Method of making steep slope on embankment slope

Info

Publication number
JPH0762350B2
JPH0762350B2 JP21745789A JP21745789A JPH0762350B2 JP H0762350 B2 JPH0762350 B2 JP H0762350B2 JP 21745789 A JP21745789 A JP 21745789A JP 21745789 A JP21745789 A JP 21745789A JP H0762350 B2 JPH0762350 B2 JP H0762350B2
Authority
JP
Japan
Prior art keywords
slope
embankment
steep
bag
rebar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP21745789A
Other languages
Japanese (ja)
Other versions
JPH0381418A (en
Inventor
修 村田
勝 舘山
陽一 大高
哲 西岡
和之 中村
幸彦 田村
敏信 笹木
健三 越智
光司 鄭
達也 壺内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Tokyu Construction Co Ltd
Original Assignee
Railway Technical Research Institute
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute, Tokyu Construction Co Ltd filed Critical Railway Technical Research Institute
Priority to JP21745789A priority Critical patent/JPH0762350B2/en
Publication of JPH0381418A publication Critical patent/JPH0381418A/en
Publication of JPH0762350B2 publication Critical patent/JPH0762350B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】 <産業上の利用分野> 本発明は鉄道や道路等の盛土法面を急勾配化する方法に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention relates to a method for making a steep slope on an embankment slope of a railway, a road or the like.

<従来の技術> 近年、特に都市部においては土地の効率的利用、高度利
用が求められている。
<Prior Art> In recent years, efficient use and advanced use of land are required especially in urban areas.

しかし、鉄道や道路等の構造物としては、都市部におい
ても盛土形式のものが多く用いられており、大きな用地
を占めている。
However, as structures such as railroads and roads, embankment type structures are often used even in urban areas and occupy large sites.

そこで、盛土の法面を急勾配化し、これにより生じる用
地の有効利用が図られている。
Therefore, the slope of the embankment is made steep and effective use of the resulting land is attempted.

従来の急勾配化工法としては、盛土体の法面をより急勾
配に掘削し、掘削後の法面にコンクリートを吹き付け被
覆する方法や、コンクリート板や鋼矢板により法面を被
覆する方法が用いられている。
As a conventional steep slope construction method, a method of excavating the slope of the embankment to a steeper slope and spraying concrete on the slope after the excavation, or a method of covering the slope with a concrete plate or steel sheet pile is used. Has been.

<本発明が解決しようとする問題点> 前記した従来の急勾配化工法には、次のような問題点が
存在する。
<Problems to be Solved by the Present Invention> The conventional steep slope construction method described above has the following problems.

<イ>急勾配化工法においては、鉄道や道路等の営業を
停止した後、再び営業を開始するまでの短時間のうち
に、作業を完了させる必要がある。
<B> In the steep slope construction method, it is necessary to complete the work within a short period of time after the business of railways and roads is stopped and before the business is restarted.

しかし、従来の吹き付けコンクリートによる方法は、コ
ンクリートの強度発現に時間がかかり、また、不測の事
故(吹き付け機の故障等)により作業ができなくなる場
合が考えられ、作業時間が多くかかるため、急勾配化工
法に用いる場合には適当でない。
However, in the conventional method using sprayed concrete, it takes time to develop the strength of the concrete, and it may be impossible to work due to an unexpected accident (breakdown machine failure, etc.). It is not suitable when used for chemical methods.

<ロ>また、吹き付けコンクリートの場合は、湧水や雨
水等のために地山から浮いてしまう場合があり、確実に
法面を押さえることが困難となる。
<B> Further, in the case of sprayed concrete, it may be floated from the ground due to spring water, rain water, etc., and it will be difficult to reliably control the slope.

<ハ>従来のコンクリート板や鋼矢板により法面を被覆
する方法は、コンクリート板等が大重量であるため、施
工性が悪く、作業時間が多くかかる。
<C> In the conventional method of covering the slope with a concrete plate or a steel sheet pile, since the concrete plate and the like are heavy, the workability is poor and the working time is long.

<本発明の目的> 本発明は上記のような問題点を解決するためになされた
もので、短時間にかつ容易に盛土体の急勾配化作業がで
き、しかも湧水や雨水等の影響を受けることが少ない盛
土法面の急勾配化工法を提供することを目的とする。
<Purpose of the present invention> The present invention has been made to solve the above-described problems, and it is possible to easily make a steep slope of an embankment in a short period of time, and to prevent the influence of spring water, rainwater, and the like. It aims to provide a steep slope construction method for the embankment slope that is rarely received.

<本発明の構成> 以下、図面を参照しながら本発明の一実施例について説
明する。
<Structure of the Present Invention> An embodiment of the present invention will be described below with reference to the drawings.

<イ>盛土体頭部の締め固め(第1、2図) 先ず第2図に示すように、盛土体の頭部のなるべく法肩
に近い場所に、略水平方向に貫通孔を削孔する。
<A> Compaction of the head of the embankment (Figs. 1 and 2) First, as shown in Fig. 2, a through hole is drilled in a position approximately as close to the shoulder as possible on the head of the embankment in a substantially horizontal direction. .

そして、この孔内に鉄筋1を挿入して貫通させ、その両
端部を孔外に露出させておく。
Then, the reinforcing bar 1 is inserted into the hole and penetrated, and both ends thereof are exposed outside the hole.

この鉄筋1の露出する両端部には、予めネジ部を形成し
ておく。
Threaded portions are formed in advance on both exposed ends of the reinforcing bar 1.

一方、盛土体の延長方向に沿って、両側の法面上端部に
腹起し材2を配置する。
On the other hand, along the extension direction of the embankment, the uprising members 2 are arranged at the upper ends of the slopes on both sides.

この腹起し材2には、例えば断面がコの字状の溝形鋼等
を使用し、溝部が外側に向くように配置する。
For this upholstery member 2, for example, a channel steel having a U-shaped cross section is used, and it is arranged so that the groove portion faces the outside.

また、この腹起し材2の法面との接触面には、鉄筋1の
挿入孔を間隔をおいて複数開設し、この挿入孔に鉄筋1
の露出するネジ部を挿入して配置する。
In addition, a plurality of insertion holes for the reinforcing bar 1 are opened at intervals on the contact surface of the uprising member 2 with the slope, and the reinforcing bar 1 is inserted in the insertion holes.
Insert and place the exposed screw part of.

なお、腹起し材2は、手で持てる程度の長さのものを使
用すると作業が行い易い。
It should be noted that work can be easily carried out if the uprising member 2 is of a length that can be held by hand.

そして、腹起し材2の挿入孔より貫通する鉄筋1の両端
ネジ部に、ナット等を取り付けて締結する。
Then, a nut or the like is attached and fastened to the threaded portions at both ends of the reinforcing bar 1 penetrating through the insertion hole of the derrick member 2.

これによって、腹起し材2が支圧板として作用するた
め、盛土体の頭部を両側の法面より締め固めることがで
きる。
As a result, the uprising member 2 acts as a bearing plate, so that the head of the embankment can be compacted from the slopes on both sides.

<ロ>アンカー鉄筋の定着(第3図) 次に第3図に示すように、上記腹起し材2のやや下方の
法面に、盛土体の中心に向けてやや下方に傾斜するよう
に、アンカー孔3を削孔する。
<B> Anchoring of anchor rebar (Fig. 3) Next, as shown in Fig. 3, on the slope slightly below the uprising member 2, incline slightly downward toward the center of the embankment. , The anchor hole 3 is drilled.

そして、このアンカー孔3内に、アンカー鉄筋31を孔奥
まで挿入する。
Then, the anchor rebar 31 is inserted into the anchor hole 3 as far as the hole.

このアンカー鉄筋31には、法面の掘削予定線の孔奥側に
ぱっカー32が取り付けてある。
To this anchor rebar 31, a pucker 32 is attached on the far side of the hole on the sloped excavation line.

また、アンカー鉄筋31は、法面の掘削予定線の孔外側が
撤去できるように、ジョイント金具33によって取り外し
可能に連結されている。
Further, the anchor rebar 31 is detachably connected by a joint fitting 33 so that the outside of the hole of the planned excavation line on the slope can be removed.

但し、法面掘削後に、アンカー鉄筋31の孔外側の端部
が、法面よりやや突出するように、ジョイント金具33を
法面の掘削予定線より孔外側にやや寄せて取り付けてお
く。
However, after excavation of the slope, the joint metal fitting 33 is attached to the hole slightly outside the planned excavation line of the slope so that the end of the anchor bar 31 outside the hole slightly projects from the slope.

また、法面掘削後に、アンカー鉄筋31の法面より突出す
る部分には、予めネジ部を形成しておく。
In addition, after excavation of the slope, a screw portion is formed in advance in a portion of the anchor rebar 31 that protrudes from the slope.

そして、注入管等によってアンカー孔3内にグラウト材
34を充填し、グラウト材34の硬化を持って、アンカー鉄
筋31の孔外側の端部を、法面に配置した支圧板等に定着
する。
Then, the grout material is put into the anchor hole 3 by an injection pipe or the like.
34 is filled, and while the grout material 34 is hardened, the end of the anchor rebar 31 outside the hole is fixed to a bearing plate or the like arranged on the slope.

<ハ>法面の掘削(第4図) 法面の掘削作業の前に、線路又は道路等を閉鎖する。<C> Excavation on the slope (Fig. 4) Before excavation work on the slope, the track or road is closed.

そして、第4図に示すように、アンカー鉄筋31の周囲の
法面を、所定の角度をもって急勾配に掘削する。
Then, as shown in FIG. 4, the slope around the anchor rebar 31 is excavated steeply at a predetermined angle.

掘削と同時に、ジョイント金具33を取り外し、アンカー
鉄筋31の孔外側部分を撤去する。
Simultaneously with the excavation, the joint fitting 33 is removed, and the hole outside portion of the anchor reinforcing bar 31 is removed.

なお、パッカー32が取り付けてあることによって、アン
カー孔3からグラウト材34の流出を防ぐことができる。
The packer 32 is attached so that the grout material 34 can be prevented from flowing out from the anchor hole 3.

<ニ>ドレーン材の設置(第1、4、6図) 次に、第1、4図に示すように、掘削後の法面に、間隔
をおいてドレーン材4を複数配置する。
<D> Installation of drain material (FIGS. 1, 4, and 6) Next, as shown in FIGS. 1 and 4, a plurality of drain materials 4 are arranged at intervals on the slope after excavation.

またドレーン材4は、盛土体の上下方向に連続するよう
縦に設置する。
Further, the drain material 4 is installed vertically so as to be continuous in the vertical direction of the embankment.

このドレーン材4は、盛土体内の湧水や雨水を集めて、
排水を良好に行うためのものである。
This drain material 4 collects spring water and rainwater in the embankment,
This is for good drainage.

例えば、第6図に示すように、透水シート41を筒状に形
成し、その内部に透水シート41の内部空間を確保するた
め、波形等のスペーサー42を装着したものが考えられ
る。
For example, as shown in FIG. 6, it is conceivable that the water permeable sheet 41 is formed in a tubular shape and a corrugated spacer 42 is attached to the inside of the water permeable sheet 41 to secure an internal space of the water permeable sheet 41.

<ホ>袋体の設置(第4、5図) 次に、第4、5図に示すように、ドレーン材4に重ね
て、掘削後の法面全体に布製等の袋体5を設置する。
<E> Installation of bag (Figs. 4 and 5) Next, as shown in Figs. 4 and 5, the bag 5 made of cloth or the like is placed on the drain material 4 over the entire slope after excavation. .

このとき、アンカー鉄筋31の露出端部35は、袋体5の中
央部に貫通させる。
At this time, the exposed end portion 35 of the anchor reinforcing bar 31 penetrates the central portion of the bag body 5.

袋体5のアンカー鉄筋31の貫通部分は、内部に注入する
モルタル51が流出しないように、穴あけ加工が施してあ
る。
The penetrating portion of the anchor reinforcing bar 31 of the bag body 5 is perforated so that the mortar 51 injected therein does not flow out.

次に、袋体5内に早強性等のモルタル51を注入する。Next, the mortar 51 having early strength is injected into the bag body 5.

そして、モルタル51に所定の強度が発現した後、支圧
板、ナット等を露出端部35に取り付けて締結する。
After the mortar 51 has developed a predetermined strength, a pressure bearing plate, a nut, etc. are attached to the exposed end portion 35 and fastened.

以上のようにして一段目を施工した後、同じ要領で二段
目、三段目というように、下方に施工を進めていく。
After constructing the first stage as described above, the construction is proceeded downward in the same manner as the second stage and the third stage.

最後まで施工が終了した後、線路又は道路等の閉鎖を解
除する。
After the construction is completed to the end, the track or road will be closed.

<その他の実施例1> その他の実施例として、第7、8図に示すように、アン
カー鉄筋31の代わりに引張材6を用いて、プレストレス
を導入する場合も考えられる。
<Other Example 1> As another example, as shown in FIGS. 7 and 8, it is possible to use a tensile member 6 instead of the anchor reinforcing bar 31 to introduce prestress.

この場合は、先ず初めに法面を所定の角度で急勾配に掘
削し、法面に削孔した孔内に引張材6を挿入して、引張
材の孔奥部を急結材61等を充填して定着する。
In this case, first, the slope is excavated at a predetermined angle with a steep slope, and the tension member 6 is inserted into the hole drilled in the slope to insert the quick-setting member 61 or the like in the deep portion of the hole of the tension member. Fill and fix.

次に引張材6の露出端部を貫通させて、法面に袋体5を
取り付け、この袋体5の内部にモルタル51を注入する。
Next, the exposed end portion of the tension member 6 is penetrated, the bag body 5 is attached to the slope, and the mortar 51 is poured into the bag body 5.

モルタル51に所定の強度が発現した後、引張材6を緊張
して、引張材6の露出端部を袋体5に定着させる。
After the mortar 51 develops a predetermined strength, the tension member 6 is tensioned to fix the exposed end portion of the tension member 6 to the bag body 5.

最後に、アンカー孔内にグラウト材62を充填して作業を
終了する。
Finally, the grout material 62 is filled in the anchor hole, and the operation is completed.

<その他の実施例2> また、上記実施例では、いずれも盛土体の頭部に、鉄筋
1を略水平方向に貫通させて設置した場合であるが、第
9図に示すように、盛土の片側が切土面等の場合は、ア
ンカー鉄筋7を用いて盛土体の頭部の締め固めを行うこ
とが考えられる。
<Other Example 2> In each of the above Examples, the reinforcing bar 1 was installed in the head of the embankment in a substantially horizontal direction, but as shown in FIG. When one side has a cut surface or the like, it is conceivable to use the anchor rebar 7 to compact the head of the embankment.

この場合は、盛土体の頭部に、法面から略水平方向にア
ンカー孔を削孔し、このアンカー孔内にアンカー鉄筋7
を挿入し、グラウト材71によって定着する方法である。
In this case, an anchor hole is drilled in the head of the embankment in a substantially horizontal direction from the slope, and the anchor rebar 7 is inserted in the anchor hole.
Is inserted and fixed by the grout material 71.

<本発明の効果> 本発明は以上説明したようになるので、次のような効果
を期待することができる。
<Effects of the Present Invention> Since the present invention has been described above, the following effects can be expected.

<イ>急勾配化工法においては、鉄道や道路等の営業を
停止した後、再び営業を開始するまでの短時間のうち
に、作業を完了させる必要がある。
<B> In the steep slope construction method, it is necessary to complete the work within a short period of time after the business of railways and roads is stopped and before the business is restarted.

しかし、従来の吹き付けコンクリートによる方法は、コ
ンクリートの強度発現が充分でなければアンカーの締付
ができず、時間がかかる。
However, in the conventional method using sprayed concrete, unless the strength of the concrete is sufficiently developed, the anchor cannot be tightened and it takes time.

また、不測の事故(吹き付け機の故障等)により作業が
できなくなる場合が考えられ、作業時間が多くかかるた
め、急勾配化工法に用いる場合には適当でない。
In addition, there is a possibility that the work cannot be performed due to an unexpected accident (broken machine failure, etc.), and it takes a lot of work time, so it is not suitable for use in the steep slope construction method.

それに対して本発明は、吹き付けコンクリートと比較し
て、袋状の型枠が存在するため、ある程度コンクリート
の強度が小さくても、アンカーの締付が可能である。
On the other hand, in the present invention, since the bag-shaped mold is present as compared with the sprayed concrete, the anchor can be tightened even if the strength of the concrete is small to some extent.

従って、短時間に施工を完了させることができ、盛土体
の急勾配化工法に適した方法であると言える。
Therefore, the construction can be completed in a short time, and it can be said that the method is suitable for the steep slope construction method of the embankment.

また、吹き付け機等の装置を必要としないため、不測の
事故(吹き付け機の故障等)により作業が中断すること
がない。
Further, since no device such as a spraying machine is required, the work is not interrupted by an unexpected accident (breakdown of the spraying machine, etc.).

<ロ>従来の吹き付けコンクリートの場合は、湧水や雨
水等のために地山から浮いてしまう場合があり、確実に
法面を押さえることが困難となる。
<B> In the case of conventional sprayed concrete, it may be floated from the ground due to spring water, rain water, etc., and it is difficult to reliably hold the slope.

それに対して本発明は、布製等の袋体をコンクリートの
型枠として使用するため、地山との密着性が良い。
On the other hand, according to the present invention, since the bag body made of cloth or the like is used as the concrete formwork, the adhesion to the ground is good.

またドレーン材を袋体と法面との間に配置することによ
って、湧水や雨水等を良好に排水することができる。
Further, by disposing the drain material between the bag body and the slope, spring water, rainwater, etc. can be drained well.

そのため、湧水や雨水等の影響を受けることがほとんど
なく、確実に法面を押さえることができる。
Therefore, the slope can be surely suppressed without being affected by spring water, rainwater, or the like.

<ハ>従来のコンクリート板や鋼矢板により法面を被覆
する方法は、コンクリート板等が大重量であるため、施
工性が悪く、作業時間が多くかかる。
<C> In the conventional method of covering the slope with a concrete plate or a steel sheet pile, since the concrete plate and the like are heavy, the workability is poor and the working time is long.

しかし本発明は、軽量な袋体を使用するため、取り付け
作業が容易かつ短時間に行うことができ、施工性が向上
する。
However, according to the present invention, since the lightweight bag body is used, the attachment work can be performed easily and in a short time, and the workability is improved.

<ニ>本発明は、施工が短時間に行えるため、特に、営
業路線の停止時間内の作業に適している。
<D> The present invention is particularly suitable for the work during the downtime of the commercial line because the construction can be performed in a short time.

<ホ>盛土体の頭部を、法面を傷めることなく、鉄筋等
によって早期に締め固めることにより、法面の掘削時に
発生する側方への盛土体の変形を抑えることができる。
<E> The head of the embankment is compacted early by reinforcing bars without damaging the slope, so that lateral deformation of the embankment that occurs during excavation of the slope can be suppressed.

そのため、盛土体上面の路盤や路床の沈下、水平変位
を、極力少なくすることができ、安全性が高くなる。
Therefore, it is possible to minimize the subsidence and the horizontal displacement of the roadbed or the roadbed on the top surface of the embankment, which improves safety.

<ヘ>盛土体の頭部の締め固め作業は、盛土頭部に鉄筋
等を略水平方向に設置するだけでよいため、すべての作
業を側方から行うことができる。
<F> Since the work of compacting the head of the embankment body only needs to be installed in the head of the embankment in a substantially horizontal direction, all the work can be performed from the side.

そのため、路線の閉鎖をする必要がなく、徐行運転程度
で作業を行うことができる。
Therefore, it is not necessary to close the route, and the work can be performed at a slow speed.

従って、路線閉鎖後の作業に時間的余裕ができる。Therefore, it is possible to spare time for the work after the line is closed.

【図面の簡単な説明】[Brief description of drawings]

第1図:本発明の一実施例の説明図 第2図:盛土体の頭部の締め固め説明図 第3〜5図:施工方法の説明図 第6図:ドレーン材の説明図 第7、8図:その他の実施例1の説明図 第9図:その他の実施例2の説明図 FIG. 1: Illustration of an embodiment of the present invention FIG. 2: Illustration of compaction of the head of the embankment FIGS. 3-5: Illustration of construction method FIG. 6: Illustration of drain material FIG. 8: Explanatory diagram of other example 1 FIG. 9: Explanatory diagram of other example 2

───────────────────────────────────────────────────── フロントページの続き (72)発明者 大高 陽一 神奈川県横浜市緑区長津田町4199―1 ラ イオンズ第3―502 (72)発明者 西岡 哲 神奈川県座間市入谷4―3011―6 座間ハ イツ2―1411 (72)発明者 中村 和之 神奈川県川崎市麻生区細山3―16―7 (72)発明者 田村 幸彦 神奈川県横浜市緑区桂台2―22―15 プラ シード桂106 (72)発明者 笹木 敏信 神奈川県鎌倉市岡本1241―4 鎌倉ロジュ マンC―904 (72)発明者 越智 健三 神奈川県横浜市緑区霧が丘3―24―1― 106 (72)発明者 鄭 光司 神奈川県川崎市宮前区土橋2―15―2― 506 (72)発明者 壺内 達也 神奈川県川崎市宮前区東有馬1―2―2 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Yoichi Otaka Yoichi Otaka 4199-1, Nagatsuta-cho, Midori-ku, Yokohama-shi, Kanagawa Rionz 3-502 (72) Inventor Satoshi Nishioka 4-3011-6 Iriya, Zama-shi, Kanagawa Zama Heights 2-1411 (72) Inventor Kazuyuki Nakamura 3-16-7 Hosoyama, Aso-ku, Kawasaki City, Kanagawa Prefecture (16) (72) Inventor Yukihiko Tamura 2-22-15, Katsuradai, Midori-ku, Yokohama City, Kanagawa Prefecture 106 (72) ) Inventor Toshinobu Sasaki 1241-4 Okamoto, Kamakura City, Kanagawa Prefecture Rojuman C-904, Kamakura (72) Inventor Kenzo Ochi 3-24-1-106 Kiritsuga, Midori-ku, Yokohama City, Kanagawa Prefecture (72) Inventor, Koji Zheng, Kawasaki, Kanagawa Prefecture 2-15-2-2 Tsuchihashi, Miyamae-ku, Ichi, 506 (72) Inventor Tatsuya Tsubouchi 1-2-2 Higashiarima, Miyamae-ku, Kawasaki-shi, Kanagawa

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】盛土体の法面を掘削し、急勾配化する方法
において、 盛土体の頭部に略水平方向に鉄筋を貫通させ、この鉄筋
の両端部を、盛土体の延長方向に沿って法面の上端部に
配置した腹起し材に定着し、 この腹起し材の下方の法面に、盛土体の中心に向けて下
方にやや傾斜するようアンカー鉄筋を定着し、 次にこれらのアンカー鉄筋の周囲の法面をより急勾配に
掘削し、 アンカー鉄筋の露出端部を貫通させて、法面に袋体を取
り付け、 この袋体の内部にモルタルを注入し、 モルタルに所定の強度が発現した後、アンカー鉄筋の露
出端部を袋体に定着させたことを特徴とする、 盛土法面の急勾配化工法。
1. A method of excavating a slope of a fill body to make it steep, in which a rebar is pierced through a head of the fill body in a substantially horizontal direction, and both ends of the rebar are along an extension direction of the fill body. Anchored to the upholstery material placed at the upper end of the slope, and anchored to the slope below the upholstery material so as to incline slightly toward the center of the embankment, and then The slopes around these anchor rebars are excavated more steeply, the exposed ends of the anchor rebars are penetrated, a bag is attached to the slope, mortar is injected into the bag, and the mortar A steep slope construction method for the embankment slope, characterized in that the exposed end of the anchor rebar is fixed to the bag after the strength of
【請求項2】盛土体の法面を掘削し、急勾配化する方法
において、 盛土体の頭部に水平方向に鉄筋を貫通させ、この鉄筋の
両端部を、盛土体の延長方向に沿って法面の上端部に配
置した腹起こし材に定着し、 次にこの腹起し材の下方の法面をより急勾配に掘削し、 この急勾配に掘削した法面に、盛土体の中心に向けて下
方にやや傾斜するよう削孔し、 この孔内に引張材を挿入して、引張材の孔奥部を定着
し、 次に引張材の露出端を貫通させて、法面に袋体を取り付
け、 この袋体の内部にモルタルを注入し、 モルタルに所定の強度が発現した後、引張材を緊張し
て、引張材の露出端部を袋体に定着させたことを特徴と
する、 盛土法面の急勾配化工法。
2. A method of excavating a slope of a fill body to make it steep, in which a rebar is pierced horizontally in the head of the fill body, and both ends of the rebar are extended along the extension direction of the fill body. It is fixed on the bellows placed at the upper end of the slope, then the slope below the riser is excavated at a steeper slope, and on the slope excavated at this steep slope, at the center of the embankment. Drill a hole so that it tilts slightly downward, insert the tension material into this hole, fix the inner part of the hole in the tension material, and then penetrate the exposed end of the tension material to form a bag on the slope. Attaching the mortar, the mortar is injected into the bag body, and after a predetermined strength is developed in the mortar, the tension material is tensioned to fix the exposed end of the tension material to the bag body, A steep slope construction method for the embankment slope.
【請求項3】特許請求の範囲第1項及び第2項記載の盛
土法面の急勾配化工法において、 前記盛土体の頭部に略水平方向に貫通させた鉄筋の代わ
りに、 盛土体の頭部に略水平方向にアンカー体を定着した盛土
法面の急勾配化工法。
3. The steep slope construction method for the embankment slope according to claim 1, wherein the head of the embankment is replaced by a reinforcing bar which is penetrated in a substantially horizontal direction. A steep slope construction method for the embankment slope where anchors are fixed to the head in a substantially horizontal direction.
JP21745789A 1989-08-25 1989-08-25 Method of making steep slope on embankment slope Expired - Fee Related JPH0762350B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21745789A JPH0762350B2 (en) 1989-08-25 1989-08-25 Method of making steep slope on embankment slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21745789A JPH0762350B2 (en) 1989-08-25 1989-08-25 Method of making steep slope on embankment slope

Publications (2)

Publication Number Publication Date
JPH0381418A JPH0381418A (en) 1991-04-05
JPH0762350B2 true JPH0762350B2 (en) 1995-07-05

Family

ID=16704530

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21745789A Expired - Fee Related JPH0762350B2 (en) 1989-08-25 1989-08-25 Method of making steep slope on embankment slope

Country Status (1)

Country Link
JP (1) JPH0762350B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100409196B1 (en) * 2001-09-20 2003-12-18 주식회사 포스코 Rod construction method for assembly steel frame
JP5015125B2 (en) * 2008-12-04 2012-08-29 株式会社メック宮崎 Slope-stabilized pseudo-pressure body installation method and pseudo-pressure body used in the installation method
JP5208904B2 (en) * 2009-11-02 2013-06-12 公益財団法人鉄道総合技術研究所 Wall construction method using bags

Also Published As

Publication number Publication date
JPH0381418A (en) 1991-04-05

Similar Documents

Publication Publication Date Title
Bruce et al. Soil nailing: application and practice-part 1
Byrne et al. Manual for design and construction monitoring of soil nail walls
Fookes et al. Stabilization and control of local rock falls and degrading rock slopes
CN106013191A (en) Environmental-friendly grass concrete highway slope protection structure and construction method thereof
CN108678000A (en) A kind of U-shaped retaining structure of roadbed Xia Chuan highways and its construction method
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
KR20210078779A (en) Underground roadway removed upper structure between upper slab and surface of road after constructing the steel continuous wall in the earth by top-down method and method for constructing the same
KR20210020573A (en) Double line retaining wall self-reliance composite wall construction method for reinforcement pile wall
KR100362615B1 (en) A Repairing Method of Underground Voids of Approach Slab in Abutment Constructure
JPH0762350B2 (en) Method of making steep slope on embankment slope
JP2653731B2 (en) Embankment slope steepening method
KR100509707B1 (en) None open cut tunnelling of arch type with hume pipe and con&#39;c rib
US20240368853A1 (en) Method for forming a pile wall in ground and a corresponding pile wall
JPH0762352B2 (en) Method of making steep slope on embankment slope
JP4485006B2 (en) Construction method for underground structures
JP2001329545A (en) Bridge pier foundation construction method and floor slab for bridge pier
JPH0762351B2 (en) Method of making steep slope on embankment slope
KR101523948B1 (en) Construction method of underground structure under the established building
CN212925645U (en) Protective structure of roadbed
KR200194458Y1 (en) The structure improved outer layer of tender base for improveing constrution of the dredged soil tender base
JPH0762349B2 (en) Method of making steep slope on embankment slope
JP2001173135A (en) Underground outer wall of structure and its construction method
JP3168197B2 (en) Caisson anchor structure and construction method
CN223434358U (en) A waterproof structure for underground tunneling
KR20040065896A (en) Micro pile and assembly foundation reinforcement structure member and its method for pier

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20080705

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20090705

LAPS Cancellation because of no payment of annual fees