JPH0819680B2 - Slope greening method - Google Patents
Slope greening methodInfo
- Publication number
- JPH0819680B2 JPH0819680B2 JP19503191A JP19503191A JPH0819680B2 JP H0819680 B2 JPH0819680 B2 JP H0819680B2 JP 19503191 A JP19503191 A JP 19503191A JP 19503191 A JP19503191 A JP 19503191A JP H0819680 B2 JPH0819680 B2 JP H0819680B2
- Authority
- JP
- Japan
- Prior art keywords
- slope
- horizontal frame
- soil
- frame
- perforated plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 12
- 239000002689 soil Substances 0.000 claims description 31
- 230000001464 adherent effect Effects 0.000 claims description 2
- 241000196324 Embryophyta Species 0.000 description 8
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000004567 concrete Substances 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 238000010276 construction Methods 0.000 description 6
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000008635 plant growth Effects 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 244000025254 Cannabis sativa Species 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000009331 sowing Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000010902 straw Substances 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【発明の詳細な説明】Detailed Description of the Invention
【0001】[0001]
【産業上の利用分野】本発明は、道路、宅地又は河川等
に面した地山斜面、特に45°以上の急斜面の安定と緑
化を図るための斜面の緑化工法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a greening method for stabilizing and greening a natural slope facing a road, a residential land or a river, especially a steep slope of 45 ° or more.
【0002】[0002]
【従来の技術】従来の斜面緑化工法は、地質にもよる
が、勾配0°〜45°は種子散布工による芝草、雑草、
樹木類の緑化が実施される。勾配45°〜70°では客
土吹付け工法、法枠工と客土による緑化工法が実施され
る。70°以上の急斜面では、緑化が困難であり、コン
クリート壁、コンクリート吹付け工等が実施されてい
る。しかし最近では、図4に示すように、客土を支持す
る客土空間bを有するコンクリートブロックaを用いた
工法が行われている。この工法は、図5に示すように、
コンクリートブロックaを積み上げ、客土空間b内に客
土cを行い、植栽を行うものである。2. Description of the Related Art The conventional slope revegetation method has a gradient of 0 ° to 45 ° depending on the geology.
Tree planting is implemented. When the slope is 45 ° to 70 °, the soil spraying method, the framing method and the soil revegetation method are used. Greening is difficult on steep slopes of 70 ° or more, and concrete walls, concrete spraying work, etc. are being carried out. However, recently, as shown in FIG. 4, a construction method using a concrete block a having a soil space b for supporting soil has been performed. This construction method, as shown in FIG.
The concrete blocks a are piled up, and the soil c is placed in the soil space b for planting.
【0003】[0003]
【発明が解決しようとする課題】上記の従来技術には、
次のような問題点が存在する。 <イ>コンクリートブロックaの重量が大であるため、
施工が困難であり、特に急斜面での施工は多難である。 <ロ>コンクリートブロックaの躯体自体の占める面積
が大きいため、斜面の緑化面積が狭くなる。 <ハ>客土空間cが狭く客土量が少ないため、植物の成
育が悪く、枯死する場合が多い。DISCLOSURE OF THE INVENTION Problems to be Solved by the Invention
There are the following problems. <B> Since the weight of the concrete block a is large,
Construction is difficult, especially on steep slopes. <B> Since the area occupied by the skeleton itself of the concrete block a is large, the green area of the slope becomes small. <C> Since the soil space c is small and the soil volume is small, the growth of plants is poor and the plants often die.
【0004】[0004]
【課題を解決するための手段】本発明は、上記のような
問題点を解決するためになされたもので、急斜面におい
ても施工が容易に行え、しかも緑化面積及び客土量を増
大することができる斜面の緑化工法を提供することを目
的とする。即ち本発明は、斜面に沿って上下方向に縦枠
を構築し、かつこの縦枠を斜面上に所定の間隔をおいて
複数並列させ、断面略L字形の有孔板で構成した横枠
を、前記縦枠間に横方向に複数段設置し、この際に、横
枠と斜面により、斜面上部側を開口した略コ字形を形成
するよう横枠を設置し、前記略コ字形内部に客土を行い
植栽をすることを特徴とした、斜面の緑化工法である。
また、上記緑化工法において、斜面と略平行な横枠有孔
板の内側には、植物種子の付着体を設置したことを特徴
とする。SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and can be easily constructed even on a steep slope, and can increase the green area and the amount of soil. The purpose is to provide a greening method for slopes that can be done. That is, according to the present invention, a vertical frame is constructed in the vertical direction along a slope, and a plurality of the vertical frames are arranged in parallel on the slope at predetermined intervals to form a horizontal frame composed of a perforated plate having a substantially L-shaped cross section. A plurality of horizontal frames are installed between the vertical frames, and at this time, the horizontal frames are installed so that the horizontal frame and the slope form a substantially U-shape with the upper side of the slope open. This is a slope revegetation method characterized by soil and planting.
In addition, in the above-mentioned greening method, it is characterized in that an adhering body of plant seeds is installed inside the horizontal frame perforated plate substantially parallel to the slope.
【0005】[0005]
【実施例】以下、図面を参照しながら、本発明の一実施
例について説明する。 <イ>縦枠の構築(図2) 図2に示すように、緑化対象地山の斜面に沿って、上下
方向に縦枠1を構築し、かつこの縦枠1を斜面上に所定
の間隔をおいて複数並列させる。縦枠1は、現場打ち或
いはプレキャストコンクリートにより構築した鉄筋コン
クリート柱、又は鋼製の柱等であり、斜面にはアンカー
11により固定する。斜面の崩壊を抑止する必要がある
場合はロックボルト、アースアンカーにより定着すると
良い。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. <A> Construction of vertical frame (Fig. 2) As shown in Fig. 2, a vertical frame 1 is constructed in the up-down direction along the slope of the greening target ground, and the vertical frame 1 is arranged at predetermined intervals on the slope. Place multiple in parallel. The vertical frame 1 is a reinforced concrete column constructed by cast-in-place or precast concrete, a steel column, or the like, and is fixed to the slope by an anchor 11. If it is necessary to prevent the slope from collapsing, lock bolts and earth anchors should be used.
【0006】<ロ>横枠の構造(図3) 横枠2は、図3に示すように、有孔板を断面略L字形に
加工したものである。有孔板としては、金網板、エキス
パンドメタル、あるいは鋼板等に孔を開設したもの等が
使用できる。L字形有孔板の斜面と略平行に設置される
面は、客土が孔を通って崩れ落ちないように、孔の寸法
を小さくするとよい。有孔板に金網板等を使用する場合
には、両端部に有孔板と直交方向に突出するL型鋼等を
接合し、このL型鋼に縦枠1に固定するためのアンカー
ボルトの挿入孔22を開設する。また、有孔板に鋼板等
を用いる場合は、鋼板の両端部を上記のように直交方向
に曲げ加工し、アンカーボルトの挿入孔を開設する。な
お、金網板等を直接アンカーボルトで縦枠1に固定して
も良く、また有孔鋼板にL型鋼21を接合しても良い。
横枠2と縦枠1との接合部分は、その他種々の構造を採
用できる。<B> Structure of Horizontal Frame (FIG. 3) The horizontal frame 2 is, as shown in FIG. 3, a perforated plate processed into a substantially L-shaped cross section. As the perforated plate, a wire mesh plate, expanded metal, or a plate having holes formed in a steel plate or the like can be used. The surface of the L-shaped perforated plate that is installed substantially parallel to the inclined surface should have a small hole size so that the soil does not fall through the hole. When a wire mesh plate or the like is used for the perforated plate, an L-shaped steel protruding in a direction orthogonal to the perforated plate is joined to both ends, and an anchor bolt insertion hole for fixing the L-shaped steel to the vertical frame 1 Open 22. When a steel plate or the like is used as the perforated plate, both ends of the steel plate are bent in the orthogonal direction as described above to open the anchor bolt insertion hole. A wire mesh plate or the like may be directly fixed to the vertical frame 1 with anchor bolts, or an L-shaped steel 21 may be joined to a perforated steel plate.
Various other structures can be adopted for the joint portion between the horizontal frame 2 and the vertical frame 1.
【0007】<ハ>横枠の設置(図1、2、4) 横枠2は、図2に示すように、縦枠1間に横方向に配置
し、両端の挿入孔22にアンカーボルトを挿入し、縦枠
1の側面に打ち込んで固定する。この際に、図1に示す
ように、横枠2と斜面により、斜面上部側を開口した略
コ字形を形成するよう横枠2を設置する。このとき、図
4に示すように、斜面と略平行な横枠有孔板の内側に
は、植物種子の付着体4を設置する場合がある。この種
子付着体4は、水溶性の紙または藁等で作製したシート
状体あるいは網状体等に、植物の種子を付着させたもの
である。このように、客土の前に予め種子付着体4を設
置することによって、容易に横枠前面の内側に種子を蒔
くことができる。また、横枠2の孔から客土がこぼれ落
ちるのを抑止し、客土の崩壊を防止できる。<C> Installation of horizontal frame (FIGS. 1, 2, and 4) The horizontal frame 2 is arranged laterally between the vertical frames 1 as shown in FIG. 2, and anchor bolts are provided in the insertion holes 22 at both ends. Insert it and drive it into the side surface of the vertical frame 1 to fix it. At this time, as shown in FIG. 1, the horizontal frame 2 is installed so that the horizontal frame 2 and the slope form a substantially U-shape with the upper side of the slope open. At this time, as shown in FIG. 4, the plant seed adherent 4 may be installed inside the horizontal frame perforated plate substantially parallel to the slope. The seed adhering body 4 is obtained by adhering plant seeds to a sheet-like body or a net-like body made of water-soluble paper or straw. In this way, by preliminarily installing the seed adhering body 4 in front of the soil, seeds can be easily sown on the inner side of the front surface of the horizontal frame. Further, it is possible to prevent the soil from spilling through the holes of the horizontal frame 2 and prevent the soil from collapsing.
【0008】<ニ>客土、植栽(図1) 横枠2の設置後、図1に示すように、横枠2と斜面によ
り包囲される空間に客土3を行う。以上のように、横枠
2の設置と客土3を繰り返して行い、客土3の安定のた
め斜面の下方から上方に順次施工を行って、必要な斜面
の上部まで施工する。なお、横枠2の上下方向の設置間
隔を調整することによって、客土量を調整できるため、
設置間隔は植栽する植物の種類により選択すると良い。
横枠2の設置と客土3の終了後、横枠2と客土3により
造成された斜面の全面に植栽を行う。この場合、横枠2
の上下方向の間隔には樹木等を植栽し、横枠2の前面に
は草類を植生すると良い。なお、客土3を行った後に、
横枠2の前面内側に植物種子を蒔く作業は多少煩雑であ
るが、予め種子付着体4を設置してある場合はその作業
を省略できる。<D> Soil and Planting (FIG. 1) After the horizontal frame 2 is installed, as shown in FIG. 1, the soil 3 is placed in the space surrounded by the horizontal frame 2 and the slope. As described above, the horizontal frame 2 and the soil 3 are repeatedly installed, and in order to stabilize the soil 3, the construction is sequentially performed from the lower side of the slope to the upper side, and the construction is performed up to the upper side of the required slope. In addition, by adjusting the installation interval in the vertical direction of the horizontal frame 2, the amount of soil can be adjusted,
The installation interval should be selected according to the type of plant to be planted.
After the horizontal frame 2 is installed and the soil 3 is completed, planting is carried out on the entire slope formed by the horizontal frame 2 and the soil 3. In this case, the horizontal frame 2
It is advisable to plant trees and the like in the vertical intervals of and to plant grass in front of the horizontal frame 2. In addition, after performing the visit soil 3,
The operation of sowing the plant seeds on the inner side of the front surface of the lateral frame 2 is somewhat complicated, but if the seed adhering body 4 is installed in advance, the operation can be omitted.
【0009】[0009]
【本発明の効果】本発明は以上説明したようになるた
め、次のような効果を得ることができる。<イ>横枠は
金網等の有孔板により形成するため、軽量であり、急斜
面においても施工が容易である。Since the present invention has been described above, the following effects can be obtained. <A> Since the horizontal frame is formed of a perforated plate such as a wire mesh, it is lightweight and easy to install even on a steep slope.
【0010】<ロ>横枠は有孔であるため、横枠前面に
も植栽が可能であり、斜面の緑化面積が増大する。<B> Since the horizontal frame is perforated, it is possible to plant even on the front surface of the horizontal frame, and the green area of the slope increases.
【0011】<ハ>横枠と斜面との間には広い客土空間
が確保され、しかも横枠が有孔のため客土が斜面全体に
連続する。従って、客土量を増大させることができ、良
好な植物の成育環境が造られる。<C> A wide soil space is secured between the horizontal frame and the slope, and since the horizontal frame is perforated, the soil is continuous over the entire slope. Therefore, the amount of guest soil can be increased, and a favorable plant growth environment can be created.
【0012】<ニ>客土の前に予め種子付着体を設置す
ることによって、容易に横枠前面の内側に種子を蒔くこ
とができる。また、横枠孔から客土がこぼれ落ちるのを
抑止し、客土の崩壊を防止できる。<D> By installing the seed adhering body in front of the soil, the seeds can be easily sown on the inner side of the front surface of the horizontal frame. Further, it is possible to prevent the soil from spilling from the horizontal frame hole and prevent the soil from collapsing.
