JPH0765299B2 - Temporary support device for hand girder - Google Patents
Temporary support device for hand girderInfo
- Publication number
- JPH0765299B2 JPH0765299B2 JP3794792A JP3794792A JPH0765299B2 JP H0765299 B2 JPH0765299 B2 JP H0765299B2 JP 3794792 A JP3794792 A JP 3794792A JP 3794792 A JP3794792 A JP 3794792A JP H0765299 B2 JPH0765299 B2 JP H0765299B2
- Authority
- JP
- Japan
- Prior art keywords
- girder
- hand
- support device
- pedestal
- pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 36
- 238000001125 extrusion Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 239000004809 Teflon Substances 0.000 description 1
- 229920006362 Teflon® Polymers 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、橋桁を施工する場合
に、手延桁を桁前進方向の次の橋脚上に仮支持する手延
桁の仮支持装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary support device for a hand girder that temporarily supports a hand girder on the next pier in the girder forward direction when constructing a bridge girder.
【0002】[0002]
【従来の技術】桁を順次押出して橋体を施工する押出工
法を例にとって説明する。コンクリート橋桁を押出工法
によって施工する場合、押し出されるコンクリート橋桁
の先端が片持とならないようにするために、コンクリー
ト橋桁の先頭端に手延桁を取付け、この手延桁を桁前進
方向の次の橋脚上に支持させて、手延桁と桁とを径間の
両端で支持しながらコンクリート橋桁を前進させて橋体
の架設を行う。この場合、手延桁の先端が桁前進方向の
次の橋脚に到達する前に別途の運搬手段によって手延桁
の仮支持装置を桁前進方向の次の橋脚上に組立ててお
き、手延桁の先端が到達したとき、この仮支持装置の上
に手延桁の先端を載せる。手延桁の後端がこの仮支持装
置の位置に達しコンクリート橋桁の先端をその橋脚上に
載置したらこの橋脚上の仮支持装置を取外す。2. Description of the Related Art An extrusion method of constructing a bridge by sequentially extruding girders will be described as an example. When constructing a concrete bridge girder by the extrusion method, in order to prevent the tip of the extruded concrete bridge girder from being cantilevered, attach a hand girder to the leading end of the concrete bridge girder and attach this hand girder to the next The concrete bridge girder is moved forward while supporting the hand-held girder and girder at both ends of the span, and the bridge body is erected. In this case, before the tip of the hand girder reaches the next bridge pier in the girder advance direction, the temporary support device for the hand girder is assembled on the next pier in the girder advance direction by a separate transportation means. When the tip of the hand girder reaches, the tip of the girder is placed on this temporary support device. When the rear end of the hand girder reaches the position of this temporary support device and the tip of the concrete bridge girder is placed on the pier, remove the temporary support device on this pier.
【0003】このとき、コンクリート橋桁を橋脚上に支
持させて仮支柱装置の荷重を盛り替えて仮支柱装置を取
り外す作業を要する。このため従来の手延桁仮支持装置
はサンドルジャッキ等をその底面にあらかじめ組込んで
おくことが必要である。以上のことを図面を参照して説
明する。図5はコンクリ−ト橋桁を押し出している状態
の手延桁の全体側面図、図6はその平面図、図7はその
正面図、図8は従来技術を示す支柱部の正面図である。At this time, it is necessary to support the concrete bridge girder on the pier and change the load of the temporary strut apparatus to remove the temporary strut apparatus. For this reason, it is necessary to previously incorporate a sandal jack or the like into the bottom surface of the conventional hand girder temporary support device. The above will be described with reference to the drawings. 5 is an overall side view of the hand-held girder in a state where the concrete bridge girder is pushed out, FIG. 6 is a plan view thereof, FIG. 7 is a front view thereof, and FIG. 8 is a front view of a column portion showing a conventional technique.
【0004】図5において、手延桁1はコンクリ−ト橋
桁2の先頭に取りつけられ、前進するコンクリ−ト橋桁
2の先端を案内している。図6は図5の平面図、図7は
コンクリ−ト橋桁2と手延桁1との取付け部の構造を示
している。手延桁1は、図5に示すように、橋脚3上に
手延桁の仮支持装置5を据付けてその上にローラ又は滑
り支承によって支承されている。In FIG. 5, the hand girder 1 is attached to the head of the concrete bridge girder 2 and guides the tip of the concrete bridge girder 2 which is moving forward. FIG. 6 is a plan view of FIG. 5, and FIG. 7 shows the structure of the attachment portion of the concrete bridge girder 2 and the hand girder 1. As shown in FIG. 5, the hand girder 1 has a temporary support device 5 for the hand girder installed on the pier 3 and is supported thereon by rollers or sliding bearings.
【0005】従来の仮支持装置5の荷重盛り替え手順を
図8によって説明する。図8は橋脚3を図5の左側から
見た図である。コンクリ−ト橋桁2の先端が橋脚3上の
橋体用滑り架台4上に到達すると、橋体用滑り架台4の
底面に設けたサンドルジャッキ6を作動させてコンクリ
−ト橋桁2を持上げ、一方手延桁1の仮支持装置5のサ
ンドルジャッキ7を下降させる。これによって手延桁1
の仮支持装置5は鉛直荷重を負担しなくなる。そこで、
手延桁1上に設けたチェーンブロック8(図5参照)に
より手延桁1の仮支持装置5を吊り、これを前方へ前進
させる。次いで橋脚3上にコンクリ−ト橋桁2用の永久
滑り架台(図示省略)を取りつけ、橋体用滑り架台4の
サンドルジャッキ6を下降させてコンクリ−ト橋桁2を
永久滑り架台上に載せ、架設工事用の橋体用滑り架台4
を抜き取る。次に、コンクリ−ト橋桁2の押出しを続行
して、手延桁1の先端9が次の図示していない橋脚に到
達すると、先端仮脚10をその橋脚上に立て、調整ジャ
ッキ11で高さを調整して、手延桁1の先端9をその橋
脚上に支持させる。次いで、手延桁1の仮支持装置5を
手延桁1上を前進させてその橋脚上に到達させ、橋脚上
に固定した後サンドルジャッキ7を用いて先端仮脚10
の荷重を手延桁1の仮支持装置5に盛り替える。A procedure for changing the load of the conventional temporary support device 5 will be described with reference to FIG. FIG. 8 is a view of the pier 3 as viewed from the left side of FIG. When the tip of the concrete bridge girder 2 reaches the bridge slide 4 on the pier 3, the sandle jack 6 provided on the bottom surface of the bridge slide 4 is actuated to lift the concrete bridge girder 2, The sandal jack 7 of the temporary support device 5 of the hand extending girder 1 is lowered. By this, hand delay girder 1
The temporary support device 5 does not bear the vertical load. Therefore,
The temporary support device 5 of the hand girder 1 is suspended by the chain block 8 (see FIG. 5) provided on the hand girder 1, and this is moved forward. Next, a permanent slide frame (not shown) for the concrete bridge girder 2 is mounted on the bridge pier 3, and the sandle jack 6 of the bridge slide frame 4 is lowered to place the concrete bridge girder 2 on the permanent slide frame and erected. Sliding stand for bridges for construction 4
Pull out. Next, the extrusion of the concrete bridge girder 2 is continued, and when the tip 9 of the hand-held girder 1 reaches the next pier (not shown), the tip temporary leg 10 is erected on the pier and the adjustment jack 11 raises it. Adjusting the height, the tip 9 of the hand girder 1 is supported on the pier. Next, the temporary support device 5 of the hand-reach girder 1 is advanced over the hand-reach girder 1 to reach the pier, and after being fixed on the pier, the tip temporary leg 10 is fixed using the sandle jack 7.
The load of (1) is transferred to the temporary support device 5 of the hand-rear girder 1.
【0006】[0006]
【発明が解決しようとする課題】このような従来の装置
では、 (イ)手延桁仮支持装置の荷重の盛り替え、撤去、運搬
作業には莫大な手間がかかる。 (ロ)橋脚上には、手延桁仮支持装置を据付ける上面ス
ペースと、コンクリ−ト橋桁を支持する滑り架台を据付
けるスペースが必要であり、このために余分な橋脚柱頭
部を造成しなければならない。 という問題があった。In such a conventional device, (a) it takes a great deal of time to load, remove, and carry the work of the temporary hand girder temporary support device. (B) On the pier, an upper space for installing the temporary suspension girder support device and a space for installing a slide stand for supporting the concrete bridge girder are required. For this purpose, an extra pier head is created. There must be. There was a problem.
