JPH0749757B2 - Tunnel construction method using tunnel lining element - Google Patents
Tunnel construction method using tunnel lining elementInfo
- Publication number
- JPH0749757B2 JPH0749757B2 JP14678990A JP14678990A JPH0749757B2 JP H0749757 B2 JPH0749757 B2 JP H0749757B2 JP 14678990 A JP14678990 A JP 14678990A JP 14678990 A JP14678990 A JP 14678990A JP H0749757 B2 JPH0749757 B2 JP H0749757B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- steel
- tunnel
- cable
- elements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 66
- 239000010959 steel Substances 0.000 claims description 66
- 239000004567 concrete Substances 0.000 claims description 56
- 239000000463 material Substances 0.000 claims description 17
- 238000000034 method Methods 0.000 claims description 8
- 239000004576 sand Substances 0.000 claims description 6
- 239000011513 prestressed concrete Substances 0.000 claims description 3
- 238000003780 insertion Methods 0.000 description 19
- 230000037431 insertion Effects 0.000 description 19
- 230000003014 reinforcing effect Effects 0.000 description 9
- 230000002787 reinforcement Effects 0.000 description 6
- 238000010008 shearing Methods 0.000 description 5
- 239000004568 cement Substances 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 4
- 241001247986 Calotropis procera Species 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 235000013372 meat Nutrition 0.000 description 1
- 239000012779 reinforcing material Substances 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は、たとえば、鉄道や道路等の下に立体交差する
トンネルを構築する場合に用いられるトンネル覆工用エ
レメントによるトンネルの構築方法に関するものであ
る。TECHNICAL FIELD The present invention relates to a tunnel construction method using a tunnel lining element, which is used, for example, when constructing a tunnel that crosses under a railway, a road, or the like. Is.
[従来の技術] 鉄道や道路の下に立体交差するトンネルを構築する方法
として、従来からの現場打設コンクリートによる覆工体
の分割されない一体構築による施工法に代え、断面形状
が矩形で、複数の長尺なコンクリート製あるいはスチー
ル製のトンネル覆工用エレメントを、地盤に対しトンネ
ル覆工断面に直交させて推進して埋設し、エレメント間
の目地空間へのモルタル注入あるいはスチール製エレメ
ントの内部空間にコンクリートを打設するとともに、互
いのエレメントに挿通させたPC鋼材を引張定着させるこ
とにより互いに連結した後、エレメント連結体の内側の
土砂を掘削除去する方法が知られている。[Prior Art] As a method of constructing a tunnel that crosses under a railway or a road, instead of the conventional construction method that does not divide the lining body by in-place concrete, the sectional shape is rectangular The long concrete or steel tunnel lining element of the above is buried by being propelled to the ground orthogonally to the tunnel lining cross section and mortar injection into the joint space between the elements or the internal space of the steel element A method is known in which concrete is poured into the concrete, and PC steel materials inserted into the respective elements are connected by pulling and fixing them to each other, and then the earth and sand inside the element connection body are excavated and removed.
[発明が解決しようとする課題] このようなトンネルの構築方法において、コンクリート
製エレメントを用いる場合、エレメントを連結するPC鋼
材(PCケーブル等)の挿通孔の位置をそれぞれ相隣り合
うエレメント間で精度より一致させることは難しく、挿
通孔がくい違った場合は土中における局部の視認ができ
ないためその対処が困難である。そこで、このPC鋼材の
挿通が便利なように挿通孔の径を広げれば、PC鋼材の位
置決め誤差が大きくなると同時に目地部へ注入したモル
タルが他の目地空間へ浸出してその先のモルタル流路を
閉塞し、以後のモルタル注入が不可能となる。[Problems to be Solved by the Invention] In such a tunnel construction method, when a concrete element is used, the position of the insertion hole of the PC steel material (PC cable or the like) connecting the elements is accurately adjusted between the adjacent elements. It is more difficult to make them coincide with each other, and if the insertion holes are misaligned, it is difficult to deal with them because the local parts in the soil cannot be visually recognized. Therefore, if the diameter of the insertion hole is widened so that this PC steel material can be easily inserted, the positioning error of the PC steel material will increase, and at the same time, the mortar injected into the joint will leach into the other joint space and the mortar flow path beyond that. Then, the mortar cannot be injected thereafter.
また、スチール製エレメントを用いる際は、隣り合うエ
レメントの境界を決する鋼板が平坦であると剪断力の伝
達が不足する場合があり、その鋼板に対して剪断力を伝
達させるためのジベル等の突起を設ける必要が生じる。When steel elements are used, the transmission of shearing force may be insufficient if the steel plates that define the boundaries between adjacent elements are flat. Need to be provided.
[課題を解決するための手段] 本発明は上記課題を解決するためになされたものであっ
て、トンネルを構築すべき地盤に対し、覆工断面と直交
させて、複数の長尺なコンクリート製トンネル覆工用エ
レメントと、このコンクリート製エレメント側に開口す
る中空状のスチール製トンネル覆工用エレメントとを交
互に並べて水平に埋設し、各エレメント間にPC鋼材を挿
通させることにより、各エレメントを互いに連結してエ
レメント連結体とし、次いで、スチール製エレメント内
にコンクリートを打設し、所要の強度に達したところで
前記PC鋼材を緊張定着することにより、各エレメントの
コンクリートに圧縮力を導入して前記エレメント連結体
をプレストレスコンクリートとして完成させた後、この
エレメント連結体の内側の土砂を掘削除去することを特
徴としている。[Means for Solving the Problems] The present invention has been made to solve the above problems, and is made of a plurality of long concretes that are orthogonal to the lining cross section with respect to the ground where a tunnel is to be constructed. Tunnel lining elements and hollow steel tunnel lining elements that open to the concrete element side are alternately arranged and buried horizontally, and by inserting PC steel between each element, each element is By connecting each other to form an element connection body, then concrete is poured into the steel element, and when the required strength is reached, the PC steel material is tension-fixed to introduce a compressive force into the concrete of each element. After completing the element connection body as prestressed concrete, excavation and removal of earth and sand inside the element connection body It is characterized in Rukoto.
[作用] 本発明のトンネル覆工用エレメントによるトンネルの構
築方法によれば、1本のコンクリート製エレメントの両
側のスチール製エレメント内に作業員が入って、全ての
コンクリート製エレメントに対するPC鋼材の挿通作業が
行えるから、このPC鋼材のエレメント連結体に対する引
き回し作業を容易かつ確実に行え、PC鋼材の挿通孔への
コンクリートの流入を防ぐ手段も講ずることができる。
また、複雑な形状の製造が容易なコンクリート製エレメ
ントを、スチール製のセグメント内に打設されるコンク
リートに対して剪断力の伝達がなされる形状に成形する
ことにより、構造体としての強度の向上が図られる。[Operation] According to the method for constructing a tunnel by the tunnel lining element of the present invention, a worker enters the steel elements on both sides of one concrete element, and the PC steel material is inserted into all the concrete elements. Since the work can be performed, it is possible to easily and surely carry out the work of routing the PC steel element to the element connection body, and it is possible to take a measure to prevent the concrete from flowing into the insertion hole of the PC steel material.
In addition, the strength of the structure is improved by molding concrete elements that are easy to manufacture in complicated shapes into shapes that transmit shearing force to concrete placed in steel segments. Is planned.
[実施例] 以下、図面を参照して本発明の一実施例を説明する。[Embodiment] An embodiment of the present invention will be described below with reference to the drawings.
第1図は本発明に基づいて地盤中に構築したトンネルの
一例を示し、このトンネル1は、地盤Gに対し、覆工断
面と直交させて複数の長尺なコンクリート製のエレメン
ト2と、中空状のスチール製のベースエレメント3、角
部エレメント4、メインエレメント5とを交互に並べて
水平に推進して埋設し、各エレメント2、3、4、5間
にPCケーブル6(PC鋼材)を挿通してその両端をベース
エレメント3に定着させ、さらに、スチール製の各エレ
メント3、4、5内と各エレメント2、3、4、5間の
目地等の空間にコンクリートを充填し、コンクリートの
充分な硬化を待ってPCケーブル6を緊張して各エレメン
ト2、3、4、5を一体化させてこれらをエレメント連
結体7とし、次いで、このエレメント連結体7の内側の
土砂を掘削除去して構築されている。FIG. 1 shows an example of a tunnel constructed in the ground based on the present invention. This tunnel 1 has a plurality of long concrete elements 2 which are orthogonal to the lining cross section with respect to the ground G, and hollow. -Shaped steel base element 3, corner element 4, and main element 5 are alternately arranged and horizontally propelled to be embedded, and a PC cable 6 (PC steel material) is inserted between each element 2, 3, 4, and 5. Then, both ends thereof are fixed to the base element 3, and the space such as joints between the steel elements 3, 4, 5 and the joints 2, 3, 4, 5 made of steel is filled with concrete to ensure that the concrete is sufficiently filled. After hardening, the PC cable 6 is tensioned to integrate the elements 2, 3, 4, 5 into the element connecting body 7, and then the earth and sand inside the element connecting body 7 are excavated and removed. It has been built.
PCケーブル6は、エレメント連結体7に対し、周囲の土
圧に抗するよう引張り力が働く部分に沿って湾曲して引
き回されている。The PC cable 6 is bent around the element connecting body 7 along a portion where a tensile force acts so as to resist the surrounding earth pressure.
前記エレメント連結体7において、両側の鉛直部8の最
下部である脚部には前記ベースエレメント3が、また、
鉛直部8と水平部9が交わる角部にはスチール製の前記
角部エレメント4が埋設され、さらに、鉛直部8および
水平部9の間に、コンクリート製の前記エレメント2と
スチール製の前記メインエレメント5が交互に配されて
埋設されている。In the element connecting body 7, the base element 3 is attached to the lowermost leg of the vertical portions 8 on both sides,
The corner element 4 made of steel is embedded in the corner where the vertical part 8 and the horizontal part 9 intersect, and further, the element 2 made of concrete and the main part made of steel are provided between the vertical part 8 and the horizontal part 9. The elements 5 are alternately arranged and buried.
コンクリート製のエレメント2は、断面略長方形状で、
短辺側の面には、長手方向に延びるシェアキー10が形成
されている。このシェアキー10は、後にスチール製の前
記各エレメント3、4、5内にコンクリートを打設した
際にこのコンクリートに剪断力を伝えるための溝であ
る。The concrete element 2 has a substantially rectangular cross section,
A shear key 10 extending in the longitudinal direction is formed on the surface on the short side. The shear key 10 is a groove for transmitting a shearing force to concrete when the concrete is placed in the steel elements 3, 4 and 5 later.
そして、このエレメント2には、短辺側の面に溝状のシ
ェアキー10が形成され、かつ、PCケーブル挿通孔11が長
手方向に間隔をおいて多数設けられている。また、長手
方向の端面間にわたって補強用かつ連結用としてのPCケ
ーブル(あるいは鋼棒、鉄筋等)を挿通するための補強
用孔12を設けてもよい。The element 2 has a groove-shaped shear key 10 formed on the surface on the short side and a large number of PC cable insertion holes 11 provided at intervals in the longitudinal direction. Further, a reinforcing hole 12 for inserting a PC cable (or a steel rod, a reinforcing bar, etc.) for reinforcement and connection may be provided between the end faces in the longitudinal direction.
なお、このコンクリート製のエレメント2の場合、軽量
化とPCケーブルによる応力の有効作用を図るため、第3
図に示すように、適宜な間隔で肉抜きを施しここに発泡
性充填材13を充填すると好ましい。In addition, in the case of this concrete element 2, in order to reduce the weight and to effectively act the stress caused by the PC cable,
As shown in the figure, it is preferable that the meat is removed at appropriate intervals and the foamable filler 13 is filled therein.
前記スチール製のベースエレメント3は、第4図に示す
ように、断面略凸状で、両側が鋼板14で覆われその上部
がトラス補強材15により連結されており下方に開口して
いる。また、推進方向の先端には、第5図に示すよう
に、中央に前方に突出する突部16が形成されて前後にず
れた段部17が設けられている。このような先端形状をな
すことにより、地盤に推進させる際に地中の応力が1カ
所に集中せず分散するので、切羽の崩壊が未然に防がれ
るという利点がある。As shown in FIG. 4, the steel base element 3 has a substantially convex cross section, is covered with steel plates 14 on both sides, is connected by a truss reinforcement 15 at its upper portion, and is open downward. Further, as shown in FIG. 5, a projecting portion 16 projecting forward is formed at the center at the tip end in the propulsion direction, and a step portion 17 is provided which is displaced forward and backward. By forming such a tip shape, when propelling to the ground, the stress in the ground is not concentrated at one location but dispersed, so that there is an advantage that face collapse can be prevented in advance.
前記スチール製の角部エレメント4は、第1図に示すよ
うに、エレメント連結体7の鉛直部8および水平部9に
臨む面にトラス補強材18が配されその他の面が鋼板19に
より覆われてなる。As shown in FIG. 1, the corner element 4 made of steel is provided with a truss reinforcement 18 on the surface facing the vertical portion 8 and the horizontal portion 9 of the element connecting body 7, and the other surface is covered with the steel plate 19. It becomes.
前記スチール製のメインエレメント5は、第6図に示す
ように、断面長方形状で互いに平行なる一対の鋼板20が
トラス補強材21によって連結されてなる中空状のもので
ある。この場合、断面の長辺側が鋼板20となっている。As shown in FIG. 6, the steel main element 5 has a hollow shape in which a pair of steel plates 20 having a rectangular cross section and parallel to each other are connected by a truss reinforcing material 21. In this case, the steel plate 20 is on the long side of the cross section.
なお、上記各スチール製のエレメント3、4、5におい
て、トラス補強材15、18、21は、ラチス構造であっても
よい。In addition, in each of the steel elements 3, 4, and 5 described above, the truss reinforcing members 15, 18, and 21 may have a lattice structure.
さて、続いて上記コンクリート製のエレメント2、スチ
ール製の各エレメント3、4、5を用いて、第1図に示
すトンネルを構築する方法の手順を説明する。Now, subsequently, the procedure of the method for constructing the tunnel shown in FIG. 1 using the concrete element 2 and the steel elements 3, 4, and 5 will be described.
第1図に示す門型の配列にしたがって、コンクリート製
のエレメント2とスチール製の各エレメント3、4、5
を交互に並べて地盤に推進させて埋設する。この際、コ
ンクリート製のエレメント2とスチール製の各エレメン
ト3、4、5とは、シェアキー10が形成された面とトラ
ス補強材15、18、21が配された面が互いに向き合う。ま
た、第7図(第7図は水平部9のみを例示している)に
示すように、コンクリート製のエレメント2をスチール
製の各エレメント3(4、5)の鋼板20(14、19)間に
さし挟む。According to the gate-shaped arrangement shown in FIG. 1, the concrete element 2 and the steel elements 3, 4, 5 are arranged.
Are alternately arranged and propelled into the ground to be buried. At this time, in the element 2 made of concrete and the elements 3, 4, 5 made of steel, the surface on which the shear key 10 is formed and the surface on which the truss reinforcing members 15, 18, 21 are arranged face each other. Further, as shown in FIG. 7 (FIG. 7 exemplifies only the horizontal portion 9), the concrete element 2 is replaced by the steel plate 20 (14, 19) of each steel element 3 (4, 5). Insert it in between.
コンクリート製のエレメント2を埋設するには、まずス
チール製の置換エレメントを推進して埋設し、このエレ
メント2の後端にエレメント2を突き当てて押し出すこ
とにより除去して回収する。この置換エレメントは、他
のコンクリート製のエレメント2を埋設するときに再び
用いる。In order to bury the concrete element 2, the replacement element made of steel is first urged and buried, and the element 2 is abutted against the rear end of the element 2 and pushed out to be removed and recovered. This replacement element is used again when burying another concrete element 2.
上記スチール製の各エレメント3、4、5を地盤Gに対
して推進する際には、トラス補強材15、18、21が配され
た側から内部に土砂が流入するのを防ぐため、第8図
(この図はメインエレメント5を例示している)に示す
ように、トラス補強材21(18、21)の外側にこのトラス
補強材21を覆うごとく複数のスライド板22をあらかじめ
取り付けておき、推進が終わって地盤Gに埋設されたら
スライド板22を推進方向に順送りして除去する。When propelling the steel elements 3, 4 and 5 above the ground G, in order to prevent the inflow of earth and sand from the side where the truss reinforcements 15, 18 and 21 are arranged, As shown in the figure (this figure illustrates the main element 5), a plurality of slide plates 22 are attached to the outside of the truss reinforcement member 21 (18, 21) so as to cover the truss reinforcement member 21 in advance. When the propulsion is finished and it is buried in the ground G, the slide plate 22 is sequentially fed in the propulsion direction and removed.
なお、構築するトンネルが長い場合には、2本以上のエ
レメントを接続する必要が生じてくるが、スチール製の
各エレメント3、4、5の場合は溶接等の手段により液
密性を保持して接続する。If the tunnel to be constructed is long, it becomes necessary to connect two or more elements, but in the case of each steel element 3, 4, 5, the liquid tightness is maintained by means such as welding. To connect.
また、コンクリート製のエレメント2を接続する場合に
は、第9図に示すように、接続端部の一方に凹部23を、
他方に凹部23に嵌合する凸部24を形成し、一方の接続端
面に接着材Pを塗布してから凹部23と凸部24を互いに嵌
合させるとともに、前記補強用孔12にPCケーブル25(あ
るいは鋼棒、鉄筋等)を挿通しこのPCケーブル25を引張
・定着させる。In addition, when connecting the concrete element 2, as shown in FIG.
A convex portion 24 that fits into the concave portion 23 is formed on the other side, and the adhesive material P is applied to one connecting end face, and then the concave portion 23 and the convex portion 24 are fitted to each other, and the PC cable 25 is inserted into the reinforcing hole 12. (Or a steel rod, a reinforcing bar, etc.) is inserted and this PC cable 25 is pulled and fixed.
また、この他に、第10図に示すように、接続端部にあら
かじめ埋設した継手金具26どうしをボルト27・ナット
(図示略)で締結したり、第11図に示すように、一方の
エレメント2の補強用孔12の端部に埋め込んだスケール
パイプ28を、他方のエレメント2の補強用孔12の端部に
設けた凹部29に嵌合して双方の補強用孔12にPCケーブル
25を挿通し、一方のエレメント2の周囲にシール材Sを
埋める手段等がある。In addition to this, as shown in FIG. 10, joint fittings 26 previously embedded in the connection end portions are fastened with bolts 27 and nuts (not shown), or as shown in FIG. The scale pipe 28 embedded in the end portion of the reinforcing hole 12 of No. 2 is fitted into the concave portion 29 provided at the end portion of the reinforcing hole 12 of the other element 2 and the PC cable is inserted into both reinforcing holes 12.
There is a means for inserting the sealing material S around the one element 2 by inserting the element 25.
次いで、各スチール製のエレメント3、4、5に作業員
が入り込み、一方のベースエレメント3から、隣接する
上方のコンクリート製のエレメント2のPCケーブル挿通
孔11にPCケーブル6を通し、その上方のメインエレメン
ト5内の作業員がそのPCケーブル6の端部を受取るとと
もに、さらにその上方のコンクリート製のエレメント2
のPCケーブル挿通孔11にPCケーブル6を通し、角部エレ
メント1内の作業員がその端部を受取る。Next, a worker enters each of the steel elements 3, 4 and 5, and the PC cable 6 is passed through the PC cable insertion hole 11 of the adjacent upper concrete element 2 from one base element 3 to A worker inside the main element 5 receives the end of the PC cable 6 and a concrete element 2 above it.
The PC cable 6 is passed through the PC cable insertion hole 11 of the above, and the worker inside the corner element 1 receives the end thereof.
このように、一方の鉛直部8にわたってPCケーブル6を
下から挿通したら、続いて、このPCケーブル6を同様に
して水平部9のメインエレメント5内の作業員により各
エレメント2、5に挿通させて他方側の角部エレメント
4まで通し、次いで、他方の鉛直部8に、PCケーブル6
をメインエレメント5内の作業員により挿通させ、ベー
スエレメント3に至らしめる。その後、スチール製の角
部エレメント4およびメインエレメント5内にコンクリ
ートを充填・打設する。In this way, when the PC cable 6 is inserted from below over the vertical portion 8 on one side, subsequently, the PC cable 6 is similarly inserted into the elements 2 and 5 by the operator inside the main element 5 of the horizontal portion 9. Through the corner element 4 on the other side, and then the PC cable 6 on the other vertical portion 8.
Is inserted by a worker in the main element 5 to reach the base element 3. Then, concrete is filled and poured into the corner element 4 and the main element 5 made of steel.
打設されたコンクリートが所要の強度に達したならば、
PCケーブル6両端のベースエレメント3内に入った作業
員により、PCケーブル6を引張してPCケーブル6が挿通
する各エレメント2、4、5に圧縮力を与えて固定す
る。Once the cast concrete reaches the required strength,
A worker who has entered the base element 3 at both ends of the PC cable 6 pulls the PC cable 6 and applies a compressive force to the elements 2, 4 and 5 through which the PC cable 6 is inserted to fix the PC cable 6.
以上により、鉛直部8および水平部9はPCケーブル6に
よりプレストレスが導入された状態で一体化される。As described above, the vertical portion 8 and the horizontal portion 9 are integrated in the state where the prestress is introduced by the PC cable 6.
PCケーブル6をコンクリート製のエレメント2に挿通す
る手段としては、第12図に示すように、あらかじめエレ
メント2のPCケーブル挿通孔11にシース31を貫入してお
き、各エレメント2、3、4、5の埋設が終わったら、
スチール製のメインエレメント5内に入ってシース31を
引き抜いてメインエレメント5内に架け渡し、隣合うエ
レメント2のPCケーブル挿通孔11と連続させる。次い
で、メインエレメント5内のシース31およびエレメント
2のPCケーブル挿通孔11にPCケーブル30を挿通して引張
・定着する。そしてこの後、PCケーブル挿通孔11とシー
ス31内にセメントペースト等を注入してPCケーブル6を
固着させる。As a means for inserting the PC cable 6 into the element 2 made of concrete, as shown in FIG. 12, a sheath 31 is previously inserted into the PC cable insertion hole 11 of the element 2, and each element 2, 3, 4, When the burial of 5 is over,
After entering the steel main element 5, the sheath 31 is pulled out, bridged over the main element 5, and made continuous with the PC cable insertion holes 11 of the adjacent elements 2. Then, the PC cable 30 is inserted through the sheath 31 in the main element 5 and the PC cable insertion hole 11 of the element 2 and pulled and fixed. Then, after this, cement paste or the like is injected into the PC cable insertion hole 11 and the sheath 31 to fix the PC cable 6.
また他の手段として、第13図に示すように、エレメント
2のPCケーブル挿通孔11の開口に鍔付きのゴムブッシュ
32を押し込んで装着し、このゴムブッシュ32を介してPC
ケーブル6を通す。この手段において、さらに上記のよ
うにセメントペーストによりPCケーブル6を固着する場
合には、第14図に示すように、あらかじめ形成したPCケ
ーブル挿通孔11を連通する連通孔33を介して1本のエレ
メント2内の全てのPCケーブル挿通孔11にセメントペー
ストをいきわたらせる。As another means, as shown in FIG. 13, a rubber bush with a collar at the opening of the PC cable insertion hole 11 of the element 2.
32 is pushed in and installed, and PC is inserted through this rubber bush 32.
Pass the cable 6. In this means, when the PC cable 6 is further fixed with cement paste as described above, as shown in FIG. 14, one PC cable 6 is inserted through the communication hole 33 for communicating the PC cable insertion hole 11 formed in advance. The cement paste is spread over all the PC cable insertion holes 11 in the element 2.
以上のように鉛直部8および水平部9にプレストレスを
導入して各エレメント2、4、5を連結して一体化させ
たら、PCケーブル6の引張作業を行ったベースエレメン
ト3内にコンクリートを打設しプレストレス構造体の構
築が完了する。As described above, when prestress is introduced into the vertical portion 8 and the horizontal portion 9 to connect and integrate the elements 2, 4 and 5, concrete is put into the base element 3 where the PC cable 6 is pulled. Construction is completed by placing and prestressing structure.
この後、このエレメント連結体7の内側の土砂を掘削除
去し、トンネル1を得る。Then, the earth and sand inside the element connecting body 7 are excavated and removed to obtain the tunnel 1.
上記のようなトンネルの構築方法によれば、1本のコン
クリート製のエレメント2の両側のスチール製のエレメ
ント3、4、5内に作業員が入って、全てのコンクリー
ト製のエレメント2に対するPCケーブル6の挿通作業を
目視で行えるから、このPCケーブル6のエレメント連結
体7に対する引き回し作業を容易かつ確実に行えるとと
もに、その作業時間が短縮する。また、コンクリート製
のエレメント2に形成されたシェアキー10により剪断力
の伝達がなされ構造体としての強度の向上が図られる。
すなわち、シェアキー10を設けることのできるコンクリ
ート製のエレメント2とPCケーブル30の挿通作業が確実
に行るスチール製のエレメント3、4、5を交互に組む
ことによりコンクリート製とスチール製のそれぞれが有
するエレメントの利点が生かされているわけである。According to the tunnel construction method as described above, a worker enters the steel elements 3, 4 and 5 on both sides of one concrete element 2 and the PC cable for all concrete elements 2 is inserted. Since the insertion work of 6 can be visually performed, the work of routing the PC cable 6 to the element connecting body 7 can be performed easily and surely and the work time can be shortened. Further, shearing force is transmitted by the shear key 10 formed on the concrete element 2, and the strength of the structure is improved.
That is, the concrete element 2 which can be provided with the share key 10 and the steel elements 3, 4 and 5 which ensure the insertion work of the PC cable 30 are assembled alternately so that each of the concrete element and the steel element is inserted. The advantage of the element that has it is utilized.
なお、第15図は水平部9が長いトンネルを本発明にもと
づいて構築した状態を示しており、この場合、真ん中に
鉛直部8を新たに埋設するとともに、1本のPCケーブル
6ではコーナーの急な曲がり部分で張力が減退して抗圧
力が不足になるおそれがあるので、水平部9と鉛直部8
にそれぞれ1本ずつPCケーブル6を挿通している。ま
た、角部エレメント4の側方にスチール製の補助エレメ
ント40を接続し、第16図に示すように、この補助エレメ
ント40に水平部9のPCケーブル6の端部を定着し、さら
に、鉛直部8のPCケーブル6の上方の端部は、角部エレ
メント4内に設けた係止片41に定着させている。Note that FIG. 15 shows a state in which a tunnel having a long horizontal portion 9 is constructed based on the present invention. In this case, a vertical portion 8 is newly embedded in the middle and one PC cable 6 has a corner portion. There is a risk that the tension will decrease at the sharp bend and the coercive force may become insufficient, so the horizontal portion 9 and the vertical portion 8
One PC cable 6 is inserted in each. Further, a steel auxiliary element 40 is connected to the side of the corner element 4, and the end of the PC cable 6 of the horizontal portion 9 is fixed to the auxiliary element 40 as shown in FIG. The upper end of the PC cable 6 of the portion 8 is fixed to a locking piece 41 provided in the corner element 4.
[発明の効果] 以上説明したように、本発明のトンネル覆工用エレメン
トによるトンネルの構築方法によれば、トンネルを構築
すべき地盤に対し、覆工断面と直交させて、複数の長尺
なコンクリート製トンネル覆工用エレメントと、このコ
ンクリート製エレメント側に開口する中空状のスチール
製トンネル覆工用エレメントとを交互に並べて水平に埋
設し、各エレメント間にPC鋼材を挿通させることによ
り、各エレメントを互いに連結してエレメント連結体と
し、次いで、スチール製エレメント内にコンクリートを
打設し、所要の強度に達したところで前記PC鋼材を緊張
定着することにより、各エレメントのコンクリートに圧
縮力を導入して前記エレメント連結体をプレストレスコ
ンクリートとして完成させた後、このエレメント連結体
の内側の土砂を掘削除去することを特徴とするもので、
1本のコンクリート製エレメントの両側のスチール製エ
レメント内に作業員が入って、全てのコンクリート製エ
レメントに対するPC鋼材の挿通作業が行えるから、この
PC鋼材のエレメント連結体に対する引き回し作業を容易
かつ確実に行え、PC鋼材の挿通孔へのコンクリートの流
入を防ぐ手段も講ずることができる。また、複雑な形状
の製造が容易なコンクリート製エレメントを、スチール
製のセグメント内に打設されるコンクリートに対して剪
断力の伝達がなされる形状に成形することにより、構造
体としての強度の向上も図られるといった効果を奏す
る。[Effects of the Invention] As described above, according to the method for constructing a tunnel by the tunnel lining element of the present invention, a plurality of long strips are formed on the ground on which the tunnel is to be constructed so as to be orthogonal to the lining section. Concrete tunnel lining elements and hollow steel tunnel lining elements that are open to this concrete element side are alternately arranged and horizontally embedded, and by inserting a PC steel material between each element, Element is connected to each other to form an element connection body, then concrete is placed in the steel element, and when the required strength is reached, the PC steel material is tension-fixed to introduce a compressive force into the concrete of each element. After completing the element connection body as prestressed concrete, It characterized in that the sediment excavation and removal,
Since workers can enter the steel elements on both sides of one concrete element to insert the PC steel material into all concrete elements,
It is possible to easily and reliably carry out the work of connecting the PC steel material to the element connection body, and to take measures to prevent the concrete from flowing into the PC steel material insertion hole. In addition, the strength of the structure is improved by molding concrete elements that are easy to manufacture in complicated shapes into shapes that transmit shearing force to concrete placed in steel segments. The effect is also achieved.
第1図ないし第14図は本発明の一実施例を説明する図で
あって、第1図は一実施例によって構築されたトンネル
の正面図、第2図はコンクリート製エレメントの斜視
図、第3図はその側面図、第4図はベースエレメントの
斜視図、第5図はその先端上面図、第6図はメインエレ
メントの斜視図、第7図は水平部の拡大正面図、第8図
はメインエレメントの推進方法を説明する斜視図、第9
図はコンクリート製エレメントの接続手段を示す側面
図、第10図は他の接続手段の斜視図、第11図はさらに他
の接続手段の側面図、第12図はPCケーブルの挿通手段を
示す正面断面図、第13図は他の挿通手段を示す正面断面
図、第14図はPCケーブルをセメントペーストにより固着
させる手段の平面断面図、第15図は他の実施例のトンネ
ルの正面図、第16図は要部拡大図である。 1……トンネル、2……コンクリート製エレメント、3
……ベースエレメント(スチール製エレメント)、4…
…角部エレメント(スチール製エレメント)、5……メ
インエレメント(スチール製エレメント)、6……PCケ
ーブル(PC鋼材)、7……エレメント連結体、G……地
盤。1 to 14 are views for explaining one embodiment of the present invention, FIG. 1 is a front view of a tunnel constructed according to one embodiment, FIG. 2 is a perspective view of a concrete element, 3 is a side view thereof, FIG. 4 is a perspective view of a base element, FIG. 5 is a top view of the tip thereof, FIG. 6 is a perspective view of a main element, FIG. 7 is an enlarged front view of a horizontal portion, and FIG. Is a perspective view illustrating a propulsion method of the main element,
The figure is a side view showing the connecting means of the concrete element, FIG. 10 is a perspective view of another connecting means, FIG. 11 is a side view of yet another connecting means, and FIG. 12 is a front view showing a PC cable insertion means. Sectional view, FIG. 13 is a frontal sectional view showing another insertion means, FIG. 14 is a plan sectional view of means for fixing a PC cable with cement paste, and FIG. 15 is a frontal view of a tunnel of another embodiment. Figure 16 is an enlarged view of the main parts. 1 ... Tunnel, 2 ... Concrete element, 3
…… Base element (steel element), 4…
… Corner element (steel element), 5 …… main element (steel element), 6 …… PC cable (PC steel material), 7 …… element connection, G …… ground.
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 実開 平2−29991(JP,U) ─────────────────────────────────────────────────── ─── Continuation of the front page (56) Bibliography Actual Kaihei 2-29991 (JP, U)
Claims (1)
面と直交させて、複数の長尺なコンクリート製トンネル
覆工用エレメントと、このコンクリート製エレメント側
に開口する中空状のスチール製トンネル覆工用エレメン
トとを交互に並べて水平に埋設し、各エレメント間にPC
鋼材を挿通させることにより、各エレメントを互いに連
結してエレメント連結体とし、次いで、スチール製エレ
メント内にコンクリートを打設し、所要の強度に達した
ところで前記PC鋼材を緊張定着することにより、各エレ
メントのコンクリートに圧縮力を導入して前記エレメン
ト連結体をプレストレスコンクリートとして完成させた
後、このエレメント連結体の内側の土砂を掘削除去する
ことを特徴とするトンネル覆工用エレメントによるトン
ネルの構築方法。1. A plurality of elongated concrete tunnel lining elements, which are orthogonal to the lining cross section, and a hollow steel tunnel which opens to the concrete element side, with respect to the ground on which the tunnel is to be constructed. The lining elements and the lining elements are alternately arranged and embedded horizontally, and the PC is placed between each element.
By inserting a steel material, each element is connected to each other to form an element connection body, then concrete is placed in the steel element, and when the required strength is reached, the PC steel material is tension-fixed, thereby Construction of a tunnel with an element for tunnel lining, characterized by excavating and removing earth and sand inside the element connection body after introducing a compressive force into the concrete of the element to complete the element connection body as prestressed concrete Method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14678990A JPH0749757B2 (en) | 1990-06-05 | 1990-06-05 | Tunnel construction method using tunnel lining element |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14678990A JPH0749757B2 (en) | 1990-06-05 | 1990-06-05 | Tunnel construction method using tunnel lining element |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0438398A JPH0438398A (en) | 1992-02-07 |
| JPH0749757B2 true JPH0749757B2 (en) | 1995-05-31 |
Family
ID=15415577
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14678990A Expired - Fee Related JPH0749757B2 (en) | 1990-06-05 | 1990-06-05 | Tunnel construction method using tunnel lining element |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0749757B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3931123B2 (en) * | 2002-07-29 | 2007-06-13 | 株式会社アルファシビルエンジニアリング | Non-open-cutting construction method for underground structures |
| JP4625815B2 (en) * | 2007-01-20 | 2011-02-02 | 株式会社アルファシビルエンジニアリング | Non-open-cutting construction method for underground structures |
| JP2021095741A (en) * | 2019-12-17 | 2021-06-24 | 株式会社Ihi建材工業 | Tunnel, cutter, and tunnel construction method |
-
1990
- 1990-06-05 JP JP14678990A patent/JPH0749757B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0438398A (en) | 1992-02-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4405260A (en) | Method of constructing underpass across railway and highway without affecting normal traffic thereof | |
| KR101088158B1 (en) | Underground roadway construction method using slurry monthly method | |
| EP0070659A1 (en) | Retaining wall and in situ method of construction | |
| JP2021042610A (en) | Culvert structure and construction method therefor | |
| JP2000291181A (en) | Construction method of precast shear wall | |
| KR101974826B1 (en) | The Precast Pile Having Interlocking Secant and The Earth Retaining Wall Method Constructed by It's Continuous Pile | |
| JPH0749757B2 (en) | Tunnel construction method using tunnel lining element | |
| JP2003113673A (en) | Reinforcement method for concrete structure and culvert structure | |
| JPS61122320A (en) | Method of coupling continuous underground wall with underground structure | |
| JPH11247579A (en) | Lining element for tunnel construction and tunnel construction method | |
| JP3251698B2 (en) | Tunnel lining element and tunnel construction method using the same | |
| JP3031191B2 (en) | Construction method of large section tunnel | |
| JP2885055B2 (en) | Construction method of frame with precast members | |
| GB2101177A (en) | Method of constructing underpass across railway and highway without affecting normal traffic thereof | |
| JPH07310365A (en) | Synthetic earth retaining wall structure and its construction method | |
| JP3659058B2 (en) | Yamadome method with low strength underground wall | |
| KR101285987B1 (en) | Improved composite roof tunnel method for civil engineering, road, railroad, complex, water resources, structure, harbor, water supply and sewage | |
| JP3765719B2 (en) | Closure adjustment element and underground structure construction method | |
| JPS6397721A (en) | Slope frame construction work | |
| JP3882882B2 (en) | Steel element and on-site reinforced concrete connection structure, steel element and on-site reinforced concrete connection method, and underground structure construction method | |
| JPH083516Y2 (en) | Basic element for tunnel construction | |
| JP3678463B2 (en) | Starting and reaching shaft for shield machine | |
| JPS6135359B2 (en) | ||
| JP2984728B2 (en) | Construction method of cast-in-place concrete pile | |
| JPH0781274B2 (en) | How to build a beam on an underground wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |