... Are provided for each row of buckets so as to be swingable via a hinge 47a, and the opening / closing lids are provided so as to be opened / closed in conjunction with each other. Further, with respect to the opening / closing lids of the buckets arranged in different steps, it is possible to provide opening / closing means for opening all the opening / closing lids at a time.
A lid opening / closing means as shown in FIG. 5 can be provided. For example, when the opening / closing lid 47 arranged in the bucket of the placing device 40 of FIG. 6 is configured as shown in FIG. 5, the locking with respect to the fixing member arranged at one end of the lid is released. As a result, the opening / closing lid can be swung. Further, when the opening / closing lid is configured as shown in FIG. 3, it is possible to configure a mechanism capable of performing the opening / closing operation more easily.

【0021】そして、前記打設装置40を用いてアスフ
ァルト類を水中施工する際には、打設装置の各バケット
に対して、各々所定の量のアスファルト類を収容した状
態で、クレーンにより吊り下げて海底の作業現場に下
し、潜水夫の指示等にしたがって、打設場所の傾斜面に
沿わせて据付けるようにする。そして、クレーンオペレ
ータの操作により、または、潜水夫が操作することによ
り、開閉蓋を一斉に開いて、各バケットからアスファル
ト類を排出させる。その際に、広い面積でアスファルト
類が一斉に排出されるが、各々のバケットから排出され
るアスファルト類の量は、捨石基礎の石の隙間に充満さ
れる程度であるために、余分なものが傾斜面の下方に向
けて流出することがない。また、2度目のアスファルト
類の施工の場合にも、各バケットから排出されるアスフ
ァルト類は、その排出部付近で堆積される状態となる。
When asphalts are submerged by using the placing device 40, each bucket of the placing device is hung by a crane while containing a predetermined amount of asphalt. And place it on the bottom of the sea floor, and install it along the inclined surface of the casting site according to the instructions of the diver. Then, by operating the crane operator or by operating the diver, the opening / closing lids are opened all at once, and the asphalts are discharged from each bucket. At that time, asphalt is discharged all at once in a wide area, but the amount of asphalt discharged from each bucket is such that the amount of asphalt discharged from each bucket is such that it fills the gaps between the stones in the rubble foundation, so extra amount is generated It does not flow down the slope. Also, in the case of the second asphalt construction, the asphalt discharged from each bucket is in a state of being deposited near the discharge part.

【0022】なお、バケットを捨石基礎の傾斜部に添わ
せて配置する打設装置40では、前記実施例に示された
ように、各バケットを段違い状に配置することの他に、
図1に示された打設装置20に対して、脚部材のみを傾
斜させた状態に配置することも出来る。そして、例え
ば、傾斜した状態に配置されている各バケットに対し
て、開閉蓋を良好な状態で作動させ得るような機構のも
のとして構成する場合には、アスファルト類の排出に支
障が生じないことにもなる。そして、前述したように、
多数のバケットを1つのフレームに支持させ、そのバケ
ットからアスファルト類を一度に放出させ得るように構
成することによって、深い海底等でのアスファルト類の
施工能率を向上させることができる。
In addition, in the placing device 40 in which the buckets are arranged along the inclined portion of the rubble foundation, in addition to the arrangement of the buckets in different steps as shown in the above embodiment,
It is also possible to dispose only the leg members in an inclined state with respect to the driving device 20 shown in FIG. Then, for example, when the buckets arranged in a tilted state are configured as a mechanism capable of operating the opening / closing lid in a good state, there is no hindrance to the discharge of asphalt. It also becomes. And, as mentioned above,
By supporting a large number of buckets on one frame and discharging the asphalts from the buckets at once, the construction efficiency of the asphalts on the deep seabed can be improved.

【0023】[0023]

【発明の効果】本発明のアスファルト類の水中敷設装置
は、前述したような打設装置を用いるものであるから、
前記打設装置に対して、多数の開閉蓋を連接した状態
で、それ等のバケットを一度に開くことにより、広い面
積の部分に対して、1度でアスファルト類の打設作業を
行うことができる。したがって、深い海底でのアスファ
ルト類の施工作業を能率よく行うことができるので、潜
水夫の1回の潜水により、広い面積にアスファルト類を
施工を行うことが可能になる。また、捨石基礎の傾斜部
分等に対しても、その傾斜に応じて開閉蓋を配置するこ
とにより、その傾斜面に沿ってアスファルト類の施工を
行うことができ、その施工作業を容易に行い得るものと
なる。さらに、本発明の装置では、バケットの内面にテ
フロンをコーティングする等の手段を施すことにより、
アスファルトが付着しないので、作業の後で、バケット
を清掃する等の手間を省くことができる。
INDUSTRIAL APPLICABILITY Since the asphalt underwater laying apparatus of the present invention uses the above-mentioned placing apparatus,
With a large number of opening / closing lids connected to the placing device, by opening those buckets at once, it is possible to perform the asphalt placement work on a large area at one time. it can. Therefore, since the asphalt construction work on the deep sea bottom can be efficiently performed, it becomes possible to construct the asphalt on a large area by one dive of the diver. Also, by arranging the opening / closing lid according to the inclination of the sloping portion of the rubble foundation, asphalt can be constructed along the inclined surface, and the construction work can be easily performed. Will be things. Furthermore, in the device of the present invention, by applying a means such as coating Teflon on the inner surface of the bucket,
Since the asphalt does not adhere, it is possible to save labor such as cleaning the bucket after the work.

【図面の簡単な説明】[Brief description of drawings]

【図1】 アスファルト類の打設装置の基本的な構成を
示す斜視図である。
FIG. 1 is a perspective view showing a basic configuration of an asphalt driving device.

【図2】 図1の装置を用いたアスファルト類の施工状
態の説明図である。
FIG. 2 is an explanatory diagram of a construction state of asphalt using the apparatus of FIG.

【図3】 図1の装置に設ける開閉蓋の開閉の連動機構
の説明図である。
FIG. 3 is an explanatory view of an interlocking mechanism for opening / closing an opening / closing lid provided in the device of FIG.

【図4】 開閉蓋の別の実施例の説明図である。FIG. 4 is an explanatory view of another embodiment of the opening / closing lid.

【図5】 開閉蓋の他の実施例の説明図である。FIG. 5 is an explanatory view of another embodiment of the opening / closing lid.

【図6】 本発明の打設装置の実施例の説明図である。FIG. 6 is an explanatory view of an embodiment of the driving apparatus of the present invention.

【図7】 従来のアスファルト類の施工装置の説明図で
ある。
FIG. 7 is an explanatory diagram of a conventional asphalt construction device.

【図8】 従来の別のアスファルト類の施工装置の説明
図である。
FIG. 8 is an explanatory view of another conventional asphalt construction device.

【図9】 図7に示される装置を用いたアスファルト類
の施工状態の説明図である。
9 is an explanatory view of a construction state of asphalt using the apparatus shown in FIG.

【符号の説明】[Explanation of symbols]

1 捨石基礎、 10・15・20・40 打設装
置、 21 フレーム、 22 脚部材、 23 バケ
ット装置、 24 バケット、 25・26・27・47 開閉
蓋、 30 開閉装置、 33 ロッド、 34 フッ
ク、 44 バケット装置。
1 Rubble stone foundation, 10 ・ 15 ・ 20 ・ 40 Placing device, 21 frame, 22 leg members, 23 bucket device, 24 bucket, 25 ・ 26 ・ 27 ・ 47 opening / closing lid, 30 opening / closing device, 33 rod, 34 hook, 44 Bucket equipment.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 クレーン等により吊り下げられるフレー
ムに対して、多数のバケットを縦横方向に並べてバケッ
ト装置を構成し、各バケットの底部分には各々開閉蓋を
配置するとともに、バケットの内面にはアスファルトの
付着防止手段を施し、前記フレームを水中の基礎等の傾
斜角度に対応させて構成し、バケット装置を構成する各
バケットを、段違い状に配置するとともに、前記各バケ
ットに設ける開閉蓋を、連動させて開き得るように構成
することを特徴とするアスファルト類の水中敷設装置。
1. A bucket device is constructed by arranging a large number of buckets in a vertical and horizontal direction with respect to a frame suspended by a crane or the like, and an opening / closing lid is arranged at the bottom of each bucket, and an inner surface of the bucket is provided. By applying an asphalt adhesion preventing means, the frame is configured in correspondence with the inclination angle of the underwater foundation, etc., each bucket constituting the bucket device is arranged in a stepwise manner, and an opening / closing lid provided on each bucket is provided. An underwater laying device for asphalts, which is configured to open in conjunction with each other.
JP3262812A 1991-09-13 1991-09-13 Underwater laying equipment for asphalt Expired - Fee Related JPH0742701B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3262812A JPH0742701B2 (en) 1991-09-13 1991-09-13 Underwater laying equipment for asphalt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3262812A JPH0742701B2 (en) 1991-09-13 1991-09-13 Underwater laying equipment for asphalt

Publications (2)

Publication Number Publication Date
JPH0579039A JPH0579039A (en) 1993-03-30
JPH0742701B2 true JPH0742701B2 (en) 1995-05-10

Family

ID=17380958

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3262812A Expired - Fee Related JPH0742701B2 (en) 1991-09-13 1991-09-13 Underwater laying equipment for asphalt

Country Status (1)

Country Link
JP (1) JPH0742701B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5259931A (en) * 1975-11-12 1977-05-17 Mitsubishi Heavy Ind Ltd Method of reinforcing water bottom

Also Published As

Publication number Publication date
JPH0579039A (en) 1993-03-30

Similar Documents

Publication Publication Date Title
US4440527A (en) Marine structure
CN111676893B (en) Temporary wharf structure and construction method thereof
JPH0742701B2 (en) Underwater laying equipment for asphalt
JPH0742702B2 (en) Underwater casting equipment for asphalt
JP2920464B2 (en) Asphalt casting apparatus and construction method
JPH08170343A (en) Finishing method for underwater rubble mound
KR20170020829A (en) Equipment for leveling of rubble stone underwater and rubble stone leveling method by using it
JPH09273128A (en) Frame device for laying under watercontinuous form
JPH08165652A (en) Foundation construction method of maritime structure
JPH1171737A (en) Seaweed field at outside of breakwater and formation thereof
JP3301967B2 (en) Shade concrete block
JP2687820B2 (en) Coating structure and coating method for underwater mound construction
JP2009137682A (en) Suspending frame device
JP2506050B2 (en) Construction method of asphalt mastic layer
JP2759833B2 (en) Embankment method
JP3388416B2 (en) Construction equipment for the layer for preventing the suction of landfill soil in reclaimed seawalls
JPH11247154A (en) Construction of riprap bank for revetment
JP2781937B2 (en) Stone distribution equipment for arranging discarded stones on the seabed
JP2002294719A (en) Slope face leveling machine and slope face leveling method
JPH1046547A (en) Covering block and underwater covering method
JPS6132459B2 (en)
RU2037603C1 (en) Device to concrete cast-in-place piles
KR970002569B1 (en) A slope compactor
JPH03103530A (en) Underwater placing method of dry filling material and device thereof
JPH07305322A (en) Construction method of control type revetment

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090510

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100510

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees