Monitoring device for tap switching device under load

Info

Publication number
JPH081861B2
JPH081861B2 JP63234761A JP23476188A JPH081861B2 JP H081861 B2 JPH081861 B2 JP H081861B2 JP 63234761 A JP63234761 A JP 63234761A JP 23476188 A JP23476188 A JP 23476188A JP H081861 B2 JPH081861 B2 JP H081861B2
Authority
JP
Japan
Prior art keywords
switching
tap
switch
time
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63234761A
Other languages
Japanese (ja)
Other versions
JPH0283910A (en
Inventor
征支 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP63234761A priority Critical patent/JPH081861B2/en
Publication of JPH0283910A publication Critical patent/JPH0283910A/en
Publication of JPH081861B2 publication Critical patent/JPH081861B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H9/00Details of switching devices, not covered by groups H01H1/00 - H01H7/00
    • H01H9/0005Tap change devices
    • H01H2009/0061Monitoring tap change switching devices

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野) 本発明は変圧器タップ巻線のタップを変圧器に負荷を
かけたままで切換えて電圧調整を行う負荷時タップ切換
装置の切換動作状況を監視する監視装置に関するもので
ある。
DETAILED DESCRIPTION OF THE INVENTION Object of the Invention (Industrial field of application) The present invention relates to a load tap switching device for performing voltage adjustment by switching a tap of a transformer tap winding while a load is being applied to a transformer. The present invention relates to a monitoring device that monitors the switching operation status.

(従来の技術) 負荷時タップ切換装置は、JECI86に定められているよ
うに、電流を遮断する切換開閉器と変圧器タップ巻線の
タップを選択するタップ選択器とで構成される負荷時タ
ップ切換器、この負荷時タップ切換器を機械的に所定の
順序で駆動する電動操作機構と、その電動装置とで装置
全体が構成されている。
(Prior Art) A tap switching device at load is a tap switch at load composed of a switching switch that cuts off current and a tap selector that selects a tap of a transformer tap winding, as defined in JECI86. The entire device is composed of a switching device, an electric operating mechanism that mechanically drives the load tap switching device in a predetermined order, and the electric device.

このような負荷時タップ切換装置の一例の動作を第5
図および第6図を用いて説明する。第6図は特公昭62-1
6004号公報に記載された2抵抗4バルブ方式の切換回路
とその切換順序をからの順に示し、図中太い線は変
圧器負荷電流の通電経路を示す。また、第5図(a)
(b)は第6図の切換回路における切換順序からを
シーケンス図として示したもので、(a)はその切換シ
ーケンス図、(b)は限流抵抗器に流れる電流抵抗の一
例を示している。
The operation of an example of such a tap switching device under load is
This will be described with reference to FIGS. Fig. 6 shows Japanese Patent Publication 62-1
The switching circuit of the 2-resistor 4-valve system described in Japanese Patent No. 6004 and its switching order are shown in the order from to. The thick line in the figure shows the energizing path of the transformer load current. FIG. 5 (a)
6B is a sequence diagram showing the switching order in the switching circuit of FIG. 6, FIG. 6A is the switching sequence diagram, and FIG. 6B is an example of the current resistance flowing in the current limiting resistor. .

