JPH076186B2 - Method and apparatus for press-fitting steel pipe pile - Google Patents
[go: Go Back, main page]

JPH076186B2 - Method and apparatus for press-fitting steel pipe pile - Google Patents

Method and apparatus for press-fitting steel pipe pile

Info

Publication number
JPH076186B2
JPH076186B2 JP1306872A JP30687289A JPH076186B2 JP H076186 B2 JPH076186 B2 JP H076186B2 JP 1306872 A JP1306872 A JP 1306872A JP 30687289 A JP30687289 A JP 30687289A JP H076186 B2 JPH076186 B2 JP H076186B2
Authority
JP
Japan
Prior art keywords
steel pipe
pipe pile
press
soil
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1306872A
Other languages
Japanese (ja)
Other versions
JPH03169913A (en
Inventor
北村  精男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Giken Ltd
Original Assignee
Giken Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Giken Ltd filed Critical Giken Ltd
Priority to JP1306872A priority Critical patent/JPH076186B2/en
Publication of JPH03169913A publication Critical patent/JPH03169913A/en
Publication of JPH076186B2 publication Critical patent/JPH076186B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は鋼管杭を地中に圧入する圧入方法およびそのた
めに使用される圧入装置に関する。本明細書中、鋼管杭
とは鋼管、鋼管杭及び鋼管矢板を指すものとする。
Description: TECHNICAL FIELD The present invention relates to a press-fitting method for press-fitting a steel pipe pile into the ground and a press-fitting device used therefor. In the present specification, the steel pipe pile refers to a steel pipe, a steel pipe pile, and a steel pipe sheet pile.

(従来の技術と発明の解決課題) 鋼管杭を地中に圧入するには、鋼管杭を挾持しながら地
中に圧入する方法が行われている。
(Prior Art and Problem to be Solved by the Invention) In order to press-fit a steel pipe pile into the ground, a method of pressing the steel pipe pile into the ground while holding the steel pipe pile is performed.

この方法は硬質地盤での杭圧入に困難が伴った。この、
圧入時の抵抗の増大については、杭径が大きく、先端抵
抗が大きな鋼管杭および礫層や土丹層などの硬質地盤で
はさらに顕著であった。
This method had difficulty in press-fitting piles on hard ground. this,
The increase in resistance during press-fitting was more remarkable in steel pipe piles with large pile diameters and large tip resistance, and in hard ground such as gravel and Dotan layers.

本発明は上記事情を考慮してなされたものであり、鋼管
杭を円滑に硬質地盤中に圧入することができる杭の圧入
方法を提供することを目的とする。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method of press-fitting a steel pipe pile that can be smoothly press-fitted into hard ground.

さらに本発明は上記圧入方法に対して、好適に実施する
ことができる鋼管杭の圧入装置を提供することを目的と
している。
Another object of the present invention is to provide a press-fitting device for a steel pipe pile that can be suitably implemented with respect to the above press-fitting method.

(課題を解決するための手段) 上記目的を達成するため、本発明の鋼管杭の圧入方法
は、鋼管杭を地中に圧入しながら、鋼管杭内の土を掘削
し、掘削された土を鋼管杭から排出しながら鋼管杭を地
中に圧入すると共に、この排出された土を既に圧入され
た鋼管杭内に投入することを特徴とする。
(Means for Solving the Problem) In order to achieve the above object, the method of press-fitting a steel pipe pile of the present invention is to excavate the soil in the steel pipe pile while press-fitting the steel pipe pile into the ground, and to excavate the excavated soil. The steel pipe pile is press-fitted into the ground while being discharged from the steel pipe pile, and the discharged soil is put into the already-press-fitted steel pipe pile.

そして、これらの圧入方法に適用される本発明の鋼管杭
の圧入装置は、鋼管杭を地中に圧入する杭打機と、地盤
を掘削しながら排出する掘進機と、土を落下させながら
締め固める圧密機とを備え、前記掘進機を前記杭打機に
より地中に圧入される鋼管杭内に挿入して鋼管杭内の土
を掘削・排土すると共に、前記圧密機を排土状態で地中
に圧入された鋼管杭内に配置して当該鋼管杭内に土を充
填することを特徴とする。
And, the press-fitting device of the steel pipe pile of the present invention applied to these press-fitting methods, a pile driving machine for press-fitting the steel pipe pile into the ground, a machine for excavating the ground while excavating, and a tightening while dropping the soil. With a compacting machine for hardening, the excavator is inserted into a steel pipe pile that is press-fitted into the ground by the pile driving machine to excavate and remove soil in the steel pipe pile, and the compaction machine in the discharged state. It is characterized in that it is arranged in a steel pipe pile press-fitted into the ground and the soil is filled in the steel pipe pile.

この圧入装置における掘進機としては、圧入する鋼管杭
内に挿入される本体と、この本体に構成した掘削刃によ
って鋼管杭内の土を掘削する掘削手段と、この掘削手段
によって掘削された土を排出する排土手段とを備えるこ
とを特徴とすることができる。
The excavator in this press-fitting device includes a main body to be inserted into a steel pipe pile to be press-fitted, an excavating means for excavating the soil in the steel pipe pile by an excavating blade configured in the main body, and a soil excavated by the excavating means. It can be characterized by comprising a soil discharging means for discharging.

また、杭の圧入装置における圧密機としては、内部の土
が排出された状態で圧入された鋼管杭内に上下動可能に
挿入される本体と、この本体下方の鋼管杭内に土を投入
する投入手段と、この投入手段によって投入された土を
締め固める圧密板とを備えることを特徴とすることがで
きる。
Further, as a compactor in a press-fitting device for piles, a main body that is vertically movably inserted into a press-fitted steel pipe pile in a state where the soil inside is discharged, and the soil is put into the steel pipe pile below the main body. It can be characterized in that it comprises an inputting means and a compacting plate for compacting the soil input by the inputting means.

(作用) 鋼管杭内で土を掘削すると先端抵抗が小さくなる。ま
た、掘削によって排出される土を既に圧入された鋼管杭
内に投入することにより掘削土処理がなくなると共に、
鋼管杭はその内外面で支持されるため支持力の低下がな
い。
(Function) When soil is excavated in a steel pipe pile, the tip resistance decreases. Also, by pouring the soil discharged by excavation into the steel pipe pile that has already been press-fitted, the excavated soil processing is eliminated, and
Since the steel pipe pile is supported on its inner and outer surfaces, the bearing capacity does not decrease.

上記構成の杭の圧入装置では、掘進機が地中に圧入され
ていく鋼管杭内で地盤を掘削しながら外部に排土するた
め鋼管杭内部を空の状態とする。一方、圧密機は掘進機
で排出された土を空状態の既設鋼管杭内に投入し締め固
めるため鋼管杭内が土で充満される。
In the press-fitting device for a pile having the above-described configuration, the excavator excavates the ground in the steel pipe pile that is being press-fitted into the ground and discharges the soil to the outside, thereby leaving the inside of the steel pipe pile empty. On the other hand, the compactor puts the soil discharged by the excavator into the empty existing steel pipe pile and compacts it, so that the inside of the steel pipe pile is filled with soil.

(実施例) 第1図は本発明の鋼管杭の圧入方法と、この方法に使用
される鋼管杭の圧入装置の第1実施例を示す。
(Embodiment) FIG. 1 shows a first embodiment of a method for press-fitting a steel pipe pile according to the present invention and a press-fitting device for a steel pipe pile used in this method.

鋼管杭の圧入装置は圧入する鋼管杭Pnを地中に圧入する
杭打機1と、鋼管杭Pn内に挿入された掘進機2と、既設
杭の内、鋼管杭P2内に挿入された圧密機3とからなる。
The steel pipe pile press-fitting device is a pile driver 1 that press-fits the steel pipe pile Pn into the ground, the excavator 2 that is inserted into the steel pipe pile Pn, and the compaction that is inserted into the steel pipe pile P2 among the existing piles. And machine 3.

杭打機1は鋼管杭Pnを地盤に圧入する推進力を付与する
ものであり、図示例では鋼管杭圧入引抜機(以下、杭打
機という)が使用されている。この杭打機1は既設杭P1
〜P6上を自走しながら新たな鋼管杭Pnを地中に圧入する
もので、前後方向に相対移動するサドル10とスライドベ
ース11とを備え、サドル10下部には既設杭P3〜P5をそれ
ぞれ掴持および解放する3個のクランプ12を垂設してい
る。
The pile driving machine 1 imparts a propulsive force for press-fitting the steel pipe pile Pn into the ground. In the illustrated example, a steel pipe pile press-fitting / pulling machine (hereinafter referred to as a pile driving machine) is used. This pile driver 1 is an existing pile P1
~ P6 is a new steel pipe pile Pn is pressed into the ground while self-propelled, equipped with a saddle 10 and a slide base 11 that move relative to each other in the front-rear direction, and existing piles P3 to P5 are located under the saddle 10 respectively. Three clamps 12 are hung vertically for gripping and releasing.

スライドベース11上にはマスト13が立設され、このマス
ト13の先端部にアーム14が取り付けられており、アーム
14の先端部に新たな鋼管杭Pnを挾持するチャック15を構
成している。鋼管杭Pnはチャック15内を貫通した状態で
挾持され、チャック15が下降することにより鋼管杭Pnは
地中に圧入される。
A mast 13 is erected on the slide base 11, and an arm 14 is attached to the tip of this mast 13.
A chuck 15 for holding a new steel pipe pile Pn is formed at the tip of 14. The steel pipe pile Pn is held while penetrating the inside of the chuck 15, and the steel pipe pile Pn is press-fitted into the ground when the chuck 15 descends.

この杭打機1はクランプ12で既設鋼管杭P3〜P5を掴持し
た状態でチャック15により鋼管杭Pnの圧入を行う。この
圧入途中で、チャック15で鋼管杭Pnを挾持したままクラ
ンプ12が鋼管杭P3〜P5の掴持を解放し、スライドベース
11を上昇させて杭1本分前進させる。この移動後、クラ
ンプ12が再び既設杭P4〜P6を掴持する(第1図参照)と
共に、チャック15を再下降し鋼管杭Pnの再圧入を行い圧
入を完了する。このように杭打機1が既設杭上を自走し
ながら鋼管杭を連続して地中に圧入していく。
The pile driver 1 presses the steel pipe pile Pn with the chuck 15 while holding the existing steel pipe piles P3 to P5 by the clamp 12. During this press-fitting, the clamp 12 releases the grip of the steel pipe piles P3 to P5 while holding the steel pipe pile Pn by the chuck 15 and slides the slide base.
Raise 11 to move forward one pile. After this movement, the clamp 12 again grips the existing piles P4 to P6 (see FIG. 1), the chuck 15 is lowered again, and the steel pipe pile Pn is re-pressed to complete the press-fitting. In this way, the pile driver 1 continuously presses the steel pipe piles into the ground while self-propelled on the existing piles.

なお、本発明における杭打機は鋼管杭を地中に圧入させ
ることができるものであれば、本実施例の杭圧入機に限
定されるものではなく、その他の型式のものでも良い。
The pile driving machine according to the present invention is not limited to the pile pressing machine of the present embodiment as long as it can press the steel pipe pile into the ground, and other types may be used.

掘進機2は圧入される鋼管杭Pn内に挿入され使用され
る。第2図はこの掘進機2の内部構造を示し、鋼管杭Pn
の下端部に挿入される本体20を備えている。本体20の外
径は鋼管杭Pnの杭径より小さく、その外面には鋼管杭Pn
内面に圧接して本体20を鋼管杭先端部分に保持する挾持
用シリンダ21を設けている。本実施例では先端部分を保
持する構成としたが、保持位置は必ずしも先端部分に限
られない。掘進機2は本体20がこのように鋼管杭Pn先端
部に保持された状態で地盤を掘削する。このため本体20
にはモータ22が設けられ、このモータ22の回転力がギヤ
を介して伝達されて回転するオーガ23が軸方向に設けら
れている。そしてオーガ23の先端部には複数のビット24
aを有する掘削ヘッド24がオーガ23と一体回転するよう
に取り付けられており、これらモータ22、オーガ23およ
び掘削ヘッド24によって掘削手段が構成される。
The excavator 2 is used by being inserted into the steel pipe pile Pn to be press-fitted. Fig. 2 shows the internal structure of the excavator 2 and shows the steel pipe pile Pn.
It has a main body 20 to be inserted into the lower end of the. The outer diameter of the main body 20 is smaller than the pile diameter of the steel pipe pile Pn, and the steel pipe pile Pn is
A holding cylinder (21) is provided that presses against the inner surface and holds the main body (20) at the tip of the steel pipe pile. In this embodiment, the tip portion is held, but the holding position is not necessarily limited to the tip portion. The excavator 2 excavates the ground with the main body 20 thus held at the tip of the steel pipe pile Pn. For this reason the body 20
A motor 22 is provided in the shaft, and an auger 23 is provided in the axial direction to rotate by transmitting the rotational force of the motor 22 via a gear. And at the tip of the auger 23 a plurality of bits 24
The excavation head 24 having a is attached so as to rotate integrally with the auger 23, and the motor 22, the auger 23, and the excavation head 24 constitute excavation means.

この場合、オーガ23のシャフト上端部には送水ホース25
を連結すると共に、オーガ23のシャフト下端部には送水
ホース25からの水Wを噴射するノズル26を取り付け、掘
削時には水を噴射して掘削土を流動性のある泥状とす
る。
In this case, a water supply hose 25 is attached to the upper end of the shaft of the auger 23.
And a nozzle 26 for injecting water W from the water supply hose 25 is attached to the lower end of the shaft of the auger 23, and water is injected during excavation to make excavated soil into a fluid mud.

このような掘削手段に加えて、掘進機2には泥状の掘削
土を鋼管杭Pn内から外部に排出する排土手段を設けてな
る。この排土手段はオーガ23の外側を囲むように本体20
内に設けたガイド筒27と、このガイド筒27の上端開口部
に連結した排土ホース28及び吸引ポンプ50とにより構成
され、吸引ポンプ50は掘削土を圧密機3へ送出する装置
である。排土ホース28他端は圧密機3に接続され、送水
ホース25は図示しない送水手段に連結されている。
In addition to such excavating means, the excavator 2 is provided with earth removing means for discharging the mud-like excavated soil from the inside of the steel pipe pile Pn to the outside. This earth removing means surrounds the outside of the auger 23 so that the main body 20
It is composed of a guide cylinder 27 provided inside, a discharge hose 28 connected to the upper end opening of the guide cylinder 27, and a suction pump 50. The suction pump 50 is a device for sending the excavated soil to the compactor 3. The other end of the soil discharge hose 28 is connected to the compactor 3, and the water supply hose 25 is connected to a water supply means (not shown).

これにより掘削ヘッド24によって掘削され、ノズル26か
らの噴射水により泥状となった掘削土は、オーガ23の回
転でガイド筒27内を上昇し、吸引ポンプ50により吸引さ
れ排土ホース28を通って圧密機3に送出される。
Due to this, the excavated soil excavated by the excavation head 24 and turned into muddy by the water jetted from the nozzle 26 rises in the guide cylinder 27 by the rotation of the auger 23, is sucked by the suction pump 50, and passes through the soil discharge hose 28. And sent to the compactor 3.

図中符号29は本体20の上面に設けたフックブラケットで
あり、鋼管杭Pn内への挿脱時にワイヤなどを引掛ける。
Reference numeral 29 in the figure is a hook bracket provided on the upper surface of the main body 20, and hooks a wire or the like when the steel pipe pile Pn is inserted and removed.

このような構成の掘進機を地盤に圧入される鋼管杭Pn内
に設けることにより、推進時の先端抵抗及び周面摩擦抵
抗が軽減され、杭径の大きな鋼管杭の圧入が容易となる
と共に硬質地盤への圧入も可能となり適用可能範囲も拡
大する。なお、上述した掘削時における水の噴射は選択
的事項であり、不要としてもよい。
By installing the excavator having such a configuration in the steel pipe pile Pn to be press-fitted into the ground, tip resistance and peripheral frictional resistance during propulsion are reduced, and press-fitting of a steel pipe pile with a large pile diameter becomes easy and hard. Press-fitting into the ground is also possible and the applicable range is expanded. It should be noted that the water injection at the time of excavation described above is an optional matter and may be unnecessary.

前記圧密機3は掘進機2によって内部が空状態で地盤に
圧入された既設杭内に挿入されて使用される。第3図
(a)、(b)はこの圧密機3の一実施例を示し、既設
杭P2内に挿入される本体30と、本体30下方に設けた圧密
板31とからなる。上記排土ホース28の終端はこの圧密機
3に接続され、排出された掘削土Mを圧密板31下方に投
入する。
The compacting machine 3 is used by being inserted into the existing pile which is press-fitted into the ground by the excavator 2 in an empty state. FIGS. 3 (a) and 3 (b) show an embodiment of the compacting machine 3, which comprises a main body 30 inserted into the existing pile P2 and a compacting plate 31 provided below the main body 30. The end of the soil discharging hose 28 is connected to the compacting machine 3, and the discharged excavated soil M is put under the compacting plate 31.

圧密板31は本体30内に設けられたシリンダ33のピストン
33a下端部に取り付けられており、ピストン33aの上下動
によって一体的に上下動する。この圧密板31の適宜位置
には投下口34が上下に貫通するように形成されており、
この投下口34に投入ホース32とが蛇腹ホース35により接
続されている。
The compaction plate 31 is a piston of a cylinder 33 provided inside the main body 30.
It is attached to the lower end of 33a and moves up and down integrally with the up and down movement of piston 33a. A dropping port 34 is formed at an appropriate position of the compaction plate 31 so as to penetrate vertically.
The dropping hose 34 is connected to the charging hose 32 by a bellows hose 35.

このように構成した圧密機3は、前記掘進機2によって
掘削された掘削土Wが吸引ポンプ50により、排土ホース
28を通って圧密機3の投下口34から既設の鋼管杭P2内に
投入されると、圧密板31が上下動して、この土を叩打し
て締め固める。このため空状態の既設鋼管杭は圧密板31
によって締め固められた掘削土によって充満されるため
支持力が付与されると共に、鋼管杭内への人や物の落下
がなく安全となっている。そして、既に圧入された鋼管
杭内に充填される土は地中に圧入された同一の杭列の鋼
管杭からの掘削土であるため、この掘削土についての残
土処理がなくなり作業を円滑に行うことができる。
The compacting machine 3 configured as described above uses the suction pump 50 to remove the excavated soil W excavated by the excavator 2 from the soil discharge hose.
When it is thrown into the existing steel pipe pile P2 from the dropping port 34 of the compacting machine 3 through 28, the compacting plate 31 moves up and down and taps and consolidates this soil. Therefore, the existing steel pipe pile in the empty state is
Since it is filled with excavated soil that has been compacted by the method, supporting force is given and it is safe because no people or objects fall into the steel pipe pile. Since the soil filled in the steel pipe pile that has already been press-fitted is excavated soil from the steel pipe pile of the same pile row that has been press-fitted into the ground, there will be no residual soil treatment for this excavated soil and the work will be carried out smoothly. be able to.

なお、圧密機3は充填された土の高さに応じて鋼管杭内
を上下方向に移動すると共に、圧密時にはその位置で停
止する必要がある。このため本体30上面には引上げ及び
吊りおろし用のワイヤなどが引掛けられるフックブラケ
ット36が取付けられると共に、本体30の外周面には保持
用シリンダ37が所定間隔で取り付けられている。
The compacting machine 3 needs to move vertically in the steel pipe pile according to the height of the filled soil and stop at that position during compaction. Therefore, a hook bracket 36 on which wires for pulling up and down and the like are hooked is attached to the upper surface of the main body 30, and holding cylinders 37 are attached to the outer peripheral surface of the main body 30 at predetermined intervals.

次に、上記構成の杭の圧入装置を使用した杭の圧入方法
を第1図に基づいて説明する。
Next, a method of press-fitting a pile using the press-fitting device for a pile having the above-described structure will be described with reference to FIG.

1本目の鋼管杭P1を圧入する場合、この鋼管杭P1内に掘
進機を挿入して掘削および掘削土の排土を行いながら圧
入を行う。2〜5本目の鋼管杭P2〜P5の圧入も同様にし
て行い、内部が空状態の鋼管杭列が施工される。
When press-fitting the first steel pipe pile P1, a machine is inserted into this steel pipe pile P1 to perform press-fitting while excavating and discharging excavated soil. The second to fifth steel pipe piles P2 to P5 are press-fitted in the same manner, and a steel pipe pile row having an empty inside is constructed.

そして6本目の鋼管杭P6の圧入の際に、1本目の鋼管杭
P1内に圧密機3を挿入し、排土される掘削土を排土ホー
ス28を通して圧密機3に送出する。そして掘削土を空の
鋼管杭P1内に投入し圧密しながら鋼管杭P1内に掘削土を
圧密充填する。以下、同様であり、杭打機1が杭上を移
動し、新たな鋼管杭Pnに対しては掘進機2によって、そ
の鋼管杭内で土を掘削・排土する一方、空の既設杭に対
しては圧密機3によって掘削土を圧密充填する。第1図
は7本目の鋼管杭Pnの圧入状態を示し、2本目に既設さ
れた鋼管杭P2内に掘削土が充填されている。
And when press-fitting the 6th steel pipe pile P6, the 1st steel pipe pile
The compacting machine 3 is inserted into P1 and the excavated soil to be discharged is sent to the compacting machine 3 through the discharging hose 28. Then, the excavated soil is charged into the empty steel pipe pile P1 and is compacted while being filled with the excavated soil. The same applies to the following, and the pile driver 1 moves on the pile, and for the new steel pipe pile Pn, the excavator 2 excavates and discharges the soil in the steel pipe pile, while it becomes an empty existing pile. On the other hand, the compacting machine 3 compacts and fills the excavated soil. Fig. 1 shows the press-fitted state of the seventh steel pipe pile Pn, and the excavated soil is filled in the second steel pipe pile P2 already installed.

この鋼管杭の圧入方法では、新たな鋼管杭の圧入を行い
ながらその鋼管杭の先端で掘削、排土を行うため、鋼管
杭の摩擦抵抗が小さくなると共に先端抵抗も小さく、鋼
管杭の圧入を円滑、迅速に行うことができる。また、排
土された掘削土を杭列内の空の鋼管杭に投入、圧密する
ため残土処理が不要となる。
In this method of press-fitting a steel pipe pile, since a new steel pipe pile is press-fitted and excavation and earth removal are performed at the tip of the steel pipe pile, the friction resistance of the steel pipe pile is small and the tip resistance is also small. It can be done smoothly and quickly. In addition, since the excavated soil that has been discharged is put into an empty steel pipe pile in the pile row and compacted, there is no need to treat the residual soil.

上記の第1実施例の場合は、吸引ポンプ50を掘進機2内
に内蔵しているが、第6図に示す第2実施例では杭打機
1の後方に土の吸引および送出しを行う台車40を設置
し、台車40内に吸引ポンプを構成した。
In the case of the above-described first embodiment, the suction pump 50 is built in the excavator 2, but in the second embodiment shown in FIG. 6, suction and delivery of soil are performed behind the pile driver 1. The trolley 40 was installed, and the suction pump was configured in the trolley 40.

台車40は、杭打機1の移動に伴って追随走行して掘進機
2および圧密機3の作動を確保する。このため台車40は
排土ホース28に接続される吸引ポンプ、送水ホース25に
接続される送水ポンプおよび投入ホース32に接続される
シリンダやスクリューなどの掘削土供給機構(いずれも
図示せず)を備えると共に、掘削土を一時的に貯溜する
タンクを備えている。
The bogie 40 travels following the movement of the pile driver 1 to ensure the operation of the excavator 2 and the compactor 3. For this reason, the trolley 40 is provided with a suction pump connected to the soil discharge hose 28, a water supply pump connected to the water supply hose 25, and an excavated soil supply mechanism (not shown) such as a cylinder or screw connected to the input hose 32. It is equipped with a tank for temporarily storing excavated soil.

これにより掘削ヘッド24によって掘削され、ノズル26か
らの噴射水により泥状となった掘削土は、オーガ23の回
転でガイド筒27内を上昇し、排土ホース28を通って台車
40に一時的に貯溜され、投入ホース32を通って既に圧入
された鋼管杭P2内に投下される。そのため圧密機3によ
る掘削土Mの圧密速度を調整でき、必ずしも掘進機2に
よる地盤掘削速度と同時に進行させなくてもよくなる。
Due to this, the excavated soil excavated by the excavation head 24 and turned into muddy by the water jetted from the nozzle 26 rises in the guide cylinder 27 by the rotation of the auger 23, passes through the soil discharge hose 28, and is carried by the truck.
It is temporarily stored in 40 and is dropped into the already-press-fitted steel pipe pile P2 through the charging hose 32. Therefore, the compacting speed of the excavated soil M by the compacting machine 3 can be adjusted, and it is not always necessary to proceed at the same time as the ground excavating speed by the excavator 2.

第4図および第5図は圧密機3の他の実施例を示し、第
3図と同一の要素は同一の符号で対応させてある。この
実施例では第5図(b)で示すように、圧密板31の鋼管
杭P内を3等分して設けていると共に、各圧密板31を上
下動させる圧密用ジャッキ38が3基設けている。そして
同図(a)で示すように、圧密用ジャッキ38の間には先
端部が鋼管杭P内面に当接する保持用ジャッキ39が3基
配置している。掘削土を圧密板31下方に投下する投入ホ
ース32は、これらの中心部分を通過して延設している。
4 and 5 show another embodiment of the compacting machine 3, and the same elements as those in FIG. 3 are designated by the same reference numerals. In this embodiment, as shown in FIG. 5 (b), the inside of the steel pipe pile P of the consolidation plate 31 is divided into three equal parts, and three consolidation jacks 38 for vertically moving each consolidation plate 31 are provided. ing. Further, as shown in FIG. 3A, three holding jacks 39 whose tip portions abut against the inner surface of the steel pipe pile P are arranged between the compression jacks 38. The input hose 32 for dropping the excavated soil below the consolidation plate 31 extends through these central portions.

第4図および第5図(b)の符号38aは各圧密板31を対
応する圧密用ジャッキ38に取り付けるため、ジャッキ38
から下方に延びるロッドである。このように圧密板31を
3等分することにより大径の鋼管杭に対しての掘削土の
圧密を容易に行うことができる。同様に、圧密板31は2
等分あるいは4等分以上であっても良く、これらの等分
は鋼管杭の杭径に対応して適宜選択することができる。
The reference numeral 38a in FIGS. 4 and 5 (b) indicates that the respective compression plates 31 are attached to the corresponding compression jacks 38.
Is a rod extending downward from the. By thus dividing the consolidation plate 31 into three equal parts, it is possible to easily consolidate the excavated soil into the large diameter steel pipe pile. Similarly, the consolidation plate 31 is 2
It may be divided into equal parts or four or more parts, and these equal parts can be appropriately selected according to the pile diameter of the steel pipe pile.

(発明の効果) 本発明の方法のよると、鋼管杭圧入個所の硬質地盤を掘
削及び排土ため先端抵抗が小さくなり、鋼管杭の圧入を
円滑かつ迅速に行うことができる。また、掘削土を既設
杭内に圧密充填することにより残土処理も不要となり、
施工の煩雑さがなくなる。さらに本発明の装置による
と、これらの方法を的確に行うことができる効果を奏す
る。
(Effects of the Invention) According to the method of the present invention, since the hard ground at the place where the steel pipe pile is press-fitted is excavated and the soil is excavated, the tip resistance is reduced, and the steel pipe pile can be press-fitted smoothly and quickly. In addition, since the excavated soil is compacted and filled in the existing piles, the residual soil treatment becomes unnecessary,
Eliminates the complexity of construction. Further, according to the apparatus of the present invention, there is an effect that these methods can be performed accurately.

【図面の簡単な説明】[Brief description of drawings]

図面は本発明の実施例を示すもので、第1図は鋼管杭の
圧入方法とその圧入装置の第1実施例を示す説明図、第
2図は掘進機の一実施例を示す断面図、第3図(a)、
(b)は圧密機の一実施例を示す断面図および平面図、
第4図は圧密機の他の実施例を示す断面図、第5図
(a)、(b)は第4図におけるA−A線およびB−B
線断面図、第6図は第2実施例の説明図である。 1……杭打機、2……掘進機 3……圧密機、20……掘進機本体 24……掘削ヘッド、28……排土ホース 30……圧密機本体、31……圧密板 32……杭入ホース、M……掘削土 P、P1〜P6、Pn……鋼管杭
Drawing shows an embodiment of the present invention, Fig. 1 is an explanatory view showing a first embodiment of a method for press-fitting a steel pipe pile and its press-fitting device, and Fig. 2 is a sectional view showing an embodiment of an excavator. FIG. 3 (a),
(B) is a cross-sectional view and a plan view showing an embodiment of a compactor,
FIG. 4 is a sectional view showing another embodiment of the compactor, and FIGS. 5 (a) and 5 (b) are lines AA and BB in FIG.
A line sectional view and FIG. 6 are explanatory views of the second embodiment. 1 ... Pile driver, 2 ... Excavator 3 ... Compactor, 20 ... Excavator body 24 ... Excavation head, 28 ... Exhaust hose 30 ... Compactor body, 31 ... Compaction plate 32 ... … Pile hose, M… Excavation soil P, P1 to P6, Pn… Steel pipe pile

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】鋼管杭を地中に圧入しながら、鋼管杭内の
土を掘削し、掘削された土を鋼管杭から排出しながら鋼
管杭を地中に圧入すると共に、この排出された土を既に
圧入された鋼管杭内に投入する鋼管杭の圧入方法。
1. A method of excavating soil in a steel pipe pile while press-fitting the steel pipe pile into the ground, press-fitting the steel pipe pile into the ground while discharging the excavated soil from the steel pipe pile, and discharging the discharged soil. A method of press-fitting a steel pipe pile in which the steel pipe is put into a steel pipe pile that has already been press-fitted.
【請求項2】鋼管杭を地中に圧入する杭打機と、地盤を
掘削しながら排出する掘進機と、土を落下させながら締
め固める圧密機とを備え、前記掘進機を前記杭打機によ
り地中に圧入される鋼管杭内に挿入して鋼管杭内の土を
掘削・排土すると共に、前記圧密機を排土状態で地中に
圧入された鋼管杭内に配置して当該鋼管杭内に土を充填
する鋼管杭の圧入装置。
2. A pile driver for press-fitting a steel pipe pile into the ground, an excavator for discharging the ground while excavating the ground, and a compactor for compacting while dropping the soil, and the excavator is the pile driver. It is inserted into the steel pipe pile that is press-fitted into the ground by excavating and discharging the soil in the steel pipe pile, and the compactor is placed in the steel pipe pile that is press-fitted into the ground in the discharged state. A press-fitting device for steel pipe piles that fills the piles with soil.
【請求項3】前記掘進機は、圧入する鋼管杭内に挿入さ
れる本体と、この本体に構成した掘削刃によって鋼管杭
内の土を掘削する掘削手段と、この掘削手段によって掘
削された土を吸引して鋼管杭内から排出する排土手段と
を備えていることを特徴とする請求項2記載の鋼管杭の
圧入装置。
3. The excavator includes a main body to be inserted into a steel pipe pile to be press-fitted, an excavating means for excavating soil in the steel pipe pile by an excavating blade formed in the main body, and soil excavated by the excavating means. 3. A press-fitting device for a steel pipe pile according to claim 2, further comprising: a soil discharging means for sucking and discharging the steel pipe pile.
【請求項4】前記圧密機は、内部の土が排出された状態
で圧入された鋼管杭内に上下動可能に挿入される本体
と、この本体下方の鋼管杭内に土を投入する投入手段
と、この投入手段によって投入された土を締め固める圧
蜜板とを備えていることを特徴とする請求項2記載の鋼
管杭の圧入装置。
4. A main body of the compacting machine, which is vertically movably inserted into a steel pipe pile press-fitted in a state where the soil inside is discharged, and a charging means for charging the soil into the steel pipe pile below the main body. The press-fitting device for a steel pipe pile according to claim 2, further comprising: a compressing plate that compacts the soil charged by the charging means.
JP1306872A 1989-11-27 1989-11-27 Method and apparatus for press-fitting steel pipe pile Expired - Lifetime JPH076186B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1306872A JPH076186B2 (en) 1989-11-27 1989-11-27 Method and apparatus for press-fitting steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1306872A JPH076186B2 (en) 1989-11-27 1989-11-27 Method and apparatus for press-fitting steel pipe pile

Publications (2)

Publication Number Publication Date
JPH03169913A JPH03169913A (en) 1991-07-23
JPH076186B2 true JPH076186B2 (en) 1995-01-30

Family

ID=17962263

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1306872A Expired - Lifetime JPH076186B2 (en) 1989-11-27 1989-11-27 Method and apparatus for press-fitting steel pipe pile

Country Status (1)

Country Link
JP (1) JPH076186B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07127060A (en) * 1993-11-05 1995-05-16 Sato Kiso Koji Kk Pile pressing-in machine and pile pressing-in and drawing-out construction method
JP2001311151A (en) * 2000-04-27 2001-11-09 Giken Seisakusho Co Ltd Pile jacking method and pull-out method
JP4568438B2 (en) * 2001-01-17 2010-10-27 株式会社技研製作所 Inner tank of cylindrical pile, press-fitting method of cylindrical pile, and construction method of cylindrical pile.
JP6488175B2 (en) * 2015-04-08 2019-03-20 株式会社技研製作所 Earth disposal equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54119705A (en) * 1978-03-09 1979-09-17 Shimizu Construction Co Ltd Method of construction of noiseless and vibrationless presssin of steel pipe pile and steel pipe sheet pile and its device

Also Published As

Publication number Publication date
JPH03169913A (en) 1991-07-23

Similar Documents

Publication Publication Date Title
JPH076186B2 (en) Method and apparatus for press-fitting steel pipe pile
JP2014074291A (en) Cast-in-place pile construction apparatus and cast-in-place pile construction method
JP2001286843A (en) Method and apparatus for treating deposited garbage at waste disposal site
JP3060045B2 (en) Garbage disposal method
CN109653266A (en) A kind of slusher chain type trenching machine
JP5827528B2 (en) Underground pile drawing method and equipment
EP4103785B1 (en) Method for introducing a soil penetrating tool into a soil and underground construction device
EP4678820A1 (en) Pipe laying apparatus
JP2619792B2 (en) Pipe laying method
JP5649755B1 (en) Steel pipe pile structure
US5219249A (en) Reinforced concrete load-bearing pile forming device
JP3921299B2 (en) Pile press-fitting device
JPH04213694A (en) Construction method for underground pipes without soil removal
JP4568438B2 (en) Inner tank of cylindrical pile, press-fitting method of cylindrical pile, and construction method of cylindrical pile.
JP2000120066A (en) Construction method of steel pipe pile
JPH08338021A (en) Method for excavating press-in construction and device thereof
JP3712883B2 (en) Ground improvement pile creation device
JP2877765B2 (en) Construction method of pile and wall-like structure and pile press-in and pull-out machine
CN112012199A (en) A new type of BNT carrier pile and its construction equipment construction method
JP3973401B2 (en) Ground compaction method
JP2601401B2 (en) Side hole drilling method
JP3818889B2 (en) Pipe propulsion machine and pipe propulsion method
JPH0224419A (en) Pile extraction and backfilling method and pile extraction machine
JPH02296923A (en) Method for improving sandy soil
JP3310845B2 (en) Work machine with earth removal plate

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090130

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090130

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100130

Year of fee payment: 15

EXPY Cancellation because of completion of term