JPH0774597B2 - Tunnel prelining equipment - Google Patents
Tunnel prelining equipmentInfo
- Publication number
- JPH0774597B2 JPH0774597B2 JP2055792A JP5579290A JPH0774597B2 JP H0774597 B2 JPH0774597 B2 JP H0774597B2 JP 2055792 A JP2055792 A JP 2055792A JP 5579290 A JP5579290 A JP 5579290A JP H0774597 B2 JPH0774597 B2 JP H0774597B2
- Authority
- JP
- Japan
- Prior art keywords
- shield frame
- tunnel
- slot
- excavator
- lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明はトンネル掘削時に切羽部のトンネル外周縁から
前方の地盤にトンネル外周に沿ったプレライニングを形
成する装置に関するものである。Description: TECHNICAL FIELD The present invention relates to an apparatus for forming a pre-lining along a tunnel outer periphery from a tunnel outer peripheral edge of a face portion to a ground in front when a tunnel is excavated.
従来から、トンネルの覆工は、トンネル空間を掘削した
のちに、その掘削壁面にコンクリートを吹き付ける方法
が広く採用されているが、トンネルの掘削から覆工まで
の間に生じる地山の緩みを抑えることができず、地盤が
軟弱な未固結地山である場合や地下水がある場合には切
羽の崩壊や覆工作業中に地盤の肌落ちなどが生じて極め
て危険であり、地山を安定させることが困難である。Conventionally, the method of spraying concrete on the excavated wall surface after excavating the tunnel space has been widely used for tunnel lining, but the loosening of the ground that occurs between tunnel excavation and lining is suppressed. If the ground is soft and unconsolidated ground or there is groundwater, it is extremely dangerous because the face collapses and the ground skin falls off during the lining work, and the ground is stable. It is difficult to let
又、トンネル壁面にコンクリートを吹き付けると、その
跳ね返りや粉塵が多く発生し、材料の損失や作業環境の
悪化が避けられないという問題点がある。Further, when concrete is sprayed on the wall surface of the tunnel, a large amount of bounce and dust are generated, and there is a problem that loss of material and deterioration of working environment cannot be avoided.
このため、切羽部のトンネル外周縁から前方の地盤に、
トンネル外周に沿うアーチ形状の溝孔を所望深さまで掘
削し、その溝孔内にコンクリートを充填してトンネル掘
削前の覆工(プレライニング)を形成したのち、該コン
クリートで囲まれた地盤を掘削するという作業を繰り返
し行ってトンネルを掘削していく工法が開発されたが、
このように工法における上記溝孔の掘削装置としては、
従来から、アースオーガを多連に並列した状態で連結
し、各アースオーガによる円形掘削断面が連続して一定
幅の溝孔を掘削し得るように装置が開発されいる。Therefore, from the outer peripheral edge of the tunnel of the face to the ground in front,
An arch-shaped slot along the outer circumference of the tunnel is excavated to a desired depth, and the slot is filled with concrete to form a lining (pre-lining) before tunnel excavation, and then the ground surrounded by the concrete is excavated. A method of excavating a tunnel by repeating the work of doing was developed,
In this way, as the excavation device for the slot in the construction method,
BACKGROUND ART Conventionally, a device has been developed so that multiple earth augers are connected in a parallel state and a circular excavation cross section by each earth auger can be continuously excavated to form a slot having a constant width.
しかしながら、このような多連式アースオーガでは掘削
される溝孔の幅は常に一定となり、従って、切羽面側に
おいては隣接する溝孔間が連通する状態で穿設されて
も、溝孔はその掘削方向がトンネルの拡径方向に傾斜す
るように末拡がり状に穿設されるものであるから、溝孔
先端部側では隣接する溝孔間に間隔が生じることにな
り、溝孔にコンクリートを充填したのち、その内部側の
地盤を掘削すると、前記間隔部から軟弱地盤が崩れ落ち
たり、湧水が生じるという問題点がある。However, in such a multiple earth auger, the width of the slot to be excavated is always constant, and therefore, even if the slots are drilled in a state where the adjacent slots communicate with each other on the face of the face, Since the digging direction is formed in a divergent shape so as to incline in the diameter expansion direction of the tunnel, there will be a gap between adjacent groove holes on the groove hole tip side, and concrete will be inserted in the groove holes. If the ground on the inner side of the ground is excavated after filling, there are problems that the soft ground collapses from the gap portion and spring water is generated.
さらに、多連式アースオーガによって掘削された溝孔の
形状は、隣接するアースオーガによる円形孔がその一部
を重ね合わせた形状、即ち、周壁が凹凸形状となるの
で、掘削面積の割りにはトンネル覆工を行うための有効
断面が小さくなり、所望の覆工厚さにするには必要以上
の材料を要するという問題点がある。In addition, the shape of the slot hole excavated by the multiple earth auger is a shape in which the circular holes by the adjacent earth augers are partly overlapped, that is, the peripheral wall has an uneven shape, so the excavation area is relatively small. There is a problem that an effective area for tunnel lining becomes small and more material than necessary is required to obtain a desired lining thickness.
又、上記のような溝孔先端部間の隙間の発生をなくする
には、切羽面側で隣接する溝孔間の一部を重複させれば
よいが、このような掘削方法でも溝孔先端部間における
断面方向の接合部が円形断面の点接合となって、覆工の
剛性が小さくなると共に止水性が不十分となる等の問題
点があった。Further, in order to eliminate the occurrence of the gap between the groove hole tip portions as described above, it is sufficient to overlap a part of the groove holes adjacent to each other on the face face side. The joints in the cross-sectional direction between the portions are point-joint with a circular cross-section, and there are problems that the rigidity of the lining is reduced and the waterproofness is insufficient.
本発明はこのような問題点を解消し、トンネル断面形状
に沿って連続した一定厚みのプレライニングを形成し得
る装置の提供を目的とするものである。SUMMARY OF THE INVENTION It is an object of the present invention to solve the above problems and provide an apparatus capable of forming a pre-lining having a constant thickness and continuous along a tunnel cross-sectional shape.
上記目的を達成するために、本発明のプレライニング装
置は、両側端面が開口した一定厚みを有する方形状の中
空シールド枠と、このシールド枠の一側開口部の外側方
に軸芯を該開口部に沿わせた状態で配設され且つシール
ド枠内に連結した方向制御ジャッキによって外側方に移
動自在に支承された掘削ビット付溝孔掘削機と、前記シ
ールド枠の後壁面適所に設けている土砂排出口と、シー
ルド枠の他側部内に摺動自在に配設され且つシールド枠
内に連結したプレスジャッキによって内外側方向に押圧
されるプレス部材と、このプレス部材を通じてシールド
枠の他側開口端側にコンクリートを打設する打設機構と
から構成していることを特徴とするものである。In order to achieve the above-mentioned object, the pre-lining device of the present invention has a rectangular hollow shield frame having a constant thickness with both end faces opened, and a shaft core that is open to the outside of one opening of the shield frame. And a slotted excavator with a digging bit movably supported outward by a direction control jack connected to the inside of the shield frame, and provided at an appropriate position on the rear wall surface of the shield frame. The earth and sand discharge port, a press member slidably arranged on the other side of the shield frame and pressed inward and outward by a press jack connected to the shield frame, and the other side opening of the shield frame through the press member. It is characterized in that it is composed of a pouring mechanism for pouring concrete on the end side.
まず、掘削すべきトンネル断面の外周一端部に本発明の
装置が配設可能な空洞を適宜な掘削機により掘削したの
ち、該空洞内に本発明装置をその一側開口端を進行方向
に向け且つ前方に向かって斜め外方に傾斜した状態に配
設する。First, a cavity in which the device of the present invention can be arranged is excavated at one end of the outer periphery of the cross section of a tunnel to be excavated by an appropriate excavator, and then the device of the present invention is directed into the cavity with its one open end facing in the traveling direction. In addition, it is arranged in a state of being inclined outward and obliquely toward the front.
しかるのち、一側開口端に沿って配設した溝孔掘削機を
回転させると共に他側開口部内のプレス部材側に反力を
とって方向制御ジャッキを伸長させると、溝孔掘削機が
トンネル断面の外周方向に押圧されながら地盤に溝孔を
掘削していく。After that, when the slot excavator arranged along the opening end on one side is rotated and the direction control jack is extended by applying a reaction force to the press member side in the opening on the other side, the slot excavator crosses the tunnel section. The trench is excavated in the ground while being pressed in the outer peripheral direction.
掘削された土砂はシールド枠に設けている排出口から切
羽側に排出される。The excavated earth and sand is discharged from the discharge port provided in the shield frame to the cutting face.
溝孔掘削機は方向制御ジャッキによってトンネル断面の
外周に沿うように制御されながら該方向制御ジャッキの
1ストローク長さだけ掘進したのち、プレスジャッキを
伸長させる一方、方向制御ジャッキを収縮させることに
よってシールド枠を溝孔掘削機により掘削された溝孔内
に推進させる。The slot excavator is controlled by the direction control jack so as to follow the outer circumference of the tunnel cross-section, and after excavating for one stroke length of the direction control jack, the press jack is extended while the direction control jack is contracted to shield the shield. The frame is propelled into the slot excavated by the slot excavator.
次いで、プレス部材の内部を通じてシールド枠の他側開
口端側からシールド枠の推進跡の溝孔にコンクリートを
打設すると共にその打設に従ってプレスジャッキを収縮
させることによりシールド枠の他端開口側に1掘進長の
プレライニング部を形成するものである。Then, through the inside of the press member, concrete is placed from the other opening end side of the shield frame to the groove hole of the propulsion mark of the shield frame, and the press jack is contracted according to the placement to the other end opening side of the shield frame. The pre-lining portion is formed to have a length of one excavation.
このプレライニング部を上記溝孔掘削機による一定長の
溝孔掘削工程と、該溝孔内にシールド枠を推進させてい
く工程と、シールド枠の推進跡の溝孔にコンクリートを
打設する工程とを繰り返し行うことによってトンネル断
面形状の外周に沿い順次形成してゆき、トンネル断面の
外周に前方に向かって斜め外方に傾斜した一定厚みを有
する一連のアーチ状プレライニングを形成するものであ
る。A step of excavating this pre-lining portion with a fixed length slot by the slot excavator, a step of propelling a shield frame into the slot, and a step of placing concrete in the slot of the propulsion mark of the shield frame. By repeating the above steps, a series of arc-shaped pre-linings having a certain thickness are formed on the outer circumference of the tunnel cross-section, and are inclined outward in the forward direction on the outer circumference of the tunnel cross-section. .
しかるのち、該プレライニングの前端部を残してプレラ
イニングにより囲まれた地盤を掘削することにより一定
長のトンネルを得るものであり、この一定長のトンネル
を前方に向かって上記作業工程を繰り返し行いながらト
ンネル覆工を形成していくものである。After that, a tunnel of a constant length is obtained by excavating the ground surrounded by the prelining leaving the front end of the prelining, and the above working steps are repeated toward the front of this constant length tunnel. While forming the tunnel lining.
本発明の実施例を図面について説明すると、第1図及び
第2図において、(1)は両側端面が開口(2)(3)
した一定厚みを有する方形状の中空シールド枠で、一定
の厚み間隔を存して対設した方形状の上下枠板部(1a)
(1b)の前後両端縁間に横長長方形状の前後枠板部(1
c)(1d)を一体に固着することより形成されているも
のである。An embodiment of the present invention will be described with reference to the drawings. In FIGS. 1 and 2, (1) has openings on both end faces (2) (3).
A rectangular hollow shield frame with a fixed thickness, and rectangular upper and lower frame plate parts (1a) that face each other with a fixed thickness interval.
Between the front and rear edges of (1b), the oblong and rectangular frame plate parts (1
c) It is formed by integrally fixing (1d).
このシールド枠(1)の一側端部内には、他側に向かっ
て半円状に彎曲した仕切板(4)が前後方向に配設され
て該仕切板(4)の前後端及び上下端面をシールド枠
(1)の前後枠板部(1c)(1d)と上下枠板部(1a)
(1b)の対向面に一体に固着することにより、該仕切板
(4)と一側開口部(2)間のシールド枠内を土砂排出
室(5)に形成してあり、さらに、該枠板部(1d)の一
側端部にはこの土砂排出室(5)に連通する排出口
(6)を開設してある。A partition plate (4) curved in a semicircular shape toward the other side is arranged in the front-rear direction in one end of the shield frame (1), and the front and rear ends and upper and lower end surfaces of the partition plate (4) are arranged. The front and rear frame plate parts (1c) (1d) and the upper and lower frame plate parts (1a) of the shield frame (1)
By integrally fixing to the facing surface of (1b), the inside of the shield frame between the partition plate (4) and the one side opening (2) is formed in the earth and sand discharge chamber (5). A discharge port (6) communicating with the earth and sand discharge chamber (5) is provided at one end of the plate portion (1d).
(7)は土砂排出室(5)内に配設されたスクリューオ
ーガよりなる排出機で、その軸の前端をシールド枠
(1)の前枠板部(1c)の内面に回転自在に支持させて
いると共に後端部を前記排出口(6)を通してシールド
枠(1)の後枠板部(1d)から突出させ、該突出端を支
持台(8)上に設置されたモータ(9)に連結してあ
る。(7) is an ejector consisting of a screw auger arranged in the earth and sand discharge chamber (5), and the front end of its shaft is rotatably supported on the inner surface of the front frame plate part (1c) of the shield frame (1). In addition, the rear end of the shield frame (1) is projected from the rear frame plate part (1d) of the shield frame (1) through the discharge port (6), and the projecting end is connected to the motor (9) installed on the support base (8). It is connected.
(10)はシールド枠の一側開口部(2)の外側方に、上
記排土機(7)と並行に配設された掘削ビット(11)付
スクリューオーガよりなる溝孔掘削機で、その回転中心
軸の前端に溝孔底掘削カッタ部(11a)を設けていると
共にその前後両端部と中央部とに軸受部材(12)を被嵌
させてあり、これらの軸受部材(12)の上下部に上下一
対の方向制御ジャッキ(13)(14)のロッド端を枢着、
連結させてある。さらに、この溝孔掘削機(10)の中心
軸後端は前記支持台(8)に並設している支持台(15)
上に設置されたモータ(16)に連結してある。(10) is a slot excavator consisting of a screw auger with an excavation bit (11), which is arranged in parallel with the above-mentioned soil excavator (7) on the outer side of the opening (2) on one side of the shield frame. A groove bottom excavation cutter (11a) is provided at the front end of the rotation center shaft, and bearing members (12) are fitted to the front and rear ends and the center of the cutter. The rod ends of a pair of upper and lower direction control jacks (13) (14) are pivotally attached to the
It is connected. Further, the rear end of the central axis of this slot excavator (10) is provided in parallel with the support base (8).
It is connected to the motor (16) installed above.
上記方向制御ジャッキ(13)(14)はシールド枠(1)
内の中央部に固定している支持板(17a)と前記仕切板
(4)間の空間部に配設され、支持板(17a)にその端
部を連結、支持させていると共にロッドを仕切板(4)
の所定部分に穿設した孔を挿通して一側開口部(2)側
に突出させてある。The direction control jacks (13) (14) are shield frames (1).
It is arranged in the space between the support plate (17a) fixed to the central part of the inside and the partition plate (4), and the end of the support plate (17a) is connected and supported and the rod is partitioned. Board (4)
Through a hole formed in a predetermined portion of the above, and is projected toward the one side opening (2) side.
(18)はシールド枠(1)の上記支持板(17a)と他側
開口部(3)間における他側部内に摺動自在に配設した
中空縦長角ボックス形状のプレス部材で、その上下並び
に前後端面をシールド枠(1)の内面に摺接させながら
前後方向に適宜間隔を存して配設したプレスジャッキ
(19)により内外側方向に進退させられるものである。(18) is a hollow vertically long rectangular box-shaped press member slidably disposed in the other side portion between the support plate (17a) and the other side opening portion (3) of the shield frame (1), and is arranged vertically and vertically. The front and rear end surfaces are slidably contacted with the inner surface of the shield frame (1) and are moved forward and backward in the inner and outer directions by a press jack (19) arranged at an appropriate interval in the front and rear direction.
これらのプレスジャッキ(19)(19)は前記仕切板
(4)の他側面に近接して配設されている支持板(17
b)に枢着、支持されてあり、そのロッド先端をプレス
部材(18)の一側面前後部に連結してある。These press jacks (19) (19) are provided with a support plate (17) arranged close to the other side surface of the partition plate (4).
It is pivotally attached to and supported by b), and its rod tip is connected to the front and rear portions of one side surface of the press member (18).
(20)はプレス部材(19)の内部を通じてシールド枠
(1)の他側開口端側にコンクリートを打設する打設機
構で、プレス部材(18)内に打設管(20a)を挿入し、
その打設管(20a)の前後部及び中間部にプレス部材(1
8)の他側壁からシールド枠(1)の他側開口端に向け
て開口した複数の打設口(20b)(20b)を連設している
と共に後部はプレス部材(18)の後壁を貫通してシール
ド枠(1)の後枠板部(1d)に開設した横長孔(21)か
ら後方に引き出され、バルブ(22)を介して可撓性を有
するコンクリート供給管を通じてコンクリート供給源に
連通させてなるものである。(20) is a pouring mechanism for pouring concrete through the inside of the press member (19) to the other open end side of the shield frame (1). The pouring pipe (20a) is inserted into the press member (18). ,
Press members (1
8) A plurality of driving holes (20b) (20b) opened from the other side wall toward the other side opening end of the shield frame (1) are continuously provided, and the rear part is the rear wall of the press member (18). It is pulled out rearward from the horizontally elongated hole (21) opened in the rear frame plate portion (1d) of the shield frame (1) and passed through the valve (22) to the concrete supply source through the flexible concrete supply pipe. It is made to communicate.
このように構成したトンネルのプレライニング装置は、
第3図及び第4図に示すように、排土機(7)と溝孔掘
削機(10)の駆動モータ(9)(16)を設置している支
持台(8)(15)をトンネル断面形状に沿うアーチ状に
彎曲した台車(23)上の移動台(24)に固定された状態
で使用される。The tunnel pre-lining device configured in this way is
As shown in FIG. 3 and FIG. 4, tunnels the support bases (8) and (15) on which the drive motors (9) and (16) of the earthmoving machine (7) and the slot excavator (10) are installed. It is used in a state of being fixed to a moving table (24) on a carriage (23) curved in an arch shape along a sectional shape.
台車(23)はトンネルの長さ方向に移動自在に配設され
ていると共にその前枠(23a)よりも後枠(23b)をやゝ
小径に形成してその円弧状外周面を前方に向かってやゝ
外向きに傾斜させているものである。The carriage (23) is arranged so as to be movable in the length direction of the tunnel, and the rear frame (23b) is formed to have a slightly smaller diameter than the front frame (23a) so that its arcuate outer peripheral surface faces forward. It is one that is tilted outward.
又、移動台(24)はその前後下面に回転自在に軸支した
ローラ(25)(25)を台車(23)の円弧状枠に回転自在
に係合させて適宜な駆動機構を介し周方向に移動可能に
構成してある。The movable table (24) has rollers (25) (25) rotatably supported on the front and rear lower surfaces thereof rotatably engaged with the arcuate frame of the carriage (23) so as to rotate in a circumferential direction via an appropriate drive mechanism. It is configured to be movable.
このように台車(23)に沿って周方向に移動自在に配設
されたプレライニング装置によってトンネル断面の外周
に沿うプレライニングを形成するには、まず、切刃面に
おける掘削すべきトンネル断面の外周一端部にプレライ
ニング装置が配設可能な空洞(26)を適宜な掘削機によ
り掘削したのち、移動台(24)の傾斜上面に沿ってプレ
ライニング装置を前進させることにより該空洞(26)内
にプレライニング装置をその一側開口部(2)を進行方
向に向け且つ前方に向かって斜め外方に傾斜した状態に
挿入すると共にこの状態で移動台(24)上にモータ支持
台(8)(15)を固定する。In order to form the pre-lining along the outer circumference of the tunnel cross section by the pre-lining device movably arranged in the circumferential direction along the carriage (23) as described above, first, the cross section of the tunnel cross section to be excavated on the cutting edge surface is to be formed. A cavity (26) in which a prelining device can be arranged at one end of the outer periphery is excavated by an appropriate excavator, and then the prelining device is advanced along the inclined upper surface of the moving table (24) to cause the cavity (26). The prelining device is inserted into the inside thereof with its one side opening (2) directed in the traveling direction and inclined forward and outward, and in this state, the motor support base (8) is placed on the movable base (24). ) Fix (15).
しかるのち、モータ(9)(16)を作動させて溝孔掘削
機(10)と排土機(7)を回転駆動させると共に他側開
口部(3)内のプレス部材(18)側に反力をとって方向
制御ジャッキ(13)(14)を伸長させると、溝孔掘削機
(10)がトンネル断面の外周方向に押圧されながら地盤
に溝孔(27)を掘削していく。After that, the motors (9) (16) are operated to rotate the slot excavator (10) and the soil excavator (7), and at the same time, the other side opening (3) is pushed to the press member (18) side. When the direction control jacks (13) (14) are extended by applying force, the slot hole excavator (10) is pressed in the outer peripheral direction of the tunnel cross section to excavate the slot hole (27) in the ground.
この時、溝孔掘削機(10)は上下方向制御ジャッキ(1
3)(14)によってトンネル断面の外周に沿うように制
御されると共に、該溝孔掘削機(10)と排土機(7)の
駆動モータ(9)(16)はその支持台(8)(15)を移
動台(24)上に固定されてあり、この移動台(24)は台
車(23)の円弧状外周面に係合しながら移動するので、
溝孔掘削機(10)と排土機(7)は台車(23)の円弧状
外周面に沿う方向に移動しながら溝孔掘削機(10)によ
り円弧状の溝孔(27)を掘削していくものであり、掘削
された土砂は排土機(7)によって土砂搬出室(5)内
を後方に搬送され、排出口(6)から切羽側に排出され
る。At this time, the slot excavator (10) is operated by the vertical control jack (1
3) It is controlled by (14) so as to follow the outer periphery of the tunnel cross section, and the drive motors (9) (16) of the slot excavator (10) and the soil excavator (7) have their support bases (8). (15) is fixed on the moving base (24), and since this moving base (24) moves while engaging with the arcuate outer peripheral surface of the carriage (23),
The slot excavator (10) and the earth removing machine (7) excavate an arcuate slot (27) by the slot excavator (10) while moving in a direction along the arcuate outer peripheral surface of the carriage (23). The excavated earth and sand is transported backward in the earth and sand carrying-out chamber (5) by the earth unloading machine (7), and is discharged from the discharge port (6) to the face side.
こうして方向制御ジャッキ(13)(14)の1ストローク
長さだけ堀進したのち、プレスジャッキ(19)を伸長さ
せる一方、方向制御ジャッキ(13)(14)を収縮させる
ことによってシールド枠(1)を溝孔掘削機(10)によ
り掘削された溝孔(27)内に推進させる。In this way, the press jack (19) is extended after the directional control jacks (13) (14) have been dug by one stroke length, while the direction control jacks (13) (14) are contracted to shield the shield frame (1). Are propelled into the slot (27) excavated by the slot excavator (10).
次いで、コンクリート打設機構(20)の打設管(20a)
にコンクリートを供給して打設口(20b)からシールド
枠(1)の推進跡の溝孔(27)にコンクリートを打設す
ると共にその打設に従ってプレスジャッキ(19)を収縮
させることによりプレス部材(18)をシールド枠(1)
の他端開口部(3)内に後退させながらそのシールド枠
(1)の他端開口部(3)側に1掘進長分のプレライニ
ング部(28a)を形成する。Next, the placing pipe (20a) of the concrete placing mechanism (20)
Concrete is supplied to the press member by pouring concrete from the pouring port (20b) into the groove hole (27) of the propulsion mark of the shield frame (1) and shrinking the press jack (19) according to the pouring. (18) Shield frame (1)
While retreating into the other end opening (3), the pre-lining portion (28a) for one excavation length is formed on the other end opening (3) side of the shield frame (1).
しかるのち、再び、方向制御ジャッキ(13)(14)を伸
長させて溝孔掘削機(10)によりトンネル断面の外周に
沿う溝孔(27)をジャッキ(13)(14)の1ストローク
分だけ掘削し、次いでプレスジャッキ(19)を伸長させ
てプレス部材(18)により既に打設されたプレライニン
グ部(28a)を突き固めながら該プレライニング部(28
a)に反力をとってシールド枠(1)を溝孔掘削機(1
0)により掘削された溝孔(27)内に推進させる一方、
その推進に従って方向制御ジャッキ(13)(14)を収縮
させたのち、推進跡の溝孔(27)にプレス部材(18)を
後退させながらコンクリートを打設する。Then, the direction control jacks (13) and (14) are extended again, and the slot hole excavator (10) is used to form the slot hole (27) along the outer periphery of the tunnel cross section for one stroke of the jacks (13) and (14). After excavating, the press jack (19) is extended to squeeze the pre-lining portion (28a) already placed by the press member (18) while pre-lining the pre-lining portion (28).
The shield frame (1) is pulled to the slot excavator (1
While propelling it into the slot (27) excavated by
Following the propulsion, the direction control jacks (13) (14) are contracted, and then the concrete is poured while the press member (18) is retracted into the groove hole (27) of the propulsion mark.
このように、溝孔掘削機(10)による一定長の溝孔掘削
工程と、該溝孔(27)内にシールド枠(1)を推進させ
ていく工程と、シールド枠(1)の推進跡の溝孔(27)
にコンクリートを打設する工程とを繰り返し行うことに
よってトンネル断面形状の外周に沿い順次プレライニン
グ部(28a)を連続形成してゆき、トンネル断面の外周
に前方に向かって斜め外方に傾斜した一定厚みを有する
一連のアーチ状プレライニング(28)を形成するもので
ある。In this way, a step of excavating a fixed length slot by the slot excavator (10), a step of propelling the shield frame (1) into the slot (27), and a propulsion mark of the shield frame (1). Slots for (27)
By repeatedly performing the step of placing concrete in the tunnel, the pre-lining part (28a) is continuously formed along the outer circumference of the tunnel cross-section, and the outer circumference of the tunnel cross-section is slanted outward and fixed at a constant angle. A series of arched prelinings (28) having a thickness are formed.
しかるのち、該プレライニング(28)の前端部を残して
プレライニング(28)により囲まれた地盤を掘削するこ
とにより一定長のトンネルを得るものであり、この一定
長のトンネルを前方に向かって上記作業工程を繰り返し
行いながらトンネル覆工を形成していくものである。After that, a tunnel of a certain length is obtained by excavating the ground surrounded by the prelining (28) leaving the front end of the prelining (28). The tunnel lining is formed by repeating the above-mentioned work steps.
なお、アーチ状に彎曲したプレライニング(28)の形成
を容易にするために、シールド枠(1)の上下枠板部
(1a)(1b)を曲面プレートに形成して全体的に緩やか
に彎曲させておいてもよく、さらには中央部分でヒンジ
結合等により屈折自在となる構造にしておいてもよい。In order to facilitate the formation of the arch-shaped prelining (28), the upper and lower frame plate portions (1a) and (1b) of the shield frame (1) are formed on a curved plate to gently bend the entire body. Alternatively, the central portion may have a structure such that it can be bent by a hinge connection or the like.
又、溝孔掘削機によって土砂の排出も兼備させることが
できるので、排土機(7)は必ずしも設ける必要はな
い。さらに、溝孔掘削機(10)はスクリューオーガタイ
プによることなく、外周面に多数の掘削ビットを突設し
た円筒形状の回転掘削機等、溝孔の掘削に適する形状で
あればよい。Further, since the earth and sand can be discharged by the groove excavator, it is not always necessary to provide the earth discharging machine (7). Further, the slot excavator (10) does not have to be a screw auger type, and may have a shape suitable for excavating a slot, such as a cylindrical rotary excavator having a large number of excavation bits projecting on the outer peripheral surface.
以上のように本発明のプレライニング装置によれば、両
側端面が開口した一定厚みを有する方形状の中空シール
ド枠と、このシールド枠の一側開口部の外側方に軸芯を
該開口部に沿わせた状態で配設され且つシールド枠内に
連結した方向制御ジャッキによって外側方に移動自在に
支承された掘削ビット付溝孔掘削機と、前記シール枠の
後壁面適所に設けている土砂排出口と、シールド枠の他
側部内に摺動自在に配設され且つシールド枠内に連結し
たプレスジャッキによって内外側方向に押圧されるプレ
ス部材と、このプレス部材を通じてシールド枠の他側開
口端側にコンクリートを打設する打設機構とから構成し
ているので、プレス部材側に反力をとりながら方向制御
ジャッキの伸長による溝孔掘削機の推進によって一定幅
を有する溝孔を方向制御ジャッキの1ストローク分だけ
トンネル断面形状の外周に沿って確実に掘削することが
でき、その掘削方向も方向制御ジャッキにより制御しな
がら正確な方向に溝孔を掘削できるものである。As described above, according to the pre-lining device of the present invention, a rectangular hollow shield frame having a constant thickness with both end faces opened, and a shaft core on the outside of one side opening of this shield frame A slotted excavator equipped with a drill bit, which is installed alongside and movably supported outward by a direction control jack connected to the inside of a shield frame, and a sand and sand discharge provided at an appropriate place on the rear wall surface of the seal frame. An outlet, a press member slidably disposed in the other side portion of the shield frame and pressed inward and outward by a press jack connected to the shield frame, and the other side opening end side of the shield frame through the press member. Since it is composed of a pouring mechanism for pouring concrete on the press member side, a groove with a certain width can be formed by propelling the groove hole excavator by extending the direction control jack while applying a reaction force to the press member side. Along the outer periphery of one stroke only tunnel cross-sectional shape of the control jack can be reliably drilled, those capable of drilling a slot in the correct direction while controlled by the drilling direction directional control jack.
さらに、プレスジャッキを伸長させると共に方向制御ジ
ャッキを収縮させることによって、掘削機により掘削さ
れた溝孔内にシールド枠を推進させることができると共
にプレスジャッキを収縮させながら該プレス部材の内部
を通じてシールド枠の推進跡の溝孔内にコンクリートを
打設することにより一定厚みのプレライニング部をトン
ネル断面の外周に沿って容易に形成できるものであり、
しかも、このようなプレライニング部は上記掘削並びに
コンクリートの打設工程を繰り返し行うことによって連
続して打ち継ぎ目のない一定厚みのプレライニングを形
成することができ、従って、プレライニングの剛性を大
きくすることができると共に止水性も向上するものであ
る。Further, by extending the press jack and contracting the direction control jack, the shield frame can be propelled into the slot drilled by the excavator and the shield frame is passed through the inside of the press member while contracting the press jack. It is possible to easily form a pre-lining part with a certain thickness along the outer circumference of the tunnel cross section by placing concrete in the groove hole of the propulsion mark of
Moreover, such a pre-lining portion can continuously form a pre-lining having a constant thickness without a joint by repeating the above-mentioned excavation and concrete placing steps, thus increasing the rigidity of the pre-lining. In addition to being able to do so, the water stopping property is also improved.
又、トンネル断面を掘削する前にライニングを施すこと
ができるから、切羽が安定し、トンネルの変位も少なく
て、地表部の地盤の沈下や地下構造物への影響を低減で
き、さらに、大型機械を使用した大断面のトンネル掘削
も可能となるものである。In addition, since the lining can be applied before excavating the tunnel cross section, the cutting face is stable, the displacement of the tunnel is small, and the subsidence of the ground at the surface and the influence on the underground structure can be reduced. It is also possible to excavate large-section tunnels using.
図面は本発明の実施例を示すもので、第1図は本装置の
縦断正面図、第2図は横断面図、第3図はプレライニン
グ形成状態を示す簡略縦断側面図、第4図はその正面図
である。 (1)……シールド枠、(2)……一側開口部、(3)
……他側開口部、(6)……土砂排出口、(7)……排
土機、(10)……溝孔掘削機、(13)(14)……方向制
御ジャッキ、(18)……プレス部材、(19)……プレス
ジャッキ、(20)……コンクリート打設機構。The drawings show an embodiment of the present invention. FIG. 1 is a vertical sectional front view of the present apparatus, FIG. 2 is a transverse sectional view, FIG. 3 is a simplified vertical sectional side view showing a prelining formation state, and FIG. It is the front view. (1) …… Shield frame, (2) …… One side opening, (3)
...... Opening on the other side, (6) …… Sediment discharge port, (7) …… Earth removal machine, (10) …… Groove excavator, (13) (14) …… Direction control jack, (18) ...... Press member, (19) …… Press jack, (20) …… Concrete placing mechanism.
───────────────────────────────────────────────────── フロントページの続き (71)出願人 999999999 前田建設工業株式会社 東京都千代田区富士見2丁目10番26号 (72)発明者 足立 義雄 茨城県つくば市大字旭1番地 建設省土木 研究所内 (72)発明者 水谷 敏則 茨城県つくば市大字旭1番地 建設省土木 研究所内 (72)発明者 稲野 茂 茨城県つくば市大字旭1番地 建設省土木 研究所内 (72)発明者 小西 守 大阪府大阪市阿倍野区松崎町2丁目2番2 号 株式会社奥村組内 (72)発明者 浜野 正之 兵庫県神戸市中央区東川崎町3丁目1番1 号 川崎重工業株式会社神戸工場内 (72)発明者 垣内 幸雄 東京都新宿区津久戸町2番1号 株式会社 熊谷組内 (72)発明者 高森 貞彦 東京都千代田区富士見2丁目10番26号 前 田建設工業株式会社内 (56)参考文献 特開 平3−257284(JP,A) 特開 平3−257292(JP,A) 特開 平3−257297(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (71) Applicant 999999999 Maeda Construction Industry Co., Ltd. 2-1026 Fujimi, Chiyoda-ku, Tokyo (72) Inventor Yoshio Adachi 1 Asahi, Tsukuba, Ibaraki Prefectural Government Civil Engineering Research Institute ( 72) Inventor Toshinori Mizutani, Asahi 1 Tsukuba, Ibaraki Prefecture, Asahi, Civil Engineering Research Institute, Ministry of Construction (72) Inventor Shigeru Inano 1 Asahi, Tsukuba, Ibaraki Prefecture, Civil Engineering Research Institute, Ministry of Construction (72) Inventor, Mamoru Konishi Osaka, Osaka 2-2-2 Matsuzaki-cho, Abeno-ku Okumura-gumi Co., Ltd. (72) Masayuki Hamano 3-1-1 Higashikawasaki-cho, Chuo-ku, Kobe, Hyogo Prefecture Kawasaki Heavy Industries Ltd. Kobe factory (72) Inventor Yukio Kakiuchi Tokyo 2-1-1 Tsukudo-cho, Shinjuku-ku, Tokyo Kumagai Gumi Co., Ltd. (72) Inventor Sadahiko Takamori 2-10-2 Fujimi, Chiyoda-ku, Tokyo No. 6 in Maeda Construction Industry Co., Ltd. (56) Reference JP-A-3-257284 (JP, A) JP-A-3-257292 (JP, A) JP-A-3-257297 (JP, A)
Claims (1)
状の中空シールド枠と、このシールド枠の一側開口部の
外側方に軸芯を該開口部に沿わせた状態で配設され且つ
シールド枠内に連結した方向制御ジャッキによって外側
方に移動自在に支承された掘削ビット付溝孔掘削機と、
前記シールド枠の後壁面適所に設けている土砂排出口
と、シールド枠の他側部内に摺動自在に配設され且つシ
ールド枠内に連結したプレスジャッキによって内外側方
向に押圧されるプレス部材と、このプレス部材を通じて
シールド枠の他側開口端側にコンクリートを打設する打
設機構とからなることを特徴とするトンネルのプレライ
ニング装置。1. A rectangular hollow shield frame having a constant thickness with both end faces opened, and a shield frame which is arranged outside the one side opening of the shield frame with a shaft core along the opening. A grooved hole excavator with a drill bit movably supported outward by a direction control jack connected in the shield frame,
A earth and sand discharge port provided at an appropriate position on the rear wall surface of the shield frame, and a press member slidably disposed on the other side of the shield frame and pressed inward and outward by a press jack connected to the shield frame. A prelining device for a tunnel, which comprises a placing mechanism for placing concrete on the other open end side of the shield frame through the press member.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2055792A JPH0774597B2 (en) | 1990-03-07 | 1990-03-07 | Tunnel prelining equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2055792A JPH0774597B2 (en) | 1990-03-07 | 1990-03-07 | Tunnel prelining equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH03257293A JPH03257293A (en) | 1991-11-15 |
| JPH0774597B2 true JPH0774597B2 (en) | 1995-08-09 |
Family
ID=13008763
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2055792A Expired - Lifetime JPH0774597B2 (en) | 1990-03-07 | 1990-03-07 | Tunnel prelining equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0774597B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103953356B (en) * | 2014-04-28 | 2016-04-06 | 北京市三一重机有限公司 | Opened type shield machine, suspension device and control system thereof and control method |
-
1990
- 1990-03-07 JP JP2055792A patent/JPH0774597B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH03257293A (en) | 1991-11-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH03221614A (en) | pipe laying equipment | |
| JPH0774597B2 (en) | Tunnel prelining equipment | |
| JP2933476B2 (en) | Underground pipe laying method | |
| JPH03176591A (en) | Shield machine | |
| JP2849822B2 (en) | Underground diaphragm wall excavation method and its equipment | |
| JPH0416694A (en) | Tunnel constructing method and device therefor | |
| JPH0774596B2 (en) | Ditch drilling equipment | |
| JP2000002082A (en) | Excavator for constructing diaphragm wall | |
| JPH0643796B2 (en) | Shield machine | |
| JP7333138B2 (en) | Rolling correction method for shield excavator, rolling correction device for shield excavator, and shield excavation method using the same | |
| JPH0774585B2 (en) | Tunnel excavation method and prelining construction device | |
| JP2015048628A (en) | Invert construction method for existing tunnels | |
| JP3716094B2 (en) | Tunnel excavator | |
| JPH0826755B2 (en) | Tunnel pre-lining structure and tunnel pre-lining method | |
| JP3070919B2 (en) | Tunnel lining method and drilling equipment | |
| JP3716093B2 (en) | Tunnel excavator and excavation method | |
| JPH07122395B2 (en) | Outer ring-shaped lining device for planned tunnel | |
| JP2798791B2 (en) | Small caliber excavator | |
| JPH0875046A (en) | Laying method for pipe member | |
| JP3773625B2 (en) | Underground excavator | |
| JP2735871B2 (en) | Hollow body drilling method and drilling equipment | |
| JPH05156639A (en) | Method and apparatus for forming digging hole for constructing thin film wall | |
| JP6430864B2 (en) | Pipe installation method, pipe installation apparatus and pipe propulsion direction adjusting apparatus | |
| JP2828919B2 (en) | Horizontal plate shield machine | |
| JP3727773B2 (en) | Tunnel excavator |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080809 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080809 Year of fee payment: 13 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080809 Year of fee payment: 13 |
|
| EXPY | Cancellation because of completion of term |