以下、これらの図を説明すると、第5図、第6図にお
いて、はタップT1に選択された運転状態を示してい
る。この状態で、図示されていない電動操作機構の切換
動作によって、タップ切換動作が開始される。まず、主
バルブHAが開くと、主バルブHAは発弧し、負荷電流を遮
断して限定抵抗Rに負荷電流IAを移す(図中)。次
に、抵抗バルブWBが閉じ、タップ間橋絡状態となり、2
つの限流抵抗RにはIA,IBの負荷電流とタップ間の短絡
電流が流れる(図中)。次に、抵抗バルブWAが開いて
負荷電流を遮断してタップT2に移すと(図中)、限流
抵抗Rには負荷電流IBのみが流れる。最後に、主バルブ
HBが閉じてタップT2に完全に移し、タップT2での運転状
態となって切換動作を終了する(図中)。
These figures will be described below. In FIGS. 5 and 6, indicates the operating state selected by the tap T 1 . In this state, the tap switching operation is started by the switching operation of the electric operating mechanism (not shown). First, when the main valve HA opens, the main valve HA ignites, interrupts the load current, and transfers the load current IA to the limited resistance R (in the figure). Next, the resistance valve WB closes, and the bridge between taps is set.
A load current of IA and IB and a short-circuit current between the taps flow in one current limiting resistor R (in the figure). Next, when the resistance valve WA opens to cut off the load current and transfer it to the tap T 2 (in the figure), only the load current IB flows through the current limiting resistance R. Finally, the main valve
HB is completely transferred to the tap T 2 closed, become a driving state of the tap T 2 to end the switching operation (in the drawing).

この第5図、第6図において、切換開閉器の1タップ
に要する時間(主バルブHAが開いた状態から、他方の主
バルブHBが閉じるまでの時間)を、t2としている。この
t2は常時一定の値でなければ、主バルブHA,HBおよび抵
抗バルブWA,WBの負荷電流遮断能力に影響を与えること
になる。また、第5図、第6図には、タップ選択器M1
M2の動作を省略しているが、第6図の状態から図示し
ないタップT3への切換に際しては、タップ選択器M1がタ
ップT1からT3へ移動を完了した後、切換開閉器は状態
からへ前述の動作と逆の順序で切換動作を行うことに
なる。
In FIGS. 5 and 6, the time required for one tap of the switching switch (the time from when the main valve HA is open to when the other main valve HB is closed) is defined as t 2 . this
If t 2 is not a constant value at all times, it will affect the load current interruption capability of the main valves HA, HB and the resistance valves WA, WB. Further, in FIGS. 5 and 6, the tap selector M 1 ,
Although the operation of M 2 is omitted, when switching from the state of FIG. 6 to tap T 3 not shown, after the tap selector M 1 completes the movement from tap T 1 to T 3 , the switching switch Will switch from state to state in the reverse order of the above operation.

負荷時タップ切換装置全体の動作順序は一例として前
述の通りであるが、この装置における総切換時間tと切
換開閉器の切換時間t2との関係は、第2図に示すように
なっている。第2図において、切換時間tは前述した電
動操作機構のタップ切換動作時間、即ち上げ下げ信号を
受けて電磁接触器が動作し、電動機を回転させ、負荷時
タップ切換器を所定の順序で切換を行わせる総時間であ
り、t1は前記電磁接触器が動作してから切換開閉器が動
作するまでの時間であり、t2は切換開閉器各相の切換時
間である。
The operation sequence of the entire load tap switching device is as described above as an example, and the relationship between the total switching time t and the switching time t 2 of the switching switch in this device is as shown in FIG. . In FIG. 2, the switching time t is the tap switching operation time of the electric operating mechanism described above, that is, the electromagnetic contactor operates in response to the raising / lowering signal to rotate the electric motor to switch the tap switching unit under load in a predetermined order. The total time to be performed, t 1 is the time from the operation of the electromagnetic contactor to the operation of the switching switch, and t 2 is the switching time of each phase of the switching switch.

(発明が解決しようとする課題) ところで、負荷時タップ切換器と電動操作機構とは伝
導軸によって機械的に連結されており、これによって第
2図のような切換順序に従って動作が行われる。この場
合、負荷時タップ切換器の中で最も重要なものは、負荷
電流を遮断する切換開閉器部分で、万一切換動作が渋滞
して切換途中で停止したり、切換時間t2が異常に長くな
ったり、全く切換が行なわれないなどの支障が生じた場
合は、直ちにタップ間短絡など重大な事故に発展するこ
とになる。
(Problems to be Solved by the Invention) By the way, the load tap changer and the electric operating mechanism are mechanically connected by a transmission shaft, whereby the operation is performed in accordance with the switching order as shown in FIG. In this case, the most important one of the load tap changers is the switching switch part that cuts off the load current, and the switching operation should stop due to congestion and the switching time t 2 should be abnormal. If any trouble occurs such as lengthening or no switching at all, a serious accident such as short-circuiting between taps will immediately develop.

このような事故を未然に防止するため、現状では定期
的な点検を行い、順調な動作が行なわれているかを検査
している。しかし、機械的な部品の故障は予兆現象が発
見し難く、その時期の判断も実質的には不可能である。
In order to prevent such accidents, at present, regular inspections are performed to inspect whether or not smooth operation is being performed. However, it is difficult to detect the precursory phenomenon of mechanical part failure, and it is virtually impossible to judge the timing.

そこで、従来から切換開閉器自身の動作を監視するた
めに、特公昭42-2891号公報に記載のように機械的接点
を切換開閉器に設けたり、特開昭61-102012号公報に記
載のように限流抵抗器に流れる電流を検出し発光ダイオ
ードなどを用いて監視する発明が提案されている。しか
し、これらの従来技術はいずれも切換開閉器自身のもの
であって装置全体の動作を監視するものではなく、他の
部分の異常や装置全体の異常を監視できない欠点があっ
た。
Therefore, in order to conventionally monitor the operation of the switching switch itself, a mechanical contact is provided in the switching switch as described in JP-B-42-2891, or disclosed in JP-A-61-102012. Thus, an invention has been proposed in which the current flowing in the current limiting resistor is detected and monitored using a light emitting diode or the like. However, all of these prior arts are for the switching switch itself and do not monitor the operation of the entire apparatus, and have the drawback that abnormalities in other parts and the entire apparatus cannot be monitored.

本発明は上記のような従来技術の問題点を解決し、切
換開閉器のみに限らず、装置全体の異常を監視すること
のできる負荷時タップ切換装置用監視装置を提供するこ
とを目的とする。
SUMMARY OF THE INVENTION It is an object of the present invention to solve the above-mentioned problems of the prior art and to provide a load tap switching device monitoring device capable of monitoring an abnormality of not only the switching switch but also the entire device. .

[発明の構成] (課題を解決するための手段) 本発明の負荷時タップ切換装置用監視装置は、変圧器
タップ巻線のタップを任意に選択するタップ選択器と、
選択されたタップに流れる負荷電流を遮断し、タップを
切換える切換開閉器と、制御装置からの上げ下げ信号を
受けて動作し、前記タップ切換器と切換開閉器を所定の
切換順序で切換える電動操作機構から構成された負荷時
タップ切換装置において、前記切換開閉器の切換時間を
検出する開閉器切換時間検出部と、電動操作機構の切換
時間を検出する総切換時間検出部と、少なくともこれら
前記両検出部の時間信号値と予め設定された設定値とを
比較検出する演算判定部とを設けたことを特徴とする。
[Configuration of the Invention] (Means for Solving the Problems) A monitoring device for a load tap switching device of the present invention includes a tap selector that arbitrarily selects a tap of a transformer tap winding,
A switching switch which cuts off the load current flowing through the selected tap and switches the tap, and an electric operating mechanism which operates in response to an up / down signal from the control device and switches the tap switching and the switching switch in a predetermined switching order. In the load tap switching device configured by, a switch switching time detection unit that detects the switching time of the switching switch, a total switching time detection unit that detects the switching time of the electric operating mechanism, and at least both of these detections. It is characterized in that an arithmetic determination unit for comparing and detecting the time signal value of the unit and a preset setting value is provided.

(作用) 上記構成により、本発明は、開閉器切換時間検出部
と、総切換時間検出部より検出された時間信号値を予め
設定された設定値と演算判定部により比較判定する。そ
の結果異常があれば異常信号を出力する。
(Operation) With the above configuration, according to the present invention, the switch switching time detecting unit and the time signal value detected by the total switching time detecting unit are compared and determined by the preset value and the calculation determining unit. If there is an abnormality as a result, an abnormality signal is output.

(実施例) 以下、本発明の一実施例を第3図および第4図により
具体的に説明する。
(Embodiment) An embodiment of the present invention will be specifically described below with reference to FIGS. 3 and 4.

第3図において、タップ巻線TWにはタップT1,T2が設け
られている。M1,M2はタップ選択器で前記タップT1,T2
を任意に選択するものである。1は切換開閉器の切換回
路で、前記第5図および第6図に示すような切換順序で
動作する。2,2′は切換開閉器の切換時間t2を検出する
開閉器切換時間検出部で、前記切換回路1およびこの開
閉器切換時間検出部2,2′としては従来公知のもの、例
えば実開昭61-102012号に記載のものが使用される。3
は電動操作機構内に設けた電磁接触器の接点で、上げ下
げ方向の総切換時間tを検出する検出部である。4は同
じく電動操作機構内に設けられ、切換動作毎にタップ位
置を機械的に検出するタップ位置検出器である。5は切
換開閉器室内に取付けたガス温検出器5aとガス圧検出器
5bとで構成された切換時間補正用の検出部である。8は
前記開閉器切換時間検出部2,2′から出力された光信号
をコネクター9を介して変圧器タンク10外部に光伝送す
る光ファイバーで、受信器6へ信号を伝送するものであ
る。7は演算判定部で、受信部6、総切換時間検出部
3、タップ位置検出部器4、切換時間補正用検出部5の
各々の信号を処理し、切換動作毎の信号を記憶装置に記
憶すると共に、異常値に対して異常信号を出力する。
In FIG. 3, the tap winding TW is provided with taps T 1 and T 2 . M 1 and M 2 are tap selectors, and the taps T 1 and T 2 are
Is arbitrarily selected. Reference numeral 1 denotes a switching circuit of the switching switch, which operates in the switching sequence as shown in FIGS. 5 and 6. 2, 2 'in the switch switching time detecting unit for detecting a switching time t 2 of the diverter switch, the switching circuit 1 and the switch switching between the detection unit 2, 2' as conventionally known, for example JitsuHiraku The one described in Sho 61-102012 is used. Three
Is a contact of an electromagnetic contactor provided in the electric operation mechanism, and is a detection unit that detects the total switching time t in the raising / lowering direction. A tap position detector 4 is also provided in the electric operation mechanism and mechanically detects the tap position for each switching operation. 5 is a gas temperature detector 5a and a gas pressure detector installed in the switching switch room
5b is a detection unit for correcting the switching time. Reference numeral 8 denotes an optical fiber for optically transmitting the optical signal output from the switch switching time detecting unit 2, 2'to the outside of the transformer tank 10 via the connector 9 and transmitting the signal to the receiver 6. Reference numeral 7 denotes a calculation determination unit, which processes each signal of the reception unit 6, the total switching time detection unit 3, the tap position detection unit 4, and the switching time correction detection unit 5, and stores the signal for each switching operation in a storage device. At the same time, an abnormal signal is output for the abnormal value.

第4図は演算判定部7のフローチャートで、第3図の
作用も含めて説明する。
FIG. 4 is a flow chart of the calculation determining section 7, and the operation of FIG. 3 will be described.