【0007】本発明はこのような問題点を合理化した手
延桁の仮支持装置を提供することを目的とするものであ
る。An object of the present invention is to provide a temporary supporting device for a hand girder in which such problems are rationalized.
【0008】[0008]
【課題を解決するための手段】本発明は、橋桁架設工事
に用いる手延桁を桁前進方向の次の橋脚上に仮支持する
装置において、(1)仮支持装置は台座とその上に載せ
る支柱部とを別体とし、(2)台座は上面に桁前進方向
前方に向って下り勾配を有し、橋脚上に固定して残置
し、橋桁の支承部となるものとし、(3)支柱部は台座
上を摺動する摺動部と、台座とは別に橋脚に着脱自在に
固定可能な固定部とを備え、順次、次の橋脚上へ移動可
能としたことを特徴とする手延桁の仮支持装置である。The present invention relates to a device for temporarily supporting a hand girder used for bridge girder erection work on a bridge pier next to the girder forward direction. (1) The temporary support device is placed on a pedestal and on it. (2) The pedestal shall be a separate body, and (2) the pedestal shall have a downward slope toward the front of the girder forward direction on the upper surface, shall be fixed and left on the pier, and shall be the bearing part of the bridge girder. The hand girder characterized in that the part has a sliding part that slides on the pedestal and a fixing part that can be detachably fixed to the pier separately from the pedestal, and that it can be sequentially moved to the next pier. It is a temporary support device.
【0009】[0009]
【作用】本発明の手延桁の仮支持装置は、台座とその上
に載置する支柱部とを別体とし、台座と支柱部とはそれ
ぞれ別々に橋脚上に固定される。この台座はコンクリ−
ト橋桁を載置して最終的にコンクリ−ト橋桁のすべり架
台とすることができる。台座と支柱部とは、桁の前進方
向前方に向って下り勾配の分割面で接している。この分
割面は、テフロン等を表面に取りつけたすべり架台を形
成している。この台座上面の上記勾配は台座を橋脚上に
固定したまま、支柱のみを前方へ押し出すとき、支柱が
支持していた手延桁の荷重を開放し、この荷重を台座上
に載っていたコンクリ−ト橋桁に移し、支持荷重を開放
した支柱部を円滑に抜きとり、この支柱を次の橋脚上へ
移動することができるようにするためのものである。In the provisional support device for the hand-retracted girder of the present invention, the pedestal and the supporting column mounted on the pedestal are separately provided, and the pedestal and the supporting column are separately fixed on the pier. This pedestal is concrete
A girder can be placed on the concrete bridge girder to finally become a slide stand for the concrete bridge girder. The pedestal and the column portion are in contact with each other at a dividing surface having a downward slope toward the front in the forward direction of the girder. The dividing surface forms a slide mount with Teflon or the like attached to the surface. The above slope of the pedestal upper surface releases the load of the hand girder supported by the stanchion when pushing out only the stanchion with the pedestal fixed on the pier, and the load was placed on the pedestal. It is for moving to the next bridge pier so that the supporting column that has released the supporting load can be smoothly extracted and moved to the next pier.
【0010】台座の上面に付与する勾配は、径間距離、
手延桁の構造その他に応じて定められるが、支柱部を前
方に押出すとき、支柱部が手延桁の荷重によって受けて
いる鉛直方向の圧縮歪の量と等しい勾配量をもたせてお
けば、支柱部が架台上を前方に押出されて滑っているう
ちに鉛直荷重がゼロとなる。従ってこの状態でなんらの
衝撃を伴うことなく、台座と支柱部は分離され、支柱部
は手延桁上に設けた走行装置に吊下げられる。The gradient applied to the upper surface of the pedestal is the span distance,
It is determined according to the structure of the hand girder, etc., but when pushing out the strut part forward, if the strut part has a gradient amount equal to the amount of vertical compressive strain received by the load of the hand girder. , The vertical load becomes zero while the prop is pushed forward on the gantry and sliding. Therefore, in this state, the pedestal and the supporting column are separated without any shock, and the supporting column is hung on the traveling device provided on the hand girder.
【0011】手延桁の先端が次の橋脚上に到達し、先端
を先端仮脚で支持したら走行装置は仮支柱部をこの橋脚
上まで前進させ、そこの台座上に載せて橋脚に固定す
る。本発明の手延桁の仮支持装置の仮支柱部の頂面は手
延桁の下面を受けるローラ又は滑り支承である。When the tip of the hand girder reaches the next bridge pier and the tip is supported by the temporary tentative leg, the traveling device advances the temporary strut to the pier, mounts it on the pedestal there, and fixes it to the pier. . The top surface of the temporary column portion of the temporary supporting device for the hand-held girder of the present invention is a roller or a slide bearing for receiving the lower surface of the hand-held girder.
【0012】[0012]
【実施例】以下図面を参照して本発明の実施例について
詳細に説明する。図1は本発明の実施例の手延桁の仮支
持装置の側面図、図2はその正面図、図3は平面図であ
る。図4は支柱部を押出している図を示す。実施例の仮
支持装置15は台座16とその上に載置した支柱部17
とに分離されている。台座16は上面に桁前進方向前方
に向って下り勾配を有している。台座16は橋脚上に固
定されており、支柱部17は台座16上を摺動すること
ができる。台座16は橋桁の支承部(滑り架台4)を兼
ねるものである。支柱部17は底面が台座16上を摺動
する摺動部23となっている。また台座16とは別に橋
脚上に着脱自在に固定する固定部21を備えている。Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 is a side view of a temporary hand girder temporary support device according to an embodiment of the present invention, FIG. 2 is a front view thereof, and FIG. 3 is a plan view thereof. FIG. 4 shows a diagram in which the support columns are extruded. The temporary support device 15 according to the embodiment includes a pedestal 16 and a support 17 mounted on the pedestal 16.
It is separated into and. The pedestal 16 has a downward slope on the upper surface toward the front of the girder forward direction. The pedestal 16 is fixed on the pier, and the support 17 can slide on the pedestal 16. The pedestal 16 also serves as the support portion (slide base 4) of the bridge girder. The bottom of the column 17 is a sliding portion 23 that slides on the pedestal 16. In addition to the pedestal 16, a fixing portion 21 that is detachably fixed to the pier is provided.
【0013】コンクリ−ト橋桁2を押出し前進させる。
図1は、丁度押し出しコンクリ−ト橋桁2の先端が橋脚
3上に到達した状態を示している。コンクリ−ト橋桁2
の先頭端を橋体用台座16上に載せる。ここで、固定部
21の取付ボルト22を外し、仮支持装置15の吊装置
を支柱部17耳18に結合する。この状態でコンクリ−
ト橋桁2の先端に取付けた押し出し金物31、32を仮
支持装置15の支柱部17に当接させ、さらに押出す
と、コンクリ−ト橋桁2は仮支持装置15の支柱部17
を前方に押す。支柱部17は台座16上に載置されてい
る。台座16の上面は桁の前進方向に下り勾配を付与し
てある。仮支持装置15の支柱部17はコンクリ−ト橋
桁2に押され、この下り勾配によって圧縮歪を解消しつ
つ前進する。この前進によって、仮支持装置15とコン
クリート橋桁の支持荷重が徐々に盛り替えられる。そし
て、手延桁1の仮支持装置15の支柱部17は鉛直荷重
を開放することができる。図4はこの押し出しが進行し
ている状態を示している。すなわち、コンクリ−ト橋桁
2が仮支持装置15の支柱部17を図の右方向に押し、
支柱部17の底面23が台座16上を摺動し、台座16
上の勾配により鉛直荷重を開放されつつある。この荷重
はコンクリ−ト橋桁2が代わりに負担している。ついに
支柱部17が台座16上から押出されるときは、仮支持
装置15は鉛直荷重を支持しておらず、コンクリート橋
桁が全鉛直荷重を台座16に支持させている。従って、
仮支持装置15の支柱部17は台座16上から円滑に外
れ、手延桁1から吊下げられる。仮支持装置15の鉛直
圧縮歪量は、条件及び構造によって異なるが3〜4mm
となる。台座16はこの歪量より僅か大きな高さの差を
持つ勾配を有すればよく、また上下方向の据え付け精度
は±5mm以内に据え付けられている。The concrete bridge girder 2 is extruded and moved forward.
FIG. 1 shows a state where the tip of the extrusion concrete bridge girder 2 has just reached the pier 3. Concrete bridge girder 2
The top end of the is placed on the pedestal 16 for the bridge. Here, the mounting bolt 22 of the fixed portion 21 is removed, and the suspension device of the temporary support device 15 is coupled to the ear portion 18 of the support column portion 17. Concrete in this state
G. When the extrusion hardware 31, 32 attached to the tip of the bridge girder 2 is brought into contact with the column 17 of the temporary support device 15 and further pushed out, the concrete bridge girder 2 is fixed to the column 17 of the temporary support device 15.
Push forward. The column 17 is placed on the pedestal 16. The upper surface of the pedestal 16 has a downward slope in the forward direction of the girder. The column 17 of the temporary support device 15 is pushed by the concrete bridge girder 2 and moves forward while eliminating the compression strain due to this downward slope. With this forward movement, the supporting loads of the temporary supporting device 15 and the concrete bridge girder are gradually rebalanced. Then, the column portion 17 of the temporary support device 15 of the hand extending girder 1 can release the vertical load. FIG. 4 shows a state in which this extrusion is in progress. That is, the concrete bridge girder 2 pushes the column portion 17 of the temporary support device 15 to the right in the figure,
The bottom surface 23 of the column 17 slides on the pedestal 16,
The vertical load is being released due to the slope above. The concrete bridge girder 2 bears this load instead. Finally, when the support 17 is pushed out from the pedestal 16, the temporary support device 15 does not support the vertical load, and the concrete bridge girder supports the pedestal 16 on the entire vertical load. Therefore,
The support 17 of the temporary support device 15 is smoothly removed from the pedestal 16 and is suspended from the hand girder 1. The vertical compressive strain amount of the temporary support device 15 varies depending on the condition and the structure, but is 3 to 4 mm.
Becomes The pedestal 16 may have a gradient having a height difference slightly larger than this strain amount, and the vertical installation accuracy is set within ± 5 mm.
【0014】[0014]
【発明の効果】本発明の手延桁の仮支持装置は以上のよ
うに構成されているので次の効果を奏する。 (a)自動的に盛り替えを行うのでその手間が不要であ
る。 (b)橋脚上面は必要最小限の広さでよい。 (c)橋の架設工期を短縮することができる。EFFECT OF THE INVENTION Since the provisional support device for the hand-retracted girder of the present invention is constructed as described above, it has the following effects. (A) Since the refilling is automatically performed, the trouble is unnecessary. (B) The top surface of the pier may be as small as necessary. (C) The bridge construction period can be shortened.
【図1】本発明の実施例の手延桁の仮支持装置の側面図
である。FIG. 1 is a side view of a temporary hand girder temporary support device according to an embodiment of the present invention.
【図2】本発明の実施例の手延桁の仮支持装置の正面図
である。FIG. 2 is a front view of a temporary hand girder temporary support device according to an embodiment of the present invention.
【図3】本発明の実施例の手延桁の仮支持装置の平面図
である。FIG. 3 is a plan view of the temporary supporting device for the hand extending girder according to the embodiment of the present invention.
【図4】支柱部を押出している図を示す。FIG. 4 is a diagram showing a case where a support column is extruded.
【図5】手延桁の全体側面図である。FIG. 5 is an overall side view of the hand extending girder.
【図6】手延桁の平面図である。FIG. 6 is a plan view of a hand extending girder.
【図7】手延桁の正面図である。FIG. 7 is a front view of a hand extending girder.
【図8】従来の支柱部の正面図である。FIG. 8 is a front view of a conventional strut.
1 手延桁 2 コンクリ
−ト橋桁 3 橋脚 4 架台 5 仮支持装置 6 サンドル
ジャッキ 7 サンドルジャッキ 8 チェーン
ブロック 9 先端 10 仮脚 11 調整ジャッキ 15 仮支持
装置 16 台座 17 支柱部 18 耳 21 固定部 22 取付けボルト 23 底面1 Hand Girder 2 Concrete Bridge Girder 3 Bridge Pier 4 Frame 5 Temporary Supporting Device 6 Sandle Jack 7 Sandle Jack 8 Chain Block 9 Tip 10 Temporary Leg 11 Adjustment Jack 15 Temporary Supporting Device 16 Pedestal 17 Strut 18 Ear 21 Fixing 22 Attaching The bottom of the bolt 23
Claims (1)
向の次の橋脚上に仮支持する仮支持装置において、該仮
支持装置は台座とその上に載置する支柱部とを別体と
し、該台座は上面に桁前進方向前方に向って下り勾配を
有し橋脚上に固定して残置し橋桁の支承部を兼ねるもの
とし、前記支柱部は該台座上を摺動する摺動部と台座と
は別に橋脚上に着脱自在に固定する固定部を備えたこと
を特徴とする手延桁の仮支持装置。1. A temporary support device for temporarily supporting a hand girder used for bridge girder erection work on the next bridge pier in the direction of advance of the girder, wherein the temporary support device is a separate body from a support column to be mounted thereon. The pedestal has a downward slope on the upper surface in the forward direction of the girder, and is fixed on the bridge pier and left as the bearing part of the bridge girder, and the strut part slides on the pedestal. A temporary support device for a hand girder characterized by having a fixing portion that is detachably fixed to the pier separately from the base and the pedestal.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3794792A JPH0765299B2 (en) | 1992-02-25 | 1992-02-25 | Temporary support device for hand girder |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3794792A JPH0765299B2 (en) | 1992-02-25 | 1992-02-25 | Temporary support device for hand girder |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0626014A JPH0626014A (en) | 1994-02-01 |
| JPH0765299B2 true JPH0765299B2 (en) | 1995-07-19 |
Family
ID=12511750
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3794792A Expired - Lifetime JPH0765299B2 (en) | 1992-02-25 | 1992-02-25 | Temporary support device for hand girder |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0765299B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103770692A (en) * | 2014-02-28 | 2014-05-07 | 中南林业科技大学 | Automatic fixing device for girder transporting carrier |
| JP6991017B2 (en) * | 2017-08-31 | 2022-01-12 | 西日本旅客鉄道株式会社 | Replacement method and erection machine |
| JP7226063B2 (en) * | 2019-04-22 | 2023-02-21 | Jfeエンジニアリング株式会社 | Send-out erection method and hand-stretching machine |
-
1992
- 1992-02-25 JP JP3794792A patent/JPH0765299B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0626014A (en) | 1994-02-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| SU878205A3 (en) | Moving mould for erecting ferroconcrete walls | |
| US6368022B1 (en) | Lifting system for massive constructions | |
| JP3177904B2 (en) | Mobile work vehicle for PC cable-stayed bridge | |
| JPS59501465A (en) | Split casting equipment for prestressed concrete bridges using cantilever construction method | |
| JPH0721165B2 (en) | How to construct a concrete cable-stayed bridge | |
| CN110080540B (en) | Large-span steel structure sliding device and construction method thereof | |
| JPH0765299B2 (en) | Temporary support device for hand girder | |
| JP3218314B2 (en) | Beam formwork equipment | |
| JPH0681846B2 (en) | Mobile construction equipment for elevated structures | |
| JP2552997B2 (en) | Bridge girder construction method and its equipment | |
| JPS6218694B2 (en) | ||
| JPH1088521A (en) | Overhang work equipment | |
| JP3058055B2 (en) | Beam formwork | |
| JP2990593B2 (en) | Demolition method and demolition equipment for building structures | |
| JPH10306445A (en) | Steel pipe pile installation device | |
| US6619885B2 (en) | Telescopic tunnel form | |
| RU94026888A (en) | Travelling forms for placement of concrete on ceilings | |
| JPH1121822A (en) | Overhang erecting device | |
| JP2550836B2 (en) | PC cable stayed bridge construction equipment | |
| CN222939595U (en) | Middle-bearing arch bridge model | |
| JPH062429A (en) | Slip form device | |
| RU69081U1 (en) | CONSTRUCTION OF A FIXED ASSEMBLY NODE OF THE MIDDLE ROAD DIVIDING BRIDGE | |
| JPH10115090A (en) | Climb form construction method | |
| JPH057519B2 (en) | ||
| JP2617735B2 (en) | Formwork support device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19960130 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100719 Year of fee payment: 15 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120719 Year of fee payment: 17 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120719 Year of fee payment: 17 |