Construction method of temporary roadbed for moving heavy objects

Info

Publication number
JPH07882B2
JPH07882B2 JP11568186A JP11568186A JPH07882B2 JP H07882 B2 JPH07882 B2 JP H07882B2 JP 11568186 A JP11568186 A JP 11568186A JP 11568186 A JP11568186 A JP 11568186A JP H07882 B2 JPH07882 B2 JP H07882B2
Authority
JP
Japan
Prior art keywords
ground
roadbed
soil layer
frozen soil
heavy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP11568186A
Other languages
Japanese (ja)
Other versions
JPS62273304A (en
Inventor
哲夫 長瀬
雅朗 古田
俊朗 渡辺
真木郎 中野
克之 鳥井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP11568186A priority Critical patent/JPH07882B2/en
Publication of JPS62273304A publication Critical patent/JPS62273304A/en
Publication of JPH07882B2 publication Critical patent/JPH07882B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Road Paving Structures (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は重量物の荷重に耐える仮設路盤の築造方法に関
するものである。
The present invention relates to a method for constructing a temporary roadbed that bears the load of heavy objects.

「従来の技術」 重量構造物を移動する場合、移動経路の地盤を重量構造
物の荷重に耐えるように一時的に改良することがなされ
ている。
"Prior Art" When moving a heavy structure, the ground of a moving route is temporarily improved so as to bear the load of the heavy structure.

従来この種の地盤改良手段の1例として、地下の支持地
盤まで杭を打ち込むとともに地表部分にコンクリートを
打設し、前記杭により支持されたコンクリート路盤を築
造して地盤を改良する方法が知られている。
Conventionally, as one example of this type of ground improvement means, there is known a method of driving a pile to an underground support ground and placing concrete on the surface of the ground to build a concrete roadbed supported by the pile to improve the ground. ing.

そして前述の如く築造したコンクリート路盤は重量構造
物の移動後にコンクリート部分を撤去して復旧し、撤去
した資材は産業廃棄物として処分するようにしている。
The concrete roadbed constructed as described above is restored by removing the concrete portion after moving the heavy structure, and the removed material is disposed of as industrial waste.

「発明が解決しようとする問題点」 ところで、前記従来の築造方法は杭の打ち込み作業とコ
ンクリートの打設作業が必要になり、大掛かりな設備と
大量の資材を必要とする問題がある。それに加えて前述
の従来方法にあっては、重量構造物の移動後に復旧のた
めに大掛かりなコンクリートの撤去作業を行う必要があ
るとともに、撤去後の資材は産業廃棄物として高額な廃
棄料を払って処分する必要があり、極めて施工コストの
嵩む方法であった。
[Problems to be Solved by the Invention] However, the above-mentioned conventional construction method has a problem that a pile driving operation and a concrete placing operation are required, which requires large-scale equipment and a large amount of materials. In addition to that, in the above-mentioned conventional method, it is necessary to perform large-scale concrete removal work for restoration after moving heavy structures, and after removing the materials, a large amount of industrial waste must be paid. It was necessary to dispose of it, and the method was extremely expensive.

本発明は、前記問題に鑑みてなされたもので、産業廃棄
物を生じることなく十分な耐力を有する路盤を築造でき
るとともに、復旧に特別の作業と多くの資材を必要とし
ない上に施工コストの安い重量構造物移動用仮設路盤の
築造方法の提供を目的とする。
The present invention has been made in view of the above-mentioned problems, and it is possible to build a roadbed having sufficient proof stress without producing industrial waste, and special work and many materials are not required for restoration, and the construction cost is increased. The purpose of the present invention is to provide a method for constructing a temporary roadbed for moving a cheap heavy structure.

「問題点を解決するための手段」 本発明は、前記問題点を解決するために、重量物を移動
させる経路の地盤を凍結して一時的に耐力を向上させ、
仮設路盤とするものである。
“Means for Solving Problems” The present invention, in order to solve the problems, freezes the ground of a route for moving a heavy load to temporarily improve the yield strength,
This is a temporary roadbed.

「作用」 杭やコンクリート等の特別な資材を用いることなく冷凍
操作を施すことにより路盤を築造するとともに、使用後
は解凍することによって産業廃棄物を出すことなく速や
かに復旧することができる。
[Operation] The roadbed can be constructed by freezing without using special materials such as piles and concrete, and can be quickly restored without thawing industrial waste by thawing after use.

「実施例」 第1図と第2図は、本発明の一実施例を説明するための
もので、重量物1を移動させる場合、移動経路の地盤G
に凍結管2を所要深さに複数打ち込んで地盤Gを冷却
し、凍土層3を形成する。ここで前記凍結管2はその内
部に冷媒を循環させることにより冷却作用を奏する公知
のものである。そして、前記凍土層3を形成する際に
は、その上を移動させる重量物1の重量に合わせて凍土
層3の厚さと凍結温度を適宜設定する。即ち、重量物1
の重量が大きい場合ほど、凍土層3の厚さを大きく、凍
結温度を低く設定する。そして、凍結温度の設定におい
ては、凍土層3の温度を−10〜−20℃程度に設定する場
合には塩素系ガス等のブラインを用いた凍結管を使用
し、さらに低い温度に凍結する場合には、必要に応じて
液体窒素等の冷却液を用いて冷却すれば良い。
"Embodiment" FIGS. 1 and 2 are for explaining one embodiment of the present invention. When the heavy load 1 is moved, the ground G on the moving route is shown.
A plurality of the freezing pipes 2 are driven to the required depth to cool the ground G to form the frozen soil layer 3. Here, the freezing tube 2 is a well-known one which has a cooling function by circulating a refrigerant therein. Then, when the frozen soil layer 3 is formed, the thickness of the frozen soil layer 3 and the freezing temperature are appropriately set according to the weight of the heavy object 1 to be moved on the frozen soil layer 3. That is, heavy object 1
The heavier the weight, the thicker the frozen soil layer 3 and the lower the freezing temperature. In setting the freezing temperature, when setting the temperature of the frozen soil layer 3 to about -10 to -20 ° C, use a freezing tube using brine such as chlorine gas, and when freezing to a lower temperature. For this purpose, a cooling liquid such as liquid nitrogen may be used for cooling.

次に凍土層3を形成したならば、凍土層3の上面に鋼板
等からなる受板4を敷設し、その上をコロ等の搬送装置
5に積載された重量物1を移動させる。この移動中にお
いては、凍土層3が重量物1と搬送装置5の荷重を支持
する。なお、凍土は、コンクリートの強度に匹敵する強
度を有することが知られているために重量物1の荷重も
十分に支持することができる。また、あるがままの地盤
Gを仮設路盤として利用できるために、杭やコンクリー
ト等の特別の資材を投入する必要もなくなる。
Next, when the frozen soil layer 3 is formed, the receiving plate 4 made of a steel plate or the like is laid on the upper surface of the frozen soil layer 3, and the heavy object 1 loaded on the conveyor device 5 such as a roller is moved on the receiving plate 4. During this movement, the frozen soil layer 3 supports the heavy load 1 and the load of the transport device 5. Since it is known that frozen soil has a strength comparable to that of concrete, it can sufficiently support the load of the heavy load 1. Further, since the ground G as it is can be used as a temporary roadbed, it is not necessary to throw in special materials such as piles and concrete.

一方、重量物1を移動させた後には凍土層3を解凍して
凍土層3を消失させることにより地盤Gの復旧工事を完
了する。この復旧工事においては、コンクリートの撤去
作業等は不要であり、しかも、産業廃棄物を生じること
がないために、産業廃棄物対策が不要になるとともに、
復旧工事費用も従来方法より少なくなる。なお、従来方
法においては、コンクリートの撤去後に杭を地盤に残留
させておくことが一般的であるために、地盤中に異物
(杭)を残すものであったが、本発明方法によれば地盤
Gに異物を残すことはない。
On the other hand, after the heavy load 1 is moved, the frozen soil layer 3 is thawed and the frozen soil layer 3 disappears to complete the restoration work of the ground G. In this restoration work, concrete removal work is unnecessary, and since industrial waste is not generated, industrial waste countermeasures are not required, and
The cost of restoration work is also less than the conventional method. In addition, in the conventional method, since the pile is generally left in the ground after the concrete is removed, a foreign substance (pile) is left in the ground, but according to the method of the present invention, the ground is removed. No foreign matter is left in G.

ところで、前記重量物1が極めて大重量の構築物(例え
ば原子炉構造物において、廃炉作業を実施する場合、原
子炉圧力容器と格納容器とそれらを囲む生体遮蔽壁をそ
のままの形で一括して取り出して搬出する場合の構造
物)の場合には、場合によっては凍土層を地下の岩盤ま
で到達させて形成し、岩盤に支持された凍土層によって
構築物の重量を支持させることもできる。
By the way, when the heavy object 1 is an extremely heavy structure (for example, in the case of performing a decommissioning operation in a reactor structure, the reactor pressure vessel, the containment vessel, and the biological shielding wall that surrounds them are collectively formed as they are. In the case of taking out and carrying out the structure), in some cases, the frozen soil layer can be formed to reach the underground rock bed, and the weight of the structure can be supported by the frozen soil layer supported by the rock bed.

以上説明したように凍土層3を用いて重量物1を移動さ
せるならば、コンクリート路盤が形成されていない場所
であっても任意の位置に仮設路盤を築造することがで
き、また土質に左右されることなく仮設路盤を築造でき
る利点がある。
As described above, if the heavy load 1 is moved using the frozen soil layer 3, it is possible to build a temporary roadbed at an arbitrary position even in a place where the concrete roadbed is not formed, and it depends on the soil quality. There is an advantage that you can build a temporary roadbed without

「発明の効果」 以上説明したように本発明は、地盤を凍結させて形成し
た凍土層によって地盤を改良し、重量物の移動に耐える
仮設路盤を築造するものであるために、杭の打ち込みや
コンクリートの打設を行う必要のあった従来方法に比較
して低コストで容易に地盤を改良することができる。ま
た、使用後には凍結層を解凍することによって復旧作業
ができるために、復旧作業に特別な資材を必要としない
上に、コンクリートの撤去作業を行う必要のあった従来
方法に比較して、復旧作業が容易になり、産業廃棄物も
生じない効果がある。
"Effects of the Invention" As described above, the present invention improves the ground by the frozen soil layer formed by freezing the ground, and constructs a temporary roadbed that withstands the movement of heavy objects. It is possible to easily improve the ground at a low cost as compared with the conventional method that requires placing concrete. In addition, since the recovery work can be done by thawing the frozen layer after use, it does not require special materials for the recovery work, and compared with the conventional method that required the removal work of concrete, It has the effect of facilitating the work and not producing industrial waste.

【図面の簡単な説明】[Brief description of drawings]

第1図と第2図は本発明の一実施例を説明するためのも
ので、第1図は地盤の縦断面図、第2図は地盤の水平断
面図である。 1……重量物、2……凍結管、3……凍土層、4……受
板、5……搬送装置、G……地盤。
1 and 2 are for explaining one embodiment of the present invention. FIG. 1 is a vertical sectional view of the ground, and FIG. 2 is a horizontal sectional view of the ground. 1 ... Heavy load, 2 ... Freezing pipe, 3 ... Frozen soil layer, 4 ... Receiving plate, 5 ... Conveying device, G ... Ground.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中野 真木郎 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 鳥井 克之 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Makiro Nakano 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Katsuyuki Torii 2-1-1-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】重量物を移動させる経路の地盤を凍結して
凍土層を形成し、一時的に耐力を向上させて仮設路盤を
築造することを特徴とする重量物移動用仮設路盤の築造
方法。
1. A method for constructing a temporary roadbed for moving heavy goods, characterized by freezing the ground on a route for moving a heavy load to form a frozen soil layer, and temporarily improving the proof stress to build a temporary roadbed. .
JP11568186A 1986-05-20 1986-05-20 Construction method of temporary roadbed for moving heavy objects Expired - Lifetime JPH07882B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11568186A JPH07882B2 (en) 1986-05-20 1986-05-20 Construction method of temporary roadbed for moving heavy objects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11568186A JPH07882B2 (en) 1986-05-20 1986-05-20 Construction method of temporary roadbed for moving heavy objects

Publications (2)

Publication Number Publication Date
JPS62273304A JPS62273304A (en) 1987-11-27
JPH07882B2 true JPH07882B2 (en) 1995-01-11

Family

ID=14668639

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11568186A Expired - Lifetime JPH07882B2 (en) 1986-05-20 1986-05-20 Construction method of temporary roadbed for moving heavy objects

Country Status (1)

Country Link
JP (1) JPH07882B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6351063B2 (en) * 2014-04-04 2018-07-04 大成建設株式会社 Temporary support method
JP6913583B2 (en) * 2017-09-25 2021-08-04 鹿島建設株式会社 Ground improvement method

Also Published As

Publication number Publication date
JPS62273304A (en) 1987-11-27

Similar Documents

Publication Publication Date Title
US3541798A (en) Method and structure for shoring a lateral face of an excavation
US20210180455A1 (en) Method for treating a high and steep landslide in a mine with a gently-inclined and weak interlayer
US4681706A (en) Nuclear waste packaging facility
CN110644998B (en) A kind of open pit backfilling treatment method
US5302054A (en) Hole shoring system
Yamato et al. Damage to Daikai subway station of Kobe rapid transit system and estimation of its reason during the 1995 Hyogoken-Nanbu earthquake
CN112963187B (en) A targeted support method for large deformation of tunnel controlled by tectonic stress and bedding
JPH07882B2 (en) Construction method of temporary roadbed for moving heavy objects
JPS5927833B2 (en) Underground structure construction method
CN108166507A (en) The construction system and its method of construction of coral reef piping lane foundation pit
CN207974122U (en) The construction system of coral reef piping lane foundation pit
EP0168219A2 (en) Nuclear waste packaging modules
JP2001166093A (en) Geological disposal method of waste and tube type geological disposal equipment
JPS6221100A (en) Underground treating method of radioactive waste
CN108915703B (en) Method for conducting tunnel through sectional type section of shield tunneling machine
JPH08284432A (en) Method for moving building
CN207672414U (en) A kind of bridge
US5278877A (en) Process for dismantling buried unsheltered equipment which is at risk of contamination and possibly is irradiating, and a vessel for implementing this process
CN112696214A (en) Tunnel construction method
RU2026452C1 (en) Berthing facility
CN115419074B (en) Crawler-type soil conveying and excavating method for ultra-deep foundation pit
Sandstedt et al. Storage of nuclear waste in long boreholes
CN211777520U (en) Positioning device for advanced support structure of tunnel excavation weathered granite section
Price Some field experiments in the removal of larger fragile archaeological remains
JPS62242062A (en) Static breaking method and apparatus for reinforced concretebuilding