まず、図示されていない電動操作機構がタップ上げか
下げの切換信号を受けて切換が開始し、この切換信号に
よって電磁接触器88R/Lが閉じる。タップ位置は機械的
検出器4により検出されているので、演算判定部7にタ
ップ位置が読込まれる。この状態で電動操作機構は切換
動作を続け、切換時間がt1に達すると切換開閉器が切断
動作する。なお、この切換時間t1の読込みは、上げ下げ
の切換信号と切換開閉器の開始の信号との時間差を計測
することにより行われる。この計測された時間t1は、予
めタップ位置によって設定された設定値に温度圧力補正
を行った設定値t1′と比較演算され、4段階に判定され
る。設定値内にある場合は正常動作として記憶装置に記
憶される。図中F1,F2,F3の場合は異常と判定される場合
で、F1は0、即ち切換動作が行われない状態を示し、F2
は設定値より短くなった状態、F3は逆に長くなった状態
である。F2,F3の状態では、負荷トルクの増大や機構系
の連結部にずれが生じたなど機械的故障が生じた状態で
ある。
First, an electric operating mechanism (not shown) receives a switching signal for tapping up or down, and switching is started, and the electromagnetic contactor 88R / L is closed by this switching signal. Since the tap position is detected by the mechanical detector 4, the tap position is read by the calculation determination unit 7. In this state, the electric operating mechanism continues the switching operation, and when the switching time reaches t 1 , the switching switch is disconnected. The switching time t 1 is read by measuring the time difference between the up / down switching signal and the start signal of the switching switch. This measured time t 1 is compared with a set value t 1 ′ obtained by performing temperature and pressure correction on the set value set by the tap position in advance, and is judged in four steps. If it is within the set value, it is stored in the storage device as a normal operation. In the figure, cases of F1, F2, and F3 are cases in which it is determined that there is an abnormality, F1 is 0, that is, a state in which the switching operation is not performed,
Is a state that is shorter than the set value, and F3 is a state that is longer than the set value. In the states of F2 and F3, mechanical failure such as an increase in load torque or a shift in the connecting portion of the mechanical system has occurred.

次に、切換開閉器自身の切換時間t2を読込み、前記と
同様の設定値t2′と比較演算することにより、同様に4
段階の判定がなされる。さらに、総切換時間tを読込
み、同様に比較演算することによって、4段階の判定を
行い、1タップ切換動作の監視を終了する。
Next, the switching time t 2 of the switching switch itself is read and compared with the set value t 2 ′ similar to the above to calculate 4
A stage determination is made. Further, the total switching time t is read, and the comparison operation is performed in the same manner to make four-stage determination, and the monitoring of the one-tap switching operation is completed.

以上述べたように、本実施例の負荷時タップ切換装置
用監視装置によれば、次のような作用効果が発揮され
る。
As described above, according to the load tap switching device monitoring device of the present embodiment, the following operational effects are exhibited.

装置全体の相対運動が、切換開始から切換開閉器動
作開始時間t1、切換開閉器の切換時間t2および総切換時
間tによって常時監視されているので、突発的に発生す
る機械的異常現象を直ちに検出して異常信号を出せる。
その結果、異常現象の2次的な重大事故への発展を防止
できる。
Since the relative motion of the entire device is constantly monitored by the switching switch operation start time t 1 , the switching switch switching time t 2 and the total switching time t from the start of switching, mechanical abnormal phenomena that occur suddenly can be prevented. Can immediately detect and give an abnormal signal.
As a result, it is possible to prevent the development of an abnormal phenomenon into a secondary serious accident.

正常動作であっても機械部品の摩耗など経年劣化に
よる切換時間の変化を知ることができるので、切換時間
t2では接点寿命の限度、またt1,tでは機械的寿命の判定
ができる。
Even during normal operation, it is possible to know the change in switching time due to deterioration over time such as wear of mechanical parts.
t 2 In the contact life limit, and may determine the t 1, t the mechanical life.

従来定期的点検を実施して来ているが、経年的な変
化が監視されるため、その変化を見極め必要と判断され
る時のみ点検すれば良いので、保守作業の頻度が低減で
きる。
Conventionally, periodic inspections have been performed, but since changes over time are monitored, it is only necessary to check the changes and inspect only when it is necessary, so the frequency of maintenance work can be reduced.

本発明は前記の実施例に示すように構成並びに作用効
果を有するものであるが、必ずしもこの実施例に限定さ
れるものではない。例えば、切換開閉器1の回路やその
切換時間検出部2,2′として構成を採用することも可能
である。また、切換時間に対する温度やガス圧力による
影響が少ない場合は、予め演算判定部7に入力される設
定値として補正をしないものを使用することも可能であ
る。
The present invention has the constitution and the action and effect as shown in the above-mentioned embodiment, but is not necessarily limited to this embodiment. For example, it is also possible to adopt a configuration as the circuit of the switching switch 1 and its switching time detecting units 2, 2 '. Further, when the influence of the temperature and the gas pressure on the switching time is small, it is possible to use a non-corrected set value that is input in advance to the calculation determination unit 7.

又、切換開閉器の切換時間t2と総切換時間tのみを設
定値と比較判定するだけでも十分従来の切換開閉器のみ
の監視を行うものよりも遥かに優れた監視を行うことが
できる。それ故、切換開始から切換開閉器動作開始まで
の時間t1については設定値と比較判定しなくとも十分良
好な効果を期待することができる。
Further, it is sufficient to compare and judge only the switching time t 2 of the switching switch and the total switching time t with the set value, and it is possible to perform monitoring far superior to the conventional monitoring of only the switching switch. Therefore, the time t 1 from the start of switching to the start of the operation of the switching switch can be expected to have a sufficiently good effect without comparing with the set value.

[発明の効果] 以上の通り、本発明によれば、切換開閉器の切換時間
と装置全体の総切換時間を設定値と比較演算するという
手段により、従来の切換開閉器のみを監視していた装置
に比較して装置全体の異常を確実に発見することがで
き、しかも予測が困難であった機械的部品の経年劣化に
よる故障などを未然に発見することができる優れた負荷
時タップ切換装置用監視装置を提供することができる。
[Advantages of the Invention] As described above, according to the present invention, only the conventional switching switch is monitored by the means of comparing and calculating the switching time of the switching switch and the total switching time of the entire device with the set value. For excellent load tap switching device that can detect abnormalities in the entire device more reliably than devices and can detect failures due to aged deterioration of mechanical parts that were difficult to predict A monitoring device can be provided.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の負荷時タップ切換装置用監視装置の基
本的構成を示すブロック図、第2図は負荷時タップ切換
装置の動作シーケンス図、第3図は本発明の一実施例を
示す構成図、第4図は第3図の演算判定部のシステムフ
ローチャート、第5図は切換開閉器の切換動作を示すシ
ーケンス図、第6図は同じく回路図である。 TW……タップ巻線、T1,T2……タップ、M1,M2……タッ
プ選択器、1……切換開閉器、2,2′……切換時間検出
部、3……総切換時間検出部、4……タップ位置検出
器、5……ガス温、ガス圧検出器、6……受信部、7…
…演算判定部、8……光ファイバー、9……コネクタ
ー、10……変圧器タンク、88R/L……電動操作機構内電
磁接触器。
FIG. 1 is a block diagram showing a basic structure of a monitoring device for a load tap switching device of the present invention, FIG. 2 is an operation sequence diagram of the load tap switching device, and FIG. 3 is an embodiment of the present invention. FIG. 4 is a configuration diagram, FIG. 4 is a system flow chart of the operation determining unit of FIG. 3, FIG. 5 is a sequence diagram showing a switching operation of the switching switch, and FIG. 6 is a circuit diagram thereof. TW ... tap winding, T 1, T 2 ... taps, M 1, M 2 ... tap selector, 1 ... diverter switch, 2,2 '... switching time detecting unit, 3 ... total switching Time detection unit, 4 ... Tap position detector, 5 ... Gas temperature, gas pressure detector, 6 ... Reception unit, 7 ...
… Calculation judgment part, 8 …… Optical fiber, 9 …… Connector, 10 …… Transformer tank, 88R / L …… Electromagnetic contactor in the electric operation mechanism.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】変圧器タップ巻線のタップを任意に選択す
るタップ選択器と、選択されたタップに流れる負荷電流
を遮断し、タップを切換える切換開閉器と、制御装置か
らの上げ下げ信号を受けて動作し、前記タップ切換器と
切換開閉器を所定の切換順序で切換える電動操作機構か
ら構成された負荷時タップ切換装置において、 前記切換開閉器の切換時間を検出する開閉器切換時間検
出部と、電動操作機構の切換時間を検出する総切換時間
検出部と、少なくともこれら前記両検出部の時間信号値
と予め設定された設定値とを比較判定する演算判定部と
を設けたことを特徴とする負荷時タップ切換装置用監視
装置。
Claim: What is claimed is: 1. A tap selector for arbitrarily selecting a tap of a transformer tap winding, a switching switch for interrupting a load current flowing through the selected tap and switching the tap, and a rise / fall signal from a control device. And a switch switching time detecting unit for detecting a switching time of the switching switch, wherein the tap switching device and the switching switch are switched in a predetermined switching order. A total switching time detecting unit for detecting a switching time of the electric operating mechanism, and an operation determining unit for determining at least a time signal value of both the detecting units and a preset setting value. Monitoring device for tap switching device under load.
JP63234761A 1988-09-21 1988-09-21 Monitoring device for tap switching device under load Expired - Lifetime JPH081861B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63234761A JPH081861B2 (en) 1988-09-21 1988-09-21 Monitoring device for tap switching device under load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63234761A JPH081861B2 (en) 1988-09-21 1988-09-21 Monitoring device for tap switching device under load

Publications (2)

Publication Number Publication Date
JPH0283910A JPH0283910A (en) 1990-03-26
JPH081861B2 true JPH081861B2 (en) 1996-01-10

Family

ID=16975942

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63234761A Expired - Lifetime JPH081861B2 (en) 1988-09-21 1988-09-21 Monitoring device for tap switching device under load

Country Status (1)

Country Link
JP (1) JPH081861B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3035734B2 (en) * 1997-06-27 2000-04-24 東京瓦斯株式会社 DMS detector, method for preparing the same, and detector tube for DMS
CN114089679B (en) * 2021-12-22 2023-07-21 全球能源互联网研究院有限公司 A control device for an on-load tap changer and its application method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62123916A (en) * 1985-11-20 1987-06-05 株式会社東芝 On-load tap changer

Also Published As

Publication number Publication date
JPH0283910A (en) 1990-03-26

Similar Documents

Publication Publication Date Title
KR100546728B1 (en) How to monitor tap selector
JPH081861B2 (en) Monitoring device for tap switching device under load
JPS60176213A (en) On-load tap changer
US4797670A (en) Redundant signal selector system
JP2695526B2 (en) Drive system abnormality diagnosis system for load tap changer
JPH02281718A (en) Automated monitoring device in tap switching device upon in loading
JPS63199408A (en) On-load tap changer
JPH0195506A (en) On-load tap changer
JP2003100529A (en) On-load tap changing device
JP7664866B2 (en) Electric operating device, electric operating mechanism, failure determination method
JPH0516846Y2 (en)
JP2000340435A (en) Tap changer under load
JP2531749B2 (en) Abnormality determination device for tap switching device under load
JPH01107620A (en) On-load tap changer
JP2690504B2 (en) Abnormality monitoring device for tap changer under load
JPS62213515A (en) On-load tap changer
JPH0775211B2 (en) Abnormality detection device for tap switching device under load
JPH0548052B2 (en)
JPH0787664A (en) Vacuum switch type load tap protector protection device
JPH0245415B2 (en)
JPS6362309A (en) Monitoring device for tap changer
JPS60189913A (en) On-load tap changer
JPH0646614B2 (en) Load tap switching device
JP2680040B2 (en) Abnormality detection device for tap changer under load
JPH01173613A (en) Abnormality detection circuit for vacuum switch type on-load tap changer