【図1】 客土、植栽終了後の説明図[Fig.1] Illustration of the soil after planting
【図2】 縦枠、横枠の設置方法の説明図[Fig. 2] An explanatory view of a method of installing a vertical frame and a horizontal frame.
【図3】 横枠の説明図FIG. 3 is an explanatory diagram of a horizontal frame.
【図4】 種子付着体を設置した状態の説明図FIG. 4 is an explanatory view of a state in which a seed adhering body is installed.
【図5】 従来のコンクリートブロックの説明図FIG. 5 is an explanatory view of a conventional concrete block.
【図6】 従来のコンクリートブロックによる緑化工法
の説明図FIG. 6 is an explanatory diagram of a conventional greening method using a concrete block.
Claims (2)
かつこの縦枠を斜面上に所定の間隔をおいて複数並列さ
せ、 断面略L字形の有孔板で構成した横枠を、前記縦枠間に
横方向に複数段設置し、この際に、横枠と斜面により、
斜面上部側を開口した略コ字形を形成するよう横枠を設
置し、 前記略コ字形内部に客土を行い植栽をすることを特徴と
した、 斜面の緑化工法。1. A vertical frame is constructed vertically along a slope,
Moreover, a plurality of the vertical frames are arranged in parallel on the slope at a predetermined interval, and a horizontal frame composed of a perforated plate having a substantially L-shaped cross section is installed in a plurality of stages in the horizontal direction between the vertical frames. By the horizontal frame and the slope,
A slope revegetation method characterized in that a horizontal frame is installed so as to form an approximately U-shape with an opening on the upper side of the slope, and the soil is planted by making soil inside the approximately U-shape.
植物種子の付着体を設置した、請求項1記載の斜面の緑
化工法。2. Inside the horizontal frame perforated plate that is substantially parallel to the slope,
The slope greening method according to claim 1, wherein a plant seed adherent is provided.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19503191A JPH0819680B2 (en) | 1991-07-10 | 1991-07-10 | Slope greening method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19503191A JPH0819680B2 (en) | 1991-07-10 | 1991-07-10 | Slope greening method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0517949A JPH0517949A (en) | 1993-01-26 |
| JPH0819680B2 true JPH0819680B2 (en) | 1996-02-28 |
Family
ID=16334387
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP19503191A Expired - Fee Related JPH0819680B2 (en) | 1991-07-10 | 1991-07-10 | Slope greening method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0819680B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06294141A (en) * | 1993-04-08 | 1994-10-21 | Furii Kogyo Kk | Slope face greening method |
| KR100467264B1 (en) * | 2000-11-30 | 2005-01-24 | (주)한맥기술 | structure for the leading aforestation of the cutting ground slope |
| CN109629581A (en) * | 2018-12-17 | 2019-04-16 | 中国十七冶集团有限公司 | A kind of non-support high gradient slope covers green construction method |
-
1991
- 1991-07-10 JP JP19503191A patent/JPH0819680B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0517949A (en) | 1993-01-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3053071B2 (en) | Natural ecological self-restoration type slope construction method and slope structure | |
| JPH0819680B2 (en) | Slope greening method | |
| JP3054749B2 (en) | Construction method of soundproof wall | |
| KR100432855B1 (en) | Revetment construction method | |
| JP3066785B2 (en) | Planting method | |
| JPS6011168Y2 (en) | Earth retaining wall structure for slopes | |
| JPH06294141A (en) | Slope face greening method | |
| JP2001323472A (en) | Greening method of special precast method | |
| JP2534473Y2 (en) | Storage device for customer bags for slope greening protection | |
| KR101138192B1 (en) | Afforestation method of vertical wall and shelf assembly thereof | |
| JPS5820338B2 (en) | Slope stabilization method | |
| JP3333994B2 (en) | Tree support device | |
| JP2000045288A (en) | Greening method | |
| JP3711439B2 (en) | Planting tree root pot fixture and its construction method | |
| JPH111927A (en) | Earth retaining method for slope, and structure of earth retaining wall therefor | |
| JPH09151469A (en) | Wall panel for multiple nature | |
| JPH0351371Y2 (en) | ||
| JP2959344B2 (en) | Precast concrete formwork | |
| JP4387494B2 (en) | Tree planting member | |
| KR200418659Y1 (en) | Vegetation sac mat installation structure of river bank | |
| JP2005290669A (en) | Retaining wall for planting and construction method of the planting retaining wall | |
| JP3180215B2 (en) | Soil installation method | |
| JP2003293347A (en) | Greening structure and method of steel sheet pile wall | |
| JPH09125422A (en) | Retaining wall for planting | |
| JP2000220147A (en) | Greening method using anticorrosive wire netting in protection work for face of slope |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |