JPH0774585B2 - Tunnel excavation method and prelining construction device - Google Patents
[go: Go Back, main page]

JPH0774585B2 - Tunnel excavation method and prelining construction device - Google Patents

Tunnel excavation method and prelining construction device

Info

Publication number
JPH0774585B2
JPH0774585B2 JP2055794A JP5579490A JPH0774585B2 JP H0774585 B2 JPH0774585 B2 JP H0774585B2 JP 2055794 A JP2055794 A JP 2055794A JP 5579490 A JP5579490 A JP 5579490A JP H0774585 B2 JPH0774585 B2 JP H0774585B2
Authority
JP
Japan
Prior art keywords
tunnel
shield frame
lining
prelining
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2055794A
Other languages
Japanese (ja)
Other versions
JPH03257284A (en
Inventor
義雄 足立
敏則 水谷
茂 稲野
守 小西
正之 浜野
幸雄 垣内
貞彦 高森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Kumagai Gumi Co Ltd
Okumura Corp
Kawasaki Motors Ltd
Original Assignee
Maeda Corp
Kumagai Gumi Co Ltd
Okumura Corp
Kawasaki Jukogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp, Kumagai Gumi Co Ltd, Okumura Corp, Kawasaki Jukogyo KK filed Critical Maeda Corp
Priority to JP2055794A priority Critical patent/JPH0774585B2/en
Publication of JPH03257284A publication Critical patent/JPH03257284A/en
Publication of JPH0774585B2 publication Critical patent/JPH0774585B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明はトンネル断面形状の外周に沿ってプレライニン
グを構築し、このプレライニングにより囲まれた地盤を
掘削することによりトンネルを形成する方法と、上記プ
レライニングを構築する装置に関するものである。
The present invention relates to a method of forming a tunnel by constructing a prelining along the outer periphery of a tunnel cross-sectional shape and excavating the ground surrounded by the prelining to form a tunnel. , A device for constructing the pre-lining.

〔従来の技術〕[Conventional technology]

従来から、トンネルの覆工は、トンネル空間を掘削した
のちに、その掘削壁面にコンクリートを吹き付ける方法
が広く採用されているが、トンネルの掘削から覆工まで
の間に生じる地山の緩みを抑えることができず、地盤が
軟弱な未固結地山である場合や地下水がある場合には切
羽の崩壊や覆工作業中に地盤の肌落ちなどが生じて極め
て危険であり、地山を安定させることが困難である。
Conventionally, the method of spraying concrete on the excavated wall surface after excavating the tunnel space has been widely used for tunnel lining, but the loosening of the ground that occurs between tunnel excavation and lining is suppressed. If the ground is soft and unconsolidated ground or there is groundwater, it is extremely dangerous because the face collapses and the ground skin falls off during the lining work, and the ground is stable. It is difficult to let

さらに、トンネル壁面にコンクリートを吹き付けると、
その跳ね返りや粉塵が多く発生し、材料の損失や作業環
境の悪化が避けられないという問題点がある。
Furthermore, when concrete is sprayed on the tunnel wall,
There is a problem in that a large amount of bounce and dust are generated, and loss of materials and deterioration of the working environment cannot be avoided.

又、このようなトンネル掘削後に覆工を施す方法は、該
トンネルが小断面の場合に適用し得るが、大断面のトン
ネルの掘削には適用し難いものである。
Further, such a method of applying a lining after excavating a tunnel can be applied to a case where the tunnel has a small cross section, but is difficult to apply to excavating a tunnel having a large cross section.

このため、切羽部のトンネル外周縁から前方の地盤に、
トンネル外周に沿うアーチ形状の溝孔を所望深さまで掘
削し、その溝孔内にコンクリートを充填してトンネル掘
削前の覆工(プレライニング)を形成したのち、該コン
クリートで囲まれた地盤を掘削するという作業を繰り返
し行ってトンネルを掘削していく工法が開発されたが、
このように工法における上記溝孔の掘削装置としては、
従来から、アースオーガを多連に並列した状態で連結
し、各アースオーガによる円形掘削断面が連続して一定
幅の溝孔を掘削し得るように装置が開発されいる。
Therefore, from the outer peripheral edge of the tunnel of the face to the ground in front,
An arch-shaped slot along the outer circumference of the tunnel is excavated to a desired depth, and the slot is filled with concrete to form a lining (pre-lining) before tunnel excavation, and then the ground surrounded by the concrete is excavated. A method of excavating a tunnel by repeating the work of doing was developed,
In this way, as the excavation device for the slot in the construction method,
BACKGROUND ART Conventionally, a device has been developed so that multiple earth augers are connected in a parallel state and a circular excavation cross section by each earth auger can be continuously excavated to form a slot having a constant width.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

しかしながら、このような多連式アースオーガでは掘削
される溝孔の幅は常に一定となり、従って、切羽面側に
おいては隣接する溝孔間が連通する状態で穿設されて
も、溝孔はその掘削方向がトンネルの拡径方向に傾斜す
るように末拡がり状に穿設されるものであるから、溝孔
先端部側では隣接する溝孔間に間隔が生じることにな
り、溝孔にコンクリートを充填したのち、その内部側の
地盤を掘削すると、前記間隔部から軟弱地盤が崩れ落ち
たり、湧水が生じるという問題点がある。
However, in such a multiple earth auger, the width of the slot to be excavated is always constant, and therefore, even if the slots are drilled in a state where the adjacent slots communicate with each other on the face of the face, Since the digging direction is formed in a divergent shape so as to incline in the diameter expansion direction of the tunnel, there will be a gap between adjacent groove holes on the groove hole tip side, and concrete will be inserted in the groove holes. If the ground on the inner side of the ground is excavated after filling, there are problems that the soft ground collapses from the gap portion and spring water is generated.

さらに、多連式アースオーガによって掘削された溝孔の
形状は、隣接するアースオーガによる円形孔がその一部
を重ね合わせた形状、即ち、周壁が凹凸形状となるの
で、掘削面積の割りにはトンネル覆工を行うための有効
断面が小さくなり、所望の覆工厚さにするには必要以上
の材料を要するという問題点がある。
In addition, the shape of the slot hole excavated by the multiple earth auger is a shape in which the circular holes by the adjacent earth augers are partly overlapped, that is, the peripheral wall has an uneven shape, so the excavation area is relatively small. There is a problem that an effective area for tunnel lining becomes small and more material than necessary is required to obtain a desired lining thickness.

又、上記のような溝孔先端部間の隙間の発生をなくする
には、切羽面側で隣接する溝孔間の一部を重複させれば
よいが、このような掘削方法でも溝孔先端部間における
断面方向の接合部が円形断面の点接合となって、覆工の
剛性が小さくなると共に止水性が不十分となり、しか
も、覆工はトンネルの長さ方向に一定長さ毎に断続的に
設けられて一連に連続していないので、一層、止水性が
不十分となる等の問題点があった。
Further, in order to eliminate the occurrence of the gap between the groove hole tip portions as described above, it is sufficient to overlap a part of the groove holes adjacent to each other on the face face side. The joints in the cross-sectional direction between the parts are point-joint with a circular cross-section, and the rigidity of the lining is reduced and the water stoppage is insufficient, and the lining is intermittent at regular intervals in the length direction of the tunnel. Since it is provided continuously and is not continuous in a series, there has been a problem that the waterproofness is further insufficient.

さらに又、一定長さの覆工形成毎に該覆工により囲まれ
た地盤を掘削する作業を交互に繰り返し行ってトンネル
を掘削していくものであるから、一定長さのトンネルを
掘削しなければ、次の覆工を行うことができないので、
作業能率が悪いという問題点があった。
Furthermore, every time a lining of a fixed length is formed, the work of excavating the ground surrounded by the lining is alternately repeated to dig a tunnel. Therefore, a tunnel of a fixed length must be excavated. If you can't do the next lining,
There was a problem that work efficiency was poor.

本発明はこのような問題点を解消し得るトンネルの掘削
方法とその方法に使用するプレライニング構築装置の提
供を目的とするものである。
An object of the present invention is to provide a tunnel excavation method capable of solving such a problem and a prelining construction device used for the method.

〔課題を解決するための手段〕[Means for Solving the Problems]

上記目的を達成するために、本発明のトンネル掘削方法
は、掘削すべきトンネルの両側部下端に計画トンネルの
長さ方向に導坑を築造し、この両側導坑の計画トンネル
始端面側にトンネル断面の外周に沿う一定厚みを有する
プレライニング構築装置を導坑間に跨いだ状態に配設す
ると共に該プレライニング構築装置の両側下端部を両側
導坑内にトンネルの長さ方向に移動自在に設置し、しか
るのち、このプレライニング構築装置をトンネルの長さ
方向に移動させながら該プレライニング構築装置の前端
部に備えた掘削機によりトンネル外周に沿う一定厚みの
溝孔を掘削すると共に、該溝孔内にコンクリートを打設
してプレライニングを構築し、このプレライニングを計
画トンネルの全長に亘って構築すると共に該プレライニ
ングで囲まれた地盤を掘削することを特徴とするもので
ある。
In order to achieve the above-mentioned object, the tunnel excavation method of the present invention constructs a tunnel in the longitudinal direction of the planned tunnel at the lower ends of both sides of the tunnel to be excavated, and tunnels to the planned tunnel starting end face side of the both tunnels. A pre-lining construction device having a constant thickness along the outer circumference of the cross section is arranged so as to straddle the tunnels, and both lower end portions of the pre-lining construction device are installed in both tunnels so as to be movable in the length direction of the tunnel. Then, while excavating a groove hole of a constant thickness along the outer circumference of the tunnel with an excavator provided at the front end of the prelining construction device while moving the prelining construction device in the length direction of the tunnel, The concrete is placed in the hole to construct the pre-lining, and this pre-lining is constructed over the entire length of the planned tunnel and is surrounded by the pre-lining. It is characterized in that drilling.

又、上記トンネル掘削方法に使用するプレライニング構
築装置としては、掘削すべきトンネルの両側部下端に計
画トンネルの長さ方向に沿って築造した両側導坑間に跨
がってその両側下端部を該導坑に沿って移動可能とした
トンネル断面の外周に沿う一定厚みを有する中空シール
ド枠と、この中空シールド枠の前端に配設されてシール
ド枠の前方地盤に一定厚みの溝孔を掘削する掘削機と、
シールド枠の下端に開口した土砂排出口と、シールド枠
の後端開口部内にコンクリートを供給、打設するコンク
リート注入路と、シールド枠の後部内に前後動自在に配
設されて打設されたコンクリートの形状保持のためのプ
レスリングと、このプレスリングを前後動させる推進ジ
ャッキとから構成していることを特徴とするものであ
る。
Further, as the pre-lining construction device used for the tunnel excavation method, the lower end portions on both sides of the tunnel to be excavated straddle the two side tunnels constructed along the length direction of the planned tunnel, A hollow shield frame having a constant thickness along the outer circumference of the tunnel cross section, which is movable along the guide shaft, and a groove hole having a constant thickness, which is arranged at the front end of the hollow shield frame and has a constant thickness, in the front ground of the shield frame. An excavator,
The earth and sand discharge port opened at the lower end of the shield frame, the concrete pouring path for supplying and placing concrete into the rear end opening of the shield frame, and the back and forth movable placement in the rear part of the shield frame were placed. It is characterized by comprising a press ring for retaining the shape of concrete and a propelling jack for moving the press ring back and forth.

〔作用〕[Action]

掘削すべきトンネルの両側部下端に沿って計画トンネル
の全長に亘って導坑を築造すると共に、この導坑の上記
計画トンネル始端面側にトンネル形状のプレライニング
構築装置を両側導坑間に跨いだ状態に配設してその両側
下端を両側導坑内にトンネルの長さ方向に移動自在に設
置する。
A tunnel will be built along the lower ends of both sides of the tunnel to be excavated, and a tunnel-shaped prelining construction device will be straddled between the tunnels on the starting side of the planned tunnel. It is installed in such a state that both lower ends are movably installed in both sides of the tunnel in the longitudinal direction of the tunnel.

しかるのち、プレライニング構築装置の中空シールド枠
の前端に配設している掘削機により前方の地盤を掘削す
ると共にプレライニング構築装置を前進させてトンネル
形状の溝孔を形成していく。
After that, the excavator disposed at the front end of the hollow shield frame of the prelining construction device excavates the ground in front, and the prelining construction device is advanced to form a tunnel-shaped slot.

掘削された土砂はシールド枠内を通じて該シールド枠の
開口下端から導坑内に排出され、運搬車等によって坑外
に搬出される。
The excavated earth and sand is discharged through the shield frame from the lower end of the opening of the shield frame into the guide pit, and is carried out of the mine by a transport vehicle or the like.

プレライニング構築装置の前進は、そのシールド枠の後
端部に配設したプレスリング側に反力をとって推進ジャ
ッキにより行われ、該プレライニング構築装置の推進跡
の溝孔にシールド枠の後端開口部を通じてコンクリート
を打設すると共にその打設に従って推進ジャッキを伸縮
させることにより、一掘進長のプレライニング部を築造
する。
The advance of the pre-lining construction device is performed by a propulsion jack by taking a reaction force to the press ring side arranged at the rear end portion of the shield frame, and the back of the shield frame is inserted into the groove of the propulsion mark of the pre-lining construction device. The concrete is cast through the end opening, and the propelling jack is expanded and contracted in accordance with the casting, thereby constructing the pre-lining portion with a length of one excavation.

このプレライニング部を、プレライニング構築装置の前
端に配設した掘削機による一定長の溝孔掘削工程と、該
溝孔内にプレライニング装置のシールド枠を推進させて
いる工程と、シールド枠の推進跡の溝孔内にコンクリー
トを打設する工程とを繰り返し行うことによって順次形
成し、計画トンネルの長さ方向に連続したアーチ状プレ
ライニングを築造する。
This prelining portion, a step of excavating a slot of a constant length by an excavator disposed at the front end of the prelining construction device, a step of propelling the shield frame of the prelining device in the slot, and a shield frame The step of placing concrete in the groove hole of the propulsion mark is repeated to form successively, and the arch-shaped pre-lining that is continuous in the length direction of the planned tunnel is built.

次いで、このプレライニングの築造に後続して該プレラ
イニングで囲まれた地盤を掘削、除去することによりト
ンネルを形成するものである。
Then, following the construction of the prelining, the ground surrounded by the prelining is excavated and removed to form a tunnel.

〔実 施 例〕〔Example〕

本発明の実施例を図面について説明すると、第1図はプ
レライニング構築装置(A)を掘削すべき計画トンネル
(T)の両側部下端にトンネル長さ方向に沿って築造し
た導坑(B)(B)間に跨がって配設した状態を示すも
ので、このプレライニング構築装置(A)は、第1図乃
至第3図に示すように、トンネル断面の外周に沿ってア
ーチ状に彎曲した一定長さと幅を有する内外彎曲板(1
a)(1b)を一定の厚み間隔を存して対設すると共にこ
れらの内外彎曲スキンプレート(1a)(1b)の両側下端
間を長方形状の底面板(1c)(1c)で全長に亘り一体に
連結することにより形成された中空アーチ状シールド枠
(1)と、このシールド枠(1)の前端開口部に配設さ
れた掘削機(2)と、シールド枠(1)を形成している
前記内側彎曲スキンプレート(1b)の前端部両側下端に
開設してなる土砂排出口(3)と、シールド枠(1)の
後部内に前後動自在に配設したプレスリング(4)と、
このプレスリング(4)を前後動させる推進ジャッキ
(5)と、プレスリング(4)の後方側にコンクリート
を供給する注入路(6)とから構成されている。
An embodiment of the present invention will be described with reference to the drawings. FIG. 1 shows a tunnel (B) constructed along the tunnel length direction at the lower ends of both sides of a planned tunnel (T) where a prelining construction device (A) is to be excavated. (B) shows a state in which the pre-lining construction device (A) is arranged so as to straddle between the two. As shown in FIGS. 1 to 3, the pre-lining construction device has an arch shape along the outer circumference of the tunnel cross section. Curved inner and outer curved plates with a fixed length and width (1
a) (1b) are placed opposite to each other with a certain thickness interval, and rectangular bottom plates (1c) (1c) are provided over the entire length between the lower ends of the inner and outer curved skin plates (1a) (1b). A hollow arch-shaped shield frame (1) formed by integrally connecting, an excavator (2) arranged in the front end opening of the shield frame (1), and a shield frame (1) are formed. A soil discharge port (3) opened at both lower ends of the front end portion of the inner curved skin plate (1b), and a press ring (4) arranged in the rear portion of the shield frame (1) so as to be movable back and forth.
It is composed of a propulsion jack (5) for moving the press ring (4) back and forth and an injection path (6) for supplying concrete to the rear side of the press ring (4).

この構成をさらに詳細に説明すると、第3図〜第6図に
示すように、シールド枠(1)の前端部内における内外
彎曲スキンプレート(1a)(1b)の前端と該前進から一
定間隔を存した後方部との対向面に前後軌条体(7)
(8)を周方向に突設し、これらの前後軌条体(7)
(8)間の空間内にカッタ駆動用モータ(9)と走行用
油圧モータ(10)を内装、設置している移動ケーシング
(11)を配設して、該移動ケーシング(11)の前後並び
に内外四方に回転自在に軸支したガイドローラ(12)を
前記軌条体(7)(8)の対向面に当接、支持させなが
ら移動ケーシング(11)を軌条体(7)(8)に沿って
シールド枠(1)の前端部内で周方向に移動可能にして
ある。
This configuration will be described in more detail. As shown in FIGS. 3 to 6, there is a certain distance from the front end of the inner and outer curved skin plates (1a) (1b) in the front end of the shield frame (1) and the forward movement. Front and rear rail bodies (7) on the surface facing the rear part
(8) is projected in the circumferential direction, and these front and rear rail bodies (7)
A moving casing (11) in which a cutter driving motor (9) and a traveling hydraulic motor (10) are installed and installed in the space between (8) is arranged in front of and behind the moving casing (11). The moving casing (11) is guided along the rail bodies (7) and (8) while the guide rollers (12) rotatably supported in four directions inside and outside are brought into contact with and supported by the facing surfaces of the rail bodies (7) and (8). And is movable in the circumferential direction within the front end of the shield frame (1).

この移動ケーシング(11)内の中央部に設置された上記
カッタ駆動用モータ(9)の回転軸の前端には、シール
ド枠(1)の前端から突出させて周面に多数の掘削ビッ
ト(2b)(2b)・・・を突設しているカッター(2a)を
固着して掘削機(2)を構成してある。
At the front end of the rotary shaft of the cutter driving motor (9) installed in the center of the moving casing (11), a large number of excavating bits (2b) are projected on the peripheral surface from the front end of the shield frame (1). ) (2b) ... is fixed to the cutter (2a) to form the excavator (2).

移動ケーシング(11)の走行用モータ(10)(10)はカ
ッタ駆動用モータ(9)の両側方に配設され、その回転
軸に固着した歯車(10a)を移動ケーシング(11)の上
枠下面に回転自在に軸支された歯車(13a)に噛合させ
ていると共に同軸(13b)に固着している小径スプロケ
ットホイール(13c)をシールド枠(1)の外側彎曲ス
キンプレート(1a)の内面に周方向に固着しているロー
ラチエーン(14)に噛合させて走行用モータ(10)の駆
動により移動ケーシング(11)をシールド枠(1)の前
端部内で周方向に移動させるように構成してある。
The traveling motors (10) (10) of the moving casing (11) are arranged on both sides of the cutter driving motor (9), and the gear (10a) fixed to the rotary shaft of the moving casing (11) is attached to the upper frame of the moving casing (11). The inner surface of the outer curved skin plate (1a) of the shield frame (1) is a small-diameter sprocket wheel (13c) that is meshed with a gear (13a) that is rotatably supported on the lower surface and is fixed coaxially (13b). The moving casing (11) is configured to move in the circumferential direction within the front end portion of the shield frame (1) by being engaged with the roller chain (14) that is fixed to the circumferential direction on the drive frame and driven by the traveling motor (10). There is.

土砂排出口(3)(3)にはその開口部から導坑(B)
内に向かって傾斜シュート(15)が配設されてあり、こ
の傾斜シュート(15)の先端を支持した吊チエーン(1
6)はその上端を導坑(B)の天井面に沿って長さ方向
に移動自在に吊支されてある。
From the opening to the earth and sand discharge port (3) (3), a tunnel (B)
A slanting chute (15) is arranged inward, and a suspension chain (1) supporting the tip of this slanting chute (15) is provided.
6) has its upper end suspended along the ceiling surface of the tunnel (B) movably in the longitudinal direction.

又、シールド枠(1)の後端開口部はコンクリート打設
口(17)に形成され、この後方部内に前後動自在に配設
されている上記プレスリング(4)は、断面中空方形状
であってシールド枠(1)の彎曲中空断面に沿った正面
アーチ状に形成されてあり、このプレスリング(4)の
前方部におけるシールド枠(1)の中間内部に前記推進
ジャッキ(5)(5)・・・(5)を周方向に適宜間隔
毎に配設し、各推進ジャッキ(5)の前端をシールド枠
(1)内に固着している支持枠板(1d)に連結すると共
にそのロッド先端をプレスリング(4)に連結してこれ
らの推進ジャッキ(5)の作動により、プレスリング
(4)をシールド枠(1)の後部内で前後摺動させるよ
うに構成してある。
Further, the rear end opening of the shield frame (1) is formed in the concrete pouring opening (17), and the press ring (4) disposed in the rear part so as to be movable back and forth has a hollow rectangular cross section. It is formed in a front arch shape along the curved hollow cross section of the shield frame (1), and the propulsion jacks (5) (5) are provided inside the shield frame (1) in the front part of the press ring (4). ) (5) are arranged at appropriate intervals in the circumferential direction, and the front end of each propulsion jack (5) is connected to the support frame plate (1d) fixed in the shield frame (1) and The tip of the rod is connected to the press ring (4), and the press ring (4) is slid back and forth within the rear part of the shield frame (1) by the operation of these propulsion jacks (5).

さらに、このシールド枠(1)の後端部内にコンクリー
トを供給する注入部(6)は、導坑(B)(B)内に露
出させているシールド枠(1)の後部両側下端に連結し
た注入管により形成されている。この注入路(6)はプ
レスリング(4)の後方側のコンクリート打設口(17)
に直接的に連通させておいてもよいが、プレスリング
(4)内に周方向に固定注入管を内装しておくと共にこ
の固定注入管の複数個所から分岐した注入口をプレスリ
ング(4)の後面から後方に開口させておき、この固定
注入管の下端に可撓性を有する注入管をシールド枠
(1)の下端を通じて連結、連通させておいてもよい。
又、第12図に示すように、予め計画トンネル(T)の彎
曲上部中央に作業坑(C)をトンネル長さ方向に掘削し
ておき、この作業坑(C)を通じてコンクリート打設口
(17)の中央部に適宜な注入管を介してコンクリートを
供給するようにしてもよい。
Furthermore, the injection part (6) for supplying concrete into the rear end of the shield frame (1) is connected to the lower ends of both sides of the rear part of the shield frame (1) exposed in the tunnels (B) and (B). It is formed by an injection tube. This injection channel (6) is a concrete pouring port (17) on the rear side of the press ring (4).
Although it may be directly communicated with the press ring (4), a fixed injection pipe is provided in the press ring (4) in the circumferential direction, and the injection ports branched from a plurality of the fixed injection pipe are pressed to the press ring (4). It is also possible to open the rear side from the rear surface and to connect the flexible injection pipe to the lower end of the fixed injection pipe through the lower end of the shield frame (1) so as to communicate therewith.
Further, as shown in FIG. 12, a working pit (C) is previously excavated in the center of the upper curved portion of the planned tunnel (T) in the length direction of the tunnel, and a concrete pouring port (17) is pierced through the working pit (C). ), Concrete may be supplied to the central portion through an appropriate injection pipe.

シールド枠(1)にはその両側下端底面板(1c)(1c)
に、前記導坑(B)(B)の外側部に築造した側壁
(D)(D)上に敷設しているレール(19)(19)上を
走行する複数個の車輪(18)を長さ方向に適宜間隔毎に
取付けてある。
The shield frame (1) has bottom plate on both sides (1c) (1c)
A plurality of wheels (18) running on rails (19) (19) laid on the side walls (D) (D) built on the outer side of the guide shaft (B) (B). They are mounted at appropriate intervals in the vertical direction.

(22)はシールド枠(1)の一側下端に装着したホース
リールで、このホースリール(22)に巻回している油圧
ホース等をシールド枠(1)内の油圧モータ(9)(1
0)等に、枠内に配設したホース導入用ローラ(23)を
介して配設してある。
(22) is a hose reel attached to the lower end of one side of the shield frame (1). The hydraulic hose wound around the hose reel (22) is connected to the hydraulic motor (9) (1) inside the shield frame (1).
0) or the like via a hose introducing roller (23) arranged in the frame.

このように構成したプレライニング構築装置を使用して
プレライニングの構築並びにトンネルの築造方法を説明
すると、まず、計画トンネルの始端側と終端側とに発進
立坑(E)と到達立坑(F)とを夫々築造すると共にこ
れらの両立坑(E)(F)間に前記導坑(B)(B)を
公知のトンネル工法によって形成する。この時、必要に
応じて前記作業坑(C)も形成しておく。
Explaining the method of constructing the prelining and the method of constructing the tunnel by using the prelining construction device configured as described above, first, the starting shaft (E) and the reaching shaft (F) are provided at the start end side and the end side of the planned tunnel. And the guide shafts (B) and (B) are formed between these compatible shafts (E) and (F) by a known tunneling method. At this time, the working pit (C) is also formed if necessary.

次いで、発進立坑(E)側にプレライニング構築装置
(A)を配設し、その両側下端を発進立坑(E)内に延
出した側壁(D)(D)上のレール(19)(19)上に車
輪(18)を介して跨いだ状態に設置する。
Next, the prelining construction device (A) is arranged on the side of the starting shaft (E), and the rails (19) (19) on the side walls (D) (D) extending into the starting shaft (E) at the lower ends of both sides thereof are arranged. ) Installed over the wheels (18).

しかるのち、このプレライニング構築装置(A)の中空
アーチ状シールド枠(1)の前端部に配設した掘削機
(2)により前方の地盤にトンネル断面の外周に沿った
溝孔(G)を掘削する。
After that, an excavator (2) arranged at the front end of the hollow arched shield frame (1) of the prelining construction device (A) is used to form a slot (G) along the outer periphery of the tunnel cross section in the front ground. Excavate.

この溝孔(G)は、移動ケーシング(11)内のカッタ駆
動用モータ(10)を駆動すると、シールド枠(1)の開
口前端から突出したカッタ(2a)が回転して該カッタ
(2a)の径に相当した孔を掘削すると共に走行用油圧モ
ータ(10)を駆動すると、噛合歯車(10a)(13a)を介
してスプロケットホイール(13a)が回転し、シールド
枠(1)の外側スキンプレート内面に設けているローラ
チエーン(14)に噛合しながら移動ケーシング(11)が
シールド枠(1)の開口端部内で軌状体(7)(8)を
ガイドとして周方向に移動することにより掘削される。
When the cutter driving motor (10) in the moving casing (11) is driven, the slot (G) rotates the cutter (2a) protruding from the front end of the opening of the shield frame (1) to rotate the cutter (2a). When the traveling hydraulic motor (10) is driven while drilling a hole corresponding to the diameter of the sprocket wheel (13a) rotates through the meshing gears (10a) (13a), the outer skin plate of the shield frame (1) is rotated. Excavation is performed by moving the casing (11) in the circumferential direction with the rails (7) and (8) as guides in the opening end of the shield frame (1) while meshing with the roller chain (14) provided on the inner surface. To be done.

このように移動ケーシング(11)をシールド枠(1)の
前端部内で周方向にアーチ状に往復させながら、シール
ド枠(1)を前進させることにより、トンネル長さ方向
にアーチ状の溝孔(G)を掘削していくものであるが、
シールド枠(1)が地中に完全に没入するまでは、該シ
ールド枠(1)の推進を発進立坑(E)の内壁等に反力
をとって適宜な押圧ジャッキ等を使用することにより行
う。
Thus, the shield casing (1) is moved forward while reciprocating the movable casing (11) in the arch direction in the front end portion of the shield frame (1), whereby the arch-shaped slot ( G) is to be excavated,
Until the shield frame (1) is completely immersed in the ground, the shield frame (1) is propelled by applying a reaction force to the inner wall of the starting shaft (E) and using an appropriate pressing jack or the like. .

溝坑(G)が発進立坑(E)から前方に向かってシール
ド枠(1)の長さ以上に掘削されると、該溝孔(G)開
口端を適宜形枠等により閉止し、推進ジャッキ(5)を
収縮させてプレスリング(4)を引っ込めた状態でシー
ルド枠(1)の後端部内にコンクリート注入路(6)を
通じてコンクリートを打設する。
When the groove shaft (G) is excavated forward from the starting shaft (E) to the length of the shield frame (1) or more, the opening end of the groove hole (G) is appropriately closed by a frame or the like, and the propulsion jack. Concrete is poured into the rear end of the shield frame (1) through the concrete pouring path (6) in a state where (5) is contracted and the press ring (4) is retracted.

しかるのち、推進ジャッキ(5)を伸長させると、プレ
スリング(4)が後方側に移動してシールド枠(1)の
コンクリート打設口(17)からシールド枠(1)の推進
跡の溝孔(G)内に充満したコンクリートが圧縮されて
突き固められ、プレライニング部(P1)が築造されると
共にそのプレライニング部(P1)に反力をとってシール
ド枠(1)を前進させながら、上記掘削機(2)の回転
並びに周方向の移動によって溝孔(G)を掘削していく
ものである。
After that, when the propulsion jack (5) is extended, the press ring (4) moves to the rear side and moves from the concrete placing port (17) of the shield frame (1) to the groove of the propulsion mark of the shield frame (1). The concrete filled in (G) is compressed and crushed, the pre-lining part (P 1 ) is built, and the shield frame (1) is moved forward by taking a reaction force to the pre-lining part (P 1 ). However, the groove hole (G) is excavated by the rotation and movement of the excavator (2) in the circumferential direction.

掘削された土砂は、シールド枠(1)の前端から両側方
に落下し、排出口(3)から傾斜シュート(15)よって
導坑(B)内に待機させている運搬車(20)に投入さ
れ、発進立坑(E)側に搬出される。
The excavated earth and sand fall from the front end of the shield frame (1) to both sides, and are thrown from the discharge port (3) into the carrier (20) waiting in the tunnel (B) by the inclined chute (15). And is carried out to the side of the starting shaft (E).

こうして、推進ジャッキ(5)によるシールド枠(1)
の前進に従って掘削機(2)により前方の地盤に溝孔
(G)を掘進していく工程と、シールド枠(1)の推進
跡の溝孔(G)内にコンクリートを打設してプレライニ
ング部(P1)を築造していく工程とを連続的に行って発
進立坑(E)から到達立坑(F)間に、プレライニング
(P)を築造する。
Thus, the shield frame (1) with the propulsion jack (5)
The process of excavating the groove hole (G) in the front ground by the excavator (2) according to the advance of the, and placing the concrete in the groove hole (G) of the propulsion mark of the shield frame (1) and prelining The process of building the part (P 1 ) is continuously performed to build the prelining (P) between the starting shaft (E) and the reaching shaft (F).

このプレライニング(P)の築造後、或いは築造中にお
いては該プレライニング(P)に後続して、このプレラ
イニング(P)により囲まれた地盤を掘削、排除するこ
とによりトンネル(T)を形成するものである。
A tunnel (T) is formed by excavating and removing the ground surrounded by the pre-lining (P) after the pre-lining (P) has been built or after the pre-lining (P) is being built. To do.

なお、シールド枠(1)は、第2、3図に示すように、
掘削機(2)を配設している前端部とそれに続く後部と
に2分割して両枠部を複数個の中折ジャッキ(21)によ
り連結しているが、これは掘削機(2)による溝孔
(G)掘削方向を正確な方向に指向させるために設けら
れているものであって、分割しなくても、溝孔(G)の
掘進が可能である。
The shield frame (1) is, as shown in FIGS.
The excavator (2) is divided into two parts, a front end part in which the excavator (2) is arranged and a rear part following it, and both frame parts are connected by a plurality of center folding jacks (21). It is provided in order to direct the excavation direction of the groove hole (G) in the correct direction, and the groove hole (G) can be excavated without dividing.

又、上記実施例においては、掘削機(2)として、シー
ルド枠(1)の前端開口部内で周方向に往復移動を行う
移動ケーシング(11)にカッター(2a)を設けた構造を
示したが、このような移動掘削機構を採用することな
く、固定式であっても、溝孔(G)を掘削し得るもので
ある。
Further, in the above embodiment, the excavator (2) has the structure in which the cutter (2a) is provided in the moving casing (11) that reciprocates in the circumferential direction within the front end opening of the shield frame (1). The groove hole (G) can be excavated even if it is a fixed type without adopting such a moving excavation mechanism.

第8図〜第11図はその一例を示すもので、上記掘削機
(2)に代えて、シールド枠(1)の前部開口部内に周
方向に小間隔毎にアースオーガ(24)(24)・・・(2
4)を多数本、並設して掘削装置を構成したものであ
り、各アースオーガ(24)は断面中空矩形状の角筒状ボ
ックス(25)内にその先端部のビット(24a)と外周ス
クリュー部(24b)とをシールド枠(1)の前端から突
出させた状態にして回転自在に収容され、そのボックス
(25)の後端内に設置した駆動モータ(26)によって回
転させられると各ボックス(25)の後端をシールド枠
(1)内に配設した押圧ジャッキ(27)のロッド先端に
連結して、該押圧ジャッキ(27)の伸縮によってボック
ス(25)を前後動させるようにしてある。さらに、これ
らのボックス(25)の先端面は掘削刃縁に形成されてい
ると共に隣接するボックス(25)(25)は互いに摺動自
在に密接、係合してある。
FIG. 8 to FIG. 11 show an example thereof. Instead of the excavator (2), the earth augers (24) (24) are provided in the front opening of the shield frame (1) at small intervals in the circumferential direction. ) ・ ・ ・ (2
4) A large number of 4) are arranged side by side to form an excavator, and each earth auger (24) has a bit (24a) at the tip and an outer periphery in a rectangular tubular box (25) with a hollow rectangular cross section. The screw part (24b) and the shield frame (1) are rotatably accommodated in a state of protruding from the front end of the shield frame (1), and are rotated by a drive motor (26) installed in the rear end of the box (25). The rear end of the box (25) is connected to the rod tip of the pressing jack (27) arranged in the shield frame (1) so that the expansion and contraction of the pressing jack (27) moves the box (25) back and forth. There is. Further, the tip surfaces of these boxes (25) are formed on the digging edge, and the adjacent boxes (25, 25) are slidably and closely engaged with each other.

その他の構成は前記実施例と同様である。The other structure is the same as that of the above embodiment.

このように構成した掘削装置は、各押圧ジャッキ(27)
を作動させてボックス(25)を前後方向に移動させるこ
とにより前方の地盤に適宜深さのアーチ状溝孔(G)を
掘削していくものであり、この溝孔(G)内にシールド
枠(1)を推進ジャッキ(5)により押し進めると共に
シールド枠(1)の推進後に上記のようにしてコンクリ
ートを打設し、プレライニング(P)を築造するもので
ある。
The excavator constructed in this way can be used for each pressure jack (27).
Is operated to move the box (25) in the front-rear direction to excavate an arch-shaped groove hole (G) of an appropriate depth in the front ground, and a shield frame is provided in this groove hole (G). The (1) is pushed by the propulsion jack (5) and the concrete is placed as described above after the shield frame (1) is propelled to build the prelining (P).

このようなプレライニング築造装置において、上記掘削
機(2)或いは掘削装置(24)を上部掘削機とし、その
下部に第8図〜第11図に示すように、別な掘削機(28)
を配設しておいてもよい。
In such a pre-lining construction device, the excavator (2) or the excavation device (24) is used as an upper excavator, and a lower excavator (28) is provided under the excavator (28) as shown in FIGS. 8 to 11.
May be provided.

このような掘削機(28)としては、シールド枠(1)の
内側スキンプレート(1b)の前端部内周面に上記移動掘
削機(2)と同一構造、即ち、スキンプレート(1b)の
内周面に沿って周方向に移動自在に配設した移動ケーシ
ング(29)内に駆動用モータ(30)を設置し、この駆動
用モータ(30)によってケーシング(29)から前方に突
出したカッター(31)を回転させるように構成したもの
であっても、又、先端に掘削ビットとそれに続くスクリ
ュー部を有するアースオーガを周方向に並設させた構造
であってもよい。
Such an excavator (28) has the same structure as the moving excavator (2) on the inner peripheral surface of the inner skin plate (1b) of the shield frame (1), that is, the inner periphery of the skin plate (1b). A drive motor (30) is installed in a movable casing (29) arranged so as to be movable in the circumferential direction along the surface, and the cutter (31) that protrudes forward from the casing (29) by the drive motor (30). ) May be configured to rotate, or a structure in which a drill bit and an earth auger having a screw portion following the drill bit are arranged side by side in the circumferential direction may be used.

このように下端掘削機(28)を設けておけば、該掘削機
(28)によってシールド枠(1)及びプレライニング
(P)の内周面に沿ってアーチ状の作業空間(32)が掘
削され、この作業空間(32)を通じて、コンクリートを
シールド枠(1)の後端中央部内に適宜な供給管を通じ
て供給したり、或いは機械の保守点検、修理等が可能と
なるものであり、さらに、後続して行われるトンネルの
掘削作業が能率よく行えるものである。
By providing the lower end excavator (28) in this way, the excavator (28) excavates the arch-shaped working space (32) along the inner peripheral surfaces of the shield frame (1) and the prelining (P). Through this working space (32), concrete can be supplied into the central part of the rear end of the shield frame (1) through an appropriate supply pipe, or maintenance and repair of the machine can be performed. The subsequent tunnel excavation work can be performed efficiently.

〔発明の効果〕〔The invention's effect〕

以上のように本発明のトンネル掘削方法によれば、ま
ず、掘削すべきトンネルの両側部下端に計画トンネルの
長さ方向に沿って導坑を築造し、この両側導坑の計画ト
ンネル始端面側にトンネル断面の外周に沿う一定厚みを
有するプレライニング築造装置を導坑間に跨いだ状態に
配設してトンネルの長さ方向に移動させながら地盤中に
プレライニングを構築していくものであるから、プレラ
イニング構築装置と同じ断面形状を有する一定厚みを有
するプレライニングを計画トンネルの外周に沿って連続
的に構築し得ると共に、大形状のプレライニングも容易
に形成できるものであり、このプレライニングを計画ト
ンネルの全長に亘って構築し、その内周面で囲まれた地
盤を掘削してトンネルを形成するものであるから、その
掘削は計画トンネルの全断面を覆う一連のプレライニン
グの築造後、或いは築造に後続して行えるので、円滑且
つ能率のよい掘削作業が可能とる上に、切羽が安定する
と共にトンネルの変位が少なくなり、地表沈下や地中構
造物への影響の低減を図ることができるものである。
As described above, according to the tunnel excavation method of the present invention, first, a tunnel is constructed at the lower ends of both sides of the tunnel to be excavated along the lengthwise direction of the planned tunnel, and the planned tunnel starting end surface side of the two-sided tunnel is constructed. A prelining construction device having a constant thickness along the outer circumference of the tunnel cross section is installed across the tunnels and moved in the length direction of the tunnel to build the prelining in the ground. Therefore, a pre-lining having the same cross-sectional shape as the pre-lining construction device and having a constant thickness can be continuously constructed along the outer periphery of the planned tunnel, and a large-sized pre-lining can be easily formed. The lining is constructed over the entire length of the planned tunnel, and the ground surrounded by the inner surface is excavated to form the tunnel. Since a series of pre-lining covering the entire cross section can be performed after or after the construction, smooth and efficient excavation work is possible, and the face is stable and the displacement of the tunnel is reduced, resulting in surface subsidence or It is possible to reduce the influence on the intermediate structure.

さらに、大断面の掘削が可能であるから、大型機械によ
りトンネル掘削が行えて、掘削作業能率が一層向上する
ものである。
Furthermore, since it is possible to excavate a large cross section, tunnel excavation can be performed by a large machine, and excavation work efficiency is further improved.

又、トンネル掘削前においてプレライニングを構築する
装置は、掘削すべきトンネルの両側部下端に沿って計画
トンネルの長さ方向に築造した両側導坑間に跨がってそ
の両側下端部を該導坑に沿って移動可能としたトンネル
断面の外周に沿う一定厚みを有する中空シールド枠と、
この中空シールド枠の前端に配設されてシールド枠の前
方地盤に一定厚みの溝孔を掘削する掘削機と、シールド
枠の下端に開口した土砂排出口と、シールド枠の後端開
口部内にコンクリートを供給、打設するコンクリート注
入路と、シールド枠の後部内に前後動自在に配設されて
打設されたコンクリートを突き固めるプレスリングと、
このプレライニングを前後動させる推進ジャッキとから
構成しているので、掘削機を作動させながらシールド枠
を推進させることによって前方の地盤にトンネル断面の
外周に沿った溝孔を正確に掘削できると共にそのシール
ド枠の推進はプレスリング側に反力をとって推進ジャッ
キの伸長によって行うので、地盤中にシールド枠を自走
式に推進させることができ、さらに、掘削された土砂は
シールド枠の開口前端の空間部から自動的に土砂排出口
に落下させることができると共に該排出口を通じて両側
の導坑内には排出することができ、運搬車等によって円
滑の排出が可能となるものである。
In addition, the device for constructing the pre-lining before the tunnel excavation is constructed so that the lower end portions of both sides of the tunnel to be excavated are straddled between the both side tunnels constructed in the longitudinal direction of the planned tunnel. A hollow shield frame having a constant thickness along the outer periphery of the tunnel cross section that is movable along the mine,
An excavator installed at the front end of this hollow shield frame to excavate a groove hole of a certain thickness in the front ground of the shield frame, a sediment discharge port opened at the lower end of the shield frame, and a concrete inside the rear end opening of the shield frame. A concrete pouring path for supplying and pouring, and a press ring for arranging the placed concrete movably arranged in the rear part of the shield frame so as to be rammed,
Since this pre-lining is composed of a propulsion jack that moves back and forth, it is possible to accurately excavate a groove along the outer circumference of the tunnel cross section in the front ground by propelling the shield frame while operating the excavator. The shield frame is propelled by extending the propulsion jack by applying a reaction force to the press ring side, so that the shield frame can be propelled in the ground in a self-propelled manner. The space can be automatically dropped to the earth and sand discharge port, and can be discharged into the guide shafts on both sides through the discharge port, and can be smoothly discharged by a carrier vehicle or the like.

さらに、シールド枠の推進跡の溝孔内にシールド枠の後
端開口部を通じてコンクリートを打設するように構成し
ているので、一定厚みのプレライニングが連続的に構築
し得るものであり、剛性が大で、且つ確実な止水性を発
揮する精度のよいプレライニングを築造できる。
Furthermore, because the concrete is placed through the rear end opening of the shield frame in the groove of the propulsion mark of the shield frame, a pre-lining with a certain thickness can be continuously constructed, and It is possible to build a highly accurate pre-lining that has a large size and exhibits a reliable waterproofing property.

又、このプレライニングは上記装置によって連続して施
工できるから、上述したようにそのプレライニングの築
造に後続してトンネルの掘削作業を行えるものである。
Further, since this pre-lining can be continuously applied by the above-mentioned device, the excavation work of the tunnel can be performed after the construction of the pre-lining as described above.

【図面の簡単な説明】[Brief description of drawings]

図面は本発明の実施例を示すもので、第1図はプレライ
ニング構築装置を両側導坑間に配設した状態の簡略背面
図、第2図はその簡略縦断側面図、第3図はプレライニ
ング構築装置の縦断側面図、第4図は移動掘削機部分の
横断面図、第5図及び第6図は夫々第4図におけるX−
X線、Y−Y線における縦断側面図、第7図は立坑間に
プレライニングと導坑を設けた状態の一部切欠簡略斜視
図、第8図は別な掘削装置を配設したプレライニング構
築装置によるプレライニング構築方法を説明するための
簡略背面図、第9図はその簡略縦断側面図、第10図はそ
の掘削装置部分の縦断側面図、第11図はコンクリート打
設部分の縦断側面図、第12図は築造されたトンネルの縦
断面図である。 (1)……シールド枠、(2)……掘削機、(3)……
土砂排出口、(4)……プレスリング、(5)……推進
ジャッキ、(6)……コンクリート注入路、(17)……
コンクリート打設口、(A)……プレライニング構築装
置、(T)……計画トンネル、(B)……導坑、(G)
……溝孔、(P)……プレライニング。
The drawings show an embodiment of the present invention. Fig. 1 is a simplified rear view of a state in which a pre-lining construction device is arranged between both sides of a tunnel, Fig. 2 is a simplified longitudinal side view thereof, and Fig. 3 is a plan view. FIG. 4 is a vertical cross-sectional side view of the lining construction device, FIG. 4 is a cross-sectional view of the mobile excavator portion, and FIGS. 5 and 6 are X- in FIG. 4, respectively.
Fig. 7 is a vertical sectional side view in X-ray and Y-Y line, Fig. 7 is a partially cutaway simplified perspective view in which a prelining and a tunnel are provided between vertical shafts, and Fig. 8 is a prelining in which another excavating device is arranged. Simplified rear view for explaining the prelining construction method by the construction device, FIG. 9 is a simplified vertical sectional side view thereof, FIG. 10 is a vertical sectional side view of the excavating device portion, and FIG. 11 is a vertical sectional side face of the concrete placing portion. Fig. 12 is a vertical sectional view of the built tunnel. (1) …… shield frame, (2) …… excavator, (3) ……
Sediment discharge port, (4) …… Press ring, (5) …… Propulsion jack, (6) …… Concrete injection path, (17) ……
Concrete pouring mouth, (A) …… Pre-lining construction device, (T) …… Planning tunnel, (B) …… Guide shaft, (G)
…… Slot, (P) …… Pre-lining.

───────────────────────────────────────────────────── フロントページの続き (71)出願人 999999999 前田建設工業株式会社 東京都千代田区富士見2丁目10番26号 (72)発明者 足立 義雄 茨城県つくば市大字旭1番地 建設省土木 研究所内 (72)発明者 水谷 敏則 茨城県つくば市大字旭1番地 建設省土木 研究所内 (72)発明者 稲野 茂 茨城県つくば市大字旭1番地 建設省土木 研究所内 (72)発明者 小西 守 大阪府大阪市阿倍野区松崎町2丁目2番2 号 株式会社奥村組内 (72)発明者 浜野 正之 兵庫県神戸市中央区東川崎町3丁目1番1 号 川崎重工業株式会社神戸工場内 (72)発明者 垣内 幸雄 東京都新宿区津久戸町2番1号 株式会社 熊谷組内 (72)発明者 高森 貞彦 東京都千代田区富士見2丁目10番26号 前 田建設工業株式会社内 (56)参考文献 特開 平3−257292(JP,A) 特開 平3−257293(JP,A) 特開 平3−257297(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (71) Applicant 999999999 Maeda Construction Industry Co., Ltd. 2-1026 Fujimi, Chiyoda-ku, Tokyo (72) Inventor Yoshio Adachi 1 Asahi, Tsukuba, Ibaraki Prefectural Government Civil Engineering Research Institute ( 72) Inventor Toshinori Mizutani, Asahi 1 Tsukuba, Ibaraki Prefecture, Asahi, Civil Engineering Research Institute, Ministry of Construction (72) Inventor Shigeru Inano 1 Asahi, Tsukuba, Ibaraki Prefecture, Civil Engineering Research Institute, Ministry of Construction (72) Inventor, Mamoru Konishi Osaka, Osaka 2-2-2 Matsuzaki-cho, Abeno-ku Okumura-gumi Co., Ltd. (72) Masayuki Hamano 3-1-1 Higashikawasaki-cho, Chuo-ku, Kobe, Hyogo Prefecture Kawasaki Heavy Industries Ltd. Kobe factory (72) Inventor Yukio Kakiuchi Tokyo 2-1-1 Tsukudo-cho, Shinjuku-ku, Tokyo Kumagai Gumi Co., Ltd. (72) Inventor Sadahiko Takamori 2-10-2 Fujimi, Chiyoda-ku, Tokyo No. 6 in Maeda Construction Industry Co., Ltd. (56) Reference JP-A-3-257292 (JP, A) JP-A-3-257293 (JP, A) JP-A-3-257297 (JP, A)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】掘削すべきトンネルの両側部下端に計画ト
ンネルの長さ方向に導坑を築造し、この両側導坑の計画
トンネル始端面側にトンネル断面の外周に沿う一定厚み
を有するプレライニング構築装置を導坑間に跨いだ状態
に配設すると共に該プレライニング構築装置の両側下端
部を両側導坑内にトンネルの長さ方向に移動自在に設置
し、しかるのち、このプレライニング構築装置をトンネ
ルの長さ方向に移動させながら該プレライニング構築装
置の前端部に備えた掘削機によりトンネル外周に沿う一
定厚みの溝孔を掘削すると共に該溝孔内にコンクリート
を打設してプレライニングを構築し、このプレライニン
グを計画トンネルの全長に亘って構築すると共に該プレ
ライニングで囲まれた地盤を掘削することを特徴とする
トンネル掘削方法。
1. A pre-lining having a constant thickness along the outer circumference of the tunnel cross section on the side of the planned tunnel starting end face of both sides of the tunnel at the lower ends of both sides of the tunnel to be excavated. The building equipment is arranged in a state of straddling between the tunnels, and the lower end portions on both sides of the prelining building equipment are movably installed in the tunnels on both sides in the tunnel length direction. While moving in the length direction of the tunnel, excavating a slot having a constant thickness along the outer circumference of the tunnel by an excavator provided at the front end of the prelining construction device, and placing concrete in the slot for prelining. A tunnel excavation method, characterized in that the pre-lining is constructed over the entire length of the planned tunnel and the ground surrounded by the pre-lining is constructed.
【請求項2】掘削すべきトンネルの両側部下端に計画ト
ンネルの長さ方向に沿って築造した両側導坑間に跨がっ
てその両側下端部を該導坑に沿って移動可能としたトン
ネル断面の外周に沿う一定厚みを有する中空シールド枠
と、この中空シールド枠の前端に配設されてシールド枠
の前方地盤にトンネル断面の外周に沿う一定厚みの溝孔
を掘削する掘削機と、シールド枠の下端に開口した土砂
排出口と、シールド枠の後端開口部内にコンクリートを
供給、打設するコンクリート注入路と、シールド枠の後
部内に前後動自在に配設されて打設されたコンクリート
の形状を保持するプレスリングと、このプレスリングを
前後動させる推進ジャッキとから構成していることを特
徴とするプレライニング構築装置。
2. A tunnel in which the lower ends of both sides of a tunnel to be excavated straddle between two side tunnels constructed along the length direction of the planned tunnel and the lower ends of both sides of the tunnel are movable along the respective tunnels. A hollow shield frame having a constant thickness along the outer circumference of the cross section, an excavator disposed at the front end of the hollow shield frame for excavating a slot of a constant thickness along the outer circumference of the tunnel cross section in the front ground of the shield frame, and a shield The earth and sand discharge port opened at the lower end of the frame, the concrete pouring path for supplying and placing concrete into the rear end opening of the shield frame, and the concrete that is placed in the rear part of the shield frame so as to be movable back and forth. A prelining construction device comprising a press ring that retains the shape of the above and a propulsion jack that moves the press ring back and forth.
JP2055794A 1990-03-07 1990-03-07 Tunnel excavation method and prelining construction device Expired - Lifetime JPH0774585B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2055794A JPH0774585B2 (en) 1990-03-07 1990-03-07 Tunnel excavation method and prelining construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2055794A JPH0774585B2 (en) 1990-03-07 1990-03-07 Tunnel excavation method and prelining construction device

Publications (2)

Publication Number Publication Date
JPH03257284A JPH03257284A (en) 1991-11-15
JPH0774585B2 true JPH0774585B2 (en) 1995-08-09

Family

ID=13008819

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2055794A Expired - Lifetime JPH0774585B2 (en) 1990-03-07 1990-03-07 Tunnel excavation method and prelining construction device

Country Status (1)

Country Link
JP (1) JPH0774585B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3513612B2 (en) * 1998-03-25 2004-03-31 大成建設株式会社 Widening method of existing tunnel
JP4809300B2 (en) * 2007-07-24 2011-11-09 株式会社間組 Covering method using tunnel and tunnel construction method

Also Published As

Publication number Publication date
JPH03257284A (en) 1991-11-15

Similar Documents

Publication Publication Date Title
JP4181980B2 (en) Tunnel construction method
JP2519380B2 (en) Self-propelled tunnel excavator and tunnel excavation method
JPH0774585B2 (en) Tunnel excavation method and prelining construction device
US4501517A (en) Self propelled trench shield
JPH03176591A (en) Shield machine
JPH0781489B2 (en) Tunnel construction method and device
JPH02210189A (en) shield machine
JP4290311B2 (en) Shield excavator for backfilling existing tunnels
JP2004060266A (en) Non-open-cut construction method for underground structure
JP2849822B2 (en) Underground diaphragm wall excavation method and its equipment
JP2516582B2 (en) Tunnel construction method
JP6746483B2 (en) Tunnel machine
JPH0224486A (en) Construction of large-diameter tunnel and ring-cut type excavator
JPH0533584A (en) Tunnel construction method
JPH0765464B2 (en) Construction method of underground structure
JP2596803B2 (en) Ring cut excavator
JP2599073B2 (en) Peripheral ring lining device for the planned tunnel
JPH0774597B2 (en) Tunnel prelining equipment
JPH0765465B2 (en) Construction method of underground structure
JPH07122395B2 (en) Outer ring-shaped lining device for planned tunnel
JPH03293497A (en) Tunnel construction method and equipment
JPH0774596B2 (en) Ditch drilling equipment
JPH03257297A (en) Prelining structure of tunnel and forming method thereof
JPH0765463B2 (en) Construction method of underground structure
JP2018096086A (en) Tunnel excavator

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080809

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080809

Year of fee payment: 13

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080809

Year of fee payment: 13

EXPY Cancellation because of completion of term